Plan_Set_-_Umpqua_Repairs_2016-17_Signed_v3.1.pdf
PDF 13 MB Posted
- Attached to
- OR FS ERFO 2016(1)-15(3), Umpqua Repairs 2016
- Solicitation number
- 69056718B000013
About this file
Plans
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX TO SHEETS
A.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft
D c m y fi le s p w p r o d u c ti o n d o r e f1 a b .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
P
M
M a y
C h e c k e d b y
D e s ig n e d b y
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS9
A
F e b r u a r y
U
S C m y fi le s p w p r o d u c ti o n d o r e f1 a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3 OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
N
VICINITY MAP
A.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 a d .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
a y
C h e c k e d b y
D e s ig n e d b y
F N
N F
N F
C a ll a h a n C r e e k
NP 2925
Drew
Development Rd 3201
National Forest
A p p r o x m il e s
F r o m D r e w t o M e d fo r d
H a tc h e t
C re e k
D r e w C r e e k
NF 800
E lk C re e k
NF 300
Devil Knob Rd or
NF 1610
T ille r
T ra il
H w y
To m
C re ek
B r o w n ie
C r e e k
NP 3232
S F o r k C o w C r e e k
NF 3232
E Fork Evans Creek Road
NF 32
USFS Road 850
NF 32
NF 32
NF 500 NF 31
NF 600
NF 900
NF 6610
Elkhorn Ridge Rd k e er C e ni pr a g u
S
Abbot Praire Rd or
NF 6620
BLM 290
Elder Mill Rd
Timber Creek Rd
Hawk Creek
Flat Creek
-1
E-2
Elk Creek Road
Elk CreekFlat Creek Rd
SCALE IN MILES
5 105
NATIONAL FOREST
UMPQUA
OPTION X
122°59'12.37"W
42°53'02.33"N
MP 7.27
Forest Road 3220
Green Butte Road
SCHEDULE A
122°87'63.10"W
42°86'14.60"N
MP 0.17
Forest Road 1613
Brownie Creek Road
OPTION X
122°42'50.15"W
42°53'58.09"N
MP 7.03
Forest Road 2925
Black Canyon Road
OPTION X
122°43'11.62"W
42°53'21.24"N
MP 8.62
Forest Road 2925
Black Canyon Road
OPTION X
122°57'16.44"W
42°46'11.82"N
MP 6.37
Forest Road 3232
South Fork Cow Creek Road
Waste Pit
122°55'38.67"W
42°45'58.81"N
Forest Road 3232
Peavine Quarry
Waste Site
122°34'40.80"W
42°53'10.32"N
Forest Road 3220
Hatchet Quarry
Waste Site
122°42'49.61"W
42°54'11.82"N
Forest Road 2925
Unnamed Site 2
N
VICINITY MAP
A.5
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 a e .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
p r il
C h e c k e d b y
D e s ig n e d b y
Wildwood
Dorena
Cottage Grove
Latham Walden
Saginaw
Walker
Culp Creek Disston
D oren a Lake
Junetta Creek y w
H cifi c a
P woR reviR dR wo R r evi R
Shoreview Dr.
woR rev iR d R sreteeT k ee rC dR
Row River Rd
Reservoir
Dorena
BLM Rd 20-2-28 t a
R k e er
C dR
Mountain Ridge
Pine Hill-Bear
US Forest Service Rd 17
Laying Creek Rd.
Brice Creek Rd.
Row River Rd Laying Creek
COUNTY
LANE
L a k e
C o tt a g e G ro v e
Blue Mountain County Park
Service Rd. 1751
US Forest
FOREST
NATIONAL
UMPQUA
SCALE IN MILES
0 1 21
SCHEDULE A
122°43'33.13"W
43°46'41.12"N
MP 5.56
Forest Road 1751
Junetta Creek Road
Waste Site
122°44'14.28"W
43°46'51.96"N
Forest Road 1751
Middle Fork Junetta Quarry
NATIONAL FOREST
UMPQUA
Cottage Grove
Walden
Dorena
Culp Creek Disston
Wildwood
Roseburg
P a c if ic H w y
N d R
VICINITY MAP
138 333
A.6
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 a f.
d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
A p r il
C h e c k e d b y
D e s ig n e d b y
Saginaw
SCALE IN MILES
5 105 woR reviR
Analauf
Yoncalla
Drain
Oakridge d R ta o b ma etS k e er
C
N F S
Dorena Lake
Park
County
Blue Mountain
Row River Rd Cottage Grove Lake
Mountain Ridge
Pine Hill-Bear
Laying Creek
US Forest Service Rd 17
Laying Creek Rd.
US Forest Service Rd. 1751
Hills Creek Lake
COUNTY
DOUGLAS
Reservoir
Dorena
COUNTY
LANE
SCHEDULE A
122°31'22.40"W
43°31'37.70"N
MP 23.23
Forest Road 38
Steamboat Creek Road
Waste Site
122°34'40.80"W
43°28'34.32"N
MP 2.1
Forest Road 3825
Unnamed Site 1
S o u th
NF-29
Jackson
Creek
Rd
Jackson
Creek kr o F
W st u ot
S d
R k r
C
1-
D
R M
L B
N
VICINITY MAP
A.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 a g .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
A p r il
C h e c k e d b y
D e s ig n e d b y
OPTION X
122°51'43.06"W
42°59'21.08"N
MP 0.81
Forest Road 2810
Johnnie Springs Road
Waste Site
122°53'29.70"W
42°57'53.58"N
Garbage Quarry
Tiller
Umpqua
Milo
Days Creek
N F -2
R iv e r
U m pq u a
S o u th
NATIONAL FOREST
UMPQUA
SCALE IN MILES
1 21
Drew
T iller
Trail
H w y
Acaademy
Milo Adventist
Douglas Co. Hwy 1 Tiller Trail Hwy
Days Creek Rd.
Days Creek
Stouts Creek Rd.
BLM Rd 30
BLM Rd 13-0
Johnnie Springs Rd
Galesville Reservoir
River to H w y a n d C le a rw a te r, O
R
.3 m ile s fr o m T ill e r, O
R
Interstate 5 and Canyonville, OR
7.2 miles from Days Creek, OR to
S. Umpqua Road
Shively Creek Rd
BLM RD 31-4-14.0
BLM RD 31-4-21
BLM RD 31-4-27
Upper Cow Creek Rd
Sheet and Description
UMPQUA 2016 UMPQUA 2016 UMPQUA 2016 UMPQUA 2016
BROWNIE CREEK
ROAD MP 0.17
JUNETTA CREEK
ROAD MP 5.56
STEAMBOAT
CREEK ROAD MP
23.23 ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL ALL
A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL LPSM ALL ALL
A0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 300 110 50 460
A0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,000 750 170 190 2,110
A0180 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (CHECK DAM) LNFT 125 325 400 20 870
A0200 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM LNFT 20 5 25
A0220 15802-0000 WATERING FOR DUST CONTROL LPSM ALL ALL
A0240 20220-1000 REMOVAL, INDIVIDUAL TREE EACH 4 4
A0260 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0280 20301-2600 REMOVAL OF STRUCTURAL PLATE PIPE EACH 1 1
A0300 20401-0000 ROADWAY EXCAVATION CUYD 1,121 782 462 635 3,000
A0320 20415-0000 SELECT TOPPING CUYD 309 207 175 309 1,000
A0340 20702-0100 GEOTEXTILE FILTER, CLASS 1, TYPE A (NON-WOVEN) SQYD 800 2,200 150 3,150
A0360 25105-0300 KEYED RIPRAP, METHOD A, CLASS 3 CUYD 100 10 110
A0380 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED CUYD 3,432 368 3,800
A0400 25301-0000 GABIONS SQFT 420 30 450
A0420 25501-0000 MECHANICALLY STABILIZED EARTH WALL SQFT 672 672 Contract Quantity
A0440 25701-0200 CONTRACTOR FURNISHED MECHANICALLY STABILIZED EARTH WALL DESIGN LPSM ALL ALL
A0460 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 810 165 160 115 1,250
A0480 30210-0000 BEDDING AND BACKFILL AGGREGATE CUYD 500 50 550
A0500 60103-0000 CONCRETE, HEADWALL EACH 2 2
A0520 60201-1000 36-INCH PIPE CULVERT LNFT 60 5 65
A0540 60302-0000 STRUCTURAL PLATE PIPE-ARCH (24-FOOT SPAN, 12-FOOT RISE) LNFT 80 80
A0560 60704-0000 CLEANING CULVERT IN PLACE EACH 1 1 2
A0580 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 30 30 30 10 100
A0600 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 30 30 30 10 100
A0620 62301-0000 GENERAL LABOR HOUR 10 10 10 10 40
A0640 62401-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH SQYD 1,000 400 300 100 1,800
A0660 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 275 25 300
A0680 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4 4 4 16
A0700 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 68 68 68 68 272
-J un -2
1:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
R F
S E
R
FO
6( 1)
-1 5(
3) S
C H
ED
U
LE
A
.x ls x] Sh ee t
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.1FS ERFO 2016(1)-15(3)
FS ERFO 2017(1)-15(1)OR
SHEET
NUMBER
Sheet and Description
SITE 1 SITE 2 SITE 3 SITE 4 SITE 5
BLACK
CANYON ROAD
MP 7.03
BLACK
CANYON ROAD
MP 8.62
GREEN BUTTE
ROAD MP 7.27
SOUTH FORK
COW CREEK
ROAD MP 6.37
JOHNNIE
SPRINGS
ROAD MP 0.81
ALLOWANCE Bid Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
X0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0080 15401-0000 CONTRACTOR TESTING LPSM ALL
X0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 100 50 50 50 25 275
X0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 200 50 200 100 50 600
X0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (Check Dam) LNFT 350 100 150 50 650
X0180 20220-1000 REMOVAL, INDIVIDUAL TREE EACH 4 1 5
X0200 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1 2
X0220 20401-0000 ROADWAY EXCAVATION CUYD 168 147 274 595 816 2,000
X0240 20415-0000 SELECT TOPPING CUYD 104 28 52 57 259 500
X0260 20420-0000 EMBANKMENT CONSTRUCTION CUYD 50 50 50 50 45 245
X0280 20702-0100 GEOTEXTILE FILTER, CLASS 1, TYPE A (NON-WOVEN) SQYD 400 265 420 115 1,200
X0300 25105-0300 KEYED RIPRAP, METHOD A, CLASS 3 CUYD 300 218 182 700
X0320 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED CUYD 1,552 448 2,000
X0340 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 77 24 21 160 33 315
X0360 30302-1000 DITCH RECONDITIONING LNFT 150 25 175
X0380 60201-0600 18-INCH PIPE CULVERT LNFT 40 5 45
X0400 60201-1000 36-INCH PIPE CULVERT LNFT 40 5 45
X0420 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 160 130 30 320
X0440 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 145 145
X0460 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 145 145
X0480 62301-0000 GENERAL LABOR HOUR 50 50
X0500 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4 4 4 18 34
X0520 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 68 68 68 68 68 340
SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
-J un -2
:0
A M c:
\m yf ile s\ pw
_p ro du ct io n\ d0
O
R F
S E
R
FO
7( 1)
-1 5(
1) O
PT
IO
N X
.x ls x] Sh ee t
STATE PROJECT
B.2FS ERFO 2016(1)-15(3)
FS ERFO 2017(1)-15(1) OR
SHEET
NUMBER
BROWNIE CREEK ROAD MP 0.17
JUNETTA CREEK ROAD MP 5.56
1+90 to 5+50
MAINLINE TYPICAL
VariesVaries
1+17 to 2+00
APP01
VariesVaries
(APPROACH ROAD)
BROWNIE CREEK ROAD MP 0.17
1+00 to 5+71.52
MAINLINE
Varies Special Rock Embankment
See Sheet G.1
TYPICAL SECTION
C.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 c a .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
a y
W
W it u c k i
S
B e lg a r d
C h e c k e d b y
D e s ig n e d b y
NO SCALE
LC
Profile grade
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
3:1 3:1
Existing ground method 2, 8" compacted depth
Roadway aggregate, NOTE:
LC
Profile grade
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
3:1 3:1
8" compacted depth
Roadway aggregate, method 2, 14'
4% 4%
4% 4% ty p
V a r ie s
LC
Profile grade
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
3:1 3:1
Existing ground method 2, 8" compacted depth
Roadway aggregate, 4% 4% ty p
V a r ie s ty p
V a r ie s
Varies (10' min)
15.5'
Varies
1:
1.2
Varies at a rate of 25:1 between widths.
2. Adjust to match existing road width or as approved by CO. Taper superelevation. Do not exceed 6% superelevation.
1. Superelevate roadway on curves to match the existing roadway
1+75 to 2+50
MAINLINE TYPICAL
STEAMBOAT CREEK ROAD MP 23.23
STEAMBOAT CREEK ROAD MP 23.23
2+95 to 4+50
2+50 to 2+75
1+35 to 1+80
MAINLINE TYPICAL
L im it s
C o n s tr u c ti o n
Varies
NOTE:
TYPICAL SECTIONS
C.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 c b .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
a y
W
W it u c k i
S
B e lg a r d
C h e c k e d b y
D e s ig n e d b y
2.
1.
Existing ground
NO SCALE
Ditch foreslope
LC
Profile grade
C o n s tr u c ti o n l im it s
C o n s tr u c ti o n l im it s
3:1 3:1
Existing ground
4% method 2, 8" compacted depth
Roadway aggregate, ty p
LC
Profile grade
C o n s tr u c ti o n l im it s
3:1 3:1
Existing ground
4% method 2, 8" compacted depth
Roadway aggregate, ty p
See Sheet G.7
Gabions
15'
4%
4%
Varies
Varies Varies
Varies
15' at a rate of of 25:1 between widths.
Adjust to match existing road width or as approved by CO. Taper
Superelevate roadway on curves to match the existing roadway
2+75 to 2+95
MAINLINE TYPICAL
STEAMBOAT CREEK ROAD MP 23.23
1:3
C o n s tr u c ti o n L im it s
Stabilized Earth Wall
Mechanically
See Sheets G - sheets
TYPICAL SECTION
C.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 c c .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
a y
W
W ik tu c k i
S
B e lg a r d
C h e c k e d b y
D e s ig n e d b y
3.
2.
1.
LC
Profile grade
Existing ground
10-12'
8" compacted depth
Roadway aggregate, method 2, NO SCALE
Existing ground
Drainage pipe
Finished slope ty p
15' 2'
4% 4%
Varies
Varies
C o n s tr u c ti o n l im it s
Varies
3:1
NOTE:
at a rate of 25:1 between widths.
Adjust to match existing road width or as approved by CO. Taper mechanically stabilized earth wall design.
MSE wall length may change upon approval of contractor furnished
Superelevate roadway on curves to match the existing roadway
CP
CP
CP
CP
CP
CP
CP
,0
.5
,0
.1
-3.8809%
-8.1652%
.7
+2.0000%
.9
117' VC
K = 27
SSD = 310'
164' VC
K = 16
10ORB
P P
A
P O T
.0
P C
.2
P C
C
.2
P C
C
.6
P T
.6
P C
.0
P T
.5
P O
T
.5
CUYD
EXC.
CUYD
EMB.
6+00 5+00 4+00 3+00 2+00 1+00
970 970
975 975
980 980
985 985
990 990
995 995
1000 1000
1005 1005
1010 1010
Curve= BRO02
D
R= 430.00'
T= 45.17'
L= 90.00'
Curve= BRO03
D
R= 180.00'
T= 21.81'
L= 43.40'
D
R= 160.00'
T= 57.27'
L= 110.00'
Curve= BRO04
Curve= BRO01
D
R= 225.00'
T= 43.81'
L= 86.54'
Curve= APP02
D
R= 120.00'
T= 21.57'
L= 42.68'
MP 0.17
BROWNIE CREEK
D.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 d a .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
J u n e
W
W it u c k i
S
B e lg a r d
C h e c k e d b y
D e s ig n e d b y
Existing edge of gravel
Existing fence
END PROJECT
CONNECTION DETAIL
Existing Roadway Tie-in
BEGIN PROJECT
OHW
LC
pavement structure
See C-Sheets for
NTS
Existing grade
Profile grade
See Sheet D.2
Line to be constructed
Slope stake limits
1+00.00
MP 0.17
BROWNIE CREEK
5+71.52
MP 0.17
BROWNIE CREEK
352 523
Existing apparant centerline
Construction limits
1+00.00
3+30.00=
See F-Sheets for details
Install 24' structural plate pipe-arch
3+72.20 Remove existing structural plate pipe-arch
CP
CP
APP01
APPROACH ROAD
MP 0.17
BROWNIE CREEK
D
R= 120.00'
T= 21.57'
Curve= APP02
L= 42.68'
N
P
O T
.0
P C
.6
P T
.3
P O
T
.9
CUYD
EXC.
CUYD
EMB.
1+00 2+00
D.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 d b .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
a y
W
W it u c k i
S
B e lg a r d
C h e c k e d b y
D e s ig n e d b y
O R
B
10PPA
.4
.4
-4.0000%
.4
-8.8056%
+2.0000%
.1
60' VC
K = 6
20' VC
K = 4
SSD = 234'
BEGIN APP01 END APP01
CONNECTION DETAIL
NTS
Existing edge of gravel
Profile grade
Existing ground
Slope stake limits
Line to be constructed
2+00.00
Approach Road APP01
BROWNIE CREEK MP 0.17
1+00.00
Approach Road APP01
BROWNIE CREEK MP 0.17
Existing Roadway Tie-in pavement structure
See C-Sheets for
Existing fence
Construction Limits
C P
C P
C P
C P
0 9
N
MP 5.56
ROAD
JUNETTA CREEK
CUYD
EXC.
CUYD
EMB.
3+00 4+00
1+00 2+00 5+00 6+00
Curve= JUNET02 D
R= 100.00' T= 72.64'
L= 125.64'
Curve= JUNET01
D
R= 400.00'
T= 35.09'
L= 70.00'
Curve= JUNET04
R= 100.00' T= 14.27' L= 28.36'
D
Curve= JUNET03
D
R= 175.00'
T= 48.70'
L= 95.00'
D.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 d c .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
J u n e
W
W it u c k i
S
B e lg a r d
C h e c k e d b y
D e s ig n e d b y
,0
.0
.2
120' VC
.7
60' VC
.3
-3.60%
+2.00% -0.45%
POT 1
+00
.001
PC 1
+37
.74
P C
C
.7
3 P C
C
.3
P T
.3
P C
.6
P T
.0
P O
T
.8
END PROJECT
BEGIN PROJECT
CONNECTION DETAIL
Existing Roadway
Tie-in pavement structure
See C-Sheets for
NTS
Existing edge of gravel
Profile grade
Existing ground
Line to be constructed
Slope stake limits
5+50.00
MP 5.56
JUNETTA CREEK ROAD
1+90.00
MP 5.56
JUNETTA CREEK ROAD
Proposed edge of gravel
See Sheet G.1
Special Rock Embankment, mechanically placed
See F-Sheets for detail
3+28.89
Install 36" culvert approved by CO.
Culvert to be field fitted and
Install 36" culvert
.6
,0
.9
.7
,0
.1
+5.2 5%
CPCP
CPCP
CPCP
CPCPCPCPCPCP
CPCPCPCP
CPCPCPCP
CPCPCPCP
CPCPCPCPCPCPCP
CPCPCPCPCPCPCP
CP
CPCPCPCPCPCP
CPCPCPCPCPCPCP
CPCP
CPCPCPCPCPCPCPCPCPCPCPCP
CPCPCPCPCPCPCPCPCP
CPCPCPCPCP
CPCPCPCPCPCPCPCPCP
CPCPCPCPCPCP
985 990
5 1000
P O
T
.0
P C
.5
P R
C
.7
P T
.9
P C
.6
P C
C
.1
9 4
P T
.1
P C
.3
5 P T
.9
.3
,0
.7
+5.2 5%
+5.2 5%
N
MP 23.23
ROAD
STEAMBOAT CREEK
NTS
Curve= STEAM30 D
R= 350.00'
T= 32.19'
L= 64.20'
Curve= STEAM29
D
R= 550.00'
T= 45.71'
L= 91.21'
Curve= STEAM33
D
R= 100.00'
T= 31.22'
L= 60.52'
Curve= STEAM32
D
R= 350.00'
T= 30.07'
L= 60.00'
Curve= STEAM31
D
R= 300.00'
T= 36.00'
L= 71.66'
CUYD
EXC.
CUYD
EMB.
5+00 4+00 3+00 2+00 1+00
984 984
988 988
992 992
996 996
1000 1000
1004 1004
1008 1008
1012 1012
1016 1016
D.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 d d .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
J u n e
W
W it u c k i
S
B e lg a r d
C h e c k e d b y
D e s ig n e d b y
CONNECTION DETAIL
Existing Roadway
Tie-in
BEGIN PROJECT
END PROJECT
pavement structure
See C-Sheets for
Existing ground
Profile grade
Line to be constructed
Existing roadway
Slope stake limits
Existing edge of gravel
1+35.00
MP 23.23
STEAMBOAT CREEK ROAD
4+50.00
MP 23.23
STEAMBOAT CREEK ROAD
Proposed edge of pavement
(Unknown Size)
Existing Culvert
END MSE WALL
BEGIN MSE WALL
Elev. 1003.18
10+95.31
MSEWL02
10+95.31
3+34.15=
10+00.00
2+44.00=
Elev. 998.71
10+00.00
MSEWL02
See G.4 - G.6 for details mechanically stabilized earth wall design) earth wall (Contractor furnished
Construct mechanically stabilized
See G-Sheets for details
Construct Gabion wall
MSE Wall alignment
See G-Sheets for details
Construct Gabion wall
SURVEY CONTROL
D.5
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 d k .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
A p r il
C h e c k e d b y
D e s ig n e d b
SCALE IN FEET
N
BROWNIE CREEK ROAD
SOIL EROSION CONTROL PLAN
E.1
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 e a .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
a y
W
W it u c k i
S
B e lg r a d
C h e c k e d b y
D e s ig n e d b
2. Contours shown represent existing topography prior to construction.
1. Adjust to meet field conditions as approved by the CO.
Existing fence
Direction of flow arrow
Existing Contour
Existing Culvert
Silt fence
Fiber roll
0 20 40 60 8020
LEGEND:
berms
Temporary diversion
Check dam (Fiber roll)
JH
SCALE IN FEET
JUNETTA CREEK ROAD
SOIL EROSION CONTROL PLAN
E.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 e b .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(1)
a y
W
W it u c k i
S
B e lg a r d
C h e c k e d b y
D e s ig n e d b y
2. Contours shown represent existing topography prior to construction.
1. Adjust to meet field conditions as approved by the CO.
LEGEND:
Direction of flow arrow
Existing Contour
Existing Culvert
Silt fence
Fiber roll
0 20 40 60 8020
Proposed 36" culvert
Existing edge of gravel
Existing edge of gravel berm
Temporary diversion
Check dam (Fiber roll) temporary diversion berm
Construct soil erosion control, Underground seasonal speepage
SCALE IN FEET
CPCP
CPCP
CPCP
CPCP
STEAMBOAT CREEK ROAD
SOIL EROSION CONTROL PLAN
985 990
5 1000
OR
N
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
E.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 e c .d g
M a y
W
W it u c k i
S
B e lg a r d
C h e c k e d b y
D e s ig n e d b y
2. Contours shown represent existing topography prior to construction.
1. Adjust to meet field conditions as approved by the CO.
Existing edge of gravel
0 20 40 60 8020 apparent centerline
Existing
Direction of flow arrow
Existing Contour
Existing Culvert
Silt fence
Fiber roll
LEGEND:
Check dam (Fiber roll) berm
Temporary diversion
See Sheet E.7 (typ.)
installation along ditch.
Fiber roll
NO SCALE
157-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
DIVERSION CHANNELS
TEMPORARY
STATE PROJECT
NUMBER
SHEET
E.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
OR
U m y fi le s p w p r o d u c ti o n d o r e f1 e d .d g n
A p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
W
B
W
B
W
B B
W
T T
Ø when scheduled)
Silt fence (typ.
Roadway embankment
Roadway embankment
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
D
D D
D
SS
SS
SS SS
1.
2.
3.
4.
5.
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
When specified replace the portion of the diversion channel through the roadway embankment with temporary culvert. Compact temporary culvert backfill using one of the methods listed in Subsection 204.11(a).
See Erosion Control Section for temporary culvert diameter, riprap class, channel dimensions and quantities.
Use plastic liner or riprap along the entire length and width of the temporary diversion channel.
Construct channel at a minimum grade of 0.5 percent.
Do not construct with longitudinal joints if using a plastic liner. Bury the upstream edge of the liner a minimum of
A
A
BB
GeotextileGeotextile
Flow
Natural ground and secure with sandbags (typ.)
6" deep and secure with riprap or sandbags.
2'2'
Bury plastic liner 6" deep
2'2'
NOTE:
with plastic liner or riprap
Temporary diversion channel
REVISED: 7/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
W157-17
METHODS
TEMPORARY DIVERSION BERM
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
OR
U m y fi le s p w p r o d u c ti o n d o r e f1 e e .d g n
A p r il
Existing ground
Water surface elevation
OPTION B
OPTION A
OPTION C
OPTION D
Existing ground
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Concrete barrier
Concrete barrier
Concrete barrier
Water surface elevation membrane
Waterproof
Water surface elevation membrane
Waterproof
Water surface elevation
Existing abutment or pier elevation (min.)
Top of berm
Existing ground at time of construction
Diverted water level at time of construction
Diverted water level
Existing ground at time of construction
Diverted water level
Limit of work zone
Limit of work zone
Limit of work zone elevation (min.)
Top of berm elevation (min.)
Top of berm at time of construction
Diverted water level
(anchoring method to be approved)
Waterproof membrane m in
4'-6" m in m in
6" (min.) freeboard. Submit temporary stream diversion m in
NOTE:
1 4.
3.
2.
1.
membrane
Waterproof height of the sandbag barrier.
directed. Remove sediment when deposits reach half the berm daily. Repair as needed after rainfall events or as
While in use, inspect and maintain the temporary diversion given time.
Place a maximum of one diversion in the stream at any upper rows of sandbags above the joints in lower rows.
of bottom rows as there are vertical course. Overlap the
Place sandbags to form a pyramid by laying equal numbers plans for approval prior to installation.
minimum height equal to the water surface elevation with
As a minimum, provide a temporary diversion berm with a prefabricated or portable diversion berms, dams, etc.).
methods may be chosen (including any approved during construction operations. Alternate stream diversion
These options suggest configurations for diverting a stream
FIBER ROLL
(ft) (ft)
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACING
T I
M E
D A
T E
U
S E
R
E.6
STATE PROJECT
NUMBER
SHEET
U
S C u s to m a r m y fi le s p w p r o d u c ti o n d o r e f1 e f.
d g n .D
G N
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
e b r u a r y
C h e c k e d b y
D e s ig n e d b y
Drive stakes at each end and at 4' spacing
Excavate trench 2"
3' min.
3' min. or
1" x 1" Wood stake
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
Direction of runoff Fi ll slo pe disturbed areas
Runoff from as specified in plans
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Step 2: Backfill soil against fiber rolls
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
larger than fiber roll
Existing ground (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction soil to ground level
Backfilled and compacted
Slope t o
D ire c tio n o f R u n o ff
Flow
Slope uphill side of sediment wattle
Place excavated material on
Pay Lim its
Pay Lim its
" (m in.)
ove rlap
Wood stakes. See Note 3
1" x 1" or 1" Ø
3.
2.
1.
sp ac in g ch ar t
S ee F ib er R ol l
Stagger joints (typ.)
m in m in
2" min.
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
Fiber Roll
Fiber Roll
FIBER ROLL LAPPING DETAIL
fiber roll while staking.
fiber roll and space stakes at 4' max. Do not crush from fiber roll end angles towards the adjacent
Overlap fiber rolls 24" minimum. Drive stakes at 6" conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush and install fiber rolls
Step 1: Excavate trench
Direction of runof f from distur bed area s
16" min
CHECK DAM
GRADE
DITCH
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
SPACING (max.)
CHECK DAM
5%
4%
3%
2%
E.7
STATE PROJECT
NUMBER
SHEET
U
S C u s to m a m y fi le s p w p r o d u c ti o n d o r e f1 e g .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
A p r il
C h e c k e d b y
D e s ig n e d b y
NOTE:
(ft)
6" min.
Trench 2" min.
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Expose stakes 2" (min.) above top of fiber roll.
Drive stakes into undisturbed soil of trench bottom 16" (min).
2' (max) spacing.
Drive stakes at each end of the fiber roll and at
Stake fiber rolls in place with 1⅛" x 1⅛" wood stakes.
Install check dams in ditches perpendicular to the flowline.
Repair all rills or gullies and properly compact prior to installation.
requirements of the check dam device.
may be used as approved by the CO, to meet the functional
Check dams of fiber rolls, riprap, or gravel bags
9" Ø min.
Fiber roll
Trench 2" min.
PLAN
Flow
Flow
Se e
Not e
CROSS SECTION
See Note 6 the ends to prevent flow around
Curve ends upstream similar for flat-bottom ditches.
Check dam installation details are
V-ditch design shown.
See Note 5
Flow Line
STAKING DETAIL
FIBER ROLL
uphill side of fiber roll
Place excavated material on steeper than 5%.
log check dams on ditch grades sediment log. Do not use sediment
* Spacing calculated based on 9" Ø min
FIBER ROLL CHECK DAM
SILT FENCE
E.8
STATE PROJECT
NUMBER
SHEET
U
S C u s to m a m y fi le s p w p r o d u c ti o n d o r e f1 e i.
d g n .D
G N
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
e b r u a r y
C h e c k e d b y
D e s ig n e d b y
PLAN
Fasten fabric to posts.
around each post one full turn.
Fold geotextile fabric
Staple or tie
POSTS AT JOINTS
Section A fabric
Geotextile
Section B
Geotextile fabricTop of posts tied together.
Posts driven tightly together.
Steel or wood posts
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
4.
3.
2.
1.
Fi ll slo pe
Flow
T o e o f s lo p e
Flow
Flow
PLAN
ELEVATION
fo r s p a c in g
S e e n o te
Limits of clearing
Support mesh
Backfilled and compacted soil
Steel or wood post
(undisturbed)
Existing ground
Geotextile
6 ft. (max.) spacing without fence support.
10 ft. (max.) spacing with fence support.
m in m in
6" min. trench min.
4"
END DETAIL
ELEVATION
Fi ll sl op e
See Note 3
PLAN
T o e o f s lo p
Note 3See
Posts Detail
See End
End posts
See End Posts Detail
End posts
END POSTS DETAIL
PLAN
Geotextile fabric
Steel or wood post
Staple or tie
NOTE:
m in running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed
10.4 x 16 20301 -1900
20301 -2600
60103 -0000
60201 -1000
60302 -0000
60704 -0000
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
R
EM
O V A L
O F
S
TR
U C
TU
R A L
PL
A
TE
P
IP
E
C O
N C R
ET
E, H
EA
D
W A
LL
-I
N C
H P
IP
E
C U
LV
ER
T
S
TR
U C
TU
R A L
PL
A
TE
P
IP
E- A R
H
(2
4-
FO
O T
S
PA
N
-F
O O
T R
IS
E)
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH EACH EACH LNFT LNFT EACH Lt Rt Brownie Creek Road 3 330 1 2 80 Junetta Creek Road 5 44 1 60 1 46°52' A,GS,AS 1 x Steamboat Creek Road 1
PROJECT TOTAL 374 1 1 2 60 80 2
Allowable Pipe Material
A Aluminum AS Aluminized steel C Concrete GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw
_p ro du ct io n\ d0 or
-e f1
_f a.
pd f.
xl sx ]S he et
-J un -2
1:
P M
A
D es ig ne r
/2
D
C he ck er
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.1
SHEET
NUMBER
FS ERFO 2016(1)-15(3)
FS ERFO 2017(1)-15(1)OR
Note: The quantities shown hereon are approximate and are subject to field adjustments.
10.4 x 16 20301 -1900
60201 -0600
60201 -1000
60501 -0000
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
-I
N C
H P
IP
E
C U
LV
ER
T
S
TA
N D
A R D
U N
D
ER
D R
IN
YS
TE
M
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH LNFT LNFT LNFT Lt Rt Black Canyon Road 7.03 1 12 1 40 A,GS,AS 1 x Option X Green Butte Road 160 Option X South Fork Cow Creek Road 1 16 1 40 A,GS,AS 1 x Option x Johnnie Springs Road 130 Option X
PROJECT TOTAL 28 2 40 40 290
Allowable Pipe Material
A Aluminum AS Aluminized steel C Concrete GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw
_p ro du ct io n\ d0 or
-e f1
_f b.
pd f.
xl sx ]S he et
-J un -2
8:
A M
A
D es ig ne r
/2
D
C he ck er
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.2
SHEET
NUMBER
FS ERFO 2016(1)-15(3)
FS ERFO 2017(1)-15(1)OR
Note: The quantities shown hereon are approximate and are subject to field adjustments.
CP
CP
CP
980980
SCALE IN FEET
0 30 40
PLAN & PROFILE
AOP PLATE ARCH CULVERT
BROWNIE CREEK
10 10 20
SCALE IN FEET
0 30 40
PLAN & PROFILE
AOP PLATE ARCH CULVERT
BROWNIE CREEK
10 10 20
SCALE IN FEET
0 30 40
PLAN & PROFILE
AOP PLATE ARCH CULVERT
BROWNIE CREEK
10 10 20
1.
5:
1.5:1
0.028 ft/ft
Flo w
PIPE INLET OUTLET
FISH SPECIES:
INSTREAM WORK WINDOW: 7/1- 9/15
ACTIVE CHANNEL WIDTH: 15 feet
LENGTH: 80 feet
INFILL TYPE: None
SPAN: 24'-0"
HYDRAULIC INFORMATION
100 100
OHW : 2.0 feet
HW : 4.0 feetQ : 1050 cfs
LOWER BEVEL HEIGHT: 1 foot LOWER BEVEL HEIGHT: 1 foot
BEVEL: 1.5(h):1(v) BEVEL: 1.5(h):1(v)
HEADWALL: Concrete collar/riprap HEADWALL: Concrete collar/riprap
TYPE: CMP Arch
PIPE SLOPE: 0.028 ft/ft
Q : 373 cfs RISE: 12'-0"
WALL THICKNESS: 0.280 in / 1 / 3
FLOWLINE SLOPE: 0.028 ft/ft
TYPE: None
INV N/E/EL: 4974.1 / 9938.1 / 977.9 INV N/E/EL: 4939.2 / 10010.1 / 975.7
BURIAL DEPTH: None BURIAL DEPTH: None
N
Note: Riprap headwall is not shown on elevation (see Sheet F.4).
F.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r e f1 fc .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
J u n e
C h e c k e d b y
D e s ig n e d b y
Sta. 3+72.2
0 20 40 60 8020406080
140 120 100 100 1200 20 40 60 8020406080
140 120 100 100 1200 20 40 60 8020406080
140 120 100 100 120
LC
Footing top, elev. 975.7
Culvert crown Proposed road grade
Footing top, elev. 977.9
Existing stream bottom
LC Culvert
Existing grade contour pipe culvert (L-80')
Proposed 24' x 12' arch plate
LCProposed road do not smooth leave roughened, Bedrock surface, See Sheet F.5
Concrete collar.
See Sheet F.4
Class 3 riprap headwall.
See Sheet F.4
Concrete collar.
See Sheet F.5
Concrete collar.
Grade fill to match concrete collar
Active channel edge
See Sheet F.6 and embedded a minimum of 12-inches, Footing bottom to be extended to bedrock
See Sheet F.4
Class 3 riprap headwall.
Sta. 3+55.6, 37.73 LT
Sta. 3+82.2, 37.98 RT
Concrete footing
Culvert wall
39.6' 40.4'
15'4.5'
Culvert footing and stem wall. See Sheet F.6
100-yr WS depth 4.0'
2-yr WS depth 2.0'
2-yr WS depth 2.0'
NO SCALE
100-yr WS depth 4.0'
AOP CULVERT DETAILS
BROWNIE CREEK
F.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o r e f1 fd .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
M a y
C h e c k e d b y
D e s ig n e d b y
CULVERT OUTLET
CULVERT INLET
'-0
21'-0"
6'-0"
21'-0"
Existing grade
Proposed road grade
Remove existing 23' arch culvert
Proposed road grade
Exisiting grade
Culvert
Culvert
Remove existing 23' arch culvert
Footing top, elev. 977.9
Footing top, elev. 975.7
Existing bedrock, leave rough, do not smooth
Existing bedrock, leave rough, do not smooth
3'-0"
3'-0"
LC
LC
(typ.)
(typ.) (min.)
(min.)
Concrete collar, see Sheet F.5
1.5
6'-0"
4'-6"
Culvert crown
Footing top
Concrete collar, see Sheet F.5
Concrete collar
Separation-stabilization geotextile, type II-C class 3
Keyed riprap, method A, RIPRAP HEADWALL DETAIL
Keyed riprap, method A, class 3
Riprap headwall
Keyed riprap, method A, class 3
Riprap headwall clean bedrock. See Sheet F.6 needed for embedding min. 1' into
Concrete footing, adjust height as clean bedrock. See Sheet F.6 needed for embedding min. 1' into
Concrete footing, adjust height as
SECTION C-C
ANCHOR BOLT DETAIL
SECTION A-A
ISOMETRIC VIEW
SECTION B-B
REINFORCED CONCRETE HEADWALL
3'-0"
COLLAR DETAILS
REINFORCED CONCRETE
OPEN-BOTTOM ARCH
2.
1.
NOTE:
F.5
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 fe .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
M a y
C h e c k e d b y
D e s ig n e d b y
18" O.C. See detail
" Anchor bolt @4 as needed
Provide beveled washers LC m in
" Ø galvanized4 bolt design - 4" hook
Acceptable anchor
Culvert crown
3'-0"
B
B
C
C
A
A
3' -0
Sp an
3' -0
18" O.C. See detail
" Anchor bolt @4 ty p
C lr
18" O.C. See detail
" Anchor bolt @4
#4 Each face
Pipe
C lr
Per plans (1.5 min.) 2'-0" min. lap splice
(3 each face, 6 total)
#4 Reinf @ equal spacing
#4 stirrups
E a c h f a c e
Top of footing
Top of footing
Bottom of footing
Bottom of footing
O .C
Anchor dowels
Anchor dowels
NO SCALE
spacing each face
#4 @ equal
@ 16" O.C.
#4 stirrups least 1-foot. Excavation and backfill according to Section 209.
be reduced provided the collar is keyed into the rock at
Where bedrock is encountered, the depth of the collar may bent to align with the collar.
install anchor bolts as shown. Anchor bolts may need to be
Provide slotted hole at bolt locations as necessary in order to
GENERAL NOTES:
Factored Bearing Resistance: 2 tons/sq. ft.
SOIL:
all other locations.
cover for concrete cast against ground, and 2-inch minimum for conforming to ASTM A1064, GRADE 65. Provide 3-inch minimum
(ASTM, A615), deformed, grade 60, or welded wire reinforcing
Furnish reinforcing steel bars conforming to AASHTO M31
REINFORCING STEEL:
-inch. 4 3exposed edges design compressive strength f'c=4500 psi. Chamfer all
Furnish minor concrete per Section 601 with minimum 28-day
CONCRETE:
conforming to AASHTO M 167 for the sizes and types specified.
Furnish structures and assembly fasteners for connecting plates
STEEL STRUCTURAL PLATE STRUCTURES:
As specified in design specifications.
LIVE LOAD:
Soil: 125 lb per cubic foot.
Concrete: 150 lb per cubic foot.
DEAD LOAD:
with AASHTO LRFD Bridge Design Specifications, latest edition.
latest edition. Design precast stem walls and footings in accordance
Design structural plate arch in accordance with ASTM A796, DESIGN:
precast sections.
Install tie rods or connector plates per manufacturer between
FP-14 (U.S. Customary). Field verify all dimensions and elevations.
Construction of Roads and Bridges on Federal Highway Projects, Federal Highway Administration Standard Specifications for
Detail is for general information only.
CONSTRUCTION:
SECTION
STRUCTURAL DETAILS
OPEN-BOTTOM PIPE ARCH
" (min.)2 12'-6
1'-3" (min.)
ty p
Flow
F.6
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 ff .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
J u n e
C h e c k e d b y
D e s ig n e d b y
15°
V a r ie s
4½"
4¼" 8 31 ref.
ref.
foam gasket Closed cell
Pipe arch
Span (per plan) as required short & long bolts
Structural-plate bolts, R is e p e r p la n in stem wall
Center pipe arch
Pipe arch wall
3" m in elev per plan
Top of footing, foundation
Outside of foundation
Inside of
NO SCALE
" thick material16
Base channel, 15" (min.)
Non-shrink grout rope
" mastic 4
" gap2
(outside joint) on top and sides mastic joint wrap
Grout and 9" wide
BASE CHANNEL
DETAIL
O Ring if required
" (max.)2 12'-9
1'-5" (max.)
DETAIL
>3 feet - 2 per joint
<3 feet - 1 per joint
Stem wall height, inside face
Stem wall
SUPPLEMENTAL PRECAST CONCRETE STEM WALL TIE
m a x bend down & twist
Base channel anchor lugs, Concrete stem wall tapered holes permitted when precast
"Ø Hole for 1" Ø joint tie,4 leave rough, do not smooth
Existing bedrock stream bottom, FOUNDATION JOINT SECTION
SUPPLEMENTAL PRECAST WATERTIGHT
clean bedrock.
needed for embedding min. 1' into
Concrete footing, adjust height as
LP
LP
conditions
* Adjust depth to meet field
6"
4"
15"
12"
NO SCALE
SYSTEM
STANDARD UNDERDRAIN
F.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o r e f1 fg .d g n
OR
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
A p r il
C h e c k e d b y
D e s ig n e d b y
1'
1'
Ditch Shoulder Traveled Lane
W
SHOULDER
FLAT BOTTOM DITCH
CURB AND GUTTER
VEE DITCH
Utility Area
Traveled LaneCurb
Traveled LaneDitch Shoulder
W
W
W
ShoulderDitch Traveled Lane
2"
VIEW A VIEW B
V a r ie s
2"
W
W/2 m in lap
12" lap
12"
W/2
W
LC
LC
LC
LC
See View "B"
See View "B"
(where required)
Selected topping
Base
Surface
See View "A"
Underdrain dia (D) Underdrain dia (D) with geotextile, class 2, type C drains encapsulated material for under-
Granular backfill
Impervious material
Minimum underdrain grade is 0.5 percent.
Location of pipe underdrains may be adjustsed by the CO.
2.
1.
NOTE:
WIDTH (W)
MINIMUM
(D)
DIAMETER
(where required)
Selected topping
Base
Surface
See View "A"
METAL ROUND PIPE CULVERT
METAL PIPE ARCH CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT
STEEL ALUMINUM
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVERSPAN x RISE
PIPE ARCH
SIZE
PIPE ARCH
SIZE
SPAN x RISE
EQUI-
VALENT
DIAMETER
MINIMUM
CORNER
RADIUS
MINIMUM
COVER
MINIMUM
COVERDIAMETER
PIPE
SIZE
PIPE
SIZE
DIAMETER
MINIMUM
COVER
ALUMINUMSTEEL
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
602-1
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
METAL PIPE CULVERT
Fill heights exceeding 100 feet require
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)INCHES
INCHES
INCHES
142 x 91
137 x 87
128 x 83
117 x 79
112 x 75
103 x 71
95 x 67
87 x 63
83 x 57
81 x 59
77 x 52
73 x 55
71 x 47
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
INCHES
3.5
INCHES
" CORRUGATIONS2
1" x 3
22 3" x 1" CORRUGATIONS
METAL THICKNESS (INCH/GAGE)
5" x 1" CORRUGATIONS
0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.109/120.138/10 0.168/8
INCHES INCHES INCHES
103 x 71
95 x 67
87 x 63
81 x 59
73 x 55
66 x 51
64 x 43
60 x 46
57 x 38
49 x 33
42 x 29
35 x 24
28 x 20
24 x 18
21 x 15
17 x 13
INCHES
3.5
" CORRUGATIONS2
1" x 3
METAL THICKNESS (INCH/GAGE)
3" x 1" CORRUGATIONS
0.135/100.105/120.075/14
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)
0.060/160.135/100.105/120.075/140.060/16
STATE PROJECT
NUMBER
SHEET
F.8
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
OR
U m y fi le s p w p r o d u c ti o n d o r e f1 fh .d g n p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
special analysis by the CO.
The fill heights in the table are for helical lockseam and welded seam pipe only.
Fill heights for culvert pipe with annular corrugations are more restrictive than those of helical lockseam and welded seam pipe.
Obtain approval before furnishing annular corrugation pipe.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements. Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavement.
ROUND PIPE
DIAMETER
PIPE ARCH
SPAN × RISE
CORRUGATION
[1] Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as
[2] For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the dimension of the end corrugation in the pipe.
COUPLING BANDS FOR METAL PIPE CULVERT [1]
[3] Use annular corrugated bands with pipes having annular corrugations or with helical pipe the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses
ANNULAR
CORRUGATED
HELICALLY
CORRUGATED
BANDS [4]
SEMI-
CORRUGATEDSIZE [2]
BANDS [3] BANDS [5]
602-2
STANDARD APPROVED FOR USE 12/1993
REVISED: 4/1994 6/2005
MINIMUM BAND WIDTH (INCHES)
1 × 2
1 × 3
3 × 1
5 × 1 78 to 144
36 to 72
78 to 144
36 to 72
78 to 84
42 to 72
12 to 36
87 × 64 to 142 × 91
60 × 46 to 81 × 59
87 × 64 to 142 × 91
60 × 46 to 81 × 59
49 × 33 to 83 × 57
17 × 13 to 42 × 29
10.5
10.5
10.5
10.5
10.5
10.5
10.5
INCHESINCHESINCHES
COUPLING BAND
METAL PIPE CULVERT
" corrugations. A 12 inch band is acceptable on pipe ends 2 1" × 3
2pipe ends rerolled with 2 corrugations on rerolled pipe ends.
STATE PROJECT
NUMBER
SHEET
F.9
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
OR
U m y fi le s p w p r o d u c ti o n d o r e f1 fi .d g n p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
SMOOTH SLEEVE BAND FLAT BAND
SEMI-CORRUGATED BAND
HELICAL BANDANNULAR BANDSTANDARD BAND CONNECTIONS
SLEEVE JOINT
SIDE VIEW SIDE VIEW SIDE VIEW
END VIEW
END VIEWEND VIEW
Oval Lug
Band Angle
Bar & Strap
Integral Flange Wedge and Strap
Smoother sleeve with center stop.
Stab type joint
W
Band Band
Band Bolts
Pipe
Band
Bolts
Angle
Pipe
BandBand
Bolts
Pipe heel and toe of angle of corrugation at fillet weld at crest
Rivet, spot weld, or
Angle
Wedge
Watertight pipe joints are not required unless specified in the Special Contract Requirements.
Other types of coupling bands or fastening devices that comply with the joint performance criteria of AASHTO Standard specifications for
Highway Bridges, Division II Section 26 may be used.
of corrugation at heel and toe of angle
Rivet, spot weld, or fillet weld at crest strap connector
Bolt, bar and
Band corrugation in pipe end with second annular around band meshes
Continuous corrugation
W
BoltsBand
WW
rerolled with 3" × 1" pipe corrugations.
having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:
thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.
Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.
"2 1" × 3
2The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 diameter, required above 42" diameter
Second angle connection optional to 42" diameter, required above 42" diameter
Second angle connection optional to 42"
NOTE:
underdrain [6]
[4] Use helical corrugated bands with pipes having helically corrugated ends.
[5]
[6]
" for 18" round culvert (21" × 15" pipe arch) or less8
" for 21" round culvert (24" × 18" pipe arch) or more2
LEGEND:
BEDDING DEPTH
MINIMUM SPACING
SPACING
DIAMETER
or SPAN
PIPE SIZE (H) DEPTH
602-3
STANDARD APPROVED FOR USE 12/1993
DRAFT: 10/2017
REVISED: 4/1994 6/2005
> 54"
12" to 54"
6"
4"
UP to 48"
48" and UP
24" span or 36", PIPE CULVERT BEDDING
METAL AND PLASTIC
STATE PROJECT
NUMBER
SHEET
F.10
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2017(1)-15(1)
FS ERFO 2016(1)-15(3)
OR
U m y fi le s p w p r o d u c ti o n d o r e f1 fj .d g n p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.
See Section 704 for bedding and backfill requirements.
1.
2.
3.
Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
MULTIPLE PIPE INSTALLATION
PIPING PLUG
BELOW NATURAL GROUND OR
TRENCH EXCAVATION IN EMBANKMENT
ON UNSTABLE MATERIAL
ABOVE AND BELOW
NATURAL GROUND
ON NATURAL GROUND
ABOVE NATURAL GROUND
ON UNYIELDING MATERIAL
PIPE BEDDING
ELEVATION
SECTION A-A
Bedding material (uncompacted)
Impermeable backfill material.
Roadway embankment Roadway embankment
Natural ground
Toe plate Toe plate
Natural ground Natural ground
Roadway embankment
Roadway excavation
Natural ground
H
Width
H H
H H
H H
H H
H
H
H
Finished subgrade Finished subgrade
Natural ground
Finished subgrade
Pipe culvert
Embankment slope
High water elevation treatment
Culvert end
Piping plug before trench excavation embankment height
Finished subgrade or
Original natural ground surface
A
A
Finished subgrade
Roadway embankment
Roadway embankment
Finished subgrade trench excavations
Embankment material placed in layers
Compacted backfill material placed in layers not backfill in accordance with Section 614.
depth table
See bedding excavation in trench
HH
compact in layers not over compressible material. Lightly and replace with selected fine
Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace
Remove…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.