Amendment_A004.pdf

PDF 72 KB Posted

Attached to
OR FS ERFO 2016(1)-15(3), Umpqua Repairs 2016
Solicitation number
69056718B000013
Issued by

About this file

Amendment A004

View the file

Other files

File Type Posted
Bid_Opening_Summary_Umpqua_Repairs_2016_&_2017.pdf PDF
Amendment_A003.pdf PDF
Q&A_9-14-18.pdf PDF
Amendment_A002.pdf PDF
Amendment_A001.pdf PDF
Q&A_8-20-18.pdf PDF
Q&A_8-9-18.pdf PDF
IFB_Umpqua_Repairs.pdf PDF
XS_Brownie.pdf PDF
Plan_Set_-_Umpqua_Repairs_2016-17_Signed_v3.1.pdf PDF
ESCP OR FS ERFO 2016(1)-15(3).pdf PDF
AOP_Brownie_Creek_Hydraulics.pdf PDF
XS_Brownie_Approach.pdf PDF
GM 09-18, OR FS ERFO 2016(1)-15(3), Umpqua Final Geotech Memo.pdf PDF
XS_Steamboat.pdf PDF
XS_Junetta_Sheets.pdf PDF
Plan_Request_for_Internet.pdf PDF
PROJECT_DESCRIPTION_Umpqua_Repairs_2016.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A004 09/20/2018 N/A See Block 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X 69056718B000013

9B. DATED (SEE ITEM 11)

07/19/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A D OTHER (Specify type of modification and authority)

N/A E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OR FS ERFO 2016(1)-15(3), Umpqua Repairs 2016 | OR FS ERFO 2017(1)-15(1), Umpqua Repairs 2017

The purpose of Amendment A004 is to allow prospective bidders the opportunity to view project sites that may not be accessible due to road closures.

Prospective bidders wishing to travel on any of the closed roads listed in this amendment must do so no later than 10/10/2018 and shall coordinate at least 24 hours in advance of the requested travel date with the Tiller Ranger District at 541-825-3100. Bidders must bring the attached fire closure waiver to travel on any of the closed roads. No questions will be answered while viewing project sites.

ENCLOSURES: Fire Closure Waiver

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A004