PROJECT_DESCRIPTION_Detroit.pdf

PDF 46 KB Posted

Attached to
OR DETROIT 2016(1), Detroit Area Visitor Portal, Bikeway and Day Use Enhancements
Solicitation number
69056718B000011
Issued by

View the file

Other files

File Type Posted
Bid_Summary.pdf PDF
Q&A_06-04-18.pdf PDF
A001_OR_Detroit.pdf PDF
Park_Septic_Construction_Permit_110_Patton_Rd._S.pdf PDF
Q&A_5-31-18.pdf PDF
NorthTrail-SlopeStake.pdf PDF
OR_DETROIT_2016(1)_Plans_Stamped.pdf PDF
IFB_OR_Detroit.pdf PDF
98-HEX16-8T-SBSP 18-S041E Detroit OR.PDF PDF
NorthTrail-Clearing.pdf PDF
XYZ_Reports.zip ZIP file
Detroit Septic Design for County Application.pdf PDF
Earthwork Report.pdf PDF
ESCP OR DETROIT 2016(1).pdf PDF
OR_DETROIT_2016(1)_Cross Sections-North Trail.pdf PDF
Plan_Request_OR_Detroit.pdf PDF
HAZMAT_Reports.zip ZIP file
Design_Surface_Files.zip ZIP file
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR DETROIT 2016(1), Detroit Area Visitor Portal, Bikeway and Day Use Enhancements, Marion County, OR

The work consists of grading, asphalt paving, base, aggregate, surfacing, signing, striping, landscaping, and other small items of work.

Project length: 0.75 Miles

Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: Between $2 and $3 million

Location: The project is in Detroit, OR.

DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14 One Schedule

Base

DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence Fiber Roll Absorbent Boom Check Dam Inlet Protection Type C Stabilized Construction Exit

1,350 LNFT

3,600 LNFT

1,000 LNFT

15 EACH

3 EACH

2 EACH

DIVISION 200 – Earthwork 201 Clearing & Grubbing 5.0 ACRE 202 Additional Clearing & Grubbing Removal, Individual Tree 1 EACH 203 Removal of Structures & Obstructions Gate Sign Valve Fence, Chain Link Waterline Pavement, Asphalt Structures and Obstructions

2 EACH

4 EACH

3 EACH

400 LNFT

280 LNFT

5,400 SQYD

LPSM

FP-14 One Schedule

Base

204 Excavation & Embankment Roadway Excavation Subexcavation Unclassified Borrow Select Topping

5,000 CUYD

2,000 CUYD

1,100 CUYD

3,700 CUYD

207 Earthwork Geosynthetics Separation-Stabilization Geotextile, Class 1, Type A 170 SQYD

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Placed Riprap, Method A (River Rock) Placed Riprap, Method A, Class 2 Boulder

22 CUYD

18 CUYD

22 EACH

DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate Roadway Aggregate, Method 2 Roadway Aggregate, Method 2 (Government Provided)

1,100 CUYD

1,000 CUYD

303 Road Reconditioning Aggregate Surface Reconditioning (Trail Reconditioning) 1,500 SQYD

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete Asphalt Concrete Pavement, Type 1 1,700 TON

DIVISION 550 – Bridge Construction 575 Minor Bridge Work (Pedestrian Bridge and Block Wall) LPSM

DIVISION 600 – Incidental Construction 602 Culverts 12-inch Pipe Culvert End Section for 12-inch Pipe Culvert

875 LNFT

1 EACH

604 Manholes, Inlets, & Catch Basins Manhole (Oregon Standard) Manhole (Shallow) Catch Basin Trench Drain

2 EACH

2 EACH

3 EACH

12 LNFT

609 Curb & Gutter Curb, Concrete, 16-inch Depth Wheel stop, Concrete

2,820 LNFT

80 EACH

FP-14 One Schedule

Base

611 Water Systems Water System 1-inch Waterline, Copper 2-inch Waterline, Copper 6-inch Waterline, Ductile Iron Valve, Gate, 2-inch Valve, Gate, 6-inch Valve, Backflow Prevention (Reduced Pressure) Valve Box Water Meter Adjust Water Valve Relocate Fire Hydrant Irrigation System Water System Accessory, Branch (6”x6” Ductile Iron Tee) Water System Accessory, Bend (6” Ductile Iron 90-Degree Bend)

LPSM

90 LNFT

140 LNFT

136 LNFT

1 EACH

1 EACH

1 EACH

1 EACH

1 EACH

7 EACH

2 EACH

LPSM

1 EACH

2 EACH

612 Sanitary Sewer Systems Sewer System (Onsite Wastewater Treatment System) LPSM 615 Sidewalks, Pads & Paved Medians Sidewalk, Concrete 670 SQYD 619 Fences, Gates, Cattle Guards & Bollard Posts Fence (Temporary Plastic) Fence, Chain Link, 72-Inch Height Fence, Chain Link, 72-Inch Height (Temporary) Gate, Chain Link, 24 Feet Width Bollard Post

100 LNFT

40 LNFT

400 LNFT

1 EACH

7 EACH

621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment Yes 623 General Labor Yes 624 Topsoil (landscaping & related items) Furnishing and Placing Topsoil Furnishing and Placing Topsoil (Water Quality Mix)

1,900 CUYD

30 CUYD

625 Turf Establishment Turf Establishment Seeding, Hydraulic Method (Fine Lawn) Mulching, Hydraulic Method Mulching, Dry Method (Wood Chips) Water

0.5 ACRE

0.5 ACRE

2.1 ACRE

420 SQYD

256 MGAL

633 Permanent Traffic Control (traffic control devices) Sign System (Interpretive Sign) Sign System (Detroit Flats Entrance Sign) Sign System Remove and Reset Sign

9 EACH

1 EACH

103 SQFT

4 EACH

634 Permanent Pavement Markings Pavement Markings, Type B, Solid Pavement Markings, Type B, Straight Arrows Pavement Markings, Type B, Accessibility Symbol

6,300 LNFT

8 EACH

4 EACH

FP-14 One Schedule

Base

635 Temporary Traffic Control Barricade, Type 3 Drum Construction Sign Flagger

5 EACH

65 EACH

150 SQFT

320 FXHR

636 Traffic Signal, Traffic Counter, Lighting, & Electrical Systems System Installation, Lighting (Gazebo Illumination) System Installation, Electrical (Service/Metering Cabinet) Conduit, 3/4-Inch, Rigid Galvanized Steel Conduit, 1-Inch, PVC Conduit, 2-Inch, PVC Conduit, 3-Inch, PVC Wire, Electrical Conductors, 12 AWG Wire, Electrical Conductors, 10 AWG Wire, Electrical Conductors, 6 AWG Wire, Electrical Conductors, 2 AWG Luminaire Pole Utility Box, Junction Box Utility Trench

LPSM

EACH

35 LNFT

50 LNFT

970 LNFT

130 LNFT

160 LNFT

1,400 LNFT

825 LNFT

165 LNFT

5 EACH

5 EACH

10 EACH

650 LNFT

646 Roadside Development Fixture (Prefabricated Restroom Building) Fixture (Bicycle Fixit Station) Fixture, Trash Receptacle Fixture, Bench Fixture, Bicycle Storage Rack Fixture, Picnic Table Fixture, Kiosk (Prefabricated Gazebo) Fixture, Vault Toilet (Prefabricated Restroom Building) Fixture (Nature Playground) Fixture (Exercise Equipment)

1 EACH

1 EACH

4 EACH

9 EACH

10 EACH

32 EACH

1 EACH

1 EACH

FP-14
DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses
DIVISION 400 – Asphalt Pavements & Surface Treatments
DIVISION 550 – Bridge Construction

File details come from the government source that posted it.