A001_OR_Detroit.pdf

PDF 57 KB Posted

Attached to
OR DETROIT 2016(1), Detroit Area Visitor Portal, Bikeway and Day Use Enhancements
Solicitation number
69056718B000011
Issued by

About this file

Amendment A001

View the file

Other files

File Type Posted
Bid_Summary.pdf PDF
Q&A_06-04-18.pdf PDF
Park_Septic_Construction_Permit_110_Patton_Rd._S.pdf PDF
Q&A_5-31-18.pdf PDF
NorthTrail-SlopeStake.pdf PDF
OR_DETROIT_2016(1)_Plans_Stamped.pdf PDF
IFB_OR_Detroit.pdf PDF
98-HEX16-8T-SBSP 18-S041E Detroit OR.PDF PDF
NorthTrail-Clearing.pdf PDF
XYZ_Reports.zip ZIP file
Detroit Septic Design for County Application.pdf PDF
Earthwork Report.pdf PDF
ESCP OR DETROIT 2016(1).pdf PDF
OR_DETROIT_2016(1)_Cross Sections-North Trail.pdf PDF
Plan_Request_OR_Detroit.pdf PDF
HAZMAT_Reports.zip ZIP file
Design_Surface_Files.zip ZIP file
PROJECT_DESCRIPTION_Detroit.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 06/01/2018 N/A See Block 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X 69056718B000011

9B. DATED (SEE ITEM 11)

05/07/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A D OTHER (Specify type of modification and authority)

N/A E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OR DETROIT 2016(1), Detroit Area Visitor Portal, Bikeway and Day Use Enhancements

Amendment A001 is issued revise the following:

1. Page C-81. Revises FAR Clauses 52.236-4, Physical Data.

Enclosures:

Page C-81 Park Septic Construction Permit 110 Patton Rd. S (separate attachment in FBO)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

C-81

Contract Clauses Project: OR DETROIT 2016(1), Detroit Area Visitor Portal, Bikeway and Day Use Enhancements

52.236-4 Physical Data (Apr 1984)

Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by: N/A..

(b) Weather conditions: N/A.

(c) Transportation facilities: N/A.

(d) Geotechnical data, design data, and environmental information consisting of the following, will be posted with the solicitation.

1) Clearing Notes

2) Design Surface Files

3) HAZMAT Reports

4) Slope Stake Notes

5) XYZ Reports

6) 98-HEX16-8T-SBSP 18-S041E Detroit OR (Natural Structures Kiosk Plans and

Calculations)

7) Detroit Septic Design for County Application

8) Government’s Erosion and Sediment Control Plan (ESCP)

9) Earthwork data listing end areas, adjusted volumes, and mass ordinates.

10) Plotted cross-sections of earthwork.

11) Park Septic Construction Permit 110 Patton Rd. S

52.236-5 Material and Workmanship (Apr 1984)

(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.

(b) The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.

(c) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.

Revised by A001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A001

File details come from the government source that posted it.