. s·V&/P.PP/ESCP TABS
TAB 1: SWPPP/ESCP Narrative
TAB 2: NPDES Permit (Construction General Permit or Corresponding State Permit)
TAB 3: NOI, EPA/State Acknowfodgement, Other Applicable EPA/State Correspondence
TAB 4: Delegation of Authority
TABS: Maps
TAB 6: Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
TAB 7: Permanent Stabilization and Revegetation Plan(plan sets and details)
TAB 8: SWPPP Amendment Log
TAB 9: Erosion/Sediment Control Inspection Reports and Requirements
TAB 10: Corrective Action Log
TAB il: Water Quality Monitoring, Reporting Requirements, and Reports
TAB 12: Training Log
TAB 13: Waste and/or Borrow Site Information
TAB 14: Grading and Stabilization .Log
TAB 15: Hazardous Spill Plan
TAB 16: Other Applicable Permits(§ 404, § 401, Oregon Remove-Fill Permit)
TAB 17: NPDES Quality Assurance Checklist
TAB 18: NPDES Notice of Termination (NOT)
Tab 1
CONTRACTOR:
Complete SWPPP narrative in accordance with contract 107.0lA(b).
Revise SWPPP narrative as needed throughout construction in accordance with contract 107.01A(f)
ALASKA, IDAHO AND WASHINGTON PROJECTS ONLY:
SWPPP narrative must be signed by General Contractor's responsible corporate officer as defined in CGP 1.11.2.
File approved SWPPP narrative i~ Tab 1.
a
For Construction Activities at:
Project Name:
Project Site Location:
City, County, State, Zip Code:
ESCP Prepared for:
Organization Name:
Address:
Telephone Number:
ESCP Prepared by:
Name, Title:
Name, Title:
Company/Organization:
Address:
Telephone Number:
Detroit Area Visitor Portal, Bikeway, and Day Use Enhancements
(OR DETROIT 2016(1))
Marion County, Oregon
FHWA, Western Federal Lands Highway Division (WFLHD)
610 East Fifth Street
Vancouver, WA 98661-3801
360-619-7700
Melissa Hogan, Environmental Protection Specialist
FHWA, Western Federal Lands Highway Division
610 East Fifth Street
Vancouver, WA 98661-3801
360-619-7735
ESCP Preparation Date: 12/6/2017
Estimated Construction Start Date: Spring 2018 Estimated Construction Completion Date: Fall 2018
Estimated Revegetation Start Date: 10/01/2018 Estimated Revegetation Completion Date: 12/15/2020
TAB 1:
TAB2:
TAB3:
TAB4:
TABS:
TAB6:
TAB7:
TABS:
TAB9:
TAB 10:
TAB 11:
TAB 12:
TAB 13:
TAB 14:
TAB 15:
TAB 16:
TAB 17:
TAB 18:
ESCP T ABs (ESCP Inclusions)
ESCP/ESCP Narrative
NPDES Permit (Construction General Permit or Corresponding State Permit)
NOI, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence
Delegation of Authority
Maps
Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
Revegetation Plan (if applicable)
ESCP Amendment Log
Inspection Reports
Corrective Action Log
Water Quality Monitoring, Reporting Requirements, and Reports (if applicable)
Training/Certification Log
Government-Selected Waste, Borrow, Staging Sites
Grading and Stabilization Log
Hazardous Spill Plan or SPCC
Threatened and Endangered Species and Historic Preservation (Section 106) Documentation
NPDES Quality Assurance Checklist
NPDES Notice of Termination (NOT)
ESCP/ESCP NARRATIVE
SECTION 1: RESPONSIBLE PARTIES/CONTACT INFORMATION
1.1 Operator(s):
1.2 Construction Site ESCP Contact(s):
1.3 ESCP Prepared by:
1.4 NPDES Stormwater Permit
1.5 ESCP Administrator
1.6 Permitting Authority for FHW A/WFLHD Projects
SECTION 2: PROJECT INFORMATION
2.1 Project Name and Location
2.2 Project Site Characteristics
SECTION 3: NATURE OF CONSTRUCTION ACTIVITY
3.1 General Description of Project and Scope of Work:
3.2 Sequence and Estimated Dates of Construction Activities
3.3 Potential Sources of Pollutants
SECTION 4: SITE MAPS
SECTION 5: DISCHARGES
5.1 Allowable Non-Stormwater Discharges
5.2 Receiving Waters:
5.3 Water Quality Monitoring Requirements
SECTION 6: COMPLIANCE WITH OTHER APPLICABLE REQUIREMENTS
6.1 Endangered Species Protection
6.2 Historic Preservation
6.3 Safe Drinking Water Act Underground Injection Control Requirements
SECTION 7: EROSION AND SEDIMENT CONTROLS
7.1 Natural Buffers or Equivalent Sediment Controls
7.2 Perimeter Controls
7.3 Sediment Track-Out
7.4 Stockpiled Soil or Other Erodible Materials ............................................................................ ~20
7.5 Minimize Dust
[i]
7 .6 Minimize Disturbance of Steep Slopes
7.7 Topsoil Conservation
7 .8 Minimize Soil Compaction
7.9 Storm Drain Inlets and Culvert Inlets
7.10 Constructed Stormwater Conveyance Channels and Culvert Outlets
7.11 Sediment Basins
7.12 Chemical Treatment .................. ;
7.13 Dewatering Practices
7.14 Erosion Control and Stabilization
7.15 Removal of BMPs
7.16 Post Construction Measures
SECTION 8: OPERATIONAL CONTROLS/GOOD HOUSEKEEPING MEASURES .•.. 29
8.1 Hazardous Spill Plan
8.2 Spills/Releases in Excess of Reportable Quantities
8.3 EquipmentNehicle Fueling and Maintenance Practices
8.4 EquipmentNehicle Washing
8.5 Material Handling and Waste Management
8.6 Designate Concrete Washout Areas
SECTION 9: INSPECTIONS
9.1 Inspection Frequency
9.2 Corrective Actions
SECTION 10: DELEGATIONS OF AUTHORITY
SECTION 11: STAFF TRAINING
SECTION 12: CERTIFICATION AND NOTIFICATION
[ii]
1.1 Operator(s):
Organization Name:
Address:
Telephone Number:
Contractor and PE
FHWA, Western Federal Lands Highway Division 610 East Fifth Street Vancouver, WA 98661-3801 360-619-7700
Note: Fill in all incomplete information following contract award date and prior to start of construction
1.2 Construction Site ESCP Contact(s):
FHWA Contact Name: TBD
Title:
Address:
Telephone Number:
General Contractor, TBD Company:
(complete for all States) Erosion Control TBD Supervisor Name:
(complete for all States) Address:
Telephone Number:
1.3 ESCP Prepared by:
Organization/Company:
Name, Position:
Role/Responsibility Telephone Number:
Melissa Hogan, Environmental Protection Specialist ESCP Preparer 360-619-7735
Email: Melissa.j .hogan@dot.gov
1.4 NPDES Stormwater Permit
The Applicable EPA/State NPDES Stormwater Permit is located in TAB 2. The Project NOI and EPA/State Acknowledgement with NPDES Tracking Number is located in TAB 3.
1.5 ESCP Administrator
The General Contractor (section 1.2) is responsible for maintaining the project ESCP of Record.
The General Contractor will provide a qualified Erosion Control Supervisor, who is responsible for managing the installation, maintenance, inspection, and reporting for erosion and sediment
[I] control measures, shall maintain and update the project ESCP of Record and prepare all documentation required by the project NPDES stormwater permit and ESCP.
The Erosion Control Supervisor (ECS) is identified in section 1.2 and his/her qualifications are documented in TAB 12.
The FHW A/WFLHD Project Engineer (PE) is the duly authorized representative of the FHWA for the purpose of overseeing compliance with the NPDES stormwater permit and ESCP at the construction site. See Delegation of Authority TAB 4.
All ESCP documentation, revisions/updates, and reports will be approved/signed by both the General Contractor's ECS and the FHW A PE.
1.6 Permitting Authority for FHW A/WFLHD Projects
Delivery Confirmation documentation of the NOI is located in TAB 3.
The applicable EPA/State NPDES permit is located in TAB 2
Oregon Department of Environmental Quality (ODEQ)
State Permitting Authority Alaska • ADEC is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for the Denali National Park and Preserve and Metlakatla Indian Reservation.
Idaho • EPA is permitting authority for discharges within the state .
Montana • MDEQ is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for Indian Country lands within the state .
Oregon • ODEQ is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for Indian Country lands within the state .
Oregon • WDE is permitting authority for most discharges within the state EXCEPT for:
• EPA is permitting authority for Federal Operators and Indian Country lands within the state
Wyoming • WDEQ is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for Indian Country lands within the state
Oregon DEQ authorizes FHW A/WFLHD projects under the programmatic 1200-CA permit, (expired in 12/31/2005, administratively extended)
[2]
2:
2.1 Project Name and Location
This basic site information is used to file for National Pollutant Discharge Elimination System (NPDES) permit coverage. Permit coverage is obtained by filing the Notice oflntent (NOi) after the ESCP is complete.
Project Name:
Project Site Location:
City, County, State, Zip Code:
Latitude/Longitude:
44.73493 N, 122.150459W
Township, Range, Section:
Tl OS, RSE, S 1
Detroit Area Visitor Portal, Bikeway, and Day Use Enhancements
(OR DETROIT 2016(1))
Detroit
Marion County, Oregon
The method used for determining latitude/longitude was: Google Earth
Is the project located in Indian country? No
If yes, the name of Reservation is: NIA
Are you applying for permit coverage as a "federal operator?" Yes
The project Does Not discharge stormwater into a Municipal Separate Storm Sewer System.
2.2 Project Site Characteristics
The undeveloped site and features of the land that are incorporated into the final soil Erosion and Sediment Control plan sheets (TAB 6), as well as natural resources that should be protected are described below:
Vegetation, trees, and sensitive areas, such as stream buffers, wetlands, highly erodible soils, and steep slopes at the site include:
Most of the Willamette National Forest (the Forest) is covered with Douglas-fir, the State tree of Oregon and a valuable timber species in the United States. Throughout Willamette National Forest, the roadside areas contain both native and non-native species including, but not limited to the following; true firs, big-leaf maple, western and mountain hemlocks, Engelmann spruce, Douglas-fir, red alder, western lurch, [3] western redcedar, Alaska yellow-cedar, various pine species, Pacific blackberry,
· western thimbleberry, ocean-spray, salal, Salmonberry, and other native/non-native herbs and grasses.
Trees and vegetation shall be preserved wherever practical. Other sensitive areas that shall be avoided include the wetland and riparian complex at the "Flats" Day Use area.
Also, see TAB 6
Stormwater currently drains from the site in the following manner, Stormwater presently drains from the site by means of soil infiltration, sheetflow, and concentrated flows into adjacent ditches.
Also, see TAB 6
The location of discharge points or areas
All stormwater drains into adjacent forested and vegetated buffers to treat the water.
Also, see TAB 6
The location of all waters, including wetlands, are shown on the site map located in
TABs 5 and 6.
Critical slopes and slope lengths include:
Locations: None within the vicinity.
Soil type(s) of highly erodible soils and the soils' infiltration capacity are identified as, 1
No highly erodible soils.
Any past soil contamination at the site is identified as, On August 7, 2017, WSP conducted a Lead Test Analysis of the site. None of the samples had detectable concentrations of total lead above the regulatory thresholds presented in Section 3 .1. No special handling or disposal procedures for onsite soils are reql1ired for this project.
The following natural features, including trees, streams, wetlands, slopes and other features to be protected includes:
Also, see TAB 6
1 Natural Resources Conservation Service (NRCS) Web Soil Survey.
[4]
Protected Natural Features:
See Section 2.2: Project Site Characteristics.
Measures to protect these features:
Project will utilize erosion and sediment control BMPs to avoid discharging sediment-laden, construction stormwater runoff into the streams and wetlands. In addition, the project was designed to avoid wetlands and waterways.
Mean Annual Precipitation (2007-2016) at the Project Site:2 94.753 inches
The frequency, intensity, and duration of rainfall for the project site, which are the principal factors influencing erosion from a construction site, are described as, The 2-year, 24-hour storm event:3
3.5 inches/day
The IO-year, 24-hour storm event:
6.0 inches/day
The 25-year, 24-hour storm event:
5.0 inches/day
3: re
3.1 General Description of Project and Scope of Work:
(i.e. highway construction, roadway realignment, highway and bridge reconstruction, etc.) is described below:
Construct a Scenic Bikeway and Detroit Recreation Area Visitor Portal, which will be connected by trails to the Detroit Flats Day Use Area and enhancements.
The scope of work includes the design and construction of a covered, lighted, octagonal visitor information kiosk, and the design and fabrication of 4-6 visitor information panels. A prefabricated flush restroom building would be installed and connected to onsite power and water. A new septic tank, leach line and drainfield will also be installed. Asphalt parking areas for about 40 vehicles including RV space(s) will be reconfigured and 5' concrete sidewalks from parking areas to restroom will be constructed along with visitor kiosk. A bicycle rack and repair station, three steel benches, a dog pet waste station, a drinking fountain and a steel garbage recept~acle will also be installed within proximity to the kiosk and restrooms.
2 NRCS Annual Climate Data 3 Historical precipitation averages for Western States
[5]
The type or function of the project is: Other transportation-related
Contractor and PE
Note: Fill in all incomplete information following contract award date and prior to start of construction
Construction Support Activities: If applicable, describe any construction support activities such as dedicated concrete or asphalt batch plants, dedicated aggregate sites, equipment staging yards, material storage areas, borrow, or disposal sites (government-selected sites):
There are no additional government-selected sites. To be further completed by contractor
NOTE: All Contractor-selected sources and support sites are the sole responsibility of the General Contractor. The ESCP and NPDES permitting for Contractor-selected sites and sources are separate from this documentation (SCR 107.0lA(h)).
Support activities are located on the general vicinity map and/or site map in
Size of the Construction Project:
(Including all Government-selected support sites such as staging, borrow, waste, access roads, etc.)
Estimated Area
Total project area(within ROW or Construction limits):
Construction site area to be disturbed:
Percent Impervious Area BEFORE Construction: 25.0 %
Runoff Coefficient BEFORE Construction: 0.507
Percent Impervious Are AFTER Construction:
Runoff Coefficient AFTER Construction:
[6]
35.0%
0.626
Units
6.94 Acres
5.82 Acres
3.
Se qu en ce a nd
E st im at ed D at es o f C on st ru ct io n
A ct iv it ie s
T he i nt en de d co ns tr uc ti on s eq ue nc in g an d ti m in g o f m aj or c on st ru ct io n ac ti vi ti es is d et ai le d he re in cl ud in g th e ph as ed g ra di ng a nd s ta bi li za ti on ac vi ti es u se d to m in im iz e ov er al l am ou nt o f d is tu rb ed s oi l.
C on st ru ct io n sc he du le to b e pr ov id ed b y
C on tr ac to r.
A dd a dd it io na l ph as es a nd a ct iv it ie s as n ee de d.
C tr ac to r an d
P E
N ot e:
F il l in a ll in co m pl et e in fo rm at io n fo ll ow in g co nt ra ct a w ar d da te a nd p ri or to s ta rt o f c on st ru ct io n
P ha se
C on tr ac to r to f ill in a ll ac ti vi es st ru ct io n se gu en ce d es cr i~ ti on
D ur at io n of se gu en ce
B M
P s as so ci at ed w it h t hi s se gu en ce
St ab il iz at io n m ea su re s:
li ck h er e to e nt er l ex l.
C li ck h er e lo e nt er t ex t.
lic k he re t o en te r te xt he re t o en te r te xt
P ha se
C on st ru ct io n se gu en ce d es cr i~ ti on
D ur at io n of se gu en ce
B M
P s as so ci at ed w it h t hi s se gu en ce
St ab il iz at io n m ea su ck h er e lo e nt er t ex t.
C li ck h er e to e nt er t ex L ck lo e nt r t< :x t.
l lo c lll r
[7 ha se
C on st ru ct io n se gu en ce d es cr in ti on
D ur at io n o f s eg ue nc e:
B M
P s as so ci at ed w it h th is s eg ue nc e:
St ab il iz at io n m ea su ck h er e lo e nt er t t.
he l o e nt er t to n te r te x t C li ck h er e 1o e n te r k x l.
se
C on st ru ct io n se gu en ce d es cr in ti on
D ur at io n of se gu en ce
B
M P s as so ci at ed w it h t hi s se gu en ce
St ab il iz at io n m ea su ck h er e lo e nk :r t e n te r k
'l e n k r t ex t to e n te r k se
C on st ru ct io n se gu en ce d es cr in ti on
D ur at io n of se gu en ce
B
M P s as so ci at ed w it h t hi s se gu en ce
St ab il iz at io n m ea su ck h er e lo e nt er t ck h er e to e nt er t ck n te r te xt
Lo e n te r
[8 g c ·;::
".C
D D D D D
3.3 Potential Sources of Pollutants
The follow table identifies all potential sources (checked activities in column 1) of sediment and other sources of pollution, which may reasonably be expected to affect the quality of storm water discharges from the construction site. To be reviewed and edited by contractor.
Potential Construction Site Pollutants
Construction Activity "' "' c !l " "' "' e ... .C·~ ~ ·;: ~ ~ "' .. ;a
= "' ::i:: "' .Q "' ... "' 0 00 :z = c. fo-Q =-
Clearing, excavating, and grading x x Fill ofroadway embankment, backfill at structures x x Vehicle/equipment fueling and maintenance x x Vehicle/equipment use and storage x Sanitary/septic waste x x Dewatering operations x x Drilling and blasting operations x x x Concrete washout and waste x x Structure construction/painting/cleaning x x x Demolition and debris disposal x x x Solid waste (trash and debris) x Hazardous waste or contaminated spills x Paving operations x x Landscaping operations x x x Mining, rock extraction, crushing x x x
Contractor and PE
Note: Fill in all incomplete information following contract award date and prior to start of construction
:t x x
Construction and waste material expected to be stored on-site includes (to be completed by contractor):
Material Storage Location
[9]
!l
Le 5 ... = -== - 0 O=.
x x x x
Vicinity maps are located in TAB 5. Site maps and erosion and sediment control plan maps are located in TAB 6.
[10]
Industrial stormwater discharges associated with industrial activity other than construction at the site (including dedicated asphalt plants and dedicated concrete plants that are covered by this permit) include:
NOTE: An Industrial Activity Multi-Sector General Permit may be required for some activities.
Industrial Activity
NIA
Stormwater Discharge Location
NIA
5.1 Allowable Non-Stormwater Discharges
Multi-Sector General Permit Number (if applicable)
NIA
Non-stormwater discharges used at the construction site are identified below, along with control measures used to eliminate or reduce the discharges and BMPs used to prevent stormwater contamination. To be reviewed, edited, and completed by Contractor.
Applicable to this Project
(check all that apply)
D D D D D
Potential Non-Stormwater Discharges
Waters used to wash vehicles where detergents are not used
Water used to control dust
Potable water including uncontaminated water line flushings
Construction dewatering (uncontaminated)
Ground water or spring water (uncontaminated)
Routine external building wash down that does not use detergents
Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and where detergents are not used
0 Foundation or footing drains where flows are not contaminated with process materials such as solvents
~ Landscape irrigation
~ Discharges from emergency fire-fighting activities
0 Fire hydrant flushings
0 Uncontaminated air conditioning or compressor condensate
Control Measures
NOTE: The likely locations of these discharges are identified on the site map TAB 5 and/or
TAB6
[I I]
5.2 Receiving Waters:
Are there any surface waters located within 50 feet of the construction disturbance? Yes
Name(s) of the first surface water that receives stormwater directly from your site and/or 1 from the MS4
1. Detroit Lake, tributary to Detroit Lake and wetlands adjacent to Detroit Lake
Impaired Waters/TDMLs:
Answer the following for each surface water listed in Table 1:
f I Is this surface j What pollutant(s) is I Has a TMDL I Pollutant(s) for which
I!
! I water listed as I causing the I been I there is a TDML . I "impaired?" impairment? · I completed? i
1~ l-.--t,-Y_e_s_D_N_o~cg}--tl-N-/A~~~-~~~-+1-Y-es-O~N-o-cg}~~1-N~/A··~~--~~--;
Source used to determine whether your project discharges into an impaired water:
EPA 303( d) GIS data layer
Tier 2, 2.5 or 3 Waters
Answer the following for each surface water listed in Table 1:
specify which Tier.
1. an item.
If applicable, documentation of consultation with State or Federal TMDL authorities on consistency ofESCP conditions with the approved TMDL is found in TAB 11. The control measures required to ensure that discharge of pollutants from the site are consistent with the assumptions and requirements of the EPA-established or approved TMDL, including any specific waste-load allocations are included in that documentation.
5.3 Water Quality Monitoring Requirements
Provisions in Permit Conditions of the applicable NPDES stormwater permit, as well as the associated §401 certification or other special conditions, define additional monitoring and reporting requirements. Details about water quality monitoring and reporting requirements applicable to this project are included in TAB 11.
Samples and measurements taken for the purpose of monitoring will be representative of the monitored activity. Records of all monitoring information will be retained in TAB 11, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation.
[12]
Records of monitoring information will include:
1. The date, exact place, and time of sampling or measurements;
2. The individual(s) who performed the sampling or measurements;
3. The date(s) analyses were performed
4. The individual(s) who performed the analyses;
5. The analytical techniques or methods used; and
6. The results of such analyses.
[13]
6.1 Endangered Species Protection
Under which criterion is project eligible for Endangered Species coverage under the NPDES permit (EPA)?
~A DB De Dn OE
Criterion A.
Criterion B.
Criterion C
Criterion D.
No federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site's "action area" as defined in Appendix A of EPA permit.
The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your action area under eligibility Criterion A, C, D, E, or F and there is no reason to believe that federally-listed species or federally-designated critical habitat not considered in the prior certification may be present or located in the "action area". To certify your eligibility under this Criterion, there must be no lapse ofNPDES permit coverage in the other operator's certification.
By certifying eligibility under this Criterion, you agree to comply with any effluent limitations or conditions upon which the other operator's certification was based. You must include in your NOI the tracking number from the other operator's notification of authorization under this permit. If your certification is based on another operator's certification under Criterion C, you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C in the EPA NOI form.
Federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in or near your site's "action area," and your site's discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat. This determination may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect listed species and critical habitat. To make this certification, you must include the following in your NOI: 1) any federally listed species and/or designated habitat located in your "action area"; and 2) the distance between your site and the listed species or designated critical habitat (in miles). You must also include a copy of your site map with the
NOL
Coordination between you and the Services has been concluded. The coordination must have addressed the effects of your site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat, and must have resulted in a written concurrence from the relevant Service(s) that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat. You must include copies of the
[14]
Criterion E.
Criterion F.
correspondence between yourself and the Services in your ESCP and NOL
Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under section 7 of the ESA has been concluded. The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally designated critical habitat. The result of this consultation must be either:
i. a biological opinion that concludes that the action in question (taking into account the effects of your site's discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat; or
IL written concurrence from the applicable Service(s) with a finding that the site's discharges and discharge-related activities are not likely to adversely affect federally-listed species or federally-designated habitat.
You must include copies of the correspondence between yourself and the Services in your ESCP and NOi.
Your construction activities are authorized through the issuance of a permit under section 10 of the ESA, and this authorization addresses the effects of the site's discharges and discharge-related activities on federally listed species and federally-designated critical habitat. You must include copies of the correspondence between yourself and the Services in your ESCP and NOi.
Support Documentation for Endangered Species criterion eligibility is filed in TAB 16.
6.2 Historic Preservation
1. Will the project involve installation of any of the following stormwater controls that entail subsurface earth disturbance? Choose an item.
D Dike
D Berm rg:i Catch Basin
D Pond rg:i Ditch, trench, swale, perimeter drain, etc.
rg:i Culvert rg:i Other ground-disturbing stormwater control: Restroom building subexcavation, Parking area subexcavation, Vault Toilet subexcavation, and Waterline and Accessory Installation
If the project involves no installation of earth-disturbing storm water controls, then no further historic preservation screening is necessary (for NPDES permitting purposes).
2. If answer to step 1 is Yes, have professional surveys or evaluations determined that historic properties do not exist (or have prior disturbances at the site precluded the existence of historic properties)? Yes
[15]
Provide documentation for the basis of this determination: Project falls under the USFS Programmatic Agreement. USFS is Section 106 Federal Lead Agency.
3. If answer to step 2 is No, have professional surveys or evaluations determined that installation of stormwater controls will have no effect on historic properties? Choose an item.
Provide documentation for the basis of this determination. Click here to enter text.
4. Has the State Historic Preservation Officer (SHPO), Tribal Historic Preservation Office (THPO) or other tribal representative concurred with the determinations of effects on historic properties? Yes
Provide the nature of their response: Project is covered under the USFS Programmatic Agreement; Undertaking meets the criteria listed in Appendix C (Exempt/Non-undertaking).
6.3 Safe Drinking Water Act Underground Injection Control Requirements
Will the project plan install any of the following controls? No
Check all that apply:
D Infiltration trenches (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than is widest surface dimension, or has a subsurface fluid distribution system)
D Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow.
D Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system)
If yes, provide documentation of communications with the EPA or applicable State agency.
[16]
7:
Contractor to review, revise and edit as needed.
Control measures at the construction site are selected, installed, implemented, and maintained to minimize pollutants in the discharge as necessary to meet applicable water quality standards.
The objectives of this ESCP include:
• Stabilize the site as soon as possible (targeting the preparation and implementation of erosion and sediment controls to get the site to final grade, and either permanently or temporarily stabilize all bare soil areas as soon as possible).
• Perimeter controls will be installed before ground disturbing activities are initiated.
• Perimeter protection will remain in place until final stabilization has been achieved.
• Slopes and channels will be protected by conveying concentrated stormwater runoff around the top of slopes and stabilize slopes as soon as possible. A void disturbing natural channels and the vegetation along natural channels as much as possible.
• Divert stormwater corning on to the site by conveying it safely around, through, or under the work area. (Divert the clean water, trap the dirty water.)
• Protect receiving waters and other environmentally sensitive waters or areas adjacent to the site.
• Follow pollution prevention measures by providing proper containers for waste and garbage at the site. Store hazardous materials and chemicals so that they are not exposed to stormwater.
• Minimize the area and duration of exposed soils. Clear only land that will be under construction in the near future.
7.1 Natural Buffers or Equivalent Sediment Controls
This section only applies if a surface water is located within 50 feet of the project's earth disturbing activities.
Are there any surface waters within 50 feet of the project's earth disturbances? Yes
If No, then no further documentation is required for the ESCP.
If Yes, check which natural buffer compliance alternative is used at the project site:
D The project will provide and maintain a 50-foot wide undisturbed natural buffer.
The location and width of natural buffers are shown on the Erosion and Sediment Control Plan sheets in TAB 6.
D The project will provide and maintain an undisturbed natural buffer that is less than 50 feet in width and is supplemented by additional erosion and sediment controls, which in combination achieves the sediment load reduction equivalent to a 50-foot undisturbed natural buff er.
The location of natural buffers is shown on the Erosion and Sediment Control Plan sheets in TAB 6.
Insert the width of the natural buffer to be retained Click here to enter text.
[17]
Insert description of additional erosion and sediment controls to be used in combination with the natural buffer: Click here to enter text.
Document the method used to determine that the above combination of natural buffer and sediment and erosion controls equal the estimated sediment removal capacity of a 50-foot undisturbed natural buffer: Click here to enter text.
[8J It is infeasible to provide and maintain an undisturbed natural buffer of any size, therefore, the project will implement erosion and sediment controls that achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer.
Insert rationale for concluding that providing and maintaining a natural buffer of any size is infeasible: A natural buffer to the greatest extent feasible will be established where feasible, however, there are areas where work is proposed immediately adjacent to wetlands, the tributary to Detroit Lake and Detroit Lake itself. The project was designed to avoid these resources directly, but it was not possible to establish buffer areas due to the limited space between the resources and existing roadways.
Insert description of erosion and sediment controls to be used to achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer: Fiber Rolls and Silt Fencing
[8J The project qualifies for one of the exceptions in EPA CGP Part 2.1.2.1.e
[8J For a "linear project", site constraints (e.g. limited right of way) make it infeasible for the project to meet any of the CGP part 2.1.2. l .a compliance alternatives.
D Other exception (state type): Click here to enter text.
Document why it is infeasible to meet one of the buffer compliance alternatives: The existing roadway (Detroit Ave) is constructed at the outer boundary of Forest Service property so the widening is taking place closer to the wetland to avoid private property.
The design widths were reduced to avoid direct impacts to the wetlands and waterway itself.
Insert description of erosion and sediment controls to be used to achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer: Orange mesh fence will be installed at the edge of the wetland to alert the contractor of the sensitive resource.
7.2 Perimeter Controls
All Perimeter Sediment Controls will be installed prior to ground disturbing activities taking place. There will be no clearing or grubbing outside the physical clearance limits.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
Control measure: Fiber rolls
Implementation: All fiber rolls will be installed prior to any ground disturbing activities. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Sediment will be removed from fiber roll perimeter controls before deposits reach 50% of the above ground height. It is the Contractor's responsibility to upgrade erosion control measures as necessary if the sediment controls are ineffective and turbid water is
[18] observed discharging from the site. Fiber rolls will not be removed until vegetation is established.
Control measure: Silt Fence
Implementation: The silt fence shall be installed before other land disturbing activities take place. Silt fence should be functional throughout the duration of construction and for a long enough duration following construction to allow disturbed areas to stabilize following revegetation and seeding. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Silt fences should be inspected periodically for damage (such as tearing by wind, animals, or equipment) and for sediment that has accumulated. Remove the sediment when it reaches one-half the height of the silt fence. In situations where access is available, machinery can be used. Otherwise, silt should be removed manually. The following are key elements to remember:
• The sediment deposits should be removed when heavy rain or high water is anticipated.
• The sediment deposits should be placed in an area where there is little danger of eros10n.
• The silt fence should not be removed until adequate vegetative growth ensures no further erosion of the slopes. Generally, the fabric is cut at ground level, the wire and posts are removed, then the sediment is spread, seeded, and protected (mulched) immediately.
Control measure: Temporary diversion channel (dike)
Implementation: Should be adequately compacted by earth-moving equipment to prevent failure.
To be implemented in accordance with schedule and contract along the North Trail alignment.
Please also refer to project plan set (Erosion Control section).
Maintenance: Dikes should be inspected after every rainfall event and at least once every two weeks, regardless of storm events. Attention should be paid to the outlet of the dike to ensure that diverted runoff is exiting the area as designed.
Add other measures as needed.
7.3 Sediment Track-Out
The following methods will be implemented to minimize off-site vehicle tracking of sediment onto paved surfaces. If sediment escapes the construction site, off-site accumulations of sediment will be removed at a frequency sufficient to minimize off-site impacts.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
[19]
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Stabilized Construction Exit
Implementation: Wherever traffic will be leaving a construction site and traveling onto paved roads or other paved areas, within 1,000 feet of the site. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Any sediment that is tracked onto pavement shall be removed by shoveling or sweeping. The sediment collected by sweeping shall be removed or stabilized on site. The pavement shall not be cleaned by washing down the street, except when sweeping is ineffective and there is a threat to public safety.
Control measure: Washing within perimeter, without detergents or solvents
Implementation: During active construction, as necessary.
Maintenance requirements: Care must be taken that runoff is directed within construction perimeter and is to be managed by established control methods already in place. Any uncontrollable runoff must be remedied and additional BMPs put in place.
7.4 Stockpiled Soil or Other Erodible Materials
Stockpile management includes measures to minimize surface erosion and sediment transport from soil stockpiles or other erodible materials.
Locate erodible stockpiles away from drainages including storm sewer inlets and culvert inlets.
Locations of stockpiles are not designated and are, therefore, not shown on the erosion and sediment control plan sheets in TAB 6. Should stockpiles be necessary, locations must remain within the permitted area of impact and as determined by the Contractor and PE.
0 Not applicable to this project. Reason: Click here to enter text.
Note: Contractor and PE - complete this section as appropriate.
If applicable:
Control measure: Fiber rolls
Implementation: All fiber rolls will be installed prior to any ground disturbing activities. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Sediment will be removed from fiber roll perimeter controls before deposits reach 50% of the above ground height. It is the Contractor's responsibility to upgrade erosion control measures as necessary if the sediment controls are ineffective and turbid water is observed discharging from the site. Fiber rolls will not be removed until vegetation is satisfactorily established.
[20]
Control measure: Silt Fence
Implementation: The silt fence shall be functional before other land disturbing activities take place. Silt fence should be functional throughout the duration of construction and for a long enough duration following construction to allow disturbed areas to stabilize following revegetation and seeding. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Silt fences should be inspected periodically for damage (such as tearing by wind, animals, or equipment) and for sediment that has accumulated. Remove the sediment when it reaches one-half the height of the silt fence. In situations where access is available, machinery can be used. Otherwise, silt should be removed manually. The following are key elements to remember:
• The sediment deposits should be removed when heavy rain or high water is anticipated.
• The sediment deposits should be placed in an area where there is little danger of erosion.
• The silt fence should not be removed until adequate vegetative growth ensures no further erosion of the slopes. Generally, the fabric is cut at ground level, the wire and posts are removed, then the sediment is spread, seeded, and protected (mulched) immediately.
Control measure: Plastic sheets
Implementation: All the soil stockpiles or other erodible materials should be covered by plastic all the time.
Maintenance requirements: Contractor should check the plastic cover frequently to make sure the soil or other erodible material is covered all the time.
7.5 Minimize Dust
Dust control includes practices used to reduce or prevent the surface and air transport of dust during construction
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Application of water for dust control.
Implementation: During active construction as needed. Apply a rate of approximately 3 gallons per acre so that the soil is wet, but not saturated or muddy, and so that no dust is being generated.
Maintenance requirements: Water used for dust control requires constant attention. In periods of hot or dry weather, several applications a day may be required.
Add other measures as needed.
[21]
7.6 Minimize Disturbance of Steep Slopes
Describe how disturbance of steep slopes will be minimized. Describe controls (e.g. erosion control blankets, tackifiers) that will be implemented to minimize sediment discharges from slope disturbances.
If applicable, describe how stormwater run-on and run-off will be managed. Flows may be diverted from exposed soils by retaining/detaining flows or otherwise minimizing runoff and the discharge of pollutants from exposed areas of the site. Placement of structural practices in floodplains will be avoided to the degree technologically and economically practicable and achievable.
IZI Not applicable to this project. Reason: There are not anticipated to be any steep slopes on this project. Contractor to modify this section, as needed.
7. 7 Topsoil Conservation
Describe how topsoil will be preserved, if feasible. If conservation of topsoil is infeasible, explain why, and describe alternate methods to be used to insure optimum vegetation survival and growth.
Erosion and sediment control measures for topsoil stockpiles (and other erodible materials) are shown in section 4.4.
Note: Contractor and PE- complete this section as appropriate.
D Conservation of topsoil is Infeasible:
Reason: Click here to enter text.
Alternate method: Click here to enter text.
IZI Conservation of topsoil is Feasible:
Conservation measure: Minimize disturbance to topsoil wherever feasible.
Implementation: Stockpile topsoil using best management practices including but not limited to perimeter erosion control and covering the stockpile using appropriate erosion controls.
Maintenance requirements: Inspect stockpile regularly to ensure erosion controls are adequate.
7.8 Minimize Soil Compaction
Minimize soil compaction in areas where final vegetative stabilization will occur and where infiltration practices will be installed.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Distribute layer of soft vegetative top soil after compaction complete
[22]
Implementation: After soil compaction is complete and prior to revegetation efforts. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Maximize depth whenever possible and seed as soon as practicable.
If seeding cannot occur in a timely manner, other BMPs (nets, blankets, etc.) will be placed to mitigate erosion.
7.9 Storm Drain Inlets and Culvert Inlets
Applicable for stormwater drain inlets which are connected to separate storm sewer systems (usually in urban locations) AND for culvert inlets that discharge stormwater from the project into surface waters.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
The following BMPs are applicable to:
IZl Storm Drain Inlets
IZl Culvert Inlets
Control measure: Storm drainage inlet protection structures
Implementation: Protect inlet structures, before and during active construction. Means must prevent discharge of turbid water downstream. The Contractor shall remove inlet protection at the end of the project without releasing captured sediment into the storm system. to not allow sediment plugging. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Clean or remove and replace the protection measures as sediment accumulates, the filter becomes clogged, and/or performance is compromised. Where there is evidence of sediment accumulation adjacent to the inlet protection measure, remove the deposited sediment by the end of the same work day in which it is found or by the end of the following work day if removal by the same work day is not feasible.
Control measure: Silt Fence as culvert inlet protection
Implementation: All existing culverts must be protected in place to maintain full functionality of existing drainage patterns. The silt fence shall be functional before other land disturbing activities take place. Silt fence should be functional throughout the duration of construction and for a long enough duration following construction to allow disturbed areas to stabilize following revegetation and seeding. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Silt fences should be inspected periodically for damage (such as tearing by wind, animals, or equipment) and for sediment that has accumulated. Remove the
[23] sediment when it reaches one-half the height of the silt fence. In situations where access is available, machinery can be used. Otherwise, silt should be removed manually. Remove after site stabilization is achieved. The following are key elements to remember:
• The sediment deposits should be removed when heavy rain or high water is anticipated.
• The sediment deposits should be placed in an area where there is little danger of erosion.
• The silt fence should not be removed until adequate vegetative growth ensures no further erosion of the slopes. Generally, the fabric is cut at ground level, the wire and posts are removed, then the sediment is spread, seeded, and protected (mulched) immediately.
7.10 Constructed Stormwater Conveyance Channels and Culvert Outlets
Describe velocity dissipation and/or erosion control devices to be installed at stormwater conveyance channels (such as roadside ditches) and culvert outlets. Includes permanent and temporary devices (specify).
Velocity dissipation devices will be placed at discharge locations and along the length of any outfall channel to provide a non-erosive flow velocity from the structure to a water course so that the natural physical and biological characteristics and functions are maintained and protected (e.g., no significant changes in the hydrological regime of the receiving water).
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
D Not applicable to this project.
Control measure: Check Dams
Implementation: Following ditch construction. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Regular inspections should be made to ensure that the center of the dam is lower than the edges. Sediment will be removed from check dams before deposits reach 50% of the above ground height. Check dams will not be removed until vegetation is satisfactorily established.
Control measure: Temporary culvert (pipe slope drain)
Implementation: Immediately following the disturbance of the slope on which it rests and should not be removed until the disturbed slope has been permanently stabilized. In accordance with schedule and contract along the North Trail alignment. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Inspected weekly and after every storm. Repairs are to be made immediately.
Inlets should be kept free of debris. Drains should remain securely fastened to the slope at all times.
[24]
Control measure: Riprap at Culvert Outlet Protection
Implementation: Outlet protection should be finalized before the drainage system becomes effective. Filter cloth should be placed between riprap and the underlying soil to prevent soil movement into and through the riprap. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance requirements: Loose rock should be replaced. Inspections should occur monthly and after each major rainfall event.
Add other measures as needed.
7.11 Sediment Basins
If applicable, provide site design specifications and other details for design of sediment basins and ponds. This may also include sediment infiltration swales.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
At a minimum, sediment ponds must provide storage for either the calculated volume of runoff from the 2-year, 24-hour storm event or 3,600 cubic feet per acre drained. Sediment ponds must also use outlet structures that withdraw water from the surface, unless infeasible.
D Not applicable to this project.
If applicable, type of sediment retention/infiltration used: Treatment swale facilities
Design description: 2/3 of a 2-year, 24-hour storm event. Please also refer to project schedule, contract, and plan set (Drainage section).
If applicable, type of sediment retention/infiltration used: Catch basin
Design description: Oregon Standard. Please also refer to project schedule, contract, and plan set (Drainage section).
7.12 Chemical Treatment
If chemical sediment control (such as polymers) will be used, provide design specifications and other details considered when choosing treatment type and locations.
~ Not applicable to this project.
If applicable:
NOTE: If use of cationic treatment chemicals is planned, separate…
This is the start of the file's text. The full file is on GovTribe.