PROJECT_DESCRIPTION.pdf
PDF 41 KB Posted
- Attached to
- OR WASH 2015(1), Hagg Lake Perimeter Road
- Solicitation number
- 69056718B000004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Hagg_Lake.pdf | ||
| A003.pdf | ||
| Q&A_11-21-17.pdf | ||
| A002.pdf | ||
| Q&A_11-17-17.pdf | ||
| Q&A_11-15-17.pdf | ||
| Q&A11-6-17.pdf | ||
| Hagg-Lake_CrossSection.pdf | ||
| IFB_Hagg_Lake.pdf | ||
| Plan_Request_form_Hagg_Lake.pdf | ||
| OR_WASH_2015(1)_Hagg_Lake_Project_Plan.pdf | ||
| Hagg-Lake_Earthwork.pdf | ||
| Haqg-Lake_Plans100_.pdf | ||
| ESCP_OR_WASH_2015(1)_Hagg_Lake_Perimeter_Rd.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR WASH 2015(1), Hagg Lake Perimeter Road, Washington County, Oregon.
The work consists of Paving, Subexcavation, Embankment, Horizontal Drains, Drainage, Guardrail, Bridge Rail and other small items of work.
Project length: 5 Miles
Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $5 million to $7 million
Location: 5 Miles SW of Forest Grove, Oregon
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence Fiber Roll Check Dam Sediment Trap Filter Rock
750 LNFT
2,400 LNFT
10 EACH
2 EACH
182 CUYD
DIVISION 200 – Earthwork 201 Clearing & Grubbing 1.1 ACRE 203 Removal of Structures & Obstructions Pipe Culvert Curb, Asphalt Guardrail Pavement, Asphalt Pavement, Asphalt, 2-inch depth (mico-milling) Sawcutting Pavement
6 EACH
60 LNFT
4,200 LNFT
4,400 SQYD
1,350 SQYD
170 LNFT
ch ed ul e
204 Excavation & Embankment Roadway Excavation Subexcavation Select Borrow
1,400 CUYD
5,700 TON
10,800 TON
207 Earthwork Geosynthetics Separation-Stabilization Geotextile, Class 1, Type D Geogrid, Stabilization
6,400 SQYD
17,300 SQYD
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Placed Riprap, Method A, Class 2 Placed Riprap, Method A, Class 3
7 CUYD
50 CUYD
DIVISION 300 – Aggregate and Base Courses 302 Roadway Aggregate, Method 2 9,580 TONS 310 Cold In-Place Recycled Asphalt Base Course Cold In-Place Recycled Asphalt Base Course, Type A Emulsified Asphalt Lime
75,000 SQYD
350 TON
110 TON
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement, Gyratory Mix, ½- Inch or 3/4 -Inch Nominal Maximum Size Aggregate,
0.3 to <3 Million ESAL (Pavement Roughness, Type
II-A) 15,000 TON
403 Asphalt Concrete Pavement, Type 1 1,000 TON 406 Fog Seal 75,000 SQYD 412 Tack Coat 70 TON 413 Asphalt Pavement Milling, 2-inch depth 1,300 SQYD 418 Asphalt Concrete Pavement Patching Asphalt Concrete Pavement Patch, Type 1 Asphalt Concrete Pavement Patch, Type 2
1,700 SQYD
750 SQYD
ch ed ul e
DIVISION 500 – Rigid Pavements 575 Minor Bridge Work LPSM
DIVISION 600 – Incidental Construction 602 Culverts & Drains 12-Inch Pipe Culvert 24-Inch Pipe Culvert 36-Inch Pipe Culvert Elbow, 12-Inch
120 LNFT
190 LNFT
340 LNFT
1 EACH
604 Manholes, Inlets, and Catch Basins Inlet, FLH Type 5A Inlet Top, Metal Frame and Grate, FLH Type 5A
1 EACH
1 EACH
605 Underdrains, Sheet Drains & Pavement Edge Drains Standard Underdrain System 1,100 LNFT 610 Horizontal Drains Horizontal Drain Pipe Horizontal Drain Jetting Horizontal Drain Casing and Collar
25,300 LNFT
LPSM
60 EACH
617 Guardrail Guardrail System G4, Type 4, Class B Wood Posts Guardrail System CRG, Type 4, Class B Terminal Section, Type G4-BAT Terminal Section, Type G4-CRT Terminal Section, Type Flared Terminal Section, Type Tangent Replacement Post, Wood Replacement Blockout Structure Transition Railing, G4 System Raising Guardrail
7,750 LNFT
650 LNFT
1 EACH
18 EACH
19 EACH
27 EACH
65 EACH
65 EACH
152 LNFT
19,200 LNFT
621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) No 623 General Labor (yes/no) No 625 Turf Establishment 3,500 SQYD 626 Plantings, Seedlings, Bare Root 420 EACH 633 Permanent Traffic Control Delineator (Guardrail Butterfly) 1,200 EACH ch ed ul e
635 Temporary Traffic Control Traffic Control Supervisor Barricade Type 3 Cone, Type 28-Inch Concrete Barrier Pavement Markings Construction Sign Pilot Car Portable Changeable Message Sign Flagger
LPSM
10 EACH
220 EACH
650 LNFT
135,000 LNFT
220 SQFT
35 DAY
130 DAY
350 HOUR
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
File details come from the government source that posted it. Updated .