Hagg-Lake_Earthwork.pdf

PDF 193 KB Posted

Attached to
OR WASH 2015(1), Hagg Lake Perimeter Road
Solicitation number
69056718B000004
Issued by

About this file

Physical Data: Hagg-Lake_Earthwork

View the file

Other files

File Type Posted
BidSum_Hagg_Lake.pdf PDF
A003.pdf PDF
Q&A_11-21-17.pdf PDF
A002.pdf PDF
Q&A_11-17-17.pdf PDF
Q&A_11-15-17.pdf PDF
Q&A11-6-17.pdf PDF
Hagg-Lake_CrossSection.pdf PDF
IFB_Hagg_Lake.pdf PDF
Plan_Request_form_Hagg_Lake.pdf PDF
OR_WASH_2015(1)_Hagg_Lake_Project_Plan.pdf PDF
Haqg-Lake_Plans100_.pdf PDF
ESCP_OR_WASH_2015(1)_Hagg_Lake_Perimeter_Rd.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hagg Lake Perimeter Road

OR WASH 2015(1)

EARTHWORK FILES

FOR

Access 1 – Pioneered access road and horizontal drilling pad A.

Access2 – Pioneered access road and horizontal drilling pad B.

Conn – Connector road between Access roads.

MP 3.142 – Deep patch

MP 4.602 – Deep patch

File: C:\WFLHD\HaggLake\PDF_Plots\2017‐08‐31_100%\Hagg‐Lake_Access1_Earthwork.txt 9/6/2

2017, 2:47:22 PM

Process Earthwork for Baseline = access1 job number = 672 beg sta = 10+00.00 R 1 end sta = 16+35.62 R 1

COMPUTING EARTHWORKS FOR BASELINE = ACCESS1

COMPUTING EARTHWORKS FOR JOB = 672

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Page: 1

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu.

yd.)

10+00.00 RDWYEXC

Excavation 24.83 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 25.94 0 0 0.00 0 0

10+10.00 RDWYEXC

Excavation 2.51 5 5 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.54 0 0 1.00 5 0

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 8 0 0.00 5 8

10+15.00 RDWYEXC

Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.12 1 1 1.00 4 1

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 3 0 0.00 4 11

10+20.00 RDWYEXC

Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.15 3 3 1.00 1 4

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 3 0 0.00 1 14

10+30.00 RDWYEXC

Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.84 10 10 1.00 ‐9 14

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Page: 2

Fill 18.15 7 0 0.00 ‐9 21

10+40.00 RDWYEXC

Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 37.77 13 13 1.00 ‐22 27

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐22 28

10+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.69 13 13 1.00 ‐35 40

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐35 35

10+60.00 RDWYEXC

Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.88 10 10 1.00 ‐45 50

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐45 42

10+65.21 RDWYEXC

Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.35 4 4 1.00 ‐49 54

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 4 0 0.00 ‐49 46

10+70.00 RDWYEXC

Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.40 3 3 1.00 ‐52 57

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 3 0 0.00 ‐52 49

10+80.00 RDWYEXC

Excavation 0.54 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.40 4 4 1.00 ‐56 61

Page: 3

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐56 56

10+90.00 RDWYEXC

Excavation 3.57 1 1 1.00 6 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.42 2 2 1.00 ‐57 63

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐57 63

11+00.00 RDWYEXC

Excavation 3.14 1 1 1.00 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.26 1 1 1.00 ‐57 64

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.21 7 0 0.00 ‐57 70

11+10.00 RDWYEXC

Excavation 3.00 1 1 1.00 8 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.19 2 2 1.00 ‐58 66

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐58 77

11+20.00 RDWYEXC

Excavation 7.96 2 2 1.00 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.46 1 1 1.00 ‐57 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐57 84

11+30.00 RDWYEXC

Excavation 13.23 4 4 1.00 14 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐53 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.20 7 0 0.00 ‐53 91

11+40.00 RDWYEXC

Page: 4

Excavation 16.68 5 5 1.00 19 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐48 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.42 7 0 0.00 ‐48 98

11+50.00 RDWYEXC

Excavation 19.00 6 6 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐42 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.78 7 0 0.00 ‐42 105

11+55.15 RDWYEXC

Excavation 19.97 4 4 1.00 29 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐38 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.75 4 0 0.00 ‐38 109

11+60.00 RDWYEXC

Excavation 20.98 4 4 1.00 33 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐34 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.89 3 0 0.00 ‐34 112

11+70.00 RDWYEXC

Excavation 21.48 8 8 1.00 41 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐26 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 7 0 0.00 ‐26 119

11+80.00 RDWYEXC

Excavation 22.09 8 8 1.00 49 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐18 67

LAYER3

Excavation 0.00 0 0 0.00 0

Page: 5

Fill 24.87 8 0 0.00 ‐18 127

11+90.00 RDWYEXC

Excavation 23.14 8 8 1.00 57 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐10 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 25.76 9 0 0.00 ‐10 136

12+00.00 RDWYEXC

Excavation 23.63 9 9 1.00 66 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐1 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 25.69 10 0 0.00 ‐1 146

12+10.00 RDWYEXC

Excavation 20.02 8 8 1.00 74 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.32 8 0 0.00 7 154

12+20.00 RDWYEXC

Excavation 14.79 6 6 1.00 80 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 13 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.21 7 0 0.00 13 161

12+29.43 RDWYEXC

Excavation 10.66 4 4 1.00 84 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 17 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 7 0 0.00 17 168

12+30.00 RDWYEXC

Excavation 10.53 0 0 1.00 84 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 17 67

Page: 6

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.92 0 0 0.00 17 168

12+40.00 RDWYEXC

Excavation 9.17 3 3 1.00 87 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 20 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.52 7 0 0.00 20 175

12+50.00 RDWYEXC

Excavation 7.66 3 3 1.00 90 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 23 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.28 7 0 0.00 23 182

12+60.00 RDWYEXC

Excavation 6.78 2 2 1.00 92 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 25 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.24 7 0 0.00 25 189

12+70.00 RDWYEXC

Excavation 9.53 3 3 1.00 95 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 28 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.72 7 0 0.00 28 196

12+80.00 RDWYEXC

Excavation 14.54 5 5 1.00 100 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 33 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.39 7 0 0.00 33 203

12+90.00 RDWYEXC

Page: 7

Excavation 21.38 7 7 1.00 107 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 40 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.62 7 0 0.00 40 210

13+00.00 RDWYEXC

Excavation 28.87 10 10 1.00 117 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 50 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 50 217

13+10.00 RDWYEXC

Excavation 36.59 12 12 1.00 129 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 62 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 62 224

13+20.00 RDWYEXC

Excavation 48.23 16 16 1.00 145 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 78 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 78 231

13+30.00 RDWYEXC

Excavation 50.91 19 19 1.00 164 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 97 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 97 238

13+40.00 RDWYEXC

Excavation 56.37 20 20 1.00 184 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 117 67

LAYER3

Excavation 0.00 0 0 0.00 0

Page: 8

Fill 18.15 7 0 0.00 117 245

13+50.00 RDWYEXC

Excavation 47.87 20 20 1.00 204 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 137 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 137 252

13+60.00 RDWYEXC

Excavation 36.92 16 16 1.00 220 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 153 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.18 7 0 0.00 153 259

13+62.80 RDWYEXC

Excavation 34.73 4 4 1.00 224 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 157 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.06 2 0 0.00 157 261

13+70.00 RDWYEXC

Excavation 31.86 9 9 1.00 233 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 166 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 33.29 7 0 0.00 166 268

13+80.00 RDWYEXC

Excavation 34.22 12 12 1.00 245 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 178 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 35.83 13 0 0.00 178 281

13+90.00 RDWYEXC

Excavation 40.88 14 14 1.00 259 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 192 67

Page: 9

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 10 0 0.00 192 291

14+00.00 RDWYEXC

Excavation 36.77 14 14 1.00 273 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 206 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.38 7 0 0.00 206 298

14+10.00 RDWYEXC

Excavation 33.48 13 13 1.00 286 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 219 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 34.13 10 0 0.00 219 308

14+20.00 RDWYEXC

Excavation 30.60 12 12 1.00 298 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 231 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 33.28 12 0 0.00 231 320

14+30.00 RDWYEXC

Excavation 31.44 11 11 1.00 309 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 242 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 35.12 13 0 0.00 242 333

14+40.00 RDWYEXC

Excavation 28.01 11 11 1.00 320 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.24 0 0 1.00 253 67

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 10 0 0.00 253 343

14+50.00 RDWYEXC

Page: 10

Excavation 108.52 26 26 1.00 346 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 279 67

SUBEXCAVATION

Excavation 11.93 2 2 1.00 2 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 279 0 Mass ordinate for SUBEXCAVATION = 2

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 2 0 0.00 279 2

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 14 0 0.00 279 14

LAYER3

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 3 0 0.00 279 346

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.58 2 0 0.00 279 2

14+60.00 RDWYEXC

Excavation 104.06 39 39 1.00 385 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 318 67

SUBEXCAVATION

Excavation 12.10 4 4 1.00 6 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 318 0 Mass ordinate for SUBEXCAVATION = 6

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 318 7

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 318 42

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.72 5 0 0.00 318 7

14+70.00 RDWYEXC

Excavation 107.43 40 40 1.00 425 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.41 0 0 1.00 358 67

Page: 11

SUBEXCAVATION

Excavation 12.15 4 4 1.00 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 358 0 Mass ordinate for SUBEXCAVATION = 10

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 358 12

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 358 70

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.78 5 0 0.00 358 12

14+80.00 RDWYEXC

Excavation 94.88 38 38 1.00 463 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.10 0 0 1.00 396 67

SUBEXCAVATION

Excavation 11.45 4 4 1.00 14 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 396 0 Mass ordinate for SUBEXCAVATION = 14

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 396 17

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 396 98

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.09 5 0 0.00 396 17

14+90.00 RDWYEXC

Excavation 87.35 34 34 1.00 497 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.92 1 1 1.00 429 68

SUBEXCAVATION

Excavation 11.02 4 4 1.00 18 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 429 0 Mass ordinate for SUBEXCAVATION = 18

LAYER1

Excavation 0.00 0 0 0.00 0

Page: 12

Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 429 22

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 429 126

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.73 4 0 0.00 429 21

15+00.00 RDWYEXC

Excavation 80.20 31 31 1.00 528 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.76 3 3 1.00 457 71

SUBEXCAVATION

Excavation 10.95 4 4 1.00 22 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 457 0 Mass ordinate for SUBEXCAVATION = 22

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 457 27

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 457 154

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.83 4 0 0.00 457 25

15+10.00 RDWYEXC

Excavation 68.13 28 28 1.00 556 Subsoil Exc 0.00 0 0 1.00 0 Fill 28.52 7 7 1.00 478 78

SUBEXCAVATION

Excavation 10.62 4 4 1.00 26 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 478 0 Mass ordinate for SUBEXCAVATION = 26

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 478 32

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 478 182

SUBEXBACKFILL

Page: 13

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.50 4 0 0.00 478 29

15+20.00 RDWYEXC

Excavation 64.94 25 25 1.00 581 Subsoil Exc 0.00 0 0 1.00 0 Fill 48.78 14 14 1.00 489 92

SUBEXCAVATION

Excavation 10.35 4 4 1.00 30 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 489 0 Mass ordinate for SUBEXCAVATION = 30

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 489 37

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 489 210

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.22 4 0 0.00 489 33

15+30.00 RDWYEXC

Excavation 65.10 24 24 1.00 605 Subsoil Exc 0.00 0 0 1.00 0 Fill 69.07 22 22 1.00 491 114

SUBEXCAVATION

Excavation 10.97 4 4 1.00 34 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 491 0 Mass ordinate for SUBEXCAVATION = 34

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 491 42

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 491 238

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.81 4 0 0.00 491 37

15+40.00 RDWYEXC

Excavation 66.88 24 24 1.00 629 Subsoil Exc 0.00 0 0 1.00 0

Page: 14

Fill 81.03 28 28 1.00 487 142

SUBEXCAVATION

Excavation 12.22 4 4 1.00 38 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 487 0 Mass ordinate for SUBEXCAVATION = 38

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 487 47

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 487 266

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.04 5 0 0.00 487 42

15+43.76 RDWYEXC

Excavation 68.53 9 9 1.00 638 Subsoil Exc 0.00 0 0 1.00 0 Fill 80.17 11 11 1.00 485 153

SUBEXCAVATION

Excavation 12.64 2 2 1.00 40 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 485 0 Mass ordinate for SUBEXCAVATION = 40

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 2 0 0.00 485 49

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 10 0 0.00 485 276

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.32 2 0 0.00 485 44

15+50.00 RDWYEXC

Excavation 66.75 15 15 1.00 653 Subsoil Exc 0.00 0 0 1.00 0 Fill 79.59 18 18 1.00 482 171

SUBEXCAVATION

Excavation 13.34 3 3 1.00 43 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 482 0 Mass ordinate for SUBEXCAVATION = 43

LAYER1

Page: 15

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 3 0 0.00 482 52

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 17 0 0.00 482 293

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.03 3 0 0.00 482 47

15+60.00 RDWYEXC

Excavation 60.04 24 24 1.00 677 Subsoil Exc 0.00 0 0 1.00 0 Fill 91.67 32 32 1.00 474 203

SUBEXCAVATION

Excavation 14.10 5 5 1.00 48 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 474 0 Mass ordinate for SUBEXCAVATION = 48

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 474 57

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 474 321

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.85 5 0 0.00 474 52

15+70.00 RDWYEXC

Excavation 50.09 20 20 1.00 697 Subsoil Exc 0.00 0 0 1.00 0 Fill 124.64 40 40 1.00 454 243

SUBEXCAVATION

Excavation 10.64 5 5 1.00 53 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 454 0 Mass ordinate for SUBEXCAVATION = 53

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 454 62

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 454 349

Page: 16

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.21 5 0 0.00 454 57

15+80.00 RDWYEXC

Excavation 42.24 17 17 1.00 714 Subsoil Exc 0.00 0 0 1.00 0 Fill 148.32 51 51 1.00 420 294

SUBEXCAVATION

Excavation 10.93 4 4 1.00 57 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 420 0 Mass ordinate for SUBEXCAVATION = 57

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 420 67

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 420 377

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.12 5 0 0.00 420 62

15+90.00 RDWYEXC

Excavation 52.19 17 17 1.00 731 Subsoil Exc 0.00 0 0 1.00 0 Fill 162.33 58 58 1.00 379 352

SUBEXCAVATION

Excavation 13.08 4 4 1.00 61 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 379 0 Mass ordinate for SUBEXCAVATION = 61

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 379 72

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 379 405

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.45 5 0 0.00 379 67

16+00.00 RDWYEXC

Excavation 51.68 20 20 1.00 751

Page: 17

Subsoil Exc 0.00 0 0 1.00 0 Fill 146.07 57 57 1.00 342 409

SUBEXCAVATION

Excavation 13.68 5 5 1.00 66 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 342 0 Mass ordinate for SUBEXCAVATION = 66

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 342 77

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 342 433

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.96 5 0 0.00 342 72

16+10.00 RDWYEXC

Excavation 49.97 19 19 1.00 770 Subsoil Exc 0.00 0 0 1.00 0 Fill 126.93 51 51 1.00 310 460

SUBEXCAVATION

Excavation 14.24 5 5 1.00 71 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 310 0 Mass ordinate for SUBEXCAVATION = 71

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 310 82

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 310 461

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.56 5 0 0.00 310 77

16+20.00 RDWYEXC

Excavation 51.11 19 19 1.00 789 Subsoil Exc 0.00 0 0 1.00 0 Fill 107.24 43 43 1.00 286 503

SUBEXCAVATION

Excavation 13.79 5 5 1.00 76 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 286 0 Mass ordinate for SUBEXCAVATION = 76

Page: 18

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 286 87

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 286 489

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.48 5 0 0.00 286 82

16+30.00 RDWYEXC

Excavation 51.81 19 19 1.00 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 97.64 38 38 1.00 267 541

SUBEXCAVATION

Excavation 13.99 5 5 1.00 81 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 267 0 Mass ordinate for SUBEXCAVATION = 81

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 267 92

LAYER2

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 267 517

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.76 5 0 0.00 267 87

16+35.62 RDWYEXC

Excavation 59.02 11 11 1.00 819 Subsoil Exc 0.00 0 0 1.00 0 Fill 95.88 20 20 1.00 258 561

SUBEXCAVATION

Excavation 13.91 3 3 1.00 84 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 258 0 Mass ordinate for SUBEXCAVATION = 84

LAYER1

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 3 0 0.00 258 95

LAYER2

Excavation 0.00 0 0 0.00 0

Page: 19

Fill 74.32 15 0 0.00 258 532

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.65 3 0 0.00 258 90

Page: 20

G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 819 819 1.00 Subsoil Exc 0 0 1.00 Fill 561 561 1.00

SUBEXCAVATION

Excavation 84 84 1.00 Subsoil Exc 0 0 1.00 Fill 0 0 1.00

LAYER1

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 95 0 0.00

LAYER2

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 532 0 0.00

LAYER3

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 346 0 0.00

SUBEXBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 90 0 0.00

Page: 21

Earthwork_Access2.log Process Earthwork for Baseline = access2 beg sta = 20+00.00 R 1 end sta = 20+85.20 R 1

COMPUTING EARTHWORKS FOR BASELINE = ACCESS2

COMPUTING EARTHWORKS FOR JOB = 672

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu.

yd.)

20+00.00 RDWYEXC

Excavation 94.92 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 46.52 0 0 1.00 0

SUBEXCAVATION

Excavation 22.86 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 0 Mass ordinate for SUBEXCAVATION = 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 0 0 0.00 0

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 0 0 0.00 0

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.39 0 0 0.00 0

20+10.00 RDWYEXC

Excavation 104.68 37 37 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 43.41 17 17 1.00 20

SUBEXCAVATION

Excavation 21.75 8 8 1.00

Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 20 Mass ordinate for SUBEXCAVATION = 8

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 20

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 20

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.20 8 0 0.00 20

20+20.00 RDWYEXC

Excavation 118.57 41 41 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.09 16 16 1.00 45

SUBEXCAVATION

Excavation 22.03 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 45 Mass ordinate for SUBEXCAVATION = 16

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 45

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 45

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.68 8 0 0.00 45

20+30.00 RDWYEXC

Excavation 117.13 43 43 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 39.10 15 15 1.00 73

SUBEXCAVATION

Excavation 22.64 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 73 Mass ordinate for SUBEXCAVATION = 24

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 73

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 73

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.27 9 0 0.00 73

20+40.00 RDWYEXC

Excavation 116.55 43 43 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 49.55 16 16 1.00 100

SUBEXCAVATION

Excavation 24.02 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 100 Mass ordinate for SUBEXCAVATION = 33

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 100

LAYER2

Excavation 0.00 0 0 0.00

Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 100

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.63 9 0 0.00 100

20+50.00 RDWYEXC

Excavation 130.21 46 46 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 56.35 20 20 1.00 126

SUBEXCAVATION

Excavation 23.31 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 126 Mass ordinate for SUBEXCAVATION = 42

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 126

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 126

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.66 9 0 0.00 126

20+60.00 RDWYEXC

Excavation 129.04 48 48 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 52.41 20 20 1.00 154

SUBEXCAVATION

Excavation 20.78 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 154

Mass ordinate for SUBEXCAVATION = 50

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 154

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 154

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.17 8 0 0.00 154

20+70.00 RDWYEXC

Excavation 116.65 45 45 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 40.40 17 17 1.00 182

SUBEXCAVATION

Excavation 17.64 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 182 Mass ordinate for SUBEXCAVATION = 57

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 182

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 182

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.43 7 0 0.00 182

20+80.00 RDWYEXC

Excavation 88.71 38 38 1.00

Fill 28.52 13 13 1.00 207

SUBEXCAVATION

Excavation 10.81 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 207 Mass ordinate for SUBEXCAVATION = 62

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 207

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 207

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.52 6 0 0.00 207

20+85.19 RDWYEXC

Excavation 89.16 17 17 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 30.66 6 6 1.00 218

SUBEXCAVATION

Excavation 10.06 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 218 Mass ordinate for SUBEXCAVATION = 64

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 2 0 0.00 218

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 14 0 0.00 218

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.28 2 0 0.00 218 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 358 358 1.00 Subsoil Exc 0 0 1.00 Fill 140 140 1.00

SUBEXCAVATION

Excavation 64 64 1.00 Subsoil Exc 0 0 1.00 Fill 0 0 1.00

LAYER1

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 42 0 0.00

LAYER2

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 238 0 0.00

SUBEXBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 66 0 0.00

Earthwork_Conn.log Process Earthwork for Baseline = conn job number = 672 beg sta = 30+00.00 R 1 end sta = 30+94.88 R 1

COMPUTING EARTHWORKS FOR BASELINE = CONN

COMPUTING EARTHWORKS FOR JOB = 672

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu.

yd.)

30+20.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 116.54 0 0 1.00 0

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 0 0 0.00 0

30+20.97 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 120.14 4 4 1.00 -4

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 1 0 0.00 -4

30+30.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 138.33 43 43 1.00 -47

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 6 0 0.00 -47

30+40.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 153.15 54 54 1.00 -101

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 7 0 0.00 -101

30+50.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 157.52 58 58 1.00 -159

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 7 0 0.00 -159

30+60.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 162.04 59 59 1.00 -218

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 7 0 0.00 -218

30+70.00 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 119.25 52 52 1.00 -270

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 7 0 0.00 -270

30+80.00 RDWYEXC

Excavation 0.00 0 0 1.00

Fill 67.30 35 35 1.00 -305

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 7 0 0.00 -305

30+81.05 RDWYEXC

Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 60.39 2 2 1.00 -307

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 1 0 0.00 -307 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 0 0 1.00 Subsoil Exc 0 0 1.00 Fill 307 307 1.00

LAYER3

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 43 0 0.00

Earthwork_mp3142-tub.log Process Earthwork for Baseline = mp3142 beg sta = 408+45 R 1 end sta = 412+25 R 1

COMPUTING EARTHWORKS FOR BASELINE = MP3142

COMPUTING EARTHWORKS FOR JOB = 672

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu.

yd.)

408+45.00 RDWYEXC

Excavation 44.35 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.89 0 0 1.00 0

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.47 0 0 0.00 0

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.88 0 0 0.00 0

408+50.00 RDWYEXC

Excavation 77.10 12 12 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.84 0 0 1.00 12

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.57 3 0 0.00 12

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.94 5 0 0.00 12

LAYER3

Excavation 0.00 0 0 0.00

Fill 30.30 3 0 0.00 12

408+60.00 RDWYEXC

Excavation 136.52 40 40 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.21 1 1 1.00 51

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.52 5 0 0.00 51

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.98 11 0 0.00 51

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 90.10 22 0 0.00 51

408+65.00 RDWYEXC

Excavation 164.59 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.92 0 0 1.00 79

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.51 3 0 0.00 79

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.98 5 0 0.00 79

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 19 0 0.00 79

408+70.00 RDWYEXC

Excavation 161.68 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.57 1 1 1.00 108

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.51 3 0 0.00 108

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.97 5 0 0.00 108

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 22 0 0.00 108

408+80.00 RDWYEXC

Excavation 161.29 60 60 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.64 3 3 1.00 165

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.51 5 0 0.00 165

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.97 11 0 0.00 165

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 44 0 0.00 165

408+90.00 RDWYEXC

Excavation 160.96 60 60 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.33 5 5 1.00 220

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.51 5 0 0.00 220

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 29.02 11 0 0.00 220

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 44 0 0.00 220

409+00.00 RDWYEXC

Excavation 157.02 59 59 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.41 6 6 1.00 273

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.51 5 0 0.00 273

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.97 11 0 0.00 273

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 44 0 0.00 273

409+10.00 RDWYEXC

Excavation 155.10 58 58 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.86 6 6 1.00 325

LAYER1

Excavation 0.00 0 0 0.00

Fill 13.51 5 0 0.00 325

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.97 11 0 0.00 325

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 44 0 0.00 325

409+20.00 RDWYEXC

Excavation 148.55 57 57 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 19.11 6 6 1.00 376

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.60 5 0 0.00 376

LAYER2

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.12 11 0 0.00 376

LAYER3

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 44 0 0.00 376

409+30.00 RDWYEXC

Excavation 144.68 54 54 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 20.67 7 7 1.00 423

LAYER1

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Fill 13.56

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .