Hagg-Lake_Earthwork.pdf
PDF 193 KB Posted
- Attached to
- OR WASH 2015(1), Hagg Lake Perimeter Road
- Solicitation number
- 69056718B000004
About this file
Physical Data: Hagg-Lake_Earthwork
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Hagg_Lake.pdf | ||
| A003.pdf | ||
| Q&A_11-21-17.pdf | ||
| A002.pdf | ||
| Q&A_11-17-17.pdf | ||
| Q&A_11-15-17.pdf | ||
| Q&A11-6-17.pdf | ||
| Hagg-Lake_CrossSection.pdf | ||
| IFB_Hagg_Lake.pdf | ||
| Plan_Request_form_Hagg_Lake.pdf | ||
| OR_WASH_2015(1)_Hagg_Lake_Project_Plan.pdf | ||
| Haqg-Lake_Plans100_.pdf | ||
| ESCP_OR_WASH_2015(1)_Hagg_Lake_Perimeter_Rd.pdf | ||
| PROJECT_DESCRIPTION.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hagg Lake Perimeter Road
OR WASH 2015(1)
EARTHWORK FILES
FOR
Access 1 – Pioneered access road and horizontal drilling pad A.
Access2 – Pioneered access road and horizontal drilling pad B.
Conn – Connector road between Access roads.
MP 3.142 – Deep patch
MP 4.602 – Deep patch
File: C:\WFLHD\HaggLake\PDF_Plots\2017‐08‐31_100%\Hagg‐Lake_Access1_Earthwork.txt 9/6/2
2017, 2:47:22 PM
Process Earthwork for Baseline = access1 job number = 672 beg sta = 10+00.00 R 1 end sta = 16+35.62 R 1
COMPUTING EARTHWORKS FOR BASELINE = ACCESS1
COMPUTING EARTHWORKS FOR JOB = 672
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Page: 1
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu.
yd.)
10+00.00 RDWYEXC
Excavation 24.83 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 25.94 0 0 0.00 0 0
10+10.00 RDWYEXC
Excavation 2.51 5 5 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.54 0 0 1.00 5 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 8 0 0.00 5 8
10+15.00 RDWYEXC
Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.12 1 1 1.00 4 1
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 3 0 0.00 4 11
10+20.00 RDWYEXC
Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 21.15 3 3 1.00 1 4
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 3 0 0.00 1 14
10+30.00 RDWYEXC
Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.84 10 10 1.00 ‐9 14
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Page: 2
Fill 18.15 7 0 0.00 ‐9 21
10+40.00 RDWYEXC
Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 37.77 13 13 1.00 ‐22 27
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐22 28
10+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.69 13 13 1.00 ‐35 40
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐35 35
10+60.00 RDWYEXC
Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.88 10 10 1.00 ‐45 50
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐45 42
10+65.21 RDWYEXC
Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.35 4 4 1.00 ‐49 54
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 4 0 0.00 ‐49 46
10+70.00 RDWYEXC
Excavation 0.00 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.40 3 3 1.00 ‐52 57
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 3 0 0.00 ‐52 49
10+80.00 RDWYEXC
Excavation 0.54 0 0 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.40 4 4 1.00 ‐56 61
Page: 3
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐56 56
10+90.00 RDWYEXC
Excavation 3.57 1 1 1.00 6 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.42 2 2 1.00 ‐57 63
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐57 63
11+00.00 RDWYEXC
Excavation 3.14 1 1 1.00 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.26 1 1 1.00 ‐57 64
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.21 7 0 0.00 ‐57 70
11+10.00 RDWYEXC
Excavation 3.00 1 1 1.00 8 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.19 2 2 1.00 ‐58 66
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐58 77
11+20.00 RDWYEXC
Excavation 7.96 2 2 1.00 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.46 1 1 1.00 ‐57 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 ‐57 84
11+30.00 RDWYEXC
Excavation 13.23 4 4 1.00 14 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐53 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.20 7 0 0.00 ‐53 91
11+40.00 RDWYEXC
Page: 4
Excavation 16.68 5 5 1.00 19 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐48 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.42 7 0 0.00 ‐48 98
11+50.00 RDWYEXC
Excavation 19.00 6 6 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐42 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.78 7 0 0.00 ‐42 105
11+55.15 RDWYEXC
Excavation 19.97 4 4 1.00 29 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐38 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.75 4 0 0.00 ‐38 109
11+60.00 RDWYEXC
Excavation 20.98 4 4 1.00 33 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐34 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.89 3 0 0.00 ‐34 112
11+70.00 RDWYEXC
Excavation 21.48 8 8 1.00 41 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐26 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 7 0 0.00 ‐26 119
11+80.00 RDWYEXC
Excavation 22.09 8 8 1.00 49 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐18 67
LAYER3
Excavation 0.00 0 0 0.00 0
Page: 5
Fill 24.87 8 0 0.00 ‐18 127
11+90.00 RDWYEXC
Excavation 23.14 8 8 1.00 57 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐10 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 25.76 9 0 0.00 ‐10 136
12+00.00 RDWYEXC
Excavation 23.63 9 9 1.00 66 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐1 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 25.69 10 0 0.00 ‐1 146
12+10.00 RDWYEXC
Excavation 20.02 8 8 1.00 74 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.32 8 0 0.00 7 154
12+20.00 RDWYEXC
Excavation 14.79 6 6 1.00 80 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 13 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.21 7 0 0.00 13 161
12+29.43 RDWYEXC
Excavation 10.66 4 4 1.00 84 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 17 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.95 7 0 0.00 17 168
12+30.00 RDWYEXC
Excavation 10.53 0 0 1.00 84 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 17 67
Page: 6
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.92 0 0 0.00 17 168
12+40.00 RDWYEXC
Excavation 9.17 3 3 1.00 87 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 20 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.52 7 0 0.00 20 175
12+50.00 RDWYEXC
Excavation 7.66 3 3 1.00 90 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 23 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.28 7 0 0.00 23 182
12+60.00 RDWYEXC
Excavation 6.78 2 2 1.00 92 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 25 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.24 7 0 0.00 25 189
12+70.00 RDWYEXC
Excavation 9.53 3 3 1.00 95 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 28 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.72 7 0 0.00 28 196
12+80.00 RDWYEXC
Excavation 14.54 5 5 1.00 100 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 33 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.39 7 0 0.00 33 203
12+90.00 RDWYEXC
Page: 7
Excavation 21.38 7 7 1.00 107 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 40 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.62 7 0 0.00 40 210
13+00.00 RDWYEXC
Excavation 28.87 10 10 1.00 117 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 50 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 50 217
13+10.00 RDWYEXC
Excavation 36.59 12 12 1.00 129 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 62 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 62 224
13+20.00 RDWYEXC
Excavation 48.23 16 16 1.00 145 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 78 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 78 231
13+30.00 RDWYEXC
Excavation 50.91 19 19 1.00 164 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 97 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 97 238
13+40.00 RDWYEXC
Excavation 56.37 20 20 1.00 184 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 117 67
LAYER3
Excavation 0.00 0 0 0.00 0
Page: 8
Fill 18.15 7 0 0.00 117 245
13+50.00 RDWYEXC
Excavation 47.87 20 20 1.00 204 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 137 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 7 0 0.00 137 252
13+60.00 RDWYEXC
Excavation 36.92 16 16 1.00 220 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 153 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.18 7 0 0.00 153 259
13+62.80 RDWYEXC
Excavation 34.73 4 4 1.00 224 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 157 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.06 2 0 0.00 157 261
13+70.00 RDWYEXC
Excavation 31.86 9 9 1.00 233 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 166 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 33.29 7 0 0.00 166 268
13+80.00 RDWYEXC
Excavation 34.22 12 12 1.00 245 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 178 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 35.83 13 0 0.00 178 281
13+90.00 RDWYEXC
Excavation 40.88 14 14 1.00 259 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 192 67
Page: 9
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 10 0 0.00 192 291
14+00.00 RDWYEXC
Excavation 36.77 14 14 1.00 273 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 206 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.38 7 0 0.00 206 298
14+10.00 RDWYEXC
Excavation 33.48 13 13 1.00 286 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 219 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 34.13 10 0 0.00 219 308
14+20.00 RDWYEXC
Excavation 30.60 12 12 1.00 298 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 231 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 33.28 12 0 0.00 231 320
14+30.00 RDWYEXC
Excavation 31.44 11 11 1.00 309 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 242 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 35.12 13 0 0.00 242 333
14+40.00 RDWYEXC
Excavation 28.01 11 11 1.00 320 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.24 0 0 1.00 253 67
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.15 10 0 0.00 253 343
14+50.00 RDWYEXC
Page: 10
Excavation 108.52 26 26 1.00 346 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 279 67
SUBEXCAVATION
Excavation 11.93 2 2 1.00 2 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 279 0 Mass ordinate for SUBEXCAVATION = 2
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 2 0 0.00 279 2
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 14 0 0.00 279 14
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 3 0 0.00 279 346
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.58 2 0 0.00 279 2
14+60.00 RDWYEXC
Excavation 104.06 39 39 1.00 385 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 318 67
SUBEXCAVATION
Excavation 12.10 4 4 1.00 6 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 318 0 Mass ordinate for SUBEXCAVATION = 6
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 318 7
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 318 42
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.72 5 0 0.00 318 7
14+70.00 RDWYEXC
Excavation 107.43 40 40 1.00 425 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.41 0 0 1.00 358 67
Page: 11
SUBEXCAVATION
Excavation 12.15 4 4 1.00 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 358 0 Mass ordinate for SUBEXCAVATION = 10
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 358 12
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 358 70
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.78 5 0 0.00 358 12
14+80.00 RDWYEXC
Excavation 94.88 38 38 1.00 463 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.10 0 0 1.00 396 67
SUBEXCAVATION
Excavation 11.45 4 4 1.00 14 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 396 0 Mass ordinate for SUBEXCAVATION = 14
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 396 17
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 396 98
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.09 5 0 0.00 396 17
14+90.00 RDWYEXC
Excavation 87.35 34 34 1.00 497 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.92 1 1 1.00 429 68
SUBEXCAVATION
Excavation 11.02 4 4 1.00 18 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 429 0 Mass ordinate for SUBEXCAVATION = 18
LAYER1
Excavation 0.00 0 0 0.00 0
Page: 12
Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 429 22
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 429 126
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.73 4 0 0.00 429 21
15+00.00 RDWYEXC
Excavation 80.20 31 31 1.00 528 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.76 3 3 1.00 457 71
SUBEXCAVATION
Excavation 10.95 4 4 1.00 22 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 457 0 Mass ordinate for SUBEXCAVATION = 22
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 457 27
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 457 154
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.83 4 0 0.00 457 25
15+10.00 RDWYEXC
Excavation 68.13 28 28 1.00 556 Subsoil Exc 0.00 0 0 1.00 0 Fill 28.52 7 7 1.00 478 78
SUBEXCAVATION
Excavation 10.62 4 4 1.00 26 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 478 0 Mass ordinate for SUBEXCAVATION = 26
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 478 32
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 478 182
SUBEXBACKFILL
Page: 13
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.50 4 0 0.00 478 29
15+20.00 RDWYEXC
Excavation 64.94 25 25 1.00 581 Subsoil Exc 0.00 0 0 1.00 0 Fill 48.78 14 14 1.00 489 92
SUBEXCAVATION
Excavation 10.35 4 4 1.00 30 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 489 0 Mass ordinate for SUBEXCAVATION = 30
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 489 37
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 489 210
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.22 4 0 0.00 489 33
15+30.00 RDWYEXC
Excavation 65.10 24 24 1.00 605 Subsoil Exc 0.00 0 0 1.00 0 Fill 69.07 22 22 1.00 491 114
SUBEXCAVATION
Excavation 10.97 4 4 1.00 34 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 491 0 Mass ordinate for SUBEXCAVATION = 34
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 491 42
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 491 238
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.81 4 0 0.00 491 37
15+40.00 RDWYEXC
Excavation 66.88 24 24 1.00 629 Subsoil Exc 0.00 0 0 1.00 0
Page: 14
Fill 81.03 28 28 1.00 487 142
SUBEXCAVATION
Excavation 12.22 4 4 1.00 38 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 487 0 Mass ordinate for SUBEXCAVATION = 38
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 487 47
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 487 266
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.04 5 0 0.00 487 42
15+43.76 RDWYEXC
Excavation 68.53 9 9 1.00 638 Subsoil Exc 0.00 0 0 1.00 0 Fill 80.17 11 11 1.00 485 153
SUBEXCAVATION
Excavation 12.64 2 2 1.00 40 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 485 0 Mass ordinate for SUBEXCAVATION = 40
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 2 0 0.00 485 49
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 10 0 0.00 485 276
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.32 2 0 0.00 485 44
15+50.00 RDWYEXC
Excavation 66.75 15 15 1.00 653 Subsoil Exc 0.00 0 0 1.00 0 Fill 79.59 18 18 1.00 482 171
SUBEXCAVATION
Excavation 13.34 3 3 1.00 43 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 482 0 Mass ordinate for SUBEXCAVATION = 43
LAYER1
Page: 15
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 3 0 0.00 482 52
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 17 0 0.00 482 293
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.03 3 0 0.00 482 47
15+60.00 RDWYEXC
Excavation 60.04 24 24 1.00 677 Subsoil Exc 0.00 0 0 1.00 0 Fill 91.67 32 32 1.00 474 203
SUBEXCAVATION
Excavation 14.10 5 5 1.00 48 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 474 0 Mass ordinate for SUBEXCAVATION = 48
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 474 57
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 474 321
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.85 5 0 0.00 474 52
15+70.00 RDWYEXC
Excavation 50.09 20 20 1.00 697 Subsoil Exc 0.00 0 0 1.00 0 Fill 124.64 40 40 1.00 454 243
SUBEXCAVATION
Excavation 10.64 5 5 1.00 53 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 454 0 Mass ordinate for SUBEXCAVATION = 53
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 454 62
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 454 349
Page: 16
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.21 5 0 0.00 454 57
15+80.00 RDWYEXC
Excavation 42.24 17 17 1.00 714 Subsoil Exc 0.00 0 0 1.00 0 Fill 148.32 51 51 1.00 420 294
SUBEXCAVATION
Excavation 10.93 4 4 1.00 57 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 420 0 Mass ordinate for SUBEXCAVATION = 57
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 420 67
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 420 377
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.12 5 0 0.00 420 62
15+90.00 RDWYEXC
Excavation 52.19 17 17 1.00 731 Subsoil Exc 0.00 0 0 1.00 0 Fill 162.33 58 58 1.00 379 352
SUBEXCAVATION
Excavation 13.08 4 4 1.00 61 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 379 0 Mass ordinate for SUBEXCAVATION = 61
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 379 72
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 379 405
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.45 5 0 0.00 379 67
16+00.00 RDWYEXC
Excavation 51.68 20 20 1.00 751
Page: 17
Subsoil Exc 0.00 0 0 1.00 0 Fill 146.07 57 57 1.00 342 409
SUBEXCAVATION
Excavation 13.68 5 5 1.00 66 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 342 0 Mass ordinate for SUBEXCAVATION = 66
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 342 77
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 342 433
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.96 5 0 0.00 342 72
16+10.00 RDWYEXC
Excavation 49.97 19 19 1.00 770 Subsoil Exc 0.00 0 0 1.00 0 Fill 126.93 51 51 1.00 310 460
SUBEXCAVATION
Excavation 14.24 5 5 1.00 71 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 310 0 Mass ordinate for SUBEXCAVATION = 71
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 310 82
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 310 461
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.56 5 0 0.00 310 77
16+20.00 RDWYEXC
Excavation 51.11 19 19 1.00 789 Subsoil Exc 0.00 0 0 1.00 0 Fill 107.24 43 43 1.00 286 503
SUBEXCAVATION
Excavation 13.79 5 5 1.00 76 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 286 0 Mass ordinate for SUBEXCAVATION = 76
Page: 18
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 286 87
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 286 489
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.48 5 0 0.00 286 82
16+30.00 RDWYEXC
Excavation 51.81 19 19 1.00 808 Subsoil Exc 0.00 0 0 1.00 0 Fill 97.64 38 38 1.00 267 541
SUBEXCAVATION
Excavation 13.99 5 5 1.00 81 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 267 0 Mass ordinate for SUBEXCAVATION = 81
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 5 0 0.00 267 92
LAYER2
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.32 28 0 0.00 267 517
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.76 5 0 0.00 267 87
16+35.62 RDWYEXC
Excavation 59.02 11 11 1.00 819 Subsoil Exc 0.00 0 0 1.00 0 Fill 95.88 20 20 1.00 258 561
SUBEXCAVATION
Excavation 13.91 3 3 1.00 84 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 258 0 Mass ordinate for SUBEXCAVATION = 84
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.34 3 0 0.00 258 95
LAYER2
Excavation 0.00 0 0 0.00 0
Page: 19
Fill 74.32 15 0 0.00 258 532
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.65 3 0 0.00 258 90
Page: 20
G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 819 819 1.00 Subsoil Exc 0 0 1.00 Fill 561 561 1.00
SUBEXCAVATION
Excavation 84 84 1.00 Subsoil Exc 0 0 1.00 Fill 0 0 1.00
LAYER1
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 95 0 0.00
LAYER2
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 532 0 0.00
LAYER3
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 346 0 0.00
SUBEXBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 90 0 0.00
Page: 21
Earthwork_Access2.log Process Earthwork for Baseline = access2 beg sta = 20+00.00 R 1 end sta = 20+85.20 R 1
COMPUTING EARTHWORKS FOR BASELINE = ACCESS2
COMPUTING EARTHWORKS FOR JOB = 672
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu.
yd.)
20+00.00 RDWYEXC
Excavation 94.92 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 46.52 0 0 1.00 0
SUBEXCAVATION
Excavation 22.86 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 0 Mass ordinate for SUBEXCAVATION = 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 0 0 0.00 0
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 0 0 0.00 0
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.39 0 0 0.00 0
20+10.00 RDWYEXC
Excavation 104.68 37 37 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 43.41 17 17 1.00 20
SUBEXCAVATION
Excavation 21.75 8 8 1.00
Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 20 Mass ordinate for SUBEXCAVATION = 8
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 20
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 20
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.20 8 0 0.00 20
20+20.00 RDWYEXC
Excavation 118.57 41 41 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 41.09 16 16 1.00 45
SUBEXCAVATION
Excavation 22.03 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 45 Mass ordinate for SUBEXCAVATION = 16
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 45
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 45
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.68 8 0 0.00 45
20+30.00 RDWYEXC
Excavation 117.13 43 43 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 39.10 15 15 1.00 73
SUBEXCAVATION
Excavation 22.64 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 73 Mass ordinate for SUBEXCAVATION = 24
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 73
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 73
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.27 9 0 0.00 73
20+40.00 RDWYEXC
Excavation 116.55 43 43 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 49.55 16 16 1.00 100
SUBEXCAVATION
Excavation 24.02 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 100 Mass ordinate for SUBEXCAVATION = 33
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 100
LAYER2
Excavation 0.00 0 0 0.00
Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 100
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 24.63 9 0 0.00 100
20+50.00 RDWYEXC
Excavation 130.21 46 46 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 56.35 20 20 1.00 126
SUBEXCAVATION
Excavation 23.31 9 9 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 126 Mass ordinate for SUBEXCAVATION = 42
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 126
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 126
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 23.66 9 0 0.00 126
20+60.00 RDWYEXC
Excavation 129.04 48 48 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 52.41 20 20 1.00 154
SUBEXCAVATION
Excavation 20.78 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 154
Mass ordinate for SUBEXCAVATION = 50
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 154
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 154
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.17 8 0 0.00 154
20+70.00 RDWYEXC
Excavation 116.65 45 45 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 40.40 17 17 1.00 182
SUBEXCAVATION
Excavation 17.64 7 7 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 182 Mass ordinate for SUBEXCAVATION = 57
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 182
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 182
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.43 7 0 0.00 182
20+80.00 RDWYEXC
Excavation 88.71 38 38 1.00
Fill 28.52 13 13 1.00 207
SUBEXCAVATION
Excavation 10.81 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 207 Mass ordinate for SUBEXCAVATION = 62
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 5 0 0.00 207
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 28 0 0.00 207
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 11.52 6 0 0.00 207
20+85.19 RDWYEXC
Excavation 89.16 17 17 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 30.66 6 6 1.00 218
SUBEXCAVATION
Excavation 10.06 2 2 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 218 Mass ordinate for SUBEXCAVATION = 64
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.34 2 0 0.00 218
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 74.32 14 0 0.00 218
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.28 2 0 0.00 218 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 358 358 1.00 Subsoil Exc 0 0 1.00 Fill 140 140 1.00
SUBEXCAVATION
Excavation 64 64 1.00 Subsoil Exc 0 0 1.00 Fill 0 0 1.00
LAYER1
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 42 0 0.00
LAYER2
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 238 0 0.00
SUBEXBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 66 0 0.00
Earthwork_Conn.log Process Earthwork for Baseline = conn job number = 672 beg sta = 30+00.00 R 1 end sta = 30+94.88 R 1
COMPUTING EARTHWORKS FOR BASELINE = CONN
COMPUTING EARTHWORKS FOR JOB = 672
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu.
yd.)
30+20.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 116.54 0 0 1.00 0
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 0 0 0.00 0
30+20.97 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 120.14 4 4 1.00 -4
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 1 0 0.00 -4
30+30.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 138.33 43 43 1.00 -47
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 6 0 0.00 -47
30+40.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 153.15 54 54 1.00 -101
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 7 0 0.00 -101
30+50.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 157.52 58 58 1.00 -159
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 7 0 0.00 -159
30+60.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 162.04 59 59 1.00 -218
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 7 0 0.00 -218
30+70.00 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 119.25 52 52 1.00 -270
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 7 0 0.00 -270
30+80.00 RDWYEXC
Excavation 0.00 0 0 1.00
Fill 67.30 35 35 1.00 -305
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 7 0 0.00 -305
30+81.05 RDWYEXC
Excavation 0.00 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 60.39 2 2 1.00 -307
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.15 1 0 0.00 -307 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 0 0 1.00 Subsoil Exc 0 0 1.00 Fill 307 307 1.00
LAYER3
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 43 0 0.00
Earthwork_mp3142-tub.log Process Earthwork for Baseline = mp3142 beg sta = 408+45 R 1 end sta = 412+25 R 1
COMPUTING EARTHWORKS FOR BASELINE = MP3142
COMPUTING EARTHWORKS FOR JOB = 672
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu.
yd.)
408+45.00 RDWYEXC
Excavation 44.35 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.89 0 0 1.00 0
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.47 0 0 0.00 0
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.88 0 0 0.00 0
408+50.00 RDWYEXC
Excavation 77.10 12 12 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.84 0 0 1.00 12
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.57 3 0 0.00 12
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.94 5 0 0.00 12
LAYER3
Excavation 0.00 0 0 0.00
Fill 30.30 3 0 0.00 12
408+60.00 RDWYEXC
Excavation 136.52 40 40 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.21 1 1 1.00 51
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.52 5 0 0.00 51
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.98 11 0 0.00 51
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 90.10 22 0 0.00 51
408+65.00 RDWYEXC
Excavation 164.59 28 28 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 2.92 0 0 1.00 79
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.51 3 0 0.00 79
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.98 5 0 0.00 79
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 19 0 0.00 79
408+70.00 RDWYEXC
Excavation 161.68 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.57 1 1 1.00 108
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.51 3 0 0.00 108
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.97 5 0 0.00 108
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 22 0 0.00 108
408+80.00 RDWYEXC
Excavation 161.29 60 60 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.64 3 3 1.00 165
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.51 5 0 0.00 165
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.97 11 0 0.00 165
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 44 0 0.00 165
408+90.00 RDWYEXC
Excavation 160.96 60 60 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.33 5 5 1.00 220
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.51 5 0 0.00 220
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 29.02 11 0 0.00 220
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 44 0 0.00 220
409+00.00 RDWYEXC
Excavation 157.02 59 59 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.41 6 6 1.00 273
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.51 5 0 0.00 273
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.97 11 0 0.00 273
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 44 0 0.00 273
409+10.00 RDWYEXC
Excavation 155.10 58 58 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.86 6 6 1.00 325
LAYER1
Excavation 0.00 0 0 0.00
Fill 13.51 5 0 0.00 325
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.97 11 0 0.00 325
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 44 0 0.00 325
409+20.00 RDWYEXC
Excavation 148.55 57 57 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 19.11 6 6 1.00 376
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 13.60 5 0 0.00 376
LAYER2
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 28.12 11 0 0.00 376
LAYER3
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 120.00 44 0 0.00 376
409+30.00 RDWYEXC
Excavation 144.68 54 54 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 20.67 7 7 1.00 423
LAYER1
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Fill 13.56