Q&A2-16-18.pdf

PDF 76 KB Posted

Attached to
WA NPS MORA 12(1), Repair Mather Memorial Slide Area
Solicitation number
69056718B000003
Issued by

View the file

Other files

File Type Posted
Bid_Opening_Summary_Mather_Memorial.pdf PDF
Amendment_A003.pdf PDF
Q&A_3-1-18.pdf PDF
Q&A_2-28-18.pdf PDF
Q&A2-23-18.pdf PDF
Q&A2-20-18.pdf PDF
Amendment_A002.pdf PDF
Amendment_A001.pdf PDF
fp14.pdf PDF
Plans_Request_form.pdf PDF
IFB_Mather_Memorial.pdf PDF
GM_28-17_Repair_Mather_Memorial_Slide_Area,_Short_Term_Repairs.pdf PDF
MoraSlide-PRO.xml XML file
mora01201_SkewedXsections.pdf PDF
mora01201xc-V8_EARTHWORK.pdf PDF
mora01201_MainlineXsections.pdf PDF
MoraSlide-Subgrade.xml XML file
mora01201_Planset-100.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
mora01201_PreAd-Planset.pdf PDF
Preliminary-Letter_pre-ad.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA NPS MORA 12(1)

REPAIR MATHER MEMORIAL SLIDE AREA

# General Technical Question Answer Date 1 x According to the index, the plan set for this project was missing sheet E.4. In addition, sheet E.7 was missing, but there was a sheet E.8 in its place.

Thank you, An Amendment will be issued to correct the index and plan sheet numbers.

2/13/18

2 X

On Plan Sheet I.1, The Edge Line Rumble Strip Quantities shows Item 40602‐0000 Fog Seal for 130 SQYD. There is no bid item on the bid schedule to complete the fog sealing, is this work incidental to the Rumble Strip Bid Item 63313‐0000?

This will be addressed in a forthcoming Amendment. 2/14/18

3 x Has a staging area close to the project been identified?

A staging area close to the project has not been identified, Please see 105.04 Handling and Storing Material for additional information concerning use of portions of the right‐of‐way. Please refer to Subsection 105.02(a) Contractor Located Sources for sites outside construction limits. 2/16/18

4 x Has a water source close to the project been identified? A water source has not been identified. 2/16/18

5 x Has a disposal site been identified for the asphalt?

A disposal site has not been identified.

Please see Section 203 Removal of Structures and Obstructions for requirements. 2/16/18

Check General or Technical

6 x Has a disposal site been identified for large rocks, muck, tree limbs, deleterious material?

A disposal site has not been identified.

Please see Subsection 203.05(a) Disposing of Material for requirements. 2/16/18