Amendment_A003.pdf
PDF 316 KB Posted
- Solicitation number
- 69056718B000003
About this file
Amendment A003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_Mather_Memorial.pdf | ||
| Q&A_3-1-18.pdf | ||
| Q&A_2-28-18.pdf | ||
| Q&A2-23-18.pdf | ||
| Q&A2-20-18.pdf | ||
| Amendment_A002.pdf | ||
| Q&A2-16-18.pdf | ||
| Amendment_A001.pdf | ||
| fp14.pdf | ||
| Plans_Request_form.pdf | ||
| IFB_Mather_Memorial.pdf | ||
| GM_28-17_Repair_Mather_Memorial_Slide_Area,_Short_Term_Repairs.pdf | ||
| MoraSlide-PRO.xml | XML file | |
| mora01201_SkewedXsections.pdf | ||
| mora01201xc-V8_EARTHWORK.pdf | ||
| mora01201_MainlineXsections.pdf | ||
| MoraSlide-Subgrade.xml | XML file | |
| mora01201_Planset-100.pdf | ||
| PROJECT_DESCRIPTION.pdf | ||
| mora01201_PreAd-Planset.pdf | ||
| Preliminary-Letter_pre-ad.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A003 03/01/2018 N/A SEE BLOCK 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X 69056718B000003
9B. DATED (SEE ITEM 11)
02/06/2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A D OTHER (Specify type of modification and authority)
N/A E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA NPS MORA 12(1), REPAIR MATHER MEMORIAL SLIDE AREA
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
WA NPS MORA 12(1)
REPAIR MATHER MEMORIAL SLIDE AREA
Amendment No. A003, dated 03/01/2018 Solicitation No. 69056718B000003
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page E-42, Subsection 156.07, Limitations on Construction Operations. Revises paragraph (m).
Page G-2a, Section 708 Plastic Pipe. Adds Subsection 708.04
PLANS
Plan sheet #H.3 Revises sign details
ENCLOSURES
Pages:
E-42 G-2a
Plan Sheets:
H.3
E-42 DIVISION 150
Special Contract Requirements Project: WA NPS MORA 12(1), REPAIR MATHER MEMORIAL SLIDE AREA
SECTION 156. — PUBLIC TRAFFIC
12/15/15– FP14
Construction Requirements
156.04 Accommodating Traffic During Work. Add the following:
(a) Allow emergency traffic to pass through project immediately. The Park dispatcher will coordinate emergency vehicle needs directly with the Traffic Control Supervisor by radio. The Park will provide an NPS radio to the Contractor’s Traffic and Safety Supervisor for this purpose.
(b) Call Washington State Department of Transportation Traffic Management Center (TMC) daily at 253-548-2420 to relay message of traffic and delay conditions. Update the TMC prior to any changes in delay conditions.
(c) Report any accidents to the CO, Park, and the TMC immediately.
156.07 Limitations on Construction Operations. Amend as follows:
Delete paragraph (g) and substitute the following:
(g) Provide two-way radio communications between Traffic Control Supervisor, flaggers, and pilot cars. Provide two-way radio communications between flaggers unless flaggers are able to see each other and communicate. Citizen band radios are not acceptable. Make radio equipment available to the CO as necessary.
Add the following:
(k) Complete paving of adjacent traffic lanes to the same elevation within 24 hours when public vehicular traffic is on-going. Adjacent lanes must be paved and to the same elevation prior to winter shut-down meeting the requirements of Subsection 403.11; Complete paving of adjacent traffic lanes to the same elevation by the end of each day.
(l) Do not perform construction operations which interfere with public travel on the roadway on any holiday or between 6 p.m. Friday and 6 a.m. the following Monday, unless approved by the CO or within full closure period.
(m) The road may be closed from May 8, 2018 to June 11, 2018. The closure period begins at the start of construction and is limited to 28 consecutive days. Weekend work is allowed. Close the road to prevent public access through the project during non-work periods. Provide a key to the NPS, RGS, WSDOT & CO.
(n) Provide NPS, RGS and WSDOT administrative access through the project at the following times during construction. Limit delays to 15 minutes or less.
8:00am – 9:00am
Revised by Amendment A003
G-2a
Special Contract Requirements Project: WA NPS MORA 12(1), REPAIR MATHER MEMORIAL SLIDE AREA
Section 708. — PLASTIC PIPE
08/01/14–FP14
708.04 Corrugated polyethylene drainage tubing. Delete the text of this subsection and substitute the following:
Furnish perforated and nonperforated 3- to 10-inch (75- to 250-millimeter) diameter tubing conforming to AASHTO M 252, Type C or CP.
Revised by Amendment A003
SIGN DETAILS
REF-1 REF-2
H.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d m o r a n c .d g n
WA NPS MORA 12(1)
A
M
O c to b e r
C
C o n r a d
C h e c k e d b y
D e s ig n e d b y
36"
60"
36"
78"
5.2"
5" C
3.4"
4" C
3"
4" C
3"
4" C
4.4"
5.2"
5" C
3.4"
4" C
3"
4" C
3"
4" C
4.4"
Christopher.Conrad Line
Christopher.Conrad Line
Christopher.Conrad Line
Christopher.Conrad Typewritten Text
Christopher.Conrad Typewritten Text
Christopher.Conrad Typewritten Text
Christopher.Conrad Typewritten Text
REVISED BY AMENDMENT A003
Christopher.Conrad Typewritten Text
Christopher.Conrad Line
Christopher.Conrad Line
Christopher.Conrad Line
Christopher.Conrad Typewritten Text
Christopher.Conrad Line
Christopher.Conrad Line
Christopher.Conrad Line
Christopher.Conrad Typewritten Text
Christopher.Conrad Line
Christopher.Conrad Line
Christopher.Conrad Line
Christopher.Conrad Typewritten Text
Christopher.Conrad Line
Christopher.Conrad Line
Christopher.Conrad Line david.l.mariman Typewritten Text david.l.mariman Line david.l.mariman Polygonal Line david.l.mariman Typewritten Text david.l.mariman Typewritten Text david.l.mariman Typewritten Text david.l.mariman Typewritten Text david.l.mariman Polygon david.l.mariman Polygon