Amendment_A001.pdf

PDF 2 MB Posted

Attached to
WA NPS MORA 12(1), Repair Mather Memorial Slide Area
Solicitation number
69056718B000003
Issued by

About this file

Amendment A001

View the file

Other files

File Type Posted
Bid_Opening_Summary_Mather_Memorial.pdf PDF
Amendment_A003.pdf PDF
Q&A_3-1-18.pdf PDF
Q&A_2-28-18.pdf PDF
Q&A2-23-18.pdf PDF
Q&A2-20-18.pdf PDF
Amendment_A002.pdf PDF
Q&A2-16-18.pdf PDF
fp14.pdf PDF
Plans_Request_form.pdf PDF
IFB_Mather_Memorial.pdf PDF
GM_28-17_Repair_Mather_Memorial_Slide_Area,_Short_Term_Repairs.pdf PDF
MoraSlide-PRO.xml XML file
mora01201_SkewedXsections.pdf PDF
mora01201xc-V8_EARTHWORK.pdf PDF
mora01201_MainlineXsections.pdf PDF
MoraSlide-Subgrade.xml XML file
mora01201_Planset-100.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
mora01201_PreAd-Planset.pdf PDF
Preliminary-Letter_pre-ad.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 02/15/2018 N/A SEE BLOCK 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056718B000003

9B. DATED (SEE ITEM 11)

02/06/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA NPS MORA 12(1), REPAIR MATHER MEMORIAL SLIDE AREA

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 02/15/2018 WA NPS MORA 12(1) Solicitation No. 69056718B000003 REPAIR MATHER MEMORIAL SLIDE AREA

REVISIONS ARE AS FOLLOWS:

PLANS

Plan sheet A.1 Revises Index To Sheets

Plan sheet E.4 Adds entire sheet.

Plan sheet E.5 Check Dam Moderate Grades Deletes entire sheet.

Plan sheet E.6 Deletes entire sheet

Plan Sheet E.8 Fiber Roll Renumbers Sheet as E.6 Titled Fiber Roll.

Plan sheet I.1 Revises Rumble Strip Quantity Table

ENCLOSURES

Plan Sheets:

A.1 E.4 E.5 Check Dam Moderate Grades E.6 E.6 Fiber Roll I.1

E.5-6

REVISED BY AMENDMENT A0011

ENTIRE SHEET ADDED BY AMENDMENT A0011

ENTIRE SHEET DELETED BY AMENDMENT A0011

E.6

REVISED BY AMENDMENT A0011

ENTIRE SHEET DELETED BY AMENDMENT A0011

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A001

File details come from the government source that posted it.