This document is a set of construction drawings and specifications for a temporary boiler project at the Newington VA Medical Center in Newington, Connecticut. The project involves installing a temporary boiler trailer, connecting it to the existing steam, natural gas, and water systems, and modifying the existing site infrastructure to accommodate the temporary boiler.
Key details include:
- This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside solicitation with Invitation for Bid (IFB) procedures.
- The bid due date is July 30, 2024 at 11:00 AM EST.
- The project involves temporary boiler connections, piping, and infrastructure modifications to support a temporary boiler during repairs to the existing boiler plant.
- The drawings and specifications provide details on the required equipment, piping, electrical, and controls for the temporary boiler system.
- The project is being managed by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24124B0048 0003.docx | DOCX document | |
| Temp Connections Questions_Response.docx | DOCX document | |
| 36C24124B0048 0002.docx | DOCX document | |
| 36C24124B0048 0001.docx | DOCX document | |
| Wage Determinations CT20240023.pdf | ||
| S02_SOW_Newington Temp Boiler Connections_R1.pdf | ||
| 689A423123VNEW001TempBoilers specs.pdf | ||
| 36C24124B0048.docx | DOCX document | |
| 689A4-23-123 Temp_BoilersNarrative.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEWINGTON ENERGY CENTER
TEMPORARY BOILER
PROJECT NO. 689A4-23-123
NEWINGTON VA MEDICAL CENTER
NEWINGTON, CT
PROJECT DIRECTORY
OWNER:
NEWINGTON VAMC
555 WILLARD AVE
BUILDING 03
NEWINGTON, CT 06111
ARCHITECT/ENGINEER:
AE WORKS, LTD
1655 FORT MYER DR
SUITE 830
ARLINGTON, VA 22209
VICINITY MAP
SITE
LOCATION MAP
SHEET INDEX
GENERAL
G001 COVER SHEET
MECHANICAL
M001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
MD101 LEVEL 1 MECHANICAL DEMOLITION PLAN
M101 LEVEL 1 HVAC PLAN
M401 EXISTING CENTRAL PLANT FLOW DIAGRAM
M501 HVAC DETAILS
M502 HVAC DETAILS 2
ELECTRICAL
E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E101 LEVEL 1 POWER PLANS
E201 ELECTRICAL DETAILS & DIAGRAMS
SITE
CONSULTANTS:
Drawing Title
Approved:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1655 FORT MYER DR
SUITE 830
ARLINGTON, VA 22209
PH: 202.594.3575
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
NEWINGTON TEMPORARY BOILER
100% CONSTRUCTION DOCUMENTS
555 Willard Ave, Newington, CT 06111
3-MAY-2024
689A4-23-123
G001
COVER SHEET
NO REVISION DATE 3-MAY-24
ABBREVIATIONS
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FD FIRE DAMPER
FDV FIRE DEPARTMENT VALVE
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
N.C. NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
N.O. NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
OA OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
R/A RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RA RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SA SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACEMOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
X DEMOLISH
XN
EXISTING TO BE RELOCATED
XR EXISTING TO REMAIN
AC AIR CONDITIONING UNIT
ACC AIR COOLED CONDENSER
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CWP CONDENSER WATER PUMP
CHWP CHILLED WATER PUMP
CV CONSTANT-AIR VOLUME BOX
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
HRU HEAT RECOVERY UNIT
IR INFRARED
MAU MAKE-UP AIR UNIT
PRV PRESSURE REDUCING VALVE
RTU ROOFTOP UNIT
SEP SEWAGE EJECTOR PUMP
SF SUPPLY FAN
SP SUMP PUMP
SS SPLIT-SYSTEM
UH UNIT HEATER
VAV VARIABLE-AIR VOLUME BOX
WH WATER HEATER
EQUIPMENT TAG ABBREVIATIONS
KEYNOTE
DETAIL NUMBER
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
POINT WHERE NEW CONNECTS TO EXISTING
PIPELINE ABBREVIATIONS
BOILER FEED WATER SUPPLY
BLOW-OFF
PIPELINE SYMBOLS
BALL VALVE
GATE VALVE
3-WAY VALVE
ECCENTRIC REDUCER
CHECK VALVE
PIPING TURNED UP
PIPING TURNED DOWN
TEE - OUTLET UP
TEE - OUTLET DOWN
PIPE CONTINUATION SYMBOL
BALANCING VALVE
HPS
POINT OF DISCONNECTION FROM EXISTING
HPS HIGH PRESSURE STEAM
NG
DOMESTIC COLD WATERDCW
DR DRAIN
BFWS
BO
HIGH PRESSURE STEAM
NATURAL GAS
OSD OPEN SITE DRAIN
DCW DOMESTIC COLD WATER
PIPE COUPLING
6" BO
2" DRAIN
M
C T BI - PUMP STATUS
V F D
BO - PUMP START/STOP
AO - PUMP VFD SPEED
BI - PUMP VFD FAULT
AI - FLOAT LEVEL HIGH LEVEL
AI - FLOAT LEVEL LOW LEVEL
STORAGE TANK
P-1
AI - FLOAT LEVEL ALARM LEVEL
CONSULTANTS:
Drawing Title
Approved:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1655 FORT MYER DR
SUITE 830
ARLINGTON, VA 22209
PH: 202.594.3575
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
NEWINGTON TEMPORARY BOILER
100% CONSTRUCTION DOCUMENTS
555 Willard Ave, Newington, CT 06111
3-MAY-2024
689A4-23-123
MC AC
M001
MECHANICAL SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES
HVAC GENERAL NOTES
1 NOT ALL SYMBOLS ARE NECESSARILY USED.
2 DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY PIPE ROUTING AND
COORDINATE INTERFERENCE BETWEEN TRADES PRIOR TO INSTALLATION.
3 ROOF OPENINGS, FLASHING, AND COUNTER FLASHING BY GENERAL CONTRACTOR. LOCATION
OF OPENINGS BY HEATING CONTRACTOR.
4 PIPING TO BE INSTALLED TIGHT TO UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED
OTHERWISE.
5 PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
6 CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMATIC AND ARE
INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY. CONTRACTOR WILL BE
RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMODATE ACTUAL SITE
CONDITIONS AS PART OF SCOPE OF WORK AT NO COST TO OWNER.
7 INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING, STATE
AND LOCAL CODES, SEISMIC REQUIREMENTS, ENERGY CODES AND INSURANCE UNDERWRITER
REQUIREMENTS.
8 COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL,
CIVIL AND ELECTRICAL WORK, ETC. SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.
9 MAINTAIN A MINIMUM OF 6-FT, 8-IN CLEARANCE TO UNDERSIDE OF PIPES, CONDUITS,
SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL
ROOMS.
10 LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM, AS RECOMMENDED
BY THE MANUFACTURER FOR ACCURACY.
11 IF APPLICABLE, TESTING ADJUSTING AND BALANCING (TAB) AGENCY MUST BE A MEMBER OF THE
ASSOCIATED AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING
BUREAU (NEBB). TAB FIRM MUST HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR
PROJECTS. PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB
PROCEDURAL STANDARD RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT APPROVED
THE TAB FIRM'S QUALIFICATIONS.
12 WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE
PRODUCTS OF A SINGLE MANUFACTURER MUST BE USED.
13 COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH THE MANUFACTURERS' CERTIFIED
DRAWINGS. COORDINATE AND PROVIDE ALL PIPING TRANSITIONS REQUIRED FOR FINAL
EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL
PIPING DIMENSIONS BEFORE FABRICATION.
14 ALL CONTROL WIRE AND CONDUIT MUST COMPLY WITH THE NATIONAL ELECTRIC CODE, DIVISION
26 OF THE SPECIFICATIONS, ALL LOCAL CODES, AND OWNER'S INSURANCE UNDERWRITER
REQUIREMENTS.
15 THE LOCATIONS AND SIZES OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE
SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY.
THE EXACT LOCATIONS AND SIZES NECESSARY TO SECURE THE BEST CONDITIONS AND
RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND MUST HAVE THE
APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.
16 PLAN DRAWINGS AND SECTIONS CUTS WHICH SPECIFICALLY IDENTIFY SERVICE ROUTE
OFFSETS, ELEVATION CHANGES, OBSTRUCTIONS, ACCESS DOORS, BALANCING DEVICES, ETC.
ARE SHOWN FOR CLARITY WHERE SPECIFIC KNOWN CONDITIONS EXIST. MECHANICAL
CONTRACTOR MUST COORDINATE EQUIPMENT AND PIPING ROUTINGS WITH ALL OTHER TRADES.
REQUIREMENTS NOT SPECIFICALLY IDENTIFIED MUST NOT BE INTERPRETED AS EXCLUSION
FROM CONTRACTOR'S SCOPE OF WORK. CONTRACTOR MUST BE RESPONSIBLE FOR ACTUAL
SITE CONDITIONS AND MUST INCLUDE SUCH CONDITIONS IN SCOPE OF WORK AT NO ADDITIONAL
COST TO THE OWNER.
17 ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND SUPPORT OF
MECHANICAL WORK AS SHOWN IN DETAILS FOR PIPING AND EQUIPMENT (UNLESS OTHERWISE
NOTED) MUST BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER.
HVAC GENERAL NOTES
18 ALL EQUIPMENT, PIPING, DUCTWORK, ETC., MUST BE SUPPORTED AS DETAILED, SPECIFIED AND
AS REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.
19 ALL OPENINGS IN FIRE RATED WALLS AND SMOKE PARTITIONS DUE TO PIPING, CONDUIT, ETC., MUST BE FIRE STOPPED WITH APPROVED FIRESTOPPING MATERIALS.
20 REFER TO TYPICAL DETAILS FOR PIPING AND EQUIPMENT INSTALLATION.
21 LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING.
22 PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN HYDRONIC WATER PIPING
SYSTEMS. ALL PIPING MUST SLOPE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES AT THE
BOTTOM OF ALL RISERS AND LOW POINTS.
23 INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER
APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
24 ALL ISOLATION VALVES MUST BE IN LOCATION AND ELEVATION WHICH ALLOWS FOR EQUIPMENT
AND BRANCH PIPING REMOVAL, WHILE MAINTAINING SERVICE UPSTREAM OF THE ISOLATION
VALVE.
25 ALL BALANCING VALVES AND ISOLATION VALVES USED TO ADJUST FLOW RATES MUST BE
PROVIDED WITH POSITIONS INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).
26 ALL ISOLATION VALVES (EXCEPT CONTROL VALVES), STRAINERS, AND PIPING SPECIALTIES MUST
BE FULL LINE SIZE BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND
CONTROLS.
27 MECHANICAL JOINTS SUCH AS UNIONS, FLANGES, OR THREADED FITTINGS MUST BE INSTALLED
AT EACH EQUIPMENT CONNECTION, IN BYPASSES, AT FLOOR PENETRATIONS, AT CONTROL
DEVICES, AND IN LONG PIPE RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR
ALTERATION AND REPAIRS.
28 MEASURE, CUT AND INSTALL PIPE LENGTH ACCURATELY TO MINIMALIZE MISALIGNMENT. INSTALL
ALL PIPING WITHOUT FORCING OR SPRINGING.
29 PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS AND OTHER
EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION (EXCEPT WATER COILS). FLEXIBLE
CONNECTIONS MUST BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS
INDICATED ON THE DRAWINGS.
30 PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT VIBRATION
TRANSMISSION TO BUILDING STRUCTURE.
31 CONCRETE HOUSEKEEPING PADS MUST BE FURNISHED AND INSTALLED BY THE GENERAL
CONTRACTOR. MECHANICAL CONTRACTOR MUST PROVIDE EQUIPMENT WEIGHTS, SIZES AND
LOCATION TO GENERAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS MUST BE IN
ACCORDANCE WITH STRUCTURAL DETAILS. PAD MUST EXTEND BEYOND THE EQUIPMENT
FOOTPRINT A MINIMUM OF 6 INCHES ON EACH SIDE.
32 MECHANICAL EQUIPMENT AND PIPING MUST NOT BE SUPPORTED FROM ROOF OR DECK
ASSEMBLY. SUPPORTS MUST ATTACH TO STRUCTURAL MEMBERS.
33 PROVIDE CHAINWHEEL OPERATORS FOR ALL EXPOSED VALVES MOUNTED GREATER THAN 8-FT, 0-IN ABOVE FINISHED FLOOR LEVEL. CHAIN MUST EXTEND UNOBSTRUCTED TO 7-FT, 0-IN ABOVE
FLOOR LEVEL.
34 ALL PIPING MUST CLEAR DOORS, WINDOWS, EQUIPMENT CLEARANCES, MAINTENANCE
REQUIREMENTS, CODE SETBACKS, ETC. TO ASSURE PROPER OPERATION, INSPECTION AND
MAINTENANCE.
35 ALL VALVES MUST BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
36 ALL EQUIPMENT SUBMITTALS AND SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS MUST
BE APPROVED BY THE ENGINEER PRIOR TO PURCHASE, FABRICATION AND INSTALLATION.
37 ALL HEATING DEVICES AND SURFACES WITH ELEVATED TEMPERATURES WHICH CAN BE
ACCESSED OR COME IN CONTACT WITH OWNER PERSONNEL MUST BE PROTECTED, INSULATED,
OR CONTROLLED TO REMAIN BELOW 120º F.
38 ALL VFDS, STARTERS, AND DISCONNECTS MUST BE PROVIDED BY THE MECHANICAL
CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR.
SEQUENCES OF OPERATION
PUMP SYSTEM - RUN CONDITIONS:
PUMP P-1 SHALL BE ENABLED WHENEVER THE TANK FLOAT LEVEL HIGH LEVEL INDICATES WATER LEVEL IS ABOVE THE HIGH LEVEL.
PUMP P-1 SHALL BE DISABLED WHENEVER THE TANK FLOAT LEVEL LOW LEVEL INDICATES WATER LEVEL IS BELOW THE LOW LEVEL.
PUMP P-1:
THE PUMP SHALL RUN ANYTIME IT IS REQUESTED TO RUN.
THE PUMP SHALL HAVE
- A USER ADJUSTABLE DELAY ON START.
THE DELAY TIMES SHALL BE SET APPROPRIATELY TO ALLOW FOR ORDERLY START-UP AND SEQUENCING.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
- PUMP FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
- PUMP RUNNING IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
- PUMP RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT.
- PUMP VFD FAULT.
TANK FLOAT LEVEL ALARM LEVEL:
WHEN THE TANK WATER LEVEL REACHES THE FLOAT LEVEL ALARM LEVEL, THE BAS SHALL INITIATE THE "EMERGENCY KILL-SWITCH"
TO THE TEMPORARY BOILER TRAILER GATEWAY AND TERMINATE THE BLOWDOWN PROCEDURE.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
- TANK OVERFLOW: PUMP P-1 IS COMMANDED ON, BUT THE WATER LEVEL IS RISING TO TANK MAXIMUM CAPACITY.
NOT TO SCALE
BLOWDOWN RETURN CONTROLS DIAGRAM
TANK WATER LEVEL ALARM LEVEL X X X
TANK WATER LEVEL HIGH LEVEL X X X
TANK WATER LEVEL LOW LEVEL X X X
PUMP RUNTIME EXCEEDED X
PUMP RUNNING IN HAND X
PUMP FAILURE X
PUMP START/STOP X X X
PUMP VFD FAULT X X X
PUMP STATUS X X X
PUMP VFD SPEED X X X
AI AO BI BO AV BV LOOP SCHED TREND ALARM
POINT NAME
HARDWARE POINTS SOFTWARE POINTS SHOW ON
GRAPHIC
BLOWDOWN RETURN CONTROLS POINTS SCHEDULE
NO REVISION DATE
8" HPS
(E)NATURAL GAS
SUPPLY MANIFOLD
(E)BOILER-3 (E)BOILER-2
(E)BOILER-1
EXISTING BOILER #3 TO BE REPAIRED
DCW
BFWS
N G
NG
BO BO BO
CONSULTANTS:
Drawing Title
Approved:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1655 FORT MYER DR
SUITE 830
ARLINGTON, VA 22209
PH: 202.594.3575
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
NEWINGTON TEMPORARY BOILER
100% CONSTRUCTION DOCUMENTS
555 Willard Ave, Newington, CT 06111
3-MAY-2024
689A4-23-123
MC AC
MD101
LEVEL 1 MECHANICAL DEMOLITION
PLAN
NORTH
PROJECT
1/8" = 1'-0"
LEVEL 1 HVAC DEMOLITION PLAN
HVAC GENERAL NOTES
1 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE OWNER. A DETAILED
JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.
2 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.
3 MAINTAIN MANUFACTURER-RECOMMENDED MINIMUM CLEARANCE FROM TEMPORARY BOILER
TO BUILDING WALLS.
4 REFER TO DETAILS ON SHEET M501 FOR FURTHER INFORMATION.
KEYNOTES
HPS HPS
(E)BOILER-2
(E)BOILER-1
DISCHARGE BLOWDOWN PIPING TO
EXISTING BLOWDOWN TRENCH
CONNECT NEW HPS WITH
DOUBLE ISOLATION VALVES
AT EXISTING HEADER.
CONNECT NEW FEED WATER PIPING WITH
ISOLATION VALVE TO EXISTING.
CONNECT NEW NATURAL GAS PIPING
WITH ISOLATION VALVE.
PROPOSED LOCATION FOR TEMPORARY
BOILER TRAILER, BY DELVAL EQUIPMENT
OR APPROVED EQUAL. PROVIDE WITH
GATEWAY CONNECTION FOR REMOTE
BAS MONITORING. PROVIDE WITH
REMOTE EMERGENCY KILL-SWITCH.
COORDINATE WITH VA GATEWAY
CONNECTION, MONITORING POINTS, AND
KILL-SWITCH OPTIONS.
(E)NATURAL GAS
SUPPLY MANIFOLD
2" BFWS
PUMP LOCATED IN CUSTOM
INSULATED WEATHER-PROOF
ENCLOSURE. 7'-0" x 4'-0" MINIMUM, WITH REMOVABLE LONG PANEL
FOR MAINTENANCE ACCESS.
PROVIDE NEMA-3R DISCONNECT.
3" NG
HPS PIPE TO REMAIN HIGH. PROVIDE
PIPE BRIDGE FROM ROOF TO TRAILER,
AND ROUTE PIPING TO DISCHARGE
CONNECTION ON TOP OF TRAILER.
CONNECT NEW DCW
PIPING TO EXISTING.
2" DCW
2" DCW
2" B
F W
S
6" B
O
6" BO
FRONT OF TRAILER
RUN ALL PIPING
UNDER TRAILER
HEAT TRACE ALL EXTERIOR DCW
PIPING, BFWS PIPING, AND BO
PIPING DOWNSTREAM OF THE
BLOWDOWN RETURN SKID
ROUTE NG PIPING HIGH ON
WALL ABOVE DOOR
PROVIDE ACCESS STEPS
TO TRAILER DOOR
REMOVE EXISTING WINDOW AND PROVIDE INSULATED METAL PANEL
WITH OPENINGS AND SLEEVES FOR PIPING AND CONDUITS.
PIPE COUPLING, CONNECT
BUILDING-SIDE PIPING TO
TEMPORARY TRAILER PIPING
8" HPS
8" HPS
1 1
2 3
M101
6" BO
P-1
TANK
2" DRAIN
STORAGE TANK, SEE DETAIL 1/M501.
PEDESTRIAN BRIDGE
PIPING SUPPORT BLOCK
SHUT-OFF VALVES
PIPING DRAIN-OUT
CONSULTANTS:
Drawing Title
Approved:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1655 FORT MYER DR
SUITE 830
ARLINGTON, VA 22209
PH: 202.594.3575
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
NEWINGTON TEMPORARY BOILER
100% CONSTRUCTION DOCUMENTS
555 Willard Ave, Newington, CT 06111
3-MAY-2024
689A4-23-123
MC AC
M101
LEVEL 1 HVAC PLAN
KEYNOTES
1 RUN PIPING ON ROOF WITH ROOFTOP SUPPORT BLOCKS, EATON DURA-BLOK OR
APPROVED EQUAL.
2 PROVIDE SHUT-OFF VALVES IN THE VERTICAL SECTION HIGH NEAR THE ROOFLINE.
3 RUN ALL PIPING DOWN ALONG EXTERIOR WALL TO GROUND LEVEL, AND OVER TO
TRAILER. (TYPICAL OF 4)
4 PIPE COUPLING, CONNECT BUILDING-SIDE PIPING TO TEMPORARY TRAILER PIPING
(TYPICAL OF 3)
5 PROVIDE PEDESTRIAN RAMP BRIDGE OVER PIPING ON SIDEWALK, MINIMUM 36 INCHES
INSIDE CLEAR WIDTH. RAMP MAY BE ROLL-TEK MODULAR RAMP KIT WITH HANDRAILS
BY SILVER SPRING OR APPROVED EQUAL, OR BE CUSTOM WOOD CONSTRUCTION
WITH HANDRAILS AND NON-SLIP TRACTION STRIPS OR RAMP TREADS. ANCHOR RAMP
BRIDGE TO THE SIDEWALK.
6 PROVIDE DRAIN-OUT FOR BFWS AND DCW PIPING ON THE BOTTOM OF THE VERTICAL
SEGMENTS.
7 PROVIDE DRAIN-OUT FOR BLOWDOWN PIPING.
8 VFD FOR PUMP P-1 MOUNTED ON WALL
HVAC GENERAL NOTES
1 ALL WORK MUST BE SCHEDULED AND COORDINATED JOINTLY WITH THE OWNER. A DETAILED
JOB TIMELINE MUST BE ESTABLISHED AND SUBMITTED FOR REVIEW AND APPROVAL.
2 MAINTAIN 6-IN MINIMUM CLEARANCE FROM RATED WALLS AND HVAC EQUIPMENT.
3 MAINTAIN MANUFACTURER-RECOMMENDED MINIMUM CLEARANCE FROM TEMPORARY BOILER
TO BUILDING WALLS.
4 REFER TO DETAILS ON SHEET M501 FOR FURTHER INFORMATION.
NORTH
PROJECT
1/8" = 1'-0"
LEVEL 1 HVAC NEW WORK PLAN
1/4" = 1'-0"
HVAC SECTION VIEW 1
2. DISCONNECT WILL BE PROVIDED BY ELECTRICAL CONTRACTOR.
1. PROVIDE PUMP WITH VARIABLE FREQUENCY DRIVE.
NOTES:
P-1 END-SUCTION BLOWDOWN 7.5 6.22 1646 80.1 800 25 16.7 460/3 BELL & GOSSETT 1510 1,2
TAG TYPE SYSTEM HP BHP RPM
EFFICIENCY
FLOW
GPM
HEAD
FT
NPSH VOLT/PH MANUFACTURER MODEL NOTES
PUMP SCHEDULE
(E)BOILER #3
OSD
CHEM
FEED
CHEM
SAMPLE
OSD
B O
B O
D R
D R
D R
D R
D R
3" B
F W
S
3" B
F W
S
6"
M
2-1/2"
OSD
(E)BOILER #2
OSD
CHEM
FEED
CHEM
SAMPLE
OSD
B O
B O
D R
D R
D R
D R
D R
3" B
F W
S
3" B
F W
S
M
OSD
(E)BOILER #1
OSD
CHEM
FEED
CHEM
SAMPLE
OSD
B O
D R
D R
D R
D R
6"
M
T
OSD
CW
SAMPLE
COOLER
ORIFICE
BF FLOW INDICATOR - 0-200 GPM
EXISTING 8" STEAM HEADER TO REMAIN
3"
3"
BFWS
BFWS
BFWS
BFWS
1/4" MIN
3"
3"
2-1/2"
BLOW OFF TRENCH
(E)BLOW-OFF
TANK
BO 2-1/2" BO BO2-1/2"
(E)DEAERATOR
R
RELIEF THRU ROOFVENT THRU ROOF
3"
3"
3"
30-300 F
FLOAT CAGE
STANDBY PUMP CONT.
BOTTOM OF TANK
HI LEVEL ALARM
GAUGE GLASS
LOW LEVEL ALARM
SET 2" BELOW STANDBY
PIPE INSIDE TANK
OVERFLOW CONTROLLER
200 GP @ 4FT HD
GAUGE GLASS
30" VAC-15 PSIG
30-300 F
N.C.
3" 3" 3"
P
(E)FWP-3
P
(E)FWP-2
P
(E)FWP-1
FEED WATER PUMPS
(E)BOILER FEED
WATER PUMP #1
(TURBINE)
(E)BOILER FEED
WATER PUMP #2
(ELEC. MTR.)
(E)BOILER FEED
WATER PUMP #3
(ELEC. MTR.)
6"
6"
3"
3"
3"3"
3"
3"
6"
CW
M
1- 1/
2"
M
1- 1/
2"
N.O.
(E)
BRINE
TANK
1- 1/
2"
FE
TO BLOW
DOWN
SEPARATOR
FROM
DOMESTIC
WATER
3"
(E)TWIN TOWER WATER SOFTENER
N.C.
VTR
(E)CONDENSATE
STORAGE TANK
P
EMERGENCY
TO BOILER
FEED WATER
5" FROM CAMPUS
RETURN SYSTEM
(E)VACUUM
SYSTEM2-
1/ 2"
PRESS RELIEF
UP THRU ROOF
PRESS RELIEF
UP THRU ROOF
PRESS RELIEF
UP THRU ROOF
1/4" MIN
NEW
TEMPORARY
BOILER
8" HPS
8" HPS
CONNECT TO EXISTING
STEAM HEADER WITH
DOUBLE VALVES
6" HPS
2" BFWS
2" BFWS
8" H
P S
2" B
F W
S
3" NG
6" BO
B O
6" B
O
(E)NATURAL
GAS MANIFOLD
LP
R
KEYNOTES:
1. OUTDOOR TEMPORARY BOILER TRAILER.
2. (E) BOILER #3 TO BE REPAIRED BY THE VA.
3. CONNECT TERMPORARY BOILER TO EXISTING STEAM HEADER.
4. CONNECT TEMPORARY BOILER TO EXISTING FEED WATER SYSTEM.
5. SPILL NEW BLOWDOWN/BLOWOFF PIPING TO EXISTING BLOWDOWN
TRENCH.
6. CONNECT TO EXISTING 4" NATURAL GAS LINE.
7. EXISTING LPR.
8. PIPE COUPLING, CONNECT PERMANENT BUILDING-SIDE PIPING TO
TEMPORARY TRAILER PIPING. (TYP OF ALL)
NGNGNG
STORAGE TANK WITH
FLOAT LEVEL SENSORS
PER DETAIL 1/M501.
6" BLOWDOWN
2" 100% BOILER DRAIN
2" DCW2" DCW
2" DCW
DCWDCW
BLOWDOWN RETURN PUMP
6" BO
6" BO
CONSULTANTS:
Drawing Title
Approved:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1655 FORT MYER DR
SUITE 830
ARLINGTON, VA 22209
PH: 202.594.3575
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
NEWINGTON TEMPORARY BOILER
100% CONSTRUCTION DOCUMENTS
555 Willard Ave, Newington, CT 06111
3-MAY-2024
689A4-23-123
MC AC
M401
EXISTING CENTRAL PLANT FLOW
DIAGRAM
NOT TO SCALE
BOILER PLANT DIAGRAM
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
MAXIMUM PIPE/TUBING SUPPORT SPACING
TUBING 5 FT
NOM. SIZE
PIPE
THRU (20)
6 8 10
(32)(25) (40)
(65)
(50)
(75)
-1312 14 -16 -
(125)(100)
(150)
(250)
(200)
(300)
(400)
(350)
(450)
(600)
(500)
20 241814 16128 1064 532 2 1/21 1/21 1 1/4IN.
(MM)
(M)
FT.
FT.
(M)
(9.1) (9.6)(8.5)(7.6) (8.2)(7.0)(5.8) (6.7)(5.2)(4.1) (4.9)(3.7)(3.0) (3.4)(2.7)(2.1)
--- --(4.9) -(4.1)(3.7) (4.0) -(3.0)(2.4)(1.8)5 FT
THRU 3/4
(2.1) (2.1)
(2.1)
(2.7)
(2.4)
HANGER ROD
INSULATION
(VAPOR BARRIER TYPE IS REQUIRED
FOR LOW TEMPERATURE PIPE)
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PCF MIN.
DENSITY) UNDER INSULATION SHIELD
INSULATION SHIELD AT
HANGER WELD
SADDLE
1/2" DIA. HANGER RODS WITH 36"
MAX. SPACING ON EACH
CHANNEL
BAND
PROVIDE INSULATION SHIELD
AND INSERT FOR ALL PIPING (8" MIN.)
1" MAX. 1-5/8" 12 GAGE CHANNEL OR
2"x2"x1/4" ANGLE
SIDE VIEW
TRAPEZE HANGER FOR UP TO 1000 LB.
UNIFORM LOAD
1-1/4" x 1-1/4" x 3/16"
ANGLE IRON SUPPORTS
NUTS AND WASHERS BOTH
SIDES OF ANGLE (TYP)
HIGH DENSITY INSULATION INSERT
UPPER HALF OF PIPE
3/8" TYPE 24 U-BOLT
STRUCTURAL JOIST
HIGH DENSITY INSULATION INSERT
LOWER HALF OF PIPE
MINIMUM 1/2" DIAMETER
THREADED HANGER ROD
HOT PIPE - ALL SIZES
COLD PIPE - ALL SIZES
UNISTRUT PIPE SUPPORT
FRAME
NUT AND WASHER
BOTH SIDES
TYPE 40 PROTECTION SHIELD
TOP AND BOTTOM (TYP)
STRUCTURAL STEEL BEAM
HEAVY DUTY BEAM
CLAMP
EYE SOCKET
CLEVIS HANGER
INSULATION WHERE
SPECIFIED SHALL
COVER HANGER
HANGER ROD
LOCKING NUT
INSERT NUT HEAVY DUTY CONCRETE STEEL
INSERT WITH ELONGATED SLOT
(OR EXPANSION SHIELD)
HANGER ROD
LOCKING NUT
VAPOR BARRIER INSULATION
PIPE
NOTES:
1. DRIP POCKET PIPE SIZE SAME AS STEAM MAIN UNLESS OTHERWISE NOTED.
STEAM TRAP ASSEMBLY
STEAM LINE DRIP POCKET
FROM DRIP
CONNECTION
3/4" MIN. DRIP RETURN
3/8" TEST CONNECTION
6" M
IN
M
IN
DIRT LEG (TYP.)
3/4" DRAIN
(ALTERNATE LOCATIONS)
(TYPICAL)
CAP (TYP.)
6" M
IN
M
IN
STEAM LINE
(TYPICAL)
PIPE T0 STEAM TRAP
(TYPICAL)
TO DRAIN
MV
MANUAL
AIR VENT
TO BUILDING
LOAD
INVERTED BUCKET
TRAP ASSEMBLY
CONDENSATE
STEAM PIPE
1" GATE VALVE
SCHEDULE 80 STEEL PIPE12" [300 MM]
6" [150 MM]
WELDED TEE
NOTE:
1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM HIGH DRIP
LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 6" SCALE
POCKET BELOW TRAP INLET.
TO RETURN MAIN
PIPE SIZE SHALL BE SAME SIZE
AS TRAP
FLOAT AND
THERMOSTATIC TRAP.
SEE PLANS, AND
SCHEDULES
DIELECTRIC FITTING
WHERE RETURN IS
COPPER PIPE
SCHEDULE 80
STEEL PIPE
BYPASS-INSTALL IN HORIZONTAL
PLANE LEVEL WITH TRAP OR IN
VERTICAL PLANE & BELOW TRAP
PROVIDE BYPASS PIPING FOR ALL
TRAPS 1" AND LARGER.
DRIP LEG OR EQUIPMENT
CONNECTION. MAKE THE
SAME SIZE AS THE SUPPLY
MAIN OR EQUIPMENT
CONNECTION. SEE NOTE 1
SCHEDULE 80 STEEL PIPE
SEE DRAWINGS FOR PIPE SIZES
1" GATE
VALVE
FLOW
M
IN
6"
M
IN
[3 m m
[1 m m
NOTES:
1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE
CALCULATION METHOD CONTAINED IN ANSI B31.1. POWER PIPING CODE, APPENDIX II.
2. VENT PIPE SHALL TERMINATE 6' MIN. ABOVE FINISHED ROOF.
3. DISCHARGE OF DRAIN MUST BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS WHICH PERSONNEL MAY OCCUPY.
4. DO NOT CONNECT ANY OTHER DRAIN TO THE DRIP PAN ELBOW DRAIN PIPE.
VENT PIPE THROUGH ROOF SUPPORT
AS INDICATED ON DWGS. (NOTES 1, 2)
PIPE THREADED INTO ELBOW (SAME SIZE
AS ELBOW)
DRIP PAN ELBOW (SECTIONAL VIEW)
FLEXIBLE CONNECTOR
D
3/4" DRAIN TO FLOOR DRAIN OR OPEN
SIGHT DRAIN (NOTE 4)
SAFETY VALVE
OPEN DRAIN (NOTE 3)
PROVIDE UNION UNLESS SAFETY VALVE
HAS FLANGED OUTLET
CONNECTION TO PRESSURE
VESSEL OR PIPE
1" M
IN
3"
1" DRAIN
3" NPT
2" OUTLET
1-1/4" NPT WITH 3-LEVEL FLOAT
SWITCH, GEMS LS-800 OR
APPROVED EQUAL.
1-1/4" NPT
6" FLANGED INLET CONNECTION
(ON OPPOSIDE SIDE)
6" FLANGED OUTLET
CONNECTION
MANHOLE
LOW LEVEL FLOAT
HIGH LEVEL FLOAT
6" FLANGED INLET
CONNECTION
6" FLANGED OUTLET
CONNECTION 3
2" FLANGED INLET CONNECTION
(ON OPPOSIDE SIDE)
NOTES:
1. STORAGE TANK BY AO SMITH, MODEL
HDH42-900A, OR APPROVED EQUAL.
2. ALL THREE FLANGED CONNECTIONS ARE
300 LB FLANGES TO MATCH TRAILER
CONNECTIONS.
ALARM LEVEL
FLOAT
DRAIN PIPE WITH
SHUT-OFF VALVE
(TYP-3)
CONSULTANTS:
Drawing Title
Approved:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1655 FORT MYER DR
SUITE 830
ARLINGTON, VA 22209
PH: 202.594.3575
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
NEWINGTON TEMPORARY BOILER
100% CONSTRUCTION DOCUMENTS
555 Willard Ave, Newington, CT 06111
3-MAY-2024
689A4-23-123
MC AC
M501
HVAC DETAILS
12" = 1'-0"
PIPE HANGERS
12" = 1'-0"
HORIZONTAL PIPE SUPPORT
12" = 1'-0"
PIPE HANGER SUPPORTS
12" = 1'-0"
STEAM LINE DRIP POCKET TRAP
NOT TO SCALE
END OF STEAM LINE DRIP TRAP
3/8" = 1'-0"
FLOAT AND THERMOSTATIC STEAM TRAP ASSEMBLY
12" = 1'-0"
STEAM SAFETY VALVE
1/2" = 1'-0"
STORAGE TANK DETAIL
CONSULTANTS:
Drawing Title
Approved:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1655 FORT MYER DR
SUITE 830
ARLINGTON, VA 22209
PH: 202.594.3575
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
NEWINGTON TEMPORARY BOILER
100% CONSTRUCTION DOCUMENTS
555 Willard Ave, Newington, CT 06111
3-MAY-2024
689A4-23-123
MC AC
M502
HVAC DETAILS 2
- OPEN TO ATMOSPHERE
ELECTRICAL SYMBOLS LEGEND
KEYED NOTE
REFER TO KEYNOTE SCHEDULE ON DRAWING
K
T
D
MC
OS
VS
OD
VD
V
SINGLE POLE SWITCH
TWO POLE, SINGLE POLE SWITCH
3-WAY SWITCH
4-WAY SWITCH
KEYED SWITCH
TIMER SWITCH
DIMMER SWITCH
MOMENTARY CONTACT SWITCH
OCCUPANCY SENSING SWITCH
(AUTOMATIC-ON, AUTOMATIC-OFF)
VACANCY SENSING SWITCH
(MANUAL-ON, AUTOMATIC-OFF)
OCCUPANCY SENSING SWITCH WITH DIMMING CONTROL
(AUTOMATIC-ON, AUTOMATIC-OFF)
VACANCY SENSING SWITCH WITH DIMMING CONTROL
(MANUAL-ON, AUTOMATIC-OFF)
VACANCY SENSING SWITCH WITH DIMMING CONTROL AND AUTOMATIC
DAYLIGHTING
(MANUAL-ON, AUTOMATIC-OFF)
OCCUPANCY SENSOR
(AUTOMATIC-ON, AUTOMATIC-OFF)
VACANCY SENSOR
(MANUAL-ON, AUTOMATIC-OFF)
J J JUNCTION BOX
PANELBOARD
REFER TO PANEL SCHEDULES FOR ADDITIONAL INFORMATION
PULL BOX
DIMENSIONS AS INDICATED ON DRAWINGS
DUPLEX WALL RECEPTACLE
NEMA 5-20R UNLESS NOTED OTHERWISE
DUPLEX WALL RECEPTACLE WITH ISOLATED GROUND
NEMA 5-20R UNLESS NOTED OTHERWISE
DUPLEX WALL RECEPTACLE ON EMERGENCY CIRCUIT
NEMA 5-20R UNLESS NOTED OTHERWISE
DUPLEX FLOOR RECEPTACLE
NEMA 5-20R UNLESS NOTED OTHERWISE
DUPLEX FLOOR RECEPTACLE WITH ISOLATED GROUND
NEMA 5-20R UNLESS NOTED OTHERWISE
QUADRAPLEX WALL RECEPTACLE
NEMA 5-20R UNLESS NOTED OTHERWISE
QUADRAPLEX WALL RECEPTACLE WITH ISOLATED GROUND
NEMA 5-20R UNLESS NOTED OTHERWISE
QUADRAPLEX WALL RECEPTACLE ON EMERGENCY CIRCUIT
NEMA 5-20R UNLESS NOTED OTHERWISE
QUADRAPLEX FLOOR RECEPTACLE
NEMA 5-20R UNLESS NOTED OTHERWISE
QUADRAPLEX FLOOR RECEPTACLE WITH ISOLATED GROUND
NEMA 5-20R UNLESS NOTED OTHERWISE
SIMPLEX WALL RECEPTACLE
NEMA 5-20R UNLESS NOTED OTHERWISE
SIMPLEX FLOOR RECEPTACLE
NEMA 5-20R UNLESS NOTED OTHERWISE
NON-TYPICAL NEMA WALL RECEPTACLE
CONFIGURATION AS NOTED ON DRAWINGS
NON-TYPICAL NEMA FLOOR RECEPTACLE
CONFIGURATION AS NOTED ON DRAWINGS
RECEPTACLE ON CORD REEL
(DUPLEX SHOWN)
RECEPTACLE ON DROP CORD
(DUPLEX SHOWN)
WALL DATA OUTLET
TYPE AND CONFIGURATION AS NOTED ON DRAWINGS
WIRELESS ACCESS POINT
BRANCH CIRCUITS TO DEVICES OR EQUIPMENT
- SHORT TICKS INDICATE HOTS
- LONG TICK INDICATES NEUTRAL
- NO TICK MARKS INDICATES ONE HOT AND ONE NEUTRAL
INCLUDE A GROUND CONDUCTOR IN ALL CONDUITS AND RACEWAYS
PER NEC REQUIREMENTS. GROUND CONDUCTORS ARE NOT
INDICATED WITH TICK MARKS.
REFER TO PANEL SCHEDULES FOR WIRE AND CONDUIT SIZES AND
QUANTITIES.
HOME RUN TO INDICATED PANEL AND CIRCUIT NUMBER(S)
- SHORT TICKS INDICATE HOTS
- LONG TICK INDICATES NEUTRAL
- NO TICK MARKS INDICATES ONE HOT AND ONE NEUTRAL
INCLUDE A GROUND CONDUCTOR IN ALL CONDUITS AND RACEWAYS
PER NEC REQUIREMENTS. GROUND CONDUCTORS ARE NOT
INDICATED WITH TICK MARKS.
REFER TO PANEL SCHEDULES FOR WIRE AND CONDUIT SIZES AND
QUANTITIES.
3P-30AF/NF SAFETY DISCONNECT SWITCH (NON-FUSED)
NUMBER OF POLES AND FRAME SIZE AS INDICATED
SAFETY DISCONNECT SWITCH (FUSED)
NUMBER OF POLES, FRAME SIZE, AND FUSE SIZE AS INDICATED
3P-30AF/30
1-PHASE MOTOR
EQUIPMENT TAG AS INDICATED
LIGHT LEVEL SENSOR
OS OS
VS VS
LS LS
GRAY SYMBOLS INDICATE ELEMENT EXISTING TO REMAIN
3-PHASE MOTOR
EQUIPMENT TAG AS INDICATED
DASHED GRAY LINES AROUND EQUIPMENT INDICATE NEC
REQUIRED CLEARANCES
POWER MULTI-OUTLET ASSEMBLY
SYMBOLS INDICATE RECEPTACLE LOCATIONS IN ASSEMBLY
DATA MULTI-OUTLET ASSEMBLY
SYMBOLS INDICATE RECEPTACLE LOCATIONS IN ASSEMBLY
DASHED SYMBOLS INDICATE ELEMENT TO BE DEMOLISHEDSOLID HATCHING OVER LIGHTING FIXTURES INDICATES FIXTURE
SHALL BE POWERED VIA LIFE SAFETY CIRCUIT AND RELAYED VIA
UL924 LISTED DEVICE FOR FULL BRIGHTNESS DURING FIRE ALARM
OR NORMAL POWER LOSS.
REFER TO LIGHTING FIXTURE SCHEDULE FOR ASSOCIATED
SYMBOL FOR EACH FIXTURE TYPE. EXIT SIGN, CEILING MOUNTED
FACES, CHEVRONS, AND ORIENTATION AS INDICATED ON DRAWINGS
EXIT SIGN, FLAG MOUNTED
FACES AND CHEVRONS AS INDICATED ON DRAWINGS
EXIT SIGN, WALL MOUNTED
CHEVRONS AS INDICATED ON DRAWINGS
J
DUPLEX FLOOR RECEPTACLE, ALL OUTLETS SWITCHED VIA LOCAL
OCCUPANCY SENSING
NEMA 5-20R UNLESS NOTED OTHERWISE
QUADRAPLEX FLOOR RECEPTACLE, ALL OUTLETS SWITCHED VIA
LOCAL OCCUPANCY SENSING
NEMA 5-20R UNLESS NOTED OTHERWISE
S S
DUPLEX WALL RECEPTACLE, ALL OUTLETS SWITCHED VIA LOCAL
OCCUPANCY SENSING
NEMA 5-20R UNLESS NOTED OTHERWISE
QUADRAPLEX WALL RECEPTACLE, ALL OUTLETS SWITCHED VIA LOCAL
OCCUPANCY SENSING
NEMA 5-20R UNLESS NOTED OTHERWISE
S S
FIRE ALARM MANUAL PULL STATION
F
F F
FIRE ALARM DETECTOR SMOKE - CEILING
FIRE ALARM DETECTOR HEAT
F FS S
FIRE ALARM SPEAKER HORN - WALL, CEILING
F
F
S
S
FIRE ALARM SPEAKER
FA
S
KIRK KEY INTERLOCKKK
FIRE ALARM TAMPER SWITCH FIRE ALARM FLOW SWITCH
FIRE ALARM HORN STROBE - WALL, CEILING FIRE ALARM SPEAKER STROBE - WALL, CEILING
FIRE ALARM DETECTOR SMOKE DUCT
FIRE ALARM DETECTOR HEAT FIRE ALARM SPEAKER
FA
S
1P 1 POLE (2P, 3P, 4P, ETC.)
A AMPERE
AC ABOVE COUNTER, AIR CONDITIONER
ACLG ABOVE CEILING
ADO AUTOMATIC DOOR OPENER
AF AMP FRAME
A.F.F. ABOVE FINISHED FLOOR
A.F.G. ABOVE FINISHED GRADE
AFI ARC FAULT CIRCUIT INTERRUPTER
AHU AIR HANDLING UNIT
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
AMPL AMPLIFIER
ANNUN ANNUNCIATOR
APPROX APPROXIMATELY
AQ-STAT AQUASTAT
ARCH ARCHITECT, ARCHITECTURAL
AS AMP SWITCH
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AWG AMERICAN WIRE GAUGE
BATT BATTERY
BD BOARD
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
C CONDUIT, CENTER LINE
CAB CABINET
CAT CATALOG
CATV CABLE TELEVISION
CB CIRCUIT BREAKER
CCOFM CLINICAL CENTER OFFICE OF FACILITY
MANAGEMENT
CCTV CLOSED CIRCUIT TELEVISION
CIT CENTER FOR INFORMATION TECHNOLOGY
CKT CIRCUIT
CLG CEILING
COMB COMBINATION
CMPR COMPRESSOR
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION OR CONTINUOUS
CONTR CONTRACTOR
CONV CONVECTOR
CP CIRCULATING PUMP
CRT CATHODE-RAY TUBE
CT CURRENT TRANSFORMER
CTR CENTER
CU COPPER
DCP DOMESTIC WATER CIRCULATING PUMP
DDCM DIVISION OF DESIGN AND CONSTRUCTION
MANAGEMENT
DEPT DEPARTMENT
DET DETAIL
DEP DIVISION OF ENVIRONMENTAL
PROTECTION
DFOM DIVISION OF FACILITIES OPERATIONS AND
MAINTENANCE
DFM DIVISION OF THE FIRE MARSHAL
DFP DIVISION OF FACILITIES PLANNING
DFS DIVISION OF FACILITIES STEWARDSHIP
DIA DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DN DOWN
DOHS DIVISION OF OCCUPATIONAL HEALTH AND
SAFETY
DPR DAMPER
DPSM DIVISION OF PHYSICAL SECURITY
MANAGEMENT
DRS DIVISION OF RADIATION SAFETY
DS SAFETY DISCONNECT SWITCH
DT DOUBLE THROW
DTR DIVISION OF TECHNICAL RESOURCES
DWG, DWGS DRAWING, DRAWING(S)
EC ELECTRICAL CONTRACTOR
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRICAL METALLIC TUBING
EP ELECTRIC PNEUMATIC
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXH EXHAUST
EXP EXPLOSION PROOF
FA FIRE ALARM
FABP FIRE ALARM BOOSTER POWER
SUPPLY PANEL
FACNET FACILITIES NETWORK SYSTEM
FACP FIRE ALARM CONTROL PANEL
FCU FAN COIL UNIT
FIXT FIXTURE
FLR FLOOR
FLUOR FLUORESCENT
FT FEET
FU FUSE
FSS FUSED SAFETY SWITCH
GA GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GFCI, GFI GROUND FAULT CIRCUIT INTERRUPTER
GFP GROUND FAULT PROTECTOR
GND GROUND
GRS GALVANIZED RIGID STEEL (CONDUIT)
GYP BD GYPSUM BOARD
HOA HAND-OFF-AUTOMATIC
HORIZ HORIZONTAL
HP HORSEPOWER
HPF HIGH POWER FACTOR
HT HEIGHT
HTG HEATING
HTR HEATER
HV HIGH VOLTAGE
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
HWP HYDRONIC WATER PUMP
IC INTERRUPTING CAPACITY
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
IN INCHES
INCAND INCANDESCENT
IR INFRARED
I/W INTERLOCK WITH
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT-AMPERE
KVAR KILOVOLT-AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT-HOUR
LOC LOCATE, LOCATION
LT LIGHT
LTG LIGHTING
LTNG LIGHTNING
LV LOW VOLTAGE
MAX MAXIMUM
MAG.S MAGNETIC STARTER
M/C MOMENTARY CONTACT
MC MECHANICAL CONTRACTOR
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDC MAIN DISTRIBUTION CENTER
MDP MAIN DISTRIBUTION PANEL
MFR MANUFACTURER
MFS MAIN FUSED DISCONNECT SWITCH
MH MANHOLE
MIC MICROPHONE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MMS MANUAL MOTOR STARTER
MOA MULTIOUTLET ASSEMBLY
MSP MOTOR STARTER PANELBOARD
MSBD MAIN SWITCHBOARD
MT MOUNT
MT.C EMPTY CONDUIT
MTS MANUAL TRANSFER SWITCH
MTR MOTOR, MOTORIZED
N.C. NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURER'S
ASSOCIATION
NFSS NON-FUSED SAFETY SWITCH
NIC NOT IN CONTRACT
NIH NATIONAL INSTITUTES OF HEALTH
NL NIGHT LIGHT
N.O. NORMALLY OPEN
NPF NORMAL POWER FACTOR
NTS NOT TO SCALE
OH OVERHEAD
OHPE OFFICE OF HOSPITAL PHYSICAL ENVIRONMENT
OL OVERLOADS
P PLATE
PA PUBLIC ADDRESS
PB PULL BOX, PUSH BUTTON
PE PNEUMATIC ELECTRIC
PED PEDESTAL
PF POWER FACTOR
PH PHASE
PIV POST INDICATING VALVE
PNL PANEL
PO PROJECT OFFICER
PP POWER POLE
PR PAIR
PRI PRIMARY
PROJ PROJECTION
PRV POWER ROOF VENTILATOR
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (CONDUIT)
ELECTRICAL ABBREVIATIONS LIST
PWR POWER
QTY., QUAN QUANTITY
RCPT RECEPTACLE
REQD REQUIRED
RM ROOM
RSC RIGID STEEL CONDUIT
RTU ROOF TOP UNIT
SC SURFACE CONDUIT
SEC SECONDARY
SHT SHEET
SIM SIMILAR
S/N SOLID NEUTRAL
SPEC SPECIFICATION
SPKR SPEAKER
SP SPARE
SR SURFACE RACEWAY
SS STAINLESS STEEL
SSW SELECTOR SWITCH
S/S STOP/START PUSHBUTTONS
STA STATION
STD STANDARD
SURF SURFACE MOUNTED
SW SWITCH
SWBD SWITCHBOARD
SYM SYMMETRICAL
SYS SYSTEM
TEL TELEPHONE
TERM TERMINAL
TL TWIST LOCK
TR TAMPER RESISTANT
T-STAT THERMOSTAT
TTC TELEPHONE TERMINAL CABINET
TV TELEVISION
TVTC TELEVISION TERMINAL CABINET
TYP. TYPICAL
UC UNDER COUNTER
UE UNDERGROUND ELECTRICAL
UEB UTILITIES ENGINEERING BRANCH
UG UNDERGROUND
UH UNIT HEATER
U.N.O. UNLESS NOTED OTHERWISE
UT UNDERGROUND TELEPHONE
UTIL UTILITY
UV UNIT VENTILATOR OR ULTRAVIOLET
V VOLT(S)
VA VOLT-AMPERE(S)
VDT VIDEO DISPLAY TERMINAL
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W WATT(S)
W/ WITH
WAO WORK AREA OUTLET
WG WIRE GUARD
WH WATER HEATER
W/O WITHOUT
WP WEATHERPROOF
XFMR TRANSFORMER
XFR TRANSFER
@ AT
' FEET
" INCHES
# NUMBER
Ø, Φ PHASE
CONSULTANTS:
Drawing Title
Approved:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1655 FORT MYER DR
SUITE 830
ARLINGTON, VA 22209
PH: 202.594.3575
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
NEWINGTON TEMPORARY BOILER
100% CONSTRUCTION DOCUMENTS
555 Willard Ave, Newington, CT 06111
3-MAY-2024
689A4-23-123
SS BW
E001
ELECTRICAL SYMBOLS AND
ABBREVIATIONS
NO REVISION DATE
Steven E. Schroth 5/3/2024
03-BPMCC
03-BPMCC-FDS
03-ATS-6
T-TB
T-FDS-1
T-FDS-2
TEMPORARY BOILER FRONT OF TRAILER
JUNCTION BOX
JUNCTION BOX
03-6110-0476
JUNCTION BOX
P-1
CONSULTANTS:
Drawing Title
Approved:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1655 FORT MYER DR
SUITE 830
ARLINGTON, VA 22209
PH: 202.594.3575
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
NEWINGTON TEMPORARY BOILER
100% CONSTRUCTION DOCUMENTS
555 Willard Ave, Newington, CT 06111
3-MAY-2024
689A4-23-123
SS BW
E101
LEVEL 1 POWER PLANS
NORTH
PROJECT
1/8" = 1'-0"
LEVEL 1 OVERALL POWER PLAN
POWER PLAN GENERAL NOTES
1 FINAL LOCATION OF ALL EQUIPMENT SHALL BE DETERMINED IN THE FIELD AND SHALL BE INSTALLED
AS DIRECTED BY THE ARCHITECT OR OWNER'S REPRESENTATIVE. WHERE STRUCTURAL OPENINGS ARE NOT AVAILABLE, THE CONTRACTOR SHALL CORE DRILL WALLS AND FLOORS AS REQUIRED TO PERMIT PASSAGE OF CONDUITS. THE ELECTRICAL CONTRACTOR SHALL PROVIDE A MARKED-UP PLAN
WITH LOCATION PENETRATIONS FOR REVIEW AND APPROVAL OF THE STRUCTURAL ENGINEER
BEFORE ROUGH-IN BEGINS.
2 RECEPTACLES FOR ALL EQUIPMENT SHALL BE COMPLETE WITH PLUGS FOR THIS EQUIPMENT. THE ELECTRICAL CONTRACTOR SHALL VERIFY NEMA CONFIGURATIONS OF PLUGS AND RECEPTACLES FOR
EQUIPMENT IN THE SPACE.
3 DURING THE BIDDING PROCESS, THE ELECTRICAL CONTRACTOR SHALL REVIEW DRAWINGS AND SPECIFICATIONS OF ALL OTHER TRADES (ARCHITECTURAL, SITE/LANDSCAPING, HVAC, PLUMBING AND
SPECIALTY TRADES). ALL ITEMS REQUIRING POWER INDICATED ON THESE DRAWINGS BUT NOT
INDICATED ON THE ELECTRICAL DRAWINGS SHALL BE CONSIDERED A PART OF THE ELECTRICAL
CONTRACTOR'S WORK. THIS WORK SHALL BE INSTALLED AS PER NEC REQUIREMENTS AT NO
ADDITIONAL COST TO THE OWNER.
4 THE CONTRACTOR SHALL MAKE EVERY EFFORT TO MAKE ALL FEEDER RUNS CONTINUOUS (NO CABLE BREAKS). IF SPLICING CABLES IN BOXES BECOMES NECESSARY, USE O.Z.G. TYPE "XW" CABLE TAPS, OR APPROVED EQUAL, AND TAPE EACH TAP IN APPROVED MANNER.
5 THE MECHANICAL CONTRACTOR SHALL PROVIDE DISCONNECT SWITCHES, VFD'S, OR COMBINATION STARTERS FOR ALL OF THEIR UNITS. THE ELECTRICAL CONTRACTOR SHALL RECEIVE THESE ITEMS
FROM THE MECHANICAL CONTRACTOR FOR INSTALLATION BY THE ELECTRICAL CONTRACTOR.
6 THE ELECTRICAL CONTRACTOR SHALL COORDINATE CONDUIT PENETRATIONS FOR ROOFTOP
EQUIPMENT WITH MECHANICAL AND ROOFING CONTRACTORS. IF PROVISIONS ARE NOT IN PLACE FOR
THESE PENETRATIONS THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING OWN
PENETRATIONS AND CONTRACTING THE ROOF CONTRACTOR FOR SEALING THE ROOF PENETRATIONS.
7 REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION OF ALL MECHANICAL EQUIPMENT.
8 PROVIDE CONDUIT AND WIRING AS REQUIRED TO MEET CIRCUITING SHOWN TO CONFORM TO NEC
REQUIREMENTS.
9 PROVIDE EQUIPMENT GROUND CONDUCTOR IN ALL RACEWAYS.
10 ROUTE CONDUIT HIGH AGAINST STRUCTURE AND OFFSET UP BETWEEN JOISTS WHERE NECESSARY
TO AVOID DUCT WORK AND HVAC SYSTEM.
11 VERIFY AND COORDINATE EXACT ELECTRICAL REQUIREMENTS OF ALL EQUIPMENT WITH
MANUFACTURER'S RECOMMENDATIONS PRIOR TO INSTALLATION OF EQUIPMENT.
12 ALL CONDUIT ROUTING SHOWN IS DIAGRAMATIC.
POWER PLAN KEYNOTES
1 INSTALL NEW FUSED DISCONNECT SWITCH T-FDS-1 AS CLOSE AS POSSIBLE TO EXISTING FUSED
DISCONNECT SWITCH 03-BPMCC-FDS-FU.
2 INSTALL NEW FUSED DISCONNECT SWITCH T-FDS-2 AS CLOSE AS POSSIBLE TO TEMPORARY
TRANSFORMER T-TR
3 CONDUIT/FEEDERS FROM NEW FUSED DISCONNECT SWITCH T-FDS-2 AND PANEL 6110-0476 CIRCUIT #16 SHALL BE ROUTED TO EXTERIOR WALL PENETRATION ADJACENT TO NEW TEMPORARY BOILER STEAM PIPING EXTERIOR WALL PENETRATION AND CONTINUE ALONG A PARALLEL ROOFTOP PATH WITH S
4 ROUTE CONDUIT ALONG EXISTING WALL MOUNTED RACK WITH EXISTING CONDUIT RUNS.
5 TIE HEAT TRACE FEEDER INTO AVAILABLE SPARE BREAKER LOCATED ON CIRCUIT #16 IN PANEL 6110-0476.
6 SPLICE HEAT TRACE TO FEEDER.
7 TIE PUMP P-1 INTO PANEL PROVIDED ON INTERIOR OF TEMPORARY BOILER
NO REVISION DATE
NOTES:
1. LABEL SHALL BE DISPLAYED ON ALL SWITCHBOARDS,
PANELBOARDS, TRANSFER SWITCHES AND PULLBOXES
(MULTIPLE VOLTAGES)
2. NAMEPLATE SHALL BE WHITE LETTERING ON BLACK MICARTA
3. IF ONLY ONE VOLTAGE IS PRESENT, LABEL SHALL INDICATE
ONLY THAT RESPECTIVE VOLTAGE
2" H
IG
H
4" WIDE
VOLTAGE
208Y / 120V
PHASE A BLACK
PHASE B RED
PHASE C BLUE
NEUTRAL WHITE
VOLTAGE
480Y / 277V
PHASE A BROWN
PHASE B ORANGE
PHASE C YELLOW
NEUTRAL GRAY
C-CLAMP HANGER
1 1/2" THREADED ROD-
LENGTH VARIES
STANDARD PIPE
STRAP
TO SECOND UNISTRUT
CHANNEL IF REQUIRED
UNISTRUT CHANNEL W/
CLAMPING NUTS
(MATCH CONDUIT MATERIAL)
CONDUIT
03-ATS-6
600 A
TO CBL-01-BOILER RM-FDS
TO 03-GEN
03-BPMCC-FDS-FU
3P-400AF/400AT
TO 03-XF-BUCK-BOOST
208V-480V
#3/0
T-TB
150 kVA
T-FDS-1
3P-400AF/400AT
T-FDS-2
3P-200AF/200AT
TEMPORARY BOILER
(3)500KCMIL
#3AWG G
3"C
(3)#3/0AWG
#6AWG G
2"C
P-1
(3)#12AWG
#12AWG G
3/4"C
CONSULTANTS:
Drawing Title
Approved:
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Dwg. of
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1655 FORT MYER DR
SUITE 830
ARLINGTON, VA 22209
PH: 202.594.3575
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
NEWINGTON TEMPORARY BOILER
100% CONSTRUCTION DOCUMENTS
555 Willard Ave, Newington, CT 06111
3-MAY-2024
689A4-23-123
SS BW
E201
ELECTRICAL DETAILS & DIAGRAMS
NOT TO SCALE
BRANCH WIRING IDENTIFICATION
NOT TO SCALE
CONDUIT SUSPENSION DETAIL
NOT TO SCALE
PARTIAL ELECTRICAL ONE-LINE - TEMPORARY BOILER TIE IN
NO REVISION DATE
| Sheets |
| G001 - COVER SHEET |
File details come from the government source that posted it. Updated .