682115-1 Plans~2.pdf
PDF 42 MB Posted
- Attached to
- 245131 2024a Salem Downtown Streetscape
- Solicitation number
- S-KS0043-00013877
- Issued by
- Marion County, Oregon
About this file
This document is a comprehensive engineering design and construction plan set for the City of Salem, Oregon's Downtown Streetscape Phase 5 Project, covering multiple streets including State Street, Court Street, and Chemeketa Street. The project involves a detailed streetscape renovation encompassing street improvements, electrical work, landscaping, irrigation, signage, striping, and utility vault modifications across three primary street schedules. The project spans multiple city blocks in downtown Salem, with detailed plans for existing conditions, demolition, traffic control, street improvements, electrical systems, and landscaping elements.
The project includes specific engineering design documentation with extensive technical specifications across multiple disciplines, including general construction notes, survey control, erosion control, structural vault plans, electrical plans, signing and striping plans, and landscaping details. Each street schedule (A, B, and C) contains comprehensive plans for existing conditions, demolition, traffic management, street improvements, electrical work, and landscaping. The plans are prepared by the Salem Public Works Department and include utility contact information for coordination, with design work completed by a registered professional engineer with license expiration on 12/31/2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF SALEM - DEPARTMENT OF PUBLIC WORKS
555 LIBERTY STREET SE - SALEM, OREGON 97301
VICINITY MAP
PN 682115-1
CHEMEKETA ST, COURT ST & STATE ST
2024A SALEM
DOWNTOWN
STREETSCAPE
PHASE 5
PROJECT AREA
Call before you dig.
Know what's below.
ATTENTION:
UTILITY CONTACTS
CITY OF SALEM
SALEM ELECTRIC
NW NATURAL GAS
COMCAST
LUMEN
ENGINEERING
DISPATCH
503-588-6211 503-588-6333
ADAM DESHON
503-316-2423
DESHON@SALEMELECTRIC.COM
JERED THOMAS
971-808-7634
JERED.THOMAS@NWNATURAL.COM
JASON MCDONALD
503-924-9120
JASON_MCDONALD3@COMCAST.COM
TRAVIS VAUGHN
541-749-6347
TRAVIS.VAUGN@LUMEN.COM
PGE (DISTRIBUTION)......... KEN SPENCER
503-970-7200
KENNETH.SPENCER@PGN.COM
PGE (LIGHTING)................. JESSE WOODBURY
503-672-5498
JESSE.WOODBURY@PGN.COM
COVER SHEET &
VICINITY MAP
G-01
MRN
PPR
SAW
COURT ST NE
CO
M
M
ER
CI
AL
S T
NE
STATE ST
FERRY ST SE
LI
BE
RT
Y
ST
N
E
FR
O
NT
S
T
NE
DRAWING INDEX - SEE SHEET G-02
IN THE NE & NW 1/4 OF SECTION 27 AND
THE SE 1/4 OF SECTION 22, T.7S, R.3W, W.M.
CITY OF SALEM, MARION COUNTY, OREGON
BENCHMARK UTILIZED:
CITY OF SALEM #1016R
ELEC: 158.81' NGVD 29
MARK IS A 3" BRASS DISK AT THE
NORTHWEST CORNER OF STATE
STREET AND COMMERCIAL STREET
J:
\2
SA
LE
M
C O
R \2
8-
ST
R
EE
TS
C
AP
E
PH
AS
E V\
C _D
ES
N
C
AD
\3
_D
ES
IG
N
\D _P
LA
N
S- 1\
_G
EN
ER
AL
\G
-0
C O
VE
R
S H
EE
T
VI
C
IN
IT
Y
M
AP
.D W
G
LA
ST
S
AV
ED
: 4 /1
/2
4:
P
M
PR
IN
TE
D : 4
/8 /2
3:
P M
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
2024A SALEM
DOWNTOWN
STREETSCAPE
PHASE 5
SHEET PREPARED BY:
245 Commercial St. SE, Suite 210 Salem, Oregon 97301
(503) 364-2002
PN:682115-1
NGVD29(COS)
NAD83-SPCS
OREGON
EXPIRES: 12/31/2026
85994PEREG
ISTERED PROFESSIONALENGINEER
JUL. 10 , 2018
PR ISC IL IA NO PERA LT A - RA MIREZ
AS SHOWN
AS SHOWN
CHEMEKETA ST NE
ORIGINAL DOCUMENT AVAILABLE UPON REQUEST
R O
W R
O W
R O
W
ROW ROW ROW
ROWROWROW
ROWROW
R O
W
R O
W
P/L
R O
W
P/L
R O
W
P/ L
P/ L
P/ L
P/ L
P/ L
ROW
ROW
P/L
P/L
P/L P/
LP/L
P/L
R O
W R
O W
R O
W R
O W
R O
W R
O W
R O
W R
O W
P/L ROW ROW
P/L ROW ROW
R O
W R
O W
R O
W
R O
W R
O W
R O
W
R O
W R
O W
R O
W
R O
W R
O W
R O
W
P/L
P/L
P/L
P/ L
P/ L
ROW
R O
W R
O W
R O
W
P/L
P/L
P/L
P/L
ROW
P/L
R O
W R
O W
R O
W
R O
W R
O W
R O
W
P/ L
R O
W R
O W
R O
W
R O
W R
O W
R O
W
R O
W
P/L
R O
W
ROW ROW
.4
2'
DECD 6" DECD 5"
DECD 4" DECD 5"
DECD 9"DECD 9"
DECD 3"
DECD 4"DECD 5" DECD 4" DECD 6"DECD 4"
MAPLE 11"
MAPLE 14"
DECD 9"DECD 7"
SHEET INDEX AND
OVERALL KEYMAP
G-02
MRN
PPR
SAW
J:
\2
SA
LE
M
C O
R \2
8-
ST
R
EE
TS
C
AP
E
PH
AS
E V\
C _D
ES
N
C
AD
\3
_D
ES
IG
N
\D _P
LA
N
S- 1\
_G
EN
ER
AL
\G
-0
SH
EE
T
IN
D
EX
.D W
G
LA
ST
S
AV
ED
: 3 /3
1/
:4
AM
PR
IN
TE
D : 4
/8 /2
3:
P M
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
2024A SALEM
DOWNTOWN
STREETSCAPE
PHASE 5
SHEET PREPARED BY:
245 Commercial St. SE, Suite 210 Salem, Oregon 97301
(503) 364-2002
PN:682115-1
NGVD29(COS)
NAD83-SPCS
OREGON
EXPIRES: 12/31/2026
85994PEREG
ISTERED PROFESSIONALENGINEER
JUL. 10 , 2018
PR ISC IL IA NO PERA LT A - RA MIREZ
AS SHOWN
AS SHOWN
GENERAL
G-01 - COVER SHEET & VICINITY MAP
G-02 - SHEET INDEX AND OVERALL KEYMAP
G-03 - GENERAL CONSTRUCTION NOTES AND LEGEND
G-04 - SURVEY CONTROL PLAN
EXISTING CONDITIONS
EC-01 - EROSION CONTROL NOTES & LEGEND
STRUCTURAL VAULT PLANS
SV-01 - GENERAL STRUCTURAL NOTES
SV-02 - GENERAL STRUCTURAL NOTES
ELECTRICAL PLANS
E-01 - ELECTRICAL ABBREVIATIONS, LEGENDS, NOTES, AND PANEL SCHEDULES
E-02 - LUMINAIRE SCHEDULES
E-03 - CONDUIT & CONDUCTOR SCHEDULE
E-04 - ELECTRICAL DETAILS
E-05 - ELECTRICAL DETAILS
SIGNING AND STRIPING PLANS
S-01 - SIGN LEGEND
LANDSCAPING PLANS
L-01 - IRRIGATION SCHEDULE AND NOTES
L-02 - PLANTING SCHEDULE AND NOTES
L-03 - IRRIGATION DETAILS
L-04 - IRRIGATION DETAILS
L-05 - PLANTING DETAILS
STATE ST - SCHEDULE A
EXISTING CONDITIONS
EC-01-A - EXISTING CONDITIONS AND ESC PLAN - STATE ST
EC-02-A - DEMOLITION AND REMOVAL PLAN - STATE ST
TEMPORARY TRAFFIC CONTROL PLANS
TC-01-A - TRAFFIC CONTROL PLAN - LIBERTY ST
TC-02-A - TRAFFIC CONTROL DETAILS - LIBERTY ST
STREET IMPROVEMENT PLANS
ST-01-A - OVERALL STREETSCAPE PLAN - STATE ST
ST-02-A - TYPICAL SECTIONS - STATE ST
ST-03-A - STREETSCAPE IMPROVEMENTS - STATE ST
ST-04-A - STREETSCAPE PLAN AND PROFILE - STATE ST
ST-05-A - STREETSCAPE PLAN AND PROFILE - STATE ST
ST-06-A - CROSS SECTIONS - STATE ST
STRUCTURAL VAULT PLANS
SV-01-A - VAULT DEMOLITION DETAILS - 388 STATE ST
SV-02-A - VAULT DEMOLITION DETAILS - 356 STATE ST
SV-03-A - VAULT ABANDONMENT DETAILS - 388 STATE ST
SV-04-A - VAULT ABANDONMENT DETAILS - 356 STATE ST
ELECTRICAL PLANS
E-01-A - ELECTRICAL DEMOLITION - STATE ST
E-02-A - ELEC ILLUMINATION PLAN - STATE ST
SIGNING AND STRIPING PLANS
S-01-A - SIGNING, STRIPING, AND SURFACING PLANS - STATE ST
LANDSCAPING PLANS
L-01-A - IRRIGATION PLAN - STATE ST
L-02-A - PLANTING PLAN - STATE ST
COURT ST - SCHEDULE B
EXISTING CONDITIONS PLANS
EC-01-B - EXISTING CONDITIONS AND ESC PLAN - COURT ST
EC-02-B - DEMOLITION AND REMOVAL - COURT ST
TEMPORARY TRAFFIC CONTROL PLANS
TC-01-B - TRAFFIC CONTROL PLAN - COURT ST
TC-02-B - TRAFFIC CONTROL DETAILS - COURT ST
STREET IMPROVEMENT PLANS
ST-01-B - OVERALL STREETSCAPE PLAN - COURT ST
ST-02-B - TYPICAL SECTION - COURT ST
ST-03-B - STREETSCAPE IMPROVEMENTS - COURT ST
ST-04-B - STREETSCAPE PLAN AND PROFILE - COURT ST
ST-05-B - STREETSCAPE PLAN AND PROFILE - COURT ST
ST-06-B - CROSS SECTIONS - COURT ST
STRUCTURAL VAULT PLANS
SV-01-B - VAULT DEMOLITION DETAILS - 310 COURT ST
SV-02-B - VAULT DEMOLITION DETAILS - 340 COURT ST
SV-03-B - VAULT ABANDONMENT DETAILS - 310 COURT ST
SV-04-B - VAULT ABANDONMENT DETAILS - 340 COURT ST
ELECTRICAL PLANS
E-01-B - ELECTRICAL DEMOLITION - COURT ST
E-02-B - ELECTRICAL ILLUMINATION PLAN - COURT ST
SIGNING AND STRIPING PLANS
S-01-B - SIGNING, STRIPING, AND SURFACING PLANS - COURT ST
LANDSCAPING PLANS
L-01-B - IRRIGATION PLAN - COURT ST
L-02-B - PLANTING PLAN - COURT ST
CHEMEKETA ST - SCHEDULE C
EXISTING CONDITIONS
EC-01-C - EXISTING CONDITIONS AND ESC PLAN - CHEMEKETA ST
EC-02-C - EXISTING CONDITIONS AND ESC PLAN - CHEMEKETA ST
EC-03-C - DEMOLITION AND REMOVAL - CHEMEKETA ST
EC-04-C - DEMOLITION AND REMOVAL - CHEMEKETA ST
TEMPORARY TRAFFIC CONTROL PLANS
TC-01-C - TRAFFIC CONTROL PLAN - CHEMEKETA ST
TC-02-C - TRAFFIC CONTROL DETAILS - CHEMEKETA ST
STREET IMPROVEMENT PLANS
ST-01-C - OVERALL STREETSCAPE PLAN - CHEMEKETA ST
ST-02-C - TYPICAL SECTION - CHEMEKETA ST
ST-03-C - STREETSCAPE IMPROVEMENTS - CHEMEKETA ST
ST-04-C - STREETSCAPE IMPROVEMENTS - CHEMEKETA ST
ST-05-C - STREETSCAPE PLAN AND PROFILE - CHEMEKETA ST
ST-06-C - STREETSCAPE PLAN AND PROFILE - CHEMEKETA ST
ST-07-C - STREETSCAPE PLAN AND PROFILE - CHEMEKETA ST
ST-08-C - ADA RAMP DETAILS - CHEMEKETA ST
ST-09-C - ADA RAMP DETAILS - CHEMEKETA ST
ST-10-C - CROSS SECTIONS - CHEMEKETA ST
ELECTRICAL PLANS
E-01-C - ELECTRICAL DEMOLITION - CHEMEKETA STREET
E-02-C - ELECTRICAL DEMOLITION - CHEMEKETA STREET
E-03-C - ELECTRICAL ILLUMINATION PLAN CHEMEKETA STREET
E-04-C - ELECTRICAL ILLUMINATION PLAN CHEMEKETA STREET
SIGNING AND STRIPING PLANS
S-01-C - SIGNING, STRIPING, AND SURFACING PLANS - CHEMEKETA ST
S-02-C - SIGNING, STRIPING, AND SURFACING PLANS - CHEMEKETA ST
LANDSCAPING PLANS
L-01-C - IRRIGATION PLAN - CHEMEKETA ST
L-02-C - IRRIGATION PLAN - CHEMEKETA ST
L-03-C - PLANTING PLAN - CHEMEKETA ST
L-04-C - PLANTING PLAN - CHEMEKETA ST
LI
BE
R
TY
S T
COURT ST
CHEMEKETA ST
STATE ST
C O
M M
ER
C
IA
L
ST
0 60 120
SCHEDULE C
SCHEDULE B
SCHEDULE A
J:
\2
SA
LE
M
C O
R \2
8-
ST
R
EE
TS
C
AP
E
PH
AS
E V\
C _D
ES
N
C
AD
\3
_D
ES
IG
N
\D _P
LA
N
S- 1\
_G
EN
ER
AL
\G
-0
G
EN
ER
AL
C O
N
ST
R U
C
TI
O N
N O
TE
S.
D W
G
LA
ST
S
AV
ED
: 3 /3
1/
:4
AM
PR
IN
TE
D : 4
/8 /2
3:
P M
GENERAL
CONSTRUCTION
NOTES AND
LEGEND
G-03
CMG
PPR
AS SHOWN
AS SHOWN
SAW
UTILITIES AND TOPOGRAPHIC FEATURES
W W W W W
SD
MATERIAL IDENTIFICATION
SS SS SS
W W W W
<8''SS <8''SS
<10''SD <10''SD
<8''SS
<10''SD
OHP OHP OHP OHP OHP OHP OHP OHP
ELECTRICITY
UNDERGROUND
ELECTRICITY
OVERHEAD
T T T T T T T T T
O O O O O X X X X X
AC PAVEMENT
TYPICAL SECTION
CONCRETE
PLAN/TYPICAL SECTION
NG NG NG NG NG NG NG NG NG
ROW ROW ROW ROW ROW ROW
P/L P/L P/L P/L P/L P/L
TO BE BUILT / EXISTING
UGP UGP UGP
L=X'± S=1.0% 10" PVC
LIGHTING
BENCH TC MAG MB
PARKING
METER BENCH PLANTER TRASH
CAN
MAGAZINE
RACK
FREE
STANDING
MAILBOX
RAPID FLASHING BEACON
SEWER-(CO/
INSPECTION PORT)
1. ALL CONSTRUCTION SHALL BE TO CITY OF SALEM STANDARDS AND SPECIFICATIONS AND THE SPECIAL PROVISIONS
DEVELOPED FOR THIS PROJECT.
2. REFERENCE SCS FOR REQUIREMENTS REGARDING PROTECTION OF EXISTING FACILITIES AND TREES.
3. REFERENCE SCS FOR REQUIREMENTS REGARDING OPERATION OF EXISTING WATER VALVES.
4. REFERENCE SCS FOR TRAFFIC PROTECTION AND CONTROL REQUIREMENTS.
5. UTILITY COORDINATION:
A. THE LOCATION AND DESCRIPTION OF EXISTING UTILITIES SHOWN ARE COMPILED FROM AVAILABLE RECORDS AND/OR FIELD SURVEYS. THE CITY OR UTILITY COMPANIES DO NOT GUARANTEE THE ACCURACY NOR THE COMPLETENESS OF
SUCH RECORDS.
B. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER.
THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: THE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503)-232-1987).
C. PROVISIONS SHALL BE MADE BY THE CONTRACTOR TO KEEP ALL EXISTING UTILITIES IN SERVICE AND PROTECT THEM
DURING CONSTRUCTION.
D. UTILITIES, OR INTERFERING PORTIONS OF UTILITIES, THAT ARE ABANDONED IN PLACE SHALL BE REMOVED BY THE CONTRACTOR TO THE EXTENT NECESSARY TO ACCOMPLISH THE WORK. THE CONTRACTOR SHALL PLUG THE REMAINING
EXPOSED ENDS OF ABANDONED UTILITIES.
6. REFERENCE SCS FOR ANY ADDITIONAL UTILITY COORDINATION REQUIREMENTS.
7. THE CONTRACTOR SHALL BE EXPECTED TO VISIT THE SITE AND MAKE THEIR OWN DETERMINATION OF TOPOGRAPHIC
FEATURES REQUIRING RESTORATION.
8. DO NOT REMOVE TREES EXCEPT AS APPROVED BY THE ENGINEER. PROTECT ALL ROOTS TWO INCHES AND LARGER IN
DIAMETER. TRIM TREES, SHRUBS AND HEDGES ONLY AS DIRECTED BY THE ENGINEER.
9. ALL CONSTRUCTION SHALL CONFORM TO OREGON D.E.Q. PERMIT No. 1200-CA, A COPY OF WHICH IS INCLUDED IN THE
SPECIAL PROVISIONS.
10. REFERENCE SECTION OF THE SPECIAL PROVISIONS AND SCS REGARDING TEMPORARY ASPHALT PATCHING REQUIREMENTS.
AGGREGATE MATERIAL PLAN/SECTION
C12 CURVE NUMBER
L34 LINE NUMBER
526 GEOMETRIC & GRADING POINT
BEG BEGIN OF CURB OR CONCRETE
BOW BACK OF SIDEWALK
CONC TOP OF CONCRETE
END END OF CURB OR CONCRETE
EXTG EXISTING
FL FLOW LINE
GB GRADE BREAK
GR TOP OF GRATE OR INLET
MID MID POINT OF CURVE
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVE
PI POINT OF INTERSECTION, ANGLE POINT
PRC POINT OF REVERSE CURVE
PT POINT OF TANGENCY
RIM RIM OF MANHOLE, OR LID
TBC TOP BACK OF CURB
TFC TOP FACE OF CURB
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
2024A SALEM
DOWNTOWN
STREETSCAPE
PHASE 5
SHEET PREPARED BY:
245 Commercial St. SE, Suite 210 Salem, Oregon 97301
(503) 364-2002
PN:682115-1
NGVD29(COS)
NAD83-SPCS
OREGON
EXPIRES: 12/31/2026
85994PEREG
ISTERED PROFESSIONALENGINEER
JUL. 10 , 2018
PR ISC IL IA NO PERA LT A - RA MIREZ
AS SHOWN
AS SHOWNABBREVIATIONS LEGEND
AC PAVEMENT-PLAN
GRAVEL PLAN
NATURAL GROUND SECTION
GENERAL CONSTRUCTION NOTES
TO BE BUILT EXISTING
SANITARY SEWER
STORM DRAIN
WATER
FENCE
EASEMENT LINE
PROPERTY LINE
RIGHT OF WAY
CURB &
SIDEWALK
WITH DRIVEWAY
FIRE HYDRANT WATER VALVE WATER METER
MAILBOX POWER POLE & ANCHOR
STORM-(CB T1/T2/T3/T4) CO
CULVERT
TELEPHONE PED GAS VALVE
MISC.
EVERGREENDECIDUOUS IRRIGATION
TELEPHONE
N.W. NATURAL
VAULT DEMO
AC PAVEMENT DEMOLITION PLAN
CONCRETE DEMOLITION PLAN
BRICK/PAVER DEMOLITION PLAN
SAW SAW SAW SAW SAW SAW SAWSAW CUT
GRIND LIMITS
ROWROWROW
O
W R
O W
R O
W R
O W
R O
W
R O
W R
O W
R O
W R
O W
R O
W
R O
W
P/ L
R O
W
R O
W
R O
W R
O W
R O
W
R O
W R
O W
R O
W R
O W
ROWROWROW
ROWROWROW
P/ L
P/ L
ROWROWROW
P/ L
ROWROWROW
P/L
P/L
P/L
P/L
P/L
R O
W
R O
W R
O W
R O
W
P/ L
P/ L
P/ L
P/L
P/ L
P/ L
ROWROWROWROWROW
ROWROWROWROWROW
P/ L
R O
W R
O W
R O
W R
O W
P/ L
R O
W R
O W
R O
W R
O W
ROWROWROW
ROWROWROW
ROWROWROW
ROWROWROW
P/ L
P/ L
P/ L
P/L
P/L
R O
W
ROWROWROW
P/ L
P/ L
P/ L
P/ L
R O
W R
O W
R O
W
R O
W R
O W
R O
W
P/ L
ROWROWROW
ROWROWROW
P/L
ROWROWROW
ROWROWROW
ROWROWROW
P/ L
ROWROWROW
R O
W R
O W
DECD 6"
DECD 5"
DECD 4"
DECD 5"
DECD 9"
DECD 9"
DECD 3"
DECD 4"
DECD 5"
DECD 4"
DECD 6"
DECD 4"
MAPLE 11"
MAPLE 14"
DECD 9"
DECD 7"
Point Table
Point #
Northing
475369.6610
475598.4780
475402.3620
475570.4190
474931.0610
475446.8490
474292.6010
474381.3290
474418.5170
475001.6660
475016.6530
475029.0670
475044.1050
475085.6350
Easting
7545204.7330
7545193.9380
7545117.0450
7544698.1520
7544915.3020
7544752.3090
7544783.6990
7545105.0570
7544531.5740
7544956.3330
7544924.5910
7544886.5490
7544848.2500
7544742.4620
Elevation
153.556
153.796
153.666
154.620
155.713
154.555
153.821
153.543
156.075
154.785
155.043
154.959
155.167
155.945
Raw Description
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
Point Table
Point #
Northing
475251.8800
475129.1067
474915.3933
475044.3162
474539.3061
474568.5246
474732.0296
474911.3664
474290.5998
474272.7425
474362.5209
474301.0575
474475.1374
474744.9262
Easting
7544858.1440
7544631.5874
7544924.7552
7544596.3068
7544702.3805
7544890.7008
7544473.7507
7544531.3333
7544337.0289
7544296.1792
7544329.0391
7544485.5682
7544373.2719
7544395.4860
Elevation
154.182
156.375
155.471
156.868
156.289
155.046
158.137
157.102
156.658
157.140
157.118
155.398
157.466
158.810
Raw Description
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
F-MM
SURVEY
CONTROL PLAN
G-04
J:
\2
SA
LE
M
C O
R \2
8-
ST
R
EE
TS
C
AP
E
PH
AS
E V\
C _D
ES
N
C
AD
\3
_D
ES
IG
N
\D _P
LA
N
S- 1\
_G
EN
ER
AL
\G
-0
SU
R
VE
Y
C O
N
TR
O L
PL
AN
.D W
G
LA
ST
S
AV
ED
: 3 /3
1/
:4
AM
PR
IN
TE
D : 4
/8 /2
3:
P M
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
2024A SALEM
DOWNTOWN
STREETSCAPE
PHASE 5
SHEET PREPARED BY:
245 Commercial St. SE, Suite 210 Salem, Oregon 97301
(503) 364-2002
PN:682115-1
NGVD29(COS)
NAD83-SPCS
OREGON
EXPIRES: 12/31/2026
85994PEREG
ISTERED PROFESSIONALENGINEER
JUL. 10 , 2018
PR ISC IL IA NO PERA LT A - RA MIREZ
AS SHOWN
AS SHOWN
LIBERTY ST
C O
U R
T
ST
C H
EM
EK
ET
A
ST
ST
AT
E
ST
COMMERCIAL ST
FE
R
R Y
ST
0 60 120
SURVEY NOTES
1. BASIS OF BEARINGS AND COORDINATE SYSTEM IS BASED ON OREGON STATE PLANE NORTH ZONE
3601, NAD83(2011), EPOCH 2010.00. ALL DISTANCES SHOWN HEREON ARE GROUND DISTANCES.
2. ELEVATIONS WERE ESTABLISHED FROM CITY OF SALEM BENCHMARK "1016R". MARK IS A 3" BRASS
DISK AT THE NORTHWEST CORNER OF STATE STREET AND COMMERCIAL STREET.
ELEVATION = 158.81' (NGVD29, CITY OF SALEM DATUM)
3. THE LOCATION OF UTILITIES SHOWN HEREON ARE FROM OBSERVED VISIBLE EVIDENCE OF ABOVE
GROUND APPURTENANCES ALONG WITH SURFACE UTILITY MARKINGS BY OTHERS. ALL
UNDERGROUND UTILITIES SHOWN WERE MARKED ON THE SURFACE BY AN "OREGON ONE-CALL
NOTIFICATION CENTER" REQUEST. SURVEYOR MAKES NO GUARANTEE AS TO THE ACCURACY OF
SAID MARKINGS, HOWEVER, THEY ARE LOCATED AS ACCURATELY AS THEY ARE MARKED ON THE
GROUND.
4. PER ORS 209.150, ANY SURVEY MONUMENT REMOVED, DISTURBED OR DESTROYED SHALL BE
REPLACED BY A PROFESSIONAL LAND SURVEYOR WITHIN 90 DAYS AT THE EXPENSE OF THE PERSON
OR PUBLIC AGENCY RESPONSIBLE FOR SAID REMOVAL, DISTURBANCE OR DESTRUCTION.
5. SPOT GRADE ELEVATIONS ARE NOT SHOWN ON THIS MAP FOR CLARITY PURPOSES. SEE CAD
DRAWING FOR SAID ELEVATIONS.
6. FIELD SURVEYED MARCH & APRIL, 2024.
HORIZONTAL DATUM:
NAD83(2011)
OREGON STATE PLANE NORTH ZONE 3601
EPOCH (2010)
VERTICAL DATUM:
NGVD 1929(47)
124 122 112
106 107
108 121
101 103 104
MRN
PPR
SAW
SA
LE
M
C O
R \2
8-
ST
R
EE
TS
C
AP
E
PH
AS
E V\
C _D
ES
N
C
AD
\3
_D
ES
IG
N
\D _P
LA
N
S- 1\
_E
SC
\E
C -0
ES
C N
O
TE
S
LE
G
EN
D
.D W
G
LA
ST
S
AV
ED
: 3 /3
1/
:4
AM
PR
IN
TE
D : 4
/8 /2
3:
P M
EROSION
CONTROL NOTES
& LEGEND
EC-01
MRN
PPR
AS SHOWN
AS SHOWN
SAW
EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) DETAILS
1. THE CONTRACTOR SHALL PROVIDE DAILY MEASURES TO ENSURE SEDIMENT
CONTROL DURING NON-WORK HOURS.
2. THE CONTRACTOR SHALL PROVIDE PROTECTION AS REQUIRED ON PRIVATE INLETS
TO ENSURE SEDIMENT CONTROL WITHIN THE WORK AREA.
3. THE PROJECT SITE SHALL HAVE A CONCRETE WASHOUT BASIN AVAILABLE PER STD.
PLAN 917 OR APPROVED EQUAL.
4. ALL TEMPORARY STOCKPILES AND CONCRETE MANAGEMENT FACILITIES SHALL BE
LOCATED A MINIMUM OF 50 FEET FROM ANY DRAINAGE INLET OR WATERCOURSE.
GENERAL EPSC NOTES
EROSION CONTROL LEGEND
DESIGN STANDARDS NOTES
(a) Pre-Construction
(1) Prior to any land disturbing activities, the boundaries of the clearing and grading limits, vegetated buffers, and any sensitive areas shown on this plan shall be clearly delineated in the field. Unless otherwise approved, no disturbance is permitted beyond the clearing limits. The contractor must maintain the delineation for the duration of the project. Note: vegetated corridors to be delineated with orange construction fence or approved equal.
(2) BMPS that must be installed prior to land disturbing activities are construction entrance, perimeter sediment control, and inlet protection.
(3) Hold a preconstruction conference to review the EPSC and with the city’s project manager and inspector.
(b) Construction
(4) All sediment is required to stay on site. Sediment amounts greater than ½ cubic foot which leave the site must be cleaned up within 24 hours and placed back on the site and stabilized or properly disposed. Vacuuming or dry sweeping must be used to clean up released sediment and it must not be swept or washed into storm sewers, drainage ways, or water bodies. The cause of the sediment release must be found and prevented from causing a recurrence of the discharge within the same 24 hours. Any in-stream clean up of sediment shall be performed according to the DSL required time frame.
(2) Construction, maintenance, replacement, and upgrading of erosion prevention and sediment control facilities is the sole responsibility of the contractor until all construction is completed,approved, and permanent erosion control (i.e., vegetation/landscaping) is established on all disturbed areas.
(3) All recommended erosion prevention and sediment control procedures are dependent on construction methods, staging, site conditions, weather, and scheduling. During the construction period, erosion control facilities shall be revised, upgraded, replaced, or added, to comply with SRC and State and Federal regulatory requirements.
(4) The contractor is solely responsible for protection of all adjacent property and downstream facilities from erosion and siltation during project construction. Any damage resulting from such erosion and siltation shall be corrected at the sole expense of the contractor.
(5) When saturated soil is present, water-tight trucks must be used to transport saturated soils from the construction site. Soil may be drained on site at a designated location, using appropriate BMPs. Soil must be drained sufficiently to drip less than one gallon per hour prior to leaving the site.
(6) All materials spilled, dropped, or washed into storm drains must be removed immediately, and the contractor shall provide protection of downstream inlets and catch basins to ensure sediment-laden water does not enter the storm drain system.
(7) All discharge of sediment-laden water must be treated with an appropriate bmp to remove sediment from discharge waters and to comply with SRC and State and Federal regulatory permits.
(8) In areas subject to wind erosion, appropriate BMPs must be used which may include the application of fine water spraying, plastic sheeting, mulching, or other approved measures.
(9) The EPSC measures and BMPs shown on this plan are the minimum requirements for anticipated site conditions. During the construction period, these measures shall be upgraded as needed to maintain compliance with all regulations.
(10) The contractor shall provide onsite water or other appropriate BMPs to prevent dust and wind erosion of fine grain soils.
(11) Disturbed areas must be stabilized after 14 days of inactivity, or immediately if rain is forecasted.
See subsection 7A.1(d)-Wet Weather Period.
(12) During the wet weather work period or when rain is forecasted, all active and inactive soil stock piles must be covered with appropriate plastic sheeting. Plastic sheeting must cover the entire stock pile and be sufficiently anchored.
(c) Pollutants, Solid Waste and Hazardous Materials Management
(1) Any use of toxic or other hazardous materials must include proper storage, application, and disposal.
(2) The contractor is solely responsible to properly manage pollutants, hazardous wastes, used oils, contaminated soils, concrete waste, sanitary waste, liquid waste, or other toxic substances discovered or generated during construction to prevent leakage, spills or release of pollutants to the environment and surface waters.
(3) Contractor shall develop a project specific written spill prevention and response procedures that includes employee training on spill prevention and proper disposal procedures; regular maintenance schedule for vehicles and machinery; and material delivery and storage controls, signage, material use, and use of covered storage areas for waste and supplies. The plan shall comply with SRC and Federal and State requirements, and shall be available on site at all times.
(d) Wet Weather Period (October 15 through April 30)
(1) Construction activities must avoid or minimize the duration of disturbed areas.
(2) Temporary stabilization of the site including covering of bare soils with approved BMPs, must be installed at the end of the shift before a holiday or weekend, or at the end of each workday if rainfall is forecast in the next 24 hours.
(3) Temporary stabilization or covering of soil stockpiles and protection of stockpiles located away from construction activity must occur at the end of each workday.
(e) Maintenance
(1) Erosion control measures shall be maintained in such a manner as to ensure that erosion is prevented and sediment-laden water does not enter a drainage system, roadway, or violate applicable water quality standards.
(2) Sediment shall not be washed or swept into storm sewers, drainage ways, or water bodies.
(3) Sediment must be removed from behind all sediment control measures when it has reached a height of 1/3 the barrier height, and prior to the control measures removal.
(4) Removal of trapped sediment in a sediment basin or sediment trap or catch basins must occur when the sediment retention capacity has been reduced by 50 percent; is not functioning properly and/or at the completion of project.
(5) Cleaning of all structures, inlet protection BMPs, and sump pumps must be completed regularly and as required to ensure structures and inlets function properly and flow freely.
(6) Construction site exits shall be maintained in a condition that will prevent tracking or flow of mud onto the row or approved access point. The entrance may require periodic top dressing as conditions demand, and repair and/or cleanout of any structures used to trap sediment. Wheel washing shall be required to prevent sediment and material tracking on road surfaces if passive BMPs are not effective.
(f) Inspection
(1) The EPSC must be kept onsite at all times. All measures shown on the plan must be installed properly to ensure compliance with SRC and State and Regulatory permits, and that sediment does not enter a surface water system, roadway, or other properties.
(2) Written EPSC inspection logs shall be maintained onsite and available to city inspectors upon request.
(3) All BMPs shall be inspected at least every week. When a rainfall event exceeds ½" in a 24-hour period, daily inspection of the erosion controls, sediment controls, and discharge outfalls must be conducted and documented. Inspections shall be done by a representative of the permit registrant who is knowledgeable and experienced in the principles, practices, installation, and maintenance of erosion and sediment controls.
(g) Inactive Construction Periods and Post-Construction
(1) Should work cease in any area for 14 days, the inactive area must be stabilized with appropriate soil stabilization BMPs. If all construction activity ceases the entire site must be temporarily stabilized using vegetation, heavy mulch layer, temporary seeding, or other method.
(2) All temporary erosion prevention and sediment control facilities shall be removed by the contractor within 30 days after permanent landscaping/vegetation is established and the threat of erosion and sediment transport has been mitigated.
(3) Temporary grass cover measures must be fully established by October 15 or other cover measures (i.e., erosion control blankets with anchors, one-inch of straw mulch, six mil HDPE plastic sheet, etc.) shall be in place over all disturbed soil areas until April 30. To establish an adequate grass stand for controlling erosion by October 15, it is recommended that seeding and mulching occur by September 1.
(4) Permanent erosion control vegetation on all embankments and disturbed areas shall be re-established as soon as construction is completed.
(h) Specifications
(1) Soil preparation.Topsoil should be prepared according to the landscape plans, if available, or recommendations of the grass seed supplier. Slopes shall be textured before seeding by track walking (i.e., driving a crawling tractor up and down the slopes to leave a pattern of cleat imprints parallel to slope contours) or other method to provide stable areas for seeds to rest.
(2) Seeding. Erosion control grass seed mix shall be as follows: Dwarf grass mix (low height, low maintenance) consisting of dwarf perennial ryegrass (80 percent by weight), creeping red fescue (20 percent by weight). Application rate shall be 100 pounds per acre minimum.
(3) Grass seed shall be fertilized at a rate of ten pounds per 1,000 square feet with 26-3-16 slow release type fertilizer. Disturbed areas within 50 feet of water bodies and wetlands must use a 26-0-16 fertilizer.
(4) The application rate of fertilizers used to reestablish vegetation shall follow manufacturer's recommendations. Nutrient releases from fertilizers to surface waters shall be minimized. Time release fertilizers shall be used. Care shall be made in the application of fertilizers within any waterway riparian zone to prevent leaching into the waterway.
(5) When used, hydromulch shall be applied with grass seed at a rate of 2,000 pounds per acre between April 30 and June 10, or between September 1 and October 1. On slopes steeper than ten percent, hydroseed and mulch shall be applied with a bonding agent (tackifier). Application rate and methodology shall be in accordance with seed supplier recommendations.
(6) When used in lieu of hydromulch, dry, loose, weed-free straw used as mulch shall be applied at a rate of 4,000 pounds per acre (double the hydromulch application requirement). Anchor straw by working in by hand or with equipment (rollers, cleat trackers, etc.). Mulch shall be spread uniformly immediately following seeding.
(7) When conditions are not favorable to germination and establishment of the grass seed, the Contractor shall irrigate the seeded and mulched areas as required to establish the grass cover.
(8) Sediment fences shall be constructed of continuous filter fabric to avoid use of joints. When joints are necessary, filter cloth shall be spliced together only at a support post, with a minimum six-inch overlap, and both ends securely fastened to a post.
(9) The standard strength filter fabric shall be fastened securely to stitched loops installed on the upslope side of the posts, and six inches of the fabric shall be extended into the trench. The fabric shall not extend more than 30 inches above the original ground surface. Filter fabric shall not be stapled to existing trees.
(10) Bio-filter bags shall be clean 100 percent wood product waste. Bags shall be 18-inch x 18-inch x 30-inch, weigh approximately 45 pounds, and be contained in a bag made of ½ inch plastic mesh.
(11) Minimum wet weather slope protection. For 3H:1V or steeper slopes use Bon Terra Type C2 or North American Green Type C125 erosion control blankets. Use a minimum of two inches straw mulch or North American Green Type S150 for slopes flatter than 3H:1V and greater than 6H:1V.
Slopes flatter than 6H:1V use one inch straw mulch, hydroseed with hydromulch and tackifier.
Slope protection shall be placed on all disturbed areas immediately after completion of each section of construction activity, until the erosion control seeding has been established. As an option during temporary or seasonal work stoppages, a six-mil HDPE plastic sheet may be placed on exposed slopes. The plastic sheet shall be provided with an anchor trench at the top and bottom of the slope, and shall be sandbagged on the slopes as required to prevent damage or displacement by wind.
FLOW ARROW EXISTING CONDITIONS PRIOR TO CONSTRUCTION
SILT SACK, REQUIRED ON ALL INLETS RECEIVING FLOW FROM THE PROJECT INCLUDING
EXISTING INLETS TO BE REMOVED AND NEW INLETS ONCE INSTALLED.
TREE PROTECTION FENCE
EROSION CONTROL WORK LIMITS
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
2024A SALEM
DOWNTOWN
STREETSCAPE
PHASE 5
SHEET PREPARED BY:
245 Commercial St. SE, Suite 210 Salem, Oregon 97301
(503) 364-2002
PN:682115-1
NGVD29(COS)
NAD83-SPCS
OREGON
EXPIRES: 12/31/2026
85994PEREG
ISTERED PROFESSIONALENGINEER
JUL. 10 , 2018
PR ISC IL IA NO PERA LT A - RA MIREZ
AS SHOWN
AS SHOWN
VAULTS
GENERAL
STRUCTURAL
NOTES
SV-01
AS SHOWN
AS SHOWN
STATEMENT OF SPECIAL INSPECTIONS:
1. THE INSPECTION REQUIREMENTS AS NOTED ON THIS SHEET ARE REQUIRED FOR THE ITEMS THAT ARE SPECIFICALLY NOTED, DESIGNED AND DETAILED IN THE STRUCTURAL DOCUMENTS. REFER TO THE 2019 EDITION, OSSC, CHAPTER 17, THE ARCHITECTURAL DRAWINGS, AND THE GEOTECHNICAL REPORT FOR ADDITIONAL INFORMATION AND ADDITIONAL INSPECTION REQUIREMENTS FOR NON-STRUCTURAL
ITEMS.
2. THE PROJECT CONTRACTOR SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS TO PROVIDE
INSPECTIONS DURING CONSTRUCTION ON THE TYPES OF WORK LISTED BELOW. THE SPECIAL
INSPECTOR SHALL BE A QUALIFIED PERSON WHO SHALL DEMONSTRATE COMPETENCE, TO THE
SATISFACTION OF THE BUILDING OFFICIAL AND/ OR EOR, FOR INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION OR OPERATION REQUIRING SPECIAL INSPECTION. THESE INSPECTIONS ARE IN
ADDITION TO THE INSPECTIONS REQUIRED BY THE BUILDING DEPARTMENT OF THE LOCAL
JURISDICTION.
3. SPECIAL INSPECTORS SHALL KEEP RECORDS OF INSPECTIONS. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL AND TO THE EOR IN RESPONSIBLE
CHARGE. REPORTS SHALL INDICATE THAT WORK INSPECTED WAS DONE IN CONFORMANCE WITH
APPROVED CONSTRUCTION DOCUMENTS. DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE
ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF THE DISCREPANCIES ARE NOT CORRECTED, THE DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE BUILDING OFFICIAL AND THE EOR IN RESPONSIBLE CHARGE PRIOR TO THE COMPLETION OF THAT PHASE OF THE WORK. A FINAL REPORT DOCUMENTING REQUIRED SPECIAL INSPECTIONS AND CORRECTION OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS SHALL BE SUBMITTED AT A POINT IN TIME AGREED UPON BY THE PERMIT APPLICANT
AND THE BUILDING OFFICIAL PRIOR TO THE START OF WORK.
4. THE CONTRACTOR SHALL:
A. COORDINATE TESTING. DO NOT PROCEED WITH SUBSEQUENT WORK UNTIL INSPECTIONS AND
TESTING HAS BEEN APPROVED.
B. COPY INSPECTION REPORT/ TESTING RESULTS TO THE ARCH / EOR AND THE OWNER BEFORE WORK
PROCEEDS.
C. CORRECT DEFICIENT WORK AT NO ADDITIONAL COST TO THE OWNER.
5. STRUCTURAL OBSERVATIONS ARE NOT REQUIRED FOR THIS PROJECT. CONTRACTOR TO NOTIFY EOR
AT THE FOLLOWING CONSTRUCTION PHASES:
5.1. CONCRETE
5.1.1. FOOTINGS, STEM WALLS, AND PIERS - PRIOR TO PLACING CONCRETE
MASONRY INSPECTION AS CONSTRUCTION BEGINS (TABLE 1.19.2, TMS-402)
PROPORTIONS OF SITE-PREPARED
MORTAR - X
VERIFY THAT MORTAR IS OF THE TYPE AND COLOR
SPECIFIED ON THE CONSTRUCTION DOCUMENTS, THAT IT
CONFORMS TO ASTM C270, AND THAT IT IS MIXED IN
ACCORDANCE WITH ARTICLE 2.6 A OF TMS-602
CONSTRUCTION OF MORTAR JOINTS - X VERIFY THAT MORTAR JOINTS COMPLY WITH ARTICLE 3.3 B
OF TMS 602
GRADE AND SIZE OF PRESTRESSING
TENDONS AND ANCHORAGE - X
VERIFY THAT PRESTRESSING TENDONS COMPLY WITH
ARTICLE 2.4 B OF TMS-602 AND THAT ANCHORAGES,
COUPLERS, AND END BLOCKS COMPLY WITH ARTICLE 2.4 H
LOCATION OF REINFORCEMENT
CONNECTORS, AND PRESTRESSING
TENDONS AND ANCHORAGES
- X
VERIFY THAT REINFORCEMENT IS PLACED IN ACCORDANCE
WITH ARTICLE 3.4 OF TMS-602 PRESTRESSING TENDONS
SHALL BE PLACED PER ARTICLE 3.6 A
PRESTRESSING TECHNIQUE - X VERIFY THAT PRESTRESSING TECHNIQUE COMPLIES WITH
ARTICLE 3.6 B OF TMS-602
PROPERTIES OF THIN-BED MORTAR FOR
ACC MASONRY - X VERIFY THAT MORTAR COMPLIES WITH ARTICLE 2.1 C OF
TMS-602
ITEM FOR VERIFICATION AND
INSPECTION
INSPECTION FREQUENCY
CONTINUOUS PERIODIC
COMMENTS
ITEM FOR VERIFICATION AND
INSPECTION
INSPECTION FREQUENCY
CONTINUOUS PERIODIC
COMMENTS
CONCRETE CONSTRUCTION (OSSC 1705.3 AND 1705.12.1)
REINFORCING STEEL - X
VERIFY PRIOR TO PLACING CONCRETE THAT REINFORCING
IS OF SPECIFIED TYPE, GRADE AND SIZE; THAT IT IS FREE
OF OIL, DIRT AND RUST; THAT IT IS LOCATED AND SPACED
PROPERLY; THAT HOOKS, BENDS, TIES, STIRRUPS AND
SUPPLEMENTAL REINFORCEMENT ARE PLACED
CORRECTLY; THAT LAP LENGTHS, STAGGER AND OFFSETS
ARE PROVIDED; AND THAT ALL MECHANICAL CONNECTIONS
ARE INSTALLED PER THE MANUFACTURER'S INSTRUCTIONS
AND/OR EVALUATION REPORT
USE OF REQUIRED MIX DESIGN - X
VERIFY THAT ALL MIXES USED COMPLY WITH THE
APPROVED CONSTRUCTION DOCUMENTS; ACI 318, CH. 4,
5.2-5.4 AND OSSC 1904.3,1913.2 AND 1913.3
CONCRETE PLACEMENT X - -
CONCRETE SAMPLING FOR STRENGTH
TESTS, SLUMP, AIR CONTENT AND TEMP X - -
CURING TEMP AND TECHNIQUES - X
VERIFY THAT THE AMBIENT TEMP FOR CONCRETE IS KEPT
AT >50°F FOR AT LEAST 7 DAYS AFTER PLACEMENT, 3 DAYS
FOR HIGH-EARLY CONCRETE. ACCELERATED METHODS MAY
BE USED. THE AMBIENT TEMP FOR SHOTCRETE SHALL BE
>40°F FOR THE SAME PERIOD OF TIME AS NOTED FOR
CONCRETE. SHOTCRETE SHALL BE KEPT CONTINUOUSLY
MOIST FOR AT LEAST 24 HOURS AFTER SHOTCRETING. ALL
CONCRETE MATERIALS, REINFORCEMENT, FORMS, FILLERS,
AND GROUND SHALL BE FREE FROM FROST. IN HOT
WEATHER CONDITIONS ENSURE THAT APPROPRIATE
MEASURES ARE TAKEN TO AVOID PLASTIC SHRINKAGE
CRACKING AND THAT THE SPECIFIED WATER/CEMENT RATIO
IS NOT EXCEEDED.
ITEM FOR VERIFICATION AND
INSPECTION
INSPECTION FREQUENCY
CONTINUOUS PERIODIC
COMMENTS
MASONRY PRIOR TO CONSTRUCTION (OSSC TABLE 1705.4, ARTICLE 1.15, TMS-602)
REVIEW MATERIAL CERTIFICATES, MIX
DESIGNS, TEST RESULTS AND
CONSTRUCTION PROCEDURES
- X
VERIFY THAT MATERIALS CONFORM TO THE REQUIREMENTS
OF THE APPROVED CONSTRUCTION DOCUMENTS. MIX
DESIGN, TEST RESULTS, MATERIAL CERTIFICATES, AND
CONSTRUCTION PROCEDURES SHOULD BE SUBMITTED FOR
REVIEW. MORTAR MIX DESIGNS SHALL CONFORM TO ASTM
C270 WHILE GROUT SHALL CONFORM TO ASTM C476.
MATERIAL CERTIFICATES SHALL BE PROVIDED FOR THE
FOLLOWING: REINFORCEMENT; ANCHORS, TIES,
FASTENERS, AND METAL ACCESSORIES; MASONRY UNITS;
MORTAR AND GROUT MATERIALS. CONSTRUCTION
PROCEDURES FOR COLD-WEATHER OR HOT WEATHER
CONSTRUCTION SHALL BE REVIEWED
ITEM FOR VERIFICATION AND
INSPECTION
INSPECTION FREQUENCY
CONTINUOUS PERIODIC
COMMENTS
MASONRY INSPECTION PRIOR TO GROUTING (TABLE 1.19.2, TMS-402)
GROUT SPACE - X
VERIFY THAT GROUT SPACE IS FREE OF MORTAR
DROPPINGS, DEBRIS, LOOSE AGGREGATE, AND OTHER
DELETERIOUS MATERIALS AND THE CLEANOUTS ARE
PROVIDED PER ARTICLE 3.2 D AND 3.2 F OF TMS-602
GRADE, TYPE, AND SIZE OF
REINFORCEMENT AND ANCHOR BOLTS,
AND PRESTRESSING TENDONS AND
ANCHORAGES
- X
VERIFY THAT REINFORCEMENT, JOINT REINFORCEMENT,
WALL TIES, ANCHOR BOLTS AND VENEER ANCHORS COMPLY
WITH THE APPROVED CONSTRUCTION DOCUMENTS AND
SECTION 1.6 OF TMS 402
PLACEMENT OF REINFORCEMENT,
CONNECTORS, AND PRESTRESSING
TENDONS AND ANCHORAGES
- X
VERIFY THAT REINFORCEMENT, JOINT REINFORCEMENT,
WALL TIES, ANCHOR BOLTS AND VENEER ANCHORS ARE
INSTALLED IN ACCORDANCE WITH THE APPROVED
CONSTRUCTION DOCUMENTS AND ARTICLES 3.2 E, 3.4 AND
3.6 A OF TMS 602
PROPORTIONS OF SITE-PREPARED
GROUT AND PRESTRESSING GROUT FOR
BONDED TENDONS
- X
VERIFY THAT GROUT IS PROPORTIONED PER ASTM C476 AND
HAS A SLUMP BETWEEN 8-11 INCHES. SELF-CONSOLIDATING
GROUT SHALL BE PROPORTIONED ONSITE.
CONSTRUCTION OF MORTAR JOINTS - X VERIFY THAT MORTAR JOINTS ARE PLACED IN ACCORDANCE
WITH ARTICLE 3.3 B OF TMS 602
MASONRY INSPECTION PRIOR TO GROUTING (TABLE 1.19.2, TMS-402)
SIZE AND LOCATION OF STRUCTURAL
ELEMENTS - X
VERIFY THE LOCATIONS OF STRUCTURAL ELEMENTS WITH
RESPECT TO THE APPROVED PLANS AND CONFIRM THAT
TOLERANCES MEET THE REQUIREMENTS OF ARTICLE 3.3 F
OF TMS 602
TYPE, SIZE, AND LOCATION OF ANCHORS,
INCLUDING OTHER DETAILS OF
ANCHORAGE OF MASONRY TO
STRUCTURAL MEMBERS, FRAMES, OR
OTHER CONSTRUCTION
- X
VERIFY THAT CORRECT ANCHORAGES AND CONNECTIONS
ARE PROVIDED PER THE APPROVED PLANS AND SECTIONS
1.16.4.3 AND 1.17.1 OF TMS 402.
WELDING OF REINFORCEMENT X -
PREPARATION, CONSTRUCTION, AND
PROTECTION OF MASONRY DURING COLD
WEATHER (<40°) OR HOT WEATHER (>90°F)
- X
VERIFY THAT COLD-WEATHER AND HOT-WEATHER
CONSTRUCTION IS PERFORMED IN ACCORDANCE WITH
ARTICLE 1.8 C AND 1.8 D OF TMS 602, RESPECTIVELY.
APPLICATION AND MEASUREMENT OF
PRESTRESSING FORCE X - -
PLACEMENT OF GROUT AND
PRESTRESSING GROUT FOR BONDED
TENDONS IS IN COMPLIANCE
X - -
ITEM FOR VERIFICATION AND
INSPECTION
INSPECTION FREQUENCY
CONTINUOUS PERIODIC
COMMENTS
PLACEMENT OF AAC MASONRY UNITS
AND CONSTRUCTION OF THIN-BED
MORTAR JOINTS
- X VERIFY THAT MORTAR IS PLACED IN ACCORDANCE WITH
ARTICLE 3.3 B.8 OF TMS 602
OBSERVATION OF GROUT SPECIMENS,
MORTAR SPECIMENS, AND/OR PRISMS - X CONFIRM THAT SPECIMENS/PRISMS ARE PERFORMED AS
REQUIRED BY ARTICLE 1.4 OF TMS 602
VERIFICATION OF f'm AND f'AAC - X
DETERMINE THE COMPRESSIVE STRENGTH FOR EACH
WYTHE BY THE "UNIT STRENGTH METHOD" OR BY THE
"PRISM TEST METHOD" AS SPECIFIED IN ARTICLE 1.4 B OF
TMS 602 PRIOR TO CONSTRUCTION.
VERIFICATION OF PROPORTIONS OF
MATERIALS IN PREMIXED OR
PRE-BLENDED MORTAR AND GROUT
- X VERIFY THAT PROPORTIONS FOR MORTAR MEET ASTM C270
AND PROPORTIONS FOR GROUT MEET ASTM C476.
ITEM FOR VERIFICATION AND
INSPECTION
INSPECTION FREQUENCY
CONTINUOUS PERIODIC
COMMENTS
MASONRY MINIMUM TESTING
VERIFICATION OF SLUMP FLOW AND
VISUAL STABILITY INDEX (VSI) FOR
SELF-CONSOLIDATING GROUT
- X
COMPRESSIVE STRENGTH TESTS SHOULD BE PERFORMED
IN ACCORDANCE WITH ASTM C1019 FOR SLUMP FLOW AND
ASTM C1611 FOR VSI
OREGON
EXPIRES: 06-30-2025
83080PERE
GIS
TERED PROFESSIONALENGINEER
SEPT . 8 , 2009
DA V ID ROBERT K INZER
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
SALEM PUBLIC WORKS DEPART
MENT
NOISIVIDGNIREE
N NIGE
2024A SALEM
DOWNTOWN
STREETSCAPE
PHASE 5
SHEET PREPARED BY:
245 Commercial St. SE, Suite 210 Salem, Oregon 97301
(503) 364-2002
PN:682115-1
NGVD29(COS)
NAD83-SPCS
AS SHOWN
AS SHOWN
CMG
AE
DK
SA
LE
M
C O
R \2
8-
ST
R
EE
TS
C
AP
E
PH
AS
E V\
C _D
ES
N
C
AD
\3
_D
ES
IG
N
\D _P
LA
N
S- 1\
_S
TR
EE
T
IM
PR
O
V\
SV
-0
G
EN
S
TR
U C
TU
R
AL
N
O
TE
S.
D
W G
LA
ST
S
AV
ED
: 3
/3 1/
:4
AM
PR
IN
TE
D
: 4 /8
/2
3:
P
M
GENERAL
STRUCTURAL
NOTES
SV-02
MRN
AE
AS SHOWN
AS SHOWN
DK
GENERAL
1. SCOPE
A. THE GENERAL NOTES AND STANDARD DETAILS APPLY TO THE
ENTIRE PROJECT, UNO.
2. THE GENERAL CONTRACTOR SHALL COORDINATE:
A. INSPECTIONS, TESTING AND STRUCTURAL OBSERVATIONS AS WORK
PROCEEDS. NOTIFY THE EOR 48 HOURS PRIOR TO ANY REQUIRED
STRUCTURAL OBSERVATIONS.
3. CONSTRUCTION SEQUENCE, SHORING AND BRACING REQUIREMENTS:
A. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE METHOD,
MEANS AND SEQUENCE OF STRUCTURAL ERECTION, UNLESS NOTED
OTHERWISE (UNO). HE SHALL PROVIDE ADEQUATE TEMPORARY
SHORING OR BRACING FOR ALL STRUCTURAL ELEMENTS UNTIL THE
ENTIRE STRUCTURAL SYSTEM IS COMPLETED. DESIGN OF SHORING
AND BRACING IS BY OTHERS AT NO ADDITIONAL COST TO THE
OWNER.
4. OMISSIONS, CONFLICTS AND DISCREPANCIES:
A. RESOLVE OMISSIONS, CONFLICTS AND DISCREPANCIES BETWEEN
THE ELEMENTS OF THE CONTRACT DOCUMENTS BEFORE
PROCEEDING WITH WORK INVOLVED.
BASIS OF DESIGN
1. BUILDING CODE: 2019 OSSC
2. BUILDING RISK CATEGORY: II
3. SEISMIC DESIGN
A. ANALYSIS PROCEDURE: MONONOBE-OKABE PROCEDURE
B. IMPORTANCE FACTOR: Ie 1.00
C. MAPPED SPECTRAL RESPONSE ACCELERATION:
Ss & S1: 0.828g & 0.416g
D. SITE CLASS: D (DEFAULT)
E. SPECTRAL RESPONSE COEFFICIENT:
Sds: 0.663g
F. SEISMIC DESIGN CATEGORY: D
G.DESIGN ACCELERATION FACTOR: KH 0.265
H. DESIGN BASE SHEAR: 0.844 K/FT
4. SOILS
A. SOIL REPORT: NONE
B. SOIL BEARING PRESSURE: 1500 PSF (DEFAULT)
C. MINIMUM FROST COVER: 12 INCHES
D. LATERAL EARTH PRESSURE METHOD: E.F.P.
D.A. ACTIVE PRESSURE: 35 PSF/FT (ASSUMED)
D.B. PASSIVE PRESSURE: 250 PSF/FT (ASSUMED)
D.C. HEEL SURCHARGE: 200 PSF
REINFORCING STEEL
1. REINFORCING STEEL SHALL COMPLY WITH THE FOLLOWING:
A. CRSI "MANUAL OF STANDARD PRACTICE".
B. ACI "DETAILING MANUAL", ACI 315 (OR SP-66).
C. ACI 318 “BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE”
D. ASTM A615, GRADE 60 FOR NEW STOCK DEFORMED REBAR AND
ASTM A706, GRADE 60 DEFORMED WELDABLE REBAR
2. SUBMITTALS
A. SUBMIT SHOP DRAWINGS TO THE EOR FOR REVIEW. DRAWINGS
SHOULD INCLUDE FABRICATIONS, BENDING, PLACEMENT PLANES
AND ELEVATIONS, BAR SIZES, LENGTHS, MATERIAL, GRADE, BAR
SCHEDULES, STIRRUP SPACING, BENT BAR DIAGRAMS, BAR
ARRANGEMENT, SPLICES AND LAPS, MECHANICAL CONNECTIONS,
TIE SPACING, HOOP SPACING, AND SUPPORTS FOR CONCRETE
REINFORCEMENT
B. REQUESTS FOR ALTERATIONS OR LAP SPLICES MADE AT LOCATIONS
OTHER THAN THOSE SPECIFICALLY INDICATED ON THE DRAWINGS
MUST BE SUBMITTED TO THE EOR FOR APPROVAL PRIOR TO
CONSTRUCTION OF COMPONENT WHERE MATERIAL WILL BE USED.
C. INSPECTION: ALL REINFORCING BARS SHALL BE MARKED SO THEIR
IDENTIFICATION CAN BE MADE WHEN THE FINAL IN-PLACE
INSPECTION OCCURS.
3. CONSTRUCTION/OTHER:
A. DETAIL, BOLSTER, AND SUPPORT ALL REBAR. TIE BARS SECURELY
WITH PROPER CLEARANCES BEFORE PLACING CONCRETE.
B. USE REBAR FREE OF LOOSE FLAKY RUST, SCALE, GREASE, OIL, DIRT,
AND OTHER MATERIALS WHICH AFFECT OR IMPAIR BOND.
C. PLACE REBAR CONTINUOUS IN WALLS, BEAMS, COLUMNS, SLABS,
FOOTINGS, ETC.
D. MINIMUM LAP SPLICES (INCHES): (MINIMUM LAP 24")
#3 #4 #5 #6 #7 #8 #9 #10 #11
CONCRETE: 24" 24" 24" 33" 53" 66" 80" 96" 113"
E. MAKE COLD BENDS. DO NOT USE HEAT. BENDS IN THE
FABRICATOR'S SHOP, UNO. DO NOT UNBEND OR REBEND A
PREVIOUSLY BENT BAR.
F. MINIMUM CONCRETE COVER: (SECURELY POSITION AND ANCHOR
REBAR PRIOR TO POUR)
a. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH 3"
b. EXPOSED TO EARTH OR WEATHER:
b.1. #6 AND LARGER 2" b.2. #5 AND SMALLER 1-1/2"
c. NOT EXPOSED TO EARTH OR WEATHER:
c.1. SLABS, WALLS AND JOIST, #11 & SMALLER 3/4" c.2. BEAMS, COLUMNS: MAIN REINFORCING OR TIES 1-1/2"
d. SLABS-ON-GRADE (SOG) CENTER OF SLAB, UNLESS NOTED
OTHERWISE (UNO)
CONCRETE
1. CODES AND STANDARDS. COMPLY WITH THE FOLLOWING CODES:
A. ACI 301, "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR
BUILDINGS".
B. ACI 318, "BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE".
C. ACI 347, "RECOMMENDED PRACTICE FOR CONCRETE FORM WORK".
2. MATERIALS SHALL CONFORM TO THE FOLLOWING:
A. CEMENT; ASTM C150, TYPE II, PORTLAND CEMENT.
B. HARD ROCK AGGREGATES: ASTM C33
LIGHTWEIGHT AGGREGATES: ASTM C330
C. WATER SHALL BE POTABLE.
D. AIR ENTRAINMENT: ASTM C260
E. FLY ASH: ASTM C618
F. CALCIUM CHLORIDE SHALL NOT BE USED.
3. MIX DESIGNS:
A. SUBMIT MIX DESIGNS TO THE EOR FOR REVIEW. ALL MIX DESIGNS
SHALL BE VERIFIED BY A QUALIFIED TESTING LABORATORY AND SEALED
BY A CIVIL ENGINEER LICENSED IN THE APPROPRIATE STATE.
B. PLACE ONLY ONE TYPE OF CONCRETE AT ANY GIVEN TIME.
C. THE MAXIMUM SLUMP SHALL BE 4" W/O PLASTICIZER ADDED.
D. USE PEA GRAVEL AND/OR PLASTICIZER IN CONGESTED AREAS.
E. LIMIT FLY ASH TO 25% OF THE TOTAL CEMENT.
F. CONCRETE MIXES SHALL CONFORM TO THE FOLLOWING:
TYPE OF 28 DAY MAX. MAX. MAX. AIR MIN.
CONCRETE STRGTH W/C DRY AGG. CEMENT
MEMBER WEIGHT SIZE PER YD.
(PSI) (RATIO) (PCF) (INCHES) (%) (LBS)
FOOTINGS: 4000 0.42 150 3/4 4.5 ±1 517
G. MIXING AND PLACING OF ALL CONCRETE AND SELECTION OF
MATERIALS SHALL BE IN ACCORDANCE WITH THE BUILDING CODE
PROPORTIONS OF AGGREGATE TO CEMENT SHALL BE SUCH AS TO
PRODUCE A DENSE, WORKABLE MIX WHICH CAN BE PLACED WITHOUT
SEGREGATION OR EXCESS FREE SURFACE WATER. ALL CONCRETE
SHALL HAVE AN ACCEPTABLE WATER-REDUCING ADMIXTURE ADDED IN
ACCORDANCE WITH MANUFACTURER'S DIRECTIONS.
H. W/C RATIO SHALL BE BASED ON TOTAL WEIGHT OF CEMENTITIOUS
MATERIALS. DO NOT ADD WATER TO CONCRETE DURING DELIVERY, AT
PROJECT SITE, OR DURING PLACEMENT.
4. CONSTRUCTION:
A. MECHANICALLY VIBRATE CONCRETE DURING PLACEMENT.
B. PRIOR TO PLACING CONCRETE, CHECK WITH TRADES TO INSURE
PROPER PLACEMENT OF OPENINGS, BLOCK OUTS, SLEEVES, CURBS,
CONDUITS, BOLTS, INSERTS, EMBEDS, DOWELS, ETC. PLACE ANCHOR
BOLTS AND DOWELS PRIOR TO CASTING CONCRETE, UNLESS NOTED
OTHERWISE (UNO).
C. FORM CONSTRUCTION JOINTS AND BULKHEADS WITH A KEY WAY.
INTENTIONALLY ROUGHEN CONTACT SURFACES (NEW OR EXISTING) AT
CONSTRUCTION JOINTS PRIOR TO CASTING ADJACENT POURS, UNLESS
NOTED OTHERWISE (UNO).
MASONRY
1. CODES AND STANDARDS:
A. COMPLY WITH TMS 402/602, "BUILDING CODE REQUIREMENTS FOR
MASONRY STRUCTURES".
2. GENERAL
A. SOLID GROUT ALL CELLS W/ REINF AND/OR EMBEDS, TYP.
B. PROVIDE MIN COVER FOR REINF.
C. LAP LENGTHS ARE REQUIRED IN ALL COLUMNS, WALLS, AND BEAMS.
D. MECHANICALLY SPLICE BARS GREATER THAN #9.
3. WALLS
A. USE RUNNING BOND. BUILD CORNERS AND INTERSECTIONS AS AN
INTEGRAL UNIT.
B. DOWEL VERTICAL REINFORCING TO THE STRUCTURE BELOW AND
ABOVE WITH THE SAME SIZE BAR AND SPACING, UNO.
C. PLACE VERTICAL REINFORCING AT THE CENTERLINE OF THE WALL
UNLESS EACH FACE (EF) IS SPECIFIED, UNO.
D. PROVIDE VERTICAL REINFORCING IN GROUTED CELLS AT CORNERS
AND INTERSECTIONS.
E. TERMINATE HORIZONTAL REINFORCING AT WALL ENDS OR OPENINGS
WITH STANDARD HOOKS OR CORNER TYPE BARS. PROVIDE CORNER
BARS OF THE SAME SIZE BAR AND SPACING AS THE HORIZONTAL
REINFORCING AT CORNERS AND INTERSECTIONS.
F. MAKE HORIZONTAL BARS CONTINUOUS WHERE CONCRETE WALLS,
COLUMNS OR PILASTERS INTERFACE. PROVIDE A KEY BETWEEN THE
MASONRY AND CONCRETE. GROUT KEY SOLID.
G. CONSTRUCT BOND BEAMS AT THE TOP COURSE AND AT FLOOR AND
ROOF DIAPHRAGM INTERFACES.
H. CONSTRUCT PENETRATIONS THRU WALLS AS THEY ARE BEING LAID.
ADD 2 #5 BARS IN THE GROUTED CELLS ON ALL SIDES OF OPENING
WHICH EXCEED 24 INCHES IN EITHER DIRECTION, UNO. EXTEND
VERTICAL EDGE BARS THE FULL HEIGHT OF THE WALL BETWEEN
FLOOR OR ROOF SUPPORT. EXTEND HORIZONTAL EDGE BARS 24
INCHES BEYOND THE OPENING EDGES.
I. DO NOT PLACE CONSTRUCTION OR EXPANSION JOINTS IN BEAMS,
HEADERS, COLUMNS OR SUPPORTS, UNO.
J. REINFORCE MASONRY WALLS AS FOLLOWS, UNO:
a. VERT. REINF. = 1 #5 AT 32" OC.
b. HORIZ. REINF. = 2 #4 AT 40" OC.
K. TOOL MORTAR JOISTS CONCAVE, TYP UNO.
L. REMOVE BACK-TO-BACK FACE SHELLS AT INTERSECTING WALLS. ALT
REMOVE FACE SHELLS, COURSE BY COURSE.
M. ADD LADDER-TYPE JOINT REINF OF (2) #9 WIRES ((3) #9 WIRES W/
VENEER) AT 16" OC HORIZ IN ALL CMU WALLS.
N. CMU SHALL BE NOMINAL 8" HIGH X 16" LONG X WIDTH SHOWN IN PLANS.
POST INSTALLED ADHESIVE ANCHORS
1. ADHESIVE SHALL NOT BE INSTALLED WITHOUT PRIOR APPROVAL OF
ENGINEER UNLESS SPECIFICALLY DETAILED ON THE DRAWINGS.
2. BARS MUST BE DEFORMED OR THREADED FOR THE FULL EMBEDMENT
DEPTH IN ADHESIVE.
3. OVER-DRILL BAR DIAMETER AS INDICATED BY THE ADHESIVE
MANUFACTURER AND TO THE DEPTH INDICATED ON THE STRUCTURAL
DRAWINGS.
4. CLEAN HOLE PER MANUFACTURER REQUIREMENTS.
5. ANY DIRT, RUST, AND OIL ON THE BARS SHALL BE REMOVED.
6. DURING THE ADHESIVE MIXING AND APPLICATION PROCESS, INSTALL IN
STRICT ACCORDANCE WITH ICC REPORT AND THE ADHESIVE
MANUFACTURER'S SPECIFICATIONS EXACTLY.
7. VERTICAL HOLES TO BE FILLED FROM THE BOTTOM ARE TO USE AN
EPOXY GEL.
8. THE FOLLOWING ADHESIVE SYSTEMS ARE ACCEPTABLE FOR USE IN
CRACKED AND SEISMIC CONCRETE APPLICATIONS:
A. SIMPSON SET-XP EPOXY
B. POWERS PURE 110+
C. SIMPSON AT XP (COLD WEATHER)
D. HILTI HIT-RE 500 V3
E. POWERS AC100+GOLD (COLD WEATHER)
9. THREADED ANCHOR RODS SHALL BE TYPE 316 STAINLESS STEEL,
UNLESS NOTED OTHERWISE (UNO).
10.USE OF ANY OTHER ADHESIVE IN A SEISMIC / CRACKED CONCRETE
LOCATION WILL ONLY BE CONSIDERED WITH AN APPROVED THIRD-PARTY
EVALUATION REPORT THAT INCLUDES RECOGNITION OF EARTHQUAKE
RESISTANCE IN ACCORDANCE WITH THE CURRENT OSSC.
G. IN MASONRY, PLACE AND POSITION REBAR ACCORDING TO THE
STRUCTURAL DRAWINGS WHILE LAYING UNITS. SECURE AGAINST
DISPLACEMENT AT INTERVALS NOT TO EXCEED THE FOLLOWING:
a. #4 AND SMALLER 6'-0"
b. #5 AND LARGER 10'-0"
H. DO NOT WELD REINFORCING UNLESS SPECIFICALLY NOTED. USE
E-90XX ELECTRODES AND ASTM A706 REINFORCING. COMPLY WITH
AWS REQUIREMENTS.
I. USE EPOXY COATED REINFORCING WHEN SPECIFICALLY NOTED.
INCREASE LAP SPLICE LENGTHS BY A FACTOR OF 1.2.
J. DOWELS: REINFORCING DOWELS BETWEEN FOOTINGS AND WALLS OR
COLUMNS SHALL BE THE SAME NUMBER, SIZE, SPACING AND GRADE AS
THE SPECIFIED VERTICAL REINFORCING, UNLESS NOTED OTHERWISE
(UNO).
K. WIRE FABRIC: WELDED WIRE FABRIC SHALL CONFORM TO ASTM A1064.
MINIMUM LAP OF WELDED WIRE FABRIC SHALL BE 6 INCHES OR ONE
FULL MESH AND ONE HALF, WHICHEVER IS GREATER.
L. BARS SHALL BE SECURELY TIED IN PLACE WITH #16 DOUBLE-ANNEALED
IRON WIRE. CONTRACTOR SHALL COORDINATE REINFORCING STEEL
PLACEMENT DETAILS AND PROVIDE TEMPLATES FOR PLACING STEEL IN
CONGESTED AREAS, AS NECESSARY.
M. METAL CHAIRS, BOLSTER BAR SUPPORTS, AND SPACERS WHICH TOUCH
FORM WORK SHALL BE PLASTIC-COATED
D. ADD ADDITIONAL REINFORCING TO SIDES OF SUSPENDED FLOOR AND
WALL OPENINGS, EQUIVALENT TO THE BARS CUT BY THE OPENING WITH
HALF TO EACH SIDE OF THE OPENING OR (2) #5 BARS, WHICHEVER IS
GREATER, UNLESS NOTED OTHERWISE (UNO). BARS PARALLEL TO THE
PRINCIPAL REINFORCING SHALL RUN FULL LENGTH OF THE SPAN. END
BARS IN THE OTHER DIRECTION WITH A STANDARD HOOK. ADD (2) #5 X
5'-0" DIAGONAL BARS AT EVERY CORNER.
E. DO NOT ALLOW PENETRATIONS THROUGH ANY BEAM, JOIST, COLUMN,
PIER, FOOTING, OR JAMB WITHOUT THE EOR'S APPROVAL. OTHERWISE,
RE-ROUT THE PENETRATION.
F. EXPOSED CONCRETE CORNERS AND EDGES SHALL HAVE 3/4"
CHAMFERS, UNLESS NOTED OTHERWISE (UNO).
G. MAINTAIN CONCRETE ABOVE 50°F AND IN A MOIST CONDITION FOR A
MINIMUM OF 7 DAYS AFTER PLACEMENT UNLESS OTHERWISE
ACCEPTED BY EOR. FOR STRUCTURAL COMPONENTS THAT ARE USED
PRIOR TO DESIGN STRENGTH, IF AVERAGE TEMPERATURE AT THE SITE
IS BELOW 50°F, (2) ADDITIONAL TESTING CYLINDERS ARE TO BE
PROVIDED AND FIELD CURED.
5. FOOTINGS:
A. BEAR FOOTINGS ON PROPERLY PREPARED MATERIALS.
B. NO FOOTINGS SHALL BE PLACED IN WATER OR ON FROZEN GROUND.
C. CENTER FOOTINGS ON THE WALL OR COLUMN ABOVE, UNLESS NOTED
OTHERWISE (UNO).
D. BEAR EXTERIOR FOOTINGS BELOW THE EFFECTS OF FROST. SEE BASIS
OF DESIGN.
E. PROVIDE 2X4 BEVELED KEY IN CONTINUOUS WALL FOOTINGS.
F. STAGGER FOOTING CONSTRUCTION JOINTS FROM WALL
CONSTRUCTION JOINTS ABOVE BY AT LEAST 6 FEET.
G. PROVIDE CORNER BARS IN CONTINUOUS FOOTINGS AT CORNERS AND
INTERSECTIONS.
H. DO NOT ALLOW PENETRATIONS THROUGH ANY CONCRETE FOOTING.
AT UTILITIES, STEP THE FOOTING DOWN BELOW THE CONFLICT AND
ADD A CONCRETE WALL, PIER OR COLUMN THAT EXTENDS TO THE
FOOTING. CONSULT WITH THE EOR.
I. BACKFILL BEARING SURFACES THAT ARE UNDERMINED DURING
CONSTRUCTION WITH A LEAN CONCRETE MIX (1000 PSI MIN.).
4. BEAMS
A. USE OPEN ENDED UNITS THROUGHOUT CMU BEAM. BACK TO
BACK END SHELLS ARE NOT ALLOWED.
B. TYPICAL HORIZONTAL REINFORCING DETAILING: SPLICE TOP
BARS AT MIDSPAN ONLY. EXTEND TOP BARS A MINIMUM OF 4'-0"
BEYOND THE FACE OF THE OPENING OR TERMINATE WITH A
STANDARD HOOK, UNLESS NOTED OTHERWISE (UNO). SPLICE
BOTTOM BARS AT SUPPORTS ONLY.