This document is a set of contract documents for the Marion VA Medical Center construction project, specifically detailing electrical and technology infrastructure work. The project involves the construction of a new energy center with associated electrical distribution, telecommunications, security, and audiovisual systems.
The electrical scope includes three main distribution panels: Panel 1LLS (208Y/120V, 150A rating), Panel 1LNA (208Y/120V, 150A rating), and Panel 1HNDP1 (480Y/277V, 200A rating), all located in Electrical Room 106. The estimated total demand across panels ranges from 9.79 kVA to 58.29 kVA. The technology infrastructure encompasses data cabling using Category 6A UTP cables, telecommunications outlet labeling schemes with modular jack configurations, wireless access points (WAP) providing network connectivity throughout the facility, and closed-circuit television (CCTV) systems with eight cameras installed at various locations including the chiller plant, electrical rooms, and exterior building corners. Security systems include electronic door controls (EDC) for eight doors plus two gates, card reader access points, intercom stations, and magnetic locks with associated power supplies. The project specifies conduit routing, cable trays, grounding systems, and detailed installation requirements per NEC standards. Installation specifications reference Sections 26 05 33 (Raceway and Boxes Systems), 26 51 00 (Luminaire Installation), 07 84 00 (Firestopping), and related sections. The construction phase is designated as NEW, with contract documents dated 05/07/2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\d m br
\A pp D at a\
Lo ca l\A ut od es k\ R ev it\
Au to de sk
R ev it
\C ol la bo ra tio nC ac he
\L Q
C 3M
U F8
4E
LP
\5 d1 ac
3- 2a e8 -4
5-b5 5f
-c ff8
3c 3d
3a
\e e-fd
-4 d-ab
-2 dc f.r vt
5/ 5/
1:
:5
PM
E602
PANEL SCHEDULES
05/07/2026 MSG DMB
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
9.29 kVA 9.79 kVA (27 A)
TOTAL CONNECTED ESTIMATED DEMAND
Notes:
Special Circuit Breaker (SCB) Types: GF=GFCI Breaker, ST=Shunt Trip Breaker, AF=AFCI Breaker, GP=GFPE Breaker
Total Est. Demand: 27 A Resistive Heat 4,493 VA 100.00% 4,493 VA Total Conn.: 26 A Receptacle 1,440 VA 100.00% 1,440 VA Total Est. Demand: 9.79 kVA Power 360 VA 100.00% 360 VA Total Conn. Load: 9.29 kVA Motor 2,998 VA 116.68% 3,498 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Load: 3.87 kVA 3.75 kVA 1.68 kVA 41 Spare 20 A 1 0 -- 1 -- Space 42 39 Spare 20 A 1 0 -- 1 -- Space 40 37 Spare 20 A 1 0 -- 1 -- Space 38 35 Spare 20 A 1 0 -- 1 -- Space 36 33 Spare 20 A 1 0 -- 1 -- Space 34 31 Spare 20 A 1 0 -- 1 -- Space 32 29 Spare 20 A 1 0 -- 1 -- Space 30 27 Spare 20 A 1 0 -- 1 -- Space 28 25 Spare 20 A 1 0 -- 1 -- Space 26 23 Spare 20 A 1 0 -- 1 -- Space 24 21 Spare 20 A 1 0 -- 1 -- Space 22 19 Spare 20 A 1 0 -- 1 -- Space 20 17 Spare 20 A 1 0 -- 1 -- Space 18 15 Spare 20 A 1 0 -- 1 -- Space 16 13 Spare 20 A 1 0 -- 1 -- Space 14 11 Spare 20 A 1 0 0.18 1 20 A LCP-1 12 9 Space -- 1 -- 2.246 -- -- -- -- 10 7 Space -- 1 -- 2.246 2 30 A DWH-1 8 5 -- -- -- -- 0.499 1 -- -- -- -- 6
3 VAV-3 15 A 2 0.499 1 2 15 A UH-5 4
1 R. CONTROL ROOM... 20 A 1 1.26 0.36 1 20 A METER CTRL PNL 2
CKT Circuit Description
SCB
Type Trip Poles
A B C Poles Trip
SCB
Type Circuit Description CKT
Voltage: 208Y/120V-3PH-4W Mains Rating: 150 A Supply From: T-1LNA Enclosure: Type 1 Mains Type: MCB
Location: ELECTRICAL ROOM 106 Mounting: Surface A.I.C. Rating: 22KAIC Panel: 1LNA Construction Phase: NEW
2.36 kVA 2.36 kVA (7 A)
TOTAL CONNECTED ESTIMATED DEMAND
Notes:
Special Circuit Breaker (SCB) Types: GF=GFCI Breaker, ST=Shunt Trip Breaker, AF=AFCI Breaker, GP=GFPE Breaker
Total Est. Demand: 7 A Total Conn.: 7 A
Power 400 VA 100.00% 400 VA Total Est. Demand: 2.36 kVA Other 500 VA 100.00% 500 VA Total Conn. Load: 2.36 kVA Lighting 1,461 VA 100.00% 1,461 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Load: 0.69 kVA 0.85 kVA 0.82 kVA 29 Spare 20 A 1 0 0 -- -- -- -- 30 27 Spare 20 A 1 0 0 -- -- -- -- 28 25 Spare 20 A 1 0 0 3 20 A SPD 26 23 Spare 20 A 1 0 -- 1 -- Space 24 21 Space -- 1 -- -- 1 -- Space 22 19 Space -- 1 -- -- 1 -- Space 20 17 Space -- 1 -- -- 1 -- Space 18 15 Space -- 1 -- -- 1 -- Space 16 13 Space -- 1 -- -- 1 -- Space 14 11 Space -- 1 -- -- 1 -- Space 12 9 Space -- 1 -- -- 1 -- Space 10 7 Space -- 1 -- -- 1 -- Space 8 5 Lighting 20 A 1 0.424 0.4 1 20 A GEN&ATS PANEL 6
3 LGT CHILLER PLANT... 20 A 1 0.347 0.505 1 20 A LGT CHILLER PLANT... 4
1 FACP 20 A 1 0.5 0.185 1 20 A LGT 2
CKT Circuit Description
SCB
Type Trip Poles
A B C Poles Trip
SCB
Type Circuit Description CKT
Voltage: 208Y/120V-3PH-4W Mains Rating: 100 A Supply From: T-1LLS Enclosure: Type 1 Mains Type: MCB
Location: ELECTRICAL ROOM 105 Mounting: Surface A.I.C. Rating: 10KAIC Panel: 1LLS Construction Phase: NEW
56.42 kVA 58.29 kVA (70 A)
TOTAL CONNECTED ESTIMATED DEMAND
Notes:
Special Circuit Breaker (SCB) Types: GF=GFCI Breaker, ST=Shunt Trip Breaker, AF=AFCI Breaker, GP=GFPE Breaker
Resistive Heat 19,493 VA 100.00% 19,493 VA Receptacle 1,440 VA 100.00% 1,440 VA Power 760 VA 100.00% 760 VA Total Est. Demand: 70 A Other 500 VA 100.00% 500 VA Total Conn.: 68 A Motor 25,481 VA 107.36% 27,356 VA Total Est. Demand: 58.29 kVA Lighting 2,740 VA 100.00% 2,740 VA Total Conn. Load: 56.42 kVA
HVAC 6,003 VA 100.00% 6,003 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Total Load: 20.45 kVA 19.09 kVA 16.88 kVA 53 Spare 20 A 1 0 0 -- -- -- -- 54 51 Spare 20 A 1 0 0 -- -- -- -- 52 49 Spare 20 A 1 0 0 3 60 A SPD 50 47 Spare 20 A 1 0 -- 1 -- Space 48 45 Spare 20 A 1 0 -- 1 -- Space 46 43 Spare 20 A 1 0 -- 1 -- Space 44 41 -- -- -- -- 0 -- 1 -- Space 42 39 -- -- -- -- 0 -- 1 -- Space 40 37 Spare 15 A 3 0 -- 1 -- Space 38 35 -- -- -- -- 0 -- 1 -- Space 36 33 -- -- -- -- 0 -- 1 -- Space 34 31 Spare 20 A 3 0 -- 1 -- Space 32 29 -- -- -- -- 0.023 -- 1 -- Space 30 27 -- -- -- -- 0.023 0 1 20 A Lighting 28
25 LC-1 20 A 3 0.023 2.001 -- -- -- -- 26
23 -- -- -- -- 2.5 2.001 -- -- -- -- 24
21 -- -- -- -- 2.5 2.001 3 15 A VAV-1 22
19 UH-3 15 A 3 2.5 1.209 1 20 A POLE LGT 20
17 -- -- -- -- 2.5 2.5 -- -- -- -- 18 15 -- -- -- -- 2.5 2.5 -- -- -- -- 16
13 UH-2 15 A 3 2.5 2.5 3 15 A UH-4 14
11 -- -- -- -- 2.494 2.5 -- -- -- -- 12 9 -- -- -- -- 2.494 2.5 -- -- -- -- 10
7 VAV-2 15 A 3 2.494 2.5 3 15 A UH-1 8
5 -- -- -- -- 0.685 1.679 -- -- -- -- 6 3 -- -- -- -- 0.824 3.746 -- -- -- -- 4
1 LS-ATS 90 A 3 0.852 3.866 3 70 A T-1LNA 2
CKT Circuit Description
SCB
Type Trip Poles
A B C Poles Trip
SCB
Type Circuit Description CKT
Voltage: 480Y/277V-3PH-4W Mains Rating: 200 A Supply From: US-49 Enclosure: Type 1 Mains Type: MLO
Location: ELECTRICAL ROOM 106 Mounting: Surface A.I.C. Rating: 42KAIC Panel: 1HNDP1 Construction Phase: NEW(NEW) (NEW) (NEW)
1 CONTRACT DOCUMENTS 05/07/2026
DETAIL NOTES
1. FIRESTOP SEALANT, PER SECTION 07 84 00, FIRESTOPPING.
2. MINERAL WOOL. (FIRMLY PACKED)
3. STEEL EXPANSION ANCHOR. TYPICAL.
4. INTERGRAL GALVANIZED LIPPED STELL MOUNTING CHANNEL.
5. CONDUIT FITTING.
6. JUCTION BOX OR PULL BOX. (SIZE AS REQUIRED)
7. SPRING NUT.
8. CONCRETE FLOOR SLAB.
9. CONDUIT.
1 88
3/8" MAX.
[9.52mm]
GENERAL NOTES:
1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING CHANNEL
LONGER THAN 3'-0" [915mm] SHALL BE INSTALLED WITH
A CENTER SUPPORT ROD. SUPPORT RODS SHALL NOT BE GREATER
THAN 1'-6" [457mm] APART.
2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED METHOD
PER SPECIFICATION 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL
SYSTEMS. FIELD VERIFY EXACT CONDITIONS.
3. FOR TRAPEZE INSTALLATIONS IN SEISMIC AREAS, REFER TO
SPECIFICATION SECTION 13 05 41, SEISMIC RESTRAINT
REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.
3/8" [9.52mm] MIN. GALVANIZED
THREADED ROD, TYPICAL.
LOCKING SQUARE,
WASHER & LOCKNUT.
INTEGRAL GALVANIZED LIPPED
STEEL MOUNTING CHANNEL
WASHER & LOCKNUT.
REFER TO PLANS FOR QUANTITY
& SIZE OF CONDUITS.
CONDUIT CLAMP.
SIZE AS REQUIRED.
INTEGRAL GALVANIZED LIPPED
STEEL MOUNTING CHANNEL
RIGID METAL
CONDUIT FOR
SUPPORT PER
N.E.C. ART. 314
RIGID
METAL
CONDUIT
FOR WIRING
CAST METAL
"WHILE-IN-USE"
WP COVER (S) &
GFCI
RECEPTACLE (S).
CONDUIT
CAP OR
PLUG
ROOF PENETRATION AND
CONDUIT SUPPORT PER
SD260533-05
CAST METAL
"WHILE-IN-USE"
WP COVER (S) &
GFCI
RECEPTACLE (S).
CAST METAL, 2-GANG,
NEMA 3R JUNCTION
BOX WITH THREADED
HUBS.
RIGID METAL
CONDUIT FOR
SUPPORT PER
N.E.C. ART. 314
RIGID
METAL
CONDUIT
FOR WIRING
SECTION "A-A"
ELEVATION
m m
(1 8"
M
A X m m
(1 2"
M
A X
A
A
DETAIL NOTES
1. INSTALLATION IS AN ACCEPTABLE ALTERNATE TO DETAILS SD260533-01.
INSTALLATION IS REQUIRED FOR CONDUIT SMALLER THAN 3" [76mm] ADN
LARGER.
2. PROVIDE EXTRA CABLE LENGTH TO MAKE A COMPLETE LOOP AROUND BOX
PERIMETER.
3. JUNCTION BOX OR PULL BOX. (SIZE AS REQUIRED).
4. EXPANSION FITTING WITH BONDING JUMPER.
5. SPRING NUT.
6. CONDUIT FITTING. TYPICAL.
7. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING CHANNEL.
8. BEAM CLAMP. TYPICAL.
9. STEEL EXPANSION ANCHOR.
10. STRUCTURAL MEMBER (BEAM, JOIST, ETC.) TYPICAL.
11. SEISMIC OR EXPANSION JOINT. FIELD VERIFY ACTUAL CONDITIONS &
LOCATIONS.
12. HEAD.
13. INSULATING BUSHING.
FLOOR OR ROOF STRUCTURE.
FIELD VERIFY ACTUAL
CONDITIONS, TYP.
CONDUIT TRAPEZE PER
SD260533-03. TYP.
CONDUIT. TYP.
3'-0" MAX
[914mm]
CONDUIT TRAPEZE PER
SD260533-03. TYP.
CONDUIT. TYP.
3/8" [9.52mm] MIN. GALVANIZED
THREADED ROD, TYPICAL.
LOCKING SQUARE,
WASHER & LOCKNUT.
REFER TO PLANS FOR QUANTITY
& SIZE OF CONDUITS.
CONDUIT CLAMP.
SIZE AS REQUIRED.
INTEGRAL GALVANIZED LIPPED
STEEL MOUNTING CHANNEL
UV-INHIBITED POLYCARBONATE OR
HIGH-DENSITY POLYPROPYLENE
PLASTIC BLOCK. LENGTH AS REQUIRED.
DETAIL NOTES
1. CONDUIT CLAMP. SIZE AS REQUIRED.
2. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING CHANNEL.
3. LOCKING SQUARE & LOCK NUT.
4. 3/8" [9.52mm] MIN. GALVANIZED THREADED ROD.
5. STEEL EXPANSION ANCHOR.
6. MULTIPLE MEMBRANE STRIPPING PLIES FEATHERED AT FIELD OF ROOF BY
ROOFING CONTRACTOR. PRIME FLANGE BEFORE STRIPPING.
7. PREFABRICATED FORMED 0.06" [1.52mm] THICK ALUMINUM FLASHING ROUND
COLLAR WITH MINIMUM 3" [76mm] WIDE FLANGE. ATTACHED TO ROOF PER
MANUFACTURER'S INSTRUCTIONS.
8. BATT INSULATION.
9. CONDUIT.
10. SEAL -OFF FITTING.
11. STAINLESS STEEL CLAMP.
12. PREFABRICATED RUBBER BOOT CAP WITH GRADUATED STEPS & WEATHER-
ROOF PRESSURE SEAL TO COLLAR.
13. SEALANT AT PENETRATION TO MEMBRANE JUNCTURE BY ROOFING
CONTRACTOR.
14. ROOF MEMBRANE.
15. CONCRETE DECKING.
16. WATER CUT-OFF MASTIC COMPATIBLE WITH ROOF MEMBRANE.
GENERAL NOTES
1. MAINTAIN A MINIMUM CLEARANCE OF 1'-0" [305mm] ON ALL SIDES OF ROOF
PENETRATION FROM WALLS, CURBS AND OTHER PROJECTION TO FACILITATE
PROPER FLASHING.
2. FLANGES OF ADJACENT FLASHING SHALL NOT BE CUT OR OVERLAPPED.
3. VERIFY ROOF AND STRUCTURAL SYSTEM WITH ARCHITECT.
4. COORDINATE FLASHING INSTALLATION WITH ROOFING CONTRACTOR TO
ENSURE PROPER METHODS AND MATERIALS ARE USED TO MAINTAIN ROOF
WARRANTY.
. FIELD OF VIEW
16 16
14 14
13 13
11 11
DETAIL NOTES
1. ALL HARDWARE SHALL BE STAINLESS STEEL.
2. PROVIDE ONE MOUNTING POINT PER 12" [305mm] OF BAR LENGTH.
3. HOLES MAYBE ADDED IF REQUIRED.
2'-0" MIN.
[610mm]
1 1/2" TYP.
[38mm]
1" [25mm]
1" [25mm]
1" [25mm]
2" [51mm]
1" [2
5m m
5/ 8"
[1 6m m
2" [5
1m m
4" [1 m m
3/8" [9.52mm] x 5/8" [16mm]
HEX HEAD BOLT.
1/4" [6.35mm] DIA. MOUNTING
HOLES. TYP OF (4)
1/4" [6.35mm] DIA.
HOLES. TYP OF (8)
1/4" [6.35mm] THICK CU BAR
3/8" [9.52mm] DIA. HOLES.
TYP. OF (6)
1/4" [6.35mm] THICK CU BAR
3/8" [9.52mm] x 5/8" [16mm]
HEX HEAD BOLT.
BASE CLAMP/ BRACKET
3/8" [9.52mm] LOCK & FLAT WASHERS
INSULATOR
STEEL EXPANSION
ANCHOR
3/8" [9.52mm] LOCK & FLAT WASHERS
BASE CLAMP/ BRACKET
6'-4" [1930mm]
3'-2" [965mm]
3'-2" [965mm]
3' -1
0" [1
8m m
5' -6
[1
6m m
9' -4
[2
5m m ]A A
POWER
6'-4" [1930mm]
5'-0" [1524mm]
8" [203mm]8"
[2 m m
SUMP 12"x12" [305x305mm]
8" [2 m m
CABLE STANCHION
PER SECTION 26 05 41.
PULLING IRON
GROUND ROD
SLEEVE
9' -4
[2
5m m
8" [2 m m
3" [76mm]
8' -0
[2
8m m
B B
FINISHED GRADE 8"
[2 m m
] GRADE RINGS AS REQUIRED
TO MATCH CIVIL FINISHED
GRADE ELEVATION.
CABLE STANCHION
PER SECTION 26 05 41.
[3 m m
6" [1 m m
CONCRETE ENVELOPE
5'-0" [1524mm]
SUMP FRAME & COVER
SUMP 12" [305mm]
3' -0
[9 m m
3'-0" [915mm]
GRAVEL SUMP
1 CUBIC YARD
[0.764 CUBIC METERS]
3/4" [19mm]
GROUND ROD
PER SECTION
26 05 26.
8" [2 m m
PULLING IRON
7' -4
[2
5m m
V A
R
IE
S
NOTE:
INCLUDE ALUMINUM LADDER. (NOT SHOWN FOR CLARITY)
SLOPE
SLO
PE
S
LO
P E
EQUIPMENT GROUND
CONDUCTOR
MANHOLE COVER FRAME
GROUND CONNECTION
CABLE SPLICES
#6 STRANDED
BARE CU CABLE
(TYP.)
DUCT BANK
CABLE PULLING
IRONS
#3/0 STRANDED
BARE CU
COMPLETE RING
EXOTHERMIC
WELD
CONNECTION
GROUND ROD PER
SPECIFICATION
SECTION 26 05 26
SUMP FRAME
DRILL AND
TAP GROUND
CONNECTION
CABLE CLIP (TYP)
EXOTHERMIC WELD
CONNECTION (TYP)
BRAIDED SHIELD
DRAIN WIRES
(TYP)
EMBEDDED CHANNEL
OR CABLE RACK (TYP)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /M a ri o n I
L V
A
N e w E n e rg y C e n te r/
-0
-M
E P
-C e n tr a l.
rv t
/5 /2
:2
:2
P M
E603
ELECTRICAL DETAILS
05/07/2026 MSG DMB
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
SCALE: NONE
CONDUIT FLOOR SLAB PENETRATION DETAIL
SCALE: NONE
CONDUIT TRAPEZE MOUNTING DETAIL
SCALE: NONE
RECEPTACLE ROOF MOUNTING DETAIL
SCALE: NONE
CONDUIT EXPANSION JOINT CROSSING - EXPANSION FITTING
SCALE: NONE
CONDUIT ROOF SUPPORT DETAIL
SCALE: NONE
CONDUIT ROOF PENETRATION DETAIL
SCALE: NONE
GROUNDING BAR DETAILS
SCALE: NONE
POWER MANHOLE DETAIL
SCALE: NONE
MANHOLE GROUNDING
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING
HARDWARE.
DRYWALL CEILING
CROSS TEE. TYP.
JUNCTION
BOX
WIRE TIE THROUGH
MOUNTING CHANNEL
& CROSS BEAM. TYP.
6.35mm (1/4")
SCREW
LOCKING
SQUARE
WASHER & NUT
GYPSUM BOARD
CEILING MAIN
BEAM
WIRE TIE THROUGH
MOUNTING CHANNEL
& CROSS BEAM. TYP.
INTEGRAL GALVANIZED
LIPPED STEEL MOUNTING
CHANNEL
CEILING MAIN
BEAM
HANGER WIRE & MOUNTING CHANNEL
ATTACHED TO STRUCTURE REFER TO
SPECIFICATION SECTION 26 51 00
FIXTURE WHIP FROM JUNCTION
BOX (1,829mm (6') LONG MAX)
CEILING HANGER
WIRE
DRYWALL CEILING
CROSS TEE. TYP.
FINISHED PAVING
PULLBOX (REFER
TO SPECIFICATIONS)
LINE SIDES OF EXCAVATION
WITH 30 LBS. (13.6 KG)
FELT PAPER.
(4) CONCRETE BRICKS
2"x8"x16" (51mm x 203mm x 406mm)
CLEAN CRUSHED ROCK
3/4" (19mm) CONDUIT(S) WITH BELL ENDS (TYP.)
SIZE, QUANTITY AND WIRING AS
INDICATED ON PLANS
(3 m m
12" (305mm)
V A
R
IE
S
GRADE. FEATHER & TAMP BACKFILL
TO CREATE FLUSH INSTALLATION AND
POSITIVE DRAINAGE AWAY FROM BOX.
PULLBOX (REFER
TO SPECIFICATIONS)
LINE SIDES OF EXCAVATION
WITH 30 LBS. (13.6 KG)
FELT PAPER.
(4) CONCRETE BRICKS
2"x8"x16" (51mm x 203mm x 406mm)
CLEAN CRUSHED ROCK
3/4" (19mm)
CONDUIT(S) WITH BELL ENDS (TYP.)
SIZE, QUANTITY AND WIRING AS
INDICATED ON PLANS
(3 m m
12" (305mm)
V A
R
IE
S
LUMINAIRE
MANUFACTURER'S
MOUNTING HARDWARE
REFER TO SPECIFICATION
SECTION 26 51 00
FIXTURE WHIP FROM
JUNCTION BOX
(1829mm (6') LONG MAX.)
LUMINAIRE.
REFER TO
SCHEDULE
3 TWIST MINIMUM
(TYP)
LUMINAIR SUSPENSION
WIRES REFER TO
SPECIFICATION SECTION
26 51 00 (TYP)
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS AND USING THE
RECOMMENDED MOUNTING HARDWARE.
ARCHITECTURAL
CEILING GRID
ACOUSTICAL
CEILING TILE (TYP)
LUMINAIRE.
REFER TO
SCHEDULE
ACOUSTICAL
CEILING TILE
(TYP)
LUMINAIRE
MANUFACTURER'S
MOUNTING HARDWARE
REFER TO SPECIFICATION
SECTION 26 51 00
FIXTURE WHIP FROM
JUNCTION BOX
(1829mm (6') LONG MAX.)
LUMINAIRE.
REFER TO
SCHEDULE
3 TWIST MINIMUM
(TYP)
GYPSUM BOARD (TYP)
CEILING CROSS BEAM
CEILING MAIN BEAM
LUMINAIR SUSPENSION
WIRES REFER TO
SPECIFICATION SECTION
26 51 00 (TYP)
CEILING CROSS BEAM
GYPSUM BOARD
DRYWAL BORDER
LUMINAIRE.
REFER TO
SCHEDULE
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING INSTRUCTIONS AND USING THE
RECOMMENDED MOUNTING HARDWARE.
1/4" CAST IRON WITH
LEGEND "GROUND"
CONCRETE SLAB
GROUND CONNECTOR
(BURNDY TYPE "GAR")
BARE GROUNDING CABLE
(SIZE AS SHOWN ON PLANS)
TO NEXT GROUND ROD
GROUND ROD (SIZE
AS SPECIFIED)
12" DIAMETER X 2'-0"
STANDARD CONCRETE
PIPE WITH HUB
3/0 COPPER CABLE
3/0 COPPER GROUND LOOP CONDUCTOR
CADWELD "TEE" TYPE
EXOTHERMIC CABLE TO
GROUND ROD CONNECTION
CADWELD EXOTHERMIC
CABLE TO GROUND ROD
CONNECTION
3/4" X 10'-0" COPPER - CLAD STEEL
GROUND ROD.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /M a ri o n I
L V
A
N e w E n e rg y C e n te r/
-0
-M
E P
-C e n tr a l.
rv t
/5 /2
:2
:2
P M
E604
ELECTRICAL DETAILS
05/07/2026 MSG DMB
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
SCALE: 1/2" = 1'-0"
EXIT SIGN MOUNTING GYPBOARD CEILING
SCALE: 1/8" = 1'-0"
UNDERGROUND CONCRETE PULLBOX - PAVED AREA
SCALE: 1/8" = 1'-0"
UNDERGROUND CONCRETE PULLBOX - TURF AREA
SCALE: 1/2" = 1'-0"
LUMINAIRE MOUNTING - LAY-IN CEILING
SCALE: 1/2" = 1'-0"
LUMINAIRE MOUNTING - GYPBOARD CEILING
SCALE: NONE
TEST WELL AND GROUND ELECTRODE
SCALE: NONE
TYPICAL GROUNDING ROD CONNECTION
ABBREVIATIONS
AAP - AREA ALARM PANEL - MEDICAL GAS
ACC - ACCESS
ADJ - ADJUSTABLE
AF - ARC FAULT CIRCUIT INTERRUPTER
AFCI - ARC FAULT CIRCUIT INTERRUPTER
AFF - ABOVE FINISHED FLOOR TO BOTTOM OF ITEM
AFG - ABOVE FINISHED GRADE TO BOTTOM OF ITEM
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
ATS - AUTOMATIC TRANSFER SWITCH
BLDG - BUILDING
BOE - BOTTOM OF EQUIPMENT
BOT - BOTTOM
BTWN - BETWEEN
CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CKT - CIRCUIT
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CONN - CONNECT OR CONNECTION
CORR - CORRIDOR
CTR - CENTER
D - DEPTH
DET - DETAIL
DIA - DIAMETER
DIM - DIMENSION
DIV - DIVISION
DN - DOWN
DWG - DRAWING
EA - EACH
EC - ELECTRICAL (DIVISION 26)
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATION OR ELEVATOR
EM - EMERGENCY
EQ - EQUAL
EQS - EQUIPMENT SUPPLIER
EQUIP - EQUIPMENT
ETR - EXISTING TO REMAIN
EX - EXISTING
EXP - EXPANSION
EXT - EXTERIOR
FCE - FIRE CONTROL EQUIPMENT
FF - FINISHED FLOOR ELEVATION
FLR - FLOOR
FSC - FIRE SUPPRESSION (DIVISION 21)
FT - FEET
FTG - FOOTING
GC - GENERAL CONTRACTOR
GF - GROUND FAULT CIRCUIT INTERRUPTER
GFCI - GROUND FAULT CIRCUIT INTERRUPTER OR GOVERNMENT
FURNISHED CONTRACTOR INSTALLED
GFFT - GROUND FAULT FEED THRU
HC - HVAC (DIVISION 23)
HH - HANDHOLE
HP - HORSE POWER OR HIGH POINT
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
ID - INSIDE DIAMETER
IN - INCHES
KEC - KITCHEN EQUIPMENT CONTRACTOR
L - LENGTH
LBS - POUNDS
MAP - MASTER ALARM PANEL (MEDICAL GAS)
MAX - MAXIMUM
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE OR MOUNTING HEIGHT TO CENTER LINE OF ITEM
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
NIC - NOT IN CONTRACT
NOM - NOMINAL
NTS - NOT TO SCALE
OD - OUTSIDE DIAMETER
OFCI - OWNER FURNISHED CONTRACTOR INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
PC - PLUMBING (DIVISION 22)
PLBG - PLUMBING
RAD - RADIUS
REC - RECESSED
REQD - REQUIRED
RI - ROUGH-IN
S - SURFACE MOUNTED
SC - SECURITY (DIVISION 28)
SCH - SCHEDULE
SHT - SHEET
SMS - SECURITY MANAGEMENT SYSTEM
SPEC - SPECIFICATIONS
SQ - SQUARE
SS - STAINLESS STEEL
SSTV - SURVEILLANCE SYSTEM TELEVISION
STD - STANDARD
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
TC - TECHNOLOGY (DIVISION 27)
TEBC - TELECOMMUNICATIONS EQUIPMENT BONDING CONDUCTOR
TEMP - TEMPERATURE
TOE - TOP OF EQUIPMENT
TYP - TYPICAL
UNO - UNLESS NOTED OTHERWISE
VFD - VARIABLE FREQUENCY DRIVE
VOL - VOLUME
W/ - WITH
W/O - WITHOUT
WP - WEATHERPROOF
ZVC - ZONE VALVE CABINET
T2
B
T2
DETAIL: B = DETAIL DESIGNATION
T2 = SHEET WHERE DETAIL IS LOCATED
SECTION: 1 = SECTION DESIGNATION
T2 = SHEET WHERE SECTION IS LOCATED
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
GENERAL FLOOR PLAN NOTES
CONDUIT RUN IN WALL OR ABOVE CEILING.
CONDUIT RUN IN SLAB OR UNDERGROUND.
CABLE MANAGEMENT SYSTEM PATHWAY.
LADDER TRAY, 12" x 4" DEEP UNLESS NOTED OTHERWISE.
CM
4"
4"
CABLE TRAY, 12" x 4" DEEP UNLESS NOTED OTHERWISE.
T2 1 ELEVATION: 1 = ELEVATION DESIGNATION
T2 = SHEET WHERE ELEVATION IS LOCATED
DASH SYMBOL INDICATES PARTICULAR OUTLET, DEVICE, OR EQUIPMENT TO BE REMOVED AND
SUPPORTING CABLING TO BE REMOVED BACK TO SOURCE OF ORIGIN UNLESS NOTED OTHERWISE.
EXISTING OUTLET, DEVICE, OR EQUIPMENT TO REMAIN. MAINTAIN EXISTING CABLING.
XX
XX
X
X
SURFACE MOUNTED OUTLET OR DEVICE. REFER TO PLANS AND DETAILS.#
SECURITY SYMBOLS
CC
1 CCTV SYSTEM CEILING MOUNTED CAMERA. REFER TO CAMERA SCHEDULE FOR MOUNTING HEIGHT AND CAMERA
SPECIFICATIONS. SUBSCRIPT "X" INDICATES ENTRY IN CAMERA SCHEDULE.
X
AV SYMBOLS
SP CEILING MOUNTED STANDARD ROUND PAGING/INTERCOM SYSTEM SPEAKER.
P
SP PENDANT MOUNTED PAGING/INTERCOM SYSTEM SPEAKER.
AV SYMBOLS WITH ELECTRICAL REQUIREMENTS
SJ
SPEAKER JACK PLATE (18" MH UNLESS NOTED OTHERWISE). 3-GANG BOX WITH 0.75" CONDUIT TO ABOVE ACCESSIBLE
CEILING, JACK PLATE AND WIRING.
SP
HORN TYPE PAGING/INTERCOM SYSTEM SPEAKER (120" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH 0.75" CONDUIT TO ABOVE ACCESSIBLE CEILING, GROMMETED FACEPLATE, SPEAKER, INSTALLATION AND WIRING.
TECHNOLOGY SYMBOLS WITH ELEC. REQUIREMENTS
WALL MOUNTED PHONE OUTLET (46" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT TO ABOVE ACCESSIBLE
CEILING, JACKS, FACEPLATE AND CABLING. REFER TO FACEPLATE DETAILS.
X R
WALL MOUNTED AV OUTLET (84" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT TO ABOVE ACCESSIBLE CEILING, JACKS, FACEPLATE AND CABLING. SUBSCRIPT "X" INDICATES ALTERNATE CONFIGURATION. REFER TO FACEPLATE DETAILS.
X V
WALL MOUNTED AV OUTLET (44" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT TO ABOVE ACCESSIBLE CEILING, JACKS, FACEPLATE AND CABLING. SUBSCRIPT "X" INDICATES ALTERNATE CONFIGURATION. REFER TO FACEPLATE DETAILS.
CONDUIT SLEEVE / FIRE RATED SLEEVE ASSEMBLY THRU WALL (1-2" SLEEVE UNLESS NOTED OTHERWISE).
J TELECOM BOX AND CONDUIT TO ABOVE ACCESSIBLE CEILING, REFER TO PLANS. REFER TO FACEPLATE DETAILS.
WALL MOUNTED VOICE/DATA OUTLET (18" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT(S) TO ABOVE
ACCESSIBLE CEILING, JACKS, FACEPLATE AND CABLING. REFER TO FACEPLATE DETAILS.
AP
WALL MOUNTED WIRELESS ACCESS POINT (96” MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT TO ABOVE
ACCESSIBLE CEILING, WAP AND CABLING. REFER TO FACEPLATE DETAILS.
FLOOR BOX WITH CONDUIT(S) TO ABOVE ACCESSIBLE CEILING, # INDICATES TYPE, REFER TO FLOOR BOX (FB) SCHEDULE.
SUBSCRIPT "X" INDICATES TECHNOLOGY DEVICE(S), REFER TO TECHNOLOGY DETAILS.
X
POKE-THRU, # INDICATES TYPE, REFER TO POKE-THRU (PT) SCHEDULE. SUBSCRIPT "X" INDICATES TECHNOLOGY DEVICE(S), REFER TO TECHNOLOGY DETAILS.
X
WALL MOUNTED DATA OUTLET (18" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT(S) TO ABOVE ACCESSIBLE CEILING, JACKS, FACEPLATE AND CABLING. SUBSCRIPT "X" DESIGNATES QUANTITY OF DATA CABLES. REFER TO FACEPLATE DETAILS.
X
OUTLET LOCATED ABOVE ACCESSIBLE CEILING. JACKS, PLENUM RATED SURFACE MOUNT BOX AND CABLING. SUBSCRIPT "X" INDICATES ALTERNATE CONFIGURATION. # INDICATES OUTLET TYPE ON THIS LEGEND, REFER TO FACEPLATE DETAILS.
X
SECURITY SYMBOLS WITH ELECTRICAL REQUIREMENTS
CC
CCTV SYSTEM WALL MOUNTED CAMERA (REFER TO CAMERA SCHEDULE FOR MOUNTING HEIGHT AND CAMERA SPECIFICATIONS). SUBSCRIPT "X" INDICATES ENTRY IN CAMERA SCHEDULE. 1-GANG BOX WITH 0.75" CONDUIT TO ABOVE
ACCESSIBLE CEILING, CAMERA AND CABLING.
IC
WALL MOUNTED INTERCOM DOOR STATION (46" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH 0.75" CONDUIT TO
ABOVE ACCESSIBLE CEILING, INTERCOM AND CABLING.
DM
DOOR POSITION SWITCH WITH WIRING. CONDUIT PATHWAYS FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING, PROVIDE ONE CONTACT FOR EACH LEAF IN MULTI-DOOR OPENINGS. REFER TO SECURITY
ROUGH-IN DETAILS.
EL
ELECTRONIC DOOR LOCK AND INSTALLATION BY OTHERS. LOW VOLTAGE WIRING AND CONDUIT PATHWAYS FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING, REFER TO SECURITY ROUGH-IN DETAILS.
EM
ELECTRONIC MAG LOCK AND INSTALLATION BY OTHERS. LOW VOLTAGE WIRING AND CONDUIT PATHWAYS FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING, REFER TO SECURITY ROUGH-IN DETAILS.
ES
ELECTRONIC STRIKE AND INSTALLATION BY OTHERS. LOW VOLTAGE WIRING AND CONDUIT PATHWAYS FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING, REFER TO SECURITY ROUGH-IN DETAILS.
RX
REQUEST TO EXIT SWITCH IN DOOR HARDWARE BY OTHERS. LOW VOLTAGE WIRING. CONDUIT PATHWAYS FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING, REFER TO SECURITY ROUGH-IN DETAILS.
HD
HANDICAP DOOR OPERATOR MOTOR ASSEMBLY BY OTHERS. 120V POWER CONNECTION AND CONDUIT FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING, LOW VOLTAGE WIRING AND INTERFACE WITH SMS
AND DOOR ACTUATOR BUTTONS. REFER TO SECURITY ROUGH-IN DETAILS.
HA
WALL/PEDESTAL MOUNT HANDICAP DOOR ACTUATOR BUTTON, FURNISHED BY OTHERS. BOX AS REQUIRED BY SYSTEM MANUFACTURER WITH INSTALLATION AND CONDUIT TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING, ALL LOW VOLTAGE WIRING AND INTERFACE WITH SMS AND DOOR MOTOR. REFER TO SECURITY ROUGH-IN DETAILS.
HO
FA
WALL/FLOOR MOUNTED ELECTROMAGNETIC DOOR HOLD OPEN WITH POWER SUPPLY INSTALLED BY OTHERS. 120V POWER AND CONNECTION, BOX AS REQUIRED BY MANUFACTURER AND CONDUIT TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING, LOW VOLTAGE WIRING FROM POWER SUPPLY TO HOLD OPEN AND INTERFACE WITH SMS.
SUBSCRIPT "FA" INDICATES DEVICES POWERED FROM FIRE ALARM SYSTEM AND INTERFACE FROM SMS TO FIRE ALARM
SYSTEM REQUIRED FOR DOOR RELEASE. REFER TO SECURITY ROUGH-IN DETAILS.
CR
GOOSENECK PEDESTAL PROXIMITY CARD READER (42" AND 64" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH CONDUIT TO COMMON SMS JUNCTION BOX, CARD READER AND CABLING. REFER TO SECURITY ROUGH-IN DETAILS.
KC
WALL MOUNTED COMBINATION KEYPAD/CARD READER (46" MH UNLESS NOTED OTHERWISE). 2-GANG BOX WITH 0.75"
CONDUIT TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING, DEVICE AND CABLING.
X
PB W
WALL MOUNTED PUSH BUTTON FOR LOCAL ELECTRONIC DOOR RELEASE (46" MH UNLESS NOTED OTHERWISE). 1-GANG
BOX WITH 0.75" CONDUIT TO ABOVE ACCESSIBLE CEILING, BUTTON AND CABLING.
PL
SITE POLE FOR MOUNTING SECURITY CAMERAS (REFER TO SPECIFICATIONS FOR SIZE/TYPE). PROVIDE POLE WITH CONCRETE BASE AS INDICATED ON PLANS. EXTEND AND CONNECT TO SITE CONDUIT SYSTEM AS INDICATED ON PLANS.
PROVIDE NEMA 3R JUNCTION BOX AT BASE OF POLE FOR CAMERA EQUIPMENT (120V POWER SUPPLY, FIBER
CONVERTERS, ETC.). REFER TO SECURITY ROUGH-IN DETAILS.
EDC
X ELECTRONIC DOOR CONTROL. SUBSCRIPT "X" INDICATES SPECIFIC DOOR. REFER TO ELECTRONIC DOOR CONTROL
SCHEDULE FOR REQUIREMENTS.
TECHNOLOGY SYMBOLS
AP CEILING MOUNTED WIRELESS ACCESS POINT WITH DATA DROP ABOVE CEILING. PROVIDE 10' COIL IN DATA CABLE TO
FACILITATE FUTURE RELOCATION OF WAP.
WIREMOLD RACEWAY, AS NOTED ON PLANS.
NOTE:
ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT TO
MODIFICATIONS ON OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT
NECESSARILY BE USED ON THIS PROJECT.
IM DESK MOUNTED INTERCOM MASTER STATION.
A. CONDUITS SHALL BE MINIMUM 1" UNLESS OTHERWISE NOTED.
B. ALTERNATIVE ROUTES MAYBE UTILIZED, WHICH ARE COORDINATED WITH THE GOVERNMENT
AND OTHER TRADES. FINAL ROUTING OF TELECOMMUNICATIONS CABLING SHALL BE
APPROVED BY COR.
C. ALL JUNCTION BOXES ARE TO BE FLUSH MOUNTED UNLESS OTHERWISE NOTED.
D. VERIFY EXACT LOCATION OF ALL CEILING MOUNTED DEVICES WITH REFLECTED CEILING PLAN
AND/OR ARCHITECT PRIOR TO ROUGH-IN. COORDINATE LOCATIONS OF CEILING MOUNTED
DEVICES WITH LIGHT FIXTURES, MECHANICAL DUCTS, AND SPRINKLER PIPES AND HEADS
BEFORE ROUGH-IN TO PREVENT CONFLICTS.
E. REFER TO ARCHITECTURAL ELEVATIONS FOR EXACT LOCATIONS AND MOUNTING HEIGHTS
OF OUTLETS AND DEVICES.
F. COORDINATE EXACT LOCATION OF ALL SWITCHES, RECEPTACLES, DATA OUTLETS, VOLUME
CONTROLLERS, AV SYSTEM CONTROLLERS, THERMOSTATS, ETC. WITH RESPECTIVE TRADE
DIVISION PRIOR TO ROUGH-INS. ALL MOUNTING HEIGHTS OF DEVICES WHICH ARE MOUNTED
ADJACENT TO EACH OTHER SHALL BE AT THE SAME DISTANCE MEASURED ABOVE THE
FINISHED FLOOR.
G. STAGGER RECEPTACLES AND OTHER RECESSED OUTLETS WHEN LOCATED ON OPPOSITE
SIDES OF PARTITION / WALL TO ELIMINATE SOUND TRANSMISSION FROM ONE SPACE TO THE
OTHER.
H. WHERE DEVICES ARE MOUNTED IN AREAS WHERE THERE ARE EXPOSED CEILINGS,
COORDINATE THE EXACT MOUNTING / LOCATION WITH THE STRUCTURAL SUPPORT
MEMBERS AND WORK OF OTHER TRADES. PROVIDE ALL NECESSARY LABOR AND MATERIALS
TO ACHIEVE MOUNTING HEIGHTS AND LOCATIONS AS INDICATED ON THE PLANS.
I. REFER TO ARCHITECTURAL DRAWINGS AND COORDINATE ANY EXPOSED CONDUITS WITHIN
THE FINISHED PORTIONS OF THE BUILDING FOR PRIME AND PAINTING REQUIREMENTS.
J. ALL EMPTY CONDUITS SHALL BE INSTALLED WITH PULL STRING.
K. WHERE WALLS ARE FURRED ON ONE SIDE, ALL NEW SERVICES SHALL BE INSTALLED IN THE
WALL FROM THE FURRED OUT SIDE OF THE WALL.
L. ALL CONDUIT SLEEVES AND PATHWAYS SHOWN ON BID DOCUMENTS SHALL BE PROVIDED.
ALL CONDUIT SLEEVES THRU WALLS AND FLOORS, NOT SPECIFICALLY SHOWN ON DRAWINGS
BUT REQUIRED FOR COMPLIANT INSTALLATION OF CABLING SHALL BE PROVIDED AS PART OF
THE SCOPE OF WORK.
M. COMPLETELY AND THOROUGHLY COORDINATE ALL PATHWAYS BEING PROVIDED. ANY
PATHWAYS THAT ARE PROVIDED THAT CAUSE CABLING INSTALLATION TO BE NON-
COMPLIANT SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE
INSTALLATION OF CABLING.
N. A 3.5" DEEP MASONRY BOX SHALL BE USED IN CMU WALLS.
O. BOND ALL CABLE RUNWAY SPLICES AND BUTT JOINTS WITH #6 AWG BOLTED TO CABLE
RUNWAY. REMOVE PAINT OFF OF CABLE RUNWAY FOR METAL TO METAL CONNECTION AND
APPLY ANTI-OXIDANT JOINT COMPOUND OVER ANY REMAINING AREAS WITH BARE METAL
EXPOSED.
P. ALL CONDUITS AND SLEEVES SHALL HAVE NYLON BUSHINGS INSTALLED.
Q. PULL BOXES SHALL NOT BE USED TO CHANGE DIRECTION AND SHALL BE INSTALLED IN LINE
WITH CONDUIT.
R. ALL INTERIOR OF PRECAST CONCRETE WALLS TECHNOLOGY DEVICES SHALL BE SURFACE
MOUNTED.
GENERAL NOTES
AP
P
PENDANT MOUNTED WIRELESS ACCESS POINT WITH DATA DROP. PROVIDE 10' COIL IN DATA CABLE TO FACILITATE
FUTURE RELOCATION OF WAP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /M a ri o n I
L V
A
N e w E n e rg y C e n te r/
-0
-M
E P
-C e n tr a l.
rv t
/5 /2
:2
:3
P M
T001
TECHNOLOGY LEGEND
05/07/2026 JCM GES
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
DN
CC
EDC
GATE 2
EDC
GATE 1
CR
42" MH
CR
64" MH
CR
42" MH
CR
64" MH
BLDG #2
BLDG #37
EDUCATIONAL
BUILDING BLDG #38
DENTAL/MEDICAL
VENDING/BUILDING
MANAGEMENT & SPD
EXISTING
CHILLER
PLANT 49
NEW HANDHOLE A-1
EXISTING TELECOMMUNICATIONS
MANHOLE 49-1 PATHWAY "A"
NEW 2-4" CONDUITS PATHWAY "C"
PL2
NEW HANDHOLE A-3
NEW HANDHOLE A-2
1-4" CONDUIT
1-4" CONDUIT
2-4" CONDUITS
MOD-1
EXISTING PATHWAY "A"
EXISTING PATHWAY "A"
NEW PATHWAY "B"
NEW PATHWAY "B"
2-4" CONDUIT
NEW HANDHOLE 37-1
NEW HANDHOLE 37-2 1 2
NEW MANHOLE 37-3
MH
MH
1-4" CONDUIT
COMMUNICATIONS
(2) x 4" CONDUIT
4" MAXCELL 3-CELL FABRIC INNERDUCT,
A HIGH-CAPACITY , FLEXIBLE, MULTI-
CELL CONDUIT SYSTEM.
(2) x 4" CONDUIT
GROUND LINE
TOP LEVEL
OF CONCRETE
12 28
4" MAXCELL 3-CELL FABRIC INNERDUCT,
A HIGH-CAPACITY , FLEXIBLE, MULTI-
CELL CONDUIT SYSTEM.
(1) x 4" CONDUIT
4" MAXCELL 3-CELL FABRIC INNERDUCT,
A HIGH-CAPACITY , FLEXIBLE, MULTI-
CELL CONDUIT SYSTEM.
(1) x 4" CONDUIT
4" MAXCELL 3-CELL FABRIC INNERDUCT,
A HIGH-CAPACITY , FLEXIBLE, MULTI-
CELL CONDUIT SYSTEM.
GENERAL NOTES
A. CONCRETE SHALL BE 3000 LB @ 28 DAYS, OR AS SPECIFIED.
B. PROVIDE #4 REINFORCING RODS ON TOP AND BOTTOM OF DUCTS WHEN
CROSSING OR PLACED IN ROADWAYS.
C. PROVIDE MINIMUM 2'-3" COVER OF TAMPED BACKFILL OVER TELECOMMUNICATIONS
DUCT BANK. INSTALL RED DYE, RED DUST, OR YELLOW WARNING MARKER TAPE AT
1'-6" BELOW FINISHED GRADE, AND CENTERED IN RELATION TO DUCT BANK, WITHIN
COMPACTED FILL TO INDICATE UNDERGROUND COMMUNICATIONS
INFRASTRUCTURE.
D. PROVIDE MINIMUM 3" SPACING BETWEEN CONDUITS AND MINIMUM 3" ENCASEMENT,
AND WHEN PARALLEL TO POWER, PROVIDE A MINIMUM OF 6" SPACE BETWEEN
POWER AND TELECOMMUNICATION DUCT BANKS. INCREASE SIZE AS REQUIRED.
E. FOR THE LOCATION OF 4-4" DUCT BANK, ADD INTERMEDIATE SPACER ON A MAX 5'-0"
CENTERS.
3" 3"
3"3"
2 - WAY DUCT LINE
3" 3"
3"3"
1 - WAY DUCT LINE
3" 3"
3"3"
3"
3"
3"
4- WAY DUCT LINE
DETAIL NOTES
1. (1) 4" MAXCELL 3-CELL FABRIC INNERDUCT WITH PULL STRINGS IN EACH CELL,
INCLUDED IN EACH 4" CONDUIT.
1 1 1
NEW
ENERGY
CENTER
ROOM
TR-102
(1) 24 STRAND OM4-(DATA)
(1) 12 STRAND OS2-(BAS)
(2) 04 STRAND OS2 FOR PACS/
AND SSTV
(1) 04 STRAND OS2 FOR PACS
VEHICLE
GATE
LIGHT
POLE
VEHICLE
GATE
(1) 04 STRAND OS2 FOR SSTV
(1) 04 STRAND OS2 FOR PACS
(1) 04 STRAND OS2 FOR PACS
(1) 04 STRAND OS2 FOR SSTV
(1) 24 STRAND OM4-(DATA)
(1) 12 STRAND OS2-(BAS)
FROM BUILDING 37
EXISTING EHRM FIBER 49-1
PATHWAY "A"
EXISTING MANHOLE 49-1 PATHWAY "A"
CONTINUATION OF
EXISTING EHRM FIBER PATHWAY "A"
NEW HAND HOLE A-3
NEW HAND HOLE A-1
NEW HAND HOLE A-2
NEW HANDHOLE 37-2
NEW HANDHOLE 37-1
EXISTING
BUILDING
BLDG #37
NEW MANHOLE 37-3
(1) 24 STRAND OM4-(DATA)
(1) 12 STRAND OS2-(BAS)
(1) 14AWG/2C FOR AUDIO
FROM BUILDING #37
(1) 24 STRAND OM4-(DATA)
(1) 12 STRAND OS2-(BAS)
(1) 14AWG/2C FOR AUDIO
FROM BUILDING #37
(1) 24 STRAND OM4-(DATA)
(1) 12 STRAND OS2-(BAS)
(1) 14AWG/2C FOR AUDIO
FROM BUILDING #37
APPROX WEIGHT:
13,150 LBS.
APPROX. WEIGHT:
15,150 LBS.
1-1/2" R-30
RING AND COVER
7'-0"
12" REDUCING CONE
MODEL 3630-R12
7'-0"
4'-0"
3'-0"
6'-0"
OVERALL
6" GRADE RING
MODEL 3606
PULLING IRON
2 TOTAL
12-0"
OVERALL
11'-0"
5'-0"
(4) PREDRILLED
HOLES FOR
CONDUITS TYP.
(4) PREDRILLED
HOLES FOR
CONDUITS TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /M a ri o n I
L V
A
N e w E n e rg y C e n te r/
-0
-M
E P
-C e n tr a l.
rv t
/5 /2
:2
:5
P M
TS100
TECHNOLOGY SITE PLAN
05/07/2026 JCM GES
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1" = 30'-0"
SITE PLAN - TECHNOLOGY
A. COORDINATE ALL UNDERGROUND CONDUIT WITH ALL EXISTING AND NEW UNDERGROUND UTILITIES
SHOWN ON CIVIL DRAWINGS.
B. COORDINATE ALL TRENCHING, CONDUIT ROUTING, AND CABLE PATHWAY INSTALLATION WITH OTHER TRADES AND THE COR TO MINIMIZE DISRUPTION TO EXISTING SERVICES. VERIFY EXISTING UTILITIES AND
COORDINATE ANY REQUIRED OUTAGES IN ADVANCE.
C. REFER TO DUCT BANK PROFILE ON THIS SHEET.
D. REFER TO CIVIL SITE PLANS AND SURVEYING DATA FOR LOCATIONS OF EXISTING SYSTEMS.
E. ALL UNDERGROUND CONDUIT ROUTING WILL BE ENCASED IN CONCRETE.
F. PROVIDE IN SCHEDULE 40 PVC 4" CONDUITS, MAXCELL 3-CELL INNERDUCT.
G. SEE SHEET T103 BUILDING #37 FOR ADDITIONAL INFORMATION.
GENERAL NOTES
NTS
2X4 QUAZITE HANDHOLE BOX
NTS
DUCT BANK DETAIL
NTS
SITE FIBER RISER DIAGRAM
NORTH
1. PROVIDE CONDUIT BETWEEN MAIN FIBER DISTRIBUTION ROM IN B37 FOR CONNECTION OF PATH "B FIBER TO NEW CHILLER BUILDING. PATH SHALL BE A CONCRETE ENCASED DUCT BANK THAT INCLUDES (2) 4" CONDUIT AND (3) 3 CELL, 4" FABRIC INNDERDUCT PER CONDUIT. PROVIDE (2) 24 STRAND OM4. PROVIDE 14AWG/2C FOR
AUDIO PAGING INTO NEW CHILLER BUILDING.
2. PROVIDE HANDHOLE FOR PATHWAY "B" FIBER. APPROXIMATE LOCATION OF NEW HANDHOLE, COORDINATE
LOCATION WITH OTHER TRADES PRIOR TO ROUGH-IN.
3. ROUTE FIBER OPTIC AND COPPER CABLING FROM NEW BUILDING "ENERGY CENTER", ROOM TR-102 VIA NEW PATHWAY "C" TO MANHOLE 49-1. CONTINUE FROM MANHOLE 49-1 ALONG EXISTING PATHWAY "A" TO BUILDING # 37, EDUCATIONAL BUILDING MDF. COORDINATE WITH EXISTING CONDITIONS AND AVOID DISRUPTIONS TO
ACTIVE SYSTEMS.
PLAN NOTES
NTS
MANHOLE DETAIL 37-3
2D
2D
2D2D
2D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /M a ri o n I
L V
A
N e w E n e rg y C e n te r/
-0
-M
E P
-C e n tr a l.
rv t
/5 /2
:2
:4
P M
TD101
TECHNOLOGY FLOOR PLAN -
DEMOLITION
05/07/2026 JCM GES
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
BUILDING 49 FIRST FLOOR - DEMOLITION
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
MOD-4
MOD-6
NORTH
GENERAL NOTES:
A. CONTRACTOR SHALL COORDINATE WITH THE OWNER IN REGARD TO REMOVALS. DIV 27 AND DIV 28 SHALL FULLY TEST ALL ELECTRONICS PRIOR TO REMOVAL AND PROVIDE WRITTEN DOCUMENTATION OF EQUIPMENT CONDITION AND DISPOSITION TO THE OWNER BEFORE DEMOLITION ACTIVITIES BEGIN. TECHNOLOGY EQUIPMENT INDICATED FOR DEMOLITION SHALL BE REMOVED, TAGGED, AND RETURNED TO THE OWNER FOR STORAGE AND/OR REUSE / REPURPOSING. ALL FIBER OPTIC AND COPPER CABLING FOR
COMMUNICATIONS, INTO BUILDING 49 SHALL BE REMOVED BACK TO BUILDING #37.
3D
3D
3D
3D
AP
P
AP
P
AP
P
AP
P
AP
P
CC
CC
CC
CC
CC
CC
EDC
EDC
EDC
EDC
EDC
EDC
KC
KC
KC
KC
KC
KC
EDC
IM
IC
IC
2D
2D
2D
R
114" MH
SP
P120" AFF
SP
P120" AFF
SP
P120" AFF
SP
P120" AFF
SP
96" MH
SP
96" MH
SP
96" MH
SP
P 120" AFF
SP
P 120" AFF
SP
P 120" AFF
SP
P 120" AFF
SP
P120" AFF
SP
SP
SP
KC
EDC
2D
2D
2D
CC
3D
3D
2D
96" MH
SP
KC
A
D
632 54
B
C
CHILLER PLANT
CONTROL ROOM
H.A.C.
TR
ELECTRICAL ROOM
ELECTRICAL ROOM
T401
100B
105A
100A 100
106A
TOILET
138" AFF 120" AFF
120" AFF
120" AFF120" AFF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /M a ri o n I
L V
A
N e w E n e rg y C e n te r/
-0
-M
E P
-C e n tr a l.
rv t
/5 /2
:2
:3
P M
T101
TECHNOLOGY FLOOR PLAN - NEW
WORK
05/07/2026 JCM GES
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
TECHNOLOGY FIRST FLOOR
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
MOD-4
MOD-6
NORTH
PLAN NOTES:
1. INTERCOM DOOR ALERT EDWARDS SIGNALING 435-4E1 OR EQUAL.
2. FIELD COORDINATE THE EXACT LOCATION OF THE DATA JACK AT THE CHILLER CONTROL PANEL WITH MECHANICAL AND ELECTRICAL TRADES PRIOR TO INSTALLATION. PROVIDE NEMA-RATED ENCLOSURE FOR PHYSICAL PROTECTION OF DATA JACK AND ASSOCIATED CABLING. COORDINATE ENCLOSURE TYPE AND MOUNTING WITH EQUIPMENT CLEARANCES AND FIELD
CONDITIONS.
3. FIELD COORDINATE THE EXACT LOCATION OF THE DATA JACK AT THE METER ENCLOSURE WITH ELECTRICAL TRADES PRIOR TO INSTALLATION. PROVIDE NEMA-RATED ENCLOSURE FOR PHYSICAL PROTECTION OF DATA JACK AND ASSOCIATED CABLING.
COORDINATE ENCLOSURE TYPE AND MOUNTING WITH EQUIPMENT CLEARANCES AND FIELD CONDITIONS.
4. FIELD COORDINATE THE EXACT LOCATION OF THE DATA JACK AT THE METER SWITCHBOARD WITH ELECTRICAL TRADES PRIOR TO INSTALLATION. PROVIDE NEMA-RATED ENCLOSURE FOR PHYSICAL PROTECTION OF DATA JACK AND ASSOCIATED CABLING.
COORDINATE ENCLOSURE TYPE AND MOUNTING WITH EQUIPMENT CLEARANCES AND FIELD CONDITIONS.
5. PROVIDE WEATHERPROOF BACK BOX WITH WEATHERPROOF COVER PLATE TO PROTECT FROM WATER/PIPE LEAKS.
GENERAL NOTES:
A. ROUTE ALL DIVISION 27 AND 28 CABLING BETWEEN DEVICES AND TR-102 IN CONDUIT UNLESS OTHERWISE NOTED. CONDUIT SHALL BE CONTINUOUS AND PROPERLY SUPPORTED, WITH BENDS AND SIZING IN ACCORDANCE WITH APPLICABLE STANDARDS.
AP
P
2D
2D
AP
P
60" MH
SP
60" MH
SP
76" MH
SP
A
D
632 54
B
C
A
D
1 32
B
C
A.4
A.6
MEZZANINE
96" AFF
84" AFF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /M a ri o n I
L V
A
N e w E n e rg y C e n te r/
-0
-M
E P
-C e n tr a l.
rv t
/5 /2
:2
:3
P M
T102
MEZZANINE FLOOR - NEW WORK
05/07/2026 JCM GES
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
TECHNOLOGY 02-MEZZANINE
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
MOD-4
MOD-6
NORTH
PLAN NOTES:
1. FIELD COORDINATE THE EXACT LOCATION OF THE DATA JACK AT OR IN THE CONTROL PANEL WITH MECHANICAL AND ELECTRICAL TRADES PRIOR TO INSTALLATION. PROVIDE NEMA-RATED ENCLOSURE FOR PHYSICAL PROTECTION OF DATA JACK AND ASSOCIATED CABLING. COORDINATE ENCLOSURE TYPE AND MOUNTING WITH EQUIPMENT CLEARANCES AND FIELD
CONDITIONS.
2. PROVIDE PATHWAYS AT THE MEZZANINE LEVEL FOR CONDUITS ENTERING TR-102. ROUTE CONDUITS TO TERMINATE ABOVE THE LADDER RACK AND COORDINATE ENTRY LOCATIONS WITH EQUIPMENT LAYOUT. BOND AND GROUND ALL CONDUITS TO THE SBB IN THE TR. SEAL ALL PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES WITH APPROVED FIRESTOP SYSTEMS TO MAINTAIN THE
RATING.
GENERAL NOTES:
A. ROUTE ALL DIVISION 27 AND 28 CABLING BETWEEN DEVICES AND TR-102 IN CONDUIT UNLESS OTHERWISE NOTED. CONDUIT SHALL BE CONTINUOUS AND PROPERLY SUPPORTED, WITH BENDS AND SIZING IN ACCORDANCE WITH APPLICABLE STANDARDS.
2 3 4 51
A
B
C
D
E
T/C ELEC
COMPUTER
ROOM
TELEPHONE
LIBRARY
CM CM
CM
CM
EXISTING
PATHWAY "A"
NEW PATHWAY "B"
CM
105A 105
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /M a ri o n I
L V
A
N e w E n e rg y C e n te r/
-0
-M
E P
-C e n tr a l.
rv t
/5 /2
:2
:3
P M
T103
BUILDING 37 FLOOR PLAN
05/07/2026 JCM GES
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 37
MARION VA
MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
TECHNOLOGY FIRST FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /M a ri o n I
L V
A
N e w E n e rg y C e n te r/
-0
-M
E P
-C e n tr a l.
rv t
/5 /2
:2
:3
P M
T103
BUILDING 37 FLOOR PLAN
05/07/2026 JCM GES
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 37
MARION VA
MEDICAL
CENTER Approved: Owner
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
MOD-4
MOD-6
NORTH
PLAN NOTES:
1. EXISTING EHRM PATHWAY "A": FIELD VERIFY PATHWAY ROUTING AND AVAILABLE SPACE WITH ROOM TO ACCOMMODATE NEW FIBER OPTIC AND COPPER CABLING FROM BUILDING 37 EDUCATIONAL BUILDING MDF. COORDINATE WITH EXISTING CONDITIONS
AND AVOID DISRUPTION TO ACTIVE SYSTEMS.
2. NEW PATHWAY "B" CORE DRILL AND OR SAW CUT AS REQUIRED TO ACCOMMODATE CONDUIT ENTRY. PROVIDE SLEEVES WHERE APPLICABLE. ALL CONDUIT PENETRATIONS SHALL BE SEALED WATERTIGHT AND INSECT-TIGHT USING APPROVED SEALANTS AND FIRESTOP SYSTEMS (WHERE RATED ASSEMBLIES ARE PENETRATED). ENSURE SEALS ARE DURABLE, UV-RESISTANT (WHERE
EXPOSED) AND COMPATIBLE WITH CONDUIT AND WALL MATERIALS.
1 CONTRACT DOCUMENTS 05/07/20261 CONTRACT DOCUMENTS 05/07/2026
EDC
KC
CC
T
C
TR
T401 3
T401
T401
14 18
16 21 22
C
14 18
66 BLOCK
110 BLOCK
9 9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /M a ri o n I
L V
A
N e w E n e rg y C e n te r/
-0
-M
E P
-C e n tr a l.
rv t
/5 /2
:2
:4
P M
T401
TECH ROOM PLAN AND
ELEVATIONS
05/07/2026 JCM GES
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/2" = 1'-0"
BUILDING A - TECHNOLOGY ENLARGED PLAN TR 102
1/2" = 1'-0"
TR 102 NORTH WALL ELEVATION
1/2" = 1'-0"
TR 102 EAST WALL ELEVATION
1/2" = 1'-0"
TR 102 SOUTH WALL ELEVATION
1/2" = 1'-0"
TR 102 WEST WALL ELEVATION
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
MOD-4
MOD-6
NORTH
1 1/2" = 1'-0"
FRONT RACK ELEVATION
1 1/2" = 1'-0"
BACK RACK ELEVATION
RACK ELEVATION GENERAL NOTES
A. FINAL QUANTITY OF (2) HORIZONTAL CABLING PATCH PANELS AND (2) NETWORK EDGE SWITCHES.
B. ALL WORK SHALL BE IN CONFORMANCE WITH INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES (USE LATEST AT TIME
OF BIDDING) VERSION 5.0 JULY 22, 2025.
C. FINAL RACK CONFIGURATIONS INCLUDING LOCATION AND ORIENTATION IN EACH ROOM SHALL BE COORDINATED WITH STATION OIT
PRIOR TO INSTALLATION AND CABLING TERMINATION.
D. PROVIDE BLANKING PANELS FOR ALL UNUSED RACK SPACE.
E. RACKS SHALL BE 30" CHANNEL STYLE, 45RU, WHITE.
F. EACH RACK SHALL INCLUDE A FULL HEIGHT FRONT/REAR 6" VERTICAL CABLE MANAGER ON EACH SIDE. TWO RACKS SHALL INCLUDE A
SINGLE CABLE MANAGER BETWEEN RACKS.
PLAN NOTES
1. RACK MOUNTED FIBER TERMINATION CASSETTE FOR DATA, WITH LC BULKHEADS. LEVITON OPT-X UHDX.
2. 1RU FLAT BLANKING PANELS. PROVIDE QUANTITY IN EACH RACK AS REQUIRED TO FILL ALL UNUSED RACK SPACES.
3. 1-4" CONDUIT WITH NYLON BUSHING INTO ROOM TR 102.
4. 24" x 1.5" VERTICALLY MOUNTED LADDER RACK, FIBER SECURED WITH VELCRO TIE WRAP.
5. CATEGORY 6A, 48 PORT, 1RU HIGH DENSITY ANGLED PATCH PANEL FOR PROPOSED DATA STATION CABLING. PANELS TO HAVE REAR CABLE MANAGERS AND ANGLED PANEL COVERS, LEVITON e2XHD SERIES, BLACK.
6. 1RU, HORIZONTAL, FRONT/REAR, CABLE MANAGEMENT PANEL.
7. NETWORK EDGE SWITCH BY VA.
8. 2RU, HORIZONTAL, FRONT/REAR, CABLE MANAGEMENT PANEL.
9. L21-20P SIDE A REQUIRES A 208 V, 20 A, THREE-PHASE CIRCUIT, TERMINATING IN A NEMA L21-20R LOCKING RECEPTACLE. L21-20P SIDE B REQUIRES A 208 V, 20 A, THREE-PHASE CIRCUIT, TERMINATING IN A NEMA L21-20R LOCKING RECEPTACLE.
10. 5KW, 208V UPS. PROVIDE IN TR RACK.
11. ZONE PDU 20 A, 3-PHASE ZONE PDU BASE UNIT. SIDE A, REQUIRES A 208V, 20A, 3 PHASE CIRCUIT, TERMINATING IN A NEMA L21-20R LOCKING RECEPTACLE. L21-20P SIDE B REQUIRES A 208 V, 20 A THREE-PHASE CIRCUIT, TERMINATING IN A NEMA L21-20R LOCKING
RECEPTACLE.
12. RACK MOUNTED TELECOMMUNICATIONS EQUIPMENT GROUND BAR (RBB) PRE-DRILLED FOR 2-HOLE LUGS. ALL EQUIPMENT WITHIN RACK TO BE BONDED TO BAR UTILIZING # 6awg BONDING CONDUCTORS. BOND BAR TO SBB WITHIN EACH TR. PROVIDE AT TOP OF
RACK IN TR.
13. 5-4" PVC CONDUITS UP THOUGH FLOOR.
14. PRIMARY BONDING BAR (PBB) ALL CONNECTIONS SHALL BE MADE WITH DOUBLE-BOLTED, COMPRESSION STYLE GROUNDING LUGS.
15. 8' HIGH x 4' WIDE x 3/4" THICK FIRE RATED AC GRADE PLYWOOD BACKBOARD, MOUNTED VERTICALLY 6" AFF AND RUNNING FULL WIDTH OF WALL. PLYWOOD SHALL BE PAINTED WITH TWO COATS ON ALL SIDES WITH A FIRE RETARDANT PAINT, LEAVING ONE FIRE RATING
STAMP VISIBLE AND UNPAINTED.
16. BAS FODP TERMINATION PANEL.
17. PROVIDE BOGAN AMPLIFIER MODEL NQ-A2060-G2 AND SHELF.
18. TEBC CONDUCTOR SIZE TO BE MINIMUM # 6 AWG PER TIA-607 CONDUCTOR SIZE BASED ON LENGTH / DISTANCE.
19. 12"x1.5" LADDER CABLE TRAY.
20. PROVIDE FIRE - AND/OR SMOKE-RATED SEALANT AROUND ALL CONDUIT AND SLEEVE PENETRATIONS ENTERING THE TELECOMMUNICATIONS ROOM. ENSURE ALL SEALS MEET THE REQUIRED FIRESTOP RATING FOR THE ASSEMBLY PENETRATED AND ARE
INSTALLED IN ACCORDANCE WITH MANUFACTURER REQUIREMENTS.
21. PROVIDE PHYSICAL ACCESS CONTROL PANEL.
22. DOOR LOCKING HARDWARE 24 VOLT DC POWER SUPPLY.
23. FIBER MEDIA CONVERSION FROM GATE 1, GATE 2, AND PTZ SSTV ON LIGHT POLE.
24. RACK MOUNTED FIBER TERMINATION PANEL FOR FIRE ALARM, WITH LC BULKHEADS. LEVITON OPT-X UHDX.
25. DATA JACK FOR WALL MOUNTED CAMERA.
26. PROVIDE PATHWAYS AT THE MEZZANINE LEVEL FOR CONDUITS ENTERING TR-102. ROUTE CONDUITS TO TERMINATE ABOVE THE LADDER RACK AND COORDINATE ENTRY LOCATIONS WITH EQUIPMENT LAYOUT. BOND AND GROUND ALL CONDUITS TO THE SBB IN THE TR. SEAL ALL PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES WITH APPROVED FIRESTOP SYSTEMS TO MAINTAIN THE RATING.
27. FIBER MEDIA CONVERSION FOR POLE MOUNTED CAMERA.
28. SHELF.
4-11/16" BOX
1.25" BUSHED
CONDUIT
PHONE
4-11/16" BOX
1.25" BUSHED
CONDUIT
DATA DATA
• ONE (1) BLUE CAT 6A JACK MODULE
• ONE (1) BLUE CAT 6A CABLE
• TWO (2) BLUE CAT 6A JACK MODULE
• TWO (2) BLUE CAT 6A CABLE
4-11/16" BOX
1.25" BUSHED
CONDUIT
DATA
• ONE (1) BLUE CAT 6A JACK MODULE
• ONE (1) BLUE CAT 6A CABLE
• ONE (1) RG-6 CABLE
• ONE (1) RG-6 F-TYPE CONNECTOR
R
DATA DATA
4-11/16" BOX
1.25" BUSHED
CONDUIT
DATA
• THREE (3) BLUE CAT 6A JACK MODULES
• THREE (3) BLUE CAT 6A CABLES
W 2D 3D
2-POSITION SURFACE BOX "BISCUIT":
• TWO (2) MODULAR 8-POSITION JACK "GREEN"
• TWO (2) CATEGORY 6A UTP CABLES "GREEN"
FURNISH AND TERMINATE CABLES WITH A 10 FT. SLACK COIL AT EACH
LOCATION.
10 FT. SLACK COIL
WIRELESS DEVICE
ACCESS POINT (AP)
(LAY-IN CEILING)
AP
X
1 2
3 4
XX-XXX-XX
XX-TR-XXX
FACEPLATE ID
XX XXX XX
FACEPLATE NUMBER IN ROOM
ROOM NUMBER
BUILDING/FLOOR IDENTIFIER
TELECOMMUNICATIONS ROOM ID
XX XX-XXXX
TR NUMBER ON FLOOR
BUILDING/FLOOR IDENTIFIER
NOTES:
1. EACH "TO" SHALL BE LABELED AS SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR INSTALLING A MACHINE-PRINTED LABEL WITH THE CORRECT FACEPLATE ID NUMBER AND TR ID.
2. CABLE JACKET COLOR SHALL MATCH THE JACK COLOR.
TELECOMMUNICATIONS OUTLET LABELING SCHEME
BASIS OF DESIGN FOR DATA CABLING
DATA
4-11/16" BOX
1.25" BUSHED
CONDUIT
• ONE (1) BLUE CAT 6A JACK MODULE
• ONE (1) BLUE CAT 6A CABLE
1D
CAT 6A CABLES AND COAXCAT 6A CABLESCAT 6A CABLESCAT 6A CABLECAT 6A CABLE
BLANK
TR 102
CABLE TRAY
P
X" AFF
EMT CONDUIT SLEEVE
A. PROVIDE CONDUIT FOR ALL LOW-VOLTAGE CABLING UNLESS
OTHERWISE NOTED. CONDUIT SHALL NOT BE REQUIRED WITHIN THE
CONTROL ROOM, EXCEPT FROM DEVICE JUNCTION BOX TO A STUB-
OUT ABOVE CEILING; UTILIZE J-HOOK(S) TO SLEEVE ENTERING TR 102.
DETAIL NOTES
12" MIN. BOTH ENDS
FIRE SEAL WITH APPROVED
CAULK OR PUTTY BY CABLE
INSTALLER
FIRE SEAL BY CONDUIT INSTALLER
EMT CONDUIT WITH BUSHED ENDS
APPROVED CATEGORY-RATED
CABLE
FIRE SEAL WITH APPROVED
CAULK OR PUTTY BY CABLE
INSTALLER
FILL CAVITY WITH ROCK-WOOL
FIRE SEAL WITH APPROVED
CAULK OR PUTTY BY CABLE
INSTALLER
6"
2"
1' -3
FIRE SEAL BY CONDUIT INSTALLER
EMT CONDUIT WITH
BUSHED ENDS
APPROVED
CATEGORY-RATED
CABLE
FIRE SEAL WITH APPROVED
CAULK OR PUTTY BY CABLE
INSTALLER
FILL CAVITY WITH
ROCK-WOOL
DETAIL NOTES:
A. DETAILS SHOWN IS FOR GUIDANCE ONLY. BRACING
SHALL BE IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATION AND ANCHORS TO BE SEISMICALLY
PRE-QUALIFIED PER ACI 355.2.
B. INSTALL CABLE TRAY AND FITTINGS STRICTLY IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
CABLE TRAY
GROUND CLAMP
LADDER TRAY
GROUNDING BUSHING
#6 AWG GROUND WIRE
C. INSTALL SHALL NOT EXCEED BICSI STANDARDS FOR CABLE BEND RADIUS.
CONDUIT CONNECTOR GROUNDING
BUSHING
EXPLODED VIEW
LADDER TYPE
CABLE TRAY
DETAIL NOTES:
A. DETAILS SHOWN IS FOR GUIDANCE ONLY. BRACING
SHALL BE IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATION AND ANCHORS TO BE SEISMICALLY
PRE-QUALIFIED PER ACI 355.2.
B. INSTALL CABLE TRAY AND FITTINGS STRICTLY IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
9/16" D
6/32" D (TYP. OF 6)
1-1/8" O.C.
9/32" D (TYP. OF 12)
1-1/8" O.C.
DETAIL NOTES
1. 4"x1/4"x12" MIN. LENGTH GROUNDING BAR #A-6163 OR EQUAL
ACTUAL LENGTH REQUIRED BY QUANTITY OF GROUND
CONNECTIONS.
2. WALL MOUNTING BRACKET #A-6056 OR EQUAL.
3. INSULATORS #3061-4 OR EQUAL.
4. 5/8-11X1 H.H.C.S. #3012-1 OR EQUAL.
5. 5/8" LOCKWASHER.
BOGEN
AMPLIFIER
MODEL NQ-A2060-G2
IN ROOM TR 102
120VAC
TYPICAL
P
SP SP NEXT
SPEAKER IN
LINE
A. REFER TO DRAWINGS FOR QUANTITY AND TYPE
OF SPEAKER.
B. VoIP PAGING AMPLIFIER.
GENERAL NOTES
14AWG/2C FOR AUDIO
FROM BUILDING #37
PAGING SYSTEM
1D
THREADED ROD SUPPORT,
TYPICAL
INDEPENDENTLY SUPPORTED
J-HOOK TREE ASSEMBLY, SIZE
& QUANTITY AS REQUIRED TO
SUPPORT CABLE BUNDLES
4 FT. M
AX
SEPARATION
J-HOOK TREE ASSEMBLY,
SUPPORTED BY CABLE TRAY
INDEPENDENTLY SUPPORTED
SINGLE J-HOOK ASSEMBLY, SIZE
AS REQUIRED TO SUPPORT
CABLE BUNDLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
A u to d e s k D o c s /M a ri o n I
L V
A
N e w E n e rg y C e n te r/
-0
-M
E P
-C e n tr a l.
rv t
/5 /2
:2
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .