657A5-21-401 - Drawings R2_Part3 - 18 pages.pdf
PDF 15 MB Posted
- Solicitation number
- 36C25526R0129
About this file
This is a comprehensive set of design and construction documents for a fire suppression sprinkler system installation at Marion VA Medical Center.
The project requires a complete wet pipe fire suppression sprinkler system for new construction areas, with piping located above ceilings in exposed structural areas unless otherwise indicated. The design basis specifies light hazard areas limited to 225 square feet per sprinkler with 0.10 GPM/square foot density plus 100 GPM hose allowance; ordinary hazard Group 1 areas at 130 square feet per sprinkler with 0.15 GPM/square foot density plus 250 GPM hose allowance; ordinary hazard Group 2 areas at 130 square feet per sprinkler with 0.20 GPM/square foot density plus 250 GPM hose allowance; and generator rooms (extra hazard Group 2) at 100 square feet per sprinkler with 0.4 GPM/square foot density plus 500 GPM hose stream allowance. Sprinklers at roof deck shall have a K factor of 8.0. All piping sizing 2 inches and smaller shall be black steel Schedule 40 with threaded connections; piping 2.5 inches and larger shall be black steel Schedule 10 with grooved connections only. Quick response sprinklers are required in all areas except high temperature areas, telecommunications rooms, and electrical switchgear rooms. All sprinkler heads must be UL-listed and FM-approved. The contractor must perform necessary flow tests, verify adequate installation space, obtain approvals from authorities having jurisdiction, and provide hydraulic calculations and stamped drawings. All penetrations through fire-rated assemblies must be fire-stopped per specifications. The work requires coordination with VAMC, other trades, and the phasing plan, with any work outside the project scope requiring COR approval minimum five working days in advance. Comprehensive plumbing and drainage plans are also included showing water distribution, sanitary drainage, and storm drainage systems throughout the facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A.
B.
C.
D.
E.
F.
G.
1.
2.
3.
4.
5.
H.
I.
J.
K.
1.
2.
L.
1.
M.
N.
O.
P.
Q.
R.
S.
T.
U.
V.
PROVIDE A COMPLETE FIRE SUPPRESSION SPRINKLER SYSTEM IN THE NEW AREA.
COORDINATE WORK WITH VAMC, PHASING PLAN AND OTHER TRADES. OFFSET AND/
OR RELOCATE SERVICES AS NEEDED TO ACCOMMODATE NEW WORK OF OTHER
TRADES.
DESIGN SERVICES SHALL FOLLOW ALL VA STANDARD DESIGN PRACTICES, DETAILS,
SPECIFICATIONS AND SITE SPECIFIC COR REQUIREMENTS AS WELL AS WORK SHOWN
ON THESE DOCUMENTS. REFERENCE VA FIRE PROTECTION DESIGN MANUAL. ALL
DEVIATIONS FROM AFOREMENTIONED REQUIREMENTS SHALL BE APPROVED BY THE
COR.
MAKE NECESSARY FLOW TESTS (SPECIFICATIONS 21 13 13), LAYOUT SYSTEMS, OBTAIN
APPROVALS FROM THE AUTHORITIES HAVING JURISDICTION PRIOR TO BEGINNING ANY
FABRICATION OR INSTALLATION WORK.
VERIFY THAT THERE IS ADEQUATE SPACE TO INSTALL ALL NEW PIPING REQUIRED TO
COMPLETE THIS WORK.
ALL SPRINKLER PIPING IS LOCATED ABOVE THE CEILING (AT THE BOTTOM STRUCTURE
IN EXPOSED STRUCTURAL AREAS), UNLESS OTHERWISE INDICATED.
THE BASIS OF DESIGN OF SPACING AND SIZING FOR THE COMPLETE FIRE
SUPPRESSION SPRINKLER SYSTEM SHALL BE FOR A WET PIPE SYSTEM
HYDRAULICALLY CALCULATED FOR A:
LIGHT HAZARD AREA LIMITED TO A MAXIMUM OF 225 SQ. FT. PER SPRINKLER WITH
THE DENSITY OF 0.10 GPM/SQ. FT. PROVIDE AN ADDITION OF 100 GPM HOSE
ALLOWANCE.
ALL MECHANICAL, ELECTRICAL, DATA, TR, AND SIMILAR SPACE AREAS SHALL BE
ORDINARY HAZARD (GROUP 1) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER
SPRINKLER WITH A DENSITY OF 0.15 GPM/SQ. FT. PROVIDE AN ADDITION OF 250
GPM HOSE ALLOWANCE.
ALL BOILER, STORAGE, TRASH, FILE STORAGE AND SIMILAR SPACE AREAS SHALL
BE ORDINARY HAZARD (GROUP 2) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER
SPRINKLER WITH A DENSITY OF 0.20 GPM/ SQ. FT. PROVIDE AN ADDITION OF 250
GPM HOSE ALLOWANCE.
GENERATOR ROOMS SHALL BE EXTRA HAZARD (GROUP 2) LIMITED TO A MAXIMUM
OF 100 SQ. FT PER SPRINKLER WITH A DENSITY OF 0.4 GPM/ SQ. FT. PROVIDE AN
ADDITION OF 500 GPM HOSE STREAM ALLOWANCE.
SPRINKLERS AT ROOF DECK SHALL HAVE A K FACTOR OF 8.0.
PROVIDE SPRINKLER LOCATIONS, PIPING LAYOUTS AND SIZING. SPRINKLER PIPING
SHALL BE MINIMUM 1" SIZE. PROVIDE HYDRAULIC CALCULATIONS AND STAMPED
DRAWINGS PER SPECIFICATION REQUIREMENTS.
ALL SPRINKLER LOCATIONS MUST BE COORDINATED WITH ALL EQUIPMENT KINDRED
TO OTHER TRADES. SPRINKLER LOCATIONS MUST BE APPROVED BY THE ARCHITECT
BEFORE WORK COMMENCES. ALL PENDENT TYPE SPRINKLERS LOCATED IN
SUSPENDED CEILING TILE AREAS SHALL BE LOCATED IN THE CENTER OF THE CEILING
TILE. REFER TO THE ARCHITECTURAL DRAWINGS REFLECTIVE CEILING PLANS FOR
ADDITIONAL INFORMATION ON ALL CEILING TYPES, HEIGHTS AND OTHER
ARCHITECTURAL FEATURES.
SPRINKLERS SHALL BE "QUICK RESPONSE" TYPE IN ALL AREAS EXCEPT HIGH
TEMPERATURE AREAS, TELECOMMUNICATION ROOMS, AND ELECTRICAL
SWITCHGEAR ROOMS. SPRINKLERS (UNLESS OTHERWISE NOTED):
EXPOSED AREAS - UPRIGHT OR PENDENT TYPE - STANDARD BRASS
CEILING AREAS - RECESSED PENDENT TYPE
CONCEALED SPRINKLERS ARE NOT PERMITTED.
ALL SPRINKLER HEADS SHALL BE UL LISTED AND FM APPROVED.
SPRINKLER SYSTEM PIPING AND FITTINGS SHALL BE IN ACCORDANCE WITH NFPA 13.
PIPING SIZES 2" AND SMALLER SHALL BE BLACK STEEL SCHEDULE 40 WITH
THREADED END CONNECTIONS.
PIPING SIZES 2.5" AND LARGER SHALL BE BLACK STEEL SCHEDULE 10 WITH
GROOVED CONNECTIONS. GROOVES IN SCHEDULE 10 PIPING SHALL BE ROLLED
GROOVED ONLY.
ACOUSTICAL CEILINGS ACCESS IDENTIFICATION MARKERS: COLORED MARKERS WITH
PRESSURE SENSITIVE ADHESIVE ON ONE SIDE, PAPER OR PLASTIC, 6 TO 9 MM (1/4 TO
3/8 INCH) DIAMETER. REFER TO SPECIFICATION 09 51 00 SECTION 2.6.C.
COLOR CODE: PROVIDE THE FOLLOWING COLOR MARKERS FOR SERVICE
IDENTIFICATION:
RED - SPRINKLER SYSTEM: VALVES AND CONTROLS.
ANNULAR SPACE AT PIPE AND OTHER SIMILAR PENETRATION OF FIRE RATED
ASSEMBLIES SHALL BE FIRE STOPPED. IN ADDITION, PENETRATIONS THROUGH 0-
HOUR RATED WALLS & FLOOR SHALL BE SEALED TO RETARD THE PASSAGE OF
SMOKE. REFER TO SPECIFICATIONS FOR FIRESTOPPING.
REFER TO ARCHITECTURAL DRAWINGS FOR SMOKE COMPARTMENTS, SMOKE
PARTITIONS, FIRE BARRIERS, LOCATIONS AND FIRE RATINGS OF NEW AND EXISTING
WALL ASSEMBLIES. ALL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES SHALL BE
PROTECTED AND/ OR FIRE STOPPED AS REQUIRED TO MAINTAIN FIRE RATINGS
INDICATED. COORDINATE WITH ALL TRADES TO ENSURE FIRE RATED PENETRATION
REQUIREMENTS AND DETAILS ARE MET. ALL SPRINKLER ZONES SHALL MATCH SMOKE
COMPARTMENTS.
ALL REMOVED MATERIAL AND EQUIPMENT SO DESIGNATED BY THE COR, SHALL BE
TURNED OVER AND PLACED WHERE DIRECTED. ALL MATERIAL AND EQUIPMENT,
WHICH THE OWNER DOES NOT WISH TO RETAIN, SHALL BECOME THE PROPERTY OF
THE CONTRACTOR RESPONSIBLE FOR THE REMOVAL
ANY RENOVATION WORK REQUIRED "OUTSIDE" OF THE BOUNDARIES/ EXTENTS OF A
SPECIFIC PHASE OF WORK (OR TEMPORARY CONSTRUCTION WALLS SHALL BE BID AS
"NIGHT WORK" AND SHALL BE AS DIRECTED BY THE COR.
ALL CORE DRILLS AND PIPE EXTENSIONS THRU THE EXISTING STRUCTURAL FLOOR
SLAB OR STRUCTURAL WALL SHALL BE X-RAYED TO DETERMINE THE EXACT LOCATION
OF THE "REBAR" IN THE STRUCTURAL SLAB OR WALL. DO NOT CUT THE LOWER
(BOTTOM REBAR) IN THE STRUCTURAL FLOOR SLAB.
WORK IN EXISTING AREAS WITH NO/ LIMITED ARCHITECTURAL SCOPE, THE
CONTRACTOR SHALL PROVIDE ALL REQUIRED FLOOR/ WALL PROTECTION (AS
REQUIRED) AND REPLACE ANY DAMAGED CEILING TILES WITH NEW. RETURN AREA
BACK TO ORIGINAL CONDITION UPON COMPLETION OF WORK.
PROVIDE AUTOMATIC OR MANUAL AIR VENT AT OR NEAR THE HIGH POINT(S) IN THE
SPRINKLER SYSTEM PIPING, IN AN ACCESSIBLE LOCATION. PROVIDE DRAINS AT LOW
POINTS AS REQUIRED BY NFPA. PIPE DRAIN TO EXTERIOR, MOP BASIN OR APPROVED
FLOOR DRAIN.
PHASING: REFER TO ARCHITECTURAL DRAWINGS FOR AN OUTLINE OF PROJECT
PHASING. ADDITIONAL NOTES DESCRIBING PHASING DETAILS MAY BE INCLUDED
THROUGHOUT THIS DRAWING SET. INCLUDE ALL LABOR AND MATERIAL TO
ACCOMMODATE PHASING.
BID ITEMS: REFER TO ARCHITECTURAL DRAWING AND SPECIFICATION SECTION 01 00
00 FOR AN OUTLINE OF BID ITEMS. ADDITIONAL NOTES DESCRIBING BID ITEM DETAILS
MAY BE INCLUDED THROUGHOUT THIS DRAWING SET.
SEISMIC REQUIREMENTS FOR SPRINKLER SYSTEM:
SITE CLASS: C (PER GEOTECHNICAL REPORT)
RISK CATEGORY: IV (SERVES ESSENTIAL HOSPITAL OPERATIONS
MAPPED SHORT SPECTRAL ACCELERATION (S s): 1.05
MAPPED 1 SECOND SPECTRAL ACCELERATION (S1): 0.28
DESIGN SHORT SPECTRAL RESPONSE (SDS): 0.66
DESIGN 1 SECOND SPECTRAL RESPONSE (SD1): 0.39
SEISMIC DESIGN CATEGORY: D
FIRE SUPPRESSION DESIGN NOTESABBREVIATIONS
AC - AIR COMPRESSOR
ACC - ACCESS
AD - ACCESS DOOR
ADB - ACID DILUTION BASIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BTWN - BETWEEN
CA - COMPRESSED AIR
CFCI - CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CLG - CEILING
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
COR - CONTRACTING OFFICER'S REPRESENTATIVE
CORR - CORRIDOR
CTR - CENTER
CWS - COMBINATION WATER SERVICE
D - DEPTH
DET - DETAIL
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DS - SPRINKLER (DRY)
DWG - DRAWING
EA - EACH
EC - ELECTRICAL (DIVISION 26)
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQ - EQUAL
EQUIP - EQUIPMENT
ETR - EXISTING TO REMAIN
EQS - EQUIPMENT SUPPLIER
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER MAIN)
FCE - FIRE CONTROL EQUIPMENT
FCO - FLOOR CLEANOUT
FD - FLOOR DRAIN
FDC - FIRE DEPARTMENT CONNECTION
FDV - FIRE DEPARTMENT VALVE
FF - FINISHED FLOOR ELEVATION
FHC - FIRE HOSE CABINET
FLR - FLOOR
FPM - FEET PER MINUTE
FR - FIRE RISER
FS - FIRE SERVICE
FSC - FIRE SUPPRESSION (DIVISION 21)
FT - FEET
FTG - FOOTING
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES (DIVISION 01)
GPM - GALLONS PER MINUTE
HC - HVAC (DIVISION 23)
HD - HUB DRAIN
HP - HORSEPOWER OR HIGH POINT
HR - HOSE REEL
HT - HEAT TRACE
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
JS - JANITOR SINK
L - LENGTH
LBS - POUNDS
MAX - MAXIMUM
MB - MOP BASIN
MC - MECHANICAL (DIVISION 23)
MEZZ - MEZZANINE
MFR - MANUFACTURER
MIN - MINIMUM
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
N/C - NORMALLY CLOSED
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NOM - NOMINAL
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OA - OUTDOOR AIR
OD - OUTSIDE DIAMETER
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
PC - PLUMBING (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PIV - POST INDICATOR VALVE
PLBG - PLUMBING
PS - PRE-ACTION/DELUGE SPRINKLER
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSV - PRESSURE SUSTAINING VALVE
PSIG - POUNDS PER SQUARE INCH GAUGE
RAD - RADIUS
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RPM - REVOLUTIONS PER MINUTE
S - SPRINKLER (WET)
SCH - SCHEDULE
SD - SPRINKLER DRAIN
SHT - SHEET
SK - SINK
SPEC - SPECIFICATIONS
SQ - SQUARE
STD - STANDARD
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TYP - TYPICAL
UNO - UNLESS NOTED OTHERWISE
VEL - VELOCITY
VIB - VALVE IN BOX
VOL - VOLUME
W/ - WITH
W/O - WITHOUT
WIV - WALL INDICATOR VALVE
WS - WATER SERVICE
VALVES AND FITTINGS
T
P
FOB
FOT
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
GAUGE - PRESSURE
GAUGE - TEMPERATURE OR THERMOMETER
UNION
CLEANOUT
STRAINER
STRAINER - WITH A BLOW DOWN VALVE AND HOSE
CONNECTION
VALVE - DRAIN WITH HOSE END CONNECTION
VALVE - PRESSURE REGULATING
VALVE - SAFETY RELIEF. PIPE DISCHARGE AIR
GAPPED TO FLOOR DRAIN UNLESS NOTED
OTHERWISE.
PLUG - PRESSURE AND TEMPERATURE TEST
TRAP PRIMER
GAUGE - VACUUM WITH STOP
CLEANOUT - TO GRADE OR FINISHED FLOOR
END CAP
MIXING FAUCET
PLUG
HOSE BIB
WALL HYDRANT
VALVE - PLUG
VALVE - SHUTOFF AND BOX
VALVE - SHUTOFF ON RISER
V
VB
TP
CO
VALVE - SOLENOID S
P/T VALVE - PRESSURE AND TEMPERATURE SAFETY
RELIEF. PIPE DISCHARGE AIR GAPPED TO
FLOOR DRAIN UNLESS NOTED OTHERWISE.
VALVE - CHECK
VALVE - SHUTOFF: BALL, GATE, BUTTERFLY VALVE
(REFER TO SPECIFICATIONS FOR REQUIRED TYPE
BASED ON APPLICATIONS)
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN
AND OUT
VALVE - COMBINATION SHUTOFF AND
BALANCING (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
A1
P1 P1OR
A1
OH
P2
B P2
GENERAL FLOOR PLAN NOTES
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
FIRE SUPPRESSION HAZARD CLASSIFICATION AND
HAZARD CLASSIFICATION GROUP
SECTION: 1 = SECTION DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
EQUIPMENT REFERENCE. LETTER DESIGNATION
VARIES. REFER TO SCHEDULES.
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK.
LETTER DESIGNATIONS REFER TO SCHEDULES.
CONNECT TO EXISTING
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH
IT IS SHOWN UNLESS NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
EXPANSION JOINT
WATER METERM
PIPING SYMBOLS
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
D
R
PIPE RISER
BC
TC
FLEX PIPING
FIRE SUPPRESSION SYMBOLS
PIPING DESIGNATIONS
FS
PIV
S
CONCEALED PENDENT SPRINKLER
FIRE HYDRANT
FLOW SWITCH
GATE VALVE OS&Y
INSTITUTIONAL PENDENT SPRINKLER
PENDENT SPRINKLER
POST INDICATOR VALVE
RECESSED PENDENT SPRINKLER
SIDE WALL SPRINKLER
SUPERVISED VALVE
UPRIGHT SPRINKLER
FIRE DEPARTMENT VALVE
SPRINKLER PIPE (DRY)
FIRE SUPPRESSION (STANDPIPE/
SPRINKLER MAIN)
FIRE SERVICE
PRE-ACTION / DELUGE SPRINKLER PIPE
SPRINKLER PIPE (WET)
SPRINKLER DRAIN PIPE
DS
F
FS
PS
S
SD
COMMMMBINATION FIRE SUPPRESSION &
DOMESTIC WATER SERVICE CWS
DEMOLISH TO POINT INDICATED
LOCATION: NORTH OF BUILDING 7
STATIC PRESSURE: 61.3 PSI
RESIDUAL PRESSURE: 39.3 PSI
FLOW: 754 GPM
DATE: 3/27/2026
NOTE: PERFORM HYDRAULIC CALCULATIONS UTILIZING THE BASIS OF DESIGN FLOW
TEST DATA PROVIDED TO BID THE FIRE SUPPRESSION SPRINKLER SYSTEM. UPON
AWARD OF THE PROJECT, A FLOW TEST ALONG WITH CORRESPONDING HYDRAULIC
CALCULATIONS SHALL BE PERFORMED TO VERIFY ADEQUATE PRESSURE AND FLOW.
BASIS OF DESIGN FLOW TEST DATA
0-HR Smoke Partition - [IBC 710] / NFPA 101-8.4
1-HR Smoke Barrier - [IBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [IBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [IBC 706] / NFPA 101-8.3
Existing Wall to Remain
New Wall
CODE LEGEND
BRANCH
FLEXIBLE HOSE
CEILING PANELCEILING GRID
SPRINKLER
6' - 0" MAXIMUM
REFER TO SPECIFICATION 21 13 13 SECTION 2.1. SUPPORT FLEXIBLE HOSE AS REQUIRED.
MOUNTING PLATE
REFER TO MANUFACTURER'S
MINIMUM EXPOSURE
DIMENSION TO OBTAIN FM
APPROVED QUICK RESPONSE
LISTING.
1" [2
5.4 mm
1 1 /4"
[3 1.8 mm
1/8
3 m m]
MOUNTING
SURFACE
ADJUSTABLE OUTER
CUP/ ESCUTCHEON
[15
0m m]
[25 mm
[15
0m m]
INSULATE
PIPE
PIPE SLEEVE
WHERE SPECIFIED
FLOOR
WELD
1/4" [6.4mm]
ANCHOR ROD FOR
NEW CONSTRUCTION
FIRESTOP MATERIAL
3/4" [19mm]
APPROVED FIRESTOP
INSULATION WITH
VAPOR BARRIER
3/4" [19mm] APPROVED
FIRESTOP INSULATION WITH
VAPOR BARRIER 6"
[150mm]
MASONRY
PARTITION INSULATED
PIPE OR
DUCT
6" [150mm]
FIRESTOP
MATERIAL
DRYWALL PARTITION
PARTITION SUPPORT
FLOOR OR DECK PENETRATION
6" [150mm]
6" [150mm]
PARTITION OR CHASE PENETRATION
NOTE:
1. APPLICABLE TO PENETRATIONS OF ALL FIRE RATED MEMBRANES,
IN ACCORDANCE WITH NFPA 101.
REFER TO SPECIFICATIONS SECTION 07 84 00, FIRE STOPPING SYSTEMS.
F
WS
FIRE MAIN
SIGNAL WIRING IN CONDUIT
TO ALARM BELL ON WALL
OF BLDG
WATER FLOW SWITCH.
FURNISHED & WIRED
EXTERIOR WALL
SPLASH BLOCK
GRADE
PRESSURE GAUGE
TEE CONNECTION
MAIN DRAIN VALVE
MAIN DRAIN & TEST LINE
FLOOR
FLANGE - TYPICAL
SLEEVE THRU FOUNDATION WALL
FOOTING
FIRE SUPPRESSION
SERVICE
4"
-0 M
IN
P
S
W S
6"
4"
2.5" TEST HOSE CONNECTIONS ON RISER
TO FACILITATE FORWARD FLOW TEST
DCDA
DOUBLE CHECK ASSEMBLY
M
TO DOMESTIC WATER MAIN
S
FDC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 7:
P
M
F001
ABBREVIATIONS, SYMBOLS &
INDEX OF DRAWINGS
05/07/2026 BDF BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
INDEX OF DRAWINGS
SHEET NUMBER SHEET NAME
F001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS
FD101 FIRST FLOOR PLAN - DEMOLITION
FX101 FIRST FLOOR PLAN - NEW WORK
FX102 MEZZANINE PLAN - NEW WORK
FX201 ROOF PLAN - NEW WORK
NTS1 SPRINKLER FLEXIBLE HOSE
NTS3 SEMI-RECESSED PENDENT SPRINKLER
NTS2 PIPE PENETRATION OF SMOKE/ FIRE BARRIERS
NTS4 FIRE RISER
1 CONTRACT DOCUMENTS 05/07/2026
BFP
3" - F
3"
F
3" - F
3"
F
3" - F
FDC
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 7:
P
M
FD101
FIRST FLOOR PLAN - DEMOLITION
05/07/2026 BDF BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
FIRST FLOOR PLAN
NOTES
1 PIPING EXTENDING TO WATER SERVICE. SEE PLUMBING DRAWING FOR
ADDITIONAL INFORMATION.
2 REMOVE EXISTING PIPING OR ITEM OF EQUIPMENT (TYPE AS INDICATED)
COMPLETE.
3 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE ONLY.
4 PLUMBING FIXTURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY.
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
C.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
COORDINATE ALL WORK WITH CONSTRUCTION MANAGER'S PHASING REQUIREMENTS.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
CLOSELY COORDINATED WITH COR A MINIMUM OF FIVE (5) WORKING DAYS AHEAD OF TIME.
A
D
632 54
B
C
DNF
STAIRS 2
TYP.
TYP.
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 7:
P
M
FX201
ROOF PLAN - NEW WORK
05/07/2026 BDF BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
ROOF FIRE SUPPRESSION PLAN - NEW WORK
PLAN NOTES
1 SCOPE OF NEW WORK AREA REQUIRING SPRINKLER PROTECTION.
COORDINATE INSTALLATION OF NEW PIPING WITH NEW MECHANICAL,
ELECTRICAL, AND PLUMBING SYSTEMS.
2 CEILING OPEN TO STRUCTURE IN THIS AREA.
3 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE ONLY.
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
C.
D.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
COORDINATE ALL WORK WITH CONSTRUCTION MANAGER'S PHASING REQUIREMENTS.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
CLOSELY COORDINATED WITH COR A MINIMUM OF FIVE (5) WORKING DAYS AHEAD OF TIME.
SPRINKLER PIPES SHALL BE SIZED ACCORDING TO HYDRAULIC CALCULATIONS.
D
632 54
B
C
MEZZANINE OH
3OH
TYP.
F FF
4DNF
UPF
DNF 5
6DNF
DNF
F
DNF 8
9 9
F
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 7:
P
M
FX102
MEZZANINE PLAN - NEW WORK
05/07/2026 BDF BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
MEZZANINE PLAN - NEW WORK
PLAN NOTES
1 SCOPE OF NEW WORK AREA REQUIRING SPRINKLER PROTECTION.
COORDINATE INSTALLATION OF NEW PIPING WITH NEW MECHANICAL,
ELECTRICAL, AND PLUMBING SYSTEMS.
2 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE ONLY.
3 HIGH CEILINGS OPEN TO FLOOR BELOW IN THIS AREA. SEE FIRST FLOOR
PLAN FOR ADDITIONAL DETAIL REGARDING EQUIPMENT LOCATIONS.
4 SPRINKLER BRANCH MAIN DOWN TO SERVE ELECTRIC ROOM 106. REFER TO
FIRST FLOOR PLAN.
5 SPRINKLER BRANCH MAIN DOWN TO SERVE ELECTRIC ROOM 105. FIRE
STOP FLOOR PENETRATION.
6 SPRINKLER BRANCH MAIN DOWN TO SERVE OFFICE AND SUPPORT ROOMS.
7 SPRINKLER BRANCH MAIN UP TO SERVE ROOF ACCESS AREA. SEE ROOF
PLAN FOR ADDITIONAL DETAIL.
8 4" SPRINKLER MAIN DOWN TO WATER SERVICE. SEE FIRST FLOOR PLAN
FOR ADDITIONAL DETAIL.
9 EXTENTS OF MEZZANINE.
10 CEILINGS OPEN TO STRUCTURE IN THIS AREA.
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
C.
D.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
COORDINATE ALL WORK WITH CONSTRUCTION MANAGER'S PHASING REQUIREMENTS.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
CLOSELY COORDINATED WITH COR A MINIMUM OF FIVE (5) WORKING DAYS AHEAD OF TIME.
M BFP
S
A
D
632 54
B
C
OH
OH
OH
H.A.C.
ELECTRICAL
ROOM
ELECTRICAL
ROOM
CHILLER
PLANT
OH
CONTROL
ROOM
TR
TOILET
FDC
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
OH
LH
LH
UPF6
UPF
UPF
UPF
UPF 8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 7:
P
M
FX101
FIRST FLOOR PLAN - NEW WORK
05/07/2026 BDF BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
PLAN NOTES
1 ONLY PIPING SERVING THIS ROOM SHALL EXTEND INTO THE ROOM. DO NOT
LOCATE PIPING/SPRINKLERS OVER ELECTRICAL EQUIPMENT.
2 PIPING EXTENDS TO WATER SERVICE. SEE PLUMBING SHEETS FOR
FURTHER DETAIL.
3 MECHANICAL AND ELECTRICAL EQUIPMENT SHOWN FOR REFERENCE ONLY.
4 HIGH CEILING OPEN TO STRUCTURE IN THIS AREA. SEE MEZZANINE PLANS
FOR ADDITIONAL DETAIL.
5 SCOPE OF NEW WORK AREA REQUIRING SPRINKLER PROTECTION.
COORDINATE INSTALLATION OF NEW PIPING WITH NEW MECHANICAL,
ELECTRICAL, AND PLUMBING SYSTEMS.
6 SPRINKLER PIPING TO EXTEND TO THE HIGH BAY ROOF DECK.
7 SPRINKLER BRANCH MAIN FROM ABOVE TO SERVE ELECTRIC ROOM 106.
FIRE STOP WALL PENETRATION.
8 SPRINKLER BRANCH MAIN FROM ABOVE TO SERVE ELECTRIC ROOM 105.
FIRE STOP CEILING PENETRATION.
9 SPRINKLER BRANCH MAIN FROM ABOVE TO SERVE OFFICE/SUPPORT AREA.
10 CONNECT WATER METER TO THE VA METERING SYSTEM. INSTALL WATER
METER PER MARION WATER DEPARTMENT REQUIREMENTS.
1/4" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION PLAN - NEW WORK
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
C.
D.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
COORDINATE ALL WORK WITH CONSTRUCTION MANAGER'S PHASING REQUIREMENTS.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
CLOSELY COORDINATED WITH COR A MINIMUM OF FIVE (5) WORKING DAYS AHEAD OF TIME.
A1
P1 P1OR
A1
OH
P2
B P2
GENERAL FLOOR PLAN NOTES
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
FIRE SUPPRESSION HAZARD CLASSIFICATION AND
HAZARD CLASSIFICATION GROUP
SECTION: 1 = SECTION DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
EQUIPMENT REFERENCE. LETTER DESIGNATION
VARIES. REFER TO SCHEDULES.
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK.
LETTER DESIGNATIONS REFER TO SCHEDULES.
CONNECT TO EXISTING
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH
IT IS SHOWN UNLESS NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
PIPING DESIGNATIONS
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
HOT WATER PIPE (140 DEGS. F.)
HOT WATER RETURN PIPE (140 DEGS. F.)
HOT WATER RETURN PIPE (180 DEGS. F.)
140R
180R
EXPANSION JOINT
WATER METERM
PIPING SYMBOLS
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
D
R
PIPE RISER
HOT WATER PIPE (180 DEGS. F.)
ARGON PIPE
COMPRESSED AIR PIPE
DIESEL FUEL PIPE
FUEL OIL FLOW LINE
FUEL OIL GAUGE LINE
FUEL OIL RETURN LINE
FUEL OIL SUPPLY LINE
NATURAL GAS PIPE
GARAGE DRAINAGE PIPE
GAS SERVICE
HYDROGEN PIPE
HELIUM PIPE
KITCHEN WASTE PIPE
LABORATORY COMPRESSED AIR PIPE
LABORATORY VENT PIPE
LABORATORY VACUUM PIPE
LABORATORY WASTE PIPE
GASOLINE PIPE (NON-LEAD)
NON-POTABLE
(OVERFLOW) SECONDARY STORM DRAINAGE PIPE
PROPANE GAS PIPE
PUMP DISCHARGE PIPE
PURE WATER PIPE
SANITARY DRAINAGE PIPE
SOFT COLD WATER
STORM DRAINAGE PIPE
FUEL TANK VENT PIPE
TRAP PRIMER DISCHARGE PIPE
TEMPERED WATER PIPE
SANITARY SEWER VENT
WATER SERVICE
LV
AR
CA
DF
FOF
FOG
FOR
FOS
G
GD
GS
H2
HE
IV
IW
LA
LV
LW
NG
NPW
OD
P
PD
PW
SAN
SCW
STM
T
TP
TW
V
WS
INDIRECT VENT PIPE
INDIRECT WASTE PIPE
K
ACID VENT PIPEAV
ACID WASTE PIPEAW
BC
TC
COMBINATION FIRE SUPPRESSION &
DOMESTIC WATER SERVICECWS
FLEX PIPINGMEDICAL INSTRUMENT AIR PIPE
MEDICAL NITROGEN PIPE
MEDICAL COMPRESSED AIR PIPE
MEDICAL SURGICAL VACUUM-EXHAUST PIPE
MEDICAL NITROUS OXIDE PIPE
MEDICAL OXYGEN PIPE
WASTE ANESTHESIA GAS DISPOSAL PIPE
IA
N2
MA
MV
NO
O2
WAGD
MEDICAL CARBON DIOXIDE PIPECO2
MEDICAL SURGICAL VACUUM PIPE
MEDICAL COMPRESSED AIR-INTAKE PIPEMA-IN
MV-EX
VALVES AND FITTINGS
T
P
FOB
FOT
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
GAUGE - PRESSURE
GAUGE - TEMPERATURE OR THERMOMETER
UNION
CLEANOUT
STRAINER
STRAINER - WITH A BLOW DOWN VALVE AND HOSE
CONNECTION
VALVE - DRAIN WITH HOSE END CONNECTION
VALVE - PRESSURE REGULATING
VALVE - SAFETY RELIEF. PIPE DISCHARGE AIR
GAPPED TO FLOOR DRAIN UNLESS NOTED
OTHERWISE.
PLUG - PRESSURE AND TEMPERATURE TEST
TRAP PRIMER
GAUGE - VACUUM WITH STOP
CLEANOUT - TO GRADE OR FINISHED FLOOR
END CAP
MIXING FAUCET
PLUG
HOSE BIB
WALL HYDRANT
VALVE - PLUG
VALVE - SHUTOFF AND BOX
VALVE - SHUTOFF ON RISER
V
VB
TP
CO
VALVE - SOLENOID S
P/T VALVE - PRESSURE AND TEMPERATURE SAFETY
RELIEF. PIPE DISCHARGE AIR GAPPED TO
FLOOR DRAIN UNLESS NOTED OTHERWISE.
VALVE - CHECK
VALVE - SHUTOFF: BALL, GATE, BUTTERFLY VALVE
(REFER TO SPECIFICATIONS FOR REQUIRED TYPE
BASED ON APPLICATIONS)
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN
AND OUT
VALVE - COMBINATION SHUTOFF AND
BALANCING (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
ABBREVIATIONS
AAP - AREA ALARM PANEL (MEDICAL GAS)
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACC - ACCESS
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADB - ACID DILUTION BASIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
AR - AIR RECEIVER OR ARGON
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
AV - ACID VENT
AW - ACID WASTE
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BT - BATHTUB
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
BTWN - BETWEEN
CA - COMPRESSED AIR
CB - CATCH BASIN
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CFCI - CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CFM - CUBIC FEET PER MINUTE
CHS - CHILLED WATER SUPPLY
CHR - CHILLED WATER RETURN
CI - CAST IRON
CK - CLINICAL SINK
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
CO2 - MEDICAL CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
COR - CONTRACTING OFFICER'S REPRESENTATIVE
CORR - CORRIDOR
CRP - CORROSION RESISTANT PIPE
CRV - CORROSION RESISTENT VENT PIPE
CS - CLINICAL SINK OR COLD SOFT WATER
CTR - CENTER
CU - COPPER
CW - COLD WATER
CWS - COMBINATION WATER SERVICE
OR CONDENSER WATER SUPPLY
CWR - CONDENSER WATER RETURN
D - DEPTH OR DRAIN LINE
DB - DIALYSIS BOX
DD - DECK DRAIN
DET - DETAIL
DF - DRINKING FOUNTAIN OR WATER COOLER
OR DIESEL FUEL
DFU - DRAINAGE FIXTURE UNIT
DI - DEIONIZED WATER
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DS - DOWN SPOUT OR SPRINKLER (DRY)
DT - PERFORATED DRAIN TILE
DWG - DRAWING
EA - EACH
EC - ELECTRICAL (DIVISION 26)
EEW - EMERGENCY EYE WASH
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQ - EQUAL
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
ES - EMERGENCY SHOWER
EQS - EQUIPMENT SUPPLIER
EWC - ELECTRICAL WATER COOLER
EXH - EXHAUST AIR
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER
MAIN)
FCE - FIRE CONTROL EQUIPMENT
FCO - FLOOR CLEANOUT
FD - FLOOR DRAIN
FDC - FIRE DEPARTMENT CONNECTION
FDV - FIRE DEPARTMENT VALVE
FF - FINISHED FLOOR ELEVATION
FHC - FIRE HOSE CABINET
FLR - FLOOR
FM - FORCE MAIN
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FR - FIRE RISER
FS - FLOOR SINK OR FIRE SERVICE
FSC - FIRE SUPPRESSION (DIVISION 21)
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES (DIVISION 01)
GD - GARAGE DRAINAGE
GPM - GALLONS PER MINUTE
GS - GAS SERVICE
GW - GREASE WASTE
H2 - HYDROGEN
HB - HOSE BIBB
HC - HVAC (DIVISION 23)
HD - HUB DRAIN
HE - HELIUM
HG - REFRIGERANT HOT GAS
HP - HORSEPOWER OR HIGH POINT
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HPW - HIGH PURITY WATER
HPWR - HIGH PURITY WATER RETURN
HR - HOSE REEL
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR
CONDITIONING
HW - HOT WATER
HWR - HEATING HOT WATER RETURN
HWS - HEATING HOT WATER SUPPLY
IA - MEDICAL INSTRUMENT AIR
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
IV - INDIRECT VENT
IW - INDIRECT WASTE
JS - JANITOR SINK
K - KITCHEN WASTE
KEC - KITCHEN EQUIPMENT
L - LENGTH
LA - LABORATORY COMPRESSED AIR
LAV - LAVATORY
LBS - POUNDS
LCW - LABORATORY COLD WATER
LEC - LABORATORY EQUIPMENT
LHW - LABORATORY HOT WATER
LHWR - LABORATORY HOT WATER RETURN
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LV - LABORATORY VACUUM OR LABORATORY
VENT
LW - LABORATORY WASTE
MA - MEDICAL COMPRESSED AIR
MAP - MASTER ALARM PANEL (MEDICAL GAS)
MAX - MAXIMUM
MB - MOP BASIN
MC - MECHANICAL (DIVISION 23)
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - WATER MAKE-UP
MV - MEDICAL SURGICAL VACUUM
N2 - MEDICAL NITROGEN
N/C - NORMALLY CLOSED
NG - GASOLINE (NON-LEAD)
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NO - MEDICAL NITROUS OXIDE
NOM - NOMINAL
NPW - NON-POTABLE WATER
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
O2 - MEDICAL OXYGEN
OA - OUTDOOR AIR
OD - OUTSIDE DIAMETER OR OVERFLOW
DRAIN
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
P - PROPANE GAS
PC - PLUMBING (DIVISION 22) OR PUMPED
CONDENSATE RETURN
PD - PUMP DISCHARGE OR PARAPET DRAIN
PIV - POST INDICATOR VALVE
PLBG - PLUMBING
PS - PRE-ACTION/DELUGE SPRINKLER
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSV - PRESSURE SUSTAINING VALVE
PSIG - POUNDS PER SQUARE INCH GAUGE
PW - PURE WATER
RA - RETURN AIR
RAD - RADIUS
RCP - REINFORCED CONCRETE PIPE
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS WATER SUPPLY
ROR - REVERSE OSMOSIS WATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTION
RV - RELIEF VALVE
S - SPRINKLER (WET)
SA - SHOCK ARRESTOR OR SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD WATER
SD - SPRINKLER DRAIN OR SUBSOIL DRAIN
SH - SHOWER
SHT - SHEET
SK - SINK
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SS - SANITARY STACK (SOIL OR WASTE) OR
STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
T - FUEL TANK VENT
TD - TRENCH DRAIN
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TF - TRAP FILLER
TP - TRAP PRIMER OR TRAP PRIMER
DISCHARGE
TW - TEMPERED WATER
TYP - TYPICAL
UR - URINAL
UNO - UNLESS NOTED OTHERWISE
V - VENT OR SANITARY SEWER VENT
VAC - VACUUM
VC - VACUUM CLEANING
VCV - VACUUM CLEANING VALVE
VE - VACUUM EXHAUST
VEL - VELOCITY
VIB - VALVE IN BOX
VOL - VOLUME
VP - VACUUM PUMP
VS - VENT STACK
VTR - VENT THROUGH ROOF
VR - VENT RISER
W/ - WITH
W/O - WITHOUT
W - WASTE
WAGD - WASTE ANESTHESIA GAS DISPOSAL
WC - WATER CLOSET
WCO - WALL CLEANOUT
WH - WALL HYDRANT OR WATER HEATER
WIV - WALL INDICATOR VALVE
WS - WATER SERVICE
YCO - YARD CLEANOUT
ZVC - ZONE VALVE CABINET
DEMOLISH TO POINT INDICATED
GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
1.
P.
Q.
1.
2.
ALL NEW PIPING IS ABOVE THE CEILING (AT THE UNDERSIDE OF STRUCTURE IN
EXPOSED STRUCTURE AREAS), UNLESS OTHERWISE NOTED. ABOVE CEILING UTILITY
SPACE IS LIMITED. COORDINATION WITH ALL TRADES IS CRITICAL, PRIOR TO
INSTALLATION OF ANY WORK.
REFER TO SCHEDULES, DETAILS AND DIAGRAMS FOR PIPING, PIPE SIZES AND
PIPELINE DEVICES NOT INDICATED ON THE FLOOR PLAN.
LOCATIONS AND SIZES OF EXISTING PIPING HAVE BEEN DETERMINED FROM A
REVIEW OF EXISTING DRAWINGS AND/ OR SITE INSPECTION, WHERE POSSIBLE. FIELD
VERIFICATION OF EXACT LOCATIONS, ELEVATIONS, INVERTS, SIZES, DIRECTION OF
FLOW, ETC. SHALL BE REQUIRED PRIOR TO BEGINNING NEW WORK.
ALL DOMESTIC WATER PIPING SHOWN TO BE DEMOLISHED SHALL BE REMOVED BACK
TO WITHIN TWO PIPE DIAMETERS OF ACTIVE MAINS AND CAPPED, OR REMOVED
BACK TO POINTS OF CONNECTION OF NEW WORK. INACCESSIBLE PIPING, WHERE SO
NOTED, TO BE ABANDONED SHALL BE DISCONNECTED FROM ACTIVE MAINS AND
CAPPED IN CONCEALED LOCATIONS.
ABANDONED PIPING DISCOVERED DURING DEMOLITION/ RENOVATION SHALL BE
REMOVED. DOMESTIC WATER DISTRIBUTION PIPING DISCOVERED DURING
DEMOLITION/ RENOVATION SHALL BE REMOVED BACK TO WITH-IN 2 PIPE DIAMETERS
OF THE ACTIVE MAIN AND CAPPED.
NEW CONNECTIONS TO EXISTING PIPING SHALL BE WITH THE SAME SIZE AS THE
EXISTING PIPING UNLESS OTHERWISE NOTED.
ALL REMOVED MATERIAL AND EQUIPMENT SO DESIGNATED BY THE COR, SHALL BE
TURNED OVER AND PLACED WHERE DIRECTED. ALL MATERIAL AND EQUIPMENT,
WHICH THE OWNER DOES NOT WISH TO RETAIN, SHALL BECOME THE PROPERTY OF
THE CONTRACTOR RESPONSIBLE FOR THE REMOVAL.
ANY RENOVATION WORK REQUIRED "OUTSIDE" OF THE BOUNDARIES/ EXTENTS OF A
SPECIFIC PHASE OF WORK (OR TEMPORARY CONSTRUCTION WALLS SHALL BE BID
AS "NIGHT WORK" AND SHALL BE AS DIRECTED BY THE COR.
ALL CORE DRILLS AND PIPE EXTENSIONS THRU THE EXISTING STRUCTURAL FLOOR
SLAB OR STRUCTURAL WALL SHALL BE X-RAYED TO DETERMINE THE EXACT
LOCATION OF THE "REBARS" IN THE STRUCTURAL SLAB. DO NOT CUT THE LOWER
(BOTTOM REBARS) IN THE FLOOR SLAB.
RESTORATION WORK, EXISTING WORK (WALLS, CEILINGS, PARTITIONS, FLOORS)
DISTURBED OR REMOVED AS A RESULT OF PERFORMING REQUIRED NEW WORK,
SHALL BE PATCHED, REPAIRED, REINSTALLED, OR REPLACED WITH NEW WORK, AND
REFINISHED AND LEFT IN AS GOOD CONDITION AS EXISTED BEFORE COMMENCING
WORK.
WORK IN EXISTING AREAS WITH NO/ LIMITED ARCHITECTURAL SCOPE, THE
CONTRACTOR SHALL PROVIDE FLOOR/ WALL PROTECTION (AS REQUIRED) AND
REPLACE ANY DAMAGED CEILING TILES WITH NEW. RETURN AREA BACK TO
ORIGINAL CONDITION UPON COMPLETION OF WORK.
REFER TO ARCHITECTURAL FIRE RATED PARTITION PLAN(S) FOR LOCATIONS AND
FIRE RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS
THROUGH FIRE RATED ASSEMBLIES SHALL BE PROTECTED AND/ OR FIRE STOPPED
AS REQUIRED TO MAINTAIN FIRE RATINGS INDICATED. COORDINATE WITH ALL
TRADES TO ENSURE FIRE RATED PENETRATION REQUIREMENTS AND DETAILS ARE
MET.
ANNULAR SPACE OF ALL PIPE & OTHER SIMILAR PENETRATIONS OF FIRE RATED
ASSEMBLIES SHALL BE FIRE STOPPED. IN ADDITION, PENETRATIONS THROUGH 0-
HOUR RATED WALLS & FLOOR SHALL BE SEALED TO RETARD THE PASSAGE OF
SMOKE.
DOMESTIC WATER PIPING MODIFIED BY THIS PROJECT SHALL BE DISINFECTED AND
TESTED IN ITS ENTIRETY. DISINFECTION AND TESTING PROCEDURES SHALL FOLLOW
CAMPUS VA WATER SAFETY PLAN, VA DESIGN MANUALS, VA SPECIFICATIONS,
AND LOCAL REQUIREMENTS.
ACOUSTICAL CEILINGS ACCESS IDENTIFICATION MARKERS: COLORED MARKERS
WITH PRESSURE SENSITIVE ADHESIVE ON ONE SIDE, PAPER OR PLASTIC, 6 TO 9 MM
(1/4 TO 3/8 INCH) DIAMETER. REFER TO SPECIFICATION 09 51 00 SECTION 2.6.C.
COLOR CODE: PROVIDE THE FOLLOWING COLOR MARKERS FOR SERVICE
IDENTIFICATION:
RED - SPRINKLER SYSTEM: VALVES AND CONTROLS.
GREEN - DOMESTIC WATER: VALVES AND CONTROLS.
YELLOW - CHILLED WATER AND HEATING WATER.
ORANGE - DUCTWORK: FIRE DAMPERS.
BLUE - DUCTWORK: DAMPERS AND CONTROLS.
BLACK - GAS: LABORATORY, MEDICAL, AIR AND VACUUM.
COMPLETE LAYOUT DRAWINGS WILL BE REQUIRED BY PARAGRAPH, SUBMITTALS.
CONSTRUCTION WORK WILL NOT START ON ANY SYSTEM UNTIL THE LAYOUT
DRAWINGS HAVE BEEN APPROVED BY VA.
PHASING/ BID NOTES
PHASING: REFER TO ARCHITECTURAL DRAWINGS FOR AN OUTLINE OF PROJECT
PHASING. ADDITIONAL NOTES DESCRIBING PHASING DETAILS MAY BE INCLUDED
THROUGHOUT THIS DRAWING SET.
BID ITEMS: REFER TO ARCHITECTURAL DRAWING AND SPECIFICATION SECTION
01 00 00 FOR AN OUTLINE OF BID ITEMS. ADDITIONAL NOTES DESCRIBING BID ITEM
DETAILS MAY BE INCLUDED THROUGHOUT THIS DRAWING SET.
0-HR Smoke Partition - [IBC 710] / NFPA 101-8.4
1-HR Smoke Barrier - [IBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [IBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [IBC 706] / NFPA 101-8.3
Existing Wall to Remain
New Wall
CODE LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 3:
P
M
P001
ABBREVIATIONS, SYMBOLS &
INDEX OF DRAWINGS
05/07/2026 EWL BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
INDEX OF DRAWINGS
SHEET NUMBER SHEET NAME
P001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS
PS001 SITE PLAN
PD001 UNDERSLAB PLAN - DEMOLITION
PD101 FIRST FLOOR PLAN - DEMOLITION
PP001 UNDERSLAB PLAN
PP101 FIRST FLOOR PLAN - DRAINAGE
PP102 MEZZANINE PLAN - DRAINAGE
PP201 ROOF PLAN - DRAINAGE
PL101 FIRST FLOOR PLAN - DISTRIBUTION
PL102 MEZZANINE PLAN - DISTRIBUTION
P601 SCHEDULES AND DETAILS
P901 SANITARY ISOMETRIC
P902 STORM ISOMETRIC
P903 DOMESTIC ISOMETRIC
D
632 54
B
C
PROPOSED BUILDING
APPROX. 7,280 Square Feet
FFE = 470'-6"
DS
DS
P-801
P-801
P-801 4"
W
S 8" - STM
P601
P601
CO
P-801
6" - SAN
CO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 4:
P
M
PS001
SITE PLAN
05/07/2026 EWL BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
PLUMBING SITE PLAN
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
CLOSELY COORDINATED WITH COR A MINIMUM OF FIVE (5) WORKING DAYS AHEAD OF TIME.
NOTES
1 PIPING INDICATED IS BELOW GROUND.
2"
V
2"
V3"
SA
N
3" - SAN
3" - SAN
2" -
SAN
4"
SA
N
3" - SAN3" - SAN
UP2" V UP2" VUP2" VSK
FD
FD
CO
FD
FD
LAV
WC
UP2" V
UP3" WS
W S
3"
TYP.
TYP.
TYP.
TYP.
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 4:
P
M
PD001
UNDERSLAB PLAN - DEMOLITION
05/07/2026 EWL BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
UNDERSLAB PLUMBING PLAN - DEMOLITION
PLAN NOTES
1 DEMOLISH WATER SERVICE BACK TO NEAREST MAIN AND CAP. REVIEW SITE CIVIL DRAWINGS FOR ADDITIONAL
DETAIL. COORDINATE WORK WITH CONTRACTOR PERFORMING SITE WORK.
2 DEMOLISH SANITARY SEWER CONNECTION BACK TO NEAREST MANHOLE AND CAP. REVIEW SITE CIVIL DRAWINGS FOR ADDITIONAL DETAIL. COORDINATE WORK WITH CONTRACTOR PERFORMING SITE WORK.
3 DEMOLISH PIPING IN ITS ENTIRETY.
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
C.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
COORDINATE ALL WORK WITH CONSTRUCTION MANAGER'S PHASING REQUIREMENTS.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
BF
P
FD
FD FD
FCO
FD
EW SK
WH
LAV
WC
FCO
1.25"
2.5"
0.75" 0.5"
2"
V
2" - V
3" VTR
WATER
TREATMENT
0.5"
3" VTR
1.5
V
2.5"
TYP.
TYP.
TYP.
TYP.
2" - V
DN3" WS
HB
HB
DN2" V DN2" V DN2" V
DN2" V
DCW
DC
W
DCW
DC
W
DH
W
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
2.5"
NP
W
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 4:
P
M
PD101
FIRST FLOOR PLAN - DEMOLITION
05/07/2026 EWL BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
PLUMBING FIRST FLOOR - DEMOLITION
PLAN NOTES
1 WATER PIPING EXTENDING TO FIRE SERVICE. SEE FIRE SUPPRESSION DRAWINGS FOR ADDITIONAL DETAIL.
2 REMOVE EXISTING FIXTURE, PIPING, OR ITEM OF EQUIPMENT (TYPE AS INDICATED) COMPLETE.
3 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE ONLY.
4 PIPING EXTENDS TO MECHANICAL EQUIPMENT. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL DETAIL.
COORDINATE DEMOLITION WITH MECHANICAL CONTRACTOR.
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
C.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
COORDINATE ALL WORK WITH CONSTRUCTION MANAGER'S PHASING REQUIREMENTS.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
D
632 54
B
C
P-502
FD-D
FD-D
FD-D
FD-D
FD-S
FD-C
6" - SAN 6" - SAN
4"
SA
N
4"
SA
N
4" - SAN
3" - SAN
3" - SAN
4" -
SAN
ST
M
8" (340 GPM)
INV: 467'-0"
INV: 467'-0"
CO
CO
FD-C
FD-C
CO
4"
W S
HD
CO
6"
SA
N
6"
SA
N SP-1B
P601
SP-1A
P-103
6" - SAN
FD-S
4"
SA
N
UP2" V
UP4" WS UP2" V
6" - SAN 6" - SAN
FD-D
UP2" V
UP2" V3" -
SAN
CO
CO
UP2" V
4" - SAN
3"
SA
N
FD-D
FD-D
UP2" V
UP2" V
FD-D
3"
SA
N
UP2" V
8" UP
(340 GPM)
UP2" V UP2" V
UP2" V
P-414
4" - SAN
3"
SA
N
UP2" V
FD-D
CO
4" - SAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 4:
P
M
PP001
UNDERSLAB PLAN
05/07/2026 EWL BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
UNDERSLAB PLUMBING PLAN
PLAN NOTES
1 NO PIPING TO BE INSTALLED IN THIS AREA.
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
D
632 54
B
C
CONTROL
ROOM
H.A.C.
TR
ELECTRICAL
ROOM
ELECTRICAL
ROOM
P-103
P-414
P-502
FD-D
FD-S
FD-D
FD-D
FD-D
FD-D
UP2" V
8" UP & DN
(340 GPM)
8" OD UP
(225 GPM)
FD-C
DS
DS
6" OD UP
(115 GPM)
FCO
FCO
TOILET
FCO
FD-C
FD-C
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
DN2" V
FCO
3"
V
CO
2" - V
DN2" V
DN2" V
FD-D
PUMP
CONTROL
PANEL
FD-S 6" HD3
DN2" V
UP3" V
DN2" V
2" - V
DN2" VDN2" V
DN2" V 2" - V
CO
CO
DN2" V
FD-D
FD-D
UP & DN2" V
P601
3" - V
DN2" V 2" - PD
DN1.5" PD
2"
V
P601
P601
UP2" V
FD-D
3" - V2" - V2" - V
UP2" V
DN3" SAN
3" - SAN
FD-D
FCO
DN2" V
2" - V
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 4:
P
M
PP101
FIRST FLOOR PLAN - DRAINAGE
05/07/2026 EWL BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
FIRST FLOOR PLUMBING PLAN - DRAINAGE
PLAN NOTES
1 NO PIPING TO BE INSTALLED IN THIS AREA.
2 MECHANICAL AND ELECTRICAL EQUIPMENT SHOWN FOR REFERENCE ONLY.
3 ROUTE DRAIN PIPING FROM EFFLUENT PUMPS TO STANDPIPE WITH AIRGAP.
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
D
632 54
B
C
TYP.
CO
6" (115 GPM)
6" (215 GPM)
8" DN
(340 GPM) 8" DN
(225 GPM)
RD1
OD1
RD1
OD1
RD1
OD1
8" (225 GPM)
8" (340 GPM)
OD
ST
M
STMSTM
OD
6" (125 GPM)
6" (100 GPM)
OD
CO
6" DN
(115 GPM)
MEZZANINE
CHILLER
PLANT
2"
V
6" (100 GPM)
VTR
DN2" V
OD
6" (115 GPM)
VTR
DN2" V
FD-D
DN2" V
DN2" V
6" (125 GPM)
STM
VTR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 4:
P
M
PP102
MEZZANINE PLAN - DRAINAGE
05/07/2026 EWL BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
MEZZANINE PLUMBING PLAN - DRAINAGE
NOTES
1 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE ONLY.
2 OPEN TO FLOOR BELOW.
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
D
632 54
B
C
RD1
125 GPM
OD1
125 GPM
OD1
100 GPM
RD1
100 GPM
RD1
115 GPM
OD1
115 GPM
VTR
3"
P-806
TYP.
TYP.
VTR
4"
TYP.
VTR
3"
A
D
1 32
B
C
A.4
A.6
'-0
25'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 4:
P
M
PP201
ROOF PLAN - DRAINAGE
05/07/2026 EWL BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
PLUMBING ROOF PLAN - DRAINAGE
PLAN NOTES
1 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE ONLY.
2 SANITARY VENTS MUST BE AT LEAST 25'-0" FROM NEAREST HVAC AIR INTAKE.
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
BFP
M BFP
M
A
D
632 54
B
C
CONTROL
ROOM
H.A.C.
TR
ELECTRICAL
ROOM
ELECTRICAL
ROOM
TYP.
TYP.
TYP.
TYP.
P-103
P-414
P-502
DN4" WS
3"
1.5" 1"
1.5"
DWH-1
TMV-E
P-709
P-801
0.75"
0.5"
ET-1
P-801
P-801
0.5"
0.5"
P601
P-801
UP3" DCW
UP0.75" DCW
UP0.75" DCW
TYP.
P-802
P-802
2.5"7
UP3" DCW
0.75"
0.75"0.5"
1.25" TYP.
TYP.
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 4:
P
M
PL101
FIRST FLOOR PLAN -
DISTRIBUTION
05/07/2026 EWL BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
FIRST FLOOR PLUMBING PLAN - DISTRIBUTION
PLAN NOTES
1 NO PIPING TO BE INSTALLED IN THIS AREA.
2 PIPING EXTENDS TO SERVE FIRE SUPPRESSION SYSTEM. SEE FIRE PROTECTION SHEETS FOR FURTHER
DETAIL.
3 MECHANICAL AND ELECTRICAL EQUIPMENT SHOWN FOR REFERENCE ONLY
4 PIPING EXTENDS TO MECHANICAL EQUIPMENT. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL DETAIL.
5 MAKE-UP WATER METER FROM MARION WATER DEPARTMENT. INSTALL PER MARION WATER DEPARTMENT
REQUIREMENTS. CONNECT WATER METER TO VA WATER METERING SYSTEM.
6 CONNECT WATER METER TO THE VA METERING SYSTEM. INSTALL WATER METER PER MARION WATER
DEPARTMENT REQUIREMENTS.
7 ROUTE DRAINAGE OF BACKFLOW PREVENTER TO NEARBY MOP BASIN.
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
D
632 54
B
C
P-806
DN0.75" DCW
DN3" DCW
DN0.75" DCW
DN3" DCW
1TYP.
TYP.
P-802
0.75"
3"
0.75" 3"
3"
0.75"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\b sg ay do s\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \F
G L2
C N
YF
N
2R
VU
3\
5d 1a c9
-2 ae
8-
-b f-c ff8 3c
3d
3a \e e-fd
-4 d-ab
-2 dc f.r vt 5/
5/
:4 4:
P
M
PL102
MEZZANINE PLAN - DISTRIBUTION
05/07/2026 EWL BSG
CONSTRUCT NEW
CAMPUS CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/4" = 1'-0"
PLUMBING 02-MEZZANINE
SITE KEY PLAN
NEW CHILLER PLANT - BLDG 49
EXISTING CHILLER PLANT - BLDG 49
37MOD-5
MOD-1
49 MOD-4
MOD-6
NORTH
SHEET NOTES
A.
B.
REFER TO SHEET P001 FOR ABBREVIATIONS, SYMBOLS & GENERAL NOTES.
ANY WORK REQUIRED OUTSIDE OF PROJECT SCOPE AREA FOR REMOVALS, SERVICE INTERRUPTIONS, OR TEMPORARY SERVICES TO BE
CLOSELY COORDINATED WITH COR A MINIMUM OF FIVE (5) WORKING DAYS AHEAD OF TIME.
PLAN NOTES
1 OPEN TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .