These are contract documents and design drawings for the construction of a new chiller plant at Marion VA Medical Center in Marion, Illinois. The project involves comprehensive mechanical, electrical, and plumbing systems for a campus chiller plant facility. Key mechanical components include three 500-ton water-cooled chillers (CH-1, CH-2, CH-3) with York YK centrifugal compressors using R-513A refrigerant, three Marley NC8410 cooling towers (CT-1, CT-2, CT-3) with 500-ton nominal capacity each, six chilled water and secondary hot water pumps (Armstrong vertical in-line models) with variable frequency drives, and associated expansion tanks, heat exchangers, and chemical feed systems. The electrical scope encompasses a new 2000 kVA transformer with 480/277V distribution, new switchgear (U-49 configuration with 800A main service and bypass isolation switches), multiple automatic transfer switches (ATS) for generator redundancy, variable frequency drive installations, fire alarm integration with BACnet MS/TP controls, and extensive underground ductbank runs with 15 kV feeder cables. The chilled water system design includes three independent circulation loops with capacity for variable flow operation, proof-of-flow safeties, and integration into an existing Johnson Metasys building automation system.
The project specifies comprehensive piping and equipment coordination requirements, including maintenance of clearance around electrical equipment and light fixtures, accessible valve operation (chainwheel provisions where necessary), heat tracing for exposed piping in freezing conditions, and detailed sequencing of operations for pump staging and cooling tower fan modulation based on outside air temperature. Contract documents include detailed equipment schedules, control narratives, points lists with over 400 monitored parameters, expansion tank specifications, refrigerant relief systems with pressure switches, and mechanical pump support details. The work requires coordination with existing campus infrastructure while maintaining operational continuity, integration with the existing 2450 kW generator set and distribution system, and compliance with current building codes and standards. Drawings provide equipment layouts, piping schematics, electrical single-line diagrams, control system architecture with field control panel (CP-1) and distributed controllers, equipment pad details, and comprehensive installation specifications for components passing through insulated walls and structural penetrations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01-FIRST FLOOR
470' - 6"
02-MEZZANINE
481' - 7"
B CB CA.4 A.6
MP301
CH-3
12" CHWS/R DECOUPLER (FRONT)
14" CDWS (NEXT)
14" CDWR (MIDDLE)
12" CHWS (NEXT)
12" CHWR (BACK)
10" CDWS
10" CDWR
8" CHWR
8" CHWS
3" RR
6" RR
2" CDWS
8" CHWR
PCHWP-3
8" CHWR
8" CHWS
10" CDWS
10" CDWR
3" RR
8" CHWR
8" CHWS
CH-2 CH-1
10" CDWS
10" CDWR
3" RR
6" CDWS
6" CHWR
10" CDWS
10" CDWS
CDWP-3
14" CDWS
14" CDWR
6" RR
AS-1
1-1/4" RR 1-1/4" RR 1-1/4" RR
01-FIRST FLOOR
470' - 6"
02-MEZZANINE
481' - 7"
CHILLER
12" CHWS/R DECOUPLER
8" CHWS
8" CHWR 10" CDWR
12" CHWR
12" CHWS
14" CDWS
14" CDWR
10" CDWS
2" CDWS
3" RR
6" RR
1-1/4" RR
CH CHW FLOW METER
CH CDW FLOW METER
8" CHWR (FRONT)
8" CHWS (MIDDLE FRONT)
10" CDWR (MIDDLE BACK)
10" CDWS (BACK)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP301
CHILLERS SECTIONS AND
ISOMETRIC
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
GENERAL NOTES
A.
B.
ALL PIPING AND EQUIPMENT SHALL BE LOCATED IN ORDER TO MAINTAIN SERVICE CLEARANCE
AROUND ALL LIGHT FIXTURES, FIRE ALARM DEVICES, HEAT AND SMOKE DETECTORS, AND ALL
OTHER ELECTRICAL EQUIPMENT. REFER TO ELECTRICAL DRAWINGS FOR MORE INFORMATION.
COORDINATE WITH ELECTRICAL DRAWINGS TO AVOID ROUTING PIPE OVER ELECTRICAL
EQUIPMENT. IF UNAVOIDABLE, PROVIDE DRIP PAN WITH MINIMUM CLEARANCE PER NEC. AND
ROUTE DRAIN TO SANITARY SYSTEM.
ALL MANUALLY OPERATED ON/OFF VALVES TO BE ACCESSIBLE FROM A WALKABLE SURFACE. IF
THE VALVE CANNOT BE ACCESSED FROM A WALKABLE SURFACE, A CHAINWHEEL SHALL BE
PROVIDED DOWN TO OPERATE THE VALVE FROM A WALKABLE SURFACE.
1/2" = 1'-0"1 CHILLER FRONT ELEVATION
1/2" = 1'-0"2 TYPICAL CHILLER SIDE ELEVATION
NTS3 TYPICAL CHILLER ISOMETRIC
SCALE: 1/2" = 1'-0
01' 2'1'
1 CONTRACT DOCUMENTS 05/07/2026
03-ROOF
490' - 6"
03-ROOF
490' - 6"
ROOF 490'-6"
490' - 6"
T/STEEL RTU PLATFORM 498'-6"
498' - 6"
COOLING TOWER
12" EQ. LINE
16" EQ. LINE
14" CDWR
14" CDWS
CT SUMP
DOOR ACCESS
PLATFORM
(FACTORY SUPPLIED)
ACCESS DOOR
SUPPORT STEEL, TYP.
3" OVERFLOW
2" CDWS
ACCESS LADDER
(FACTORY SUPPLIED)
03-ROOF
490' - 6"
03-ROOF
490' - 6"
03-ROOF
490' - 6"
ROOF 490'-6"
490' - 6"
T/STEEL RTU PLATFORM 498'-6"
498' - 6"
14" CDWR
CT SUMP (TYP.)
4" OVERFLOW
14" CDWS
10" CDWR
10" CDWR 10" CDWR
14" CDWS
CT-1 CT-2 CT-3
SUPPORT STEEL, TYP.
DOOR ACCESS
PLATFORM, TYP.
(FACTORY SUPPLIED)
ACCESS LADDER, TYP.
(FACTORY SUPPLIED)
2-1/2" CDWS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP302
COOLING TOWERS SECTIONS AND
ISOMETRIC
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
GENERAL NOTES
A.
B.
C.
ALL PIPING AND EQUIPMENT SHALL BE LOCATED IN ORDER TO MAINTAIN SERVICE CLEARANCE
AROUND ALL LIGHT FIXTURES, FIRE ALARM DEVICES, HEAT AND SMOKE DETECTORS, AND ALL
OTHER ELECTRICAL EQUIPMENT. REFER TO ELECTRICAL DRAWINGS FOR MORE INFORMATION.
COORDINATE WITH ELECTRICAL DRAWINGS TO AVOID ROUTING PIPE OVER ELECTRICAL
EQUIPMENT. IF UNAVOIDABLE, PROVIDE DRIP PAN WITH MINIMUM CLEARANCE PER NEC. AND
ROUTE DRAIN TO SANITARY SYSTEM.
ALL MANUALLY OPERATED ON/OFF VALVES TO BE ACCESSIBLE FROM A WALKABLE SURFACE. IF
THE VALVE CANNOT BE ACCESSED FROM A WALKABLE SURFACE, A CHAINWHEEL SHALL BE
PROVIDED DOWN TO OPERATE THE VALVE FROM A WALKABLE SURFACE.
PROVIDE HEAT TRACING ON ALL PIPING EXPOSED TO FREEZING CONDITIONS.
1/4" = 1'-0"1 COOLING TOWERS WEST ELEVATION
1/4" = 1'-0"2 COOLING TOWERS SOUTH ELEVATION
NTS3 COOLING TOWERS ISOMETRIC
SCALE: 1/4" = 1'-0
02' 4'2'
01-FIRST FLOOR
470' - 6"
02-MEZZANINE
481' - 7"
12" CHWR 12" CHWR
8" CHWR 8" CHWR
PCHWP
SUCTION
DIFFUSER
2" CDWS
1" CF
SUPPORT, TYP.
EQUIPMENT PAD 1
01-FIRST FLOOR
470' - 6"
02-MEZZANINE
481' - 7"
SCHWP
8" CHWS
12" CHWS
8" CHWS
SUCTION DIFFUSER
12" CHWS
8" CHWR
SUPPORT, TYP.EQUIPMENT PAD1 2
01-FIRST FLOOR
470' - 6"
02-MEZZANINE
481' - 7"
10" CDWS
CDWP
14" CDWS
10" CDWS
14" CDWS
SUCTION DIFFUSER
SUPPORT, TYP.
EQUIPMENT PAD 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP303
PUMP SECTIONS AND
ISOMETRICS
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
GENERAL NOTES
A.
B.
ALL PIPING AND EQUIPMENT SHALL BE LOCATED IN ORDER TO MAINTAIN SERVICE CLEARANCE
AROUND ALL LIGHT FIXTURES, FIRE ALARM DEVICES, HEAT AND SMOKE DETECTORS, AND ALL
OTHER ELECTRICAL EQUIPMENT. REFER TO ELECTRICAL DRAWINGS FOR MORE INFORMATION.
COORDINATE WITH ELECTRICAL DRAWINGS TO AVOID ROUTING PIPE OVER ELECTRICAL
EQUIPMENT. IF UNAVOIDABLE, PROVIDE DRIP PAN WITH MINIMUM CLEARANCE PER NEC. AND
ROUTE DRAIN TO SANITARY SYSTEM.
ALL MANUALLY OPERATED ON/OFF VALVES TO BE ACCESSIBLE FROM A WALKABLE SURFACE. IF
THE VALVE CANNOT BE ACCESSED FROM A WALKABLE SURFACE, A CHAINWHEEL SHALL BE
PROVIDED DOWN TO OPERATE THE VALVE FROM A WALKABLE SURFACE.
1/2" = 1'-0"1 PRIMARY CHILLED WATER PUMP TYPICAL SECTION
NTS2 PRIMARY CHILLED WATER PUMP ISOMETRIC
1/2" = 1'-0"3 SECONDARY CHILLED WATER PUMP TYPICAL SECTION
NTS4 SECONDARY CHILLED WATER PUMP ISOMETRIC
1/2" = 1'-0"5 CONDENSER WATER PUMP TYPICAL SECTION
NTS6 CONDENSER WATER PUMP ISOMETRIC
DRAWING NOTES
REFER TO SHEET SB501 FOR EQUIPMENT PAD DESIGN. ENSURE MINIMUM 4" OVERHANG FROM
SUPPORT LEGS.
PROVIDE PUMP SUPPORT LEGS PER DETAIL 11 ON SHEET MP602.
SCALE: 1/2" = 1'-0
01' 2'1'
MP304
12" CHWR
12" CHWS
SUMP PUMP
SUMP PUMP DISCHARGE
DUCTWORK
MP304
12" CHWR (FRONT)
12" CHWS (BACK)
DUCTWORK
SUMP PUMP
SUMP PUMP DISCHARGE3
MP304
MP304
12" CHWR
12" CHWS
DUCTWORK
SUMP PUMP 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP304
CHILLED WATER DISTRIBUTION
PIT DETAILS
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
1/2" = 1'-0"1 CHW DISTRIBUTION PIT SOUTH ELEVATION
1/2" = 1'-0"2 CHW DISTRIBUTION PIT WEST ELEVATION
1/2" = 1'-0"3 CHW DISTRIBUTION PIT PLAN
SCALE: 1/2" = 1'-0
01' 2'1'
DRAWING NOTES
REFER TO "P" SERIES SHEETS FOR MORE INFORMATION.
REFER TO SHEET MH101 FOR MORE INFORMATION.
PROVIDE PIPING TRANSITION FROM STEEL (INTERIOR) TO DUCTILE IRON (DIRECT-BURIED
EXTERIOR) PER DETAIL 12 ON SHEET MP602.
8" CHWR
A.A.V.
MP504, C-9
FROM CFT-1
A.A.V. A.A.V.
1" ED
SD
VFD
A.A.V.
VFD
SD
12" CHWR
8" CHWR
6" CHWR
6" CHWR
6" CHWS
6" CHWS
A.A.V.
A.A.V.
VFD
SD
6" CHWR
6" CHWR
A.A.V.
VFD
SD
6" CHWR
6" CHWR
SD
VFD
6" CHWS
6" CHWS
SD
VFD
6" CHWS
6" CHWS
PDIT
58001
PDIT
58002
PDIT
58003
CH-1
(EVAPORATOR)
500 TONS
1,000 GPM
CH-2
(EVAPORATOR)
500 TONS
1,000 GPM
CH-3
(EVAPORATOR)
500 TONS
1,000 GPM
CONTROL
PANEL
CONTROL
PANEL
CONTROL
PANEL
CHWXT-1
SCHWP-1
PCHWP-1
HX-1
200 TONS
350 GPM
PCHWP-2 PCHWP-1
SCHWP-2SCHWP-3
NO CONT.
FROM CAMPUS
DISTRIBUTION
PDG
11006
FCV
12003
FCZ
12003
TG
11004
TT
11003
TT
51001
TT
52001
FIT
12004
TG
12002
TT
12001
FCV
22003
FCZ
22003
TG
21004
TT
21003
TG
22002
TT
22001
FCV
32003
FCZ
32003
TG
31004
TT
31003
TG
32002
TT
32001
MP502, B-1
FROM DOMESTIC
WATER SYSTEM
TG
51002
PIT
51003
PG
51004
TG
52002
PIT
52003
PG
52004
PDIT
11007
TCX
11008
IT
11009
YSR
11010
YXR
11010
YA
11010
PDG
21006
PDIT
21007
PDG
31006
PDIT
31007
TCX
21008
IT
21009
TCX
31008
IT
31009
ZT
12003
ZT
22003
ZT
32003
YSR
21010
YXR
21010
YA
21010
YSR
31010
YXR
31010
YA
31010
FE
51005
PDG
52111
PDIT
52112
PDG
52115
PDIT
52116
ST
52113
SCX
52113
YSR
52114
YXR
52114
YA
52114
HSR
52114
FIT
51010
PDG
51111
PDIT
51112
PDG
51115
PDIT
51116
ST
51113
SCX
51113
YSR
51114
YXR
51114
YA
51114
HSR
51114
PG
11001
PG
21001
PG
31001
PG
22002
PG
32002
FCV
42003
FCZ
42003
TG
41004
TT
41003
TG
42002
TT
42001
PDG
41006
PDIT
41007
ZT
42003
PG
41001
PG
42002
PG
12002
FE
12004
FIT
22004
FE
22004
FIT
32004
FE
32004
FIT
42004
FE
42004
FIT
51005
FE
51010
PDG
51211
PDIT
51212
PDG
51215
PDIT
51216
ST
51213
SCX
51213
YSR
51214
YXR
51214
YA
51214
HSR
51214
PDG
51311
PDIT
51312
PDG
51315
PDIT
51316
ST
51313
SCX
51313
YSR
51314
YXR
51314
YA
51314
HSR
51314
PDG
52211
PDIT
52212
PDG
52215
PDIT
52216
ST
52213
SCX
52213
YSR
52214
YXR
52214
YA
52214
HSR
52214
PDG
52311
PDIT
52312
PDG
52315
PDIT
52316
ST
52313
SCX
52313
YSR
52314
YXR
52314
YA
52314
HSR
52314
FS
21005
FS
11005
FS
31005
PDG
51001
PDIT
51001
MH102
FROM PLANT HVAC
JI
51314
JI
51214
JI
51114
JI
52114
JI
52214
JI
52314
FE
52005
FIT
52005
NO CONT.
TO CAMPUS
DISTRIBUTION
MP504, C-1
TO CFT-1
MH102
TO PLANT HVAC
ZI
12003
ZI
42003
ZI
32003
ZI
22003
TI
41003
TI
31003
TI
21003
TI
11003
PDI
41007
PDI
31007
PDI
21007
PDI
11007
TI
12001
FI
12004
TI
22001
FI
22004
TI
32001
FI
32004
TI
42001
FI
42004
FS
11005
FS
21005
FS
31005
3/4" CHWR
1" CF
12" CHWS
12" CHWR
8" CHWR 8" CHWR
8" CHWS8" CHWS 12" CHWS 8" CHWS
3/4" DCW
12" CHWS
INJECTION
QUILL W/
CORP STOP
12" CHWR 12" CHWR12" CHWR
8" CHWS
8" CHWS8" CHWS
12" CHWS
8" CHWS
8" CHWS
A.A.V.
8" CHWS12" CHWS
12" CHWS/R DECOUPLER
8" CHWR
8" CHWR8" CHWR
12" CHWR8" CHWR 8" CHWR12" CHWR
TO CONTROLLER
BACNET MS/TP
TEST
PLUG
TEST
PLUG
TEST
PLUG
TEST
PLUG
TEST
PLUG
TEST
PLUG
TEST
PLUG
8" CHWR
8" CHWS
TEST
PLUG
TEST
PLUG
12" CHWS/R DECOUPLER
A.A.V.A.A.V.
A.A.V.
A.A.V.
A.A.V.
A.A.V.
A.A.V.
A.A.V.
A.A.V.
A.A.V.
1/2" DRAIN
SUCTION DIFFUSER, TYP.
M.A.V.
M.A.V.
M.A.V.
M.A.V.
8" CHWR
A.A.V.
1" DR.
1" CF
INJECTION
QUILL W/
CORP STOP
3" CHWR
3" CHWS
RELIEF VALVE
SET @ 150#
(TYP.)
OUTSIDE
PLANT CONNECTION FOR
TEMPORARY CHILLER
8" CHWS
OUTSIDE
PLANT CONNECTION FOR
TEMPORARY CHILLER
8" CHWR
BLDG 2
BLDG 42
BLDG 37
TO CONTROLLER
BACNET MS/TP
TO CONTROLLER
BACNET MS/TP
TO CONTROLLER
BACNET MS/TP
TO CONTROLLER
BACNET MS/TP
TO CONTROLLER
BACNET MS/TP
M.A.V.
TIC
11008
II
11009
TIC
21008
II
21009
TIC
31008
II
31009
YIC
11010
YIC
21010
YA
21010
YIC
31010
YA
31010
TI
51001
PI
51003
TI
52001
PI
52003
PDI
52112
PDI
52116
SI
52113
HIC
52113
YA
52114
FI
51010
PDI
51112
PDI
51116
YA
51114
SI
51113
HIC
51113
YA
11010
FI
51005 PDI
51212
PDI
51216
YA
51214
SI
51213
HIC
51213
PDI
51312
PDI
51316
YA
51314
SI
51313
HIC
51313
PDI
52212
PDI
52216
SI
52213
HIC
52213
YA
52214
PDI
52312
PDI
52316
SI
52313
HIC
52313
YA
52314
PDI
51001
CC
11010
CC
21010
CC
31010
PDI
58001
PDI
58002
PDI
58003
FI
52005
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP501
CHILLED WATER SYSTEM P&ID -
NEW WORK
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
DRAWING NOTES
REFER TO SHEET MP602 DETAIL 8 FOR EXPANSION TANK VALVES AND ASSOCIATED
INSTRUMENTATION.
THE CHILLER CONTROL PANEL BACNET COMMUNICATION LINK SHALL TRANSMIT THE
FOLLOWING DATA POINTS TO / FROM THE PCS:
READ / WRITE
-- CHILLED WATER SETPOINT
-- CURRENT LIMIT SETPOINT
-- BASE LOADING SETPOINT
-- BASE LOADING ENABLE
-- DIAGNOSTIC RESET
READ ONLY
-- UNIT AVERAGE LINE CURRENT
-- ACTIVE CURRENT LIMIT SETPOINT
-- ACTIVE BASE LOADING SETPOINT
-- UNIT POWER CONSUMPTION
-- EVAPORATOR LEAVING WATER TEMPERATURE
-- EVAPORATOR ENTERING WATER TEMPERATURE
-- CONDENSER LEAVING WATER TEMPERATURE
-- CONDENSER ENTERING WATER TEMPERATURE
-- EVAPORATOR WATER FLOW RATE
-- EVAPORATOR DIFFERENTIAL PRESSURE
-- CONDENSER WATER FLOW RATE
-- CONDENSER DIFFERENTIAL PRESSURE
-- CHILLER RUNNING STATUS
-- CHILLER START / STOP
-- EMERGENCY STOP
-- ALARM PRESENT (INDIVIDUAL ALARMS NOT BATCHED)
-- RUN ENABLED
-- EVAPORATOR REFRIGERANT PRESSURE
-- EVAPORATOR REFRIGERANT TEMPERATURE
-- CONDENSER REFRIGERANT PRESSURE
-- CONDENSER REFRIGERANT TEMPERATURE
-- OIL TEMPERATURE
-- OIL PRESSURE
-- CHILLED WATER FLOW STATUS
-- CONDENSER WATER FLOW STATUS
THE CHILLER SHALL BE EQUIPPED WITH THE FOLLOWING
SAFETY CONTROLS THAT, WHEN TRIGGERED, SHALL TRIP
OUT THE COMPRESSOR MOTOR AND REQUIRE A MANUAL
RESET:
-- EVAPORATOR PROOF OF WATER FLOW
-- CONDENSER PROOF OF WATER FLOW
-- HIGH REFRIGERANT PRESSURE CUTOUT
-- HIGH REFRIGERANT PRESSURE RELIEF VALVE
-- LOW REFRIGERANT PRESSURE CUTOUT
-- HIGH COMPRESSOR MOTOR TEMPERATURE
-- HIGH REFRIGERANT TEMPERATURE
-- HIGH OIL TEMPERATURE
-- LOW REFRIGERANT TEMPERATURE
-- LOW VOLTAGE
-- PHASE LOSS
-- PHASE REVERSAL
-- HIGH CURRENT
CONNECT TO EXISTING CONTROL POINT IN JOHNSON
METASYS CONTROL SYSTEM.
TO CFT-4
FROM DOMESTIC
YI
57001
TO CHWXT-1
VS
63001
VI
63001
TT
64001
FCV
64002
ZSC
64002
ZSO
64002
ZI
64002TT
63002
FCV
63003
ZSC
63003
ZSO
63003
TI
63002
ZI
63003
TI
64001
VS
73001
VI
73001
TT
74001
FCV
74002
ZSC
74002
ZSO
74002
ZI
74002TT
73002
FCV
73003
ZSC
73003
ZSO
73003
TI
73002
ZI
73003
TI
74001
VS
83001
VI
83001
TT
84001
FCV
84002
ZSC
84002
ZSO
84002
ZI
84002TT
83002
FCV
83003
ZSC
83003
ZSO
83003
TI
83002
ZI
83003
TI
84001
PDG
54310
PG
54313
PDG
54210
PG
54213
PDG
54110
YXR
54112
PG
54113
PDIT
44005
PDI
44005
PG
43002
TG
43004
TT
43003
TI
43003
FE
44001
FT
44001
FI
44001
FCV
44001
ZT
44001
ZI
44001
TT
44003
TI
44003
PG
44002
TG
44004
PDIT
14005
PDI
14005
FS
13005
TT
13003
TI
13003
FE
13001
FT
13001
FI
13001
FCV
14001
ZT
14001
ZI
14001
TT
14003
TI
14003
PG
14002
TG
14004
PDIT
24005
PDI
24005
FS
23005
TT
23003
TI
23003
FE
23001
FT
23001
FI
23001
FCV
24001
ZT
24001
ZI
24001
TT
24003
TI
24003
PG
24002
TG
24004
PDIT
34005
PDI
34005
FS
33005
TT
33003
TI
33003
FE
33001
FT
33001
FI
33001
FCV
34001
ZT
34001
ZI
34001
TT
34003
TI
34003
PG
34002
TG
34004
MP504, B-1
TO CONDUCTIVITY
TRANSMITTER
MP504, B-1
TO PH
TRANSMITTER
FE
53002
FT
53002
FI
53002
FCV
53001
ZSC
53001
ZSO
53001
ZI
53001
LT
54001
LI
54001
MP504, B-9
FROM PH
TRANSMITTER
MP504, B-9
FROM CONDUCTIVITY
TRANSMITTER
FS
23005
FS
13005
FS
33005
PG
13002
TG
13004
PG
23002
TG
23004
PG
33002
TG
33004
TT
54002
TI
54002
TT
54004
TI
54004
FCV
54003
ZT
54003
ZI
54003
PG
54002
YSR
FILTER
SKID
CONTROL
PANEL
FILTER
SKID
PUMP
LCV
56002
LCZ
56002
LI
56002
FE
56001
FIT
56001
FI
56001
MP504, C-1
TO CFT-2 & CFT-3
MP504, C-9
FROM CFT-4
MP504, D-9
TO FLOOR SINK
2" DRAIN
TO FLOOR SINK
PDG
54311
PDG
54211
PDG
54111
CDWF-1
MP504, C-9
FROM CFT-2 & CFT-3
PL101
WATER SYSTEM
YSR
54112
YA
54112
YXR
54212
YSR
54212
YA
54212
YXR
54312
YSR
54312
YA
54312
PG
55002
HOA
54312
HOA
54212
HOA
54112
FILTER
PG
55001
PDIT
55003
PDI
55003
YT
57001
MP501, B-1
ST
X5001
SCX
X5001
YA
X5001
HSR
X5001
YSR
X5001
YXR
X5001
JI
X5001
COOLING TOWER
CT-1
4" OVERFLOW (TYP.)
VFD
4" DR.
(TYP.)
10" CDWR
3/4" DRAIN
(TYP. OF 6)
TO ROOF
VFD
10" CDWR
TO ROOF
VFD
10" CDWR
TO ROOF
6" SAN
6" OPEN
SITE DRAIN
P-TRAP
1" DR.
1" DR.
10" CDWS
10" CDWS
1" DR.
1" DR.
10" CDWS
10" CDWS
1" DR.
1" DR.
10" CDWS
10" CDWS
CONDENSER
WATER PUMP
CDWP-1
A.A.V.
CONDENSER
WATER PUMP
CDWP-2
A.A.V.
CONDENSER
WATER PUMP
CDWP-3
A.A.V.
HEAT
EXCHANGER
HX-1
1" DR.
1" DR.
6" CDWS
6" CDWR
A.A.V.
CHILLER
CH-1
CONDENSER
1" DR.
1" DR.
10" CDWS
10" CDWR
A.A.V.
CHILLER
CH-2
CONDENSER
1" DR.
1" DR.
10" CDWS
10" CDWR
A.A.V.
CHILLER
CH-3
CONDENSER
1" DR.
1" DR.
10" CDWS
10" CDWR
A.A.V.
1" DRAIN CONDENSER WATER
E.D.
2" CDWR
3/4" MUW 12" EQ. LINE12" EQ. LINE 16" EQ. LINE16" EQ. LINE
10" CDWS 10" CDWS 10" CDWS14" CDWS
14" CDWS
14" CDWS
14" CDWR
14" CDWR
14" CDWS
14" CDWS 14" CDWS
14" CDWS
10" CDW BYPASS
10" CDW BYPASS
3" CDWS
12" EQ. LINE
3" CDWS 3" CDWS
COOLING TOWER
CT-3
COOLING TOWER
CT-2
2" CDWR
14" CDWS
14" CDWS
3" CDWR3" CDWR3" CDWR
1" CF
1" CF
1" CF
1" CF
2" DCW
4" OVERFLOW
6" CDWR
MMM
4" CDWS
6" CDWS6" CDWS
6" CDWR
3/4" CDWS
3/4" CDWS
3/4" CDWR
3/4" CDWR
INJECTION
QUILL W/
CORP STOP
SD SD SD
HEAT TRACE
3/4" DCW
TO CONTROLLER
BACNET MS/TP
TO CONTROLLER
BACNET MS/TP
TO CONTROLLER
BACNET MS/TP
1" DR.
1" DR.
A.A.V.
A.A.V.
A.A.V.
A.A.V.
A.A.V.10" CDW BYPASS
CT
F
AN
V
FD
M.A.V.
M.A.V.
M.A.V.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP502
CONDENSER WATER SYSTEM
P&ID - NEW WORK
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
CONTROL NOTES
A.
1.
2.
3.
4.
5.
6.
7.
THE FOLLOWING CONTROLS NOTES ARE TYPICAL FOR EACH COOLING TOWER FAN VFD, AS
REPRESENTED TO THE LEFT. THE X IN THE CONTROL POINTS INDICATE THE RESPECTIVE
COOLING TOWER FAN VFD THE CONTROL POINT IS REFERRING TO, WITH 6, 7, AND 8
REPRESENTING COOLING TOWERS 1, 2, AND 3 FANS, RESPECTIVELY. REFER TO THE POINTS
LIST ON SHEET MP805 FOR MORE DETAIL REGARDING THESE CONTROL POINTS.
SPEED INDICATION
SPEED CONTROL
FAULT ALARM
LOR POSITION INDICATION
RUN STATUS
START/STOP
POWER INDICATION
DRAWING NOTES
COOLING TOWER TO BE INSTALLED WITH FACTORY SUPPLIED BASIN SWEEPER SYSTEM
PIPING.
ROUTE TO NEAREST FLOOR DRAIN.
METER AND LEVEL CONTROL VALVE ON TOWER WATER MAKEUP SYSTEM TO BE LOCATED IN
ROOM 103. BOTH METER AND LEVEL CONTROL VALVE SHALL BE ACCESSIBLE FROM THE
FINISHED FLOOR.
3 3
PAH
16001
PAH
16002
PAH
16003
PAH
26001
PAH
26002
PAH
26003
PAH
36001
PAH
36002
PAH
36003
CH-1
TERMINATE WITH 45 DEGREE
OPENING AND INSECT
SCREEN.
6" RR
RUPTURE
GUARD
SWITCH
(TYP)
RELIEF VALVE (TYP.)
(PROVIDED BY
CHILLER MFGR) FLEXIBLE
CONNECTOR
(TYP.)
3" RR
6" RR
OPERATING FLOOR
ROOF LINE
CH-2
RUPTURE
GUARD
SWITCH
(TYP)
RELIEF VALVE (TYP.)
(PROVIDED BY
CHILLER MFGR) FLEXIBLE
CONNECTOR
(TYP.)
3" RR
CH-3
1-1/4" RR
1-1/4" RR
RUPTURE
GUARD
SWITCH
(TYP)
RELIEF VALVE (TYP.)
(PROVIDED BY
CHILLER MFGR) FLEXIBLE
CONNECTOR
(TYP.)
1-1/4" RR
3" RR
1-1/4" RR
6" RR
PSH
16001
PSH
16002
PSH
16003
PSH
26001
PSH
26002
PSH
26003
PSH
36001
PSH
36002
PSH
36003
PSO
16004
PSO
16005
PSO
26004
PSO
26005
PSO
36004
PSO
36005
PSO
16006
PSO
26006
PSO
36006
1-1/4" RR
1-1/4" RR
1-1/4" RR
1-1/4" RR
1-1/4" RR
1-1/4" RR
1-1/4" RR
1-1/4" RR
1-1/4" RR
1-1/4" RR
1-1/4" RR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP503
REFRIGERANT RELIEF SYSTEM
P&ID - NEW WORK
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
MP502, C-1
FROM CDWR
HEADER
MP502, C-1
FROM CDWR
HEADER
MP502, F-10
TO CDWP
SUCTION HEADER
MP502, F-10
TO CDWP
SUCTION HEADER
MP501, B-1
FROM PCHWP
DISCHARGE HEADER
MP502, E-1
FROM CDWP
DISCHARGE HEADER
MP501, A-1
TO PCHWP
SUCTION HEADER
MP502, B-1
TO CDWR HEADER
MP502, B-1
TO CDWR HEADER
MP502, B-1
FROM TOWER
MAKEUP SYSTEM
PG
91001
PG
91002
PG
91003
FCV
91004
PHT
91006
CT
91005
PHI
91006
CI
91005
CFT-2
(TOWER
BIOCIDE)
CFP-2
CFT-3
(TOWER
SCALE AND
CORROSION
INHIBITOR)
CFP-3
CFT-4
(BROMINE
FEEDER)
1" CF 1" CF
RELIEF BYPASS
VALVE
RELIEF BYPASS
VALVE
3/4" CF 3/4" CF
1" CF
3/4" CF
3/4" CF
3/4" CF
3/4" CF
FOUR STATION
CORROSION
COUPON RACK
1" CF
FOUR STATION
CORROSION
COUPON RACK
CDW SYSTEM
WATER TREATMENT
CONTROLLER
(CDWC-1)
FOUR STATION
CORROSION
COUPON RACK
CFT-1
(CHILLED WATER
SCALE AND
CORROSION
INHIBITOR)
CFP-1
RELIEF BYPASS
VALVE
3/4" CF
3/4" CDWR
3/4" CDWR
3/4" CDWS
3/4" CDWS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP504
CHEMICAL FEED SYSTEM P&ID -
NEW WORK
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
COMPONENTS PASSING THROUGH INSULATED WALL
INSTALLATION OF THERMOMETER WELLS PRESSURE TRANSMITTER INSTALLATIONSECURING HANGER RODS IN CONCRETE
2 3SCALE:
NONE
SCALE:
NONE
5 6SCALE:
NONE
SCALE:
NONE
SCALE:
NONE4
PIPE HANGERS
EXTERIOR SKIN
PREFAB. WALL PANEL
AS SPECIFIED
MASTIC
INTERIOR SKIN
GASKET
S.S. WALL PLATE
SECURED WITH S.S.
SCREWS
PIPE
INSULATION
AS SPECIFIED
SEAL
INSULATION
AGAINST SKIN OF
WALL PANEL
TUBING, PIPING
OR CONDUIT
S.S. WALL PLATE
SECURED WITH S.S.
SCREWS
FIELD APPLIED INSULATION
AFTER INSERTION OF
RESPECTIVE SERVICE FACILITY
THRU REFRIGERATOR OR
FREEZER WALL
GREATER THAN 50mm [2"] DIA.
PIPE
50mm [2"] DIA. & SMALLER
VERTICAL
GREATER THAN 50mm [2"] DIA.
PIPE
50mm [2"] DIA. & SMALLER
HORIZONTAL
65mm [2 1/2"] DIA.
NOTE:
PROVIDE THE APPROPRIATE WELL DEPTH TO HAVE THE
NECESSARY INSULATION STAND-OFF DISTANCE.
65mm [2 1/2"] DIA.
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
PROVIDE INSULATION
SHIELD
& INSERT FOR ALL
PIPING
(200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA.
HANGER RODS WITH
900mm [36"] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
m m
NOTE:
SEE SPECIFER FOR DETAILED HANGER
REQUIREMENTS
1" M
AX
mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU 3/4]
[7]
[5]
[1]
[7]
[6]
[11/4] [7]
[7]
[11/2] [9]
[8]
[2]
[10] [8]
[21/2] [11] [9]
[3]
[12] [10]
[4]
[14] [12]
[5]
[16] [13]
[6]
[17] [14]
[8]
[19] [16]
[10] [22]
[12] [23]
[14] [25]
[16] [27]
[18] [28]
[20] [30]
[24] [32]
1SCALE:
NONE
STEEL EXPANSION SHIELD FOR EXISTING
CONSTRUCTION AND INSERTS FOR NEW
CONSTRICTION THIS TYPE SHALL BE USED
ONLY IN SLABS OR BEAMS OF 4" [100mm]
MIN DEPTH
3/8" [10mm] MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND INSERTS
FOR NEW CONSTRUCTION
CONCRETE
FLOOR SLAB
CLIP
ANGLE
NUTS & WASHERS
3/8" [10mm] MIN DIA
HANGER RODS
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1 1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] & LARGER USE 3"x3"x1/4" [75x75x6.4mm]
ANGLE
TURNBUCKLE
3/8" [10mm] MIN DIA
HANGER RODS
3/8" [10mm] MIN DIA
INSERTS NEW
CONSTRUCTION ONLY.
NOTES:
1. INSTALLATION OF SENSORS AND TRANSMITTERS SHALL CONFORM TO
RECOMMENDATIONS OF MANUFACTURERS OF TRANSMITTERS.
1/2" [15mm] STEEL PIPE OR
STEEL TUBING TO SENSORS
DIFFERENTIAL PRESSURE
TRANSMITTER (FLOW, LEVEL)
BLOWDOWN
PT
ELEVATION
ROD HANGER ATTACHMENT DETAIL
NOTES:
1. PROVIDE HORIZONTAL TRAVELER CEILING ATTACHMENT FOR ALL HANGERS ON SERVICES
OVER 200 DEG F WHERE THE TOP OF THE BARE PIPE IS 5'-0" OR LESS BELOW THE CEILING
OR SUPPORT STEEL.
CONCRETE
CLEVIS
PLATE HANGER
ATTACHMENTWELDLESS EYE NUT
MSS-SP-69 FIG# 290
CONCRETE SLAB
ANCHOR BOLT
(TYP. OF 4)
CONCRETE SLAB
CEILING PLATE
ANCHOR BOLT
FORGED STEEL CLEVIS -
MSS SP-69 FIG# 299
HORIZONTAL TRAVELER
MSS SP-69 FIG# 170
THREADED ROD
WELD HORIZONTAL TRAVELER
PER MANUFACTURER'S
RECOMMENDATIONS
1/4"
WELDLESS EYE NUT
MSS-SP-69 FIG #290
STRUCTURAL STEEL
1/4"
WELDED BEAM
ATTACHMENT FIG #66
FORGED STEEL CLEVIS -
MSS SP-69 FIG# 299
HORIZONTAL TRAVELER
MSS SP-69 FIG# 170
THREADED ROD
1/4" 1/4"
STRUCTURAL STEEL
3 1/2" 3 1/2"
4 3/4"
EMBEDMENT (D)
1 1/4" DIA
3/4" DIA
5/8" DIA
ROD SIZE (A)
1" DIA
1/2" DIA
CEILING PLATE SIZE (B)
4200 LBS
7800 LBS
600 LBS
1430 LBS
2400 LBS
MAX. LOAD
12"x12"x3/4" 12"x12"x3/4"
10"x10"x1/2" 10"x10"x1/2" 10"x10"x3/8"
(4) 7/8" DIA -8"x8"
(4) 1/2" DIA -8"x8"
(4) 1/2" DIA -8"x8"
(4) 5/8" DIA -8"x8"
(4) 3/4" DIA -8"x8"
ANCHOR BOLTS (C)
6"
4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP601
CHILLER PLANT DETAILS
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
DRAIN VALVE AND AIR VENT CONNECTIONS
PITOT TEST CONNECTIONS CHILLED WATER DISTRIBUTION WALL PENETRATIONMECHANICAL PUMP SUPPORT
8 9SCALE:
NONE
SCALE:
NONE
11 12SCALE:
NONE
SCALE:
NONE
SCALE:
NONE10
INSERTION TYPE METER INSTALLATION 7SCALE:
NONE FLOOR MOUNTED EXPANSION TANK PIPING CONNECTIONS
NOTES:
1. SEE EXPANSION TANK SYSTEM
SCHEDULE FOR COMPONENT SIZES.
2. FOR HOT WATER SYSTEMS 50mm
[2"] AND SMALLER AND CHILLED
WATER SYSTEMS USE IN-LINE AIR
PURGER IN LIEU OF AIR SEPARATOR.
3. SET PRESSURE REDUCING VALVE
SO PRESSURE AT HIGHEST POINT IN
SYSTEM HAS A MINIMUM OF 28kPa [4
PSIG].
4. PROVIDE STRAINER IN AIR
SEPARATOR IF INDICATED IN
EXPANSION TANK SCHEDULE.
5. RELIEF VALVE FOR CHILLED WATER
SYSTEM IS SHOWN. OMIT WHEN
RELIEF VALVE IS SHOWN ON HEAT
EXCHANGER DETAIL AND SYSTEM IS
USED ONLY FOR HOT WATER
HEATING.
D
FLOOR MOUNTING BASE RING
WITH DRAIN ACCESS OPENING
SHOWN. ANGLE IRON LEGS MAY
BE USED AS AN OPTION.
150mm [6"]
HOUSEKEEPING
PAD
COLD WATER FILL LINE.
SEE EXPANSION TANK
SCHEDULE FOR SIZE
DRAIN
FROM SYSTEM
RUN DRAIN LINE TO
NEAREST FD UNLESS
INDICATED OTHERWISE
DRAIN
TO PUMP
SUCTION
AIR
SEPARATOR
SEE NOTES 1
& 2
HANGER RODS
(TYP)
CONNECTOR PIPE.
REDUCED PRESSURE ZONE
BACKFLOW PREVENTER
NC
BUTTERFLY
OR BALL
ISOLATION
VALVE
D
RUN DRAIN LINE
TO NEAREST FD
AIR CHARGING
SHRAEDER VALVE
MV
AUTO. AIR VENT TO DRAIN
PI
OMIT PRESSURE
GAUGE LINE IF
STRAINER IS NOT
INCLUDED.
TYPICAL AIR VENT
TYPICAL CHILLED WATER PIPING DRAIN
VALVE CONNECTIONS
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" [20mm] BALL VALVE
ADAPTER TO 3/4" [20mm] HOSE
THREAD-PROVIDE HOSE CAP NUT
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS AND/OR
PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
AIR VENT
1/2" [15mm]
BALL VALVE
1/4" [8mm]
COPPER TUBING
1/2" [15mm] x 4" [100mm]
NIPPLE
CIRCULATING WATER PIPING
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
MV
OR
AV
NOTE:
1.
2.
PROVIDE IN CHILLED WATER MAIN AND IN CONDENSER WATER MAIN.
LOCATE PILOT TUBE TAPS 20 PIPE DIAMETERS DOWNSTREAM AND 10 PIPE
DIAMETERS UPSTREAM FROM THE NEAREST PIPE FITTING.
EITHER TOP OR SIDE LOCATION. BOTH ARE NOT REQUIRED AT SAME
LOCATION.
90°
PLUG
1 1/2" [40mm]
FULL PORT BALL
VALVE
1 1/2"∅x2" LONG [40x50mm] PIPE
1 1/2" [40mm] FULL
PORT BALL VALVE
PLUG
WELD (TYP)
PER MFR. SPEC.
MIN. UPSTREAM AND
DOWNSTREAM DISTANCE
REQUIRED
OVERHEAD
CLEARANCE
PER MFR.
SPEC.
FLOW DIRECTION
FLOW
ALLOW ENOUGH SLACK IN THE
FLEXIBLE CONDUIT TO PERMIT
THE METER TO BE REMOVED
FROM THE VALVE
OUTPUT SIGNALS TO
CONTROLS SYSTEM
NOTES:
1. THIS DETAIL APPLIES FOR TURBINE FLOW METER AND ELECTROMAGNETIC METER TYPES.
2. FOR ELECTROMAGNETIC METER INSTALLATION. PROVIDE ADEQUATE STRAIGHT PIPE ON
EITHER SIDE OF METER TO ACCOUNT FOR BIDIRECTIONAL FLOW.
BLADDER
EXPANSION TANK
REFER TO PLANS FOR SIZE
OF PIPING
WELD PIPE LEG TO
BASE PLATE
3/4" THICK STEEL BASE
PLATE (SEE NOTE 2)
EQUIPMENT PAD
FINISHED FLOOR
3/4" WEEP HOLE
1/4" WELD ALL AROUND
REFER TO PLANS FOR SIZE
OF PIPING
STEEL PIPE SUPPORT LEG, CENTER
ON RISER (SEE NOTE 1), TYP.
NOTES:
1. SUPPORT LEG SHALL BE TWO PIPE SIZES SMALLER THAN PIPE BEING
SUPPORTED (UNLESS OTHERWISE NOTED).
2. STEEL PLATE SHALL EXTEND A MINIMUM OF THREE (3") INCHES BEYOND
THE SUPPORT LEG PIPE WALL ON ALL SIDES (UNLESS OTHERWISE NOTED).
3. VALVE AND PIPING ARRANGEMENT SHOWN FOR SECONDARY CHILLED
WATER PUMP SCHEME. REFER TO MP303 FOR PRIMARY CHILLED WATER
AND CONDENSER WATER VALVE AND PIPING ARRANGEMENT.
ATTACH TO SUCTION DIFFUSER PER
MANUFACTURER RECOMMENDATION
SUCTION DIFFUSER
PUMP
PIPE CONTINUES TO FINISHED
FLOOR PER BELOW RIGHT
SERVICE PIPE
(DUCTILE IRON)
EXTERIOR WALL
1-5/8" UNISTRUT
(TYP X 2)
3/4" WEDGE ANCHOR, (TYP X 4)
THREADED ROD, MATCH
FLANGE BOLT SIZE (LENGTH
SHALL BE DETERMINED IN FIELD)
WATERTIGHT SEAL,
TYP.
SERVICE PIPE
(STEEL)
TRANSITION POINT FROM STEEL
TO DUCTILE IRON PIPE
INTERIOR WALL
PIPE SLEEVE
NOTES:
1. PIPE SLEEVE SHALL BE CAST IRON OR ZINC COATED.
2. WATERTIGHT SEAL SHALL BE MODULAR OR LINK RUBBER SEAL AND SHALL
BE APPLIED AT BOTH ENDS OF WALL PENETRATION PIPE SLEEVE.
3. PROVIDE FLANGED TRANSITION FROM STEEL (INTERIOR) TO DUCTILE IRON
(DIRECT-BURIED EXTERIOR) ON INTERIOR SIDE OF WALL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP602
CHILLER PLANT DETAILS
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP701
CHILLER PLANT SCHEDULES
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
CDWP-3 CHILLER PLANT CONDENSER WATER VERTICAL IN-LINE WATER 1650 85 8.63 85 1 46 50 3 460 1200 CONSTANT ARMSTRONG 4300
CDWP-2 CHILLER PLANT CONDENSER WATER VERTICAL IN-LINE WATER 1650 85 8.63 85 1 46 50 3 460 1200 CONSTANT ARMSTRONG 4300
CDWP-1 CHILLER PLANT CONDENSER WATER VERTICAL IN-LINE WATER 1650 85 8.63 85 1 46 50 3 460 1200 CONSTANT ARMSTRONG 4300
SCHWP-3 CHILLER PLANT CHILLED WATER VERTICAL IN-LINE WATER 1200 125 10.74 42 1 58 60 3 460 1800 VARIABLE ARMSTRONG 4300
SCHWP-2 CHILLER PLANT CHILLED WATER VERTICAL IN-LINE WATER 1200 125 10.74 42 1 58 60 3 460 1800 VARIABLE ARMSTRONG 4300
SCHWP-1 CHILLER PLANT CHILLED WATER VERTICAL IN-LINE WATER 1200 125 10.74 42 1 58 60 3 460 1800 VARIABLE ARMSTRONG 4300
PCHWP-3 CHILLER PLANT CHILLED WATER VERTICAL IN-LINE WATER 1200 40 13.49 54 1 58 20 3 460 1800 VARIABLE ARMSTRONG 4300
PCHWP-2 CHILLER PLANT CHILLED WATER VERTICAL IN-LINE WATER 1200 40 13.49 54 1 58 20 3 460 1800 VARIABLE ARMSTRONG 4300
PCHWP-1 CHILLER PLANT CHILLED WATER VERTICAL IN-LINE WATER 1200 40 13.49 54 1 58 20 3 460 1800 VARIABLE ARMSTRONG 4300
GPM FT FT °F HP
FLUID
FLOW HEAD NPSH
REQUIRED TEMPERATURE
SP GR
NOMINAL
POWER PHASE VOLT MAX RPM SPEED
CONTROL REMARKS
MARK LOCATION SYSTEM AND/OR
SERVICE TYPE
CIRCULATING FLUID
MIN % EFF
ELECTRICAL MOTOR
BASIS OF
DESIGN
PUMP SCHEDULE
3. BOTH THE EVAPORATOR AND CONDENSER SHALL BE DESIGNED FOR VARIABLE FLOW.
2. "MAX kW/TON" AND "MIN COP" SPECIFIED ARE AT DESIGN CONDITION INDICATED.
1. SEE SPECIFICATIONS FOR OTHER APPLICABLE ENGINEERING REQUIREMENTS.
NOTES
CH-3 CHILLER PLANT CENTRIFUGAL 500 R-513A 0.63 5.6 0.65 1000 54 42 8.06 0.00010 1500 85 94.3 12.7 0.00025 493 3 460 VARIABLE YORK YK SINGLE POINT POWER
CONNECTION
CH-2 CHILLER PLANT CENTRIFUGAL 500 R-513A 0.63 5.6 0.65 1000 54 42 8.06 0.00010 1500 85 94.3 12.7 0.00025 493 3 460 VARIABLE YORK YK SINGLE POINT POWER
CONNECTION
CH-1 CHILLER PLANT CENTRIFUGAL 500 R-513A 0.63 5.6 0.65 1000 54 42 8.06 0.00010 1500 85 94.3 12.7 0.00025 493 3 460 VARIABLE YORK YK SINGLE POINT POWER
CONNECTION
TONS GPM °F °F FT GPM °F °F FT MCA
CAPACITY
REFRIGERANT
FLOW EWT LWT MAX... FOULING
FACTOR
FLOW EWT LWT MAX... FOULING
FACTOR
POWER
PHASE VOLT SPEED
CONTROL
MARK LOCATION TYPE
CAPACITY
MAX
kW/TON
MIN
COP
MAX IPLV
(kW/TON)
EVAPORATOR CONDENSER ELECTRICAL
BASIS OF
DESIGN REMARKS
WATER COOLED CHILLER SCHEDULE
2. BASIS OF DESIGN IS MARLEY NC8410
1. PROVIDE WITH FACTORY INSTALLED BASIN SWEEPER ASSEMBLY
NOTES
CT - 3 ROOF CONDENSER
WATER CROSS FLOW 500 1 1500 20 81.9 95 85 1 40 3 460 1200 VARIABLE ELECTRIC
IMMERSION 40000 40500 22 MARLEY
NC8410
STAINLESS STEEL
CONSTRUCTION
CT - 2 ROOF CONDENSER
WATER CROSS FLOW 500 1 1500 20 81.9 95 85 1 40 3 460 1200 VARIABLE ELECTRIC
IMMERSION 40000 40500 22 MARLEY
NC8410
STAINLESS STEEL
CONSTRUCTION
CT - 1 ROOF CONDENSER
WATER CROSS FLOW 500 1 1500 20 81.9 95 85 1 40 3 460 1200 VARIABLE ELECTRIC
IMMERSION 40000 40500 22 MARLEY
NC8410
STAINLESS STEEL
CONSTRUCTION
TONS GPM FT °F °F °F HP BTUH LB FT
AMBIE... EWT LWT
NO
POWER
PHASE VOLT RPM SPEED
CONTROL TYPE
CAPACITYMARK LOCATION SERVICE TOWER TYPE
TOTAL
NOMINAL
CAPACITY # CELLS
FLOW RATE
EACH CELL WPD
TEMPERATURE FAN MOTOR SUMP HEATER MAX
OPERATING
WEIGHT
MAX HEIGHT W/
HANDRAIL BASIS OF
DESIGN REMARKS
COOLING TOWER SCHEDULE
CHWXT-1 NEW PLANT CHILLED
WATER BLADDER 20000 42 54 40 150 80 70 100 100 1-1/2 0.75 WESSELS
NLA-400 BASIS OF DESIGN: WESSELS NLA-400
GAL °F °F PSIG PSIG PSIG PSIG GAL GAL IN IN
MIN MAX RELIEF
VALVE
AT
TANK
MARK LOCATION
SYSTEM
AND/OR
SERVICE
TYPE
APPROX
SYSTEM
VOLUME
SYSTEM
TEMPERATURE RANGE INITIAL PRESSURE IN
TANK
MAX OPERATING
PRESSURE
FILL PRESSURE
AT TANK MIN VOLUME
TANK
MIN BLADDER
VOLUME
PIPE SIZE TO
TANK
MAKE-UP
WATER FILL
SIZE BASIS OF
DESIGN REMARKS
EXPANSION TANK SCHEDULE
AS-1 NEW PLANT CHILLED
WATER
AIR AND DIRT
SEPARATOR 12 2090 4 YES SPIROTHERM
SPIROVENT VDT 1200 BASIS OF DESIGN: SPIROTHERM SPIROVENT VDT1200
IN GPM FT
SIZE IN FLOW WPD BUILT-IN
STRAINER
REQ'D
BASIS OF DESIGN
MARK LOCATION
SYSTEM
AND/OR
SERVICE
TYPE
AIR SEPARATOR
REMARKS
AIR SEPARATOR SCHEDULE
CDWF-1 OPERATING FLOOR CDW SCREEN 663
INLET: 4" FLANGED
OUTLET: 6" FLANGED
BACKWASH: 2" FLANGED
SYSTEM WATER 50 150 140 20 460 3 60 NO YES 2,000 54" x 28" x 54" STRUCTURAL STEEL AMIAD FILTER SKID
6" SAF 6000
FLOW
(GPM) CONNECTIONS HP VOLTS PH HZ VFD SINGLE POINT
DISCONNECT
DESIGNATION LOCATION SERVICE TYPE
SYSTEM
BACKWASH
SUPPLY
FILTRATION
CAPABILITY
(MICRON)
MAXIMUM
PRESSURE
(PSIG)
MAXIMUM
TEMPERATURE
(DEG F)
ELECTRICAL OPERATING
WEIGHT
(LBS.)
DIMENSIONS
(LENGTH x WIDTH x HEIGHT)
CONCRETE PAD OR
STRUCTURAL STEEL BASIS OF DESIGN REMARKS
MEDIA FILTER SCHEDULE
FE-56001 CHILLER PLANT MAKEUP 60 150 10-50 1 .5 INSERTION STYLE, DUAL TURBINE
FE-53002 CHILLER PLANT BLOWDOWN 85 150 15-150 1 .5 INSERTION STYLE, DUAL TURBINE
FE-52005 CHILLER PLANT CHWS
DISTRIBUTION 42 150 715 - 4500 1 .5 INSERTION STYLE, DUAL TURBINE
FE-51010 CHILLER PLANT DECOUPLER 42 150 70-715 1 .5 INSERTION STYLE, ELECTROMAGNETIC
FE-51005 CHILLER PLANT CHWR
DISTRIBUTION 54 150 715 - 4500 1 .5 INSERTION STYLE, DUAL TURBINE
FE-44001 CHILLER PLANT HX-1 CDW 85 150 715 - 1800 1 .5 INSERTION STYLE, DUAL TURBINE
FE-42004 CHILLER PLANT HX-1 CHW 42 150 500 - 1500 1 .5 INSERTION STYLE, DUAL TURBINE
FE-33001 CHILLER PLANT CH-3 CDW 95 150 1000 - 2000 1 .5 INSERTION STYLE, DUAL TURBINE
FE-32004 CHILLER PLANT CH-3 CHW 42 150 715 - 1800 1 .5 INSERTION STYLE, DUAL TURBINE
FE-23001 CHILLER PLANT CH-2 CDW 95 150 1000 - 2000 1 .5 INSERTION STYLE, DUAL TURBINE
FE-22004 CHILLER PLANT CH-2 CHW 42 150 715 - 1800 1 .5 INSERTION STYLE, DUAL TURBINE
FE-13001 CHILLER PLANT CH-1 CDW 95 150 1000 - 2000 1 .5 INSERTION STYLE, DUAL TURBINE
FE-12004 CHILLER PLANT CH-1 CHW 42 150 715 - 1800 1 .5 INSERTION STYLE, DUAL TURBINE
°F PSIG GPM PSIG
MARK LOCATION
SYSTEM
AND/OR
SERVICE
FLUID TEMP LINE
PRESSURE
ACCURATE
FLOW RANGE
MIN
ACCURACY [%]
DIFF PRESS AT
MAX FLOW
REMARKS
WATER FLOWMETER SCHEDULE
HX-1 CHILLER PLANT FREE COOLING CHILLED
WATER PLATE & FRAME 40 800 54 42 11 1200 40 48 23 BELL & GOSSETT
GPX AP62 -----
GPM °F °F FT GPM °F °F FT
FLOW EWT LWT WPD FLOW EWT LWT WPDMARK LOCATION
AREA
AND/OR
BLDG
SERVED
SYSTEM
AND/OR
SERVICE
TYPE OPERATING
PRESSURE PSIG
HOT SIDE COLD SIDE
BASIS OF DESIGN REMARKS
LIQUID TO LIQUID HEAT EXCHANGER SCHEDULE
Cv VALUES BASED ON 60 DEGREES OPEN AT DESIGN FLOW CONDITIONS
NOTES
FCV-91004 CHILLER PLANT CFT-4 BY CHEMICALS CONTRACTOR
FCV-84002 CHILLER PLANT
ROOF CT-3 CDWS 510 6 2000 1500 1200 85 150 70 FAIL IN PLACE BRAY
McCANNALOK
FCV-83003 CHILLER PLANT
ROOF CT-3 CDWR 510 6 2000 1500 1200 95 150 70 FAIL IN PLACE BRAY
McCANNALOK
FCV-74002 CHILLER PLANT
ROOF CT-2 CDWS 510 6 2000 1500 1200 85 150 70 FAIL IN PLACE BRAY
McCANNALOK
FCV-73003 CHILLER PLANT
ROOF CT-2 CDWR 510 6 2000 1500 1200 95 150 70 FAIL IN PLACE BRAY
McCANNALOK
FCV-64002 CHILLER PLANT
ROOF CT-1 CDWS 510 6 2000 1500 1200 85 150 70 FAIL IN PLACE BRAY
McCANNALOK
FCV-63003 CHILLER PLANT
ROOF CT-1 CDWR 510 6 2000 1500 1200 95 150 70 FAIL IN PLACE BRAY
McCANNALOK
LCV-56002 CHILLER PLANT
DCW MAKEUP
TO COOLING
TOWERS
20 2 80 60 40 60 150 70 FAIL IN PLACE BRAY
V-CONTROL
FCV-54003 CHILLER PLANT CDW BYPASS 510 6 2000 1500 1200 55 150 70 FAIL IN PLACE BRAY McCANNALOK
FCV-53001 CHILLER PLANT CDWR HEADER
DRAIN 20 2 80 60 40 95 150 70 FAIL IN PLACE BRAY
V-CONTROL
FCV-44001 CHILLER PLANT HX-1 CDW 380 6 1600 1200 700 85 150 70 FAIL IN PLACE BRAY McCANNALOK
FCV-42003 CHILLER PLANT HX-1 CHW 250 6 1200 800 500 42 150 70 FAIL IN PLACE BRAY
McCANNALOK
FCV-34001 CHILLER PLANT CH-3 CDW 475 10 1875 1500 1300 85 150 70 FAIL IN PLACE BRAY McCANNALOK
FCV-32003 CHILLER PLANT CH-3 CHW 315 8 1500 1000 715 42 150 70 FAIL IN PLACE BRAY McCANNALOK
FCV-24001 CHILLER PLANT CH-2 CDW 475 10 1875 1500 1300 85 150 70 FAIL IN PLACE BRAY McCANNALOK
FCV-22003 CHILLER PLANT CH-2 CHW 315 8 1500 1000 715 42 150 70 FAIL IN PLACE BRAY McCANNALOK
FCV-14001 CHILLER PLANT CH-1 CDW 475 10 1875 1500 1300 85 150 70 FAIL IN PLACE BRAY McCANNALOK
FCV-12003 CHILLER PLANT CH-1 CHW 315 8 1500 1000 715 42 150 70 FAIL IN PLACE BRAY McCANNALOK
GPM GPM GPM °F PSIG PSIG
MARK LOCATION
SYSTEM
AND/OR
SERVICE
MINIMUM FLOW
COEFFICIENT [CV]
VALVE SIZE
INCHES
MAXIMUM
FLOW
DESIGN
FLOW
MINIIMUM
FLOW FLUID TEMP MAX INLET
PRESS
MIN INLET
PRESS FAILSAFE
POSITION
BASIS OF
DESIGN REMARKS
FLOW CONTROL VALVE SCHEDULE
CAMPUS LAN/WAN
REFER TO TECHNOLOGY DRAWINGS
FIELD CONTROL PANEL CP-1
CONTROL ROOM
OPERATOR
WORKSTATION
(OWS-1)
UPS
REFRIGERANT LEAK
DETECTION SYSTEM
ETHERNET
DATA DROP
VAV-1
CONTROLLER
VAV-2
CONTROLLER
VAV-3
CONTROLLER
BUILDING 42
AHU-2
CONTROLLER
AHU-1
CONTROLLER
CH-1
CONTROLLER
CH-2
CONTROLLER
CH-3
CONTROLLER
CHILLER PLANT
BACNET IP (TYP)
BACNET MS/TP (TYP)
SPLIT
SYSTEM
SPLIT
SYSTEM
FAN
EXHAUST #2
FAN
EXHAUST #3
FAN
EXHAUST #1
PCHWP-1
VFD
PCHWP-2
VFD
PCHWP-3
VFD
SCHWP-1
VFD
SCHWP-2
VFD
SCHWP-3
VFD
CT-1 VFD
CT-2 VFD
CT-3 VFD
CDW SYSTEM
WATER
TREATMENT
CONTROLLER
CDWC-1
ETHERNET
DATA DROP
ETHERNET
DATA DROP
ETHERNET
DATA DROP
ETHERNET
DATA DROP
ETHERNET
DATA DROP
EXISTING ENGINEERING CONTROL CENTER
JOHNSON METASYS
UPS
ALARM
PRINTER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP801
CONTROLS SYSTEM
ARCHITECTURE
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CHILLED WATER SEQUENCE OF OPERATIONS: CONDENSER WATER SEQUENCE OF OPERATIONS:
HEAT EXCHANGER SEQUENCE OF OPERATIONS:
A.GENERAL
1. THE CHILLED WATER SYSTEM CONSISTS OF THREE PRIMARY PUMPS, THREE CHILLERS, AND THREE SECONDARY PUMPS TO DELIVER CHILLED WATER TO THE CAMPUS.
2. THE DDC CONTROLS SHALL OPERATE THE CHILLED WATER SYSTEM BY STARTING AND STOPPING THE CHILLED WATER AND CONDENSER WATER PUMPS, AND BY
ENABLING/DISABLING THE CHILLERS.
B. PRIMARY PUMP STAGING
1. THE PRIMARY PUMPING SYSTEM CONSISTS OF THREE PUMPS (CHWP-1, CHWP-2, AND CHWP-3) WHICH SHALL BE DESIGNATED AS LEAD-1, LEAD-2, AND STANDBY.
2. THE CONTROL SYSTEM SHALL ALTERNATE LEAD AND STANDBY STATUS EACH MONTH AND INCLUDE TOTALIZING RUN TIMERS FOR EACH PUMP.
3. PRIOR TO BRINGING A CHILLER ONLINE, THE CONTROL SYSTEM SHALL START THE LEAD PUMP. THE VFD FOR THE LEAD PUMP SHALL MODULATE TO MAINTAIN A FLOW RATE
THROUGH THE PRIMARY LOOP 10% HIGHER THAN THE FLOW RATE OF THE SECONDARY LOOP, BUT NO LOWER THAN THE MINIMUM FLOW RATE OF THE CHILLER.
4. THE SYSTEM SHALL AUTOMATICALLY START THE LEAD-2 PUMP WHEN A SECOND CHILLER IS BROUGHT ONLINE. WHEN TWO CHILLERS AND TWO PUMPS ARE IN OPERATION, THE
PUMPS SHALL BE SET TO THE SAME FLOW RATE AND PUMP VFD'S SHALL MODULATE THEIR SPEED TO MAINTAIN A FLOW THROUGH THE PRIMARY LOOP 10% HIGHER THAN THE FLOW RATE OF THE SECONDARY LOOP, BUT NO LOWER THAN THE SUM OF THE MINIMUM FLOW RATES OF ALL ACTIVE CHILLERS.
5. THE SYSTEM SHALL AUTOMATICALLY START THE STANDBY PUMP IF ONE OF THE OPERATING PUMPS FAULTS WHILE RUNNING.
C.SECONDARY PUMP STAGING
1. THE SECONDARY PUMPING SYSTEM CONSISTS OF THREE PUMPS (SCHWP-1, SCHWP-2, AND SCHWP-3) WHICH SHALL BE DESIGNATED AS LEAD-1, LEAD-2, AND STANDBY.
2. THE CONTROL SYSTEM SHALL ALTERNATE LEAD AND STANDBY STATUS ON A WEEKLY BASIS AND INCLUDE TOTALIZING RUN TIMERS FOR EACH PUMP TO MAINTAIN EQUAL RUN
TIME BETWEEN EACH PUMP.
3. ANYTIME A CHILLER IS IN OPERATION, THE LEAD-1 PUMP SHALL RUN CONTINUOUSLY. THE VFD FOR THE LEAD PUMP SHALL MODULATE TO MAINTAIN A DIFFERENTIAL PRESSURE
SETPOINT OF 11 PSIG (ADJ) IN THE PENTHOUSES OF BUILDINGS 2, 42, AND 37 USING EXISTING DIFFERENTIAL PRESSURE TRANSMITTERS. IF COMMUNICATION WITH THE REMOTE DP SENSOR IS LOST, CONTROL SHALL SWITCH TO THE PLANT DP TRANSMITTER WITH A SETPOINT TO BE DETERMINED DURING COMMISSIONING.
4. THE SYSTEM SHALL AUTOMATICALLY START THE LEAD-2 PUMP IF A SECOND CHILLER IS BROUGHT ONLINE. WHEN TWO PUMPS ARE RUNNING, THEY SHALL BE SET TO THE SAME SPEED AND MODULATE TOGETHER. THE PUMP SHALL BE STOPPED IF THE ASSOCIATED CHILLER IS DISABLED.
5. THE SYSTEM SHALL AUTOMATICALLY START THE STANDBY PUMP IF ONE OF THE OPERATING PUMPS FAULTS WHILE RUNNING.
D. CHILLER STAGING
1. THE THREE CHILLERS SHALL BE DESIGNATED AS LEAD-1, LEAD-2, AND STANDBY.
2. THE CONTROL SYSTEM SHALL ALTERNATE LEAD AND STANDBY STATUS EACH MONTH AND INCLUDE TOTALIZING RUN TIMERS FOR EACH CHILLER.
3. OPERATOR SHALL HAVE THE CAPABILITY TO SET A CHILLER OUT OF SERVICE, WHICH DISABLES CONTROL SYSTEM START AND STOP COMMAND AND ANY AUTO SEQUENCING.
4. WHEN A CHILLER IS STARTED, BOTH FLOW CONTROL VALVES SHALL RAMP OPEN TO THE OPERATOR PREPROGRAMMED MAXIMUM POSITION. WHEN A CHILLER IS STOPPED, BOTH
FLOW CONTROL VALVES SHALL RAMP CLOSED.
5. AN ADDITIONAL CHILLER SHALL BE ENABLED WHEN EITHER OF THE FOLLOWING CONDITIONS IS MET:
i. THE FLOW THROUGH THE SECONDARY LOOP EXCEEDS A SETPOINT EQUIVALENT TO 95% (ADJ) OF THE MAXIMUM CHILLER CAPACITY FOR MORE THAN 10 MINUTES (ADJ).
ii. CHILLER AMPERAGE EXCEEDS 95% (ADJ) OF THE CHILLER'S RATED FLA FOR MORE THAN 10 MINUTES (ADJ).
6. THE SECOND CHILLER SHALL BE DISABLED WHEN EITHER OF THE FOLLOWING CONDITIONS IS MET:
i. THE FLOW THROUGH THE SECONDARY LOOP FALLS BELOW A SETPOINT EQUIVALENT TO 40% (ADJ) OF THE MAXIMUM CHILLER CAPACITY FOR MORE THAN 10 MINUTES
(ADJ).
ii. CHILLER AMPERAGE FALLS BELOW 55% (ADJ) OF THE CHILLER'S RATED FLA FOR MORE THAN 10 MINUTES (ADJ).
7. THE SYSTEM SHALL AUTOMATICALLY START THE NEXT AVAILABLE CHILLER IF ONE FAILS TO START OR FAULTS WHILE RUNNING.
E. ALARMING
1. LOW FLOW - SYSTEM RUNNING WITH NO MEASURED FLOW.
2. VFD FAULT.
3. PRIMARY PUMP SYSTEM OPERATING OUTSIDE OF ALLOWABLE FLOW RANGE.
4. SECONDARY PUMP SYSTEM OPERATING OUTSIDE OF ALLOWABLE FLOW RANGE.
5. LOW PRESSURE AT REMOTE DP SENSOR.
6. DP SENSOR FAULT.
7. DISTRIBUTION TEMPERATURE DIFFERENTIAL OUTSIDE OF ALLOWABLE RANGE.
A. GENERAL
1. THE CONDENSER WATER SYSTEM CONSISTS OF THREE CONDENSER WATER PUMPS AND THREE COOLING TOWERS.
B. CONDENSER WATER PUMP STAGING
1. THE THREE CONDENSER WATER PUMPS (CDWP-1, CDWP-2, AND CDWP-3) SHALL BE DESIGNATED AS LEAD-1, LEAD-2, AND STANDBY.
2. THE CONTROL SYSTEM SHALL ALTERNATE LEAD AND STANDBY STATUS EACH MONTH AND INCLUDE TOTALIZING RUN TIMERS FOR EACH PUMP.
3. OPERATOR SHALL HAVE THE CAPABILITY TO SET PUMP OUT OF SERVICE, WHICH DISABLES CONTROL SYSTEM START AND STOP COMMAND AND ANY AUTO CONTROL
SEQUENCING.
4. ANYTIME A CHILLER IS IN OPERATION, THE LEAD-1 PUMP SHALL RUN CONTINUOUSLY.
5. THE SYSTEM SHALL AUTOMATICALLY START THE LEAD-2 PUMP IF A SECOND CHILLER IS BROUGHT ONLINE. THE PUMP SHALL BE STOPPED IF THE ASSOCIATED
CHILLER IS DISABLED.
6. THE SYSTEM SHALL AUTOMATICALLY START THE STANDBY PUMP IF ONE OF THE OPERATING PUMPS FAULTS WHILE RUNNING.
C. COOLING TOWER STAGING
1. THE CONDENSER WATER SYSTEM CONSISTS OF THREE COOLING TOWERS (CT-1, CT-2, AND CT-3) WHICH SHALL BE DESIGNATED AS LEAD-1, LEAD-2, AND STANDBY.
2. OPERATOR SHALL HAVE THE CAPABILITY TO SET TOWER OUT OF SERVICE, WHICH DISABLES CONTROL SYSTEM START AND STOP COMMAND AND ANY AUTO CONTROL
SEQUENCING.
3. THE CONTROL SYSTEM SHALL ALTERNATE LEAD AND STANDBY STATUS EACH MONTH AND INCLUDE TOTALIZING RUN TIMERS FOR EACH TOWER FAN.
4. WHEN A CHILLER IS ENABLED, THE SYSTEM SHALL AUTOMATICALLY START THE LEAD-1 AND LEAD-2 TOWERS. THE STANDBY TOWER SHALL BE STARTED WHEN A SECOND
CHILLER IS BROUGHT ONLINE.
5. FAN SPEED SHALL BE MODULATED TO MAINTAIN CONDENSER WATER OUTLET TEMPERATURE AT SETPOINT. SETPOINT SHALL BE RESET BASED ON THE OUTSIDE AIR DRY
BULB TEMPERATURE PER THE FOLLOWING SCHEDULE (ADJ):
OUTSIDE DB TEMP TOWER WATER TEMP
76F OR HIGHER 85F
72F-76F 80F 67F-72F 75F
BELOW 67 70F
6. WHEN A TOWER IS STARTED, THE INLET AND OUTLET VALVES SHALL BE COMMANDED FULLY OPEN. WHEN TOWER IS STOPPED, THE INLET AND OUTLET VALVES SHALL BE
COMMANDED FULLY CLOSED.
7. THE SYSTEM SHALL AUTOMATICALLY START THE STANDBY COOLING TOWER IF ONE OF THE OPERATING COOLING TOWERS FAULTS WHILE RUNNING.
D. ALARMING
1. LOW CONDENSER WATER OUTLET TEMPERATURE - TEMPERATURE IS LESS THAN OPERATOR ENTERED SETPOINT BY MORE THAN 5 DEGREES F
2. FAN OR PUMP SPEED DEVIATION
3. VALVE POSITION DEVIATION
4. LOW FLOW - SYSTEM RUNNING WITH NO MEASURED FLOW
5. TOWER FAN FAULT STATUS
6. LOW TOWER WATER LEVEL
7. FAN OR PUMP MOTOR FAILED TO RUN
8. HIGH FAN VIBRATION
9. LOW GEARBOX OIL
10. HIGH GEARBOX OIL TEMPERATURE
A. HEAT EXCHANGER STAGING
1. WHEN OUTSIDE AIR DRY BULB TEMPERATURE DROPS BELOW 40F (ADJ), THE CHILLERS SHALL BE DISABLED.
2. LEAD-1 PRIMARY PUMP SHALL BE COMMANDED ON AND VALVE FCV-41002 SHALL BE MODULATED OPEN TO DIRECT PRIMARY CHILLED WATER FLOW THROUGH HX-1. PRIMARY
PUMP SPEED SHALL BE MODULATED TO MAINTAIN FLOW THROUGH HX-1 AT A RATE 10% HIGHER THAN THE SECONDARY LOOP.
3. LEAD-1 SECONDARY PUMP SHALL BE ENABLED AND ITS SPEED MODULATED TO MAINTAIN DIFFERENTIAL PRESSURE SETPOINT IN THE DISTRIBUTION SYSTEM.
4. LEAD-1 CONDENSER PUMP SHALL BE COMMANDED ON AND VALVE FVC-44001 SHALL BE MODULATED OPEN TO DIRECT CONDENSER WATER FLOW THROUGH HX-1.
5. LEAD-1 AND LEAD-2 COOLING TOWER FAN SPEED SHALL BE MODULATED TO MAINTAIN 45F (ADJ) CHILLED WATER TEMPERATURE LEAVING HX-1. WHEN TWO OPERATING TOWER
FANS SLOW TO LESS THAN 40% OF FULL SPEED, ONE TOWER SHALL BE DISABLED. CONDENSER WATER SUPPLY TEMPERATURE SHALL NOT BE ALLOWED TO DROP BELOW 36F
(ADJ).
6. WHEN OUTDOOR TEMPERATURE RISE AND CHILLED WATER TEMPERATURE LEAVING HX-1 EXCEEDS 45F FOR 30 MINUTES, CHILLERS SHALL BE STAGED ON PER NORMAL
SEQUENCE OF OPERATIONS.
11. HEAT TRACE FAULT STATUS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP802
CHILLER PLANT SEQUENCE OF
OPERATION
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Date:Revisions:No.
C :\U se rs
\k ok en ni c\ Ap pD at a\ Lo ca l\A ut od es k\
R ev it\ Au to de sk R ev it
\C ol la bo ra tio nC ac he \W
8D H
LW
H
PR
G
5V \5 d1 ac
3-
2a e8
-4
5-b5
5f -c ff8 3c
3d
3a \4
4-fd fa
-4 8c e- 9e bd -4
4b b3 c9 ab da 9.
rv t
5/ 6/
:0
7:
P M
MP803
CHILLER PLANT POINTS LIST
05/07/2026 DM NK
CONSTRUCT NEW CAMPUS
CHILLER PLANT
657A5-21-401
2401 W MAIN ST, MARION IL 62959
CONTRACT
DOCUMENTS 49
MARION VA
MEDICAL
CENTER Approved: Owner
PDIT 51216 DIFFERENTIAL PRESSURE INDICATING TRANSMITTERCHWR DIFFERENTIAL PRESSURE INDICATION, PCHWP-2 CP-1 N/A N/A AIL 0-20 PSIG 0-20 PSIG 4-20mA, PROCESS MP501 CONTRACTOR CONTRACT DOCUMENTS PDG 51215 DIFFERENTIAL PRESSURE GAUGE CHWR DIFFERENTIAL PRESSURE INDICATION, PCHWP-2 N/A N/A N/A N/A N/A 0-20 PSIG PROCESS MP501 CONTRACTOR CONTRACT DOCUMENTS JI 51214 POWER INDICATION PUMP MOTOR POWER OUTPUT, PCHWP-2 CP-1 N/A N/A AIL 0-20 kW 0-20 kW 4-20mA MP501 CONTRACTOR CONTRACT DOCUMENTS YXR 51214 RUN COMMAND PUMP MOTOR RUN COMMAND, PCHWP-2 CP-1 STOP START DOL N/A STOP / START 120V MP501 CONTRACTOR CONTRACT DOCUMENTS YSR 51214 RUNNING CONTACT PUMP MOTOR RUNNING CONTACT, PCHWP-2 CP-1 NOT POWERED POWERED DIL N/A NOT POWERED / POWERED 120V MP501 CONTRACTOR CONTRACT DOCUMENTS HSR 51214 HAND SWITCH REMOTE PUMP HAND SWITCH REMOTE MODE, PCHWP-2 CP-1 HAND NORMAL DOL N/A HAND / NORMAL 120V MP501 CONTRACTOR CONTRACT DOCUMENTS YA 51214 FAULT PUMP FAULT, PCHWP-2 CP-1 FAULT NORMAL DIL N/A FAULT / NORMAL 120V MP501 CONTRACTOR CONTRACT DOCUMENTS SCX 51213 MOTOR SPEED CONTROL MOTOR SPEED CONTROL, PCHWP-2 CP-1 N/A N/A AOL 0-1750 RPM 0-1750 RPM 4-20mA MP501 CONTRACTOR CONTRACT DOCUMENTS ST 51213 SPEED CONTROL FEEDBACK MOTOR SPEED CONTROL FEEDBACK, PCHWP-2 CP-1 N/A N/A AIL 0-1750 RPM 0-1750 RPM 4-20mA MP501…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .