631-21-011 Bid Drawings_Part3.pdf
PDF 11 MB Posted
- Attached to
- Z2DZ-- 631-21-011 Modernize, Replace, or Install Elevators in 8 Buildings Federal contract opportunity
- Solicitation number
- 36C24123B0011
About this file
This document outlines a federal contract opportunity to modernize, replace, or install elevators in eight buildings for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. Solicitation number 36C24123B0011 requests bids to replace elevators at various VA medical center locations, with a response due date of April 30, 2022. The opportunity type is listed as a solicitation. The related file provides bid drawings in PDF format with a file size of 11MB to assist contractors in preparing responses for the elevator modernization and installation work across eight VA buildings. Relevant details include the federal agency involved, general scope of work required, response deadline, and file to aid bidding on the opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24123B0011 0002.docx | DOCX document | |
| 36C24123B0011 0001.docx | DOCX document | |
| 631-21-011 Modernize Elevators RFI Responses 20230802.docx | DOCX document | |
| S02_WD MA 20230003 07 28 2023.pdf | ||
| S04_Site Visit Sign-In Sheet_631-21-011.pdf | ||
| VA Leeds Building 25 Geo Report 05-17-22.pdf | ||
| 631-21-011 Bid Drawings_Part2.pdf | ||
| 631-21-011-Bid Specifications.pdf | ||
| 36C24123B0011.docx | DOCX document | |
| S02_WD MA 20230003 06162023.pdf | ||
| 631-21-011 Bid Drawings_Part1.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
2:
:4
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v_ bn ee dh am
8H
L.
rv t
W-G-002
MEADOW (BUILDING 2) EXISTING
PHOTOS
2 4OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
DocuSign Envelope ID: 541ADAB3-2504-4B07-BAA0-A19CCA635BA3
6/28/2023
DN
UP
NEW WALL
NEW DOOR
NEW WINDOW
NEW WORK LEGEND
ELEVATOR
EQUIP
RM
UP
W-A-400 _____ 3
W-A-400
ELEVATOR
PIT
P2
FD
TC
102A
DN
W-A-400 _____ 3
W-A-400
ELEVATOR
P2
HK
CORRIDOR
ELEVATOR
P2
EXISTING WALL TO REMAIN
EXISTING DOOR TO REMAIN
TEMPORARY DOOR
TEMPORARY WALL
DEMOLISH WALL
DEMOLISH DOOR
DEMOLISH WINDOW
EXISTING WINDOW TO REMAIN
DEMOLITION LEGEND
TEMPORARY WALL
TEMPORARY DOOR
TC
102A
ELEVATOR
P2
CORRIDOR
ROOM
HK
203ROOM
ROOM
ELEVATOR
P2
ELEVATOR
EQUIP
RM
ELEVATOR
PIT
P2
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
2:
:2
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v_ bn ee dh am
8H
L.
rv t
W-A-100
MEADOW (BUILDING 2) ELEVATOR
FLOOR PLANS & DETAILS
3 4OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
NORTH
0 4 8 16
1 NEW ELEVATOR CAB FINISHES.
2 NEW ELEVATOR PANEL/CONTROLS.
3 NEW ELEVATOR DOOR.
4 PROVIDE NEW CODE COMPLIANT PIT LADDER. SEE
SHEET G-006 FOR PIT LADDER DETAILS
5 CARD READER WILL BE PLACED ON THE DOOR
FRAME.
6 NEW 90 MIN RATED DOOR AND FRAME, REFER TO
DOOR SCHEDULE FOR MORE INFORMATION.
7 PROVIDE WALL BRACKET AND SNOW HOOD COVER
FOR NEW MINI-SPLIT CONDENSING UNIT. SEE MECH.
DWGS FOR MORE INFORMATION
8 WALL MOUNTED MINI-SPLIT UNIT AND CONDENSATE
PUMP. DO NOT PLACE DIRECTLY OVER ANY
PROPOSED OR EXIST. ELEVATOR EQUIPMENT THAT
IS IN THE ROOM
9 GC TO VERIFY IF EXISTING FIRE EXTINGUISHER IS
STILL CODE COMPLIANT. IF IT IS NOT CODE
COMPLIANT, THE GC WILL REPLACE THE EXISTING
FIRE EXTINGUISHER WITH A NEW CODE COMPLIANT
EXTINGUISHER AND BRACKET.
10 NEW CELLAR DOOR ABOVE
11 NEW CELLAR DOOR, REFER TO DOOR SCHEDULE
FOR MORE INFORMATION.
12 PROVIDE INTERIOR CONTROL PANEL.
13 PROVIDE NEW ELEVATOR HOISTWAY DOOR.
14 OIL INTERCEPTOR. SEE DETAIL 3/PF501 FOR MORE
INFORMATION.
15 ELEVATOR SUMP PUMP. SEE DETAIL 3/PF501 FOR
MORE INFORMATION.
Scale: 1/4" = 1'-0"
ELEVATOR PIT & ELEV. EQUIP. ROOM NEW WORK FLOOR
PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR NEW WORK PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR NEW WORK PLAN
NORTH
0 2 4 8
NORTH
0 2 4 8
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
NORTH
0 4 8 16
NORTH
0 2 4 8
NORTH
0 2 4 8
Scale: 1/4" = 1'-0"
FIRST FLOOR DEMOLITION FLOOR PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR DEMOLITION PLAN
Scale: 1/4" = 1'-0"
ELEVATOR PIT & ELEV. EQUIP. ROOM DEMOLITION PLAN
1 DEMOLISH EXISTING ELEVATOR CAB INTERIOR
FINISHES
2 DEMOLISH EXISTING ELEVATOR PANEL/CONTROLS
3 DEMOLISH EXISTING ELEVATOR CAB DOOR
4 DEMOLISH EXISTING PIT LADDER
5 DEMOLISH EXISTING DOOR AND HM FRAME
6 REPAIR AND REPAINT STAIRS AND STAIR WALLS
7 REPLACE EXISTING METAL CELLAR DOORS
8 REMOVE AND STORE EXISTING METAL FLOOD STOP
BRACING. REPLACE AFTER FLOOR REPAINTING.
9 DEMOLISH EXISTING ELEVATOR HOISTWAY DOOR
10 TRENCH OUT ELEVATOR PIT FOR NEW EQUIPMENT.
SEE PLUMBING DWGS FOR MORE INFORMATION.
A. SEE SHEET G-005 FOR GENERAL NOTES.
B. SEE SHEET W-A-400 FOR ELEVATOR P1 CAB
PLANS AND INTERIOR ELEVATIONS.
C. PATCH AND REPAIR ALL HOLES TO BE SEALED
WITH FIRESTOPPING.
D. PATCH, REPAIR, AND PAINT ALL GYPSUM BOARD
DAMAGED OR ALTERED DUE TO NEW ELEVATOR
WORK. INCLUDING BUT NOT LIMITED TO
REPLACING JAMB WORK AND CONTROL DEVICE
AND LANTERN CHANGE OUT WORK.
E. SEE SPECIFICATION SECTION 14 20 10 FOR
EQUIPMENT SCHEDULES AND ADDITIONAL
INFORMATION.
F. CEILING CONTRACTOR TO MEASURE EACH
CEILING AREA AND ESTABLISH A CEILING LAYOUT
TO BALANCE BORDER WIDTHS AT OPPOSITE
EDGES OF EACH ROOM. AVOID USE OF LESS-
THAN 6" TILES.
G. EXIST. METAL FLOOR FLOOD STOP BARS SHALL
BE REMOVED. THE EQUIP. RM. FLOOR SHALL BE
PAINTED. THE FLOOR FLOOD STOP BARS SHALL
BE REINSTALLED.
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
CR
TOP OF CAB
8' -0
PROVIDE NEW MAIN
CAR OPERATING
PANEL IN THE CAR
ENCLOSURE ON THE
FRONT RETURN
PANEL. CONTRACTOR
TO VERIFY LOCATION
PER CAB INTERIOR.
SEE ELEVATOR
SPECIFICATIONS
PROVIDE CAB WITH NEW
TWO-SPEED SIDE
HORIZONTAL SLIDING
HOISTWAY DOORS .
PROVIDE CAR ENCLOSURE
WITH NEW S.S. PANELS
ABOVE ELEVATOR DOOR.
COORDINATE
EMERGENCY EXIT
HATCH WITH CAB
CEILING
PROVIDE CCTV
CAMERA INSIDE OF
THE CAR. SEE
ELECTRICAL SHEETS.
PROVIDE (6) LED
ILLUMINATED CAR
LIGHT FIXTURES
ABOVE THE CEILING.
MAINTAIN A MINIMUM
LIGHT LEVEL OF 50-
FOOT CANDLES AT
(36") ABOVE THE
FINISHED FLOOR.
PROVIDE S.S.
HANGING CEILING
FRAME. CONSTRUCT
FRAME OF .125" X
1.50" X 1.50" "T" AND
"L" SECTIONS.
1"
EQ
1/ 2"
EQ
1/
2"
EQ
1"
SE
E
SC
H
ED
U
LE
SEE SCHEDULE
1" EQ EQ 1"1/2"
8' -0
PROVIDE CAR
ENCLOSURE WITH
NEW S.S. CEILING
TOP OF CAB
PROVIDE CAR ENCLOSURE WITH NEW
HANDRAIL @ CENTERLINE OF 30" AND
42" ABOVE THE CAR FLOOR. MATCH
EXIST. SPACING OF HANDRAIL FROM
CAB WALL. CONCEAL ALL HANDRAIL
FASTENINGS HANDRAILS SHALL BE
REMOVABLE FROM THE INSIDE OF THE
CAR ENCLOSURE. LOCATE HANDRAILS
1-1/2" FROM CAB WALL. PROVIDE 1-1/2"
S.S. ROUND HANDRAILS WITH THE ENDS
AT THE ENTRANCE TURNED BACK TO
THE WALL.
PROVIDE NEW CAR
ENCLOSURE. FINAL PANEL
DESIGN TO BE APPROVED BY
VA INTERIOR DESIGNER
1' -0
2'
-6
4"
1" EQ 1/2" EQ 1/2" EQ
8"
PROVIDE NEW 8" TALL CRASH RAIL
@12" ABOVE CAR FLOOR.
CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL
BE REMOVABLE FROM THE
INSIDE OF THE CAR ENCLOSURE.
SEE SCHEDULE
7' -0
3' -6
CALL BUTTON.
HOISTWAY DOORS
TO BE REPLACED -
SEE ELEVATOR
SPECIFICATIONS.
COMBINATION
HALL LANTERNS
AND ELEV CALL
BUTTON PLATES
TO BE REPLACED
BACK BOXES TO
REMAIN.
RECLAD EXISTING
STAINLESS STEEL
ENTRANCE FRAME,
AND TOP HEADER.
EMERGENCY
KEYWAY PLATE TO
BE REPLACED
8' -0
TOP OF CAB
1' -0
2'
-6
4"
1" EQ 1/2" EQ 1"
8"
PROVIDE CAR
ENCLOSURE WITH
NEW S.S. CEILING
PROVIDE CAR ENCLOSURE WITH
NEW HANDRAIL @ CENTERLINE OF
30" AND 42" ABOVE THE CAR
FLOOR. MATCH EXIST. SPACING OF
HANDRAIL FROM CAB WALL.
CONCEAL ALL HANDRAIL
FASTENINGS HANDRAILS SHALL BE
REMOVABLE FROM THE INSIDE OF
THE CAR ENCLOSURE. LOCATE
HANDRAILS 1-1/2" FROM CAB WALL.
PROVIDE 1-1/2" S.S. ROUND
HANDRAILS WITH THE ENDS AT THE
ENTRANCE TURNED BACK TO THE
WALL.
PROVIDE NEW CAR
ENCLOSURE. FINAL
PANEL DESIGN TO BE
APPROVED BY VA
INTERIOR DESIGNER
PROVIDE NEW 8" TALL CRASH RAIL
@12" ABOVE CAR FLOOR.
CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL
BE REMOVABLE FROM THE
INSIDE OF THE CAR ENCLOSURE.
SEE SCHEDULE
PASSENGER ELEVATOR CAB SIZE SCHEDULE
ELEVATOR WIDTH DEPTH
P2 62" 92"
RATED LOAD
4,000 (lbs)
5' -2
7'-8"
7' -4
9'-4"
W-A-400 26
PROVIDE NEW CAR
ENCLOSURE WITH NEW
FLOORING.
NEW SECURITY
CAMERA
ELEVATOR
P2
ENTRANCE FRAME TYPE:
1. SWEEP JAMB AT EACH LEVEL OF THE
ELEVATOR ENTRANCE.
2. REFER TO SHEET G-006 FOR JAMB AND HEAD
DETAIL
F
SE
E
SC
H
ED
U
LE
SCHEDULE
SEE
F-1
2" 2"
SCHEDULE
SEE
SE
E
SC
H
ED
U
LE
2"
DOOR HARDWARE NOTES:
1. PROVIDE 90 MIN RATED H.M. FRAME IN EXISTING OPENING. PROVIDE RATING LABEL FOR DOOR AND FRAME.
2. PROVIDE CARD READER/PACS DEVICE AT NEW DOOR OPENING.
3. FBC APPROVED HARDWARE TO BE USED ON NEW DOOR IN THIS OPENING.
4. COORDINATE HARDWARE REQUIREMENTS WITH NEW FRAME. VERIFY LOCK FUNCTIONS AND HARDWARE COMPATIBILITY PRIOR TO ORDERING ANY HARDWARE.
5. PROVIDE NEW SECURITY CAMERA AT CORRIDOR SIDE OF DOOR OPENING.
6. SEE HARDWARE SETS IN SPECIFICATION 08 71 00 FOR DOOR COMPONENTS.
7. PROVIDE WELDED FRAMES PER VA REQUIREMENTS, SEE SPECIFICATIONS FOR MORE INFORMATION.
DOOR REMARKS:
1. PROVIDE ELECTRIC WIRING TO CARD READER AND ELECTRIC STRIKE. SEE ELECTRICAL DWGS. FOR MORE INFORMATION.
2. REPLACE EXISTING CELLAR DOOR (SEE 3/W-A-400). FIRST FLOOR
0' - 0"
1' -1
0"
V.I.F.5'-4" +/-
ALL FASTENERS AND CONNECTIONS
TO EITHER BRICK WALLS OR
CONCRETE SLAB SHALL BE GALV.
PER DOOR MANUFACTURER
PROVIDE GALV. REGLET
FLASHING AND SEALANT IN
MASONRY JOINT, ALONG WITH
PERIMETER OF MASONRY WALL
ATTACHMENT
EXIST. BRICK MASONRY WALL
FIELD VERIFY EXIST. DOOR TO
ENSURE THAT NEW DOOR WILL
FIT OVER EXIST. STAIRS
NEW BASEMENT DOOR
B.O.D. BILCO BASEMENT DOOR
SIZE: B
COLOR: BRICK
DIM: 51" W X 64" L X 22" H
REMOVE EXIST. BASEMENT
DOOR AND STEEL HOOD
EXIST. CONCRETE BASE &
STAIRS TO BE POWERWASHED
AND CLEANED
STRIP PAINT FROM EXIST.
HANDRAILS AND RE-PAINT
HANDRAILS & WALL
ATTACHMENTS
PROVIDE NEW GALVANIZED
METAL HOOD WITH 12" X 12"
VENTILATION LOUVER. PAINT
HOOD TO MATCH BASEMENT
DOOR COLOR
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
2:
:2
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v_ bn ee dh am
8H
L.
rv t
W-A-400
MEADOW (BUILDING 2) ELEVATOR
BUILDING SECTION & INTERIOR CAB
ELEVATIONS
4 4OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
Scale: 3/4" = 1'-0"
CAB INTERIOR - FRONT ELEVATION - MEADOW
Scale: No Scale
ELEVATOR CAB - CEILING PLAN - MEADOW
Scale: 3/4" = 1'-0"
CAB INTERIOR - SIDE ELEVATION - MEADOW
Scale: No Scale
TYPICAL PASSENGER CAB - EXTERIOR ELEVATION -
MEADOW
Scale: 3/4" = 1'-0"
CAB INTERIOR - REAR ELEVATION - MEADOW
Scale: 3/4" = 1'-0"
ELEVATOR CAB - FLOOR PLAN - MEADOW
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
Scale: 1/2" = 1'-0"
MEADOW EQUIPMENT ROOM DOOR TYPE
Scale: 1/2" = 1'-0"
MEADOW EQUIPMENT ROOM FRAME TYPE
DOOR SCHEDULE
ROOM NAME
DOOR DOOR DOOR FRAME
LBL
HDWR
SET REMARKSNO. WIDTH HEIGHT THICK MAT'L FINISH ELEV MAT'L FINISH ELEV
ELEVATOR
EQUIP RM
003 3' - 0" 7' - 0" 1 3/4" MTL PNT F HM PNT F-1 90 MIN. 1.0 1
ELEVATOR
EQUIP RM
003A 4' - 0" 4' - 2" - MTL PNT - HM PNT - - 2
ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS
REMARKSEAST NORTH SOUTH WEST
003 ELEVATOR EQUIP
RM
EPF-1 RB-1 P-4 P-4 P-4 P-4 PAINT EXTERIOR TO MATCH
EXISTING BUILDING,FLOOD STOPS
TO BE REMOVED, FLOOR TO
RECIEVE EPOXY PAINT, FLOOD
STOP TO BE RE-INSTALLED
Scale: 1/2" = 1'-0"
CELLAR DOOR SECTION
POSITION INDICATORS IN HALLWAY/LOBBY SHOULD
DISPLAY "OUT OF SERVICE", FOR FIRE SERVICE,
INDEPENDENT SERVICE, ELEVATOR INSPECTION, ETC.
ROOM
542SF
ELEVATOR PIT
P2
ELEVATOR EQUIP RM
ROOM
542SF
ELEVATOR PIT
P2
ELEVATOR EQUIP RM
2-SP-1
2-SP-2
1 1/2" PD
3" PD
4" SAN
1 1/2" PD
FD-B
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
5:
:1
PM
C :\U se rs
\s ge or ge
\D oc um en ts \R ev it
Fi le s\ R ev it
\M _2
1-
9_ Le ed s-
In st al l E le v_ sp ge or ge
.rv t
W-PF101
MEADOW (BUILDING 2) PLUMBING AND
FIRE SUPPRESSION PLAN
1 1AV
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
SPG
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 PROVIDE NEW SUMP PUMP IN ELEVATOR
MACHINE ROOM. CONNECT TO EXISTING DRAIN
PIPING.
2 TRENCH OUT ELEVATOR PIT FOR NEW SUMP
PUMP, OIL INTERCEPTOR, AND FLOOR DRAIN IN
ELEVATOR PIT. COORDINATE EXACT
LOCATIONS WITH ELEVATOR STRUCTURAL
SUPPORTS.
3 ROUTE PUMP DISCHARGE TO CRAWL SPACE,
DISCHARGE TO TOP OF EXISTING 4" SANITARY
PIPE.
4 PROVIDE QUICK RESPONSE SPRINKLER HEADS
IN ELEVATOR PIT. EXTEND SPRINKLER PIPE
FROM MACHINE ROOM.
5 SLEEVE AND FIRE SEAL PIPE PENETRATION
THROUGH ELEVATOR SHAFT WALL.
6 ROUTE SEPARATE 2" VENTS FROM OIL
INTERCEPTOR AND SUMP PUMP UP TO 18'
ABOVE PIT FLOOR.
Scale: 1/4" = 1'-0"
BASEMENT FLOOR PLUMBING AND FIRE SUPPRESSION
DEMOLITION PLAN
Scale: 1/4" = 1'-0"
BASEMENT FLOOR PLUMBING AND FIRE SUPPRESSION
NEW WORK PLAN
1 DEMOLISH EXISTING SUMP PUMP IN ELEVATOR
MACHINE ROOM. DISCONNECT FROM EXISTING
PUMP DISCHARGE PIPING, CAP AND PREPARE
FOR RECONNECTION.
NORTH
0 4 8 16
NORTH
0 4 8 16
A. SLEEVE ALL PENETRATIONS. FIRESTOP AND
SEAL WATER TIGHT.
B. REUSE EXISTING FIRE SUPPRESSION MAINS
WHERE POSSIBLE. PROVIDE NEW BRANCH
PIPNG AS REQUIRED.
C. EXISTING FIRE AND SMOKE ZONES SHALL BE
MAINTAINED.
Scale: 12" = 1'-0"
CRAWLSPACE PLUMBING PLAN 2
NORTH
0 4 8 16
ROOM
542SF
ELEVATOR PIT
P2
ELEVATOR EQUIP RM
2-UH-1 2-SS-1
2-CU-1
T 4 S
RLRL3/4" D
ROOM
542SF
ELEVATOR PIT
P2
ELEVATOR EQUIP RM
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
5:
:1
PM
C :\U se rs
\s ge or ge
\D oc um en ts \R ev it
Fi le s\ R ev it
\M _2
1-
9_ Le ed s-
In st al l E le v_ sp ge or ge
.rv t
W-M-101
MEADOW (BUILDING 2) MECHANICAL
PLAN
1 1AV
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
SPG
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
BASEMENT FLOOR MECHANICAL NEW WORK PLAN
A. COORDINATE ALL DEMOLITION WORK WITH THE
GENERAL CONTRACTOR, OTHER TRADES AND
THE COR TO MINIMIZE DISRUPTION OF AREAS
OUTSIDE OF THE PROJECT LIMITS OF WORK.
B. ALL DEMOLISHED EQUIPMENT SHALL BECOME
THE PROPERTY OF THE CONTRACTOR AND
SHALL BE DISPOSED OF IN ACCORDANCE WITH
VAPHS REQUIREMENTS AND ENVIRONMENTAL
REGULATIONS.
C. CONTRACTOR TO FIELD VERIFY ALL
CONDITIONS. PRESERVE EXISTING DUCTWORK,
PIPING OR EQUIPMENT THAT IS NOT INDICATED
FOR DEMOLITION OR IS DISCOVERED IN THE
DEMOLITION PROCESS.
NORTH
0 4 8 16
1 PROVIDE NEW DUCTLESS SPLIT AND OUTDOOR
CONDENSING UNIT. ROUTE REFRIGERANT
LIQUID AND SUCTION PIPING TO OUTDOOR UNIT
ACCORDING TO MANUFACTURER'S
RECOMMENDATIONS.
2 PROVIDE NEW ELECTRIC UNIT HEATER.
3 PROVIDE MANUFACTURER'S CONDENSATE
PUMP. ROUTE CONDENSATE DRAIN TO
EXTERIOR WALL, DISCHARGE ON NEW SPLASH
BLOCK ON GRADE.
4 PROVIDE NEW THERMOSTAT FOR MINI-SPLIT
SYSTEM AND NEW CENTRAK TEMPERATURE
SENSOR. CONFIGURE TO EXISTING SYSTEM.
5 MOUNT WITH WALL BRACKET PER DETAIL
6/M-501.
Scale: 1/4" = 1'-0"
BASEMENT FLOOR MECHANICAL DEMOLITION PLAN
NORTH
0 4 8 16 1 DEMOLISH EXISTING UNIT HEATER.
GF
I
T
CR
ES
DC
RX
E
GF
I
T
GFI
WP E
ELEVATOR
EQUIP
RM
ELEVATOR
PIT
P2
ROOM
542SF
EC
B
G H I J K
PANEL '2-B1'
Ex. UH
2-UH-1
'2-B1'- 14,16
'E1EB-2'- 7
'E1EB-2'- 8
'E1EB-2'- 15
ELEVATOR
EQUIP
RM
ELEVATOR
PIT
P2
ROOM
542SF EXISTING
PANEL '2-B1'
EC
B
G H I J K
ELEVATOR
EQUIP
RM
003ELEVATOR
PIT
P2
ROOM
542SF
PANEL '2-B1'
EC
B
B1
B1 EM
G H I J K
ROOM
CORRIDOR
-ELEVATOR
P2
TC
102A
ROOM
ROOM
ROOM
G H I J K
'2-B1'- 15 '2-B1'- 17
2-CU-1
ROOM
ROOM
ROOM
CORRIDOR
ROOM
HK
G H I J K
ELEVATOR
P2
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
:5 7:
A
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 1-
9_
Le ed s- In st al l E le v_ w re ed
R G
8R E.
rv t
W-E-101
MEADOW (BUILDING 2) FLOOR
ELECTRICAL PLANS
1 1AMM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JKM
1 CIRCUIT NEW LIGHTS AND SWITCH TO
EXISTING ROOM LIGHTING CIRCUIT.
2 EXISTING ELEVATOR CIRCUIT BREAKER TO
REMAIN TO POWER NEW ELEVATOR
CONTROLLER.
3 NEW 30A 2 POLE DISCONNECT FOR
ELEVATOR CAB LIGHTS.
4 CONNECT NEW CAMERAS TO EXISTING
CAMERA SYSTEM IN TR 115C.
5 CONNECT NEW CARD READER TO EXISTING
PACS IN TR 115C. MOUNT CARD READER IN
THE DOOR MULLION. PROGRAM CARD
READER PER VA.
6 EXISTING CCTV & PACS IN TR 115C SEE
4-G-001 FOR MORE INFO.
7 EXISTING CAMERA TO REMAIN.
8 DISCONNECT FOR ELEVATOR CAB LIGHTS.
CIRCUIT TO EXISTING CAB LIGHTS CIRCUIT.
9 NEW CAMERA TO BE INSTALLED IN
ELEVATOR CAB. CONNECT NEW CAMERAS
TO THE EXISTING CAMERA SYSTEM.
10 PROVIDE A NEW 1 POLE, 20A 5MA GFCI
BREAKER FOR THIS PUMP AND OIL LEVEL
SENSOR (IF APPLICABLE) AND CIRCUIT
USING 2-12 AWG, 1-12 AWG EG IN ¾”
CONDUIT.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
ELEVATOR POWER PLAN
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
TRACING AND IDENTIFYING ALL CIRCUITS AND
CONDUITS THAT ORIGINATE, PASS THROUGH, OR
TERMINATE IN THE AREA OF WORK. DEMOLISH
ALL CIRCUITS THAT ARE NO LONGER IN USE.
MAINTAIN CIRCUIT CONTINUITY TO ALL CIRCUITS
WHICH ARE NOT COMPLETELY REMOVED.
CONTRACOR RESPONSIBLE FOR LOCKOUT/TAG
OUT PROCEDURES OF LOADS FOR DEMOLITION.
B. CONTRACTOR SHALL DISCONNECT AND REMOVE
ELECTRICAL CONNECTION TO OUTLETS,
RECEPTACLES, HVAC EQUIPMENT AND OTHER
ELECTRICAL DEVICES. REMOVE CONDUCTORS
AND CONDUIT BACK TO PANELBOARD SERVICING
EQUIPMENT OR TO THE POINT WHERE OTHER
REMAINING LOADS ARE CONNECTED. MARK ANY
ABANDONED OVERCURRENT PROTECTION
DEVICE AS "SPARE (UNUSED)".
C. CONTRACTOR SHALL REMOVE ALL ELECTRICAL
CONDUIT, CABLE, WIRING DEVICE, JUNCTION
BOXES, FITTINGS, AND RELATED ITEMS FROM ALL
PORTIONS OF THE AREA OF WORK INCLUDING
WALL, CEILING, AND FLOORS. THIS SHALL BE FOR
ALL WALLS, EVEN WALLS NOT SUBJECT FOR
REMOVAL.
D. FOR ELECTRICAL CIRCUITS BEING DEMOLISHED,
REMOVE BOXES, CONDUIT AND CONDUCTORS
BACK TO SOURCE, INCLUDING THOSE
CONCEALED WITHIN WALLS, LEAVING NO
ABANDONED ITEMS.
E. WHERE CONDUIT IS REMOVED FROM AN
EXISTING RATED ASSEMBLY NOT SUBJECT TO
DEMOLITION, THE REMAINING HOLE SHALL BE
PATCHED/REPAIRED TO MAINTAIN THE RATING
OF THE ASSEMBLY.
F. EACH PHASE OF THE CONSTRUCTION SHALL BE
PERFORMED WHILE LEAVING WORK AREAS OF
OTHER PHASES ACTIVE TO THE GREATEST
EXTENT POSSIBLE. NOTIFY COR IF ANY WORK IS
REQUIRED THAT WILL CROSS MULTIPLE PHASES
OF THE WORK AREA PRIOR TO PERFORMING THE
WORK.
G. ALL RECEPTACLE CONDUCTORS ARE 2-12 AWG,
1-12 AWG EG IN 3/4" CONDUIT MINIMUM UNLESS
NOTED OTHERWISE.
H. COORDINATE LOCATION AND ELECTRICAL
REQUIREMENTS OF ALL MECHANICAL AND
PLUMBING EQUIPMENT WITH MECHANICAL AND
PLUMBING CONTRACTORS.
I. COORDINATE EQUIPMENT WITH ARCHITECTURAL
& INTERIORS EQUIPMENT PLANS AND
SCHEDULES.
J. ELECTRICAL CONTRACTOR SHALL FOLLOW SITE
LOCK-OUT/TAG-OUT GUIDELINES TO DE-
ENERGIZE EQUIPMENT.
K. ALL RECEPTACLES SHALL HAVE THEIR SOURCE
PANEL AND CIRCUIT NUMBER INDICATED ON
THEIR FACEPLATE.
NORTH
0 2 4 8
Scale: 1/4" = 1'-0"
ELEVATOR DEMOLITION PLAN
NORTH
0 2 4 8
Scale: 1/4" = 1'-0"
ELEVATOR LIGHTING PLAN
NORTH
0 2 4 8
1 EXISTING SWITCH FOR CAB LIGHTS TO BE
REMOVED AND REPLACED WITH
DISCONNECT.
2 EXISTING ELEVATOR CIRCUIT BREAKER TO
REMAIN.
3 REPLACE EXISTING 100A MCB 208Y/120V
PANEL WITH NEW 30 CIRCUIT 100A MCB
208Y/120V PANEL. CONNECT TO EXISTING
FEEDERS.
4 DISCONNECT EXISTING LIGHTING CIRCUIT
AND REMOVE EXISTING LIGHTS. MAINTAIN
EXISTING CIRCUIT FOR REUSE WITH NEW
MACHINE ROOM LIGHTING.
PANEL '2-B1'
(TOTAL KVA) X 1000 = TOTAL AMPS
VOLTS X 1.732 0
PANEL / FEEDER (TOTAL KVA) 0.00
TOTAL DEMAND AMPERES PER PHASE 0 0 0
NOTE: ALL MOTOR CIRCUIT BREAKERS SHALL BE HACR
RATED.
TOTAL... 0.00 0.00 0.00 0.00 0.00 0.00
SIGN 0.00 0.00 0.00 125% 0.00 0.00 0.00
DEDICATED RECEPT 0.00 0.00 0.00 100% 0.00 0.00 0.00
NEUTRAL RATING 100% FIX. ELEC. SPACE HEAT 0.00 0.00 0.00 100% 0.00 0.00 0.00
BUS RATING 100A WATER HEATERS 0.00 0.00 0.00 125% 0.00 0.00 0.00
MCB RATING MCB ALL... 0.00 0.00 0.00 100% 0.00 0.00 0.00
MINIMUM AIC (K AMPS) 10
MOTORS AND...
LARGEST 0.00 0.00 0.00 125% 0.00 0.00 0.00
SERVICE ENTR. RATED YES X NO >10KVA@50% 0.00 0.00 0.00
MAIN CIRCUIT BREAKER YES X NO
GENERAL USE... 0.00 0.00 0.00 <=10 KVA@100% 0.00 0.00 0.00
ISOLATED GROUND BUS YES X NO GENERAL LIGHTING 0.00 0.00 0.00 125% 0.00 0.00 0.00
MOUNTING SURFACE A B C A B C
C/B TEMP. 75 C. RATING 120 208 V 3 PH 4... LOAD TYPE CONNECTED KVA NEC DEM
FACTOR
DEMAND KVA
0.00 0.00 0.00 TOTAL
SUB TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 SUB TOTAL
SPARE --- --- 0.00 1P-20 29 30 1P-20 --- --- 0.00 SPARE
SPARE --- 0.00 --- 1P-20 27 28 1P-20 --- 0.00 --- SPARE
SPARE 0.00 --- --- 1P-20 25 26 1P-20 0.00 --- --- SPARE
SPARE --- --- 0.00 1P-20 23 24 1P-20 --- --- 0.00 SPARE
SPARE --- 0.00 --- 1P-20 21 22 1P-20 --- 0.00 --- SPARE
SPARE 0.00 --- --- 1P-20 19 20 1P-20 0.00 --- --- SPARE
SPEC --- --- 0.00 1P-20 17 18 1P-20 --- --- 0.00 SPARE
GFI RECEPTACLE --- 0.00 --- 1P-20 15 16 --- 0.00 ---
0.00 --- --- 13 14 2P-20 0.00 --- --- UNIT HEATER
SPACE
--- --- 0.00 2P-30 11 12 --- --- 0.00
SPACE --- 0.00 --- 1P-20 9 10 2P-15
--- 0.00 ---
SUMP PUMP (5mA GFCI)
ELEV WORKMAN LIGHT & RECEP 0.00 --- --- 1P-20 7 8 1P-20 0.00 --- --- EXHAUST FAN
EXHAUST FAN --- --- 0.00 1P-20 5 6 1P-20 --- --- 0.00 MACH ROOM LIGHTS & RECEP
PIT RECEPTACLE --- 0.00 --- 1P-20 3 4 1P-20 --- 0.00 --- CONTROL CIRCUIT
SHUNT TRIP BREAKER PWR 0.00 --- --- 1P-20 1 2 1P-20 0.00 --- --- LIGHTS - PIT & SHAFT
A B C A B C LOAD SERVED KVA / Phase CKT
BRKR
CKT
NO
NEUTRA
L
A B C
CKT
NO
CKT
BRKR
KVA / Phase LOAD SERVED
Scale: 1/4" = 1'-0"
FIRST FLOOR POWER PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR POWER PLAN
NORTH
0 2 4 8
NORTH
0 2 4 8
TR 115C
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
SD
HD
F
F
HD
SD
FS
SD
F
F
FA
C
P
F
SD
SDHD
ELEVATOR
EQUIP
RM
ELEVATOR
PIT
P2
ROOM
542SF
G H I J K
ELEVATOR
EQUIP
RM
ELEVATOR
PIT
P2
ROOM
542SF
G H I J K
15cd 1/2 W
G H I J K
ROOM
CORRIDOR
-ELEVATOR
P2
TC
102A
ROOM
ROOM
ROOM
G H I J K
ROOM
ROOM
ROOM
CORRIDOR
ROOM
HK
ELEVATOR
P2
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
:5 8:
A
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 1-
9_
Le ed s- In st al l E le v_ w re ed
R G
8R E.
rv t
W-FA101
MEADOW (BUILDING 2) FIRE ALARM
PLANS
1 1AMM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
RSB
NORTH
0 4 8 16
1 REPLACE EXISTING ELEVATOR FIRE ALARM
RECALL MODULES WITH NEW AND CONNECT
TO EXISTING FIRE ALARM SYSTEM. SEE
DETAIL ON SHEET FA001 FOR MORE INFO.
2 PROVIDE NEW FIRE ALARM DEVICES AND
CONNECT TO EXISTING FIRE ALARM SYSTEM.
3 EXISTING FACP (NOTIFIER BY HONEYWELL TO
REMAIN).
4 EXISTING CAMERA TO REMAIN.
5 EXISTING FIRE ALARM DEVICES TO REMAIN.
6 PROVIDE SMOKE & HEAT DETECTORS ON TOP
OF THE HOIST.
Scale: 1/4" = 1'-0"
BASEMENT FLOOR FIRE ALARM DEMOLITION PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
BASEMENT FLOOR FIRE ALARM PLAN
NORTH
0 4 8 16
A. A CONTRACTOR SHALL BE RESPONSIBLE
FOR TRACING THE FIRE ALARM CONDUIT
AND WIRING.
B. EACH PHASE OF THE CONSTRUCTION SHALL
BE PREFORMED WHILE LEAVING WORK
AREAS OF OTHER PHASES ACTIVE TO THE
GREATEST EXTENT POSSIBLE. NOTIFY COR
IF ANY WORK IS REQUIRED THAT WILL
CROSS MULTIPLE PHASES OF THE WORK
AREA PRIOR TO PREFORMING THE WORK.
C. COORDINATE EQUIPMENT WITH
ARCHITECTURAL AND INTERIORS
EQUIPMENT PLANS AND SCHEDULES.
D. CONNECT NEW FIRE ALARM DEVICES TO THE
EXISTING FIRE ALARM PANEL.
1 EXISTING FIRE ALARM DEVICES TO BE
REPLACED WITH NEW.
Scale: 1/4" = 1'-0"
FIRST FLOOR FIRE ALARM DEMOLITION PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR FIRE ALARM PLAN
NORTH
0 2 4 8
NORTH
0 2 4 8
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
107108
105 106
135A
127A
118120122
TC
HK
TC
136A
UP
DN
UP
DN
UP
III/IVLOW Risk Group 1
Class III Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
II
MEDIUM Risk Group 2 HIGH Risk Group 3 HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
II
II
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete cabling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding)
- wallcovering electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Cardiology
- Echocardiography
- Endoscopy
- Nuclear Medicine
- Physical Therapy
- Radiology/MRI
- Respiratory Therapy
- Office areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- CCU
- Emergency Room
- Labor & Delivery
- Laboratories (specimen)
- Medical Units
- Newborn Nursery
- Outpatient Surgery
- Pediatrics
- Pharmacy
- Post Anesthesia Care Unit
- Surgical Units
- Any area caring for immunocompromised patients
- Burn Unit
- Cardiac Cath Lab
- Central Sterile Supply
- Intensive Care Units
- Negative pressure isolation rooms
- Oncology
- Operating rooms including C-section rooms
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
CL
AS
S
IV
CL
AS
S
II
During Construction Project
CL
-I
CL
AS
S
III
1. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Prevention & Control Department and thoroughly cleaned by the owner's Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Contain construction waste before transport in tightly covered containers.
4. Cover transport receptacles or carts. Tape covering unless solid lid.
5. Vacuum work area with HEPA filtered vacuums.
6. Wet mop area with cleaner/disinfectant.
7. Upon completion, restore HVAC system where work was performed.
1. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Prevention & Control Department and thoroughly cleaned by the owner's Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with cleaner/disinfectant.
5. Upon completion, restore HVAC system where work was performed.
1. Clean work area upon completion of task
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Upon completion, restore HVAC system where work was performed.
1. Includes all activities required by Class II
2. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
3. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
4. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
5. Contain construction waste before transport in tightly covered containers.
6. Cover transport receptacles or carts. Tape covering unless solid lid.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Place dust mat at entrance and exist of work area.
7. Remove or isolate HVAC system in area where work is being performed.
1. Includes all activities required by Class III
2. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
3. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
5. Seal holes, pipes, conduits, and punctures.
6. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
7. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
A-A-100
ELEVATOR
P3
43.1.1 CLASSIFICATION OF REHABILITATION WORK -
RENOVATION
43.4.2 CAPACITY OF MEANS OF EGRESS. THIS PROJECT
DOES NOT CHANGE OR ALTER EXISTING
OCCUPANT LOAD OR MEANS OF EGRESS. THE
EGRESS CAPACITY SHALL HAVE BEEN
PREVIOUSLY APPROVED AS BEING ADEQUATE.
NFPA 101 - CHAPTER 43
BUILDING REHABILITATION
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
1:
:5
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v_ bn ee dh am
8H
L.
rv t
A-G-001
MAPLE (BUILDING 3) ICRA FLOOR PLAN
1 4OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
Scale: 1/8" = 1'-0"
MAPLE (BUILDING 3) PARTIAL GROUND FLOOR PLAN
N O
R
TH0 4 8 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
REFERENCE CODES
AMERICAN WITH DISABILITIES ACT(ADA) STANDARDS, 2010
PG 18-13: VA BARRIER FREE DESIGN STANDARD, 2017
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND
AIR -CONDITIONING ENGINEERS MANUAL(ASHRAE)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES
AND STANDARDS
OSHA RULES AND REGULATIONS
2015 INTERNATIONAL BUILDING CODE
LIFE SAFETY CODE (NFPA 101) 2021
THE JOINT COMMISSION (TJC) ACCREDITATION MANUAL
(LATEST EDITION)
NATIONAL ELECTRICAL CODE (NEC) (NFPA 70) 2020
NATIONAL FIRE ALARM CODE (NFPA 72) 2022
2021 INTERNATIONAL FIRE CODE
ILLUMINATING ENGINEERING SOCIETY (IES) LIGHTING
HANDBOOK, 10TH EDITION
HEALTH CARE FACILITIES CODE (NFPA 99) 2021
VA ELECTRICAL DESIGN MANUAL, DEC. 2019
VA PHYSICAL SECURITY AND RESILIENCY DESIGN
MANUAL, APRIL 2021
VA DESIGN GUIDE: OFFICE OF INFORMATION AND
TECHNOLOGY, FEB. 2019
VA DESIGN GUIDE: INFRASTRUCTURE STANDARD FOR
TELECOMMUNICATIONS SPACES, JULY. 2021
ANSI/TIA/EIA 568-2020 COMMERCIAL BUILDING CABLING
STANDARDS
ANSI/TIA/EIA 569-C-2019 COMMERCIAL BUILDING
STANDARDS FOR TELECOMMUNICATIONS PATHWAYS AND
SPACES
ANSI/TIA-1179-2017 TELECOMMUNICATIONS SPACES FOR
HEALTHCARE FACILITIES
ASME A17.1/CSA B44-2019 ELEVATOR CODE
BICSI, TELECOMMUNICATIONS DISTRIBUTION METHODS
MANUAL, 14TH EDITION.
A. ALL MAJOR EQUIPMENT TRANSPORTED THROUGH
THE BUILDING TO BE VA APPROVED ROUTE AND
TIME. COORDINATE WITH VA COR GIVING 2 WEEKS
NOTICE MINIMUM.
B. WORK HOURS - 7:00 AM TO 6:00 PM.
C. COORDINATE WITH COR FOR PARKING
REQUIREMENTS.
D. PROVIDE STICKY MAT AT ALL CONSTRUCTION
ACCESS POINTS.
E. THE GC SHALL FILL OUT THE PROPER ISLM FORMS
WITH THE VA COR BEFORE ANY CONSTRUCTION
WORK COMMENCES.
F. GC TO PROVIDE A 1-HOUR CONSTRUCTION
BARRIER IF THE ELEVATOR DOOR WILL BE
REMOVED FOR REFURBISHMENT OR IF ELEVATOR
DOORS WILL BE REMOVED FOR REFURBISHMENT
OR REPLACEMENT WITHOUT REINSTALLATION ON
THE SAME DAY, LIMIT WORK TO ONE FLOOR AT A
TIME TO LIMIT THE POTENTIAL FOR SMOKE/HOT
GAS SPREAD BETWEEN FLOORS VIA THE
ELEVATOR SHAFT.
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
1:
:0
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v_ bn ee dh am
8H
L.
rv t
A-G-002
MAPLE (BUILDING 3) EXISTING PHOTOS
2 4OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
UP UP
NEW WALL
NEW DOOR
NEW WINDOW
NEW WORK LEGEND
ELEVATOR
EQUIP.
ROOM
4 5
9ELEVATOR
PIT
P3
CR
FD
STAIR
136A
ROOM
ROOM
ROOM
CORRIDOR
ROOM
11ELEVATOR
P3
ROOM
ROOM
CORRIDOR
ROOM
ROOM
11ELEVATOR
P3
ELEVATOR
EQUIP.
ROOM
ELEVATOR
PIT
P3
STAIR
136A
ROOM
ROOM
CORRIDORROOM
ROOM
ELEVATOR
P3
ROOM
ROOM
CORRIDOR
ROOM
ROOM
ELEVATOR
P3
EXISTING WALL TO REMAIN
EXISTING DOOR TO REMAIN
TEMPORARY DOOR
TEMPORARY WALL
DEMOLISH WALL
DEMOLISH DOOR
DEMOLISH WINDOW
EXISTING WINDOW TO REMAIN
DEMOLITION LEGEND
TEMPORARY WALL
TEMPORARY DOOR
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
1:
:5
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v_ bn ee dh am
8H
L.
rv t
A-A-100
MAPLE (BUILDING 3) ELEVATOR FLOOR
PLANS & DETAILS
3 4OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
1 PROVIDE NEW ELEVATOR CAB FINISHES.
2 PROVIDE NEW ELEVATOR PANEL/CONTROLS.
3 PROVIDE NEW ELEVATOR CAB DOOR.
4 PROVIDE NEW CODE COMPLIANT PIT LADDER. SEE
SHEET G-006 FOR PIT LADDER DETAILS
5 CARD READER WILL BE PLACED ON THE DOOR
FRAME.
6 NEW 90 MIN RATED DOOR AND FRAME, REFER TO
DOOR SCHEDULE FOR MORE INFORMATION.
7 PROVIDE WALL BRACKET AND SNOW HOOD COVER
FOR NEW MINI-SPLIT CONDENSING UNIT. SEE
MECH. DWGS FOR MORE INFORMATION.
8 OVERHEAD WALL MOUNTED MINI-SPLIT UNIT. DO
NOT PLACE DIRECTLY OVER ANY PROPOSED OR
EXIST. ELEVATOR EQUIPMENT THAT IS IN THE
ROOM
9 GC TO VERIFY IF EXISTING FIRE EXTINGUISHER IS
STILL CODE COMPLIANT. IF IT IS NOT CODE
COMPLIANT, THE GC WILL REPLACE THE EXISTING
FIRE EXTINGUISHER WITH A NEW CODE
COMPLIANT EXTINGUISHER AND BRACKET.
10 PROVIDE INTERIOR CONTROL PANEL.
11 PROVIDE NEW ELEVATOR HOISTWAY DOOR.
12 OIL INTERCEPTOR. SEE DETAIL 3/PF501 FOR MORE
INFORMATION.
13 ELEVATOR SUMP PUMP. SEE DETAIL 3/PF501 FOR
MORE INFORMATION.
N O
R
TH0 2 4 8
N O
R
TH0 2 4 8
N O
R
TH0 2 4 8
Scale: 1/4" = 1'-0"
ELEVATOR PIT & ELEV. EQUIP. ROOM NEW WORK FLOOR
PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR NEW WORK PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR NEW WORK PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
N O
R
TH0 2 4 8
N O
R
TH0 2 4 8
N O
R
TH0 2 4 8
Scale: 1/4" = 1'-0"
ELEVATOR PIT & ELEV. EQUIP. ROOM DEMOLITION FLOOR
PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR DEMOLITION FLOOR PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR DEMOLITION FLOOR PLAN
1 DEMOLISH EXISTING ELEVATOR CAB INTERIOR
FINISHES
2 DEMOLISH EXISTING ELEVATOR PANEL/CONTROLS
3 DEMOLISH EXISTING ELEVATOR CAB FRAME AND SS
DOORS. REAR DOOR TO BE INFILLED.
4 DEMOLISH EXISTING PIT LADDER
5 DEMOLISH EXISTING DOOR AND HM FRAME
6 REPAIR AND REPAINT EXISTING METAL CELLAR
DOORS
7 REMOVE LOUVER BLADES. PROVIDE NEW BLANK
OFF LOUVER PANEL IN LOUVER FRAME OPENING
8 REMOVE AND STORE EXISTING METAL FLOOD STOP
BRACING. REPLACE AFTER FLOOR REPAINTING.
9 DEMOLISH EXISTING ELEVATOR HOISTWAY DOOR
10 TRENCH OUT ELEVATOR PIT FOR NEW EQUIPMENT.
SEE PLUMBING DWGS FOR MORE INFORMATION.
A. SEE SHEET G-005 FOR GENERAL NOTES.
B. SEE SHEET A-A-400 FOR ELEVATOR P1 CAB
PLANS AND INTERIOR ELEVATIONS.
C. PATCH AND REPAIR ALL HOLES TO BE SEALED
WITH FIRESTOPPING.
D. PATCH, REPAIR, AND PAINT ALL GYPSUM BOARD
DAMAGED OR ALTERED DUE TO NEW ELEVATOR
WORK. INCLUDING BUT NOT LIMITED TO
REPLACING JAMB WORK AND CONTROL DEVICE
AND LANTERN CHANGE OUT WORK.
E. SEE SPECIFICATION SECTION 14 24 10 FOR
EQUIPMENT SCHEDULES AND ADDITIONAL
INFORMATION.
F. CEILING CONTRACTOR TO MEASURE EACH
CEILING AREA AND ESTABLISH A CEILING
LAYOUT TO BALANCE BORDER WIDTHS AT
OPPOSITE EDGES OF EACH ROOM. AVOID USE
OF LESS-THAN 6" TILES.
G. EXIST. METAL FLOOR FLOOD STOP BARS SHALL
BE REMOVED. THE EQUIP. RM. FLOOR SHALL BE
PAINTED. THE FLOOR FLOOD STOP BARS SHALL
BE REINSTALLED.
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
-0
PROVIDE NEW MAIN
CAR OPERATING
PANEL IN THE CAR
ENCLOSURE ON THE
FRONT RETURN
PANEL. CONTRACTOR
TO VERIFY LOCATION
PER CAB INTERIOR.
SEE ELEVATOR
SPECIFICATIONS
PROVIDE CAB WITH NEW
TWO-SPEED SIDE
HORIZONTAL SLIDING
HOISTWAY DOORS .
PROVIDE CAR ENCLOSURE
WITH NEW S.S. PANELS
ABOVE ELEVATOR DOOR.
COORDINATE
EMERGENCY EXIT
HATCH WITH CAB
CEILING
PROVIDE CCTV
CAMERA INSIDE OF
THE CAR. SEE
ELECTRICAL SHEETS.
PROVIDE (6) LED
ILLUMINATED CAR
LIGHT FIXTURES
ABOVE THE CEILING.
MAINTAIN A MINIMUM
LIGHT LEVEL OF 50-
FOOT CANDLES AT
(36") ABOVE THE
FINISHED FLOOR.
PROVIDE S.S.
HANGING CEILING
FRAME. CONSTRUCT
FRAME OF .125" X
1.50" X 1.50" "T" AND
"L" SECTIONS.
SEE SCHEDULE
1" EQ EQ 1"
1"
EQ
1/ 2"
EQ
1/
2"
EQ
1"
SE
E
SC
H
ED
U
LE
1/2"
8' -0
PROVIDE CAR
ENCLOSURE WITH
NEW S.S. CEILING
TOP OF CAB
PROVIDE CAR ENCLOSURE WITH NEW
HANDRAIL @ CENTERLINE OF 30" AND
42" ABOVE THE CAR FLOOR. MATCH
EXIST. SPACING OF HANDRAIL FROM
CAB WALL. CONCEAL ALL HANDRAIL
FASTENINGS HANDRAILS SHALL BE
REMOVABLE FROM THE INSIDE OF THE
CAR ENCLOSURE. LOCATE HANDRAILS
1-1/2" FROM CAB WALL. PROVIDE 1-1/2"
S.S. ROUND HANDRAILS WITH THE ENDS
AT THE ENTRANCE TURNED BACK TO
THE WALL.
PROVIDE NEW CAR
ENCLOSURE. FINAL PANEL
DESIGN TO BE APPROVED BY
VA INTERIOR DESIGNER
1' -0
2'
-6
4"
1" EQ 1/2" EQ 1/2" EQ
8"
PROVIDE NEW 8" TALL CRASH RAIL
@12" ABOVE CAR FLOOR.
CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL
BE REMOVABLE FROM THE
INSIDE OF THE CAR ENCLOSURE.
SEE SCHEDULE
7' -0
3' -6
CALL BUTTON.
HOISTWAY DOORS
TO BE REPLACED -
SEE ELEVATOR
SPECIFICATIONS.
NEW
COMBINATION
HALL LANTERNS
AND PLATES TO
BE INSTALLED.
RECLAD EXISTING
STAINLESS STEEL
ENTRANCE FRAME,
AND TOP HEADER.EMERGENCY
ACCESS
KEYWAY PLATES
TO BE
REPLACED.
SIGNAGE TO BE
REPLACED. SEE
INTERIORS. SIGNAGE TO BE
REPLACED. SEE
INTERIORS.
8' -0
TOP OF CAB
1' -0
2'
-6
4"
1" EQ 1/2" EQ 1"
8"
PROVIDE CAR
ENCLOSURE WITH
NEW S.S. CEILING
PROVIDE CAR ENCLOSURE WITH
NEW HANDRAIL @ CENTERLINE OF
30" AND 42" ABOVE THE CAR
FLOOR. MATCH EXIST. SPACING OF
HANDRAIL FROM CAB WALL.
CONCEAL ALL HANDRAIL
FASTENINGS HANDRAILS SHALL BE
REMOVABLE FROM THE INSIDE OF
THE CAR ENCLOSURE. LOCATE
HANDRAILS 1-1/2" FROM CAB WALL.
PROVIDE 1-1/2" S.S. ROUND
HANDRAILS WITH THE ENDS AT THE
ENTRANCE TURNED BACK TO THE
WALL.
PROVIDE NEW CAR
ENCLOSURE. FINAL
PANEL DESIGN TO BE
APPROVED BY VA
INTERIOR DESIGNER
PROVIDE NEW 8" TALL CRASH RAIL
@12" ABOVE CAR FLOOR.
CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL
BE REMOVABLE FROM THE
INSIDE OF THE CAR ENCLOSURE.
SEE SCHEDULE
PASSENGER ELEVATOR CAB SIZE SCHEDULE
ELEVATOR WIDTH DEPTH
P3 62" 92"
RATED LOAD
4,000 (lbs)
A-A-400 26
PROVIDE NEW CAR ENCLOSURE
WITH NEW FLOORING.
5' -2
7'-8"
NEW SECURITY
CAMERA
ELEVATOR
P3
ENTRANCE FRAME TYPE:
1. SWEEP JAMB AT EACH LEVEL OF THE
ELEVATOR ENTRANCE.
2. REFER TO SHEET G-006 FOR JAMB AND HEAD
DETAIL
DOOR HARDWARE NOTES:
1. PROVIDE 90 MIN RATED H.M. FRAME IN EXISTING OPENING. PROVIDE RATING LABEL FOR DOOR AND FRAME.
2. PROVIDE CARD READER/PACS DEVICE AT NEW DOOR OPENING.
3. FBC APPROVED HARDWARE TO BE USED ON NEW DOOR IN THIS OPENING.
4. COORDINATE HARDWARE REQUIREMENTS WITH NEW FRAME. VERIFY LOCK FUNCTIONS AND HARDWARE COMPATIBILITY PRIOR TO ORDERING ANY HARDWARE
5. PROVIDE NEW SECURITY CAMERA AT CORRIDOR SIDE OF DOOR OPENING.
6. SEE HARDWARE SETS IN SPECIFICATION 08 71 00 FOR DOOR COMPONENTS.
7. PROVIDE WELDED FRAMES PER VA REQUIREMENTS, SEE SPECIFICATIONS FOR MORE INFORMATION.
DOOR REMARKS:
1. PROVIDE ELECTRIC WIRING TO CARD READER AND ELECTRIC STRIKE. SEE ELECTRICAL DWGS. FOR MORE INFORMATION.
F
SE
E
SC
H
ED
U
LE
SCHEDULE
SEE
F-1
2" 2"
SCHEDULE
SEE
SE
E
SC
H
ED
U
LE
2"
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
1:
:5
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v_ bn ee dh am
8H
L.
rv t
A-A-400
MAPLE (BUILDING 3) ELEVATOR
BUILDING SECTION & INTERIOR CAB
ELEVATIONS
4 4OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
Scale: 3/4" = 1'-0"
CAB INTERIOR - FRONT ELEVATION - MAPLE
Scale: No Scale
ELEVATOR CAB - CEILING PLAN - MAPLE
Scale: No Scale
CAB INTERIOR - SIDE ELEVATION - MAPLE
Scale: 3/4" = 1'-0"
TYPICAL PASSENGER CAB - EXTERIOR ELEVATION - MAPLE
Scale: No Scale
CAB INTERIOR - REAR ELEVATION - MAPLE
Scale: 3/4" = 1'-0"
ELEVATOR CAB FLOOR PLAN - MAPLE
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
DOOR SCHEDULE
ROOM NAME
DOOR DOOR FRAME
LBL
HDWR
SET REMARKSNO. WIDTH HEIGHT THICK MAT'L FINISH ELEV MAT'L FINISH ELEV
ELEVATOR
EQUIP. ROOM
002 3' - 0" 7' - 0" 1 3/4" MTL PNT F HM PNT F-1 90 MIN. 1.0 1
ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS
REMARKSEAST NORTH SOUTH WEST
002 ELEVATOR EQUIP. ROOM EPF-1 RB-1 P-4 P-4 P-4 P-4 FLOOD STOPS TO BE REMOVED, FLOOR TO RECIEVE
EPOXY PAINT, FLOOD STOP TO BE RE-INSTALLED
Scale: 1/2" = 1'-0"
MAPLE EQUIPMENT ROOM DOOR TYPE
Scale: 1/2" = 1'-0"
MAPLE EQUIPMENT ROOM FRAME TYPE
POSITION INDICATORS IN HALLWAY/LOBBY SHOULD
DISPLAY "OUT OF SERVICE", FOR FIRE SERVICE,
INDEPENDENT SERVICE, ELEVATOR INSPECTION, ETC.
CRAWL SPACE - NO ACCESS
ELEVATOR EQUIP. ROOM
ELEVATOR PIT
P3
1 1/2" PD
CRAWL SPACE - NO ACCESS
ELEVATOR EQUIP. ROOM
ELEVATOR PIT
P3
1 3-SP-1
1 1/2" PD
3-SP-2
3" PD
CO
4" SAN
3" PD
FD-B
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
5:
:1
PM
C :\U se rs
\s ge or ge
\D oc um en ts \R ev it
Fi le s\ R ev it
\M _2
1-
9_ Le ed s-
In st al l E le v_ sp ge or ge
.rv t
A-PF101
MAPLE (BUILDING 3) PLUMBING AND
FIRE SUPPRESSION PLAN
1 1AV
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
SPG
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 PROVIDE NEW SUMP PUMP IN ELEVATOR
MACHINE ROOM. CONNECT TO EXISTING DRAIN
PIPING.
2 TRENCH OUT ELEVATOR PIT FOR NEW SUMP
PUMP, OIL INTERCEPTOR, AND FLOOR DRAIN IN
ELEVATOR PIT. COORDINATE EXACT
LOCATIONS WITH ELEVATOR STRUCTURAL
SUPPORTS.
3 ROUTE PUMP DISCHARGE TO CRAWL SPACE,
DISCHARGE TO TOP OF EXISTING 4" SANITARY
PIPE.
4 PROVIDE QUICK RESPONSE SPRINKLER HEADS
IN ELEVATOR PIT. EXTEND SPRINKLER PIPE
FROM MACHINE ROOM.
5 SLEEVE AND FIRE SEAL PIPE PENETRATION
THROUGH ELEVATOR SHAFT WALL.
6 ROUTE SEPARATE 2" VENTS FROM OIL
INTERCEPTOR AND SUMP PUMP UP TO 18'
ABOVE PIT FLOOR.
Scale: 1/4" = 1'-0"
BASEMENT FLOOR PLUMBING AND FIRE SUPPRESSION
DEMOLITION PLAN
Scale: 1/4" = 1'-0"
BASEMENT FLOOR PLUMBING AND SUPPRESSION NEW
WORK PLAN
1 DEMOLISH EXISTING SUMP PUMP IN ELEVATOR
MACHINE ROOM. EXISTING PUMP DISCHARGE
PIPING TO REMAIN.
N O
R
TH0 2 4 8
N O
R
TH0 2 4 8
A. SLEEVE ALL PENETRATIONS. FIRESTOP AND
SEAL WATER TIGHT.
B. REUSE EXISTING FIRE SUPPRESSION MAINS
WHERE POSSIBLE. PROVIDE NEW BRANCH
PIPNG AS REQUIRED.
C. EXISTING FIRE AND SMOKE ZONES SHALL BE
MAINTAINED.
Scale: 12" = 1'-0"
CRAWLSPACE PLUMBING PLAN 3
N O
R
TH0 4 8 16
CRAWL SPACE - NO ACCESS
ELEVATOR EQUIP. ROOM
ELEVATOR PIT
P3
3-SS-1
3-CU-1
2 3
T S3/4" D
RS RL
CRAWL SPACE - NO ACCESS
ELEVATOR EQUIP. ROOM
ELEVATOR PIT
P3
EXISTING UNIT HEATER TO REMAIN
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
5:
:2
PM
C :\U se rs
\s ge or ge
\D oc um en ts \R ev it
Fi le s\ R ev it
\M _2
1-
9_ Le ed s-
In st al l E le v_ sp ge or ge
.rv t
A-M-101
MAPLE (BUILDING 3) MECHANICAL
PLAN
1 1AV
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
SPG
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
BASEMENT FLOOR MECHANICAL NEW WORK PLAN
A. COORDINATE ALL DEMOLITION WORK WITH THE
GENERAL CONTRACTOR, OTHER TRADES AND
THE COR TO MINIMIZE DISRUPTION OF AREAS
OUTSIDE OF THE PROJECT LIMITS OF WORK.
B. ALL DEMOLISHED EQUIPMENT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .