This geotechnical letter report provides recommendations for a proposed elevator installation at Building 25 on the campus of the Veterans Administration Medical Center in Leeds, Massachusetts. Two test borings were conducted at the site, with subsurface conditions consisting of up to 7 feet of fill overlying olive gray fine to medium sand with some silt and trace gravel interpreted as glacial till. The report recommends founding shallow mat foundations for the elevator pit on undisturbed glacial till soils, with all existing fill removed and replaced as structural fill. A net allowable soil bearing pressure of 3,000 psf is indicated, with foundations founded at least 4 feet below finished grade for frost protection. Lateral earth pressures and drainage recommendations are also provided to design the elevator pit walls and backfill. The report concludes by recommending construction monitoring services be retained to observe subsurface conditions during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24123B0011 0002.docx | DOCX document | |
| S04_Site Visit Sign-In Sheet_631-21-011.pdf | ||
| S02_WD MA 20230003 07 28 2023.pdf | ||
| 36C24123B0011 0001.docx | DOCX document | |
| 631-21-011 Modernize Elevators RFI Responses 20230802.docx | DOCX document | |
| 631-21-011 Bid Drawings_Part3.pdf | ||
| 631-21-011 Bid Drawings_Part2.pdf | ||
| 631-21-011 Bid Drawings_Part1.pdf | ||
| S02_WD MA 20230003 06162023.pdf | ||
| 36C24123B0011.docx | DOCX document | |
| 631-21-011-Bid Specifications.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLR International Corporation, 2 Commerce Drive, Suite 110, Bedford, NH 03110
603 668 1654 slrconsulting.com
May 17, 2022
Mr. Michael W. Schafer, PE Huntley Associates, PC 30 Industrial Drive East Northampton, Massachusetts 02110
Re: Geotechnical Letter Report Proposed Elevator Installation Veterans Administration Medical Center Building 25
SLR #144.20563.00001
Dear Mike:
SLR International Corporation (SLR) is pleased to submit this geotechnical letter report for the proposed elevator installation at Building 25 on the campus of the Veterans Administration Medical Center in Leeds, Massachusetts. A site Locus Plan is attached as Figure 1 and selected photographs are attached as Site Photographs. This letter report has been prepared in general accordance with our proposal dated October 26, 2022.
SITE AND PROJECT DESCRIPTION
Building 25 is a two-story masonry and brick faced building that houses the V.A. campus police. The basement elevation finish floor elevation is shown as Elevation 406.74 feet on the Site Plan provided. The building is currently under renovation as shown in Photo No. 1. The scope of work pertaining to this phase of work consists of design and construction of an exterior elevator.
TEST BORINGS
Two test borings were drilled at the site on April 15, 2022. The borings were drilled by Seaboard Drilling of Chicopee, Massachusetts under the observation of a professional engineer from SLR. The test borings were drilled using standard hollow stem auger techniques to refusal depths of 20.5± feet and 23.5± feet.
Standard Penetration Tests (SPTs) were performed in general accordance with ASTM D 1586 in each test boring, with split spoon samples recovered generally at five-foot intervals. The SPT consists of driving a 1- 3/8-inch I.D. split spoon sampler with a 140-pound hammer falling 30 inches. The blows for each 6 inches of penetration are recorded for a total of 18 or 24-inches. The sum of the blows required to drive the sampler from 6 inches to 18 inches penetration is referred to as the Standard Penetration Resistance or N-value which is an index measure of in-situ soil density or consistency.
Approximate locations of the test borings are shown on the Exploration Location Plan, attached as Figure
2. Subsurface conditions and general observations from the test borings were documented on the Test Boring Logs attached hereto. Soil classifications were based upon the Burmister Soil Classification System included after the test boring logs.
V.A. Medical Center Building 25 – Leeds, Massachusetts
SLR International Corporation slrconsulting.com
Prior to mobilizing drilling equipment, a private utility locator was retained under separate contract to locate underground utilities using ground penetrating radar (GPR). As an additional precaution, the top five feet of each boring were advanced using vacuum excavation (vac-ex) as shown in Photos 2 and 3. Due to the ongoing renovation work the proposed boring locations were inaccessible due to scaffolding as shown in Photo 1.
SUBSURFACE CONDITIONS
No split spoon sampling was performed for the upper 5 feet of each boring due to vac-ex. Several cobbles were noted on the boring logs during vac-ex advancement.
Subsurface conditions consisted of up to 7 feet of fill in SLR-2. While no fill was identified in SLR-1, it is reasonable to presume fill was present in the upper 5 feet not sampled due to vac-ex. The fill is described as fine to medium sand, with traces of brick and gravel. No organic matter or weak, compressible materials were noted in the fill at the locations sampled.
The native soils below the fill consist of olive gray fine to medium sand, some silt, trace gravel interpreted to consist of glacial till. Glacial till is a non-sorted, non-stratified mixture of sand, silt/clay, and gravel in various proportions deposited directly by glacial ice during retreat of the glaciers.
Auger refusal was encountered at depths of 20.5± feet and 23.5±feet in SLR-1 and SLR-2, respectively. Due to the drilling behavior of the augers during advancement, it is our interpretation that auger refusal was caused by bedrock encounter. Auger refusal is defined as the inability of the augers to advance despite increasing downward pressure and torque applied by the drilling rig. Refusal may be caused by very dense soils, boulders, or bedrock.
Groundwater was not encountered in SLR-1. Groundwater was encountered at a depth of 12± feet in SLR-2. It should be noted that long term equilibrated groundwater measurements were not obtained and that fluctuations in water conditions and groundwater levels should be anticipated to occur with variations in precipitation, snowmelt, site development, and other factors not present during the exploration program. Groundwater levels should be anticipated to vary, and perched water conditions may occur during and after periods of intense precipitation and snowmelt due to higher content silt zones within the shallow glacial deposits.
Refer to the attached test boring logs for more detailed information on subsurface conditions encountered in the borings.
GEOTECHNICAL DESIGN AND CONSTRUCTION RECOMMENDATIONS
The subsurface conditions appear amenable to supporting the elevator pit on shallow mat foundations bearing directly or indirectly on undisturbed glacial till soils. The existing fill soils are considered unsuitable for direct or indirect support of foundations.
All existing fill, demolition debris, and any other deleterious materials (i.e., organic matter, boulders, etc.) should be completely removed where located below the elevator pit bearing zones, and be replaced with either flowable fill or new compacted structural fill as necessary to achieve design footing grade.
The footing bearing zone is defined herein as the area encompassed within a zone beginning 1 foot horizontally beyond the bottom edge of the footing and extending outward and downward at a 1H:1V slope until suitable natural glacial till deposits are encountered.
Mat foundations for the elevator pit may be proportioned for a net allowable soil bearing pressure of 3,000 pounds per square foot (psf). All replacement and raise-in-grade compacted structural fill, should be compacted to a minimum of 95 percent maximum dry density per ASTM D 1557.
For frost protection, elevator pit mat foundations should be founded at least 4 feet below finished exterior grades.
A modulus of subgrade reaction, ksl of no greater than 125 pounds per cubic inch (pci) should be used for design of the elevator pit slab. Note, however, that the value of ksl is for a 1 square foot area. The ksl value should be adjusted for larger areas using the following equation:
Modulus of Subgrade Reaction (ks) = ksl [(B+1)/2B]2
Where: ks = Coefficient of vertical subgrade reaction for loaded area ksl = Coefficient of vertical subgrade reaction for 1 x 1 square foot area
B = Width of area loaded, in feet
The elevator pit walls should be designed to resist the combined lateral forces resulting from earth pressures as well as those posed by any surcharge loading. Backfill materials behind these walls should consist of new compacted structural fill except that a 2-foot thick chimney drain should be placed behind the pit wall as shown on Figure 3. Considering the recommended backfill soil, it is recommended that earth pressures be calculated based upon an equivalent fluid weight of 44 pounds per cubic foot (pcf) for the active condition (i.e. unbraced top of wall), 65 pcf for the at-rest condition (i.e. braced top of wall), and 300 psf for passive pressures; with any surcharge loadings applied over the face of the wall at an intensity equal to 0.3, 0.5 and 3 times the surcharge loading for the active, at-rest and passive conditions, respectively.
The above-referenced lateral earth loads do not include hydrostatic forces, as they are based on construction of a subdrainage system behind all walls to collect and discharge any potential groundwater, perched water or water from sub-slab utilities that could leak or become damaged, as illustrated on Figure
3. Elevator pit subdrains should generally be installed at a minimum 0.5 percent slope and discharge to a suitable system outlet. The system should be gravity drained, if possible, to a suitable surface discharge or storm water catch basins. Given the site topography, it appears that adequate drainage pitch exists to allow for surface discharge. No subdrain system should be connected to roof drain systems.
SLR has evaluated the site seismic Site Class in accordance with the Massachusetts State Building code, 9th Edition, the 2015 International Building Code (IBC) Section 1613 and ASCE 7. Based on the existing subsurface soil profile encountered in the borings, the site meets the general parameters of Seismic Site Class D. Based on the composition, relative density, and groundwater conditions, it is our opinion that the site soils are not susceptible to liquefaction in the event of seismic disturbance.
CONSTRUCTION MONITORING
It is recommended that SLR be retained to provide construction observation services, including elevator pit subgrade observation, and compaction of select granular fill materials crushed stone. The purpose of these observations and testing is to verify that construction is being performed in accordance with the intent of the geotechnical engineering recommendations given in this report and to observe any changes in subsurface conditions that may warrant modification to the foundation systems recommended herein.
If SLR is not retained to provide full-time observation of earthwork during the construction-phase of this project, we cannot be held responsible if unforeseen conditions are not identified and addressed or if conditions identified in this report are not addressed as we intended.
We trust this geotechnical letter report will be responsive to your needs at this time. Feel free to contact the undersigned with questions or if we may be of additional service to your office.
Sincerely, SLR International Corporation
Carl W. Thunberg, PE Charles E. Teale, PE, LSP Principal Geotechnical Engineer Senior Principal Geotechnical Engineer
Attachments: Figure 1 Locus Plan Figure 2 Subsurface Exploration Location Plan Figure 3 Lateral Earth Pressure Diagrams Site Photographs Test Boring Logs Burmister Soil Classification System
FIG. 1
DRAWING NAME:
NORTHAMPTON, MASSACHUSETTS
VA LEEDS BUILDING 25
421 NORTH MAIN STREET
PROJ. NO. 144.20563.00001
SCALE 1"=±2000'
DATE MAY 2022
CHECKEDDRAWNDESIGNED
CWT EAA CWT
PROJECT PHASE:
GEOTECHNICAL
REV: ---
Copyright SLR - 2022
S
W
N
E
2 COMMERCE DRIVE, SUITE 110
BEDFORD, NH 03110
603.668.1654
SLRCONSULTING.COM
FIGURE 1 - SITE LOCUS
SOURCE: 2021 USGS EASTHAMPTON (MA), 7.5 MINUTE SERIES.
SITE
SLR-1
SHEET NO.
FIG 2
R E
V I S
I O
N S
DATE
PROJECT NO.
DESIGNED
CWT
SCALE
DRAWN
EAA
CHECKED
CWT
MAY 2022
144.20563.00001
1"=±10'
S
W
N
E
F I G
U R
E
S
U B
S U
R F
A C
E
E
X P
L O
R A
T I O
N
L
O C
A T
I O
N
P
L A
N
N O
R T
H A
M P
T O
N
M
A S
S A
C H
U S
E T
T S
V A
L
E
D
B
U I L
D I N
G
N
O R
T H
M
I N
R
E E
T
0' 5' 10'
SCALE 1" = ±10'
0 1/2" 1"
C o p y r i g h t
S
R
C
O M
M E R
C E
D
R I V
E
S
U I T
E
B E D
F O
R D
N
H
S L R
C O
N S
U L T
I N
G C
O M
DESIGNATION AND APPROX. LOCATION OF TEST
BORING CONDUCTED ON APRIL 15, 2022 BY
SEABOARD DRILLING, OBSERVED BY SLR.
LEGEND:
UNSCALED ELECTRONIC SITE SKETCH
PROVIDED BY HUNTLEY ASSOCIATES.
BASE PLAN:
NOTE:
1. LATERAL EARTH PRESSURE DIAGRAM IS BASED ON NO PERMANENT HYDROSTATIC
PRESSURES (I.E. GROUNDWATER) BEHIND THE WALL AND CONSTRUCTION OF A
SUBDRAINAGE SYSTEM BEHIND THE WALL, AS SHOWN HEREON, TO RELIEVE
HYDROSTATIC PRESSURES.
2. REFER TO SLR's GEOTECHNICAL REPORT, DATED MAY 2022 FOR ADDITIONAL
INFORMATION.
FIG. 3
R E
V I S
I O
N S
DATE
PROJECT NO.
DESIGNED
CWT
SCALE
DRAWN
EAA
CHECKED
CWT
N.T.S.
F I G
U R
A T
E R
R
P
E
S S
U R
E
D
I A
G R
A M
S
B
S
P r o j e c t
N u m b e r s u n t l e y
A s s o c i a t e s
V
A
L e e d s
B u i l d i n g
C
A D
F
G d w g
LEGEND:
MAY 2022
144.20563.00001
N O
R T
H A
M P
T O
N
M
A S
S A
C H
U S
E T
T S
V
E
D
B
U I L
D I N
G
N
O R
T H
M A
N
R
E E
T
C
O M
M E R
C E
D
R I V
E
S
U I T
E
B E D
F O
R D
N
H
S L R
C O
N S
U L T
I N
G C
O M
AutoCAD SHX Text
SURCHARGE
AutoCAD SHX Text
PASSIVE
AutoCAD SHX Text
LATERAL EARTH
AutoCAD SHX Text ACTIVE: 44H (psf)
AutoCAD SHX Text ACTIVE: 0.3Q (psf)
AutoCAD SHX Text 300h (psf)
AutoCAD SHX Text
FINISH FLOOR
AutoCAD SHX Text
2' MIN
AutoCAD SHX Text 18H (psf)
AutoCAD SHX Text H (ft)
AutoCAD SHX Text h (ft)
AutoCAD SHX Text
PRESSURES
AutoCAD SHX Text SURCHARGE, Q (psf)
AutoCAD SHX Text
EXTERIOR GRADE
AutoCAD SHX Text
BELOW GRADE WALL
AutoCAD SHX Text AT-REST: 65H (psf)
AutoCAD SHX Text AT-REST: 0.5Q (psf)
AutoCAD SHX Text PASSIVE: 3Q (psf)
AutoCAD SHX Text
NON-WOVEN GEOTEXTILE (MIRAFI 140N OR SIMILAR)
AutoCAD SHX Text
3/4" CRUSHED STONE (MA-DOT M2.01.4)
AutoCAD SHX Text
CHIMNEY DRAIN MATERIAL
Veterans Administration Medical Center Building 25
Leeds, Massachusetts
SITE PHOTOGRAPHS
April 15, 2022 Job No: 144.20563.00001
Photo 1: Building 25 under renovation. Proposed boring location inaccessible due to scaffolding.
Photo 2: Vacuum excavation at SLR-1 for top 5 feet to clear utilities.
Veterans Administration Medical Center Building 25
Leeds, Massachusetts
SITE PHOTOGRAPHS
April 15, 2022 Job No: 144.20563.00001
Photo 3: Vacuum excavation at SLR-2 for top 5 feet to clear utilities.
Photo 4: Truck mounted drill rig at SLR-1 in progress.
PROJECT: SHEET: 1 of 1
LOCATION:
PROJ. NO:
CLIENT:
DATE:
X
50/0
Notes:
FILE: Huntley Associates\001 VA Leeds Building 11\Exploration Logs & Data\[ 50 + = VERY DENSE 30 + = HARD
10-30 = MEDIUM 4 - 8 = MEDIUM UP = UNDISTURBED PISTON some = 20% - 35%
30-50 = DENSE 8 -15 = STIFF UT = UNDISTURBED THINWALL and = 35% - 50%
1) TYPE OF RIG: Mobile B-53 truck mounted N = 0 - 4 = VERY LOOSE N = 0 -2 = VERY SOFT C = ROCK CORE trace = 0% - 10%
2) HAMMER/HOIST TYPE: Safety hammer 4-10 = LOOSE 2 - 4 = SOFT S = SPLIT SPOON little = 10% - 20%
COHESIONLESS SOILS COHESIVE SOILS SAMPLE TYPE PROPORTIONS
21 Auger refusal at 20.5 feet. Augers grinding. Inferred bedrock.
S-4 12 Gray fine to medium SAND, some Silt, trace Gravel (GLACIAL TILL)
S-3 8 Broken rock fragments in gray fine SAND with Silt matrix
15 (GLACIAL TILL)
S-2 14 Gray fine to medium SAND, some Silt, trace Gravel (GLACIAL TILL)
S-1 1 Split spoon sampler bouncing. Probable cobble. Light brown fine
6 sand, some silt in tip of split spoon sampler
BURMISTER SYSTEM (SOIL) U.S. CORPS OF ENGINEERS SYSTEM (ROCK)
3 inches of bituminous concrete.
1 Soft dig to 5 feet by vac ex to clear utilities. No samples taken.
2 Difficulty advancing vac-ex due to cobbles.
NO GROUNDWATER ENCOUNTERED
Depth
(FT)
SAMPLE
NUMBER
RECOVERY
(IN)
BLOWS
PER 6"
SOIL AND ROCK CLASSIFICATION-DESCRIPTION
STRATUM CHANGE
DESCRIPTION
PID (PPM)
± PID SCREENING
HAMMER FALL (IN) -- -- 30 --
MONITORING WELL INSTALLED
HAMMER WT (LB) -- -- 140 -- DEPTH (FT)
LABORATORY TESTING
SIZE ID (IN) 4 -- 1 3/8 -- CASING AT (FT) Out
FIELD TESTING
TYPE HSA -- S -- ELAPSED TIME (HR) 0
April 15, 2022 GROUND SURFACE ELEVATION: 407±
EQUIPMENT: AUGER CASING SAMPLER COREBRL. GROUNDWATER OBSERVATIONS
Seaboard
144.20563.00001 FOREMAN: Doug Seeley
Huntley Associates INSPECTOR: Carl Thunberg
No aggregate base noted
GLACIAL TILL
SOFT DIG
5 ft
TEST BORING LOG
VA LEEDS Building 25 BORING NO.: SLR- 1
421 N. Main Street, Northampton, MA CONTRACTOR:
2 Commerce Drive; Suite 110 Bedford, New Hampshire 03110
603-668-1654
PROJECT: SHEET: 1 of 1
LOCATION:
PROJ. NO:
CLIENT:
DATE:
Notes:
FILE:
TEST BORING LOG
VA LEEDS Building 25 BORING NO.: SLR- 2
421 N. Main Street, Northampton, MA CONTRACTOR: Seaboard
144.20563.00001 FOREMAN: Doug Seeley
Huntley Associates INSPECTOR: Carl Thunberg
April 15, 2022 GROUND SURFACE ELEVATION: 410±
EQUIPMENT: AUGER CASING SAMPLER COREBRL. GROUNDWATER OBSERVATIONS FIELD TESTING
TYPE HSA -- S -- ELAPSED TIME (HR) 0 LABORATORY TESTING
SIZE ID (IN) 4 -- 1 3/8 -- CASING AT (FT) Out MONITORING WELL INSTALLED
HAMMER WT (LB) -- -- 140 -- DEPTH (FT) ± 12.0 PID SCREENING
HAMMER FALL (IN) -- -- 30 -- NO GROUNDWATER ENCOUNTERED
Depth
(FT)
SAMPLE
NUMBER
RECOVERY
(IN)
BLOWS
PER 6"
SOIL AND ROCK CLASSIFICATION-DESCRIPTION
STRATUM CHANGE
DESCRIPTION
PID (PPM)
BURMISTER SYSTEM (SOIL) U.S. CORPS OF ENGINEERS SYSTEM (ROCK)
Bare soil at ground surface 1 Soft dig to 5 feet by vac ex to clear utilities. No samples taken.
2 Difficulty advancing vac-ex due to cobbles.
S-1 7 Gray fine to medium SAND, trace brick, trace Gravel (FILL)
6 sand, some silt in tip of split spoon sampler
7 Change in drilling effort at 7 feet. Inferred strata change.
S-2 20 Olive gray fine to medium SAND, some Silt, trace Gravel (GLACIAL TILL)
S-3 12 Similar to S-2 - Wet (GLACIAL TILL)
S-4 8 Similar to S-3. Rock lodged in tip of split spoon sampler.
19 (GLACIAL TILL)
Auger refusal at 23.5 feet. Augers grinding. Inferred bedrock.
COHESIONLESS SOILS COHESIVE SOILS SAMPLE TYPE PROPORTIONS
1) TYPE OF RIG: Mobile B-53 truck mounted N = 0 - 4 = VERY LOOSE N = 0 -2 = VERY SOFT C = ROCK CORE trace = 0% - 10%
2) HAMMER/HOIST TYPE: Safety hammer 4-10 = LOOSE 2 - 4 = SOFT S = SPLIT SPOON little = 10% - 20%
10-30 = MEDIUM 4 - 8 = MEDIUM UP = UNDISTURBED PISTON some = 20% - 35%
30-50 = DENSE 8 -15 = STIFF UT = UNDISTURBED THINWALL and = 35% - 50%
SOFT DIG
5 ft
Huntley Associates\001 VA Leeds Building 11\Exploration Logs & Data\[ 50 + = VERY DENSE 30 + = HARD
FILL
GLACIAL TILL
7 ft
2 Commerce Drive; Suite 110 Bedford, New Hampshire 03110
603-668-1654
Coarse ---- 3/4" to 3" ---- Fine ---- No. 4 to 3/4" ---- PRINCIPAL COMPONENT
Coarse ---- No. 10 to No. 4 ---- GRAVEL, SAND, SILT 50 or more Medium ---- No. 40 to No. 10 ---- CLAY, etc.
Fine ---- No. 200 to No. 40 ----
MINOR COMPONENTS
Non-Plastic 0 and 35 to 50 fine to coarse Slight SAND, and GRAVEL, 1 to 5 etc.
Low some 20 to 35 5 to 10 some Gravel, some Silt, etc.
Medium 10 to 20 little 10 to 20 little Gravel, little Silt, High etc.
20 to 40 trace 1 to 10
Very High trace Gravel, trace Silt, 40 and greater etc.
0 - 4 Very loose 4 - 10 Loose
10 - 30 Medium dense 30 - 50 Dense
50+ Very dense
0 - 2 Very soft 2 - 4 Soft 4 - 8 Medium
8 - 15 Stiff 15 - 30 Very stiff
30+ Hard
DECOMPOSED VEGETATION - PARTIALLY DECOMPOSED ORGANIC MATTER WHICH RETAINS
ITS ORIGIANAL CHARACTER;
LIGNITE - IMMATURE COALS WITH LOW FIXED CARBON CONTENT GENERALLY EXHIBITING
DISTINCT TEXTURE OF WOOD;
HUMUS - COMPLETELY DECOMPOSED ORGANICMATTER
FILL - MAN MADE DEPOSIT CONTAINING SOIL, ROCK OR FOREIGN MATTER
PROBABLE FILL - SOILS WHICH CONTAIN NO VISUALLY DETECTABLE FOREIGN MATTER BUT
WHICH ARE SUSPECT WITH RESPECT TO ORIGIN
LENSES - LAYER LESS THAN 1/2 INCH LAYERS - 1/2 TO 12 INCH THICK LAYER
POCKET - DISCONTINUOUS LAYERS LESS THAN 12 INCHES
STRATUM - CONTINUOUS LAYERS GREATER THAN 12 INCHES
COLOR SHADING - LIGHT OR DARK TO INIDCATE SUBSTANTIAL DIFFERENCE IN COLOR
B. INDENTIFICATION OF DESCRIPTION TERMS
all fractions greater than 10 percent less than 10 percent fine less than 10 percent coarse less than 10 percent coarse and fine less than 10 percent coarse and medium
FISSURED CLAYS - COHESIVE SOILS AND EXHIBITING A JOINT STRUCTURE,
TOPSOIL - SURFICIAL SOILS THAT SUPPORT PLANT LIFE AND WHICH CONTAIN CONSIDERABLE
AMOUNTS OF ORGANIC MATTER
VARVED DEPOSITS - ALTERNATING LIGHT AND DARK LAYERS OF COHESIVE
MOISTURE CONDITIONS - WET, MOIST, OR DRY PER VISUAL OBSERVATION
GRANULAR SOILS
Relative Density medium to coarse fine to medium
1/32
1/64
Passing No. 200
Passing No. 200
CLAYS AND SILTS DEPOSITED AS GLACIAL LAKE SEDIMENTATION
QUARTZ - A HARD SILICA MINERAL OFTEN FOUND IN SOME GLACIAL LAYERS
IRONITE - CEMENTED DEPOSITS OF IRON OXIDE WITHIN A SOIL LAYER
CEMENTED SAND - VARIOUS SIZED AND GRAINS CEMENTED BY CALCIUM
CARBONATE OR OTHER MINERALS WITHIN THE SOIL DEPOSIT
A. CLASSIFICATION OF SOIL COMPONENTS
D. DENSITY OR CONSISTENCY
1/4 Passing No. 200 ----
Passing No. 200 ---- 1/16
SILT and CLAY ----
CLAY
Passing No. 200
1/8 Passing No. 200
SMALLEST DIAMETER OF
ROLLED THREAD (IN.)
PEAT
DESCRIPTION OF SOIL
COMPONENTS
Clayey Silt
CLAY and SILT
Silty Clay
GRADATION DESIGNATIONS FOR IDENTIFICATION DEFINING PROPORTIONS
C. DEFINITION OF TERMS IDENTIFYING THE GRADATION OF THE GRANULAR COMPONENT
Partially decomposed fibrous organic matter without living fibers
GRAVEL
SAND
SILT
Standard Penetration Resistance (N value) blows/footfine to coarse
PLASTIC SOILS
PLUS (+) NEARER THE UPPER LIMIT OF THE PROPORTION OR OVERALL PLASTICITY
MINUS (-) NEARER THE LOWER LIMIT OF THE PROPORTION OR OVERALL PLASTICITY
Standard Penetration Resistance (N value) Blows/foot
Consistency fine
ORGAINIC MATTER (EXCLUDING PEAT):
BURMISTER SOIL CLASSIFICATION SYSTEM
GENERALLY SLIGHTLY TO HIGHLY OVER CONSOLIDATED
PERCENTAGE OF SAMPLE BY
WEIGHT
OVERALL PLASTICITY
AND PLASTICITY INDEX
PRINCIPAL
COMPONENT
DESCRIPTIVE
PARTICLE SIZE
SIEVE SIZE
FROM PARENT ROCK AND ARE PRESENT IN A SOIL MATRIX
NO SIGN - MIDDLE RANGE OF THE PROPORTION OR OVERALL PLASTICITY
COBBLES - ROUNDED PIECES OR ROCK BETWEEN 3 TO 6 INCHES
BOULDERS - ROUNDED PIECES OF ROCK LARGER THAN 6 INCHES
ROCK FRAGMENTS - ANGULAR PIECES OF ROCK WHICH HAVE SEPARATED
E. GLOSSARY OF MISCELLANEOUS TERMS
medium test Borings
File details come from the government source that posted it. Updated .