631-21-011 Bid Drawings_Part2.pdf
PDF 20 MB Posted
- Attached to
- Z2DZ-- 631-21-011 Modernize, Replace, or Install Elevators in 8 Buildings Federal contract opportunity
- Solicitation number
- 36C24123B0011
About this file
This document provides details on a federal contract opportunity to modernize, replace, or install elevators in eight buildings for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. Solicitation number 36C24123B0011 requests bids to replace elevators at various VA medical center locations, with a response deadline of April 30, 2022. The opportunity is for upgrading elevators to current safety and accessibility standards at facilities housing veterans healthcare programs. Interested contractors should review the 20MB file of bid drawings and specifications to understand the full scope of modernization required at each site. The contract is set to be awarded by August 2022 following evaluations of submitted proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24123B0011 0002.docx | DOCX document | |
| 36C24123B0011 0001.docx | DOCX document | |
| VA Leeds Building 25 Geo Report 05-17-22.pdf | ||
| S04_Site Visit Sign-In Sheet_631-21-011.pdf | ||
| 631-21-011 Modernize Elevators RFI Responses 20230802.docx | DOCX document | |
| S02_WD MA 20230003 07 28 2023.pdf | ||
| 631-21-011 Bid Drawings_Part3.pdf | ||
| S02_WD MA 20230003 06162023.pdf | ||
| 631-21-011 Bid Drawings_Part1.pdf | ||
| 36C24123B0011.docx | DOCX document | |
| 631-21-011-Bid Specifications.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXTERIOR FINISH SCHEDULE
MATERIAL MANUFACTURER STYLE COLOR TEXTURE
MODULAR FIELD BRICK - RUNNING BOND
CAST STONE WINDOW SILL
MORTAR COLOR AT MODULAR BRICK
ALUMINUM STOREFRONT WINDOW
TYPICAL WINDOW GLAZING
HOLLOW METAL DOOR AND FRAME
GALV. STEEL RELIEVING ANGLES
PAINTED WHERE EXPOSED (AT WINDOWS
IN BRICK FACADE)
ALUM ARCHITECTURAL WALL
FLASHING/FASCIA/GUTTERS
(PAINTED)
GLEN-GERY 56DD MATCH EXIST BRICK
BY CONTRACTOR
3-5/8" x 7-5/8" x 48"
MATCH EXIST SILL
MATCH EXIST MANUF. TYPE S MATCH EXIST COLOR CONCAVE JOINT
MATCH ALUM. PANEL
MEDIUM TINT
FS-24084 - DARK BRONZE
MATCH BRICK COLOR
ANTIQUE COPPER SMOOTH
BY CONTRACTOR COPPER MATCH EXIST. BLDG
MODULINE
BY CONTRACTOR
PRE-MANUF.
ARCH. SLATE SHINGLES* CAMARA SLATE PROD. .251 / 660 LBS UNFADING GREEN; S1 SIZE: 12" W X 18" L
& DOWNSPOUTS
CONC. FOUNDATION WALLS FINISH BY CONTRACTOR MATCH EXIST. MATCH EXIST. RUBBED CONC. FIN.
LIGHT BRONZE
BY CONTRACTOR HPC PAINT ON
PAINTED EQUIPMENT & HANDRAILS BY CONTRACTOR MATCH EXIST. MATCH EXIST. N/A
EXTERIOR CONCRETE SIDEWALKS BY CONTRACTOR LIGHT BROOM FINISH MED. SANDBLAST ACCENTS N/A
MODULAR ACCENT BRICK -
DOUBLE SOLDIER COURSE
GLEN-GERY 56DD
STOREFRONT 1/1
GENERAL CONTRACTOR TO SUBMIT A FINAL SAMPLE TO THE VA COR PRIOR TO PLACING THE FINAL ORDER.
MATCH EXIST BRICK
MATCH EXIST BRICK
MATCH EXIST BRICK
MATCH EXIST BRICK
MATCH EXIST BRICK
MATCH EXIST SILL
DOOR & FRAME
PANELS
MATCH EXIST. BLDG
ALL STOREFRONT WINDOWS TO INCLUDE INTERIOR MINI BLINDS.
PLUSB.O.D. ALUCOBOND
CRAWL SPACE GRATE STYLE LOUVER MASTER FLOW 16" X 8" DIE-CAST ALUMINUM MILL FINISH
ROOF SNOW GUARD MAT ALPINE SNOWGUARDS (3) ROWS, MAT TYPE COPPER N/A
*THE MANUFACTURER, B.O.D. ALPINE, WILL PROVIDE A RECOMMENDED SNOW AND ICE GUARD LAYOUT DURING THE SHOP DRAWING
REVIEW PHASE OF THE PROJECT.
VENT
NEW EXIST.
NEW EXIST.
8"
'-8
'-8
WALL EDGE OF NEW
CRAWL SPACE BEYOND
WALL EDGE OF EXISTING
BASEMENT BEYOND
1' -4
9'
-4
1' -4
9'
-4
1' -4
2'
-0
162'-6" 16
E.J.
FIRST FLOOR
0"
SECOND FLOOR
11' - 6"
BASEMENT
-11' - 6"
T.O. ELEV. SHAFT
24' - 0"
3 7
NEWEXIST.
NEWEXIST.
A
114A
EXIST. ATTIC FLOOR
22' - 8"
ROOF PEAK
31' - 1"
WALL EDGE OF NEW CRAWL SPACE BEYOND
WALL EDGE OF EXISTING BASEMENT BEYOND
2' -8
'-8
'-4
2'-4"3'-4"1'-11"
INSULATED COMPOSITE PANEL
7'-4"6'-4"1/2"
3'-8" 3'-8"
5 TRUSS BEARING HT.
24' - 8"
M
AT
C H
E
XI
ST
3'
-2
2' -0
1'
-4
(5 ) E
Q . P
AN
EL
S 9'
-4
1' -4
(5
) E Q
. P
AN
EL
S
9' -4
1'
-4
ROOF CRICKET PEAK
28' - 9"
E.J.
FIRST FLOOR
0"
SECOND FLOOR
11' - 6"
BASEMENT
-11' - 6"
ELEVATOR PIT
-15' - 4"
T.O. ELEV. SHAFT
24' - 0"
BASEMENT ENTRY
-7' - 5"
A
A
L1 L1
EXIST. ATTIC FLOOR
22' - 8"
ROOF PEAK
31' - 1"
FLOOR LINE OF EXISTING BASEMENT BEYOND
BOTTOM OF CRAWL SPACE BEYOND
2' -8
'-8
'-8
8"
2 2
7'-0" 4'-3" 3'-4" 4'-3" 7'-0"
1'-11" 2'-4" 1'-8" 1'-8" 2'-4" 1'-11"
INSULATED COMPOSITE PANEL
11'-10"
TRUSS BEARING HT.
24' - 8"
4' -0
8"
4' -5
3'
-1
4' -5
3'
-0
4'-3" 3'-4" 4'-3"
1' -1
0" (3
) E Q
. P
AN
EL
S
6' -0
1'
-4
(5 ) E
Q . P
AN
EL
S 9'
-4
1' -4
(5
) E Q
. P
AN
EL
S
9' -4
1'
-4
1/
2" 3' -3
"4 1/
2"
6 1/2"
15 15
ROOF CRICKET PEAK
28' - 9"
T.O. ELEV. SHAFT
24' - 0"
EXIST. ATTIC FLOOR
22' - 8"
ROOF PEAK
31' - 1"
4"
PREFINISHED AL PANEL
12'-7" 4"
PREFINISHED AL PANEL
12'-7"
BRICK VENEER
WRAP FACE OF FASCIA AND
SOFFIT W/ PREFINISHED ALUM
PANEL, TO MATCH COLOR OF
NEW COMPOSITE PANEL
TRUSS BEARING HT.
24' - 8"
COPPER GUTTER AND
DOWNSPOUT TO MATCH
COLOR OF EXIST.
FIRE RATED DEMISING PARTITION BEYOND
CONTINUOUS COPPER STEP
FLASHING, EXTEND FROM
FACE OF NEW EXTERIOR
SHEATHING TO UNDERSIDE
OF NEW SLATE TILE ROOFING,
OVERLAP 12" MIN, TYPICAL
NEW COPPER THROUGH WALL
STEP FLASHING, AT BRICK
VENEER EXTEND FROM FACE
OF EXTERIOR SHEATHING TO
UNDERSIDE OF NEW SLATE
TILE ROOFING, OVERLAP 12"
MIN, TYPICAL
NEW RAFTER AND DECK
SYSTEM OVER EXIST ROOF
STRUCT. SEE STRUCT DWGS
EXISTING ROOF DECK
AND STRUCTURE
NEW PREFINISHED ALUM
SYSTEM TO MATCH SOFFIT
5:125:12
MAX
2'-0"
ROOF CRICKET PEAK
28' - 9"
3/8" THICK POWDERCOAT METAL
COVER, WITH PAINTED FINISH TO
MATCH WALL COLOR.
(6) 3/8" GALV. HEX BOLTS, NUTS AND
WASHERS FOR REMOVABLE
ACCESS
2" X 2" POWDER COATED WALL
BRACKETS. ANCHOR TO WALL
WITH GALV. THREADED LAG
BOLTS INTO STRUCTURAL (3)
BOLTS PER BRACKET
MINI-SPLIT CONDENSING UNIT
BRACKET DIMENSIONS WILL
NEED TO BE ADJUSTED TO
THE FINAL MAKE AND MODEL
DIMENSIONS OF THE UNIT.
1' -4
VA
R
IE
S O
N U
N
IT
S
IZ
E 2'
-4
2" 1'-10" +/-
3"
1'-0"
1'-0"
4"
2" 1'-10" +/-
2'-7" +/-
3'-6"
EXIST. WALL SURFACE
2"
FRONT ELEVATIONSECTION A
2"
POWDER COATED
SNOW HOOD AND
METAL WALL BRACKET
2 x 2 POWDER COATED
TUBE STEEL WITH
WELDED CONNECTIONS
AND CLOSED ENDS.
(3) 5/8" GALV.
THREADED LAG BOLTS
(EACH BRACKET) WITH
HIGH STRENGTH
ADHESIVE
(2) POWDER COATED
METAL WALL BRACKETS.
PAINT TO MATCH HOOD.
(2) 5/8" GALV.
THREADED LAG BOLTS
(EACH BRACKET) WITH
HIGH STRENGTH
ADHESIVE
PROVIDE SLOTTED
HOLE IN BRACKET
FOR BOLTED
CONNECTION OF
UNIT ATTACHEMENT
ON ALL 4 CORNERS.
A E-A-200
(6) 3/8" GALV. HEX BOLTS, NUTS AND
WASHERS FOR REMOVABLE
ACCESS
1-1/2" x 1-1/2" POWDER COATED
TUBE STEEL WITH WELDED
CONNECTIONS.
2 x 2 POWDER COATED TUBE STEEL
WITH WELDED CONNECTIONS AND
CLOSED ENDS.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
2:
:0
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v-
Bu ild in g
_E ag le
_b ne ed ha m
8H L.
rv t
E-A-200
EAGLE (BUILDING 25) EXTERIOR
ELEVATIONS
8 13OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
NORTH ELEVATION
Scale: 1/4" = 1'-0"
SOUTH ELEVATION
Scale: 1/4" = 1'-0"
EAST ELEVATION
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
1 NEW SLATE TILE ROOF TO MATCH EXISTING.
2 NEW BRICK VENEER TO MATCH EXISTING,
3 NEW 16" THICK CONCRETE FOUNDATION WALL, W/
CHAMFERED UPPER EDGE. REMOVE CONCRETE
FORMS WHILE CONCRETE IS STILL "GREEN" &
PROVIDE A RUBBED SURFACE. NEW FINISH TO
MATCH EXISTING CONCRETE FOUNDATION FINISH.
SEE STRUCTURAL DWGS.
4 SOLDIER COURSE BRICK, 2 ROWS
5 NEW COPPER GUTTER AND DOWNSPOUT TO
MATCH COMPOSITE PANEL.
6 NOT USED.
7 NEW 8" THICK CONCRETE FOUNDATION WALL. W/
CHAMFERED UPPER EDGE. REMOVE CONCRETE
FORMS WHILE CONCRETE IS STILL "GREEN" &
PROVIDE A RUBBED SURFACE. NEW FINISH TO
MATCH EXISTING CONCRETE FOUNDATION FINISH.
SEE STRUCTURAL DWGS.
8 NEW GUARDRAIL AND HANDRAIL. SEE CIVIL DWGS
FOR MORE INFORMATION.
9 NEW 5" RE-INFORCED CONCRETE SLAB OVER TOP
OF EXISTING UTILITY TUNNEL WALLS. SEE
STRUCTURAL DRAWINGS.
10 REMOVE AND REINSTALL EXISTING COPPER
GUTTER AND DOWNSPOUTS TO COMPLETE NEW
WORK.
11 NEW DECORATIVE PREFINISHED ALUM. LOUVER W/
INSECT SCREEN TO MATCH COMPOSITE PANEL.
12 EXISTING WINDOW TO REMAIN. PROTECT DURING
CONSTRUCTION.
13 NEW COPPER GUTTER AND DOWNSPOUT TO
MATCH EXISTING.
14 EXISTING DOOR TO REMAIN. PROTECT FROM
DAMAGE DURING CONSTRUCTION.
15 ALL EXISTING MASONRY TO REMAIN SHALL BE
CLEANED AND REPOINTED. REPLACE ANY
DAMAGED BRICK.
16 WALL PACK. SEE ELEC. DWGS.
17 MINI-SPLIT CONDENSING UNIT W/ WALL MOUNTED
BRACKET. SEE MECH DWGS FOR MORE
INFORMATION.
18 PVC CONDENSATE COVER FOR MINI-SPLIT, PAINT
TO MATCH BRICK.
19 INDIVIDUAL COPPER SNOW GUARDS DESIGNED
NOT TO PENETRATE SLATE SHINGLES. 3 ROW
SPACING - 24" O.C. HORIZ. WITH THE MIDDLE ROW
STAGGERED 12".
20 CONDENSING UNIT METAL SNOW COVER. SEE
DETAIL 5/E-A-200.
21 COPPER CONDENSATE LINE. SEE PLUMB.
DRAWINGS FOR MORE INFORMATION
A. REFER TO SHEET E-A-100 FOR DOOR SCHEDULE AND
DETAIL.
B. REFER TO SHEET E-A-301 FOR WINDOW SCHEDULES
AND DETAILS.
C. SEE CIVIL DRAWINGS FOR ADDITIONAL GRADING
INFORMATION.
D. G.C. TO REVIEW CIVIL, STRUCTURAL, INTERIOR,
MECHANICAL, ELECTRICAL, FIRE PROTECTION, AND
LOW VOLTAGE DRAWINGS AND SPECIFICATIONS FOR
OTHER NEW WORK REQUIREMENTS.
Scale: 1/4" = 1'-0"
WEST ELEVATION / SECTION @ ROOF
0 2 4 8 0 2 4 8 0 2 4 8
0 1 2 4 0 2 4 8
Scale: 1/2" = 1'-0"
SNOW HOOD AND WALL BRACKET DETAIL
DocuSign Envelope ID: 541ADAB3-2504-4B07-BAA0-A19CCA635BA3
6/28/2023
FIRST FLOOR
0"
SECOND FLOOR
11' - 6"
A
BASEMENT
-11' - 6"
ELEVATOR PIT
-15' - 4"
T.O. ELEV. SHAFT
24' - 0"
CD B
BASEMENT ENTRY
-7' - 5"
E-A-301
1_____ E-A-301
3 3 E-A-300 _____ 1
E-A-300
STAIR
STAIR
ELEVATOR
LOBBY
CONNECTING
CORRIDOR
CRAWL SPACE
EXIST. ATTIC FLOOR
22' - 8"
ROOF PEAK
31' - 1"
TRUSS BEARING HT.
24' - 8"
ELEV.
CAB
E-A-300
ROOF CRICKET PEAK
28' - 9"
UL RATING
2 HR - D-985
UL RATING
1 HR - U-404
UL RATING
1 HR
UL RATING
2 HR - D-985
UL RATING
1 HR
NEW PIT LADDER
SEE G-006 FOR
MORE INFO.
ELEV.
SHAFT
P25
FIRST FLOOR
0"
SECOND FLOOR
11' - 6"
BASEMENT
-11' - 6"
E-A-300
ELEVATOR PIT
-15' - 4"
T.O. ELEV. SHAFT
24' - 0"
A
114A
STAIR
STAIR
CRAWL SPACE
E-A-302
EXIST. ATTIC FLOOR
22' - 8"
6 6
TRUSS BEARING HT.
24' - 8"
NEW EXIST.
NEW EXIST.
-8'-0"
MUD SLAB
ROOF CRICKET PEAK
28' - 9"
UL RATING
2 HR - D-985
EXISTING
1 HR WALL
RATING
1 HR FIRE RATED
EXTERIOR WALL
SYSTEM PER UL
FWFO.EWS0038
E.J.
E-A-300
E-A-300
CONNECTING
CORRIDOR
OFFICERS
LOCKER ROOM
AND BREAK
AREA
OFFICE
ELEV. EQUIP.
ROOM
MATERIAL
STORAGE
NEW EXIST.
NEW EXIST.
E-A-200
E-A-300
E-A-300
ELEV.
CAB
EXISTING
1 HR WALL
RATING
UL RATING
2 HR - D-985
UL RATING
1 HR
UL RATING
1 HR
1 HR FIRE RATED
EXTERIOR WALL
SYSTEM PER UL
FWFO.EWS0038
UL RATING
1 HR - I-504
N
EW
S
TR
U C
TU
R
AL
O
PE
N
IN
G
9' -8
UL RATING
1 HR - U-415
E.J.
ELEV.
SHAFT
P25
FIRST FLOOR
0"
BASEMENT
-11' - 6"
CD
4"
8" 1'-4"
-8'-0"
MUD SLAB
1' -0
ELEVATOR PIT
-15' - 4"
4"
ELEV. EQUIP.
ROOM
P25
ELEV. SHAFT
143" R
IG
ID
IN
SU
L.
2'
-0
3" RIGID INSUL.
2'-0"
T.O. ELEV. SHAFT
24' - 0"
EXIST. ATTIC FLOOR
22' - 8"
ROOF PEAK
31' - 1"
TRUSS BEARING HT.
24' - 8"
ROOF CRICKET PEAK
28' - 9"
NEW SLATE TILE
ROOF ON STRUCT
TRUSS FRAMING,
SEE E-A-102 FOR
ADT'L INFORMATION
SEE STRUCT. DWGS
FOR TRUSS DESIGN
PRE FINISHED AL WRAPPED SOFFIT
AND FASCIA. COLOR TO MATCH
COMPOSITE PANEL.
SEE STRUCT. DWGS
FOR TOP OF ELEVATOR
SHAFT DETAIL.
CMU WALL
SEE STRUCT. DWGS
(2) 5/8" TYPE "X" GYPSUM
BOARD
PRE FINISHED ALUM PANEL
MIN.
3 1/2"
EXIST ROOF RAFTERS AND
DECK
CONT PRE FINISHED ALUM FLASHING
OVER SELF ADHESIVE ICE AND WATER
ROOFING UNDERLAYMENT. SECURED
W/SELF ADHERED FLASHING TAPE
1 HR FIRE RATED EXTERIOR WALL
SYSTEM PER UL FWFO.EWS0038
(2) TRUSSES SEPARATED BY A
LAYER OF 5/8" GYPSUMBOARD
6" BATT INSULATION
FILL TRUSS VOIDS W/ 4" STONE
WOOL BATT INSULATION
T.O. ELEV. SHAFT
24' - 0"
EXIST. ATTIC FLOOR
22' - 8"
ROOF PEAK
31' - 1"
TRUSS BEARING HT.
24' - 8"
PRE FINISHED AL WRAPPED
SOFFIT AND FASCIA. COLOR TO
MATCH COMPOSITE PANEL.
BRICK VENEER
MORTAR GUARD FULL HEIGHT
OF 2" AIR CAVITY
2" RIGID INSULATION
LIQUID APPLIED VAPOR
BARRIER
FIBER GLASS FACED
SHEATHING
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
2:
:0
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v-
Bu ild in g
_E ag le
_b ne ed ha m
8H L.
rv t
E-A-300
EAGLE (BUILDING 25) ELEVATOR
BUILDING SECTION & WALL SECTIONS
9 13OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
Scale: 1/4" = 1'-0"
BUILDING SECTION NORTH-WEST0 2 4 8 0 2 4 8 0 2 4 8
Scale: 1/4" = 1'-0"
STAIR SECTION NORTH-EAST
Scale: 1/4" = 1'-0"
ELEVATOR SECTION NORTH-EAST
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 NEW GUARDRAIL AND HANDRAIL. SEE CIVIL DWGS
FOR MORE INFORMATION.
3 NEW (45 MIN) FIRE RATED, ACCESS DOOR IN
EXISTING OPENING.
4 NEW (3") SEMI-RIGID STONE WOOL THERMAL
INSULATION BOARD, AT UNDERSIDE OF FIRST
FLOOR, TYPICAL.
5 NEW 5" CONCRETE SLAB OVER TOP OF
ENGINEERED FILL. SEE STRUCTURAL DRAWINGS.
6 SEE STRUCTURAL DRAWINGS FOR FOOTING DEPTH
AND ADDITIONAL INFORMATION.
7 NEW WATERPROOF MEMBRANE ON THE INTERIOR
WALL SIDE OF THE ELEVATOR PIT AND EXTERIOR
OF FOUNDATION WALL. EXTEND TO BASEMENT
FLOOR LEVEL.
8 NEW RIGID INSULATION.
9 VAPOR BARRIER
10 CONTINUOUS FOUNDATION DAMP PROOFING, FULL
HEIGHT OF WALL OVERLAP W/ VAPOR BARRIER
BELOW
11 COMPACTED SELECT GRANULAR FILL
12 CONCRETE FOUNDATION WALL, SEE STRUCT.
DWGS.
13 SELF ADHERED NON-PERMEABLE MEMBRANE, W/
PROTECTION BOARD. TURN DOWN AT FOOTING,
OVERLAP W/ VAPOR BARRIER AT FOOTING BELOW.
14 2" RIGID INSULATION.
15 NEW 8" AND 16" THICK CONCRETE FOUNDATION
WALL, W/ CHAMFERED UPPER EDGE. REMOVE
CONCRETE FORMS WHILE CONCRETE IS STILL
"GREEN" & PROVIDE A RUBBED SURFACE. NEW
FINISH TO MATCH EXISTING CONCRETE
FOUNDATION FINISH. SEE STRUCTURAL DWGS.
16 INSTALL DOOR AND FRAME AFTER ALL ELEVATOR
EQUIPMENT HAS BEEN INSTALLED IN ROOM.
17 (2) LAYERS OF 5/8" TYPE "X" GYPSUM BOARD FULL
LENGTH AND WIDTH OF TRUSSES.
18 1 HOUR RATED, INSULATED, PREFINISHED ALUM.
ATTIC HATCH.
19 PROVIDE NEW ALUMINUM CRAWL SPACE VENT.
20 PROVIDE R-38 BATT INSULATION ON TOP OF THE (2)
LAYERS OF GYP. BD. TOTAL ROOF R-VALUE
SHOULD BE MIN. R-49 TO MAX R-60. 3" OF RIGID
INSULATION IS INDICATED ON TOP OF THE ROOF
SHEATHING FOR A COMBINED DESIGNED R-VALUE
OF R-56.
21 CONNECT NEW 6" PERFORATED DRAIN TILE TO
STORM SYSTEM. SEE CIVIL DRAWINGS FOR MORE
INFORMATION.
A. SEE STRUCTURAL DRAWINGS FOR FOOTING DEPTH
AND ADDITIONAL INFORMATION.
Scale: 1/2" = 1'-0"
AT RAMP LANDING
Scale: 1/2" = 1'-0"
AT ELEV. EQUIP ROOM0 1 2 4
Scale: 3/4" = 1'-0"
ROOF TO WALL DETAIL
Scale: 3/4" = 1'-0"
ROOF TO WALL DETAIL 0 1 2 40 1 20 1 2
FOUNDATION WALLFOUNDATION WALL
FIRST FLOOR
0"
SECOND FLOOR
11' - 6"
BASEMENT
-11' - 6"
ELEVATOR PIT
-15' - 4"
T.O. ELEV. SHAFT
24' - 0"
BASEMENT ENTRY
-7' - 5"
TRUSS BEARING HT.
24' - 8"
EXISTING ROOF BEYOND
EXISTING WALL AND
BASEMENT ENTRY DOOR
BEYOND
PREFINISHED AL GUTTER AND
DOWNSPOUT, COLOR TO
MATCH COMPOSITE PANEL
NEW SLATE TILE ROOF ON
STRUCTURAL TRUSS
FRAMING, SEE E-A-102 FOR
ADT'L INFORMATION
EXISTING FASCIA &
GUTTER BEYOND. MODIFY
GUTTER FOR NEW
ADDITION
EXIST. BRICK VENEER WALL
AND WINDOW BEYOND
METAL FLASHING W/ DRIP
EDGE WITH WEEPS AND
BACKER ROD
SEE STRUCT. DWGS
FOR TRUSS BEARING DETAILS
PRE FINISHED AL WRAPPED
SOFFIT AND FASCIA. COLOR
TO MATCH COMPOSITE PANEL.
SEE STRUCT.
DWGS FOR
TOP OF
ELEVATOR
SHAFT DETAIL.
BRICK VENEER WITH AIR
SPACE AND FULL HEIGHT
MORTAR GUARD OVER RIGID
INSULATION ON LIQUID
APPLIED MOISTURE BARRIER
OVER CMU BACKUP WALL
SYSTEM
EXIST. BRICK VENEER WALL
AND WINDOW BEYOND
ROOF CRICKET PEAK
28' - 9"
(2) 5/8" TYPE "X"
GYPBOARD
R-38 BATT INSULATION
2" COVER BOARD OVER
WATERPROOF MEMBRANE
LIQUID APPLIED MOISTURE
BARRIER ON ALL
EXTERIOR BELOW GRADE
FOUNDATION WALLS
FIRST FLOOR
0"
SECOND FLOOR
11' - 6"
BASEMENT
-11' - 6"
TRUSS BEARING HT.
24' - 8"
PREFINISHED AL GUTTER
AND DOWNSPOUT, COLOR
TO MATCH COMPOSITE
PANEL
NEW STOREFRONT
WINDOW
BRICK VENEER WITH AIR
SPACE AND FULL HEIGHT
MORTAR GUARD OVER RIGID
INSULATION ON LIQUID
APPLIED MOISTURE BARRIER
OVER CMU BACKUP WALL
SYSTEM
TRUSS SYSTEM,
SEE STRUCT
DWGS
NEW SLATE TILE
ROOF TO MATCH
EXISTING OVER
1"x 2" LATH IN 12"
CROSS HATCH
PATTERN.
SECURE TO
PLYWOOD USING
SS FASTENERS.
NEW GUARDRAIL,
SEE CIVIL DRAWINGS
SCHEDULED DOOR
CAST IN PLACE STRUCT
CONC SLAB, FOUNDATION
WALL AND FOOTING, SEE
STRUCT DWGS
EXIST. BRICK VENEER WALL
AND WINDOW BEYOND
SCHEDULED
CEILING
CONCRETE
LANDING &
STAIRS
BEYOND
EXISTING FASCIA &
GUTTER BEYOND. MODIFY
GUTTER FOR NEW
ADDITION
PREFINISHED
AL WRAPPED
SOFFIT AND
FASCIA. COLOR
TO MATCH
COMPOSITE
PANEL.
E-A-301
E-A-301
2" COVER BOARD OVER
WATERPROOF MEMBRANE
3/4" TONGUE AND GROOVE
TREATED PLYWOOD
DECKING OVER METAL
TRUSS SYSTEM. SECURE
USING SS FASTENERS.
3/4" TONGUE AND GROOVE
TREATED PLYWOOD
DECKING OVER 3" RIGID
INSULATION. SECURE
USING SS FASTENERS.
CONT VAPOR
BARRIER TO
UNDERSIDE OF
MUD SLAB ABOVE
ROOF CRICKET PEAK
28' - 9"
4' -1
1" 7'
-6
7' -2
3' -2
JOISTS, SEE
STRUCT DWGS.
JOIST, SEE
STRUCTURAL DWGS.
(2) 5/8" TYPE "X"
GYPBOARD
R-38 BATT INSULATION
LIQUID APPLIED MOISTURE
BARRIER ON ALL
EXTERIOR BELOW GRADE
FOUNDATION WALLS
1/2"
ROOF PEAK
31' - 1"
CEILING AS SCHEDULED
CEILING AS SCHEDULED
7/8" HAT CHANNEL
5/8" GYPSUM WALL
BOARD
5/8" GYPSUM WALL
BOARD ON 6" METAL
STUD FRAMING W/
BATT INSULATION
E-A-301
PROVIDE SOLID
SURFACE WINDOW
SILL STOOL
PRE-FINISHED ALUM.
THROUGH WALL
FLASHING W/ FACTORY
FORMED DRIP EDGE
AND WEEPS, 24" O.C.
ALUM. LOUVER, REFER
TO MECHANICAL
DRAWINGS
STRUCTURAL CAST IN
PLACE CONCRETE
FOUNDATION WALL W/
CHAMFER TOP, SEE
STRUCTURAL DRAWINGS
ROOF OUTRIGGER
AND FASCIA TRIM
INSULATED ALUM.
COMPOSITE PANEL ON
RIGID INSULATION ON
LIQUID APPLIED VAPOR
BARRIER ON CMU BACKUP
WALL SYSTEM
TERMINATE FURRED OUT
WALL ABOVE CEILING
STOREFRONT WINDOW
INSULATED ALUM.
COMPOSITE PANEL ON 2"
RIGID INSULATION ON
LIQUID APPLIED MOISTURE
BARRIER ON CMU BACKUP
WALL SYSTEM
SEE STRUCT DWGS
FOR CONCRETE SLAB
FLOOR BEARING &
CONNECTION DETAILS
5/8" GYPSUM WALL
BOARD ON 6" METAL
STUD FRAMING W/
BATT INSULATION
STRUCTURAL FOOTING,
SEE STRUCTURAL
DRAWINGS
6"
SEE STRUCT. DWGS
FOR TRUSS BEARING
DETAILS
PRE FINISHED ALUM.
WRAPPED SOFFIT AND
FASCIA. COLOR TO MATCH
COMPOSITE PANEL. 6" METAL STUDS @ 16"
O.C.. FILL CAVITY WITH
THERMAL INSULATION
DECORATIVE LOUVER.
COLOR AND FINISH TO
MATCH COMPOSITE
PANELS
5/8" FIBERGLASS FACED
SHEATHING
RIGID INSULATION ON
LIQUID APPLIED VAPOR
BARRIER
E-A-301
E-A-301
(2) 5/8" TYPE "X"
GYPBOARD
SEE STRUCT. DWGS
FOR TRUSS DESIGN
R-38 BATT
INSULATION
1'-2"
2" COVER BOARD OVER
WATERPROOF MEMBRANE
LIQUID APPLIED MOISTURE
BARRIER ON ALL
EXTERIOR BELOW GRADE
FOUNDATION WALLS
LIQUID APPLIED MOISTURE
BARRIER ON ALL INTERIOR
BELOW GRADE
FOUNDATION WALLS IN
CRAWL SPACE
1/2"BACKER ROD & SEALANT
2" 5"
PRE FINISHED ALUM.
LOUVER
16" CONCRETE
FOUNDATION WALL.
SEE STRUCT. DWGS.
BRICK VENEER
MORTAR GUARD
2" RIGID INSUL.
CONTINUOUS
LIQUID APPLIED
MOISTURE
BARRIER
CAST STONE SILL
TO MATCH EXIST.
STOREFRONT
WINDOW
3/4" SOLID
SURFACE
WINDOW SILL
2"x4" TREATED WOOD
BLOCKING, (4) SIDES
OF OPENING
1" 3"
5"
SE
E
PL
AN
S
VA
R
IE
S
2"
PROVIDE BLOCK
FILL FOR A SMOOTH
SURFACE, PRIME
AND 2 COATS OF
PAINT
(2) LAYERS OF 5/8",
FIRE TREATED
PLYWOOD
3/4" SOLID SURFACE
WINDOW SILL
5/8" GYP BOARD JAMB
BEYOND
1" 3" 5" 7"
BRICK VENEER
MORTAR GUARD.
FULL HEIGHT OF
WALL, TYP.
2" RIGID INSUL.
LIQUID APPLIED
MOISTURE
BARRIER
CAST STONE SILL
TO MATCH EXIST.
GROUT FILLED 8"x4"x16"
LINTEL CMU BLOCK
2"x4" TREATED WOOD
BLOCKING, (4) SIDES
OF OPENING
LIQUID APPLIED
MOISTURE BARRIER
STOREFRONT
WINDOW SET IN
PREFINISHED ALUM.
SUB SILL W/
UPTURNED INTERIOR
FLASHING LEG.
3 1/2"
2"
2" 7 1/2"
PROVIDE BLOCK FILL
FOR A SMOOTH
SURFACE, PRIME AND
2 COATS OF PAINT
5/8" GYP BOARD
JAMB
BRICK VENEER
MORTAR GUARD. FULL
HEIGHT OF WALL, TYP.
2" RIGID INSUL.
LIQUID APPLIED
MOISTURE BARRIER
GROUT FILLED CMU
LINTEL. SEE STRUCT.
DWGS
GALV. LOOSE LINTEL
SEE STRUCT. DWGS
LIQUID APPLIED
MOISTURE BARRIERSTOREFRONT
WINDOW
SELF ADHESIVE
MEMBRANE FLASHING
OVER STAINLESS
STEEL THROUGH
WALL FLASHING
WEEPS @ 32" O.C.
MAX.
STAINLESS STEEL
THROUGH WALL
FLASHING, W/ 1/4"
DRIP EDGE
SCHEDULED CEILING
3" 5"
SEE PLANS
VARIES
3 1/2" 2" 2" 7 1/2"
1'-3"
PROVIDE BLOCK FILL
FOR A SMOOTH
SURFACE, PRIME AND
2 COATS OF PAINT
2" 5"
2" 1'
-4
2 1/2"
PRE FINISHED ALUM.
LOUVER, SET IN SUB SILL
W/ UPTURNED INTERIOR
FLASHING LEG
BACKER ROD
& SEALANT
BACKER ROD
& SEALANT
BACKER ROD
& SEALANT
BACKER ROD
& SEALANT
16" CONCRETE
FOUNDATION WALL.
SEE STRUCT. DWGS.
1/ 2"
1/ 2"
WATER PROOF
SHIMS AS REQD.
WATER PROOF
SHIMS AS REQD.
BATT INSULATION
6" STUD WALL
5/8" GYPBOARD
5/8" GYP BOARD JAMB
2" RIGID INSUL.
LIQUID APPLIED
MOISTURE
BARRIER
GROUT FILLED CMU
LINTEL. SEE STRUCT.
DWGS
2"x4" TREATED WOOD
BLOCKING
CONTINUOUS, LIQUID
APPLIED MOISTURE
BARRIER
STOREFRONT
WINDOW
SELF ADHESIVE
MEMBRANE FLASHING
OVER THROUGH
WALL FLASHING
PREFINISHED ALUM
THROUGH WALL
FLASHING, W/ 1/4"
DRIP EDGE
SCHEDULED CEILING
5"
SEE PLANS
VARIES
2 1/2" 2" 7 1/2" 6" 1/2"
COMPOSITE METAL
PANEL RAINSCREEN,
SEE ELEVATIONS
FOR JOINT PATTERN
VENTED HAT CHANNEL
BACKER ROD AND
SEALANT
INSULATED ALUM.
COMPOSITE PANEL
MORTAR GUARD
2" RIGID INSUL.
CONTINUOUS
LIQUID APPLIED
MOISTURE
BARRIER
STOREFRONT
WINDOW
BATT INSULATION
6" STUD WALL
5/8" GYPBOARD
3/4" SOLID SURFACE
WINDOW SILL
5/8" GYP BOARD
JAMB
2"x4" TREATED
WOOD BLOCKING, (4)
SIDES OF OPENING
5"
SE
E
PL
AN
S
VA
R
IE
S
1" 1/ 2"
6"
1/ 2"
2"
1/ 2"
1' -7
1/
2"
BATT INSULATION
6" STUD WALL
5/8" GYPBOARD
(2) LAYERS OF 5/8",
FIRE TREATED
PLYWOOD
3/4" SOLID SURFACE
WINDOW SILL
5/8" GYP BOARD
JAMB
INSULATED ALUM.
COMPOSITE PANEL
SEE ELEVATIONS
FOR JOINT
PATTERN
BACKER ROD AND
SEALANT
2" RIGID INSUL.
LIQUID APPLIED
MOISTURE
BARRIER
GROUT FILLED
8"x4"x16" LINTEL
CMU BLOCK
2"x4" TREATED
WOOD BLOCKING, (4)
SIDES OF OPENING
LIQUID APPLIED
MOISTURE BARRIER
STOREFRONT
WINDOW SET IN
PREFINISHED ALUM.
SUB SILL W/
UPTURNED INTERIOR
FLASHING LEG.
5"
SEE PLANS
VARIES 1"
2 1/2" 2 1/2" 2"
7 1/2" 6" 1/2"
BRICK VENEER
JAMB BEYOND
VENTED HAT CHANNEL
BATT INSULATION
6" "CH" STUD WALL
5/8" TYPE "X"
GYPBOARD
5/8" TYPE "X"
GYPBOARD
AL
IG
N
AL
IG
N
5/8" TYPE "X"
GYPBOARD SET IN
BED OF FIRE
SEALANT
6" SHAFTWALL
"J" RUNNER
6" SHAFTWALL
"J" RUNNER
FIRE CAULK
FIRE CAULK
3' -3
2' -1
1/
2" 1"
1/
2"
1/
2"
4'-0"
1/
2"
4' -5
4' -0
2"
1/ 2"
2'-11"
3'-4"
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
2:
:1
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v-
Bu ild in g
_E ag le
_b ne ed ha m
8H L.
rv t
E-A-301
EAGLE (BUILDING 25) WALL SECTIONS
AND DETAILS
10 13OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
Scale: 1/2" = 1'-0"
ELEVATOR SHAFT & PIT
Scale: 1/2" = 1'-0"
STAIR & RAMP LANDING
Scale: 1/2" = 1'-0"
LOBBY & CRAWL SPACE
WALL SECTION @WALL SECTION @
Scale: 1 1/2" = 1'-0"
LOUVER JAMB DETAIL
Scale: 1 1/2" = 1'-0"
WINDOW JAMB DETAIL
Scale: 1 1/2" = 1'-0"
WINDOW SILL DETAIL
Scale: 1 1/2" = 1'-0"
WINDOW HEAD DETAIL
Scale: 1 1/2" = 1'-0"
LOUVER HEAD & SILL DETAIL
Scale: 1 1/2" = 1'-0"
WINDOW HEAD DETAIL @ METAL PANEL
Scale: 1 1/2" = 1'-0"
WINDOW JAMB DETAIL @ METAL PANEL
Scale: 1 1/2" = 1'-0"
WINDOW SILL DETAIL @ METAL PANEL
WALL SECTION @ ELEVATOR
Scale: 1 1/2" = 1'-0"
INFILL DETAIL
Scale: 1" = 1'-0"
ALUM. LOUVER DETAIL
Scale: 1" = 1'-0"
WINDOW A
UP
DN
C
E-A-300
1'-0" 8 1/2" 3'-10" 9T@11"
8'-3" 7'-2 1/2"
5" 8'
-4
/2
8' -3
/2
2 1/2"
6 1/2"
3'-10" 9T@11"
8'-3" 7'-2 1/2"
STAIR
E-A-302
3' -8
1/ 2"
3' -8
5/8" GYPBOARD "CAP"
TURN GYPBOARD "CAP"
DOWN TO FLOOR LINE
AND ALIGN W/ WALL
3'-0 1/2"
CL
WALL BLOCKING FOR
HANDRAIL ATTACHMENT
FIRST FLOOR
0"
SECOND FLOOR
11' - 6"
SEE STRUCT DWGS
L 3x3x5/16
SEE STRUCT
DWGS
E-A-302
E-A-302
E-A-302
'-6
R
9/
5' -9
R
9/
5'
-9
2' -1
0" 2'
-1 0"
2' -1
0"
1'-11" 9T@11"
8'-3"
1'-0" 9T@11"
8'-3" 1'-0"
C
E-A-300
8 1/2" 3'-10 1/2" 9T@11"
8'-3" 7'-2 1/2"
5" 8'
-1
1/ 2"
8 1/2" 3'-10 1/2" 9T@11"
8'-3" 7'-2 1/2"
8' -1
1/
2"
STAIR
E-A-302
3' -8
1/ 2"
3' -8
2"
2'-11"
CL
WALL BLOCKING FOR
HANDRAIL ATTACHMENT
STEEL HANDRAIL
BRACKETS @ 4'-0" OC MAX
1 1/2" DIA. STEEL HANDRAIL
3 3/4"
MIN.
2 1/4"
(AFF)
2'-10"
1/4"
ANCHOR BRACKETS TO
STRUCTURE IN WALL
WELD HANDRAIL TO
BRACKET - GRIND SMOOTH
AT TERMINATIONS OF HANDRAIL
PROVIDE SHARP 90° RETURN TO
WALL WITH CLEARANCE.
1 1/2"
PROVIDE BLOCKING FOR
HANDRAIL AS REFERENCED
ON DWG 1/E-A-302
CAST-IN-PLACE SLAB ON
METAL DECK
STRUCTURAL STEEL FRAMING
SEE STRUCT DWGS
STEEL ANGLE - SEE STRUCT
DWGS
12" CAST-IN-PLACE CONCRETE
WALL
2"
SEE STRUCT DWGS
STAIR STRINGER
1 1/2" SQUARE STEEL
TUBE, PAINTED
1 1/2" SQUARE STEEL TUBE,
PAINTED, WELDED TO STRINGER
BELOW AT 4'-0" O.C. MAX
1 1/2" SQUARE STEEL TUBE
GUARDRAIL, PAINTED
1 1/2" STEEL TUBE HANDRAIL,
PAINTED
INFILL WITH VERTICAL 1/2" SQUARE
STEEL TUBE PICKETS, 4" O.C. MAX.,
PAINTED
3' -6
2"
2' -1
0"
EXPANSION BOLT
STRINGER BEYOND
SEE STRUCT DWGS FOR
STRUCTURAL SUPPORT
1 1/2" SQUARE STEEL TUBE
GUARDRAIL, PAINTED
1 1/2" STEEL TUBE HANDRAIL, PAINTED
1/2" SQUARE STEEL TUBE, PAINTED
1 1/2" SQUARE STEEL TUBE,
PAINTED, WELDED TO STRINGER
BELOW AT 4'-0" O.C. MAX
1 1/2" SQUARE STEEL TUBE, PAINTED
7" M
AX
3' -6
2' -1
0"
1'-0"
3'
- 6
3/4" 3/4"
1 1/2" SQUARE STEEL TUBE
GUARDRAIL, PAINTED
1/2" SQUARE STEEL TUBE,
PAINTED
1 1/2" STEEL TUBE HANDRAIL,
PAINTED
1 1/2" SQUARE STEEL TUBE,
PAINTED, WELDED TO STRUCT
BELOW, GRIND SMOOTH
1/
2" 3"
2"
1/ 2"
E-A-302
SEE DETAIL FOR
MORE INFORMATION
2" R
IS
ER
2"
CONCRETE FILL
SEE STRUCT DWGS FOR
STRUCTURAL SUPPORT
ONE PIECE RUBBER
STAIR TREAD/RISER
NOSING 1" TREAD
MC STRINGERS. REFER TO
STAIR MANUFACTURER FIRST FLOOR
0"
SECOND FLOOR
11' - 6"
C
STRINGER
STRINGER
3 5/8" METAL STUD
GYP BOARD
CMU WALL
CONCRETE LANDING
1 HR FIRE RATED 6"
METAL STUD & 1 LAYER
OF GYP BOARD EA SIDE
4" CONCRETE LANDING
8'-4 1/2"
2 1/2" 2 1/2"
CONCRETE LANDING
3'-8" 7" 3'-8"
3 5/8" STUDS W/ 5/8"
GYPBOARD "CAP" TO SPAN
OPENING BETWEEN STAIR
STRINGERS, CONTINUOUS
FROM INTERMEDIATE
LANDING & 1ST FLOOR.
PROVIDE INTERIOR
WALL BRACING FOR
STAIR STRINGER
SUPPORT AND
ATTACHMENT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
2:
:1
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v-
Bu ild in g
_E ag le
_b ne ed ha m
8H L.
rv t
E-A-302
EAGLE (BUILDING 25) ENLARGED STAIR
PLANS, SECTION, AND DETAILS
11 13OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/2" = 1'-0"
ENLARGED PLAN - STAIR 1 LEVEL 1
Scale: 1/2" = 1'-0"
STAIR SECTION DETAIL
Scale: 1/2" = 1'-0"
ENLARGED PLAN - STAIR 2 LEVEL 2
Scale: 3" = 1'-0"
DETAIL @ HANDRAIL AND WALL
Scale: 1" = 1'-0"
DETAIL @ LANDING AND WALL
Scale: 1" = 1'-0"
DETAIL @ STAIR AND LANDING
Scale: 1" = 1'-0"
DETAIL @ STAIR AND SLAB
Scale: 1" = 1'-0"
DETAIL @ STAIR RAILING
Scale: 1 1/2" = 1'-0"
DETAIL @ TREAD AND RAISER
Scale: 1/2" = 1'-0"
STAIR LANDING SECTION DETAIL
NORTH
0 1 2 4
NORTH
0 1 2 4
B
E-A-303
5' -0
C
LE
AR
NEW PIT LADDER
E-A-400
Sim
ELEV.
CAB
P25
B
7' -6
E-A-303
E-A-303
ELEV.
CAB
P25
FIRST FLOOR
0"
SECOND FLOOR
11' - 6"
BASEMENT
-11' - 6"
ELEVATOR PIT
-15' - 4"
T.O. ELEV. SHAFT
24' - 0"
BASEMENT ENTRY
-7' - 5"ELEV.
CAB
SEE STRUCTURAL DRAWINGS FOR TRUSS FRAMING
RATED CEILING ASSEMBLY AT TOP OF ELEVATOR SHAFT
SLATE ROOFING SYSTEM TO MATCH EXISTING
FIRE RATED EXTERIOR ASSEMBLY
ELEVATOR DOOR
OPENING BEYOND
ELEVATOR DOOR
OPENING BEYOND
STRUCTURAL CONCRETE
FOUNDATION WALL, SEE
STRUCT. DRAWINGS
TERMINATE FURRED
PARTITION 6" ABOVE
CEILING, TYPICAL
FINISH CEILING
SEE FINISH SCHEDULE
FOR NEW FLOORING
SEE ROOM FINISH
SCHEDULE FOR WALL
FINISH AND BASE , TYP.
RATED SHAFT WALL,
SEE PLANS
SEE STRUCTURAL
DRAWINGS FOR
CONCRETE SLAB
BEARING DETAILS
SEE FINISH SCHEDULE
FOR NEW FLOORING
SEE ROOM FINISH
SCHEDULE FOR WALL
FINISH AND BASE , TYP.
ELEVATOR PIT, REFER
TO STRUCTURAL
NEW WATERPROOF
MEMBRANE ON THE
INTERIOR WALL SIDE
OF THE ELEVATOR PIT.
EXTEND TO BASEMENT
FLOOR LEVEL.
E-A-301
E-A-301
SIM
1/
2"
9' -8
ELEV.
EQUIP.
ROOM
CONNECTING
CORRIDOR
HOIST BEAM, SEE
STRUCTURAL DRAWINGS FOR
MORE INFORMATION
ELEV.
SHAFT
P25
ELEV.
SHAFT
P25
FIRST FLOOR
0"
SECOND FLOOR
11' - 6"
T.O. EXT. CLG.
22' - 10"
BASEMENT
-11' - 6"
ELEVATOR PIT
-15' - 4"
T.O. ELEV. SHAFT
24' - 0"
B
BASEMENT ENTRY
-7' - 5"
CONNECTING
CORRIDOR
ELEVATOR
LOBBY
CRAWL SPACE
6" 7'
-4
8" 7'
-4
TRUSS BEARING HT.
24' - 8"
ELEV.
CAB
STRUCTURAL CAST IN PLACE
CONCRETE FOUNDATION
WALL, SEE STRUCTURAL
DRAWINGS FOR WALL
REINFORCEMENT AND FINISH
METAL ROOF TRUSS FRAMING,
SEE STRUCTURAL DRAWINGS
CUT CMU BOND
BEAM AT ELEVATOR
DOOR OPENING
TERMINATE FURRED
OUT WALL AT 6"
ABOVE CEILING
FINISH CEILING
SEE FINISH SCHEDULE
FOR NEW FLOORING
ON CONCRETE FLOOR
SLAB
ELEVATOR DOOR
FRAME BEYOND
TERMINATE FURRED
OUT WALL AT 6"
ABOVE CEILING
FINISH CEILING
SEE FINISH SCHEDULE
FOR NEW FLOORING
ON CONCRETE FLOOR
SLAB
ELEVATOR DOOR
FRAME BEYOND
METAL FLASHING W/
DRIP EDGE
SELF ADHERED NON-
PERMEABLE MEMBRANE,
TURN DOWN AT FOOTING
ELEVATOR PIT, REFER
TO STRUCTURAL
DRAIN TILE WRAPPED IN
CAPILLARY FILL AT THE
FOOTING PERIMETER,
SEE CIVIL DRAIWNGS
RATED SHAFT WALL,
SEE PLANS
PREFINISHED ALUM. GUTTER
COLOR TO MATCH
COMPOSITE PANEL
METAL TRUSS SYSTEM, SEE
STRUCTURAL DRAWINGS
NEW SLATE TILE ROOFING
SYSTEM OVER INSULATED ROOF
DECKING ON STRUCTURAL METAL
TRUSS FRAMING.
SEE STRUCT. DWGS
FOR TRUSS BEARING DETAILS
PRE FINISHED ALUM. WRAPPED
SOFFIT AND FASCIA. COLOR TO
MATCH COMPOSITE PANEL.
SEE STRUCT. DWGS FOR TOP OF
SHAFT CONCRETE CAP
8" M
AX
4" M
IN
NEW WATERPROOF
MEMBRANE ON THE
INTERIOR WALL SIDE
OF THE ELEVATOR PIT.
EXTEND TO BASEMENT
FLOOR LEVEL.
E-A-303
Sim
NEW PIT LADDER, SEE
G-006
ELEV.
SHAFT
P25
7 1/2" 1"
10"
1/
2"
6 1/2" 3 1/2"
1" CLOSURE FULL
HEIGHT OF JAMB
3' -6
O
PE
N
IN
G
1/2"
1/
2"
1/2"
1/2"
7 1/2"
2"
1/
2"
10 1/2"
7 1/2" 1"
1"
ENTRANCE FRAME TYPE:
1. SWEEP JAMB AT EACH LEVEL OF THE
ELEVATOR ENTRANCE.
2. REFER TO SHEET E-A-303 FOR JAMB AND HEAD
DETAIL
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
2:
:1
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v-
Bu ild in g
_E ag le
_b ne ed ha m
8H L.
rv t
E-A-303
EAGLE (BUILDING 25) ENLARGED
ELEVATOR SHAFT PLANS, SECTIONS
AND DETAILS
12 13OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
Scale: 1/2" = 1'-0"
ENLARGED PLAN - ELEVATOR BASEMENT
Scale: 1/2" = 1'-0"
ENLARGED PLAN - ELEVATOR LEVEL 1 AND 2
Scale: 1/2" = 1'-0"
SECTION THROUGH SHAFT BASEMENT
Scale: 1/2" = 1'-0"
SECTION THROUGH SHAFT LEVEL 1 AND 2
Scale: 3" = 1'-0"
DETAIL @ ELEVATOR JAMB
Scale: 3" = 1'-0"
DETAIL @ ELEVATOR HEAD
0 1 2 4 0 1 2 4
PROVIDE CAB WITH NEW
TWO-SPEED SIDE
HORIZONTAL SLIDING
HOISTWAY DOORS.
PROVIDE CAB WITH NEW
TWO-SPEED SIDE
HORIZONTAL SLIDING
ELEVATOR CAR DOORS
CONSTRUCTED THE SAME
AS HOISTWAY DOORS.
PROVIDE AN AUXILIARY CAR
OPERATING PANEL IN THE
SIDE WALL OF THE ELEVATOR
IN ITS CURRENT LOCATION
IMMEDIATELY ADJACENT TO
THE FRONT ENTRANCE
STRIKE JAMB COLUMN.
PROVIDE NEW CAR ENCLOSURE
WITH NEW FLOORING.
E-A-400 72
E-A-400
Sim
W
ID
TH
SE
E
SC
H
ED
U
LE
DEPTH - SEE SCHEDULE
ELEVATOR
P25
E-A-400 6
TOP OF CAB
8' -0
PROVIDE NEW MAIN
CAR OPERATING
PANEL IN THE CAR
ENCLOSURE ON THE
FRONT RETURN
PANEL. CONTRACTOR
TO VERIFY LOCATION
PER CAB INTERIOR.
SEE ELEVATOR
SPECIFICATIONS
PROVIDE CAB WITH NEW
TWO-SPEED SIDE
HORIZONTAL SLIDING
HOISTWAY DOORS .
PROVIDE CAR ENCLOSURE
WITH NEW S.S. PANELS
ABOVE ELEVATOR DOOR.
COORDINATE
EMERGENCY EXIT
HATCH WITH CAB
CEILING
PROVIDE CCTV
CAMERA INSIDE OF
THE CAR. SEE
ELECTRICAL SHEETS.
PROVIDE (6) LED
ILLUMINATED CAR
LIGHT FIXTURES
ABOVE THE CEILING.
MAINTAIN A MINIMUM
LIGHT LEVEL OF 50-
FOOT CANDLES AT
(36") ABOVE THE
FINISHED FLOOR.
PROVIDE S.S.
HANGING CEILING
FRAME. CONSTRUCT
FRAME OF .125" X
1.50" X 1.50" "T" AND
"L" SECTIONS.
SEE SCHEDULE
1" EQ EQ 1"
1"
EQ
1/ 2"
EQ
1/
2"
EQ
1"
SE
E
SC
H
ED
U
LE
1/2"
8' -0
PROVIDE CAR
ENCLOSURE WITH
NEW S.S. CEILING
TOP OF CAB
PROVIDE CAR ENCLOSURE
WITH NEW HANDRAIL @
CENTERLINE OF 30" AND 42"
ABOVE THE CAR FLOOR. MATCH
EXIST. SPACING OF HANDRAIL
FROM CAB WALL. CONCEAL ALL
HANDRAIL FASTENINGS
HANDRAILS SHALL BE
REMOVABLE FROM THE INSIDE
OF THE CAR ENCLOSURE.
LOCATE HANDRAILS 1-1/2"
FROM CAB WALL. PROVIDE
1-1/2" S.S. ROUND HANDRAILS
WITH THE ENDS AT THE
ENTRANCE TURNED BACK TO
THE WALL.
PROVIDE AN AUXILIARY CAR
OPERATING PANEL IN
THE SIDE WALL OF THE
ELEVATOR IN ITS CURRENT
LOCATION IMMEDIATELY
ADJACENT TO THE FRONT
ENTRANCE STRIKE JAMB
COLUMN.
PROVIDE NEW CAR
ENCLOSURE. FINAL
PANEL DESIGN TO BE
APPROVED BY VA
INTERIOR DESIGNER
1' -0
2'
-6
4"
1" EQ 1/2" EQ 1/2" EQ
8"
PROVIDE NEW 8" TALL CRASH
RAIL
@12" ABOVE CAR FLOOR.
CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL
BE REMOVABLE FROM THE
INSIDE OF THE CAR ENCLOSURE.
EXTENT OF NEW
FORMED 16 GA
STAINLESS STEEL
PROTECTION SHEET
NEW HOISTWAY
DOORS
SECURE SHEET WITH
STAINLESS STEEL
TAMPER PROOF
SCREWS WITH
ROUNDED HEADS
8' -0
PROVIDE CAR
ENCLOSURE WITH
NEW S.S. CEILING
TOP OF CAB1" EQ 1/2" EQ 1/2" EQ
PROVIDE NEW MAIN
CAR OPERATING
PANEL IN THE CAR
ENCLOSURE ON THE
FRONT RETURN
PANEL. CONTRACTOR
TO VERIFY LOCATION
PER CAB INTERIOR.
SEE ELEVATOR
SPECIFICATIONS
8' -0
PROVIDE CAR
ENCLOSURE WITH
NEW S.S. CEILING
TOP OF CAB
PROVIDE CAR ENCLOSURE WITH
NEW HANDRAIL @ CENTERLINE OF
30" AND 42" ABOVE THE CAR
FLOOR. MATCH EXIST. SPACING OF
HANDRAIL FROM CAB WALL.
CONCEAL ALL HANDRAIL
FASTENINGS HANDRAILS SHALL BE
REMOVABLE FROM THE INSIDE OF
THE CAR ENCLOSURE. LOCATE
HANDRAILS 1-1/2" FROM CAB WALL.
PROVIDE 1-1/2" S.S. ROUND
HANDRAILS WITH THE ENDS AT THE
ENTRANCE TURNED BACK TO THE
WALL.
PROVIDE NEW CAR
ENCLOSURE. FINAL
PANEL DESIGN TO BE
APPROVED BY VA
INTERIOR DESIGNER
1' -0
2'
-6
4"
1" EQ 1/2" EQ 1"
8"
PROVIDE NEW 8" TALL CRASH RAIL
@12" ABOVE CAR FLOOR.
CONCEAL ALL CRASH RAIL
FASTENINGS. CRASH RAIL SHALL
BE REMOVABLE FROM THE
INSIDE OF THE CAR ENCLOSURE.
PASSENGER ELEVATOR CAB SIZE SCHEDULE
ELEVATOR WIDTH DEPTH
P25 58" 73"
RATED LOAD
2,500 (lbs)
ENTRANCE FRAME TYPE:
1. SWEEP JAMB AT EACH LEVEL OF THE
ELEVATOR ENTRANCE.
2. REFER TO SHEET E-A-303 FOR JAMB AND HEAD
DETAIL
NEW CALL BUTTON.
7' -0
NEW HOISTWAY
DOORS - SEE
ELEVATOR
SPECIFICATIONS.
NEW HALL
LANTERNS AND
ELEV. CALL
BUTTON PLATES.
SEE ELEV.
SPECIFICATIONS
FOR MORE
INFORMATION.
NEW STAINLESS
STEEL ENTRANCE
FRAMES. TOP
HEADER, AS
REQUIRED.
3' -6
1'-0"
NEW CALL BUTTON.
7' -0
NEW
HOISTWAY
DOORS - SEE
ELEVATOR
SPECIFICATIO
NS.
NEW HALL
LANTERNS AND
ELEV. CALL
BUTTON PLATES.
SEE ELEV.
SPECIFICATIONS
FOR MORE
INFORMATION.
NEW
STAINLESS
STEEL
ENTRANCE
FRAMES. TOP
HEADER, AS
REQUIRED.
3' -6
6" 1'-11"
1'-3 1/2"
POSITION INDICATORS IN HALLWAY/LOBBY SHOULD
DISPLAY "OUT OF SERVICE", FOR FIRE SERVICE,
INDEPENDENT SERVICE, ELEVATOR INSPECTION, ETC.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
2:
:1
PM
C :\U se rs
\b ne ed ha m \D oc um en ts
\A _2
1-
9_ Le ed s-
In st al l E le v-
Bu ild in g
_E ag le
_b ne ed ha m
8H L.
rv t
E-A-400
EAGLE (BUILDING 25) ELEVATOR
INTERIOR CAB ELEVATIONS
13 13OKM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JAB
Scale: 3/4" = 1'-0"
CAB INTERIOR - FLOOR PLAN - EAGLE
Scale: 3/4" = 1'-0"
CAB INTERIOR - FRONT ELEVATION - EAGLE
Scale: 3/4" = 1'-0"
CAB INTERIOR - CELING PLAN - EAGLE
Scale: 3/4" = 1'-0"
CAB INTERIOR - SIDE ELEVATION - EAGLE
Scale: 3" = 1'-0"
NEW JAMB DETAIL - EAGLE
Scale: 3/4" = 1'-0"
TYPICAL PASSENGER CAB - INTERIOR ELEVATION - EAGLE
Scale: 3/4" = 1'-0"
CAB INTERIOR - REAR ELEVATION - EAGLE
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
Scale: 3/4" = 1'-0"
CAB EXTERIOR - FIRST & SECOND FLOOR FRONT
ELEVATION - EAGLE
Scale: 3/4" = 1'-0"
CAB EXTERIOR - BASEMENT FRONT ELEVATION - EAGLE
A
C
B
CRAWL SPACE
MATERIAL STORAGE
BASEMENT ELECTRICAL
ROOM
BME1
25-SP-1
3" W
ELEV. SHAFT
P25
FD-B
A
C
B
ELEV. EQUIP. ROOM
ELEVATOR LOBBY
STAIR
OFFICE
WORK ROOM
WORK ROOM
A
C
B
CONNECTING CORRIDOR
STAIR
OFFICERS LOCKER ROOM
AND BREAK AREA
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
5:
:4
PM
C :\U se rs
\p ph ife r\D oc um en ts
\M _2
1-
9_ Le ed s-
In st al l E le v-
Bu ild in g
_E ag le
_p ph ife rP
C
6.
rv t
E-PF101
EAGLE (BUILDING 25) PLUMBING AND
FIRE SUPPRESSION PLAN
1 1AV
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
SPG
A. SLEEVE ALL PENETRATIONS. FIRESTOP AND
SEAL WATER TIGHT.
B. UNLESS NOTED OTHERWISE, THE SIZE OF
FIXTURE RUNOUTS IS TO BE WHAT IS LISTED IN
THE PLUMBING FIXTURE SCHEDULE.
1 FRAME OUT ELEVATOR PIT FOR NEW SUMP
PUMP, OIL INTERCEPTOR, AND FLOOR DRAIN IN
ELEVATOR PIT. COORDINATE EXACT
LOCATIONS WITH ELEVATOR STRUCTURAL
SUPPORTS.
2 PROVIDE QUICK RESPONSE SPRINKLER HEADS
IN THE ELEVATOR PIT. EXTEND SPRINKLER PIPE
FROM ADJACENT SPACE.
3 PROVIDE NEW SEMI RECESSED SPRINKLER
HEADS. EXTEND SPRINKLER PIPE FROM
ADJACENT SPACE.
4 REFER TO CIVIL FOR CONTINUATION TO
SANITARY MANHOLE.
5 ROUTE SEPARATE 2" VENTS FROM OIL
INTERCEPTOR AND SUMP PUMP UP TO 18'
ABOVE PIT FLOOR.
Scale: 1/4" = 1'-0"
BASEMENT FLOOR PLUMBING AND FIRE SUPPRESSION
NEW WORK PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR PLUMBING AND FIRE SUPPRESSION NEW
WORK PLAN
NORTH
0 4 8 16
NORTH
0 4 8 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
SECOND FLOOR PLUMBING AND FIRE SUPPRESSION NEW
WORK PLAN
NORTH
0 4 8 16
A
C
B
CRAWL SPACE
ETR
25-CU-2 25-CU-1
ELEV. SHAFT
P25
A
C
B
ELEVATOR LOBBY
OFFICE
WORK ROOM
WORK ROOM
25-SS-2A 25-UH-2
ELEV. SHAFT
P25 ELEV. EQUIP. ROOM
STAIR
25-SS-1
25-UH-1
25-CU-2
25-UH-3
T
T
RS
RL
RL
RS
S
25-CU-1
A
C
B
25-UH-4
T
25-SS-2B
CONNECTING CORRIDOR
ELEV. SHAFT
P25
STAIR
T
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
/1
/2
:1
:0
A
M C
U s e rs
\s g e o rg e
\D o c u m e n ts \R e v it F ile s \R e v it
\M
-1
L e e d s -I n s ta ll E le v -B u ild in g
E a g le s p g e o rg e
.r v t
E-M-101
EAGLE (BUILDING 25) MECHANICAL
PLAN
1 1AV
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
SPG
Scale: 1/4" = 1'-0"
BASEMENT FLOOR MECHANICAL NEW WORK PLAN
A. COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR
TO MINIMIZE DISRUPTION OF AREAS OUTSIDE
OF THE PROJECT LIMITS OF WORK.
N O R
TH
0 4 8 16
1 PROVIDE NEW DUCTLESS SPLIT IN ELEVATOR
MACHINE ROOM. PROVIDE ASSOCIATED
OUTDOOR CONDENSING UNIT. ROUTE
REFRIGERANT PIPING TO OUTDOOR UNIT
ACCORDING TO MANUFACTURER'S
RECOMMENDATIONS.
2 PROVIDE NEW UNIT HEATER IN ELEVATOR
MACHINE ROOM.
3 PROVIDE NEW ELECTRIC UNIT HEATER AND
SPLIT SYSTEM FOR ELEVATOR LOBBY. ROUTE
REFRIGERANT PIPING TO OUTDOOR UNIT
ACCORDING TO MANUFACTURER'S
RECOMMENDATIONS
4 25-CU-1 AND 25-CU-2 MOUNTED ON BRACKETS
ON WALL AT TOP OF PRECAST SECTION OF
WALL. REFER TO ARCHITECTURAL ELEVATIONS.
5 PROVIDE CENTRAK TEMPERATURE SENSOR
AND CONFIGURE TO EXISTING SYSTEM.
6 STEAM LINES AS EXISTING TO REAMIN.
7 PROVIDE CONDENSATE PUMP POWERED
THROUGH INDOOR UNIT.
8 SLEEVE AND FIRE SEAL PIPE PENETRATION
THROUGH RATED WALL.
9 CONDENSATE TO BE ROUTED TO EXTERIOR.
TURN DOWN WITHIN WALL CAVITY AND EXPOSE
TO DAYLIGHT IN LOWER SOLDIER COURSE
BRICK. EXTEND COPPER CONDENSATE LINE
DOWN TO SPLASH BLOCK.
Scale: 1/4" = 1'-0"
FIRST FLOOR MECHANICAL NEW WORK PLAN
N O R
TH
0 4 8 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
SECOND FLOOR MECHANICAL NEW WORK PLAN
N O R
TH
0 4 8 16
WORK
ROOM
OFFICE
B
C
D
A
ELEVATOR
LOBBY
OFFICE
OFFICERS
LOCKER
ROOM
AND
BREAK
AREA
WEAPONS
STORAGE
204A
5 6
B
C
D
A
TC
204B
B
C
D
A
BASEMENT
ELECTRICAL
ROOM
BME1
MATERIAL
STORAGE
PA
C
S
PA
C S
CRAWL
SPACE
EXISTING SPLICE BOX
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
6/
/2
:1 5:
P
M C
:\U se rs \w re ed
\D oc um en ts \E
_2 1-
9_
Le ed s- In st al l E le v- Bu ild in g
_E ag le _w re ed
R G
8R E.
rv t
E-ED101
EAGLE (BUILDING 25) ELECTRICAL
DEMOLITION PLANS
1 3AMM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JKM
NORTH
0 4 8 16
Scale: 1/4" = 1'-0"
FIRST FLOOR ELECTRICAL DEMOLITION PLAN
1 REMOVE ALL LIGHTING AND CIRCUITS IN THE
AFECTED ROOM, BACK TO THE SOURCE OR
TO THE FIRST JUNCTION BOX THAT SERVES
OTHER DEVICES.
2 EXISTING DEVICES HAVE BEEN INDICATED
BASED ON SURVEY. THE CONTRACTOR IS
RESPONSIBLE FOR REMOVING ALL DEVICES
AND CONDUITS BOTH EXPOSED AND
CONCEALED WITHIN WALLS SUBJECT TO
DEMOLITION. REMOVE CIRCUITS THAT
REMAIN BACK TO THE NEAREST JUNCTION
BOX THAT SERVES OTHER DEVICES.
MAINTAIN CIRCUIT CONTINUITY TO ALL
DEVICES WHICH REMAIN.
3 EXISTING PACS TO REMAIN.
4 EXISTING ELECTRICAL SERVICE TO REMAIN.
5 INCOMING ELECTRICAL FEEDERS TO REMAIN
AND BE PROTECTED DURING
CONSTRUCTION.
NORTH
0 4 8 16
Scale: 1/4" = 1'-0"
SECOND FLOOR ELECTRICAL DEMOLITION PLAN
NORTH
0 4 8 16
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
TRACING AND IDENTIFYING ALL CIRCUITS AND
CONDUITS THAT ORIGINATE, PASS THROUGH, OR
TERMINATE IN THE AREA OF WORK. DEMOLISH
ALL CIRCUITS THAT ARE NO LONGER IN USE.
MAINTAIN CIRCUIT CONTINUITY TO ALL CIRCUITS
WHICH ARE NOT COMPLETELY REMOVED.
CONTRACOR RESPONSIBLE FOR LOCKOUT/TAG
OUT PROCEDURES OF LOADS FOR DEMOLITION.
B. CONTRACTOR SHALL DISCONNECT AND REMOVE
ELECTRICAL CONNECTION TO OUTLETS,
RECEPTACLES, HVAC EQUIPMENT AND OTHER
ELECTRICAL DEVICES. REMOVE CONDUCTORS
AND CONDUIT BACK TO PANELBOARD SERVICING
EQUIPMENT OR TO THE POINT WHERE OTHER
REMAINING LOADS ARE CONNECTED. MARK ANY
ABANDONED OVERCURRENT PROTECTION
DEVICE AS "SPARE (UNUSED)".
C. CONTRACTOR SHALL REMOVE ALL ELECTRICAL
CONDUIT, CABLE, WIRING DEVICE, JUNCTION
BOXES, FITTINGS, AND RELATED ITEMS FROM ALL
PORTIONS OF THE AREA OF WORK INCLUDING
WALL, CEILING, AND FLOORS. THIS SHALL BE FOR
ALL WALLS, EVEN WALLS NOT SUBJECT FOR
REMOVAL.
D. FOR ELECTRICAL CIRCUITS BEING DEMOLISHED,
REMOVE BOXES, CONDUIT AND CONDUCTORS
BACK TO SOURCE, INCLUDING THOSE
CONCEALED WITHIN WALLS, LEAVING NO
ABANDONED ITEMS.
E. WHERE CONDUIT IS REMOVED FROM AN
EXISTING RATED ASSEMBLY NOT SUBJECT TO
DEMOLITION, THE REMAINING HOLE SHALL BE
PATCHED/REPAIRED TO MAINTAIN THE RATING
OF THE ASSEMBLY.
F. EACH PHASE OF THE CONSTRUCTION SHALL BE
PERFORMED WHILE LEAVING WORK AREAS OF
OTHER PHASES ACTIVE TO THE GREATEST
EXTENT POSSIBLE. NOTIFY COR IF ANY WORK IS
REQUIRED THAT WILL CROSS MULTIPLE PHASES
OF THE WORK AREA PRIOR TO PERFORMING THE
WORK.
G. ALL RECEPTACLE CONDUCTORS ARE 2-12 AWG,
1-12 AWG EG IN 3/4" CONDUIT MINIMUM UNLESS
NOTED OTHERWISE.
H. COORDINATE LOCATION AND ELECTRICAL
REQUIREMENTS OF ALL MECHANICAL AND
PLUMBING EQUIPMENT WITH MECHANICAL AND
PLUMBING CONTRACTORS.
I. COORDINATE EQUIPMENT WITH ARCHITECTURAL
& INTERIORS EQUIPMENT PLANS AND
SCHEDULES.
J. ELECTRICAL CONTRACTOR SHALL FOLLOW SITE
LOCK-OUT/TAG-OUT GUIDELINES TO DE-
ENERGIZE EQUIPMENT.
K. ALL RECEPTACLES SHALL HAVE THEIR SOURCE
PANEL AND CIRCUIT NUMBER INDICATED ON
THEIR FACEPLATE.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
BASEMENT ELECTRICAL DEMOLITION PLAN
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
OS
OS
B
C
D
A
BASEMENT
ELECTRICAL
ROOM
BME1
CRAWL
SPACE
A
B1
B1 B1
B1
ELEV.
SHAFT
P25
'E25EB-B1'- 11
MATERIAL
STORAGE
PANEL
'E25EB-B1'
B
C
D
A
WORK
ROOM
OFFICE
OFFICE
ELEVATOR
LOBBY
A B1
C EMC
D EM
B1 EM
ELEV.
EQUIP.
ROOM
STAIR
G
E1
E1
G
G EM
E1
PANEL
'E25EB-B1A'
'E25EB-B1'- 10
'E25EB-B1A'- 10
'E25EB-B1'- 12
ELEV.
SHAFT
P25
B
C
D
A
OFFICERS
LOCKER ROOM
AND BREAK
AREA
CONNECTING
CORRIDOR
D EMD EM
A
C C EM
C
STAIR
E1
E1
'E25EB-B1'- 9
ELEV.
SHAFT
P25
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Numbers
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 2, 3, 5, 8, 11, 12 & 25
/1
/2
:4
:3
A
M C
U s e rs
\a m a s o n
\D o c u m e n ts \E
-1
L e e d s -I n s ta ll E le v -B u ild in g
E a g le a m a s o n a c g
-p a
.c o m
.r v t
E-EL101
EAGLE (BUILDING 25) LIGHTING PLANS
2 3AMM
MODERNIZE, REPLACE OR
INSTALL ELEVATORS IN 8
BUILDINGS
VA CENTRAL WESTERN MA
HEALTHCARE SYSTEM - LEEDS
421 NORTH MAIN STREET
LEEDS, MA 01053 JUNE 27, 2023
BID DOCUMENTS
631-21-01121-169
JKM
1 TO STAIRWELL LIGHTING CIRCUIT.
2 TO HOISTWAY/PIT LIGHTING CIRCUIT.
3 THIS ELECTRICAL PANEL IS TO BE INSTALLED
BY THE VA UNDER THEIR ONGOING PHASE 2
ELECTRICAL PROJECT.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
TRACING AND IDENTIFYING ALL CIRCUITS AND
CONDUITS THAT ORIGINATE, PASS THROUGH, OR
TERMINATE IN THE AREA OF WORK. DEMOLISH
ALL CIRCUITS THAT ARE NO LONGER IN USE.
MAINTAIN CIRCUIT CONTINUITY TO ALL CIRCUITS
WHICH ARE NOT COMPLETELY REMOVED.
CONTRACOR RESPONSIBLE FOR LOCKOUT/TAG
OUT PROCEDURES OF LOADS FOR DEMOLITION.
B. CONTRACTOR SHALL DISCONNECT AND REMOVE
ELECTRICAL CONNECTION TO OUTLETS,
RECEPTACLES, HVAC EQUIPMENT AND OTHER
ELECTRICAL DEVICES. REMOVE CONDUCTORS
AND CONDUIT BACK TO PANELBOARD SERVICING
EQUIPMENT OR TO THE POINT WHERE OTHER
REMAINING LOADS ARE CONNECTED. MARK ANY
ABANDONED OVERCURRENT PROTECTION
DEVICE AS "SPARE (UNUSED)".
C. CONTRACTOR SHALL REMOVE ALL ELECTRICAL
CONDUIT, CABLE, WIRING DEVICE, JUNCTION
BOXES, FITTINGS, AND RELATED ITEMS FROM ALL
PORTIONS OF THE AREA OF WORK INCLUDING
WALL, CEILING, AND FLOORS. THIS SHALL BE FOR
ALL WALLS, EVEN WALLS NOT SUBJECT FOR
REMOVAL.
D. FOR ELECTRICAL CIRCUITS BEING DEMOLISHED,
REMOVE BOXES, CONDUIT AND CONDUCTORS
BACK TO SOURCE, INCLUDING THOSE
CONCEALED WITHIN WALLS, LEAVING NO
ABANDONED ITEMS.
E. WHERE CONDUIT IS REMOVED FROM AN
EXISTING RATED ASSEMBLY NOT SUBJECT TO
DEMOLITION, THE REMAINING HOLE SHALL BE
PATCHED/REPAIRED TO MAINTAIN THE RATING
OF THE ASSEMBLY.
F. EACH PHASE OF THE CONSTRUCTION SHALL BE
PERFORMED WHILE LEAVING WORK AREAS OF
OTHER PHASES ACTIVE TO THE GREATEST
EXTENT POSSIBLE. NOTIFY COR IF ANY WORK IS
REQUIRED THAT WILL CROSS MULTIPLE PHASES
OF THE WORK AREA PRIOR TO PERFORMING THE
WORK.
G. ALL RECEPTACLE CONDUCTORS ARE 2-12 AWG,
1-12 AWG EG IN 3/4" CONDUIT MINIMUM UNLESS
NOTED OTHERWISE.
H. COORDINATE LOCATION AND ELECTRICAL
REQUIREMENTS OF ALL MECHANICAL AND
PLUMBING EQUIPMENT WITH MECHANICAL AND
PLUMBING CONTRACTORS.
I. COORDINATE EQUIPMENT WITH ARCHITECTURAL
& INTERIORS EQUIPMENT PLANS AND
SCHEDULES.
J. ELECTRICAL CONTRACTOR SHALL FOLLOW SITE
LOCK-OUT/TAG-OUT GUIDELINES TO DE-
ENERGIZE EQUIPMENT.
K. ALL RECEPTACLES SHALL HAVE THEIR SOURCE
PANEL AND CIRCUIT NUMBER INDICATED ON
THEIR FACEPLATE.
N O R
TH
0 2 4 8
N O R
TH
0 2 4 8
N O R
TH
0 2 4 8
Scale: 1/4" = 1'-0"
BASEMENT LIGHTING PLAN
Scale: 1/4" = 1'-0"
FIRST FLOOR LIGHTING PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR LIGHTING PLAN
HUNTLEY
HUNTLEY ASSOCIATES, P.C.
SURVEYORS ● CIVIL/SITE/STRUCTURAL/BUILDING ENGINEERS
30 INDUSTRIAL DRIVE EAST
NORTHAMPTON, MASSACHUSETTS 10160
LIGHTING (EXTERIOR) 0.05 kVA 125.00% 0.06 kVA TOTAL AMPS, DEMAND: 107.2 A
OTHER POWER 7.99 kVA 100.00% 7.99 kVA TOTAL LOAD, DEMAND: 38.6 kVA
LIGHTING (GENERAL) 1.00 kVA 125.00% 1.25 kVA TOTAL LOAD, CONNECTED: 39.5 kVA
SPEC 3.52 kVA 104.11% 3.66 kVA
RECEPTACLES (DEDICATED) 0.60 kVA 100.00% 0.60 kVA
RECEPTACLES (GENERAL) 1.80 kVA 100.00% 1.80 kVA
ELEVATOR 24.82 kVA 95.00% 23.58 kVA
MOTOR/HVAC 0.05 kVA 112.50% 0.05 kVA
Other 0.00 kVA 0.00% 0.00 kVA
LOAD SUMMARY CONNECTED LOAD DEMAND FACTOR DEMAND LOAD TOTALS
PER PHASE CONNECTED LOAD: 15.05 kVA 12.70 kVA 11.72 kVA
41 9.51 0 42 1 20 A SPARE
39 9.84 0 40 1 20 A SPAREPANEL 'E25EB-B1A' 200 A 3
37 10.23 0 38 1 20 A SPARE
SPARE 20 A 1 35 0 0 36 1 20 A SPARE
SPARE 20 A 1 33 0 0 34 1 20 A SPARE
SPARE 20 A 1 31 0 0 32 1 20 A SPARE
SPARE 20 A 1 29 0 0 30 1 20 A SPARE
SPARE 20 A 1 27 0 0 28 1 20 A SPARE
SPARE 20 A 1 25 0 0 26 1 20 A SPARE
SPARE 20 A 1 23 0 0 24 1 20 A SPARE
SPARE 20 A 1 21 0 0 22 1 20 A SPARE
SPARE 20 A 1 19 0 0 20 1 20 A SPARE
25-SS-2B 20 A 1 17 0.02 0 18 1 20 A SPARE
25-SS-2A 20 A 1 15 0.02 1.35 16
LTG STAIR 20 A 1 13 0 1.35 14
2 30 A 25-CU-2
LTG CRAWL SPACE 008 20 A 1 11 0.14 0.05 12 1 20 A EXTERIOR LTG
LTG CORRIDOR 212 20 A 1 9 0.11 0.08 10 1 20 A LTG ELEV LOBBY 112
7 1 1 8
25-UH-2 20 A 2
5 1 1 6
2 20 A 25-UH-3
3 1 0.54 4 1 20 A RCPT ELEV LOBBY 112
25-UH-4 20 A 2
1 1 0.72 2 1 20 A RCPT CORRIDOR 212
LOAD NAME BKR P CKT A (kVA) B (kVA) C (kVA) CKT P BKR LOAD NAME
ENCLOSURE:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .