6-Project map DRG 07232026.pdf
PDF 2 MB Posted
- Attached to
- AM27-11 Soldier Creek Watershed Restoration FY-27 Lop and Scatter (Pre-Qualified Contractors)
- Solicitation number
- AM27-11
- Issued by
- Utah County, Utah
About this file
This is a project map and scope document from the Utah Division of Wildlife Resources for the Soldier Creek Lop and Scatter Project located in Utah County's Central Region Wildlife Management Area. The project encompasses up to 1,177 acres requiring lop and scatter services, which involve cutting and scattering vegetation for habitat management purposes. The project performance period runs from September 30, 2026, through December 30, 2026. No mandatory site visit is required for participation. The map identifies specific project boundaries, existing fence types (including 1-strand barbed and net wire right-of-way fences, 4-strand barbed fences, 6-foot chainlink fences, and wildlife exclusion fences), and relevant landscape features including Hobble Creek, Mill Fork, and Dairy Fork.
This invitation for bid is restricted to pre-qualified contractors only, with participation limited to vendors on the state's current pre-approved vendor list. Contract award will be made to the lowest cost responsive and responsible bidder, with pricing evaluated on a per-acre basis. The vendor selected must guarantee its pricing through project completion. The State of Utah Division of Purchasing is the issuing procurement unit, while the Division of Wildlife Resources is the conducting procurement unit. A single contract award is anticipated to result from this solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Attachment B-Scope of Work.docx | DOCX document | |
| 9-Soldier creek lop scatter project area Basemap.pdf | ||
| Millforklopscatter2026_Layer.kmz | KMZ file | |
| 7-Attachment A-PO Terms and Conditions.docx | DOCX document | |
| 1-Contract Performance Evaluation FOR REFERENCE USE ONLY.pdf | ||
| 4-Soldier creek dairy fork unit.pdf | ||
| 8-Soldier Creek Mill fork unit NAIP.pdf | ||
| 2-Vendor Prerequisites - IFB Agency.pdf | ||
| Dairy Fork Lop_Scatter 2026.kmz | KMZ file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Utah Division of Wildlife Resources makes no warranty with respect to the accuracy, completeness or usefulness of the data. Utah Division of Wildlife Resources assumes no liability for direct, indirect, special, or consequential damages resulting from the use or misuse of this data or
Copyright:© 2013 National Geographic Society, i-cubed
Legend hobble creek pts
Mill fork lop scatter 2026 Dairy_Fork_Lop_Scatter_07232026
Central Region WMA Fences <all other values>
Type 1 strand barb and net wire right-of-way fence }}4 strand barb
6 ft chainlink Net wire with 1 strand barb
\Post and rail Top rail fence Wildlife exclusion fence DWR_WMAs_2017
0 0.5 1 1.50.25 Miles
Soldier Creek Lop and Scatter Project
File details come from the government source that posted it. Updated .