6-Preferred Alternative-Phase 2A.pdf

PDF 39 MB Posted

Attached to
RFQ - Engineering/Design Services, Capital Project #202514, Various State Project ID's, CTH K Corridor (CTH JK to Brookfield Road)
Solicitation number
2026016
Issued by
Waukesha County, Wisconsin

About this file

This file is a preliminary engineering design plan for the CTH K Corridor modernization project in Waukesha County, Wisconsin, involving the Villages of Sussex, Lisbon, Menomonee Falls and the City of Brookfield. The document represents Phase 2A of the preferred alternative design and depicts a detailed site plan with station measurements ranging from 254+00 to 301+00, showing proposed right-of-way configurations, sidewalk and path alignments, and slope intercepts. The plan identifies existing infrastructure including the Canadian National Railroad, Lannon Stone Products/All-Ways Topsoil facilities, and local roadways such as County K, County FD, Plainville Road, and Robert A Drive. The design includes varied right-of-way widths ranging from 40 to 75 feet across the project corridor segment.

The plan illustrates the preliminary layout for the corridor expansion and modernization project, for which Waukesha County Department of Public Works has secured federal funding approval for Phase 1 extending from Executive Drive to Sussex Creek. This design document serves as part of the facility development process that will ultimately support the preparation of preliminary and final plans, PS&E documents, and reports required for the full modernization and expansion project between CTH JK and Brookfield Road.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

254+00 255+00 256+00 257+00 258+00 259+00 260+00 261+00 262+00 263+00 264+00 265+00 266+00 267+00 268+00 269+00 270+00 271+00 272+00 273+00 274+00 275+00 276+00 277+00 278+00

279+00 280+00

281+00 282+00

283+00 284+00 285+00 286+00 287+00 288+00 289+00 290+00 291+00 292+00 293+00 294+00 295+00 296+00 297+00 298+00 299+00

300+00 301+00

C O

U N

T Y

F

D U

PLA

IN

V

ILLE

R D

R O

B E

R T

A D

R

COUNTY K

Q U

A R

R Y

C O

R N

E R

S P

K W

Y

C A

N A

D

IA

N N

A

TIO

N A

L R A

ILR

O

A D

U N

N A

M E

D S

T R

E A

M

CANADIAN NATIONAL

RAILROAD

LANNON STONE

PRODUCTS

ALL-WAYS

TOPSOILLANNON STONE

PRODUCTS

ALL-WAYS

TOPSOIL

' 75

SCALE, FEET

0 50 100

COUNTY K PLANNING STUDY

PRELIMINARY ALTERNATIVE - PHASE 2A

JANUARY 14 2026

SHEET 1 OF 1

LEGEND

SLOPE INTERCEPTS

EXISTING RIGHT OF WAY

ULTIMATE RIGHT OF WAY

SIDEWALK/ PATH

File details come from the government source that posted it. Updated .