5-Preferred Alternative-Phase 1.pdf

PDF 35 MB Posted

Attached to
RFQ - Engineering/Design Services, Capital Project #202514, Various State Project ID's, CTH K Corridor (CTH JK to Brookfield Road)
Solicitation number
2026016
Issued by
Waukesha County, Wisconsin

About this file

This is a preliminary planning and design document for the Waukesha County Department of Public Works' CTH K Corridor modernization and expansion project. The file presents a Phase 1 planning study map dated January 14, 2026, depicting the preferred alternative alignment for the corridor between CTH JK and Brookfield Road, spanning approximately 94.83 miles through the Villages of Sussex, Lisbon, Menomonee Falls, and the City of Brookfield in Wisconsin. The map identifies key geographic features, existing right-of-way boundaries, proposed ultimate right-of-way corridors, and proposed sidewalk/path infrastructure along the project alignment. Notable facilities and landmarks shown within the project area include Meijer, a gas station, Sussex Injection Molding, Momentum Early Learning, Pet Partners Animal Clinic, Sussex Gateway Retail Center, Kwik Trip, Lannon Stone Products, Halquist Stone, Sussex Creek, Halquist Park, Stark Asphalt, and Quarry Road. The document indicates varying right-of-way widths ranging from 33 to 88 feet depending on specific corridor segments.

The document serves as the preliminary design alternative for Phase 1 of the corridor expansion, which encompasses the Executive Drive to Sussex Creek segment. This phase has received federal funding approval from Waukesha County. The engineering/design consulting firm selected through the related request for qualifications will be responsible for advancing this preliminary alternative through the design process, including the preparation of preliminary and final plans, PS&E (Plans, Specifications, and Estimates) documents, and supporting reports for the complete corridor modernization and expansion project.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

154+00 155+00 156+00 157+00 158+00 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 188+00 189+00 190+00 191+00 192+00 193+00 194+00 195+00 196+00 197+00 198+00 199+00 200+00 201+00175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00 185+00 186+00 187+00 188+00 189+00 190+00 191+00 192+00 193+00 194+00 195+00 196+00 197+00 198+00 199+00 200+00 201+00

PI

: 1

+8

3.

B U

S

IN

E S

S D

R

W

IS

E X

E C

U T

IV

E

D R

S W

A N

R D

COUNTY K

MEIJER

MEIJER GAS STATION

SUSSEX INJECTION MOLDING

MOMENTUM EARLY

LEARNING

PET PARTNERS

ANIMAL CLINIC

SUSSEX GATEWAY

RETAIL CENTER

KWIK TRIP

'75

' 75

' 65

R-2

201+00 202+00 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00 216+00 217+00 218+00

219+00 220+00 221+00 222+00 223+00 224+00 225+00 226+00 227+00 228+00 229+00 230+00 231+00 232+00 233+00 234+00 235+00 236+00 237+00 238+00 239+00 240+00 241+00 242+00 243+00 244+00 245+00 246+00 247+00

201+00 202+00 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 214+00 215+00 216+00 217+00 218+00

219+00 220+00 221+00 222+00 223+00 224+00 225+00 226+00 227+00

PI

: 2

+0

0.

PI

: 2

+0

0.

M A

P

LE

A V

E

COUNTY K

LANNON STONE

PRODUCTS

HALQUIST STONE

SU

SSEX CREEK

STONEY C

HALQUIST

PARK

(VILLAGE OF LISBON)

STARK ASPHALT

Q U

A R

R Y

R D

' 33

SCALE, FEET

0 50 100

COUNTY K PLANNING STUDY

PRELIMINARY ALTERNATIVE - PHASE 1

JANUARY 14, 2026

SHEET 1 OF 1

LEGEND

SLOPE INTERCEPTS

EXISTING RIGHT OF WAY

ULTIMATE RIGHT OF WAY

SIDEWALK/ PATH

File details come from the government source that posted it. Updated .