6-JF26-025-IFB 217 - FA and CO Specifications.pdf

PDF 3 MB Posted

Attached to
Construction: Fire Alarm Upgrade at Bridger Elementary
Solicitation number
JF26-025-IFB
Issued by
Salt Lake County, Utah

About this file

This is a technical specifications document and invitation for bids issued by Granite School District (GSD) for the installation of a new fire alarm and carbon monoxide detection system at Jim Bridger Elementary School located at 5368 Cyclamen Way, West Jordan, Utah 84081. The project seeks bids from responsive and responsible licensed General Electrical Contractors (E200) to furnish and install a complete microprocessor-controlled, analog addressable fire alarm system including alarm initiating devices, notification appliances, control panels, auxiliary control devices, annunciators, power supplies, and wiring. The system shall comply with NFPA Standard No. 72, UL listing requirements, and local and state codes. The specifications detail a Gamewell-FCI E3-BB-BB or S3-BB-BB main fire alarm control panel with digital addressable capabilities, intelligent smoke detectors (photoelectric and thermal), manual pull boxes, duct smoke detectors, addressable monitor and control modules, audiovisual notification devices, and a carbon monoxide detection system with Realtest Technology. A mandatory pre-bid meeting is required; attendance details are specified in the Project Manual. The award recommendation will be presented at the June 2, 2026 GSD Board meeting, with final award to be issued following board approval. The contract will result in a single award to the lowest cost responsive and responsible vendor.

The specifications require all fire alarm system components to be manufactured by a single U.S. manufacturer and the system must be UL certificated upon completion. The contractor must provide a factory-trained and authorized technician for system programming and modifications with a response time not exceeding four hours, and must conduct comprehensive testing of all circuits, devices, and functions before final acceptance. All conduit and existing fire alarm equipment shall be removed, and new installation shall comply with the National Electrical Code (NEC), NFPA 72, local building codes, and the International Building Code (IBC). The contractor is responsible for instruction on system operation, provision of typed sequence of operation documentation, and commissioning activities coordinated with a Commissioning Authority. The contract includes a one-year warranty period from the date of acceptance, during which the contractor shall provide all maintenance, labor, and materials required to correct any defects at no cost to the owner.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2500 South State Street Salt Lake City, Utah 84115

April 23, 2026

Technical Specifications for Jim Bridger Elementary School

Fire Alarm and Carbon Monoxide Upgrade

Jim Bridger Elementary School 5368 Cyclamen Way, West Jordan, Utah 84081

TABLE OF CONTENTS

SECTION SECTION

NUMBER TITLE

TABLE OF CONTENTS TOC-1

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

NOT USED

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 25 00 Substitution Procedures 01 31 00 Project Management and Coordination 01 33 00 Submittal Procedures 01 35 16 Alteration Project Procedures 01 40 00 Quality Requirements 01 50 00 Temporary Facilities and Controls 01 60 00 Product Requirements 01 73 29 Cutting and Patching 01 77 00 Closeout Procedures

DIVISION 02 - EXISTING CONDITIONS

NOT USED

DIVISION 03 - CONCRETE

NOT USED

DIVISION 04 - MASONRY

NOT USED

DIVISION 05 - METALS

NOT USED

DIVISION 06 - WOOD, PLASTICS AND COMPOSITES

NOT USED

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00 Firestopping 07 92 10 Joint Sealants

DIVISION 08 - OPENINGS

NOT USED

TABLE OF CONTENTS TOC-2

DIVISION 09 - FINISHES

NOT USED

DIVISION 10 - SPECIALTIES

NOT USED

DIVISION 11 - EQUIPMENT

NOT USED

DIVISION 12 - FURNISHINGS

NOT USED

DIVISION 13 - SPECIAL CONSTRUCTION

NOT USED

DIVISION 14 - CONVEYING EQUIPMENT

NOT USED

DIVISION 21 – FIRE SUPPRESSION

NOT USED

DIVISION 22 – PLUMBING

NOT USED

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

NOT USED

DIVISION 25 – INTEGRATED AUTOMATION

NOT USED

ELECTRICAL SPECIFICATIONS BY ECE (ELECTRICAL CONSULTING ENGINEERS), LLC

DIVISION 26 – ELECTRICAL

26 05 00 Common Work Results for Electrical 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems

TABLE OF CONTENTS TOC-3

26 05 33 Raceways and Boxes for Electrical Systems 26 05 48 Vibration and Seismic Controls for Electrical Systems

DIVISION 27 – COMMUNICATIONS

NOT USED

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 11 Digital Addressable Fire-Alarm System

DIVISION 31 - EARTHWORK

NOT USED

DIVISION 32 - EXTERIOR IMPROVEMENTS

NOT USED

DIVISION 33 - UTILITIES

NOT USED

END OF TABLE OF CONTENTS

Granite School District JIM BRIDGER ELEMENTARY SCHOOL Rev. November 1, 2022

FIRE ALARM AND CARBON MONOXIDE UPGRADE

SUMMARY OF WORK 01 11 00-1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 – GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project description.

2. Owner occupancy.

3. Contractor’s use of site and premises.

1.2 PROJECT DESCRIPTION

A. Work of this Project is described as installation of a fire alarm and carbon monoxide system upgrade at Jim Bridger Elementary School, 5368 Cyclamen Way, West Jordan, Utah 84081

B. Work includes electrical and fire alarm/carbon monoxide systems.

C. The Project will be constructed under a single prime contract.

1.3 OWNER OCCUPANCY

A. The Owner will occupy the site and premises during the entire period of construction for conduct of normal operations.

B. Cooperate with the Owner to minimize conflict, and to facilitate Owner’s operations.

C. Schedule the Work to accommodate this requirement.

1.4 CONTRACTOR’S USE OF SITE AND PREMISES

A. Limit use of site and premises to allow for:

1. Owner occupancy.

2. Use of site and adjacent premises by the public.

B. Move any stored products under Contractor’s control that interfere with the operations of the Owner.

C. Assume full responsibility for protection and safekeeping of products under this Contract stored on site.

D. Obtain and pay for use of any additional storage or work areas needed for operations.

E. Coordinate use of site and premises with the Owner:

1. Employee parking: In designated areas.

2. Access to site and premises: In designated areas.

SUMMARY OF WORK 01 11 00-2

3. Storage and staging areas: In designated areas.

4. Transport materials and equipment to and from construction area along routes approved by Owner.

5. Use designated elevators.]

F. Conform to Building Rules and Regulations.

G. Confine operations to construction area unless otherwise approved by Owner.

H. If access to adjacent common or occupied spaces is required:

1. Schedule operations with Owner in advance.

2. Perform work after normal business hours or on weekends when directed by

Owner.

I. Do not interrupt building fire or life safety systems.

J. Do not close or obstruct exits.

K. Do not use or store hazardous or flammable materials on premises without Owner’s approval; follow requirements of governing authorities having jurisdiction over the work.

L. Prohibit smoking within interior spaces or anywhere on School property. Smoking is only permitted at public ways, such as sidewalks, off School property. Keep areas where smoking occurs clean and free from trash or “butts”.

PART 2 – PRODUCTS

Not Used

PART 3 – EXECUTION

END OF SECTION 01 11 00

SUBSTITUTION PROCEDURES 01 25 00-1

SECTION 01 25 00

SUBSTITUTION PROCEDURES

1. Product Substitution Procedures.

1.2 GENERAL

A. Definition: Proposal by Contractor to use manufacturer, product, material, or system different from one required in Contract Documents.

B. Do not substitute Products unless a substitution request has been approved by

Architect.

C. Substitutions during Bidding: Submit substitution requests not later than 5 days prior to Bid Due Date.

1. Substitution requests will not be considered after award of Contract except due to non-availability of a specified Product after award, through no fault of the Contractor.

D. In case of non-availability of a specified Product notify Architect in writing as soon as non-availability becomes apparent.

1.3 SUBSTITUTION REQUESTS

A. Submit substitution requests on Contractor’s standard form.

B. Document specified product and proposed substitution with complete data, including:

1. Product identification, including name and address of manufacturer.

2. Product description, performance and test data, and reference standards.

3. Sample, if requested.

4. Description of any anticipated effect that acceptance of proposed substitution will have on Progress Schedule, construction methods, or other items of Work.

5. Description of any differences between specified product and proposed substitution.

6. Difference in cost between specified product and proposed substitution.

C. Burden of proof for substantiating compliance of proposed substitution with Contract

Document requirements remains with Contractor.

D. A request constitutes a representation that the Contractor:

1. Has investigated the proposed Product and determined that it meets or exceeds the quality level of the specified Product.

2. Will provide the same warranty for the substitution as for the specified Product.

SUBSTITUTION PROCEDURES 01 25 00-2

3. Will coordinate installation and make changes to other Work that may be required for the Work to be complete with no additional cost to Owner.

4. Waives claims for additional costs or time extension that may subsequently become apparent.

5. Will reimburse Owner for design services associated with re-approval by authorities or revisions to Contract Documents to accommodate the substitution.

E. Substitutions will not be considered if:

1. They are indicated or implied on Shop Drawings or other submittals without submittal of a substitution request.

2. Approval will require substantial revision of Contract Documents without additional compensation to Architect.

F. Submit electronically in Adobe PDF format.

G. Architect will notify Contractor of approval or rejection of each Substitution Request.

END OF SECTION 01 25 00

Granite School District JIM BRIDGER ELEMENTARY SCHOOL Rev. May 31, 2023

PROJECT MANAGEMENT AND COORDINATION 01 31 00-1

SECTION 01 31 00

PROJECT MANAGEMENT AND COORDINATION

1. Project coordination.

2. Coordination drawings.

3. Project meetings.

B. Related Sections:

1. Section 01 77 00 - Contract Closeout.

1.2 PROJECT COORDINATION

A. Submit required project submittals electronically in Abode PDF format.

B. Coordinate scheduling, submittals, and work of various Sections of specifications to assure efficient and orderly sequence of installation of interdependent construction elements.

C. Verify that utility requirement characteristics of operating equipment are compatible with building utilities. Coordinate work of various Sections having interdependent responsibilities for installing, connecting to, and placing in service such equipment.

D. Coordinate space requirements and installation of mechanical and electrical items that are indicated diagrammatically on Drawings.

1. Follow routing shown as closely as practical; place runs parallel with building lines.

2. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

E. In finished areas, conceal pipes, ducts, and wiring within construction. Coordinate locations of fixtures and outlets with finish elements.

F. Coordinate completion and clean-up of work of separate Sections in preparation for

Substantial Completion.

G. After Owner occupancy, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents to minimize disruption of Owner's activities.

1.3 COORDINATION DRAWINGS

A. Coordination Drawings:

1. Prior to commencement of Work, prepare coordination drawings to define relationship of mechanical, plumbing, fire protection, and electrical components

PROJECT MANAGEMENT AND COORDINATION 01 31 00-2

with beams, columns, ceilings and walls.

2. Include plans, elevations, sections, and details required to define relationships between components.

3. Prepare drawings at 1/4" = 1'-0" scale for general layout and 3/8” = 1'-0" for plans and sections in congested areas including equipment spaces.

4. Submit electronically in Adobe PDF format.

B. Hold coordination meetings with trades providing mechanical, plumbing, fire protection, and electrical work.

C. Resolve conflicts between trades, prepare composite coordination drawings and obtain signatures on original composite coordination drawings.

D. When conflicts cannot be resolved:

1. Cease work in areas of conflict and request clarification prior to proceeding.

2. Prepare drawings to define and to indicate proposed solution.

3. Submit drawings for approval when actual measurements and analysis of

Drawings and Project Manual indicate that various systems cannot be installed without significant deviation from intent of Contract Documents.

E. Submit original composite coordination drawings as part of Project Record

Documents specified in Section 01 77 00.

1.4 PROJECT MEETINGS

A. Schedule and administer preconstruction meeting, progress (OAC) meetings, and pre-installation conferences.

B. Make physical arrangements for meetings; notify involved parties at least four (4) days in advance.

C. Record significant proceedings and decisions at each meeting; reproduce and distribute copies to parties in attendance and others affected by proceedings and decisions made.

1.5 PRECONSTRUCTION MEETING

A. Preconstruction meeting will be scheduled by the Owner after date of Notice to Proceed at location determined by the Owner.

B. Attendance:

1. Contractor.

2. Owner.

3. Architect and principal consultants.

4. Major subcontractors and suppliers as Contractor deems appropriate.

C. Review and Discuss:

1. Relation and coordination of various parties, and responsible personnel for each party.

2. Use of premises, including office and storage areas, temporary controls, and security procedures.

PROJECT MANAGEMENT AND COORDINATION 01 31 00-3

3. Construction schedule and critical work sequencing.

4. Frequency of Owner/Architect/Contractor (OAC) meetings.

a. Day of Week

b. Time

c. Frequency (weekly, every other week, etc.)

5. Processing of:

a. Contract modifications.

b. Shop Drawings, Product Data, and Samples.

c. Applications for Payment.

d. Substitutions.

e. Requests for Information.

f. Other required submittals.

6. Adequacy of distribution of Contract Documents.

7. Procedures for maintaining contract closeout submittals.

8. Installation and removal of temporary facilities.

9. Notification procedures and extent of testing and inspection services.

1.6 PROGRESS MEETINGS (OWNER/ARCHITECT/CONTACTOR (OAC) MEETING)

A. Location: Contractor’s Project field office, or as determined during preconstruction meeting.

B. Attendance:

1. Contractor.

2. Owner.

3. Architect and consultants as appropriate to agenda.

4. Subcontractors and suppliers as appropriate to agenda.

5. Others as appropriate to agenda.

C. Review and Discuss:

1. Work progress since previous meeting, including:

a. Field observations, deficiencies, conflicts, and problems.

b. Progress and completion date.

c. Corrective measures needed to maintain quality standards, progress, and completion date.

2. Status of:

a. Requests for information.

b. Submittals.

c. Contract modifications.

3. Coordination between various elements of Work.

4. Maintenance of Project Record Documents.

1.7 PRE-INSTALLATION CONFERENCES

A. Where required in individual specification Section, convene a pre-installation conference at project site or other designated location.

B. Require attendance of parties directly affecting or affected by work of the specific

Section.

C. Review conditions of installation, preparation and installation procedures, and

PROJECT MANAGEMENT AND COORDINATION 01 31 00-4

coordination with related work.

END OF SECTION 01 31 00

SUBMITTAL PROCEDURES 01 33 00-1

SECTION 01 33 00

SUBMITTAL PROCEDURES

1. Submittal procedures.

2. Shop Drawings.

3. Product Data.

4. Samples.

5. Quality control submittals.

1. Section 01 40 00 - Quality Requirements.

1.2 SUBMITTAL PROCEDURES

A. Number each submittal with Project Manual section number and a sequential number within each section. Number resubmittals with original number and an alphabetic suffix.

B. Identify Project, Contractor, Subcontractor or supplier, pertinent Drawing sheet and detail numbers, and specification Section number, as appropriate.

C. Submit all submittals listed under “Submittals for Review” simultaneously for each Product or Specification Section.

D. Where multiple Products function as an assembly, group submittals for all related

Products into single submittal.

E. Architect will not review incomplete submittals.

F. Apply Contractor’s stamp, signed or initialed certifying that:

1. Submittal was reviewed.

2. Products, field dimensions, and adjacent construction have been verified.

3. Information has been coordinated with requirements of Work and Contract

Documents.

G. Schedule submittals to expedite the Project, and deliver to Architect. Coordinate submittal of related items.

H. For each submittal, allow 14 days for Architect’s review, excluding delivery time to and from Contractor.

I. Identify variations from Contract Documents and Product or system limitations that may be detrimental to successful performance of completed Work.

SUBMITTAL PROCEDURES 01 33 00-2

J. Revise and resubmit submittals when required; identify all changes made since previous submittal.

K. Distribute copies of reviewed submittals to concerned parties and to Project Record

Documents file. Instruct parties to promptly report any inability to comply with provisions.

1.3 SHOP DRAWINGS

A. Present information in clear and thorough manner.

B. Identify details by reference to sheet and detail numbers or room number shown on Drawings.

C. Reproductions of details contained in Contract Documents are not acceptable.

D. Submit electronically in Adobe PDF format. Architect will return one copy to

Contractor for printing and distribution.

1.4 PRODUCT DATA

A. Mark each copy to identify applicable products, models, options, and other data.

B. Supplement manufacturers' standard data to provide information unique to this Project.

C. Submit electronically in Adobe PDF format. Architect will return one copy to

Contractor for printing and distribution.

1.5 SAMPLES

A. Submit samples to illustrate functional and aesthetic characteristics of Products, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.

B. Where so indicated, submit samples of finishes from the full range of manufacturers' standard colors, textures, and patterns for Architect's selection. Electronic samples will not be accepted for color selection.

C. Include identification on each sample, with full Project information.

D. Unless otherwise specified in individual specifications, submit two of each sample.

E. Architect will notify Contractor of approval or rejection of samples, or of selection of color, texture, or pattern if full range is submitted.

1.6 QUALITY CONTROL SUBMITTALS

A. Quality control submittals specified in Section 01 40 00 are for information and do not require Architect’s responsive action except to require resubmission of incomplete or incorrect information.

SUBMITTAL PROCEDURES 01 33 00-3

END OF SECTION 01 33 00

Granite School District JIM BRIDGER ELEMENTARY SCHOOL Rev. June 1, 2023

ALTERATION PROJECT PROCEDURES 01 35 16-1

SECTION 01 35 16

ALTERATION PROJECT PROCEDURES

1. Patching and extending existing work.

2. Transitions and adjustments.

3. Repair of damaged surfaces.

1. Section 07 84 00 - Firestopping.

1.2 PROJECT CONDITIONS

A. Hazardous Materials:

1. A survey of hazardous materials was performed by the Owner; a copy of the report is available for review at the office of the Owner and will be provided to the Contractor. Review report prior to commencement of work under this Contract. Contractor must keep a copy of the hazardous materials report on site at all times during the construction of the project.

2. Owner will remove or encapsulate existing asbestos and other hazardous materials prior to commencement of work under this Contract.

B. Unknown Hazardous Materials: If asbestos, lead-bearing paint, or other suspected hazardous materials are encountered during work of this Contract:

1. Cease work in affected area immediately.

2. Notify Architect and await instructions.

3. Close off affected areas.

2.1 MATERIALS

A. New Materials:

1. Provide new materials to match existing adjacent materials for closing of openings, repairs, and reconstructions where suitable salvaged materials do not exist, are insufficient in quantity, or where reuse is not permitted.

2. Match existing materials in material, type, size, quality, color, finish, and other attributes.

B. Reused Materials:

1. Clean and prepare salvaged materials for reuse.

2. Do not use materials with objectionable chips, cracks, splits, dents, scratches, or other defects.

3. Repair operable items to function properly.

ALTERATION PROJECT PROCEDURES 01 35 16-2

3.1 PREPARATION

A. Test materials to be used in repairs for compatibility with existing materials; do not use incompatible materials.

B. Cut, move, or remove items as necessary for access to alterations and renovation work. Replace and restore upon completion.

C. Remove, cut, and patch work in manner to minimize damage and to provide means for restoring products and finishes to their original or specified new condition.

D. Remove unsuitable materials not marked for salvage.

E. Remove debris and abandoned items from areas of work and from concealed spaces.

3.2 ALTERATIONS

A. Coordinate alterations and renovations to expedite completion.

B. Install products and finish surfaces as specified in individual sections, or where no specification section exists to match existing.

C. Refinish visible surfaces to specified condition, with neat transition to adjacent surfaces.

D. Finish patches to provide uniform color and texture over entire surface, with repairs not discernible from normal viewing distance. If finish cannot be matched, refinish entire surface to nearest intersections.

E. Where removal of partitions or walls results in adjacent spaces becoming one, rework finished surfaces to smooth plane, without breaks, steps, or bulkheads.

F. Where new work abuts or aligns with existing, provide smooth and even transition.

Where a change in plane of 1/4-inch or more occurs, submit recommendation to Architect for transition.

G. Where alterations expose mechanical and electrical components that were previously concealed, renovate to be concealed in completed work.

H. In addition to specified replacement of equipment and fixtures, restore mechanical and electrical systems to full operational condition.

I. Patch holes in exposed surfaces left by removal of mechanical and electrical components.

J. Existing Fire-Rated Assemblies:

ALTERATION PROJECT PROCEDURES 01 35 16-3

1. Patch or replace fire protection materials to maintain integrity of fire ratings.

2. Seal penetrations through and perimeter of fire-rated assemblies under provisions of Section 07 84 00.

END OF SECTION 01 35 16

QUALITY REQUIREMENTS 01 40 00-1

SECTION 01 40 00

QUALITY REQUIREMENTS

1. References.

2. Quality assurance and control of installation.

3. Mockups.

4. Manufacturer's field services and reports.

5. Test reports and certifications.

6. Manufacturer's installation instructions.

1.2 REFERENCES

A. For products or workmanship specified by reference to association, trade, or industry standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B. Should specified reference standards conflict with Contract Documents, request clarification from Architect before proceeding.

C. Conform to edition of reference standard in effect as of date of Project Manual.

D. The contractual relationship of the parties to the Contract shall not be altered from the Contract Documents by mention or inference otherwise in any reference document.

1.3 QUALITY ASSURANCE AND CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality.

B. Comply fully with manufacturers' instructions, including each step in sequence.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Architect before proceeding.

D. Comply with specified standards as a minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Perform work by persons qualified to produce workmanship of specified quality.

F. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion or disfigurement.

QUALITY REQUIREMENTS 01 40 00-2

1.4 MOCKUPS

A. Definition:

1. Mockups are field samples constructed, applied, or assembled at the project site for review by the Owner and Architect that illustrate materials, equipment, or workmanship.

2. Approved mockups establish the standard of quality by which the Work will be judged.

B. Construct, apply, or assemble specified items, with related attachment and anchorage devices, flashings, seals, and finishes.

C. Perform work in accordance with applicable specifications sections.

D. Erect at project site at location acceptable to Architect. Protect from damage.

E. Removal:

1. Mockups may remain as part of the Work only when so designated in individual specification sections.

2. Do not remove mockups until removal is approved by Architect or upon Final

Completion.

3. Where mockup is not permitted to remain as part of the Work, clear area after removal of mockup has been approved by Architect.

1.5 MANUFACTURERS' FIELD SERVICES AND REPORTS

A. When specified in individual specification Sections, require material or Product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, or startup of equipment, as applicable, and to initiate instructions when necessary.

B. Individuals to report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.

C. Submit report to Architect within 10 days of observation.

1.6 TEST REPORTS AND CERTIFICATIONS

A. When specified in individual specification Sections, require material or Product suppliers or manufacturers to provide test reports and manufacturers’ certifications.

B. Indicate that material or Product conforms to or exceeds specified requirements.

Submit supporting reference data, affidavits, and certifications as appropriate.

C. Submittals may be recent or previous test results on material or Product but must be acceptable to Architect.

D. Submit electronically in Adobe PDF format.

QUALITY REQUIREMENTS 01 40 00-3

1.7 MANUFACTURER'S INSTALLATION INSTRUCTIONS

A. When Contract Documents require that Products be installed in accordance with manufacturer's instructions:

1. Submit manufacturer's most recent printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, as applicable.

a. Submit in quantities specified for Product Data.

b. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.

c. Identify conflicts between manufacturers' instructions and requirements of Contract Documents.

2. Perform installation of Products to comply with requirements of manufacturer's instructions.

3. If installation cannot be performed in accordance with manufacturer's instructions, notify Architect and await instructions.

4. Submit electronically in Adobe PDF format.

END OF SECTION 01 40 00

TEMPORARY FACILITIES AND CONTROLS 01 50 00-1

SECTION 01 50 00

TEMPORARY FACILITIES AND CONTROLS

1. Temporary utilities.

2. Field offices and sheds.

3. Temporary controls.

4. Protection of installed Work.

5. Progress cleaning.

6. Water, erosion, sediment, dust, and mold and mildew control.

7. Access roads and parking areas.

8. Removal.

A. Green Seal, Inc. (GS) 37 - Environmental Standard for Industrial and Institutional Cleaners.

2.1 MATERIALS

A. Cleaning Materials: Use only materials that:

1. Comply with GS 37.

2. Are not potentially hazardous to health or property.

3. Do not contain hazardous ingredients.

4. Are non-carcinogenic.

5. Are non or mildly irritating to skin, eyes, and mucous membranes.

6. Have an LD50 rating above 5 grams per kilogram.

7. Are non-reactive.

8. Contain minimum fragrance and dye.

9. Do not require respiratory protection.

3.1 TEMPORARY ELECTRICITY

A. Provide temporary electrical service of capacity and characteristics required for construction.

B. Connect to existing electrical system for electricity required during construction.

1. Cost of electricity used will be paid for by Owner. Exercise measures to conserve electricity.

TEMPORARY FACILITIES AND CONTROLS 01 50 00-2

2. Regulate system to prevent interference with Owner's normal usage.

3. Maintain continuous power operation of Owner's facilities during changeover of electrical services.

4. Notify Owner when unusually heavy loads will be connected, including welding and other equipment with special power requirements.

5. Provide and pay for required service of capacity or characteristics other than that currently available.

C. Provide power outlets for construction operations, with branch wiring and distribution boxes located as required. Provide flexible power cords as required.

D. Maintain distribution system and provide routine repairs.

3.2 TEMPORARY LIGHTING

A. Provide temporary lighting for construction and security purposes.

B. Provide branch wiring from power source to distribution boxes with lighting conductors, pigtails, and lamps as required.

C. Maintain lamps and provide routine repairs.

D. Provide portable lights when required to provide minimum lighting levels necessary for specific work.

3.3 TEMPORARY HEAT

A. Provide temporary heating devices required to maintain specified ambient temperatures for construction.

B. Utilize existing facilities for heat required during construction.

1. Extend and supplement with temporary heat devices required to maintain specified ambient temperatures for construction.

2. Costs of fuel used from existing facilities will be paid for by Owner. Exercise measures to conserve fuel.

C. Maintain minimum ambient temperature of fifty (50°) degrees F in areas where construction is in progress, unless otherwise indicated in individual specification sections.

3.4 TEMPORARY VENTILATION

A. Ventilate enclosed areas to facilitate curing of materials, disperse humidity, and prevent accumulations of dust, fumes, vapors, or gases.

B. Provide temporary fan units as required to maintain clean air for construction.

C. Utilize existing ventilation equipment. Extend and supplement with temporary fan units as required to maintain clean air for construction.

TEMPORARY FACILITIES AND CONTROLS 01 50 00-3

3.5 TEMPORARY TELEPHONE, FACSIMILE, AND COMPUTER SERVICES

A. Contractor shall be accessible during normal business hours via mobile telephone with voice mail or an answering service.

3.6 TEMPORARY WATER

A. Provide temporary water required for construction.

B. Connect to existing water source for water required for construction.

1. Regulate system to prevent interference with Owner's usage.

2. Costs of water used will be paid for by Owner. Exercise measures to conserve water.

C. Extend branch piping and provide temporary hoses so that water is available at locations needed for work.

D. Protect from freezing.

E. Maintain distribution system and provide routine repairs.

3.7 TEMPORARY SANITARY FACILITIES

A. Provide chemical toilets for use during construction.

B. Existing toilets, if so designated by Owner, may be used during construction.

C. Maintain facilities in clean and sanitary condition.

3.8 FIELD OFFICES AND SHEDS

A. Provide temporary field offices and storage sheds required for construction.

B. Areas within existing building and on site designated by Owner may be used for field office and storage of materials subject to damage by weather. Store large materials and those not subject to damage by weather outside building.

C. Do not unreasonably encumber site or premises with excess materials or equipment.

D. Temporary Structures:

1. Portable or mobile buildings, structurally sound, weathertight, with floors raised above ground.

2. Thermal transmission resistance: Compatible with occupancy and storage requirements.

3. Provide connections for utility services when required.

4. Provide steps and landings at entrances.

E. Field Office:

1. Size required for Contractor’s use and to provide space for project meetings.

2. Adequate electrical power, lighting, heating, and cooling to maintain human comfort.

TEMPORARY FACILITIES AND CONTROLS 01 50 00-4

3. Provide facilities for storage of Project Record Documents.

4. Provide thermometer mounted at convenient outside location, not in direct sunlight.

3.9 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas, to allow Owner’s use of site and premises, and to protect existing facilities from construction operations.

B. Provide barricades required by governing authorities for public rights-of-way and for public access to existing facilities.

C. Fencing:

1. Provide temporary fencing for construction operations.

2. Construction: Commercial grade chain link.

3. Height: six (6) feet.

4. Locate to protect construction operations, materials, and equipment.

5. Provide vehicular and pedestrian gates.

3.10 PROTECTION OF INSTALLED WORK

A. Protect installed work from construction operations; provide special protection when required in individual specification sections.

B. Prohibit traffic from landscaped areas.

3.11 PROGRESS CLEANING

A. Maintain areas free from waste materials, debris, and rubbish. Maintain site in clean and orderly condition.

B. Provide containers for collection of waste materials, debris, and rubbish; remove and dispose of off-site as required by construction activities. Do not use Owner’s waste containers for construction waste.

C. Periodically clean interior areas to provide suitable conditions for finish work.

3.12 TEMPORARY CONTROLS

A. Dust Control:

1. Provide dust control materials and methods to minimize dust from construction operations.

2. Prevent dust from dispersing into atmosphere.

3.13 ACCESS ROADS AND PARKING AREAS

A. Existing roads designated by Owner may be used for construction purposes. Do not allow heavy vehicles or construction equipment in parking areas.

B. Provide for access by emergency vehicles.

TEMPORARY FACILITIES AND CONTROLS 01 50 00-5

C. Keep fire hydrants and water control valves free from obstruction and accessible for use.

D. Provide parking facilities for construction personnel. When parking needs exceed on site capacity, provide additional off-site facilities.

E. Maintain existing construction and restore to original or specified condition at completion of Work.

3.14 REMOVAL

A. Remove temporary utilities, equipment, facilities, and services when construction needs can be met by use of permanent construction or upon completion of Project.

B. Clean and repair damage caused by installation or use of temporary work.

C. Restore existing and permanent facilities used during construction to original or to specified condition.

END OF SECTION 01 50 00

PRODUCT REQUIREMENTS 01 60 00-1

SECTION 01 60 00

PRODUCT REQUIREMENTS

1. Products.

2. Transportation and handling.

3. Storage and protection.

4. Reuse of existing materials.

5. Product options.

1. Section 01 25 00 - Substitution Procedures.

1.2 PRODUCTS

A. Provide interchangeable components by the same manufacturer for identical items.

B. Do not use products containing asbestos or other known hazardous materials.

C. Do not reuse materials and equipment removed from existing construction in completed Work, except as specifically permitted by the Contract Documents.

1.3 TRANSPORTATION AND HANDLING

A. Coordinate delivery of Products to prevent conflict with Work and adverse conditions at site.

B. Transport and handle Products in accordance with manufacturer's instructions.

C. Promptly inspect shipments to ensure that Products comply with requirements of

Contract Documents, are undamaged, and quantities are correct.

D. Provide equipment and personnel to handle products by methods to prevent damage.

1.4 STORAGE AND PROTECTION

A. Store and protect Products in accordance with manufacturer's instructions with manufacturer's seals and labels intact and legible.

B. Store Products on site unless prior written approval to store off site has been obtained from Owner.

C. Store Products subject to damage by elements in weathertight enclosures. Maintain temperature and humidity within ranges required by manufacturer's instructions.

PRODUCT REQUIREMENTS 01 60 00-2

D. Exterior Storage:

1. Store fabricated Products above ground; prevent soiling and staining.

2. Cover products subject to deterioration with impervious sheet coverings;

provide ventilation to prevent condensation.

3. Store loose granular materials in well drained area on solid surfaces; prevent mixing with foreign matter.

E. Arrange storage areas to permit access for inspection. Periodically inspect stored products to verify that products are undamaged and in acceptable condition.

1.5 REUSE OF EXISTING MATERIALS

A. Reuse existing materials only where specifically permitted by the Contract Documents.

B. Carefully remove, handle, protect, and store Products.

C. Clean and refinish Products to original or specified condition.

D. Restore operable components to working condition.

E. Arrange and pay for transportation, storage, and handling of Products requiring off site storage, restoration, or renovation.

1.6 PRODUCT OPTIONS

A. Products specified by reference standard only:

1. Select any Product meeting the specified standard.

2. Submit Product Data to substantiate compliance of proposed Product with specified requirements.

B. Products specified by naming two or more acceptable Products: Select any named Product.

C. Products specified by stating that the Contract Documents are based on a Product by a single manufacturer followed by the statement "Equivalent products by the following manufacturers are acceptable":

1. Select the specified Product or a Product by a named manufacturer having equivalent or superior characteristics to the specified Product and meeting the requirements of the Contract Documents.

2. If the specified Product is not selected, submit Product Data to substantiate compliance of proposed Product with specified requirements.

3. The specified Product establishes the required standard of quality.

D. Products specified by naming one or more Products followed by "or approved substitute" or similar statement:

1. Submit a substitution request under provisions of Section 01 25 00 for Products not listed.

2. The specified Product establishes the required standard of quality.

PRODUCT REQUIREMENTS 01 60 00-3

E. Products specified by naming one or more Products or manufacturers followed by the statement "Substitutions: Under provisions of Division 01":

1. Submit a substitution request under provisions of Section 01 25 00 for Products not listed.

2. The specified Product establishes the required standard of quality.

F. Products specified by naming one Product followed by the statement "Substitutions:

Not permitted": Substitutions will not be allowed.

G. Products specified by required performance or attributes, without naming a manufacturer or Product:

1. Select any Product meeting specified requirements.

2. Submit Product Data to substantiate compliance of proposed Product with

END OF SECTION 01 60 00

CUTTING AND PATCHING 01 73 29-1

SECTION 01 73 29

CUTTING AND PATCHING

1. Requirements and limitations for cutting and patching of work.

B. Related sections:

1. Section 01 25 00 - Substitution Procedures.

1.2 SUBMITTALS

A. Submit written request in advance of executing cutting or alteration that affects:

1. Work of Owner or separate contractor.

2. Structural integrity of project.

3. Integrity or effectiveness of weather exposed or moisture resistant elements or systems.

4. Efficiency, operational life, maintenance, or safety of operational elements.

5. Visual qualities of sight exposed elements.

B. Include in Request:

1. Identification of project.

2. Description of work affected.

3. Necessity for cutting or patching.

4. Effect of cutting or patching on work of Owner or separate contractor, or on structural, weatherproof, or visual integrity of project.

5. Description of proposed work:

a. Scope of cutting and patching.

b. Subcontractor and trades to execute work.

c. Products proposed to be used.

d. Extent of refinishing.

6. Alternate to cutting and patching.

7. Cost proposal, if applicable.

8. Written permission of any separate contractor whose work will be affected.

C. If conditions of work or schedule necessitate a change of material from that originally installed, submit substitution request in accordance with Section 01 25 00.

CUTTING AND PATCHING 01 73 29-2

A. Examine existing conditions of work, including elements subject to movement or damage during cutting and patching.

B. After uncovering work, examine conditions affecting installation of new products or performance of work.

C. Provide protection for other portions of project.

D. Provide protection from elements.

3.2 CUTTING AND PATCHING

A. Execute cutting to include excavating, fitting, and patching of Work required to:

1. Make several parts fit properly.

2. Uncover work to provide for installation of ill-timed work.

3. Remove and replace defective work.

4. Remove and replace work not conforming to requirements of Contract

Documents.

5. Provide routine penetrations of nonstructural surfaces for installation of piping and electrical conduit.

B. Execute fitting and adjustment of products to provide finished installation to comply with specified tolerances, and finishes.

C. Execute cutting and demolition by methods that will prevent damage to other work, and will provide proper surfaces to receive installation of repairs and new work.

D. Execute excavating and backfilling by methods that will prevent damage to other Work, and will prevent settlement.

E. Employ original installer or fabricator to perform cutting and patching for:

1. Weather exposed or moisture resistant elements.

2. Sight exposed finished surfaces.

F. Restore work that has been cut or removed; install new products to provide completed Work in accordance with requirements of Contract Documents.

G. Refinish entire surfaces as necessary to provide an even finish:

1. Continuous surfaces: To nearest intersections.

2. Assembly: Refinish entirely.

END OF SECTION 01 73 29

CLOSEOUT PROCEDURES 01 77 00-1

SECTION 01 77 00

CLOSEOUT PROCEDURES

1. Closeout procedures.

2. Final cleaning.

3. Adjusting.

4. Project record documents.

5. Operation and maintenance data.

6. Warranties.

7. Spare parts and maintenance materials.

8. Starting of systems.

9. Demonstration and instructions.

1.2 CLOSEOUT PROCEDURES

A. Final Inspection:

1. Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with the Contract Documents and ready for Architect's inspection.

2. If Architect performs reinspection due to failure of Work to comply with claims of status of completion made by Contractor, Owner will compensate Architect for such additional services and will deduct the amount of such compensation from final payment to Contractor.

B. Submit final Application for Payment showing original Contract Sum, adjustments, previous payments, retainage withheld from previous payments, and sum remaining due.

C. Closeout Submittals, as applicable:

1. Project Record Documents.

2. Operation and Maintenance Data.

3. Warranties.

4. Keys and keying schedule.

5. Spare parts and maintenance materials.

6. Evidence of payment of Subcontractors and suppliers.

7. Final lien waiver.

8. Certificate of insurance for products and completed operations.

D. Owner will occupy all portions of the building as specified in Section 01 11 00.

1.3 FINAL CLEANING

A. Execute final cleaning prior to final inspection.

CLOSEOUT PROCEDURES 01 77 00-2

B. Clean surfaces exposed to view:

1. Clean glass.

2. Remove temporary labels, stains and foreign substances.

3. Polish transparent and glossy surfaces.

4. Vacuum carpeted surfaces; damp mop hard surface flooring.

C. Clean equipment and fixtures to a sanitary condition.

D. Clean or replace filters of operating equipment.

E. Clean debris from roofs and drainage systems.

F. Clean site; sweep paved areas, rake clean landscaped surfaces.

G. Remove waste and surplus materials, rubbish, and construction facilities from the site.

1.4 ADJUSTING

A. Adjust operating Products and equipment to ensure smooth and unhindered operation.

1.5 PROJECT RECORD DOCUMENTS

A. Maintain following record documents on site; record actual revisions to the Work:

1. Drawings.

2. Specifications.

3. Addenda.

4. Change Orders and other Modifications to the Contract.

5. Reviewed Shop Drawings, Product Data, and Samples.

6. Material Safety Data Sheets.

B. Store Record Documents separate from documents used for construction.

C. Record information concurrent with construction progress.

D. Make entries neatly and accurately.

E. Label each set or volume with title "PROJECT RECORD DOCUMENTS", project title, and description of contents.

1. Organize contents according to Project Manual table of contents.

2. Provide table of contents for each volume.

F. Drawings: Mark each item to record actual construction including:

1. Measured depths of foundations in relation to finish floor datum.

2. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.

3. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work.

4. Field changes of dimension and detail.

5. Details not on original Drawings.

CLOSEOUT PROCEDURES 01 77 00-3

G. Specifications: Mark each Product section description of actual Products installed, including the following:

1. Manufacturer's name and product model and number.

2. Product substitutions or alternates utilized.

3. Changes made by Addenda and Modifications.

H. Shop Drawings: Mark each item to record actual construction including:

1. Field changes of dimension and detail.

2. Details not on original Shop Drawings.

I. Submit electronically in Adobe PDF format.

1.6 OPERATION AND MAINTENANCE DATA

A. Identify as "OPERATION AND MAINTENANCE INSTRUCTIONS" and title of project.

B. Contents:

1. Directory: List names, addresses, and telephone numbers of Architect, Contractor, Subcontractors, and major equipment suppliers.

2. Operation and maintenance instructions: Arranged by system and subdivided by specification section. For each category, identify names, addresses, and telephone numbers of Subcontractors and suppliers. Identify the following:

a. Significant design criteria.

b. List of equipment.

c. Parts list for each component.

d. Operating instructions.

e. Maintenance instructions for equipment and systems.

f. Maintenance instructions for special finishes, including recommended cleaning methods and materials and special precautions identifying detrimental agents.

3. Project documents and certificates including, as applicable:

a. Shop drawings and product data.

b. HVAC balance reports.

c. Certificates.

d. Copies of warranties and bonds.

C. Submittal:

1. Submit electronically in Adobe PDF format at least 15 days prior to final inspection.

2. Architect will notify Contractor of any required revisions after final inspection.

3. Revise content of documents as required prior to final submittal.

4. Submit three copies of revised documents in three-ring binders, each binder to be indexed by volume and include Table of Contents. In addition to hardcopy, submit revised documents electronically in Adobe PDF format. Revised documents shall be submitted within 10 days after final inspection.

1.7 WARRANTIES

A. Execute and assemble documents from Subcontractors, suppliers, and manufacturers.

CLOSEOUT PROCEDURES 01 77 00-4

B. Include Table of Contents.

C. Submit three copies in three-ring binders. In addition to hardcopy, submit electronically in Adobe PDF format. Warranties to be submitted along with final Application for Payment.

D. For items of Work delayed beyond date of Substantial Completion, provide updated submittal within 10 days after acceptance, listing date of acceptance as start of warranty period.

1.8 SPARE PARTS AND MAINTENANCE MATERIALS

A. Provide products, spare parts, maintenance and extra materials (“attic stock”) in quantities specified in individual specification Sections.

B. Deliver to Project site in location as directed; obtain receipt prior to final payment.

1.9 STARTING OF SYSTEMS

A. Notify Owner and Architect at least seven days prior to startup of each system or piece of equipment.

B. Prior to beginning startup verify that:

1. Lubrication has been performed.

2. Drive rotation, belt tension, control sequences, tests, meter readings, and electrical characteristics are within manufacturer's requirements.

3. Utility connections and support components are complete and tested.

C. Execute start-up under supervision of applicable manufacturer's representative or

Contractor’s personnel in accordance with manufacturers' instructions.

D. When specified in individual specification Sections, require manufacturer to provide authorized representative to be present at site to inspect, check, and approve equipment or system installation prior to startup, and to supervise placing equipment or system in operation.

E. Submit written report that equipment or system has been properly installed and is functioning correctly.

1.10 DEMONSTRATION AND INSTRUCTIONS

A. Demonstrate operation and maintenance of Products to Owner's personnel two weeks prior to date of Substantial Completion.

B. For equipment or systems requiring seasonal operation, perform demonstration for other season within six months.

C. Utilize Operation and Maintenance Manuals as basis for instruction. Review contents of manual with Owners' personnel in detail to explain all aspects of operation and maintenance.

CLOSEOUT PROCEDURES 01 77 00-5

D. Demonstrate startup, operation, control, adjustment, troubleshooting, servicing, maintenance, and shutdown of each item of equipment at agreed upon times, at equipment location.

E. Prepare and insert additional data in Operation and Maintenance Manuals when need for additional data becomes apparent during instruction.

END OF SECTION 01 77 00

Granite School District JIM BRIDGER ELEMENTARY SCHOOL Rev. November 18, 2024

FIRESTOPPING 07 84 00-1

SECTION 07 84 00

FIRESTOPPING

1. Firestopping perimeter of and penetrations through fire and smoke rated assemblies.

1. Division 01: Administrative, procedural, and temporary work requirements.

A. ASTM International (ASTM):

1. E814 - Standard Test Method for Fire Tests of Through-Penetration Firestops.

2. E1966 - Standard Test Method for Fire-Resistive Joint Systems.

3. E2307 - Standard Test Method for Determining Fire Resistance of Perimeter

Fire Barrier Systems Using Intermediate-Scale, Multi-Story Test Apparatus.

B. Underwriters Laboratories, Inc. (UL):

1. 1479 - Fire Tests of Through-Penetration Firestops.

2. 2079 - Fire Resistance of Building Joint Systems.

1.3 SYSTEM DESCRIPTION

A. Provide continuous protection against passage of heat, fire, smoke, and gases at perimeter of and penetrations through rated assemblies.

1.4 SUBMITTALS

A. Submittals for Review:

1. Product Data:

a. Firestopping schedule; prepare in tabular format and identify:

1) Type of assembly receiving firestop and required fire rating.

2) Type of penetrating item.

3) Proposed firestop system.

b. Include UL or equivalent details for each firestop system.

2. Test Reports: Indicate conformance with ASTM E814, ASTM E1966, ASTM

E2307, UL 1479, or UL 2079.

B. Quality Control Submittals:

1. Certificates of Compliance: Indicate conformance of installed systems with

FIRESTOPPING 07 84 00-2

1.5 QUALITY ASSURANCE

A. Applicator Qualifications: Minimum five (5) years’ experience in work of this Section.

B. Firestopping: Fire resistance rating equivalent to adjacent construction; tested to ASTM E814, ASTM E1966, ASTM E2307, UL 1479, or UL 2079.

C. Mockups:

1. Provide mockup of each firestopping system.

2. Locate where directed.

3. Approved mockups may remain as part of the Work.

D. Pre-Installation Conference:

1. Convene at site 1 week prior to beginning work of this Section.

2. Attendance: Architect, Owner, Contractor, firestopping applicator, firestopping manufacturer's representative, and related trades.

3. Review and discuss: Contract Documents, fire rating requirements, manufacturer's literature, job conditions, scheduling, and other matters…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .