6. Activity Schedule.pdf
PDF 159 KB Posted
- Attached to
- FY 2024 - Grandfather Road Maintenance
- Solicitation number
- 12445224B0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is an Activity Schedule for the FY 2024 Grandfather Road Maintenance project, which is a federal contract opportunity solicited by the Department of Agriculture Forest Service.
The Activity Schedule details the roadwork required for 37.9 miles of roads in the Grandfather Ranger District, including blading and shaping the existing traveled way and shoulders, maintaining ditches, and cleaning drainage structures. The work is divided into 11 road sections, with specific quantities and descriptions of tasks such as blading, aggregate surfacing, spot surfacing, grading, ditch cleaning, and culvert cleaning. The document also includes 4 optional task orders for an additional 12.7 miles of road reconditioning work and 2,080 tons of ABC Stone placement and compaction. The contract opportunity has a pre-bid site visit scheduled for May 20th, 2024.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item 811 813 831 834 807.07 Unit Mile Ton Mile Mile Day
187 6 6 6 192 3.7 3.7 3.7 210 13.4 13.4 13.4
210B 1.5 1.5 1.5 464 9 200 9 9 470 3 3 3
1188 1.3 1.3 1.3
37.9 200 37.9 37.9
45 3.9 3.9 3.9 464 940 3
464A 0.9 0.9 0.9 482 7.9 1140 7.9 7.9 2
Little Buck
Grandfather Ranger District 2024 Road Maintenance
Activity Schedule
Maintenance Activity Code
Bl ad in g
Ag gr eg at e Su rf ac ed R oa ds
Sp ot
S ur fa ci ng
Re pl ac em en t
G ra di ng
-N
CD
O T
AB
C
Cl ea n an d Re sh ap e Di tc he s
Cl ea n Cu lv er ts a nd
Ta il
Di tc he s
Co m pa ct io n
Ro lle r Vi br at or y
T
Road Number Road Name
Maple Sally Roseboro-Gragg Roses Creek Rich Cove Edgemont-Pineola
Lost Cove Curtis Creek
Sugar Cove Totals
Options Watauga Turnpike Edgemont-Pineola
811 813 831 834 807.07 Mile Ton Mile Mile Day
Begin End
0+00 316+80
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
6 6 6
6 0 6 6 0
Com paction Roller
Vibratory 20 T
Total Quantity of Work
Station (Feet)
FSR 187 Maple Sally Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Begin End
0+00 195+36
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
3.7 0 3.7 3.7 0
3.7 0 3.7 3.7 0
Station (Feet)
FSR 192 Roseboro-Gragg Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Total Quantity of Work
Begin End
0+00 707+52
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
13.4 0 13.4 13.4 0
13.4 0 13.4 13.4 0
Station (Feet)
FSR 210 Roses Creek Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Total Quantity of Work
Clean and Reshape Ditches
Begin End
0+00 63+36
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
1.5 0 1.5 1.5 0
1.5 0 1.5 1.5 0
Station (Feet)
FSR 210B Rich Cove Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Com paction Roller
Begin End
0+00 475+20
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
9 200 9 9
0+00 475+20 Spot Surface on COR designated sections 200 9 200 9 9 0
Station (Feet)
FSR 464 Edgemont-Pineola Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Total Quantity of Work
Begin End
0+00 158+40
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
3 3 3 3 0 3 3 0
Station (Feet)
FSR 470 Little Buck Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Com paction Roller
Begin End
0+00 68+64
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
1.3 1.3 1.3
1.3 0 1.3 1.3 0
Station (Feet)
FSR 1188 Sugar Cove Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Total Quantity of Work
Begin End
0+00 205+92
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
3.9 3.9 3.9
3.9 0 3.9 3.9 0
OPTIONS
Station (Feet)
FSR 45 Watauga Turnpike Option 1 Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Com paction Roller
Begin End
0+00 475+20 Spot surface with NCDOT ABC as disignated by COR and compact. 940 3
0 940 0 0 3
Station (Feet)
FSR 464 Edgemont-Pineola Option 2 Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Com paction Roller
Begin End
0+00 89+76
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
0.9 0.9 0.9
0.9 0 0.9 0.9 0
Station (Feet)
FSR 464A Lost Cove Option 3 Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Total Quantity of Work
Begin End
0+00 417+12
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
7.9 7.9 7.9
0+00 417+12 Spot surface with NCDOT ABC as disignated by COR and compact. 1100 3
7.9 1100 7.9 7.9 3Total Quantity of Work
Station (Feet)
FSR 482 Curtis Creek Option 4 Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Com paction Roller
| DOW |
| Activity Schedule |
| BLANKSOI |
File details come from the government source that posted it. Updated .