Description of Work.pdf

PDF 124 KB Posted

Attached to
FY 2024 - Grandfather Road Maintenance
Solicitation number
12445224B0008
Issued by

About this file

This document appears to be a Description of Work for a federal contract opportunity titled "FY 2024 - Grandfather Road Maintenance". The work includes road reconditioning of 37.9 miles in the Grandfather Ranger District, involving blading and shaping of the existing traveled way and shoulders, maintaining ditches, removing waste materials, and cleaning drainage structures. An option item provides for an additional 12.7 miles of road reconditioning work, as well as 2,080 tons of ABC Stone placement and compaction. The Statement of Work details specific tasks and quantities of work for 12 different road segments. A pre-bid site visit is scheduled for May 20th, 2024, though attendance is not mandatory. The contracting agency is the Department of Agriculture Forest Service.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

811 813 831 834 807.07 Mile Ton Mile Mile Day

Begin End

0+00 316+80

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

6 6 6

6 0 6 6 0

Com paction Roller

Vibratory 20 T

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading

NCDOT ABC

Clean and Reshape Ditches

Station (Feet)

FSR 187 Maple Sally Description of Work

Total Quantity of Work

Clean Culverts and Tail Ditches

Begin End

0+00 195+36

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

3.7 0 3.7 3.7 0

3.7 0 3.7 3.7 0

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading

NCDOT ABC

Com paction Roller

Vibratory 20 T

Clean and Reshape Ditches

Clean Culverts and Tail Ditches

Total Quantity of Work

Station (Feet)

FSR 192 Roseboro-Gragg Description of Work

811 813 831 834 807.07 Mile Ton Mile Mile Day

Begin End

0+00 195+36

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

3.7 0 3.7 3.7 0

3.7 0 3.7 3.7 0

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading

NCDOT ABC

Com paction Roller

Vibratory 20 T

Clean and Reshape Ditches

Clean Culverts and Tail Ditches

Total Quantity of Work

Station (Feet)

FSR 192 Roseboro-Gragg Description of Work

Begin End

0+00 707+52

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

13.4 0 13.4 13.4 0

13.4 0 13.4 13.4 0

Clean and Reshape Ditches

Clean Culverts and Tail Ditches

Com paction Roller

Vibratory 20 T

Station (Feet)

FSR 210 Roses Creek Description of Work

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading

NCDOT ABC

Total Quantity of Work

Begin End

0+00 63+36

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

1.5 0 1.5 1.5 0

1.5 0 1.5 1.5 0

Clean Culverts and Tail Ditches

Com paction Roller

Vibratory 20 T

Clean and Reshape Ditches

Station (Feet)

FSR 210B Rich Cove Description of Work

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading

NCDOT ABC

Total Quantity of Work

811 813 831 834 807.07 Mile Ton Mile Mile Day

Begin End

0+00 63+36

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

1.5 0 1.5 1.5 0

1.5 0 1.5 1.5 0

Station (Feet)

FSR 210B Rich Cove Description of Work

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading

NCDOT ABC

Clean Culverts and Tail Ditches

Com paction Roller

Vibratory 20 T

Total Quantity of Work

Clean and Reshape Ditches

Begin End

0+00 179+52

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

3.4 3.4 3.4

3.4 0 3.4 3.4 0

Com paction Roller

Vibratory 20 T

Station (Feet)

FSR 45 Watauga Turnpike Description of Work

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading

NCDOT ABC

Clean and Reshape Ditches

Clean Culverts and Tail Ditches

Total Quantity of Work

811 813 831 834 807.07 Mile Ton Mile Mile Day

Begin End

0+00 179+52

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

3.4 3.4 3.4

3.4 0 3.4 3.4 0

Station (Feet)

FSR 45 Watauga Turnpike Description of Work

Com paction Roller

Vibratory 20 T

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading

NCDOT ABC

Clean and Reshape Ditches

Clean Culverts and

Total Quantity of Work

Begin End

0+00 290+40

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

5.5 200 5.5 5.5

0+00 290+40 Spot Surface on COR designated sections 200

5.5 200 5.5 5.5 0

Clean and Reshape Ditches

Clean Culverts and Tail Ditches

Com paction Roller

Vibratory 20 T

Station (Feet)

FSR 464 Edgemont-Pineola Description of Work

Blading Aggregate Surface Roads

Total Quantity of Work

Spot Surfacing Replacem ent Grading

NCDOT ABC

Begin End

0+00 89+76

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

0.9 0.9 0.9

0.9 0 0.9 0.9 0

Station (Feet)

FSR 464A Lost Cove Description of Work

Blading Aggregate Surface Roads

Total Quantity of Work

Spot Surfacing Replacem ent Grading

NCDOT ABC

Clean and Reshape Ditches

Com paction Roller

Vibratory 20 T

Clean Culverts and Tail

Begin End

0+00 158+40

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

3 3 3 3 0 3 3 0Total Quantity of Work

Station (Feet)

FSR 470 Little Buck Description of Work

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading

NCDOT ABC

Clean Culverts and Tail Ditches

Com paction Roller

Vibratory 20 T

Begin End

0+00 68+64

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

1.3 1.3 1.3

1.3 0 1.3 1.3 0Total Quantity of Work

Station (Feet)

FSR 1188 Sugar Cove Description of Work

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading

NCDOT ABC

Clean and Reshape Ditches

Com paction Roller

Vibratory 20 T

Clean Culverts and

Begin End

0+00 105+60

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

2 2 2 2 160 2 2 0

Station (Feet)

FSR 2055 Boone Fork Description of Work

Total Quantity of Work

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading

NCDOT ABC

Clean and Reshape Ditches

Clean Culverts and Tail Ditches

Com paction Roller

Vibratory 20 T

Begin End

0+00 417+12

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.

Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.

Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.

7.9 7.9 7.9

0+00 417+12 Spot surface with NCDOT ABC as disignated by COR and compact. 1100 3

7.9 1100 7.9 7.9 3

Station (Feet)

FSR 482 Curtis Creek Option Description of Work

Blading Aggregate Surface Roads

Spot Surfacing Replacem ent Grading N

CDO

T ABC

Clean Culverts and Tail Ditches

Com paction Roller

Vibratory 20 T

Total Quantity of Work

187
192
210
210B
45
464
464A
470
1188
2055
482 Option