Description of Work.pdf
PDF 124 KB Posted
- Attached to
- FY 2024 - Grandfather Road Maintenance
- Solicitation number
- 12445224B0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This document appears to be a Description of Work for a federal contract opportunity titled "FY 2024 - Grandfather Road Maintenance". The work includes road reconditioning of 37.9 miles in the Grandfather Ranger District, involving blading and shaping of the existing traveled way and shoulders, maintaining ditches, removing waste materials, and cleaning drainage structures. An option item provides for an additional 12.7 miles of road reconditioning work, as well as 2,080 tons of ABC Stone placement and compaction. The Statement of Work details specific tasks and quantities of work for 12 different road segments. A pre-bid site visit is scheduled for May 20th, 2024, though attendance is not mandatory. The contracting agency is the Department of Agriculture Forest Service.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
811 813 831 834 807.07 Mile Ton Mile Mile Day
Begin End
0+00 316+80
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
6 6 6
6 0 6 6 0
Com paction Roller
Vibratory 20 T
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading
NCDOT ABC
Clean and Reshape Ditches
Station (Feet)
FSR 187 Maple Sally Description of Work
Total Quantity of Work
Clean Culverts and Tail Ditches
Begin End
0+00 195+36
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
3.7 0 3.7 3.7 0
3.7 0 3.7 3.7 0
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading
NCDOT ABC
Com paction Roller
Vibratory 20 T
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Total Quantity of Work
Station (Feet)
FSR 192 Roseboro-Gragg Description of Work
811 813 831 834 807.07 Mile Ton Mile Mile Day
Begin End
0+00 195+36
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
3.7 0 3.7 3.7 0
3.7 0 3.7 3.7 0
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading
NCDOT ABC
Com paction Roller
Vibratory 20 T
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Total Quantity of Work
Station (Feet)
FSR 192 Roseboro-Gragg Description of Work
Begin End
0+00 707+52
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
13.4 0 13.4 13.4 0
13.4 0 13.4 13.4 0
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Station (Feet)
FSR 210 Roses Creek Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading
NCDOT ABC
Total Quantity of Work
Begin End
0+00 63+36
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
1.5 0 1.5 1.5 0
1.5 0 1.5 1.5 0
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Clean and Reshape Ditches
Station (Feet)
FSR 210B Rich Cove Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading
NCDOT ABC
Total Quantity of Work
811 813 831 834 807.07 Mile Ton Mile Mile Day
Begin End
0+00 63+36
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
1.5 0 1.5 1.5 0
1.5 0 1.5 1.5 0
Station (Feet)
FSR 210B Rich Cove Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading
NCDOT ABC
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Total Quantity of Work
Clean and Reshape Ditches
Begin End
0+00 179+52
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
3.4 3.4 3.4
3.4 0 3.4 3.4 0
Com paction Roller
Vibratory 20 T
Station (Feet)
FSR 45 Watauga Turnpike Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading
NCDOT ABC
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Total Quantity of Work
811 813 831 834 807.07 Mile Ton Mile Mile Day
Begin End
0+00 179+52
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
3.4 3.4 3.4
3.4 0 3.4 3.4 0
Station (Feet)
FSR 45 Watauga Turnpike Description of Work
Com paction Roller
Vibratory 20 T
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading
NCDOT ABC
Clean and Reshape Ditches
Clean Culverts and
Total Quantity of Work
Begin End
0+00 290+40
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
5.5 200 5.5 5.5
0+00 290+40 Spot Surface on COR designated sections 200
5.5 200 5.5 5.5 0
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Station (Feet)
FSR 464 Edgemont-Pineola Description of Work
Blading Aggregate Surface Roads
Total Quantity of Work
Spot Surfacing Replacem ent Grading
NCDOT ABC
Begin End
0+00 89+76
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
0.9 0.9 0.9
0.9 0 0.9 0.9 0
Station (Feet)
FSR 464A Lost Cove Description of Work
Blading Aggregate Surface Roads
Total Quantity of Work
Spot Surfacing Replacem ent Grading
NCDOT ABC
Clean and Reshape Ditches
Com paction Roller
Vibratory 20 T
Clean Culverts and Tail
Begin End
0+00 158+40
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
3 3 3 3 0 3 3 0Total Quantity of Work
Station (Feet)
FSR 470 Little Buck Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading
NCDOT ABC
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Begin End
0+00 68+64
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
1.3 1.3 1.3
1.3 0 1.3 1.3 0Total Quantity of Work
Station (Feet)
FSR 1188 Sugar Cove Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading
NCDOT ABC
Clean and Reshape Ditches
Com paction Roller
Vibratory 20 T
Clean Culverts and
Begin End
0+00 105+60
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
2 2 2 2 160 2 2 0
Station (Feet)
FSR 2055 Boone Fork Description of Work
Total Quantity of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading
NCDOT ABC
Clean and Reshape Ditches
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Begin End
0+00 417+12
Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage.
Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.
Clean drainage structures, inlets, catch basins and outlets.
Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets.
Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow.
7.9 7.9 7.9
0+00 417+12 Spot surface with NCDOT ABC as disignated by COR and compact. 1100 3
7.9 1100 7.9 7.9 3
Station (Feet)
FSR 482 Curtis Creek Option Description of Work
Blading Aggregate Surface Roads
Spot Surfacing Replacem ent Grading N
CDO
T ABC
Clean Culverts and Tail Ditches
Com paction Roller
Vibratory 20 T
Total Quantity of Work
| 187 |
| 192 |
| 210 |
| 210B |
| 45 |
| 464 |
| 464A |
| 470 |
| 1188 |
| 2055 |
| 482 Option |
File details come from the government source that posted it. Updated .