4. Detailed Drawings.pdf

PDF 713 KB Posted

Attached to
FY 2024 - Grandfather Road Maintenance
Solicitation number
12445224B0008
Issued by

About this file

This document appears to be Detailed Drawings related to the FY 2024 - Grandfather Road Maintenance federal contract opportunity.

The solicitation is for road reconditioning work on 37.9 miles of roads in the Grandfather Ranger District, including blading and shaping the existing traveled way and shoulders, maintaining ditches and drainage structures, and removing waste materials and debris. An additional 12.7 miles of road reconditioning work and 2,080 tons of ABC Stone placement and compaction are included as option items. The pre-bid site visit is scheduled for May 20th, 2024 at 10 AM EST, though attendance is not mandatory. The contracting agency is the Department of Agriculture Forest Service.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .