6.12.25_Opening.pdf

PDF 244 KB Posted

Attached to
Groveview Pump Station Improvements State and local contract opportunity
Solicitation number
IFB 24/25-23
Issued by
Seminole County, Florida

About this file

This is an Invitation for Bid (IFB) document issued by the City of Sanford, Florida for the Groveview Pump Station Improvements project (IFB 24/25-23). The scope of work encompasses the complete demolition of an existing above-ground pump station and its replacement with a new submersible pump station, including construction of one junction manhole, installation of force and gravity mains to redirect flow, implementation of electrical controls and equipment, and integration of an emergency diesel by-pass pump. All questions regarding the bid must be submitted by May 15, 2025 at 2:00 P.M. local time, with sealed bid responses due by May 22, 2025 at 2:00 P.M. local time. Bidding documents are available for download from www.myvendorlink.com. The anticipated contract duration is 270 calendar days from the Notice to Proceed. The project will be awarded to the lowest responsive and responsible bidder.

Qualified bidders must submit comprehensive documentation including bid bonds, non-collusion affidavits, and conflict of interest statements, along with evidence of proper licensing and professional qualifications. Bidders must demonstrate the ability to meet stringent insurance requirements, including performance bonds and comprehensive liability coverage. The City encourages participation from Minority/Women-owned Business Enterprises (M/WBE) and reserves the right to waive formalities and reject any or all bids. The project requires specialized expertise in utility coordination, compliance with Florida Department of Environmental Protection regulations, and adherence to specific engineering specifications. The work involves integration with existing municipal sanitary sewer infrastructure, including an 8-foot diameter wet well and 6-inch force mains, utilizing materials such as PVC pipes and fiber mesh-reinforced concrete with provisions for utility protection and erosion control.

View the file

Other files for this state and local contract opportunity

Other files attached to Groveview Pump Station Improvements, newest first.
File Type Posted
800197898_PP_Bond_Form.pdf PDF
IFB_24_25-23_Grovieview_Pump_Station_Improvement_NOA.pdf PDF
IFB_24_25-23_Grovieview_Pump_Station_Improvement_NOA.pdf PDF
Notice_of_Intent_to_Award.pdf PDF
Notice_of_Intent_to_Award.pdf PDF
Bid_Tabulation_-_Groveview_Pump_Station_Improvements.pdf PDF
Bid_Tabulation_-_Groveview_Pump_Station_Improvements.pdf PDF
IFB_24_25_23_Bid_Tabulation_UPDATED.pdf PDF
IFB_24_25_23_Bid_Tabulation_UPDATED.pdf PDF
IFB_24_25_23_Bid_Tabulation_UPDATED.pdf PDF
IFB_24_25_23_Bid_Tabulation_UPDATED.pdf PDF
IFB_24_25-23_Tabulation.pdf.pdf PDF
IFB_24_25-23_Tabulation.pdf.pdf PDF
IFB_24_25-23_Tabulation.pdf.pdf PDF
IFB_24_25-23_Tabulation.pdf.pdf PDF
6.12.25_Opening.pdf PDF
IFB_24_25_23_Adedendum_3.pdf PDF
IFB_24_25_23_Adedendum_3.pdf PDF
IFB_24_25_23_Adedendum_3.pdf PDF
IFB_24_25_23_Adedendum_3.pdf PDF
IFB_24_25_23_Addedum_2.pdf PDF
IFB_24_25_23_Addedum_2.pdf PDF
IFB_24_25_23_Addedum_2.pdf PDF
IFB_24_25_23_Addedum_2.pdf PDF
IFB_24_25_23_Addedum_1.pdf PDF
IFB_24_25_23_Addedum_1.pdf PDF
IFB_24_25_23_Addedum_1.pdf PDF
IFB_24_25_23_Addedum_1.pdf PDF
IFB_24_25_23_Addedum_1.pdf PDF
IFB_24_25_23_Addedum_1.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Plans.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Project_Manual.pdf PDF
Order_ID_7800421.pdf PDF
Order_ID_7800421.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Plans.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Project_Manual.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Project_Manual.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Plans.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Project_Manual.pdf PDF
Order_ID_7800421.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Plans.pdf PDF
Order_ID_7800421.pdf PDF
Order_ID_7800421.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Project_Manual.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Plans.pdf PDF
Order_ID_7800421.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Project_Manual.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Plans.pdf PDF
Order_ID_7800421.pdf PDF
IFB_24-25-23_Groveview_Pump_Station_Improvements_-_Plans.pdf PDF
Show all 50

Groveview Pump Station Improvements has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .