The file's text, extracted by GovTribe without its formatting.
COMMONWEALTH UNIVERSITY
STATE SYSTEM OF HIGHER EDUCATION
COMMONWEALTH OF PENNSYLVANIA
BID FORM
Note: The Bid Form pricing information is included with the Bidding Documents for Reference. Bidders shall complete the attached manual bid form and electronic bid form within PennBid (“Prepare Your Submission” tab), inclusive of all pricing items and required supporting documents as identified. The manual bid form pricing submission information shall take precedent.
BID FOR:
| Contract(s): | CWU-L-2027/1.1 – GENERAL CONSTRUCTION |
| CWU-L-2027/1.2 – HVAC CONSTRUCTION |
| CWU-L-2027/1.3 – PLUMBING CONSTRUCTION |
| CWU-L-2027/1.4 – ELECTRICAL CONSTRUCTION |
| CWU-L-2027/1.5 – PAINTING |
| CWU-L-2027/1.6 – ROOFING |
| CWU-L-2027/1.7 – CONCRETE |
| CWU-L-2027/1.8 – MASONRY |
| CWU-L-2027/1.9 – SITEWORK |
| CWU-L-2027/1.10 – ASPHALT AND CONCRETE PAVING |
| CWU-L-2027/1.11 – BOILER SPECIALTY |
Title of Project Work Order Contracts for Construction, Renovation, and Repair
Location Commonwealth University – Lock Haven Campus / Lock Haven, PA
BID FROM:
Firm Name
Federal ID No.
Address
Telephone
Fax
E-mail
Name of Contact for this Bid
The Proposer agrees to perform the work specified in the Contract Documents, under the terms and conditions specified in the Contract Documents, without exceptions or substitutions, and under any required additional certifications and conditions attached hereto, for the prices proposed on this Bid Form.
The Proposer additionally certifies that requirements in the Instructions to Bidders are met.
The Proposer acknowledges the Addenda hereinafter enumerated, which have been issued during the period of bidding, and agrees that contents of said Addenda shall become incorporated into the Contract.
Addenda No. Date Issued
The estimated quantities listed on this Bid Form are estimated and approximate, and are presented solely for the purpose of determining the Total Base Bid. The System may increase or decrease the quantities to be performed without any adjustment in the unit prices quoted on this Bid Form.
If accepted by the System, the unit prices quoted on this Bid Form will become the Contractual unit prices, and they shall be the only payment that the Contractor will receive for completed Work. Unless otherwise called for, all unit prices must be fully encumbered to include all labor burdens, and must include overhead and profit.
In order to receive payment for bid items consisting of a percent markup, instead of a unit price, the Contractor may be required to provide supporting documentation of the actual cost of materials, equipment, and/or subcontractors.
Any classification (labor, materials, and/or equipment) not included in the listed unit prices on the Bid Form, but required under an individual work order, shall be negotiated with the System. The Contractor may be required to submit supporting documentation.
Subcontracted work is subject to prior approval by the System.
The unit prices and extended unit prices as called for should be submitted in the spaces provided below. An omission of prices for any unit-price item called for will be sufficient cause for rejection of the bid as being incomplete and non-responsive.
Specification Section 012200, Unit Prices, provides detailed descriptions of bid items.
Abbreviations:
CY = Cubic Yard EA = Each LF = Linear Foot SF = Square Foot SY = Square Yard
UNIT PRICE MATRIX – GENERAL CONSTRUCTION, CWU-L-2027/1.1
1. LABOR – NON-PREVAILING WAGE
Item
Labor Classification
| Bid Qty. Hours |
| Non-PW Rate |
Unit Price Extended Price
| 1a. |
| Bricklayer, Stone Masons, Pointers, Caulkers, Cleaners - straight time |
| 40.0 |
| 1b. |
| Carpenters – Piledriver/Welder – straight time |
| 40.0 |
| 1c. |
| Carpenter, Drywall Hanger, Framers, Instrument Men, Lathers, Soft Floor Layers – straight time |
| 40.0 |
| 1d. |
| Cement Finishers & Plasterers – straight time |
| 40.0 |
| 1e. |
| Cement Masons – straight time |
| 40.0 |
| 1f. |
| General Labor – straight time |
| 40.0 |
| 1g. |
| Equipment Operator – straight time |
| 40.0 |
| 1h. |
| Working Foreman – straight time |
| 40.0 |
| 1i. |
| Superintendent – straight time |
| 40.0 |
| 1j. |
| Truck Driver – straight time |
| 40.0 |
| 1K. |
| SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1j) |
| LS |
2. LABOR – PREVAILING WAGE
Unit Price Extended Price
| 2a. |
| Bricklayer, Stone Masons, Pointers, Caulkers, Cleaners - straight time |
| 40.0 |
| 2b. |
| Carpenters – Piledriver/Welder – straight time |
| 40.0 |
| 2c. |
| Carpenter, Drywall Hanger, Framers, Instrument Men, Lathers, Soft Floor Layers – straight time |
| 40.0 |
| 2d. |
| Cement Finishers & Plasterers – straight time |
| 40.0 |
| 2e. |
| Cement Masons – straight time |
| 40.0 |
| 2f. |
| General Labor – straight time |
| 40.0 |
| 2g. |
| Equipment Operator – straight time |
| 40.0 |
| 2h. |
| Working Foreman – straight time |
| 40.0 |
| 2i. |
| Superintendent – straight time |
| 40.0 |
| 2j. |
| Truck Driver – straight time |
| 40.0 |
| 2K. |
| SUBTOTAL – PREVAILING WAGE RATES (2a thru 2j) |
| LS |
3. MATERIAL – 10% MARKUP
4. EQUIPMENT
Equipment Type
| Bid Quantity Days |
| Per Diem Rate |
| Extended Price |
| 4b. |
| Compact Excavator or Skid Loader |
| 1.0 |
| 4c. |
| Pettibone (Up to 9,000 lb. capacity with a 44' 6" lift height) |
| 1.0 |
| 4d. |
| Boom Lift (30 ft.) |
| 1.0 |
| 4e. |
| Boom Lift (60 ft.) |
| 1.0 |
| 4f. |
| Scissor Lift (19 ft.) |
| 1.0 |
| 4g. |
| Scissor Lift (32 ft.) |
| 1.0 |
| 4h. |
| Dump Truck – 10 Ton |
| 1.0 |
| 4i. |
| Dump Truck – Tri-Axle |
| 1.0 |
| 4J. |
| SUBTOTAL – EQUIPMENT RATES (4a thru 4i) |
| LS |
CWU-L-2027/1.1 - BASE BID TOTAL
(Combined totals of 1K, 2K and 4J)
CWU-L-2027/1.1 - GC
BASE BID:
___________________________________________________Dollars
Written
UNIT PRICE MATRIX – HVAC, CWU-L-2027/1.2
1. LABOR NON-PREVAILING WAGE
| Bid Qty. Hours |
| Non-PW Rate |
Unit Price
Item Price
| 1a. |
| HVAC Technician – straight time |
| 40.0 |
| 1b. |
| Sheet Metal Worker – straight time |
| 40.0 |
| 1c. |
| Working Foreman – straight time |
| 40.0 |
| 1d. |
| Equipment Operator – straight time |
| 40.0 |
| 1E. |
| SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1d) |
| LS |
2. LABOR PREVAILING WAGE
Unit Price
Item Price
| 2a. |
| HVAC Technician – straight time |
| 40.0 |
| 2b. |
| Sheet Metal Worker – straight time |
| 40.0 |
| 2c. |
| Working Foreman – straight time |
| 40.0 |
| 2d. |
| Equipment Operator – straight time |
| 40.0 |
| 2E. |
| SUBTOTAL – PREVAILING WAGE RATES (2a thru 2d) |
| LS |
3. MATERIAL – 10% MARKUP
4. EQUIPMENT
| Bid Quantity Days |
| Per Diem Rate |
Item Price
| 4a. |
| Pettibone (Up to 9,000 lb. capacity with a 44' 6" lift height) |
| 1.0 |
| 4b. |
| Boom Lift (30 ft.) |
| 1.0 |
| 4c. |
| Boom Lift (60 ft.) |
| 1.0 |
| 4d. |
| Scissor Lift (19 ft.) |
| 1.0 |
| 4e. |
| Scissor Lift (32 ft.) |
| 1.0 |
| 4F. |
| SUBTOTAL – EQUIPMENT RATES (4a thru 4e) |
| LS |
CWU-L-2027/1.2 - BASE BID TOTAL
(Combined totals of 1E, 2E and 4F)
CWU-L-2027/1.2 - HVAC
___________________________________________________Dollars
Written
UNIT PRICE MATRIX – PLUMBING, CWU-L-2027/1.3
1. LABOR NON-PREVAILING WAGE
| Bid Qty. Hours |
| Non-PW Rate |
Unit Price
Item Price
| 1a. |
| Plumber/Pipefitter – straight time |
| 40.0 |
| 1b. |
| Working Foreman – straight time |
| 40.0 |
| 1c. |
| Equipment Operator – straight time |
| 40.0 |
| 1D. |
| SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1c) |
| LS |
2. LABOR PREVAILING WAGE
| Bid Qty. Hours |
| PW Rate Unit Price |
Item Price
| 2a. |
| Plumber/Pipefitter – straight time |
| 40.0 |
| 2b. |
| Working Foreman – straight time |
| 40.0 |
| 2c. |
| Equipment Operator – straight time |
| 40.0 |
| 2D. |
| SUBTOTAL – PREVAILING WAGE RATES (2a thru 2c) |
| LS |
3. MATERIAL – 10% MARKUP
4. EQUIPMENT
| Bid Quantity Days |
| Per Diem Rate |
Item Price
| 4a. |
| Pettibone (Up to 9,000 lb. capacity with a 44' 6" lift height) |
| 1.0 |
| 4b. |
| Boom Lift (30 ft.) |
| 1.0 |
| 4c. |
| Boom Lift (60 ft.) |
| 1.0 |
| 4d. |
| Scissor Lift (19 ft.) |
| 1.0 |
| 4e. |
| Scissor Lift (32 ft.) |
| 1.0 |
| 4F. |
| SUBTOTAL – EQUIPMENT RATES (4a thru 4e) |
| LS |
CWU-L-2027/1.3 - BASE BID TOTAL
(Combined totals of 1D, 2D and 4F)
CWU-L-2027/1.3 - Plumbing
___________________________________________________Dollars
Written
UNIT PRICE MATRIX – ELECTRICAL CWU-L-2027/1.4
1. LABOR NON-PREVAILING WAGE
| Bid Qty. Hours |
| Non-PW Rate |
Unit Price
Item Price
| 1a. |
| Apprentice Electrician - straight time |
| 40.0 |
| 1b. |
| Electrician - straight time |
| 40.0 |
| 1c. |
| Working Foreman – straight time |
| 40.0 |
| 1d. |
| Equipment Operator – straight time |
| 40.0 |
| 1E. |
| SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1d) |
| LS |
2. LABOR PREVAILING WAGE
| Bid Qty. Hours |
| PW Rate Unit Price |
Item Price
| 2a. |
| Apprentice Electrician - straight time |
| 40.0 |
| 2b. |
| Electrician - straight time |
| 40.0 |
| 2c. |
| Working Foreman – straight time |
| 40.0 |
| 2d. |
| Equipment Operator – straight time |
| 40.0 |
| 2E. |
| SUBTOTAL – PREVAILING WAGE RATES (2a thru 2d) |
| LS |
3. MATERIAL – 10% MARKUP
4. EQUIPMENT
| Bid Quantity Days |
| Per Diem Rate |
Item Price
| 4a. |
| Pettibone (Up to 9,000 lb. capacity with a 44' 6" lift height) |
| 1.0 |
| 4b. |
| Boom Lift (30 ft.) |
| 1.0 |
| 4c. |
| Boom Lift (60 ft.) |
| 1.0 |
| 4d. |
| Scissor Lift (19 ft.) |
| 1.0 |
| 4e. |
| Scissor Lift (32 ft.) |
| 1.0 |
| 4f. |
| Bucket Truck (30 ft.) |
| 1.0 |
| 4G. |
| SUBTOTAL – EQUIPMENT RATES (4a thru 4f) |
| LS |
CWU-L-2027/1.4- BASE BID TOTAL
(Combined totals of 1E, 2E and 4G)
CWU-L-2027/1.4 - Electrical
___________________________________________________Dollars
Written
UNIT PRICE MATRIX – PAINTING, CWU-L-2027/1.5
1. LABOR – NON-PREVAILING WAGE
| Bid Qty. Hours |
| Non-PW Rate |
Unit Price Extended Price
| 1a. |
| Painter – straight time |
| 40.0 |
| 1b. |
| Working Foreman – straight time |
| 40.0 |
| 1C. |
| SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1b) |
| LS |
2. LABOR – PREVAILING WAGE
| Bid Qty. Hours |
| PW Rate Unit Price |
| Extended Price |
| 2a. |
| Painter – straight time |
| 40.0 |
| 2b. |
| Working Foreman – straight time |
| 40.0 |
| 2C. |
| SUBTOTAL – PREVAILING WAGE RATES (2a thru 2b) |
| LS |
3. MATERIAL – 10% MARKUP
4. EQUIPMENT – not applicable
CWU-L-2027/1.5 - BASE BID TOTAL
(Combined totals of 1C and 2C)
CWU-L-2027/1.5 - Painting
___________________________________________________Dollars
Written
UNIT PRICE MATRIX – ROOFING, CWU-L-2027/1.6
1. LABOR-NON-PREVAILING WAGE
| Bid Qty. Hours |
| Non-PW Rate |
Unit Price Extended Price
| 1a. |
| Roofer EPDM – straight time |
| 40.0 |
| 1b. |
| Roofer Shingle – straight time |
| 40.0 |
| 1c. |
| Roofer Slate – straight time |
| 40.0 |
| 1d. |
| Working Foreman – straight time |
| 40.0 |
| 1e. |
| Equipment Operator – straight time |
| 40.0 |
| 1f. |
| Truck Driver – straight time |
| 40.0 |
| 1G. |
| SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1f) |
| LS |
2. LABOR PREVAILING WAGE
| Bid Qty. Hours |
| PW Rate Unit Price |
| Extended |
Price
| 2a. |
| Roofer EPDM – straight time |
| 40.0 |
| 2b. |
| Roofer Shingle – straight time |
| 40.0 |
| 2c. |
| Roofer Slate – straight time |
| 40,0 |
| 2d. |
| Working Foreman – straight time |
| 40.0 |
| 2e. |
| Equipment Operator – straight time |
| 40.0 |
| 2f. |
| Truck Driver – straight time |
| 40.0 |
| 2G. |
| SUBTOTAL – PREVAILING WAGE RATES (2a thru 2f) |
| LS |
3. MATERIAL – 10% MARKUP
4. EQUIPMENT
| Bid Quantity Days |
| Per Diem Rate |
| Extended Price |
| 4a. |
| Boom Lift (30 ft.) |
| 1.0 |
| 4b. |
| Boom Lift (60 ft.) |
| 1.0 |
| 4c. |
| Scissor Lift (19 ft.) |
| 1.0 |
| 4d. |
| Scissor Lift (32 ft.) |
| 1.0 |
| 4e. |
| Dump Truck – 10 Ton |
| 1.0 |
| 4f. |
| Dump Truck – Tri-Axle |
| 1.0 |
| 4G. |
| SUBTOTAL – EQUIPMENT RATES (4a thru 4f) |
| LS |
CWU-L-2027/1.6 - BASE BID TOTAL
(Combined totals of 1G, 2G and 4G)
CWU-L-2027/1.6 - Roofing
_________________________________________________Dollars
Written
UNIT PRICE MATRIX – CONCRETE, CWU-L-2027/1.7
1. LABOR NON-PREVAILING WAGE
| Bid Qty. Hours |
| Non-PW Rate |
Unit Price Extended Price
| 1a. |
| Cement Finisher – straight time |
| 40.0 |
| 1b. |
| General Labor – straight time |
| 40.0 |
| 1c. |
| Working Foreman – straight time |
| 40.0 |
| 1d. |
| Equipment Operator – straight time |
| 40.0 |
| 1e. |
| Truck Driver – straight time |
| 40.0 |
| The following unit prices are to include all labor, equipment, materials, mark-up, overhead & profit costs for on-site installation of the following: |
| Bid Qty. |
| Cost per Unit |
| Extended Price |
| 1f. |
| Replace Curb (per L.F.) |
| 50 |
| 1g. |
| Replace Radial Curb (per L.F.) |
| 50 |
| 1h. |
| Replace Sidewalk (per S.F.) |
| 1,000 |
| 1i. |
| Replace Integral Curb/Sidewalk (per S.F.) |
| 300 |
| 1j. |
| Replace Wheelchair Ramp (per Each) |
| 2 |
| 1k. |
| Replace Steps (per (S.F.) |
| 500 |
| 1l. |
| New Curb (per L.F.) |
| 50 |
| 1m. |
| New Radial Curb (per L.F.) |
| 50 |
| 1n. |
| New Sidewalk (per S.F.) |
| 1,000 |
| 1o. |
| New Integral Curb/Sidewalk (per S.F.) |
| 300 |
| 1p. |
| New Wheel Chair Ramp (per Each) |
| 2 |
| 1q. |
| New Steps (per S.F.) |
| 500 |
| 1r. |
| New Aluminum Railing System (per L.F.) |
| 100 |
| 1s. |
| New Steel Railing System (per L.F.) |
| 100 |
| 1t. |
| New 2’ x 4’ x 4’ Catch Basin (per Each) |
| 10 |
| 1u. |
| New Plastic P.E. Storm Pipe – 10” (per L.F.) |
| 100 |
| 1V. |
| SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1u) |
| LS |
2. LABOR PREVAILING WAGE
| Bid Qty. Hours |
| PW Rate Unit Price |
| Extended |
Price
| 2a. |
| Cement Finisher – straight time |
| 40.0 |
| 2b. |
| General Labor – straight time |
| 40.0 |
| 2c. |
| Working Foreman – straight time |
| 40.0 |
| 2d. |
| Equipment Operator – straight time |
| 40,0 |
| 2e. |
| Truck Driver – straight time |
| 40.0 |
| The following unit prices are to include all labor, equipment, materials, mark-up, overhead & profit costs for on-site installation of the following: |
| Bid Qty. |
| Cost per Unit |
| Extended Price |
| 2f. |
| Replace Curb (per L.F.) |
| 50 |
| 2g. |
| Replace Radial Curb (per L.F.) |
| 50 |
| 2h. |
| Replace Sidewalk (per S.F.) |
| 1,000 |
| 2i. |
| Replace Integral Curb/Sidewalk (per S.F.) |
| 300 |
| 2j. |
| Replace Wheelchair Ramp (per Each) |
| 2 |
| 2k. |
| Replace Steps (per (S.F.) |
| 500 |
| 2l. |
| New Curb (per L.F.) |
| 50 |
| 2m. |
| New Radial Curb (per L.F.) |
| 50 |
| 2n. |
| New Sidewalk (per S.F.) |
| 1,000 |
| 2o. |
| New Integral Curb/Sidewalk (per S.F.) |
| 300 |
| 2p. |
| New Wheel Chair Ramp (per Each) |
| 2 |
| 2q. |
| New Steps (per S.F.) |
| 500 |
| 2r. |
| New Aluminum Railing System (per L.F.) |
| 100 |
| 2s. |
| New Steel Railing System (per L.F.) |
| 100 |
| 2t. |
| New 2’ x 4’ x 4’ Catch Basin (per Each) |
| 10 |
| 2u. |
| New Plastic P.E. Storm Pipe – 10” (per L.F.) |
| 100 |
| 2V. |
| SUBTOTAL – PREVAILING WAGE RATES (2a thru 2u) |
| LS |
3. MATERIAL – 10% MARKUP
4. EQUIPMENT
| Item |
| Equipment Type |
| Bid Quantity Days |
| Per Diem Rate |
| Extended Price |
| 4d. |
| Dump Truck – 10 Ton |
| 1.0 |
| 4e. |
| Dump Truck – Tri-Axle |
| 1.0 |
| 4F. |
| SUBTOTAL – EQUIPMENT RATES (4a thru 4e) |
| LS |
CWU-L-2027/1.7 - BASE BID TOTAL
(Combined totals of 1V, 2V and 4F)
CWU-L-2027/1.7- Concrete
___________________________________________________Dollars
Written
UNIT PRICE MATRIX – MASONRY, CWU-L-2027/1.8
1. LABOR-NON-PREVAILING WAGE
| Bid Qty. Hours |
| Non-PW Rate |
Unit Price Extended Price
| 1a. |
| Bricklayers, Stone Masons, Pointers, Caulkers, |
Cleaners – straight time 40.0
| 1b. |
| General Laborer – straight time |
| 40.0 |
| 1c. |
| Working Foreman – straight time |
| 40.0 |
| 1d. |
| Superintendent – straight time |
| 40.0 |
| 1e. |
| Equipment Operator – straight time |
| 40.0 |
| 1f. |
| Truck Driver – straight time |
| 40.0 |
| 1G. |
| SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1f) |
| LS |
2. LABOR PREVAILING WAGE
| Bid Qty. Hours |
| PW Rate Unit Price |
| Extended |
Price
| 2a. |
| Bricklayers, Stone Masons, Pointers, Caulkers, |
Cleaners – straight time 40.0
| 2b. |
| General Laborer – straight time |
| 40.0 |
| 2c. |
| Working Foreman – straight time |
| 40,0 |
| 2d. |
| Superintendent – straight time |
| 40.0 |
| 2e. |
| Equipment Operator – straight time |
| 40.0 |
| 2f. |
| Truck Driver – straight time |
| 40.0 |
| 2G. |
| SUBTOTAL – PREVAILING WAGE RATES (2a thru 2f) |
| LS |
3. MATERIAL – 10% MARKUP
4. EQUIPMENT
| Bid Quantity Days |
| Per Diem Rate |
| Extended Price |
| 4a. |
| Boom Lift (30 ft.) |
| 1.0 |
| 4b. |
| Boom Lift (60 ft.) |
| 1.0 |
| 4c. |
| Scissor Lift (19 ft.) |
| 1.0 |
| 4d. |
| Scissor Lift (32 ft.) |
| 1.0 |
| 4e. |
| Dump Truck – 10 Ton |
| 1.0 |
| 4f. |
| Dump Truck – Tri-Axle |
| 1.0 |
| 4G. |
| SUBTOTAL – EQUIPMENT RATES (4a thru 4f) |
| LS |
CWU-L-2027/1.8 - BASE BID TOTAL
(Combined totals of 1G, 2G and 4G)
CWU-L-2027/1.8 - Masonry
___________________________________________________Dollars
Written
UNIT PRICE MATRIX – SITEWORK - CWU-L-2027/1.9
1. LABOR NON-PREVAILING WAGE
| Bid Qty. Hours |
| Non-PW Rate |
Unit Price
Item Price
| 1a. |
| Cement Finisher – straight time |
| 40.0 |
| 1b. |
| General Labor – straight time |
| 40.0 |
| 1c. |
| Working Foreman – straight time |
| 40.0 |
| 1d. |
| Equipment Operator – straight time |
| 40.0 |
| 1e. |
| Welder – straight time |
| 40.0 |
| 1f. |
| Truck Driver – straight time |
| 40.0 |
| 1G. |
| SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1f) |
| LS |
2. LABOR PREVAILING WAGE
| Bid Qty. Hours |
| PW Rate Unit Price |
Item Price
| 2a. |
| Cement Finisher – straight time |
| 40.0 |
| 2b. |
| General Labor – straight time |
| 40.0 |
| 2c. |
| Working Foreman – straight time |
| 40.0 |
| 2d. |
| Equipment Operator – straight time |
| 40.0 |
| 2e. |
| Welder – straight time |
| 40.0 |
| 2f. |
| Truck Driver – straight time |
| 40.0 |
| 2G. |
| SUBTOTAL – PREVAILING WAGE RATES (2a thru 2f) |
| LS |
3. MATERIAL – 10% MARKUP
4. EQUIPMENT
| Bid Quantity Days |
| Per Diem Rate |
Item Price
| 4a. |
| Excavator (up to 20 ton) |
| 1.0 |
| 4b. |
| Mini Excavator (up to 20 ton) |
| 1.0 |
| 4c. |
| Skid Loader (up to 100 HP) |
| 1.0 |
| 4d. |
| Backhoe (up to 100 HP) |
| 1.0 |
| 4g. |
| Dump Truck – 5 Ton |
| 1.0 |
| 4h. |
| Dump Truck – 10 Ton |
| 1.0 |
| 4i. |
| Dump Truck – Tri-Axle |
| 1.0 |
| 4K. |
| SUBTOTAL – EQUIPMENT RATES (4a thru 4j) |
| LS |
CWU-L-2027/1.9 - BASE BID TOTAL
(Combined totals of 1G, 2G and 4K)
CWU-L-2027/1.9 - Sitework
___________________________________________________Dollars
Written
UNIT PRICE MATRIX – ASPHALT AND CONCRETE PAVING - CWU-L-2027/1.10
UNIT PRICE BASE BIDS – PREVAILING WAGE UNIT PRICE BASE BIDS
| Estimated | | PW | | | Extended | | |
| Item No. | Description | | Quantity | Unit | | Unit Price | Price |
| 1 | Remove soft and yielding | 100 | CY | $____________ | $____________ |
| sub-grade. | | | | |
2 Remove stone sub-base course.
Quantities from 1 to 100 100 CY $____________ $____________
> 100 200 CY $____________ $____________
3 Remove bituminous paving.
Quantities from 1 to 100 100 SY $____________ $____________
> 100 300 SY $____________ $____________
4 Mill bituminous paving surface.
Quantities from 1 to 100 100 SY $____________ $____________
> 100 200 SY $____________ $____________
5 New excavation.
All Quantities 50 CY $____________ $____________
6 New stone sub-base course.
Quantities from 1 to 50 50 CY $____________ $____________
> 50 100 CY $____________ $____________
7 Install new 2 ½” bituminous concrete binder course.
Quantities from 1 to 100 100 SY $____________ $____________
> 100 200 SY $____________ $____________
8 Install new 1 ½” bituminous wearing course.
Quantities from 1 to 100 100 SY $____________ $____________
> 100 300 SY $____________ $____________
| Estimated | | PW | | | Extended | | |
| Item No. | Description | | Quantity | Unit | | Unit Price | Price |
9 New Asphalt Walkway. 100 SY $____________ $____________
10 Tack coat.
Quantities from 1 to 100 100 SY $____________ $____________
> 100 200 SY $____________ $____________
11 Replace Existing Concrete Curb with New Concrete Curb
50 LF $____________ $____________
12 Replace Existing Concrete Paving with New 6” Concrete Paving
300 SF $____________ $____________
13 Replace Concrete Inlet. 3 EA $____________ $____________
14 New Concrete Inlet. . 5 EA $____________ $____________
15 Recyclable Geotextile. 300 SY $____________ $____________
16 New bituminous joint sealer. 1,000 LF $_____________ $____________
17 Seal coating . 30,000 SF $_____________ $____________
18 Line Painting / Yellow. 1,000 LF $_____________ $____________
19 Line Painting / White. 1,000 LF $_____________ $____________
20 STOP line/bar, 24” x 12’ 5 EA $_____________ $____________
UNIT PRICE BASE BIDS – NON-PREVAILING WAGE UNIT PRICE BASE BIDS
| Estimated | | Non-PW | Extended | | | |
| Item No. | Description | | Quantity | Unit | Unit Price | Price |
| 21 | Remove soft and yielding | | | | |
| sub-grade. | | | 20 | CY | $____________ | $____________ |
22 Remove existing stone sub-base course.
Quantities from 1 to 100 50 CY $____________ $____________
| Estimated | | Non-PW | Extended | | | |
| Item No. | Description | | Quantity | Unit | Unit Price | Price |
23 New stone sub-base course.
Quantities from 1 to 100 100 SY $____________ $____________
24 Pot Hole Repair 50 SY $____________ $____________
25 Asphalt Repair 100 SY $____________ $____________
| 26 | New bituminous crack filling | 1,000 | LF | $_____________ | $____________ |
| | < 1” wide. | | | |
27 Seal coating 25,000 SF $_____________ $____________
28 Line Painting / Yellow. 1,000 LF $_____________ $____________
29 Line Painting / White. 1,000 LF $_____________ $____________
30 STOP line/bar, 24” x 12’ 5 EA $_____________ $____________
TOTAL BASE BIDS (Extended Totals Bid Items 1 through 30) CWU-L-2027/1.10 – Asphalt and Concrete Paving
| _________________________________________ | | Dollars $___________________ | |
| (WRITTEN) | | (FIGURES) |
List the PADOT ECMS Asphalt Cement Index price upon which pricing is based: $713.00/Ton (Nov 2026 – Zone 2, District 2)
UNIT PRICE MATRIX – BOILER SPECIALTY, CWU-L-2027/1.11
1. LABOR – NON-PREVAILING WAGE
| Bid Qty. Hours |
| Non-PW Rate |
Unit Price Extended Price
| 1a. |
| Boiler Technician – straight time |
| 40.0 |
| 1b. |
| Sheet Metal Worker – straight time |
| 40.0 |
| 1c. |
| Working Foreman – straight time |
| 40.0 |
| 1D. |
| SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1c) |
| LS |
2. LABOR – PREVAILING WAGE
| Bid Qty. Hours |
| PW Rate Unit Price |
| Extended Price |
| 2a. |
| Boiler Technician – straight time |
| 40.0 |
| 2b. |
| Sheet Metal Worker – straight time |
| 40.0 |
| 2c. |
| Working Foreman – straight time |
| 40.0 |
| 2D. |
| SUBTOTAL – PREVAILING WAGE RATES (2a thru 2c) |
| LS |
3. MATERIAL – 10% MARKUP
4. EQUIPMENT – not applicable
CWU-L-2027/1.11 - BASE BID TOTAL
(Combined totals of 1D and 2D)
CWU-L-2027/1.11 - Boiler
___________________________________________________Dollars
Written
BIDDER'S BUSINESS CERTIFICATION
TYPE OF BUSINESS (check one of the three options below, and circle the correct entries within)
The Bidder is a Pennsylvania Corporation, LP, LLP, or LLC (circle one), organized and existing under the laws of Pennsylvania, and so is authorized to do business in Pennsylvania by the Pennsylvania Business Corporation Law of 1988, as amended.
The Bidder is a Foreign Corporation, LP, LLP, or LLC (circle one), organized and existing under the laws of the state of (enter the name of the state), and has or has not (circle one) been granted a certificate of authority, or is or is not (circle one) registered, to do business in Pennsylvania as required by the Pennsylvania Business Corporation Law of 1988, as amended.
The Bidder is an Individual, Proprietorship, Partnership, or other (circle one), trading under a fictitious or assumed name, and has or has not (circle one) registered under the Pennsylvania Fictitious Names Act of 1982, as amended.
RESIDENCY (complete one of the two options below)
Does your firm have a street address in Pennsylvania at which it was transacting business when the Notice to Contractors for this contract was issued?
If "Yes", insert the address, or insert "same as address on page 1."
If "No," insert the address of the office responsible for this bid, or insert "same as address on page 1."
(In either case, provide a street address in lieu of a post office box.)
BID SIGNATURE PAGE
CERTIFICATIONS
The person(s) signing below certifies that:
· he/she(they) is(are) authorized to represent the Bidder and bind the Bidder to this bid,
· and, the information contained in or with this bid is true and correct, and that this information is material and important and will be relied upon by the System in awarding the contract for which this bid is submitted.
If the Bidder is an Individual, Proprietorship, or Partnership:
(one signature and one witness signature required)
(Signature) (Witness)
(Date)
If the Bidder is a Corporation, LP, LLP, or LLC:
(two signatures required)
(President/Vice President) (Secretary/Treasurer)
(Date)
(CORPORATE SEAL)
| Solicitation for Work Order Contract for Construction 2018K112 | Bid Form | |
| Solicitation # CWU-L-2027/1.1 | | Page 9 of 9 |