3-Binder 3 - Tech Specs (Reference Only).pdf
PDF 2 MB Posted
- Solicitation number
- US.262366
- Issued by
- Clearfield County, Pennsylvania
About this file
This document contains technical specifications and the associated state and local contract opportunity from Lock Haven University, part of the Pennsylvania State System of Higher Education, for multiple award open-end work order contracts covering General Construction, HVAC, Plumbing, Electrical, Painting, Roofing, Concrete, Masonry, Sitework, Asphalt and Concrete Paving, and Boiler Specialty services. The specifications address selective site demolition, cast-in-place concrete, unit masonry assemblies, rough carpentry, finish carpentry, site clearing, and earthwork. These are indefinite quantity contracts for labor and equipment rates to support miscellaneous construction, renovation, repair, and maintenance projects under $100,000 per work order for unplanned emergency work and renovations. A mandatory pre-bid conference with site visit will be held on November 19, 2026, at 11:00 AM at East Campus Science Center Room 215 on Lock Haven University's campus in Lock Haven, Pennsylvania. Electronic bids are due no later than 1:00 PM, Eastern Daylight Time, on December 15, 2026, through PennBid at https://pennbid.bonfirehub.com/. The bid package is available at no cost through the same platform.
Contractor eligibility requires location within a 75-mile radius or 1.5-hour drive from the University. No specific pricing terms, set-asides, incumbent information, or funding amounts are detailed in the provided specification sections. The contract allows the University to award multiple firms with the lowest base bids. Due to the emergency nature of the work covered under these contracts, contractor availability and responsiveness are critical factors. Registration with PennBid is required at no cost for interested bidders to submit proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
024113 - 1
SECTION 024113 – SELECTIVE SITE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Demolition and removal of site improvements.
2. Removal of bituminous pavement, concrete pavement, base course, and concrete curbing.
B. Related Sections include the following:
1. Division 31 Section "Site Clearing" for site clearing and removal of vegetation and other natural features.
2. Division 31 Section "Earthwork" for excavation of site.
1.3 DEFINITIONS
A. Demolish: Completely remove and legally dispose of off-site.
B. Existing to Remain: Protect construction indicated to remain against damage and soiling during demolition. When permitted by the Owner, items may be removed to a suitable, protected storage location during demolition and then cleaned and reinstalled in their original locations.
1.4 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI A10.6 and NFPA 241.
C. Pre-demolition Conference: Conduct conference at Project site to comply with requirements in Division 01 Section "Project Coordination." Review methods and procedures related to site demolition including, but not limited to, the following:
1. Inspect and discuss condition of construction to be demolished.
024113 - 2
2. Review and finalize demolition schedule and verify availability of demolition personnel, equipment, and facilities needed to make progress and avoid delays.
3. Review and finalize protection requirements.
4. Review procedures for noise and dust control.
5. Review procedures for protection of adjacent buildings.
1.5 PROJECT CONDITIONS
A. Buildings immediately adjacent to demolition area will be occupied. Conduct demolition so operations of occupied buildings will not be disrupted.
1. Provide not less than 72 hours’ notice of activities that will affect operations of adjacent occupied buildings.
2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacent buildings.
a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacent buildings without written permission from the Owner.
1.6 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS
A. Satisfactory Soils: Comply with requirements in Division 31 Section "Earthwork".
B. Topsoil: Comply with requirements in Division 32 Section “Lawns and Grasses”.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Survey existing conditions and correlate with requirements indicated to determine extent of demolition required.
3.2 PREPARATION
A. Existing Utilities: Locate and identify existing utilities.
024113 - 3
3.3 PROTECTION
A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations. Maintain exits from existing buildings.
B. Existing Utilities: Maintain utility services to remain and protect from damage during demolition operations.
1. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by Owner and authorities having jurisdiction.
2. Provide temporary services during interruptions to existing utilities, as acceptable to Owner and authorities having jurisdiction.
3.4 DEMOLITION, GENERAL
A. General: Demolish indicated existing site improvements completely. Use methods required to complete the Work within limitations of governing regulations.
B. Site Access and Temporary Controls: Conduct demolition and debris-removal operations to ensure minimum interference with walkways and other adjacent occupied and used facilities.
1. Do not close or obstruct streets, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.
Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction.
2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations. Do not use water when it may damage adjacent construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.
C. Explosives: Use of explosives is not permitted for demolition operations.
3.5 SITE RESTORATION
A. Below-Grade Areas: Rough grade below-grade areas ready for further excavation or new construction.
B. Site Grading: Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and legally dispose of them in an EPA-approved landfill acceptable to authorities having jurisdiction.
024113 - 4
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Do not burn demolished materials.
3.7 CLEANING
A. Clean area of dust, dirt, and debris caused by demolition operations. Return adjacent areas to condition existing before demolition operations began.
END OF SECTION 024113
Facilities Construction, Repair & Renovation 033000 - 1
SECTION 033000 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes, for the following:
1. Foundations
2. Walls, stairs (standard and steel pan), and steps
3. Slabs-on-grade.
4. Curbs and gutters
5. Miscellaneous concrete items.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated (if stated in the Individual Work Order).
B. Design Mixtures: For each concrete mixture (if stated in the Individual Work Order).
C. Steel Reinforcement Shop Drawings: Placing drawings that detail fabrication, bending, and placement. Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement (if stated in the Individual Work Order).
D. Material certificates (if stated in the Individual Work Order).
1.3 QUALITY ASSURANCE
A. Field Supervision: A project field superintendent must be on-site when a contractor’s crew and/or subcontractor’s crew is on-site. The same project field superintendent must be the same for each project work order. The project field superintendent shall be ACI-certified as a “Concrete Flatwork Finisher/Technician.”
B. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94 requirements for production facilities and equipment.
1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities."
Facilities Construction, Repair & Renovation 033000 - 2
C. Source Limitations: For each Project Individual Work Order, obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, obtain aggregate from one source, and obtain admixtures through one source from a single manufacturer.
D. ACI Publications: Comply with the following unless modified by requirements in the Contract Documents:
1. ACI 301, "Specification for Structural Concrete"
2. ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."
1.4 DELIVERY, STORAGE, AND HANDLING
A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage.
1.5 PROJECT CONDITIONS
A. Traffic Control: Maintain access for vehicular and pedestrian traffic as required for other construction activities.
PART 2 - PRODUCTS
2.1 FORM-FACING MATERIALS
A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.
1. Plywood, metal, or other approved panel materials.
2. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows:
a. High-density overlay, Class 1 or better.
b. Medium-density overlay, Class 1 or better; mill-release agent treated and edge sealed.
c. Structural 1, B-B or better; mill oiled and edge sealed.
d. B-B (Concrete Form), Class 1 or better; mill oiled and edge sealed.
B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material. Provide lumber dressed on at least two edges and one side for tight fit.
C. Forms for Cylindrical Columns, Pedestals, and Supports: Metal, glass-fiber-reinforced plastic, paper, or fiber tubes that will produce surfaces with gradual or abrupt irregularities not exceeding specified formwork surface class. Provide units with sufficient wall thickness to resist plastic concrete loads without detrimental deformation.
D. Forms for Curbs: Use flexible or curved forms (smooth-formed finished) for curves with a radius 100 feet or less.
Facilities Construction, Repair & Renovation 033000 - 3
E. Pan-Type Forms: Glass-fiber-reinforced plastic or formed steel, stiffened to resist plastic concrete loads without detrimental deformation.
F. Void Forms: Biodegradable paper surface, treated for moisture resistance, structurally sufficient to support weight of plastic concrete and other superimposed loads.
G. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.
H. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.
1. Formulate form-release agent with rust inhibitor for steel form-facing materials.
I. Form Ties: Factory-fabricated, removable or snap-off metal or glass-fiber-reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
1. Furnish units that will leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface.
2. Furnish ties that, when removed, will leave holes no larger than 1 inch in diameter in concrete surface.
3. Furnish ties with integral water-barrier plates to walls indicated to receive damp proofing or waterproofing.
2.2 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A 615, Grade 60, deformed.
B. Plain-Steel Wire: ASTM A82 as drawn.
C. Deformed-Steel Welded Wire Reinforcement: ASTM A 497, flat sheet.
D. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:
1. For concrete surfaces exposed to view where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire or CRSI Class 2 stainless-steel bar supports.
2.3 CONCRETE MATERIALS
A. Cementitious Material: Portland Cement: ASTM C 150, Type I or II or I/II or III. Use the following cementitious materials, of the same type, brand, and source, throughout Project.
Facilities Construction, Repair & Renovation 033000 - 4
Normal-Weight Aggregates: ASTM C 33, graded,
1. Coarse Aggregate: 1-1/2-inch nominal maximum size
2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
C. Water: ASTM C 94 and potable.
D. Air-Entraining Admixture: ASTM C 260.
E. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.
1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.
2. Retarding Admixture: ASTM C 494/C 494M, Type B.
3. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.
F. Synthetic Fiber: Monofilament polypropylene fibers engineered and designed for use in concrete pavement, complying with ASTM C 1116, Type III, 1/2 to 1-1/2 inches long.
2.4 CURING MATERIALS
A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.
1. Products:
a. Conspec M&M Co., Inc., a Dayton Superior Company; Aquafilm.
b. Dayton Superior Corporation; Sure Film.
c. Euclid Chemical Company (The); Eucobar.
d. L&M Construction Chemicals, Inc.; E-Con.
e. Meadows, W. R., Inc.; Sealtight Evapre.
B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd when dry.
C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.
D. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating.
1. Products:
a. Conspec M&M Co., Inc., a Dayton Superior Company; W.B. Resin Cure.
b. Dayton Superior Corporation; Day Chem Rez Cure (J-11-W).
c. Euclid Chemical Company (The); Kurez DR VOX.
d. L&M Construction Chemicals, Inc.; L&M Cure R.
e. Meadows, W. R., Inc.; 1100 Clear.
Facilities Construction, Repair & Renovation 033000 - 5
E. Clear, Waterborne, Membrane-Forming Curing and Sealing Compound:
ASTM C 1315, Type 1, Class A.
1. Products:
a. Conspec M&M Co., Inc., a Dayton Superior Company; Sealcure 1315 WB.
b. Euclid Chemical Company (The); Super Diamond Clear VOX.
c. L&M Construction Chemicals, Inc.; Lumiseal WB Plus.
d. Meadows, W. R., Inc.; Vocomp-30.
2.5 RELATED MATERIALS
A. Expansion- and Isolation-Joint-Filler Strips: ASTM D 1751, Fiber.
B. Semi-rigid Joint Filler: Two-component, semi-rigid, 100 percent solids, epoxy resin with a Type A shore durometer hardness of 80 per ASTM D 2240.
C. Plastic Vapor Retarder: ASTM E 1745, Class A. Include manufacturer's recommended adhesive or pressure-sensitive tape.
D. Slip-Resistive Emery Aggregate Finish: Factory-graded, packaged, rustproof, nonglazing, abrasive, crushed emery aggregate containing not less than 50 percent aluminum oxide and not less than 20 percent ferric oxide; unaffected by freezing, moisture, and cleaning materials with 100 percent passing No. 4 sieve.
1. Products:
a. Anti-Hydro International, Inc.; Emery.
b. Dayton Superior Corporation; Emery Non-Slip.
c. Emeri-Crete, Inc.; Emeri-Topcrete.
d. Lambert Corporation; EMAG-20.
e. L&M Construction Chemicals, Inc.; Grip It.
E. Epoxy Bonding Adhesive: ASTM C 881, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class suitable for application temperature and of grade to suit requirements, and as follows:
1. Types I and II for non-load bearing or IV and V for load bearing, for bonding hardened or freshly mixed concrete to hardened concrete.
2.6 CONCRETE MIXTURES
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.
B. Proportion normal-weight concrete mixture as follows:
1. Minimum Compressive Strength: 3500 psi at 28 days.
2. Maximum Water-Cementitious Materials Ratio: 0.45.
3. Slump Limit: 4 inches, plus or minus 1 inch.
Facilities Construction, Repair & Renovation 033000 - 6
4. Air Content:
a. 5-1/2 percent, plus or minus 1.5 percent at point of delivery for 1-1/2-inch nominal maximum aggregate size.
b. Do not allow air content of troweled finished floors to exceed 3 percent.
C. Limit water-soluble, chloride-ion content in hardened concrete to 0.30 percent by weight of cement.
D. Synthetic Fiber: Uniformly disperse in concrete mixture at manufacturer's recommended rate, but not less than 1.5 lb/cu. yd.
E. Admixtures: Use admixtures according to manufacturer's written instructions.
2.7 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
2.8 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94, and furnish batch ticket information.
1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine exposed subgrades and subbase surfaces for compliance with requirements for dimensional, grading, and elevation tolerances.
B. Proceed with concrete operations only after nonconforming conditions have been corrected and subgrade is ready to receive concrete work.
3.2 PREPARATION
A. Remove loose material from compacted subbase surface immediately before placing concrete.
3.3 FORMWORK
A. Design, erect, shore, brace, and maintain formwork according to ACI 301 to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads.
B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.
Facilities Construction, Repair & Renovation 033000 - 7
C. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, as follows:
1. Smooth-formed finished surfaces: Class A, 1/8 inch
2. Rough-formed finished surfaces: Class C, 1/2 inch
D. Construct forms tight enough to prevent loss of concrete mortar. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.
E. Fabricate forms for easy removal without hammering or prying against concrete surfaces. Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.
1. Install keyways, reglets, recesses, and the like, for easy removal.
2. Do not use rust-stained steel form-facing material.
F. Chamfer exterior corners and edges of permanently exposed concrete.
G. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.
H. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.
I. Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F for 24 hours after placing concrete, if concrete is hard enough to not be damaged by form-removal operations and curing and protection operations are maintained. Leave formwork for beam soffits, joists, slabs, and other structural elements that supports weight of concrete in place until concrete has achieved at least 70 percent of its 28-day design compressive strength.
3.4 EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
3.5 VAPOR RETARDERS
A. Plastic Vapor Retarders: Place, protect, and repair vapor retarders according to ASTM E 1643 and manufacturer's written instructions.
1. Lap joints 6 inches and seal with manufacturer's recommended tape.
Facilities Construction, Repair & Renovation 033000 - 8
3.6 STEEL REINFORCEMENT
A. General: Comply with CRSI's "Manual of Standard Practice" for placing reinforcement.
B. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete.
C. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that would reduce bond to concrete.
D. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars.
E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.
F. Install welded wire reinforcement in longest practicable lengths on bar supports spaced to minimize sagging. Lap edges and ends of adjoining sheets at least one mesh spacing. Offset laps of adjoining sheet widths to prevent continuous laps in either direction. Lace overlaps with wire.
3.7 JOINTS
A. General: Construct joints true to line with faces perpendicular to surface plane of concrete.
B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by University.
C. Contraction Joints in Slabs-on-Grade: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least 1/4- concrete thickness as follows:
1. Grooved Joints: Form contraction joints after initial floating by grooving and finishing each edge of joint to a radius of 1/8 inch. Repeat grooving of contraction joints after applying surface finishes. Eliminate groover tool marks on concrete surfaces.
2. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch wide joints into concrete when cutting action will not tear, abrade, or otherwise damage surface and before concrete develops random contraction cracks.
D. Isolation Joints in Slabs-on-Grade: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.
E. Use epoxy-bonding adhesive at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.
Facilities Construction, Repair & Renovation 033000 - 9
F. Edging: Tool edges of walks, gutters, curbs, and joints in concrete after initial floating with an edging tool to a 3/8-inch radius. Repeat tooling of edges after applying surface finishes. Eliminate tool marks on concrete surfaces.
3.8 CONCRETE PLACEMENT
A. Comply with ACI301 for measuring, batching, mixing, transporting, and placing concrete.
B. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections have been performed.
C. Remove snow, ice, or frost from subbase surface and reinforcement before placing concrete. Do not place concrete on frozen surfaces.
D. Moisten subbase to provide a uniform dampened condition at time concrete is placed.
Do not place concrete around manholes or other structures until they are at required finish elevation and alignment.
E. Do not add water to concrete during delivery, at Project or during placement.
F. Before test sampling and placing concrete, water may be added at Project site ONLY IF the maximum water amount is shown on delivery ticket and the water is added in the presence of the University.
G. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. Deposit concrete to avoid segregation.
H. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301 and supplementing with hand spading, rodding and/or tamping. Do not use the vibrator to transport concrete.
I. Steel Pan Stairs: Provide concrete fill for steel pan stair treads, landings, and associated items. Cast-in inserts and accessories as shown on Drawings. Screed, tamp, and trowel-finish concrete surfaces.
J. Screed walk and slab surfaces with a straightedge and strike off.
K. Curbs and Gutters: When automatic machine placement is used for curb and gutter placement, submit revised mix design and laboratory test results that meet or exceed requirements. Produce curbs and gutters to required cross section, lines, grades, finish, and jointing as specified for formed concrete. If results are not approved, remove and replace with formed concrete.
L. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
Facilities Construction, Repair & Renovation 033000 - 10
1. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.
2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials.
3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.
M. Hot-Weather Placement: Comply with ACI 301 and as follows:
1. Maintain concrete temperature below 90 deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water.
2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete.
Keep subgrade uniformly moist without standing water, soft spots, or dry areas.
3.9 FINISHING FORMED SURFACES
A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes and defects repaired and patched. Remove fins and other projections that exceed specified limits on formed-surface irregularities.
1. Apply to concrete surfaces not exposed to public view.
B. Smooth-Formed Finish: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams. Repair and patch tie holes and defects. Remove fins and other projections that exceed specified limits on formed-surface irregularities.
1. Apply to concrete surfaces exposed to public view, or to receive a rubbed finish, or to be covered with a coating or covering material applied directly to concrete.
C. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces, unless otherwise indicated.
3.10 FINISHING FLOORS, SLABS AND WALKS
A. General: Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet or add water to concrete surfaces during finishing operations.
B. Scratch Finish: While still plastic, texture concrete surface that has been screeded and bull-floated or darbied. Use stiff brushes, brooms, or rakes to produce a profile amplitude of 1/4 inch in 1 direction.
1. Apply scratch finish to surfaces to receive concrete floor toppings or to receive mortar setting beds for bonded cementitious floor finishes.
Facilities Construction, Repair & Renovation 033000 - 11
C. Float Finish: Consolidate surface with power-driven floats or by hand floating if area is small or inaccessible to power driven floats. Restraighten, cut down high spots, and fill low spots. Repeat float passes and restraightening until surface is left with a uniform, smooth, granular texture.
1. Apply float finish to surfaces to receive trowel finish or to be covered with fluid-applied or sheet waterproofing, built-up or membrane roofing, or sand-bed terrazzo.
D. Trowel Finish: After applying float finish, apply first troweling and consolidate concrete by hand or power-driven trowel. Continue troweling passes and restraighten until surface is free of trowel marks and uniform in texture and appearance. Grind smooth any surface defects that would telegraph through applied coatings or floor coverings.
1. Apply a trowel finish to surfaces exposed to view or to be covered with resilient flooring, carpet, ceramic or quarry tile set over a cleavage membrane, paint, or another thin-film-finish coating system.
2. Finish and measure surface so gap at any point between concrete surface and an unleveled, freestanding, 10-foot long straightedge resting on 2 high spots and placed anywhere on the surface does not exceed 3/16 inch
E. Trowel and Fine-Broom Finish: While concrete is still plastic, slightly scarify surface with a fine broom.
1. Apply a first trowel finish to surfaces where ceramic or quarry tile is to be installed by either thickset or thin-set method.
2. Comply with flatness and levelness tolerances for trowel finished floor surfaces.
F. Broom Finish: Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route. Coordinate required final finish with University before application.
1. Apply a broom finish to exterior concrete platforms, steps, and ramps, and elsewhere as indicated.
G. Slip-Resistive Finish: Before final floating, apply slip-resistive aggregate finish where indicated and to concrete stair treads, platforms, and ramps. Apply according to manufacturer's written instructions and as follows:
1. Uniformly spread 25 lb/100 sq. ft. of dampened slip-resistive aggregate over surface in 1 or 2 applications. Tamp aggregate flush with surface, but do not force below surface.
2. After broadcasting and tamping, apply float finish.
3. After curing, lightly work surface with a steel wire brush or an abrasive stone and water to expose slip-resistive aggregate.
Facilities Construction, Repair & Renovation 033000 - 12
3.11 CONCRETE PROTECTING AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 301 for hot-weather protection during curing.
B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.
C. Begin curing after finishing concrete but not before free water has disappeared from concrete surface.
D. Cure concrete according to ACI 308.1, by one or a combination of the following methods:
1. Moisture Curing: Keep surfaces continuously moist for not less than seven days.
2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive.
Cure for not less than seven days. Immediately repair any holes or tears during curing period using cover material and waterproof tape.
3. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. PROVIDE TWO COATS (second in perpendicular direction from first coat). Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period.
4. Curing and Sealing Compound: Apply uniformly to floors and slabs indicated in a continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Repeat process 24 hours later and apply a second coat.
Maintain continuity of coating and repair damage during curing period.
E. Maintain exposed surfaces of concrete free of stains, discoloration, dirt, and other foreign material.
3.12 JOINT FILLING
A. Prepare, clean, and install joint filler according to manufacturer's written instructions.
1. Defer joint filling until concrete has aged at least 30 calendar days. Do not fill joints until construction traffic has permanently ceased.
B. Remove dirt, debris, saw cuttings, curing compounds, and sealers from joints; leave contact faces of joint clean and dry.
Facilities Construction, Repair & Renovation 033000 - 13
C. Install semirigid joint filler full depth in saw-cut joints and at least 2 inches deep in formed joints. Overfill joint and trim joint filler flush with top of joint after hardening.
3.13 CONCRETE SURFACE REPAIRS
A. Defective Concrete: Repair and patch defective areas when approved by University.
Remove and replace concrete that cannot be repaired and patched to University’s approval.
B. Patching Mortar: Mix dry-pack patching mortar, consisting of one part portland cement to two and one-half parts fine aggregate passing a No. 16 sieve, using only enough water for handling and placing.
C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycombs, rock pockets, fins and other projections on the surface, and stains and other discolorations that cannot be removed by cleaning.
1. Immediately after form removal, cut out honeycombs, rock pockets, and voids more than 1/2 inch in any dimension in solid concrete, but not less than 1 inch in depth. Make edges of cuts perpendicular to concrete surface. Clean, dampen with water, and brush-coat holes and voids with bonding agent. Fill and compact with patching mortar before bonding agent has dried. Fill form-tie voids with patching mortar or cone plugs secured in place with bonding agent.
2. Repair defects on surfaces exposed to view by blending white portland cement and standard portland cement so that, when dry, patching mortar will match surrounding color. Patch a test area at inconspicuous locations to verify mixture and color match before proceeding with patching. Compact mortar in place and strike off slightly higher than surrounding surface.
3. Repair defects on concealed formed surfaces that affect concrete's durability and structural performance as determined by University.
D. Repairing Unformed Surfaces: Test unformed surfaces, such as floors and slabs, for finish and verify surface tolerances specified for each surface. Correct low and high areas. Test surfaces sloped to drain for trueness of slope and smoothness; use a sloped template.
1. Repair finished surfaces containing defects. Surface defects include spalls, popouts, honeycombs, rock pockets, crazing and cracks in excess of 0.01 inch wide or that penetrate to reinforcement or completely through unreinforced sections regardless of width, and other objectionable conditions.
2. After concrete has cured at least 14 days, correct high areas by grinding.
3. Correct localized low areas during or immediately after completing surface finishing operations by cutting out low areas and replacing with patching mortar.
Finish repaired areas to blend into adjacent concrete.
4. Correct other low areas scheduled to receive floor coverings with a repair underlayment. Prepare, mix, and apply repair underlayment and primer according to manufacturer's written instructions to produce a smooth, uniform, plane, and level surface. Feather edges to match adjacent floor elevations.
Facilities Construction, Repair & Renovation 033000 - 14
5. Correct other low areas scheduled to remain exposed with a repair topping. Cut out low areas to ensure a minimum repair topping depth of 1/4 inch to match adjacent floor elevations. Prepare, mix, and apply repair topping and primer according to manufacturer's written instructions to produce a smooth, uniform, plane, and level surface.
6. Repair defective areas, except random cracks and single holes 1 inch or less in diameter, by cutting out and replacing with fresh concrete. Remove defective areas with clean, square cuts and expose steel reinforcement with at least a 3/4-inch clearance all around. Dampen concrete surfaces in contact with patching concrete and apply bonding agent. Mix patching concrete of same materials and mixture as original concrete except without coarse aggregate. Place, compact, and finish to blend with adjacent finished concrete. Cure in same manner as adjacent concrete.
7. Repair random cracks and single holes 1 inch or less in diameter with patching mortar. Groove top of cracks and cut out holes to sound concrete and clean off dust, dirt, and loose particles. Dampen cleaned concrete surfaces and apply bonding agent. Place patching mortar before bonding agent has dried. Compact patching mortar and finish to match adjacent concrete. Keep patched area continuously moist for at least 72 hours.
E. Additional testing and inspecting will be performed at the Contractor’s expense to determine compliance of replaced or additional work with specified requirements.
3.14 FIELD QUALITY CONTROL
A. Testing and Inspecting: University will engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports.
1. Testing Services: Tests shall be performed according to ACI 301.
END OF SECTION 033000
Facilities Construction, Repair & Renovation 042100 - 1
SECTION 042100 – UNIT MASONRY ASSEMBLIES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes brick, concrete masonry units; reinforcement, anchorage, and accessories.
1.2 REFERENCES
1. ASTM A153/A153M – Zinc Coating (Hot-Dip) on Iron and Steel Hardware.
2. ASTM A615/A615M – Deformed and Plain Billet Steel Bars for Concrete
Reinforcement.
3. ASTM A641 – Zinc Coated (Galvanized) Carbon Steel Wire.
4. ASTM C27 – Fireclay and High-Alumina Refractor Brick.
5. ASTM C90 – Load-Bearing Concrete Masonry Units.
6. ASTM C126 – Ceramic Glazed Structural Clay Facing Tile, Facing Brick, and
Solid Masonry Units.
7. ASTM C129 – Non-load Bearing Concrete Masonry Units.
8. ASTM D226 – Asphalt-Saturated Organic Felt Used in Roofing and
Waterproofing.
9. MSJC (Masonry Standards Joint Committee) Code – ACI (American Concrete
Institute) 530/ASCE (American Society of Civil Engineers) 5/TMS (The Masonry Society) 402 – Building Code Requirements for Masonry Structures.
10. MSJC Specification – ACI 530.1/ASCE 6/TMS 602 – Specifications for Masonry Structures.
1.3 SUBMITTALS
A. Product Data: Submit data for masonry units and fabricated wire reinforcement wall tie anchors and other accessories.
B. Samples: Submit four samples of face brick, units to illustrate color, texture and extremes of color range of each indicated brick.
C. Manufacturer’s Certificate: certify that products meet or exceed specified requirements.
1.4 QUALITY ASSURANCE.
A. Perform work in accordance with MSJC Code and MSJC Specification.
B. Hot and Cold Weather Requirements: MSNC Specification.
Facilities Construction, Repair & Renovation 042100 - 2
1.5 MOCK-UP
A. Construct an exterior cavity masonry wall into a panel sized 8 feet long by 6 feet high, which includes masonry, mortar and accessories, structural backup, thru-wall flashings, end dam flashing, wall insulation and architectural precast concrete coping as specified. Mock-up shall be constructed of full size components as specified.
B. Locate where directed.
C. Mock-up shall be approved by the Professional or University prior to building wall construction.
D. Mock-up may not remain as part of the Work.
E. Mock-up to be removed from site when directed.
1.6 DELIVERY, STORAGE AND HANDLING
A. Accept units on site. Inspect for damage.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Subject to compliance with specified requirements, provide one of the following unless indicated otherwise:
1. Glen-Gery Brick or other.
2.2 COMPONENTS
A. Face Brick: Face brick shall be red; color and texture to be approved by the University.
University standard face brick is Glen-Gery 53DD unless otherwise approved.
B. Special Brick Shape: Shaped to profile indicated; surface texture on exposed sides and ends.
C. Hollow Load Bearing Concrete Masonry Units (CMU): ASTM C90, Type I – Moisture Controlled normal weight.
D. Hollow Non-Load Bearing Concrete Masonry Units (CMU): ASTM C129, Type I – Moisture Controlled light weight.
E. Concrete Masonry Unit Size and Shape: Nominal modular size of 16 face inches thickness. Provide special units for 90 degree corners, bond beams, lintels, and bull-nosed corners.
F. Provide fire rated classified CMU where required.
G. Provide bull-nose concrete masonry units for all outside corners where units do not receive finish covering other than paint or coating.
Facilities Construction, Repair & Renovation 042100 - 3
H. Brick Splits: ASTM C27; 9 inch by 4-1/2 inch by 1-1/4 inch high; shall withstand temperatures up to minimum 2,000 degrees F; color shall be as selected by Professional from manufacturer’s standards.
I. All mortar additives, where required, shall contain no more than 0.1% chloride ions and shall be certified as such by the contractor.
J. Provide mortar color to match existing adjacent construction. Coordinate with the University.
K. Ground-face block is desirable in high-traffic areas.
2.3 ACCESSORIES
A. Single Wythe Joint Reinforcement: Ladder type; steel wire, hot dip galvanized to ASTM A641 Class 3 after fabrication, 3/16 inch side rods with No. 9 inch cross ties.
B. Multiple Wythe Joint Reinforcement: Ladder type; with moisture drip; adjustable type, steel wire, hot dip galvanized to ASTM A641 Class 3 after fabrication, 3/16 inch side rods with 3/16 inch cross ties.
C. Reinforcing Steel: ASTM A615/A615M, 60 ksi yield grade, deformed billet bars, galvanized finish.
D. Strap Anchors: bent steel shape, 1 x 8 inch size x 1/8 inch thick, hot dip galvanized to ASTM A153/A153M B2 finish.
E. Masonry Ties: Corrugated formed sheet metal, 1 x 8 inch size x 16 gage thick, hot dip galvanized to ASTM A153/A153M B2 finish.
F. Mortar and Grout: As specified.
G. Thru-Wall Flashings: 7 oz/sq ft rolled sheet copper bonded to fiber reinforced asphalt treated Kraft paper. Provide adequate thru-wall flashing, with weep holes in masonry at 16” o.c.
H. Preformed Control Joints: Rubber material. Provide with corner and tee accessories, cement fused joints.
I. Joint Filler: Closed cell polyvinyl chloride; oversized 50 percent to joint width; self expanding; ½ inch wide x by maximum lengths.
J. Building Paper: ASTM D226, No. 30 asphalt saturated felt.
K. Weeps: Preformed plastic hollow tubes.
L. Cleaning Solution: Non-acidic, not harmful to masonry work or adjacent materials.
M. Steel Lintels: As specified.
Facilities Construction, Repair & Renovation 042100 - 4
N. Triangular Masonry Ties: Steel, 3/16 diameter, triangular shaped wire, complete with weld-on anchor rods or anchor straps, hot-dipped galvanized to ASTM A153/A153M B2 finish.
O. Dovetail Anchors: Galvanized steel sheet fabricated from 0.034 inch material complete with dovetail slot, anchor and filler strip.
P. Brick Vent: Extruded aluminum assembly of 6063-TS alloy with minimum thickness of
0.125 inch; 18 x 14 aluminum insect screen; baked enamel finish, color shall be a custom color to match adjacent brick, 1 inch overlapping blades at 45 degree angle;
water-stop, drainable; with wall depth extension for ductwork connection.
Q. Brick Ties: 3/16 inch diameter adjustable hook with two prongs and a receiver, designed for brick veneer anchorage to steel stud and sheathing backup; hot dip galvanized to ASTM A 153.
R. Vapor Barrier: As specified.
S. Self-Adhered Membrane Flashing: Shall be manufactured of a 40 mil thick waterproofing membrane consisting of a self-adhering rubberized asphalt laminated to a high density polyethylene film. Membrane shall conform to puncture resistance of 40 pounds minimum; tensile strength of 1,200 psi. Provide membrane in width to allow one pass of membrane; provide longest length membrane roll as achievable. Provide manufacturer’s recommended primer where recommended by manufacturer.
T. Cavity Drainage Fabric: Manufactured of high density polyethylene or recycled polyester, woven into a 90 percent open mesh design; ½ inch thick, height of mesh shall be 10 inches with a continuous bottom 3 inch row and 7 inch high dovetails.
U. Overflow Outlet: Cast bronze material; satin finish; consisting of one-piece cast nozzle, wall flange and inlet threaded connection. Coordinate pipe inlet size with Plumbing Contractor for pipe size. Outlet shall have three holes in flange for attachment to building face, nozzle shall extend from building face minimum 4 inch, with curved lip.
2.4 PRECAST CONCRETE LINTELS
A. General: Provide either concrete or masonry lintels, complying with requirements below.
B. Concrete Lintels: Precast units made from concrete matching concrete masonry units in color, texture, and compressive strength and with reinforcing bars indicated or required to support loads indicated. Cure precast lintels by same method used for concrete masonry units.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that field conditions are acceptable and are ready to receive work.
Facilities Construction, Repair & Renovation 042100 - 5
B. Verify items provided by other sections of work are properly sized and located.
C. Verify that built-in items are in proper location, and ready for roughing into masonry work.
3.2 PREPARATION
A. Direct and coordinate placement of metal anchors supplied to other sections.
B. Provide temporary bracing during installation of masonry work. Maintain in place until building structure provides permanent support.
3.3 INSTALLATION
A. Establish lines, levels, and coursing indicated. Protect from displacement.
B. Maintain masonry courses to uniform dimension. Form bed and head joints of uniform thickness.
C. Coursing of Concrete Masonry Units:
1. Bond: Running.
2. Coursing: One unit and one mortar joint to equal 8 inches.
3. Mortar Joints: Concave.
D. Coursing of Brick Units:
1. Bond: Running unless noted otherwise.
2. Coursing: Three units and three mortar joints to equal 8 inches.
3. Mortar Joints: Concave.
E. Placing and Bonding:
1. Lay solid masonry units in full bed of mortar, with full head joints.
2. Lay hollow masonry units with face shell bedding on head and bed joints.
3. Buttering corners of joints or excessive furrowing of mortar joints are not permitted.
4. Remove excess mortar as work progresses.
5. Interlock intersections and external corners.
6. Do not shift or tap masonry units after mortar has achieved initial set. Where adjustment must be made, remove mortar and replace.
Facilities Construction, Repair & Renovation 042100 - 6
7. Perform job site cutting of masonry units with proper tools to provide straight, clean, un-chipped edges. Prevent broken masonry unit corners or edges.
8. Cut mortar joints flush where wall tile is scheduled, cement parging is required, and where resilient base is scheduled.
9. Isolate masonry from vertical structural framing members with a movement joint.
10. Isolate top of masonry from horizontal structural framing members and slabs or decks with compressible joint filler.
11. Provide brick ties, masonry ties and straps as indicated and as required to anchor all face brick to framing system, masonry backup and concrete masonry units to structural framing whether shown or not. Provide where masonry is adjacent to or constructed around every steel column. Provide anchors at 16 inches on center both horizontally or vertically unless noted otherwise.
12. Provide an open space not less than ½ inch in width between masonry and structural members, unless indicated otherwise. Keep open space free of mortar and other rigid materials.
F. Anchor masonry veneers to wall framing with anchors as indicated to comply with the following requirements.
1. Fasten screw-attached anchors through sheathing to wall framing with metal fasteners of type indicated. Use two fasteners unless anchor design only uses one fastener.
2. Insert slip-in anchors in metal studs as sheathing is installed. Provide one anchor at each stud in each horizontal joint between sheathing boards.
3. Embed tie sections in masonry joints. Provide not less than 2 inches of air space between back of masonry veneer and face of sheathing.
4. Locate anchor sections to allow maximum vertical differential movement of ties up and down.
5. Space anchors as indicated, but not more than 18 inches oc vertically and 24 inches oc horizontally, with not less than 1 anchor for each 2 sq. ft. of wall area.
Install additional anchors within 12 inches of openings and at intervals, not exceeding 8 inches, around perimeter.
G. Install brick splits where indicated. Loose lay in metal tray; butt ends together, no mortar. Lay in stack bond pattern. Cut bricks as required to fit tight in metal pan.
H. Weeps and Vents: Provide weeps and vents in outer wythe at 24 inches oc horizontally above through-wall flashing and shelf angles. At lintels, provide weeps and vents in outer wythe at 16 inches oc.
I. Cavity Wall: Do not permit mortar to drop or accumulate into cavity air space or to plug weeps. Build inner wythe ahead of outer wythe to receive cavity insulation and
Facilities Construction, Repair & Renovation 042100 - 7 air/vapor barrier. Install cavity drainage fabric in accordance with manufacturer’s recommendations at bottom of all cavities, over opening headers, and at all through wall flashing.
J. Joint Reinforcement and Anchorage – Single Wythe Masonry:
1. Install horizontal joint reinforcement 16 inches oc.
2. Place masonry joint reinforcement in first and second horizontal joints above and below openings. Extend minimum 16 inches each side of opening.
3. Place joint reinforcement continuous in first and second joint below top of walls.
4. Lap joint reinforcement ends minimum 6 inches.
5. Reinforce joint corners and intersections with strap anchors 16 inches oc.
K. Joint Reinforcement and Anchorages – Cavity Wall Masonry:
1. Install horizontal joint reinforcement 16 inches oc.
2. Place masonry joint reinforcement in first and second horizontal joints above and below openings. Extend minimum 16 inches each side of opening.
3. Place joint reinforcement continuous in first and second joint below top of walls.
4. Lap joint reinforcement ends minimum 6 inches.
5. Attach to structural steel members. Embed anchorages in every second block joint.
6. Reinforce joint corners and intersections with strap anchors 16 inches oc.
L. Masonry Flashings:
1. Extend flashings horizontally through…