1-Binder1 - Solicitation and Contract Documents.pdf
PDF 6 MB Posted
- Solicitation number
- US.262366
- Issued by
- Clearfield County, Pennsylvania
About this file
Summary
This is a Solicitation and Contract Documents package issued by Commonwealth University of Pennsylvania, part of the State System of Higher Education, for Work Order Contracts for Construction, Renovation, and Repair at the Lock Haven Campus. The solicitation seeks multiple award open-end contracts in eleven disciplines: General Construction, HVAC, Plumbing, Electrical, Painting, Roofing, Concrete, Masonry, Sitework, Asphalt and Concrete Paving, and Boiler Specialty. These contracts are indefinite quantity arrangements for miscellaneous construction, emergency work, and facility maintenance, with individual work orders not to exceed $100,000 to $200,000 depending on discipline, and annual limits of $500,000 per contract. The University may award up to three contractors per discipline. A mandatory pre-bid conference with site visit is scheduled for November 19, 2026, at 11:00 AM at the East Campus Science Center. Electronic bids must be submitted through PennBid no later than 1:00 PM EST on December 15, 2026. Bid documents are available at no cost on PennBid. Bidders must be located within a 75-mile radius of the university due to emergency work requirements. The contract term is one year with four optional one-year renewal periods.
Bidders must provide unit prices for labor (non-prevailing and prevailing wage), materials (at a 10% markup), and equipment on a per diem basis. Work orders under $25,000 are classified as non-prevailing wage, while those exceeding $25,000 are subject to prevailing wage rates per Prevailing Wage Determination Serial Number 26-09714, effective November 9, 2026. No bid security is required. For individual work orders exceeding $63,985, contractors must provide performance and payment bonds at 100% and maintenance bonds at 10%. Labor rate escalation for contract renewals is limited to the Consumer Price Index for All Urban Consumers (CPI-U), with the October 2026 baseline of 337.511. The contract is subject to Pennsylvania Act 127 (Public Works Employment Verification Act), requiring E-Verify compliance. Contractors must be registered to do business in Pennsylvania if organized out-of-state. No set-asides are identified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Binder 3 - Tech Specs (Reference Only).pdf | ||
| 5-map-main campus7 19 2017.pdf | ||
| 4-1 - 2018K112 Spec Instr to Bidders 2018 06 15.pdf | ||
| 6-CWU--L-2027-1 - Bid Form.docx | DOCX document | |
| 2-Binder2 - Div 1 - General Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE SYSTEM OF HIGHER EDUCATION
COMMONWEALTH OF PENNSYLVANIA
Commonwealth UNIVERSITY OF PENNSYLVANIA
Lock Haven Campus
PROJECT MANUAL
AND
INVITATION FOR BIDS
WORK ORDER CONTRACTS FOR CONSTRUCTION, RENOVATION, AND REPAIR
PROJECT NO. CWU-L-2027-1
Contract # CWU-L-2027/1.1 – GENERAL CONSTRUCTION Contract # CWU-L-2027/1.2 – HVAC CONSTRUCTION
Contract # CWU-L-2027/1.3 – PLUMBING CONSTRUCTION Contract # CWU-L-2027/1.4 – ELECTRICAL CONSTRUCTION
Contract # CWU-L-2027/1.5 – PAINTING Contract # CWU-L-2027/1.6 – ROOFING
Contract # CWU-L-2027/1.7 – CONCRETE Contract # CWU-L-2027/1.8 – MASONRY Contract # CWU-L-2027/1.9 – SITEWORK
Contract # CWU-L-2027/1.10 – ASPHALT AND CONCRETE PAVING Contract # CWU-L-2027/1.11 – BOILER SPECIALTY
JOSH SHAPIRO, GOVERNOR
CHRIS FIORENTINO, CHANCELLOR
JEFFERY OSGOOD, UNIVERSITY PRESIDENT
Issued for Bid: November 10, 2026
Commonwealth University of Pennsylvania 401 North Fairview Street
Lock Haven, PA 17745
Solicitation No. CWU-L-2027/1 Table of Contents Work Order Contracts for Construction, Renovation, and Repair Page 1 of 2
TABLE OF CONTENTS
WORK ORDER CONTRACTS FOR CONSTRUCTION, RENOVATION, AND REPAIR
CWU-L-2027/1
Page Numbers Solicitation for Construction
Special Instructions to Bidders .............................................................................................................. 1-4 General Instructions to Bidders ............................................................................................................. 1-8 Bid Form ............................................................................................................................................ 1-21
Contract Form
Standard Form of Contract ............................................................................................................. 1-5 General Conditions....................................................................................................................... 1-34 Amendment To General Conditions For Work Order Construction Contract (RTKL)..…………1-2 Insurance Rider .............................................................................................................................. 1-3 Prevailing Wage Determination Rates ........................................................................................... 1-5 Rider A – Contractual Unit Prices …………………………………………………………………………1-18 Exhibit A – Sample – IWO Form Template ………………………………………………………………..1-3 Exhibit B – Sample – Contract Bond (for use with applicable IWO’s)…………………………………..1-6
Specifications
Division 01 - General Requirements Section 01 10 00 Summary ................................................................................................ 1-10 Section 01 11 01 Special Provisions………………………………………………………………..1-2 Section 01 22 00 Unit Prices ................................................................................................ 1-9 Section 01 26 00 Contract Modification Procedures ............................................................. 1-3 Section 01 29 00 Applications for Payment Section 01 32 00 Construction Schedule Reporting .............................................................. 1-2 Section 01 33 00 Submittals ................................................................................................. 1-4 Section 01 35 00 C Safety and Health Requirements ............................................................... 1-4 Section 01 45 00 Quality Control .......................................................................................... 1-4 Section 01 50 00 B Temporary Facilities.................................................................................. 1-4 Section 01 50 01 Safety ....................................................................................................... 1-4 Section 01 60 00 Product Requirements .............................................................................. 1-4 Section 01 73 20 Cutting and Patching ……………………………………………………………1-6 Section 01 78 36 Warranties ................................................................................................ 1-3
Technical Specifications (Standards for Reference Only)
To be developed as necessary for IWO’s.
DIVISION 02 – EXISTING CONDITIONS
024113 Selective Site Demolition …………………………………………………………………………..1-4
DIVISION 03 – CONCRETE
033000 Cast-In-Place Concrete ................................................................................................... 1-14
DIVISION 04 – MASONRY
042100 Unit Masonry Assemblies ................................................................................................ 1-10
DIVISION 06 – WOOD AND PLASTIC
061000 Rough Carpentry .............................................................................................................. 1-6 062000 Finish Carpentry ............................................................................................................... 1-9
Solicitation No. CWU-L-2027/1 Table of Contents Work Order Contracts for Construction, Renovation, and Repair Page 2 of 2
DIVISION 031 – SITEWORK
311000 Site Clearing ..................................................................................................................... 1-5 311200 Earthwork ......................................................................................................................... 1-9 321400 Unit Brick Paver ................................................................................................................ 1-6 321713 Precast Concrete Wheel Stops 329200 Lawns and Grasses .......................................................................................................... 1-5 331000 Water Utilities ................................................................................................................. 1-31 333000 Sanitary Sewer Utilities ................................................................................................... 1-19 334000 Storm Sewer Utilities....................................................................................................... 1-30 336300 Steam Distribution .......................................................................................................... 1-47
DIVISION 032 – EXTERIOR IMPROVEMENTS
321216 Hot-Mix Asphalt Paving……………………………………………………………………………1-7 323313 Cement Concrete Paving………………………………………………………………………….1-8 321373 Pavement Joint Sealants………………………………………………………………………….1-4 321723 Pavement Markings………………………………………………………………………………..1-2 329200 Lawns and Grasses………………………………………………………………………………..1-7
Sketches
PAV-1 Typical Light Duty Asphalt Paving PAV-2 Typical Heavy Duty Asphalt Paving PAV-3 8” x 18” Concrete Curb PAV-4 Asphalt Pedestrian Walk PAV-5 Paving Termination PAV-6 Typical Detail for 6” Thick Concrete Pavement
Drawings
To be developed as necessary for IWO’s.
Solicitation for Work Order Contract for Construction 2018K112 Special Instructions to Bidders Solicitation No. CWU-L-2027/1 Page 1 of 4
SPECIAL INSTRUCTIONS TO BIDDERS
PROJECT INFORMATION
Project Title: Work Order Contracts for Construction, Renovation and Repair
Project No: CWU-L-2027/1
Location: Commonwealth University – Lock Haven Campus / Lock Haven, PA
Project Scope: Work included under this project at Commonwealth University, Lock Haven Camps, Clinton
County, Lock Haven Pennsylvania Work consists of multiple award open-end contracts for General Construction, HVAC, Plumbing, Electrical, Painting, Roofing, Concrete, Masonry, Sitework, Asphalt and Concrete Paving and Boiler Specialty for labor and equipment rates for various miscellaneous construction, renovation, repair, and maintenance of facilities and buildings.
These are small construction / maintenance repair and/or replacement of equipment, emergency work and renovations to space that are unplanned projects that are under 100K per work order. No known quantity or amount is known until the need arises for the service.
This is not a scheduled maintenance contract on equipment. Due to emergency work, Bidders must be located in a 1 and half hour drive / 75 mile radius within the University, refer to Section 01 11 01 Special Provisions 1.2 Contractor Qualifications Statement for bidding eligibility.
Commonwealth University, Lock Haven Campus is seeking to retain multiple Work Order
Contracts with up to three Contractors in each discipline to address:
CWU-L-2027/1.1 – GENERAL CONSTRUCTION
CWU-L-2027/1.2 – HVAC CONSTRUCTION
CWU-L-2027/1.3 – PLUMBING CONSTRUCTION
CWU-L-2027/1.4 – ELECTRICAL CONSTRUCTION
CWU-L-2027/1.5 – PAINTING
CWU-L-2027/1.6 – ROOFING
CWU-L-2027/1.7 – CONCRETE
CWU-L-2027/1.8 – MASONRY
CWU-L-2027/1.9 – SITEWORK
CWU-L-2027/1.10 – ASPHALT AND CONCRETE PAVING
CWU-L-2027/1.11 – BOILER SPECIALTY
Directions: Visit www.Commonwealthu.edu Lock Haven Campus for driving directions.
Contract Time: see Standard Form of Contract, Work Order Contract for Construction
Contract Value: see Standard Form of Contract, Work Order Contract for Construction
Individual Work Orders (IWO’s): see Standard Form of Contract, Work Order Contract for Construction
Prevailing Wages: Labor rates shall be identified as non-prevailing wage for those work orders under
$25,000 The Prevailing Minimum Wage Determination for this Project is Serial Number 26-09714, determined on November 9, 2026 for work orders exceeding $25,000.
Liquidated Damages: No; See Standard Form of Contract, For project specific IWO’s only http://www.commonwealthu.edu/
Solicitation No. CWU-L-2027/1 Page 2 of 4
Act 127, PA Everify: This Contract is subject to Pennsylvania Act 127 of 2012, known as the Public Works Employment Verification Act. IWOs may or may not be subject to Act 127
BIDDING INFORMATION
Issuing Office: Wesley Light, Construction Procurement Lead PASSHE c/o Commonwealth University 400 E. Second Street Bloomsburg, PA 17815 Email: wlight@passhe.edu
Ph: (717) 517-6304
University Representatives: Kimmer VanGilder Facilities Director, Operations
Commonwealth University Email: kvangilder@commonwealthu.edu Ph: 570-389-4534
Emil Mikle Project Director Commonwealth University Email: emikle@commonwealthu.edu
Phone: 570-389-4922
Contracting Officer: Wesley Light, Construction Procurement Lead
Plans and Specs: Available for download at no cost on PennBid at https://pennbid.bonfirehub.com. Bidders must obtain all bid documents from PennBid and not any other bid exchanges to be eligible to submit a bid proposal.
Bids Due Date/Time: December 15, 2026, at 1:00 PM EST
Method of submission of bids for this IFB (see Sections 1 and 7 of the General Instructions to Bidders):
by upload of electronic documents to PennBid at https://pennbid.bonfirehub.com/
Bid Opening Date/Time: December 15, 2026 at 1:00 PM EDT. Bid results/tabulation will be posted at https://pennbid.bonfirehub.com/ Phone or fax inquiries will not be accepted.
Pre-bid Conference Date/Time:
A Pre-Bid Conference, with site visit to follow, will be held on November 19, 2026 at 11:00 AM at East Campus Science Center (ECSC) Room 215 on the campus of Lock Haven University, Lock Haven Pa.
Parking is reserved in Area 21 (map attached), Guests will be able to enter the building through any of the doors adjacent to the parking, and will proceed to the second floor, Room 215.
Mandatory or Not: Attendance is mandatory.
Location: East Campus Science Center (ECSC) Room 215 on the campus of Lock Haven University, Lock Haven Pa. Parking is reserved in Area 21 (map attached), Guests will be able to enter the building through any of the doors adjacent to the parking, and will proceed to the second floor, Room 215.
Site Visits: Yes, following the Pre-Bid Conference (if needed) mailto:wlight@passhe.edu mailto:kvangilder@commonwealthu.edu mailto:emikle@commonwealthu.edu https://pennbid.bonfirehub.com/ https://pennbid.bonfirehub.com/
Solicitation No. CWU-L-2027/1 Page 3 of 4
Submit Pre-Bid Questions through the “Ask a Question” feature in PennBid only.
Cut-off Date for Pre-Bid Questions: December 2, 2026, at 12:00 PM EST
REAAs for Small Diverse Business (SDB) proactive solicitation: Not Required
Bid Security Required: Not Required
Bid Security Allowed: Not Required
Bid Period: Bids shall be valid for not less than 60 days.
Items Required to be Submitted with the Bid: Bid Form
Multiple Award / Open-end Contracts: The University may award a contract to multiple firms with the lowest base bids. This Contract is an indefinite quantity contract against which Individual Work Orders shall be issued. The threshold total amount of Work Orders issued shall not exceed, unless approved by the PASSHE Construction Support Office;
Work Order Limit Annual Limit
CWU-L-2027/1.1 General Construction: $100,000 $500,000
CWU-L-2027/1.2 HVAC: $200,000 $500,000
CWU-L-2027/1.3 Plumbing: $200,000 $500,000 CWU-L-2027/1.4 Electrical: $200,000 $500,000 CWU-L-2027/1.5 Painting: $100,000 $500,000 CWU-L-2027/1.6 Roofing: $100,000 $500,000 CWU-L-2027/1.7 Concrete: $100,000 $500,000 CWU-L-2027/1.8 Masonry $100,000 $500,000 CWU-L-2027/1.9 Sitework $100,000 $500,000 CWU-L-2027/1.10Asphalt & Concrete Paving $100,000 $500,000 CWU-L-2027/1.11Boiler Specialty: $200,000 $500,000
The Contract will allow the System to acquire work and/or services during the contract period through the issuance of Individual Work Orders (IWO).
For each specific assignment, the University will request a proposal for the performance of specified scope of work. Based on satisfactory past performance and acceptance of the Contractor’s proposal, the University will issue an Individual Work Order. There is no guarantee that any particular Contractor will be awarded an Individual Work Order for any particular project or for any dollar amount for the term of the Contract.
Selection of Contractors: If identical contracts are awarded to multiple contractors, the contracts will be awarded with an alphabetical indicator with the letter “A” as the lowest primary Contract, “B” would be the second lowest responsible bidder and so forth.
Contract Renewals: The term of the Contract will be the initial one (1) year, with four (4) additional one-year optional renewal terms.
Any offer of renewal or extension to the Contract will be as determined by the University.
Any escalation of annual costs for the renewal years will be handled as described below:
The Individual Work Orders themselves will not allow an increase for labor, materials, and other services due to escalation. Labor rate changes can
Solicitation No. CWU-L-2027/1 Page 4 of 4 only be accomplished at the new term of each contract renewal and then only to the maximum rate allowed as determined by the Consumer Price Index – Urban (CPI-U) Index as published by United States Department of Labor, Bureau of Labor Statistics Series Id: CUUR0000SA0; Titled: All items in U.S. city average, all urban consumers, not seasonally adjusted.
The CPI-U Index available at the Bid of the Agreement was for October, 2026 and it was 337.511. This value is being used as the basis for the computation of all increases for subsequent renewals.
Refer to: https://www.bls.gov/cpi/
Asphalt & Concrete Paving PADOT ECMS Asphalt Cement Index price upon which price is based: $713.00/Ton (Nov 2026 – Zone 2, District 2) Refer to: https://www.ecms.penndot.pa.gov/ECMS/
Proposed Date of Completion: Individual Work Orders will specify the scope of work and required date of completion.
Contract Bonds: Applicable for Individual Work Orders only.
Performance and Payment, Maintenance bonds in the amount of a specific project Individual work order may be required. Contractors must be capable of securing a Performance and Payment, Maintenance bond in the amount of $63,985 and above. Refer to the General Instructions to Bidders.
https://www.bls.gov/cpi/ https://www.ecms.penndot.pa.gov/ECMS/
Durrwachter/ Admissions
Admissions’ Visitors Only
Visitor Section
6D
Scie nce and
Mat h C ente r
2, 3, 3A, 3B, 4, 9, 12, 13, 14, 14A, 15A, 16, 17, 19, 20, 21, 22
6, 6A, 6B, 6C, 6D, 15 & red lined spaces in 19& red lined spaces in 19 7 (upper level)
8, 9, 14 & 19 (white lined spaces)
14A
** Temporary Parking Permit required and issued to University visitor’s assigned to a specific lot. Obtain permit at the Public Safety office located in the Glennon Infirmary Building.
** All parking lots on University property are closed for parking between 12 mid - 5 am Monday - Friday with the exception of Areas 2, 18 and Red/Orange lined spaces throughout campus.
Permission for overnight parking will be granted upon request through Public Safety.
Area # Decal Color Hours
Gold
Gold Gold
Red Red
Green
GoldGold
Silver
Blue
Yellow
7 am - 5 pm Monday - Friday
24 hrs, 7 days a week 7 am - 10 pm Monday - Thursday 7 am - 5 pm Friday
7 days a week 24 hours a day 5 pm Sunday - 5 pm Friday
7 am - 5 pm Monday - Friday7 am - 5 pm Monday - Friday
7 days a week 24 hours a day
6 am - 7 pm Monday - Friday
6 am - 6 pm Monday - Friday
5 pm Sunday - 5 pm Friday
Produced by the LHU offices of Public Safety and University Relations - 7/2015
Solicitation for Work Order Contract for Construction 2018K112 General Instructions to Bidders Solicitation No. CWU-L-2027/1 Page 1 of 8
GENERAL INSTRUCTIONS TO BIDDERS
1. PennBid Bonfire - Bid Event The System uses the PennBid Bonfire web-based platform for public notice for Invitations for Bids (IFBs).
Specific instructions related to the PennBid Bonfire Bid Event are posted online. The bid documents take precedence over any online instruction.
Detailed information about submission and acceptance of bids is addressed in Section 7 below.
2. Responsibility of the Bidder It is the responsibility of the bidders by careful examination of the Contract Documents to satisfy themselves as to the nature and location of the Work, as well as all environmental conditions that may affect performance of the Work. All bidders should visit the site to thoroughly familiarize themselves with the existing conditions. If any discrepancies should be found between existing conditions and the Contract Documents, prospective bidders shall report these discrepancies to the System for clarification prior to submitting a bid. Requests for interpretation of the Work to be performed shall be submitted in writing to the System or the System's designated representative. Failure of the bidder to visit the site, recognize and take into account in their bid site conditions that affect the Work, shall not be considered sufficient cause for any increase in the agreed-upon contracted amount. If subsurface drilling or other exploration has been performed at the Project site, information resulting from such drilling and/or exploration and provided to the System in forms and/or subsurface drilling reports is included in the Technical Plans and Specifications.
3. Incurring Costs The System is not liable for any cost or expenses incurred by bidders or prospective bidders in the preparation of their bids or for attendance at any conferences, meetings, or site visits related to this IFB.
4. Restriction of Contact From the issue date of this IFB until a final contract award has been made, all contacts with Commonwealth personnel concerning this IFB must be made only through the Issuing Office or other specific representatives identified for the IFB on PennBid Bonfire Bid Event.
5. Addenda to the IFB If it becomes necessary to revise any part of this IFB, Addenda will be issued. If Addenda are issued, all terms and conditions that are not changed remain. Bidders shall acknowledge on the Bid Form all Addenda, identified by the numbers and dates of those Addenda. Bidders are responsible for ensuring they are aware of all Addenda prior to submitting their bid.
6. Questions and Answers to the IFB The PennBid Bonfire Bid Event provides a message board for on-line questions and answers. The System will post answers to questions, as applicable. If there are a significant number of questions and/or complex questions/answers, the answers may be consolidated and provided in an Addendum. Posted answers shall
Solicitation No. CWU-L-2027/1 Page 2 of 8 be considered official, as if included in an Addendum. Answers will be posted in a timely-enough manner for bidders to be able to adequately consider them. Bidders are responsible for ensuring they are aware of all posted answers prior to submitting their bid.
7. Submission and Acceptance of Bids Bids shall be entered on the Bid Form provided elsewhere in this IFB. The completed Bid Form shall be PDF format, and uploaded to the PennBid Bonfire Bid Event not later than the bid due date and time to be considered as responsive to the bid requirements. Bidders submitting bids for more than one separate prime contract shall prepare and upload separate Bid Forms.
All other items required to be submitted with the bid shall be PDF format and uploaded in the same manner and at the same time as the Bid Form. Items may be separate PDF files, or combined into one PDF file; or may be combined into one PDF file with the Bid Form. If separate PDF files are used, however, they must be gathered into a Zip file for uploading. Bidders submitting bids for more than one separate prime contract shall prepare, scan, and upload separate items for each separate prime contract.
The apparent low bidder may be asked to submit one (1) original hard copy of their Bid Form, and one (1) original hard copy of their bid security, if required for the IFB, with all entries in ink or typewritten and with original signatures, within 48 hours of bid opening date and time. Other items required to be submitted with the bid may also be required to be submitted as original hard copies.
The System will not be responsible if the bidder is not able to upload their scanned PDF Bid Form if the problem is not associated with a failure of PennBid Bonfire itself. Uploaded Bid Forms and other documents which are not readable when accessed by the System will be rejected as non-responsive.
To be considered, bids must be a complete response to the IFB, and must contain all elements required to be submitted with the bid. An omission of prices requested on the Bid Form may be sufficient cause for rejection of the entire bid as non-responsive.
Bidders may submit modifications to their bids at any time before the bid due date and time. Modifications to bids shall be accomplished by withdrawing their bid form and uploading a new bid form. Otherwise, all bids shall be unconditionally accepted without alteration or modification except as authorized in this IFB.
Bids may be withdrawn up to the time of bid opening.
Requests for withdrawal of bids after bid opening based on an erroneous bid and/or a mistake in the bid, in accordance with the Commonwealth Procurement Code 62 P.S. 512(f), must be made within two (2) working days after the date of bid opening.
8. Bid Security If a bid security is required, each bid must be accompanied by a certified check, bank cashier's check, or Bid Bond. Specific bid security required, and the type, for the solicitation is identified on the PennBid Bonfire bid event. Failure to submit bid security, if required, will result in the rejection of the bid as non-responsive.
If a check is allowed, it shall be drawn to the order of the System. If a Bid Bond is used as the security, it must be submitted on the System-furnished Bid Bond form, complete with all signatures, seals, and certificate of power of attorney. Failure to use the System Bid Bond form for a bid bond will result in the rejection of the bid as non-responsive. The Bid Bond form is located elsewhere in this IFB.
The bid security will be forfeited if a bid or any part thereof is accepted by the System and the bidder fails to furnish approved performance and payment bonds, if required, and execute the contract within the time frame stated in the Notice of Award.
All bid security not forfeited, except for the two lowest responsive, responsible bidders, shall be released on or before the thirtieth (30th) day after the bid opening. The bid security of the two lowest responsive, responsible bidders, except where forfeiture is involved, will be returned, or released, as appropriate, upon execution of the performance and payment bonds and the contract by the lowest responsive, responsible
Solicitation No. CWU-L-2027/1 Page 3 of 8 bidder. In the event no contract is awarded by the System, the bid security of the two lowest responsive, responsible bidders will be returned, or released, as appropriate, on or about sixty (60) days after the bid opening, unless an extension is agreed upon.
9. Business Certification The Bid Form contains a Bidder Business Certification section that bidders must complete.
If the bidder is incorporated or organized in a state other than Pennsylvania, the bidder must be registered to do business in Pennsylvania. If the bidder is operating under an assumed or fictitious name, the bidder must have registered that name in Pennsylvania. No contract will be awarded to a foreign (non-Pennsylvania) corporation, LLC, LLP, or LP, or to an assumed or fictitious name, unless the bidder has complied with the registration requirements of Pennsylvania statutes.
Information on business registration in the Commonwealth of Pennsylvania is available from the Pennsylvania Department of State, Bureau of Corporations and Charitable Organizations, 206 North Office Building, Commonwealth Avenue & North Street, Harrisburg, PA 17120.
10. Submission of Small Diverse Business (SDB) Participation Information If applicable, bidders must submit with their bid the required SDB participation information. The SDB Requirements Instructions, and the required SDB Solicitation Form, are located elsewhere in this IFB.
11. Selection for Award The System intends to award a contract or contracts resulting from this IFB to the responsible bidder(s) who submitted a responsive bid(s) which represents the lowest price to the System based on the bid evaluation plan.
If unit-priced bid items are included on the Bid Form, the System reserves the right to make an award on any item for a quantity less than the estimated quantity offered.
If the Bid Form includes multiple Bid Items, the System reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the System's best interest to do so.
12. Tie Bids When two or more low bids are equal in all respects, a recognized simple "game of chance" will be used to determine which equally-eligible bidder is to be awarded the contract. For two equally-eligible bidders, a coin flip or a drawing of straws or lots may be used. For three or more equally-eligible bidders, a drawing of straws or lots will be used. Equally-eligible bidders will have the opportunity to witness the process, if applicable.
13. Unbalanced Bids The System may reject a bid as nonresponsive if it is materially unbalanced as to prices for the basic requirement, any unit prices, and/or any options. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more Bid Form line items is significantly overstated or understated.
A bid may be rejected if the System determines that the lack of balance poses an unacceptable risk to the System.
Solicitation No. CWU-L-2027/1 Page 4 of 8
14. Apparent Clerical and Other Mistakes on the Bid Form For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the Bid Form as submitted by the bidder:
a. Obviously misplaced decimal points will be corrected.
b. For a discrepancy between a unit price and its extended price, the unit price will govern.
c. Apparent errors in extension of unit prices will be corrected.
d. Apparent errors in addition of lump-sum and extended prices will be corrected.
In the case of a discrepancy between written words and numbers, the written words will govern.
15. System's Right to Reject Bids The System reserves the right to reject any bid if it shows any omission, alteration, addition, or deduction not called for; if it contains substitutions or exceptions; if it is conditional or represents an uninvited alternate bid; or if it contains irregularities of any kind. The System reserves the right, however, to waive technical defects or minor irregularities. Additionally, in the event a bidder fails, refuses, or neglects to provide any requested information or documents within the time stated in this IFB or upon the System's request, the System will have the right to reject their bid as non-responsive.
The System reserves the right to reject at any time all bids received.
16. Anti-Bid-Rigging The bids of any bidder or bidders who engage in collusive bidding shall be rejected. Any bidder who submits more than one bid in such manner as to make it appear that the bids submitted are on a competitive basis from different parties shall be considered a collusive bidder. The System may reject the bids of any collusive bidder upon bid openings of future projects. By submitting a bid, a bidder is certifying that they are not engaged in collusive bidding or bid rigging relative to this bid. Nothing in this section shall prevent a bidder from superseding a bid by a subsequent bid delivered prior to bid opening which expressly revokes the previous bid.
17. Reciprocal Limitations Act Requirements The Reciprocal Limitations Act (62 P.S. 107) is applicable to contracts of $10,000 and greater.
The Reciprocal Limitations Act requires the System to give bidders a preference against a nonresident bidder from any state that gives or requires a preference to bidders from that state. The amount of the preference shall be equal to the amount of the preference applied by the state of the nonresident bidder.
The following is a list of the states which have been found by the Commonwealth of Pennsylvania to have applied a preference for in-state bidders and the amount of the preference:
Arizona 5% (construction materials from Arizona resident dealers only)
Montana 3%
West Virginia 2.5% (for the construction, repair, or improvement of any buildings)
Wyoming 5%
The Reciprocal Limitations Act also requires the System to give preference to those bidders offering supplies produced, manufactured, mined, or grown in Pennsylvania against those bidders offering supplies produced, manufactured, mined, or grown in any state that gives or requires a preference to supplies produced, manufactured, mined, or grown in that state. The amount of the preference shall be equal to the amount of
Solicitation No. CWU-L-2027/1 Page 5 of 8 the preference applied by the other state for that particular supply. The following is a list of states which have been found by the Commonwealth of Pennsylvania to have applied a preference for in-state supplies and the amount of the preference:
Alaska 7% (applies only to timber, lumber, and manufactured lumber products originating in the state)
Arizona 5% (construction materials produced or manufactured in the state only)
Hawaii 10%
Louisiana 10% (steel rolled in Louisiana)
7% (all other products)
Montana 5% (for residents offering in-state goods, supplies, equipment, and materials)
3% (for non-residents offering in-state goods, supplies, equipment, and materials)
New Mexico 5%
Oklahoma 5%
Washington 5% (fuels mined or produced in the state only)
Wyoming 5%
The Reciprocal Limitations Act also requires the System to not specify, use, or purchase supplies which are produced, manufactured, mined, grown, or performed in any state that prohibits the specification for, use of, or procurement of such supplies in or on its public buildings or other works when such supplies are not produced, manufactured, mined, or grown, or performed in that state. The following is a list of the states which have been found by the Commonwealth of Pennsylvania to have prohibited the use of certain out-of-state supplies:
Georgia forest products only
Indiana coal
New Jersey various products, to include but not limited to: chain link fence, portable sanitation units, glass, glazier supplies, carpet and cushion, shades, upholstery materials and supplies, room air conditioning, electrical supplies, plumbing supplies, hardware supplies, fasteners, lumber, building supplies, audio/visual equipment, fire extinguishers, fire hose, motor oils, fuel oil, Venetian blinds, and drapes
New Mexico construction
The above lists and amounts of preferences are those related to construction contracts only. The complete list of preferences for all contracts, supplies, and services is available from the Commonwealth of Pennsylvania Department of General Services.
18. Nondiscrimination The System is an equal opportunity employment agency with nondiscrimination/sexual harassment requirements, as contained in the General Conditions for the Construction Contract. It is the policy of the System to award and administer contracts for goods and services in a nondiscriminatory manner, to promote the affirmative participation of minority-owned and women-owned businesses in procurement activities and awards, and to integrate into procurement processes the necessary practices and procedures for the procurement of all goods and services for the System to effectively implement the policy.
19. Debarred Contractors Contractors currently under suspension or debarment by the Commonwealth, any other state, or the Federal
Solicitation No. CWU-L-2027/1 Page 6 of 8 government, are not eligible for award of any contract for this Project. By submitting a bid, a bidder is certifying that they are not currently under suspension or debarment by the Commonwealth, any other state, or the Federal government. Additionally, contractors shall not contract with or employ any subcontractors, suppliers, or individuals that are currently under suspension or debarment. A current list of suspended or debarred contractors is available by contacting the Department of General Services, Office of General Counsel, North Office Building Room 603, Harrisburg, Pennsylvania 17125.
20. Delinquent Payments By submitting a bid, a bidder is certifying that, to the best of their knowledge, they are not delinquent in the payment of taxes or other levies to the Pennsylvania Department of Revenue, the Pennsylvania Department of Labor & Industry, or any other Commonwealth Agency or entity.
21. Submission of Contractor Qualification and/or Financial Information Upon request, or if specifically required by the terms of this IFB, the apparent low bidder may be requested to submit a contractor's qualification and/or financial statement within ten (10) calendar days of the bid date, with financial information current within twelve (12) months prior to the bid date, of which statements shall be certified to be true and correct by an affidavit sworn to or affirmed before a notary public or other officer empowered to administer oaths or affirmations.
22. Financial Requirements To be deemed a responsible bidder, the bidder may be required to demonstrate, in relation to the bid price, adequate financial and other resources in order to be able to successfully prosecute the work. Additional information may be requested by the System whenever, in its judgment, such information is necessary to determine the responsibility of the bidder.
23. Contractor Performance Evaluation Systems The System may utilize a contractor performance evaluation system or tool established by the Department of General Services or by another Commonwealth agency, entity, or instrumentality to obtain past performance information on the bidder. Such information may be used in a determination of the bidder’s responsibility.
24. Commonwealth of Pennsylvania Contractor Responsibility Program (CRP) The System may utilize the Commonwealth of Pennsylvania CRP System, as provided for under the Governor's Office's Management Directive 215.9 Amended, Contractor Responsibility Program, dated October 25, 2010, to ensure that the System contracts only with responsible contractors.
25. References and Past Performance The System reserves the right to contact any and all references provided by the bidder, as well as any of the bidder’s past or current clients and/or customers, to glean information on the bidder’s past performance and experience. Such information may be used in a determination of the bidder’s responsibility.
26. Award of Contract The System may, solely at its own discretion, award a contract within sixty (60) days from the date of bid opening. A time extension may be made by written consent of the lowest responsive responsible bidder.
Award will be consummated by a Notice of Award letter mailed to the Contractor.
Solicitation No. CWU-L-2027/1 Page 7 of 8
The System contemplates award of a firm fixed price contract resulting from this IFB. The contract into which the parties are anticipated entering is the System's Standard Form of Contract for Construction, located elsewhere in this IFB.
The System will provide to the contractor the completed Contract for signature with the Notice of Award letter. The Contract will not become effective until executed by all necessary Commonwealth officials as provided by law.
27. Notice to Proceed (NTP) The System will endeavor to issue the NTP within 120 days of the bid opening. Any delays caused by the contractor's failure to provide any required documents within the specified time will cause an equivalent number of days to be added to this 120-day time frame.
28. Performance, Payment, and Maintenance Bonds Should Performance, Payment, and/or Maintenance Bonds be required, the System will provide to the Contractor with the Notice of Award letter the blank System Contract Bond form. The Contractor's surety company must be authorized to do business in the Commonwealth of Pennsylvania and must successfully demonstrate in writing prior to award that the amount of bond or reinsurance or other security has been obtained in conformance with the Pennsylvania Insurance Company law of 1921, 40 P.S. 832. If specifically required by the terms of this IFB, as indicated in the Special Instructions to Bidders, the Contractor’s surety company may be required to be rated at a specific level or better by A.M. Best and Company. Failure of the Bidder to execute the required Performance, Payment, and/or Maintenance Bonds within the time specified may result in payment to the System their bid security, in the amount of the difference between their bid and the next lowest responsive responsible bid, or the bid security amount, whichever is less. The System shall have the right to award the contract to the next lowest responsive responsible bidder.
29. PA E-Verify The Commonwealth of Pennsylvania enacted Act 127 of 2012, known as the Public Works Employment Verification Act (‘the Act’), which requires all public work contractors and subcontractors to utilize the Federal Government’s E-Verify system (EVP) to ensure that all employees performing work on public work projects are authorized to work in the United States. The Department of General Services’ (DGS) Public Works Employment Verification Compliance Program is responsible for the administration, education, and enforcement of the Act. Information on the Act and DGS' program are available on DGS' web site.
Contracts resulting from this solicitation will fall under the Act and the associated DGS compliance program.
Contractors will be required to sign and submit to the university, as a pre-condition of being awarded a contract, the Commonwealth of Pennsylvania Public Works Employment Verification Form (the Form). The Form is available on DGS' web site and/or through the university.
30. Investment Activities in Iran The Commonwealth of Pennsylvania enacted Act 149 of 2014, which prohibits entities which engage in certain investment activities in Iran from entering into a contract with the Commonwealth. Contractors may be required to sign and submit to the university, as a pre-condition of being awarded a contract, a certification stating that they are not on the Department of General Services' list of entities whom the Department determined are engaged in investment activities in Iran, as described in Act 149.
31. News Releases
Solicitation No. CWU-L-2027/1 Page 8 of 8
News releases and media contacts regarding this Contract and Project will be made by the System only, unless the System directs otherwise in specific instances. In such instances, the System shall receive prior review and approval of such releases. In any case, Contractors shall not use the name of the System or any University for promotional or marketing purposes without the System’s prior written approval.
32. Pennsylvania Right-to-Know Law Effective January 1, 2009, all responses to this procurement opportunity are subject to the Pennsylvania Right-to-Know Law, 65 P.S. §67.101 et seq., (Act 3 of 2008). The Right-to-Know Law permits any requestor to inspect and/or copy any record prepared and maintained or received in the course of the operation of a public office or agency that is not subject to the enumerated exceptions under the law. If a bidder’s/proposer’s response to the procurement opportunity contains a trade secret or confidential proprietary information, the bidder/proposer should include with their response a separate signed written statement to that effect. Should the response become the subject of a Pennsylvania Right-to-Know Law request, the bidder/proposer will be notified by the procurement office to identify all trade secrets or confidential and proprietary information that is included in your response. The agency will then determine whether the claimed trade secret or confidential and proprietary information is subject to disclosure.
33. Right to Protest A bidder or prospective bidder or prospective contractor who is aggrieved concerning the solicitation or award of a contract may protest, as provided for in the Commonwealth Procurement Code, 62 Pa C.S.
1711.1. Protests shall be made in writing by submitting the protest to the Office of the Chancellor, State System of Higher Education, 2986 North Second Street, Harrisburg PA 17110. A copy of the protest shall be mailed simultaneously to the Contracting Officer identified for the solicitation on the PennBid Bonfire bid event. All protests must be received within seven (7) calendar days after the protestant knew, or should have known of the facts giving rise to the protest. If a protest is submitted by a prospective bidder, the protest must be received prior to the bid opening date/time. If a protestant fails to file a protest or files an untimely protest, the protestant shall be deemed to have waived its right to protest the solicitation or award of the contract in any forum. Untimely filed protests will be disregarded. A protest must state all grounds upon which the protestant asserts the solicitation or award of the contract was improper. The protestant may submit with the protest any documents or information it deems relevant to the protest. Upon receipt and evaluation of the protest, the Office of the Chancellor will render a written decision, in accordance with the procedures outlined within the Commonwealth Procurement Code.
Solicitation for Work Order Contract for Construction 2018K112 Bid Form Solicitation # CWU-L-2027/1.1 Page 1 of 21
COMMONWEALTH UNIVERSITY
BID FORM
Note: The Bid Form pricing information is included with the Bidding Documents for Reference.
Bidders shall complete the attached manual bid form and electronic bid form within PennBid
(“Prepare Your Submission” tab), inclusive of all pricing items and required supporting documents as identified. The manual bid form pricing submission information shall take precedent.
BID FOR:
Contract(s): CWU-L-2027/1.1 – GENERAL CONSTRUCTION
CWU-L-2027/1.2 – HVAC CONSTRUCTION
CWU-L-2027/1.3 – PLUMBING CONSTRUCTION
CWU-L-2027/1.4 – ELECTRICAL CONSTRUCTION
CWU-L-2027/1.5 – PAINTING
CWU-L-2027/1.6 – ROOFING
CWU-L-2027/1.7 – CONCRETE
CWU-L-2027/1.8 – MASONRY
CWU-L-2027/1.9 – SITEWORK
CWU-L-2027/1.10 – ASPHALT AND CONCRETE PAVING
CWU-L-2027/1.11 – BOILER SPECIALTY
Title of Project Work Order Contracts for Construction, Renovation, and Repair
Location Commonwealth University – Lock Haven Campus / Lock Haven, PA
BID FROM:
Firm Name
Federal ID No.
Address
Telephone
Fax
Name of Contact for this Bid
The Proposer agrees to perform the work specified in the Contract Documents, under the terms and conditions specified in the Contract Documents, without exceptions or substitutions, and under any required additional certifications and conditions attached hereto, for the prices proposed on this Bid Form.
The Proposer additionally certifies that requirements in the Instructions to Bidders are met.
Solicitation # CWU-L-2027/1.1 Page 2 of 21
The Proposer acknowledges the Addenda hereinafter enumerated, which have been issued during the period of bidding, and agrees that contents of said Addenda shall become incorporated into the Contract.
Addenda No. Date Issued
The estimated quantities listed on this Bid Form are estimated and approximate, and are presented solely for the purpose of determining the Total Base Bid. The System may increase or decrease the quantities to be performed without any adjustment in the unit prices quoted on this Bid Form.
If accepted by the System, the unit prices quoted on this Bid Form will become the Contractual unit prices, and they shall be the only payment that the Contractor will receive for completed Work. Unless otherwise called for, all unit prices must be fully encumbered to include all labor burdens, and must include overhead and profit.
In order to receive payment for bid items consisting of a percent markup, instead of a unit price, the Contractor may be required to provide supporting documentation of the actual cost of materials, equipment, and/or subcontractors.
Any classification (labor, materials, and/or equipment) not included in the listed unit prices on the Bid Form, but required under an individual work order, shall be negotiated with the System. The Contractor may be required to submit supporting documentation.
Subcontracted work is subject to prior approval by the System.
The unit prices and extended unit prices as called for should be submitted in the spaces provided below.
An omission of prices for any unit-price item called for will be sufficient cause for rejection of the bid as being incomplete and non-responsive.
Specification Section 012200, Unit Prices, provides detailed descriptions of bid items.
Abbreviations:
CY = Cubic Yard EA = Each LF = Linear Foot SF = Square Foot SY = Square Yard
Solicitation # CWU-L-2027/1.1 Page 3 of 21
UNIT PRICE MATRIX – GENERAL CONSTRUCTION, CWU-L-2027/1.1
1. LABOR – NON-PREVAILING WAGE
Item
Labor Classification Bid Qty.
Hours
Non-PW Rate
Unit Price
Extended Price
1a. Bricklayer, Stone Masons, Pointers, Caulkers, Cleaners -straight time
40.0
1b. Carpenters – Piledriver/Welder – straight time 40.0
1c. Carpenter, Drywall Hanger, Framers, Instrument Men, Lathers, Soft Floor Layers – straight time
40.0
1d. Cement Finishers & Plasterers – straight time 40.0
1e. Cement Masons – straight time 40.0
1f. General Labor – straight time 40.0
1g. Equipment Operator – straight time 40.0
1h. Working Foreman – straight time 40.0
1i. Superintendent – straight time 40.0
1j. Truck Driver – straight time 40.0
1K. SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1j) LS $________
2. LABOR – PREVAILING WAGE
Hours
PW Rate Unit Price
Extended Price
2a. Bricklayer, Stone Masons, Pointers, Caulkers, Cleaners -straight time
40.0
2b. Carpenters – Piledriver/Welder – straight time 40.0
2c. Carpenter, Drywall Hanger, Framers, Instrument Men, Lathers, Soft Floor Layers – straight time
40.0
2d. Cement Finishers & Plasterers – straight time 40.0
2e. Cement Masons – straight time 40.0
2f. General Labor – straight time 40.0
2g. Equipment Operator – straight time 40.0
2h. Working Foreman – straight time 40.0
2i. Superintendent – straight time 40.0
2j. Truck Driver – straight time 40.0
2K. SUBTOTAL – PREVAILING WAGE RATES (2a thru 2j) LS $________
3. MATERIAL – 10% MARKUP
Solicitation # CWU-L-2027/1.1 Page 4 of 21
4. EQUIPMENT
Equipment Type Bid Quantity
Days Per Diem
Rate Extended
Price 4a. Backhoe 1.0
4b. Compact Excavator or Skid Loader 1.0
4c. Pettibone (Up to 9,000 lb. capacity with a 44' 6" lift height) 1.0
4d. Boom Lift (30 ft.) 1.0
4e. Boom Lift (60 ft.) 1.0
4f. Scissor Lift (19 ft.) 1.0
4g. Scissor Lift (32 ft.) 1.0
4h. Dump Truck – 10 Ton 1.0
4i. Dump Truck – Tri-Axle 1.0
4J. SUBTOTAL – EQUIPMENT RATES (4a thru 4i) LS $________
CWU-L-2027/1.1 - BASE BID TOTAL
(Combined totals of 1K, 2K and 4J) $________________
CWU-L-2027/1.1 - GC
BASE BID: ___________________________________________________Dollars
Written
Solicitation # CWU-L-2027/1.1 Page 5 of 21
UNIT PRICE MATRIX – HVAC, CWU-L-2027/1.2
1. LABOR NON-PREVAILING WAGE
Hours
Non-PW Rate
Unit Price
Item Price
1a. HVAC Technician – straight time 40.0
1b. Sheet Metal Worker – straight time 40.0
1c. Working Foreman – straight time 40.0
1d. Equipment Operator – straight time 40.0
1E. SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1d) LS $________
2. LABOR PREVAILING WAGE
Hours
PW Rate
2a. HVAC Technician – straight time 40.0
2b. Sheet Metal Worker – straight time 40.0
2c. Working Foreman – straight time 40.0
2d. Equipment Operator – straight time 40.0
2E. SUBTOTAL – PREVAILING WAGE RATES (2a thru 2d) LS $________
Days Per Diem
4a. Pettibone (Up to 9,000 lb. capacity with a 44' 6" lift height) 1.0
4b. Boom Lift (30 ft.) 1.0
4c. Boom Lift (60 ft.) 1.0
4d. Scissor Lift (19 ft.) 1.0
4e. Scissor Lift (32 ft.) 1.0
4F. SUBTOTAL – EQUIPMENT RATES (4a thru 4e) LS $________
CWU-L-2027/1.2 - BASE BID TOTAL
(Combined totals of 1E, 2E and 4F) $________________
CWU-L-2027/1.2 - HVAC
Solicitation # CWU-L-2027/1.1 Page 6 of 21
UNIT PRICE MATRIX – PLUMBING, CWU-L-2027/1.3
Hours
Non-PW
1a. Plumber/Pipefitter – straight time 40.0
1b. Working Foreman – straight time 40.0
1c. Equipment Operator – straight time 40.0
1D. SUBTOTAL – NON PREVAILING WAGE RATES (1a thru 1c) LS $________
Hours
2a. Plumber/Pipefitter – straight time 40.0
2b. Working Foreman – straight time 40.0
2c. Equipment Operator – straight time 40.0
2D. SUBTOTAL – PREVAILING WAGE RATES (2a thru 2c) LS $________
Days
4b. Boom Lift (30 ft.) 1.0
4c. Boom Lift (60 ft.) 1.0
4d. Scissor Lift (19 ft.) 1.0
4e.