This is a Division 1 General Requirements specification document for an indefinite quantity, multiple-award work order contract issued by Commonwealth University of the Pennsylvania State System of Higher Education, Lock Haven Campus. The contract (CWU-L-2027/1) establishes open-ended contracts for construction, renovation, and repair services across eleven trade categories: General Construction, HVAC, Plumbing, Electrical, Painting, Roofing, Concrete, Masonry, Sitework, Asphalt and Concrete Paving, and Boiler Specialty. Work consists of miscellaneous maintenance, repairs, renovations, and emergency services to campus buildings and structures, with individual work orders expected to be under $100,000. Bidders must be located within a 1.5-hour drive or 75-mile radius of Lock Haven University to be eligible. A mandatory pre-bid conference with site visit is scheduled for November 19, 2026, at 11:00 AM at East Campus Science Center, Room 215. Electronic bids are due by 1:00 PM EDT on December 15, 2026, through PennBid. The bid package is available at no cost via https://pennbid.bonfirehub.com/.

Pricing is established through unit price schedules that include labor rates (prevailing and non-prevailing wage), materials at cost plus 10 percent markup, and equipment charges on a daily basis. Projects above $25,000 are subject to Pennsylvania prevailing wage requirements; maintenance projects below that threshold are not. Individual work orders will be issued on either a not-to-exceed time and material basis or lump sum basis. Material invoices exceeding $500 must be submitted with payment applications. Equipment charges include fuel, oil, transportation, and maintenance, but hand-held tools and company vehicles are considered overhead. The contract requires contractors to maintain a superintendent and project manager on site, carry $500,000 annual bonding capacity, have five years of business experience, and have successfully completed at least five similar projects. No liquidated damages apply. The contract is subject to Pennsylvania Act 127 (Public Works Employment Verification Act) on a per-work-order basis and may or may not require prevailing wage certification depending on individual project scope.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CWU-L-2027/1 Work Order Contracts for Construction, Renovation, and Repair 011000 - 1

SECTION 011000 – SUMMARY OF WORK

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specifications Sections, apply to this Section.

1.2 SUMMARY

A. Scope of Work shall include furnishing all necessary labor, materials, tools, and equipment to perform work such as miscellaneous construction, renovation, repair, and maintenance of campus buildings and structures to the satisfaction of and subject to approval by the University.

1. General Construction (Contract # CWU-L-2027/1.1 - GC)

General Construction work includes but is not necessarily limited to; miscellaneous general carpentry, drywall, masonry, and concrete repairs including new and/or renovations and repairs to building interiors or exteriors as well as limited site work. Includes lawn repair and site clean-up, as required. Located within 1 and half hour drive / 75 miles of the University.

2. HVAC (Contract # CWU-L-2027/1.2 - HVAC)

HVAC work includes but is not necessarily limited to: General HVAC Work, heating systems, air handling systems, heat pumps, chillers, sheet metal, and associated systems.

Also includes repairs and replacement to natural gas pipe distribution systems and site restorations such as lawn repair and site cleanup, as required. Emergency repairs require a 24-hour response time. Contractor must be located within 1 and half hour drive / 75 miles of the University.

3. Plumbing (Contract # CWU-L-2027/1.3 - PLMB)

Plumbing work includes but is not necessarily limited to: general plumbing, pumps, boilers, water heaters, drains, fixtures, associated systems, removal of debris and cleanup.

Contractor must be located within 1 and half hour drive / 75 miles of the University.

4. Electrical (Contract # CWU-L-2027/1.4 - ELEC)

Electrical work includes but is not necessarily limited to; medium and low voltage general electrical repairs or replacements such as main yard switchgear and building switchgear, distribution panels, transformers, interior and/or exterior lighting, equipment connections, conduit, power, and wiring and electrical testing. Contractor must be located within 1 and half hour drive / 75 miles of the University and have an Emergency response time of 2 hour.

5. Painting (Contract # CWU-L-2027/1.5 - PAINT)

Painting work includes but is not necessarily limited to; patching, preparation, wallpaper removal, finished painting of interior and exterior items, and clean-up as required.

Located within 1 and half hour drive / 75 miles of the University.

6. Roofing (Contract # CWU-L-2027/1.6 - ROOF)

Roofing work includes but is not necessarily limited to; miscellaneous roof repairs and/or replacement including EPDM, shingles, and slate, roof drains, and other roofing components. Contractor must be located within 1 and half hour drive / 75 miles of the University.

CWU-L-2027/1 Work Order Contracts for Construction, Renovation, and Repair 011000 - 2

7. Concrete (Contract # CWU-L-2027/1.7 - CONC)

Concrete work includes but is not necessarily limited to; sidewalks, curbs, stairs, flat slab work, ramps, steps, railings, retaining wall construction, excavation, lawn repair, removal of debris and cleanup. Located within 1 and half hour drive / 75 miles of the University.

8. Masonry (Contract # CWU-L-2027/1.8 – Masonry)

Masonry work includes but is not necessarily limited to; building foundation, building envelope, stairs, flat slab work, ramps, steps, retaining wall construction, excavation, lawn repair, removal of debris and cleanup. Located within 1 and half hour drive / 75 miles of the University.

9. Sitework (Contract # CWU-L-2027/1.9 - SITEWORK)

Preparing sub-grades for slabs-on-grade, walks and lawns/grasses. Excavating and backfilling for structures. Drainage course for slabs-on-grade. Sub-base course for concrete walks. Separation and Drainage Geotextiles. Excavating, backfilling and repair for Water, Sanitary Sewer, Storm Sewer, gas and Steam utilities. Located within 1 and half hour drive / 75 miles of the University.

10. Asphalt and Concrete Paving (Contract # CWU-L-2027/1.10 - ASPHALT)

Paving work includes but is not necessarily limited to; sidewalks, walkways, curbs, ramps, parking lots, roadways, excavation, line painting, sealing, removal of debris and cleanup Located within 1 and half hour drive / 75 miles of the University.

11. Boiler Specialty (Contract # CWU-L-2027/1.11 - BOILER)

Boiler Specialty work includes but is not necessarily limited to: inspections, repairs and replacements of boilers and boiler components and removal of debris and cleanup.

Replacement projects will include having the Contractor complete the necessary PA Labor & Industry boiler intent to install form. Located within 1 and half hour drive / 75 miles of the University.

Permits & Inspections

1. The University or design professional will obtain any necessary permits required for a project.

2. The Contractor is responsible to coordinate and schedule required inspections. Upon completion of inspection, testing, sample-taking and similar services, the Contractor shall be responsible to repair damaged construction and restore substrates and finished to eliminate deficiencies, including deficiencies in visual qualities of exposed finishes.

1.3 DESCRIPTION OF SEPARATE BASE BIDS

A. General Construction: Base Bid #1 will consist of all General Construction Work as shown in the

Contract Documents, including but not limited to the items described in Summary of Work in this section and as outlined in Section 0122000 – Unit Prices.

B. HVAC: Base Bid #1 will consist of all HVAC Work as shown in the Contract Documents, including but not limited to the items described in Summary of Work in this section and as outlined in Section 012200 – Unit Prices.

C. Plumbing: Base Bid #1 will consist of all Plumbing Work as shown in the Contract Documents, CWU-L-2027/1 Work Order Contracts for Construction, Renovation, and Repair 011000 - 3 including but not limited to the items described in Summary of Work in this section and as outlined in Section 012200 – Unit Prices.

D. Electrical: Base Bid #1 will consist of all Electrical Work as shown in the Contract Documents, in Section 012200 – Unit Prices

E. Painting: Base Bid #1 will consist of all Painting Work as shown in the Contract Documents, in Section 012200 – Unit Prices.

F. Roofing: Base Bid #1 will consist of all Roof Work as shown in the Contract Documents, including but not limited to the items described in Summary of Work in this section and as outlined in Section 012200 – Unit Prices.

G. Concrete: Base Bid #1 will consist of all Concrete Work as shown in the Contract Documents, H. Masonry: Base Bid #1 will consist of all Masonry Work as shown in the Contract Documents, in Section 012200 – Unit Prices

I. Sitework: Base Bid #1 will consist of all Excavation Work as shown in the Contract Documents, J. Asphalt and Concrete Paving: Base Bid #1 will consist of all Asphalt and Concrete Paving Work as shown in the Contract Documents, including but not limited to the items described in Summary of Work in this section and as outlined in Section 012200 – Unit Prices

K. Boiler Specialty: Base Bid #1 will consist of all Boiler Work as shown in the Contract Documents,

1.4 INDIVIDUAL WORK ORDER PROCEDURE

A. Individual work order (IWO) will be issued for specific projects. The Contractor shall, within five

(5) working days of receipt, return to the University the IWO executed by the Contractor. The effective date of this IWO is the date of the Contracting Officer’s signature. The fully executed work order will constitute the Notice to Proceed.

B. The Contractor will provide a Not-to-Exceed Time and Material or Lump Sum price based on the contractual unit price matrix.

C. The IWO will identify the scope of work and include any sketches relating to the project. Submittal requirements will be identified in the work order. Specifications sections and/or clarifications, or Drawings may also be issued to the Contractor for preparing the project cost. The University will also indicate if a specific project is prevailing wage.

D. Final project costs will be based on actual time and materials up to the not-to-exceed amount for

NTE Work Orders. The Contractor and the University shall be in agreement as to the actual quantities of the work before any final payments will be made. Invoice and backup documentation requirements are outlined in Section 012900 - Payment Applications and Section 012200 - Unit Prices.

E. The scope of work outlined in each IWO shall be completed by a reasonable completion date as

CWU-L-2027/1 Work Order Contracts for Construction, Renovation, and Repair 011000 - 4 set forth in the IWO. This date will be set by the University when requesting prices for a particular IWO. Superintendent and Project Management time will only be utilized on larger projects and will be requested on an individual project basis.

F. Selection of Contractor for IWO’s; the University may directly solicit a proposal from one

Contractor, or request proposals from multiple Contractors under the same trade. The IWO would be issued to the lowest proposal.

1.5 PREVAILING WAGE

A. The IWO will determine if a specific project is subject to the Pennsylvania Prevailing Wage Act, 43 P.S. § 165-1 et seq, as amended. The IWO will identify the Prevailing Wage Determination serial number.

1.6 LIQUIDATED DAMAGES

A. No Liquidated damages (LDs).

1.7 ACT 127, PA eVERIFY

A. This Contract is subject to Pennsylvania Act 127 of 2012, known as the Public Works Employment

Verification Act. IWOs may or may not be subject to Act 127.

1.8 WORK SCHEDULE AND COORDINATION

A. Work Hours

1. General: The Contractor is responsible for providing sufficient staff to perform the work and complete the Project in the time allotted. Working hours indicated below are not intended to restrict the Contractor's ability to perform the Work and may be expanded as permitted.

2. Working hours will be according to a schedule agreed upon by the Contractor, Construction Manager (if applicable), and the University. Contractors are permitted to schedule work between 7:00 AM and 4:30 PM, 5 days a week. Work during different hours or work on State and National Holidays, must be approved by the University.

3. Working hours may be expanded in isolated and/or emergency instances when a particular operation must be performed in a continuous sequence that extends the working day beyond the approved working hours. Coordinate with the University in these instances.

4. The University's failure to approve expanded working hours or work on holidays will not be cause for a claim against the University.

B. Schedule

1. Contractor shall schedule all work with the University so that it will cause minimal disruption to the students at periods and times determined by the University and at no additional cost to the University. Examples of disruptions include, but are not limited to, work creating excessive noise, dust, and/or odors.

2. Work shall be scheduled and sequenced to minimize areas that cannot be used by the

University. All areas to be closed to University use must be approved by the University prior to closing.

3. Locations of work will vary as to the amount of work at each replacement or new installation site. Roads or access to buildings shall not be closed to traffic unless approval is given by the University at least three (3) days prior to the closing.

CWU-L-2027/1 Work Order Contracts for Construction, Renovation, and Repair 011000 - 5

1.9 HAZARDOUS MATERIALS

A. There is a possibility that hazardous materials not identified in contract documents may be discovered on a project. Should hazardous or suspicious materials be encountered, the Contractor shall immediately stop work in that area and notify the University. The University will investigate the suspicious material and if it is found to be hazardous the University is responsible to have it removed.

B. Mercury: All fluorescent and high-intensity discharge lamps containing mercury and which are intended for disposal shall be removed from campus and properly recycled or disposed of by the Contractor, in accordance with statutory and/or regulatory requirements.

C. PCBs: Ballasts found to contain PCBs and which are intended for disposal shall be removed from campus and properly recycled or disposed of by the Contractor, in accordance with statutory and/or regulatory requirements.

D. Lead: No information is available for lead containing material.

1.10 CONTRACTOR USE OF PREMISES

A. General: Contractors shall have full use of premises for construction operations, including use of Project site, during construction period. Contractors use of premises is limited by the University's right to perform work or to retain other Contractors on portions of the Project and as indicated on the Drawings by the Contract limits.

1. Keep driveways and entrances servicing the campus and adjacent buildings clear and available to the University and emergency vehicles at all times. Such areas shall not be used for parking or storage of materials. Deliveries shall be scheduled to minimize space and time requirements for storage of materials and equipment.

2. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. The Contractor shall not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the University and/or the authorities having jurisdiction.

3. Damage: Regardless of the proximate cause, in the event of any damage occurring to

University or private property by any Contractor activity during the life of the contract, the Contractor shall promptly advise the Project Manager, and participate in a joint assessment of the damage with University personnel. It is essential that the Contractor take all actions necessary to avoid delayed claims by third parties.

4. Workmanship and Conduct: All work shall be done in a workmanlike manner by skilled technicians using the commonly accepted best practices of the trade. The Contractor shall remain responsible for inspection and correction of any poor workmanship or work not in compliance with the Contract. Work shall be scheduled to minimize interference with the normal operation of the University. The Contractor is responsible for behavior of employees and will immediately remove from the site any employee engaging in racial or sexual harassment, whether by word or deed.

5. Smoking and other use of tobacco products are prohibited in University buildings, including buildings under construction. Contractors and their employees working on University property are prohibited from smoking in University buildings.

6. Alcoholic beverages and controlled substances shall not be carried, consumed, or stored on University property.

7. Open fires or burning are not permitted on University property.

CWU-L-2027/1 Work Order Contracts for Construction, Renovation, and Repair 011000 - 6

8. Burning or burying of waste materials on site is prohibited. The Contractor shall remove any such material from the project site and recycle or dispose of it in a legal manner.

9. Clean Up: At the end of each day, the Contractor shall clean the immediate environment of scraps, packaging containers, and other trash and have same removed from campus.

This includes waste and packaging that has blown outside of the construction area.

10. Hoists, Ladders and Scaffolding: The Contractor is referred to and agrees to comply with the terms, regulations, and conditions contained in the latest edition of the Department of Labor and Industry Regulations for Construction and Repairs. The Contractor shall erect, maintain, and operate at his/her own expense scaffolding and hoisting facilities and equipment for his/her own use. The operator of all equipment shall be properly licensed for equipment in use and shall be fully experienced in the safe operation of the equipment in use. The Contractor shall supply and assemble, erect, maintain and operate at his/her own expense, scaffolding and hoisting facilities and equipment for his/her own use. The Contractor shall supply and assemble, erect and move into proper location, all derricks, hoists, lifting apparatus and similar equipment necessary for the execution and installation of his work at his/her own expense and cost.

B. Use of Site: Limit use of premises to work areas and areas within the Contract Limits indicated.

Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Confine operations at the site to areas permitted by law, ordinances, permits and Contract

Documents.

2. The Contractor shall comply with all University personnel identification and vehicle registration requirements for Work on the campus.

3. Parking: All vehicles on campus are required to display a University Parking Permit.

Parking permits will be issued by the Facilities Management Office.

a. Contractor employees shall park privately-owned vehicles in an area designated by the University. Contractor employee parking shall not interfere with existing and established parking requirements of the University. If employee parking is on a grassed area, the General Contractor shall be responsible for restoration and re-grassing of the area at the end of the Project.

4. Staging/Storage: The Contractor will be permitted to use the areas designated by the

University. Coordinate with the University for size/access for staging, parking/vehicular traffic and dumpster location(s). Contractors shall provide protection of the parking lot and/or staging areas as appropriate and as directed by the University.

a. Move any stored products that interfere with operations of the University or other

Contractors.

b. Assume full responsibility for protection and safekeeping of products stored on premises.

5. Do not unreasonably encumber the site with materials and equipment.

6. Building: Do not load structure with weight that will endanger structure including lifts, hoists, etc.

7. The Contractor shall make suitable prior arrangements with the University for delivery of large equipment or materials in large vehicles to the project site. The intent is to avoid such deliveries at time of peak commuter traffic to the University. The University will determine if other University entities, such as University Police, need to be involved.

CWU-L-2027/1 Work Order Contracts for Construction, Renovation, and Repair 011000 - 7

C. Existing Building(s): The Contractor will take all necessary precautions to maintain a weather tight envelope during sequence of operations on alteration work of the existing building.

1. Elevators: Use of existing elevator(s) maybe permitted.

2. Sanitary Facilities: Use of existing sanitary facilities will usually be permitted.

3. The University shall have first right of refusal on all removed equipment. Existing pieces of equipment and materials that are to remain the property of the University will be tagged by the University prior to the start of work. Such items shall be moved and/or stored by the Contractor where directed by the university. Equipment shall be stored as complete units with all associated accessories and auxiliary equipment. Equipment shall be disconnected and carefully removed and shall be transported to the storage areas as directed.

Equipment shall be stored in a neat and workmanlike manner, tagged and identified for future use.

D. Protection:

1. Contractor shall provide protection for all existing landscaping, earthwork, grass, signs, roads, walkways, pavements, buildings, system property, automobiles, etc. Contractor shall provide means to protect items from damage, and shall repair same at no additional cost to the University if damage is done.

2. Contractor shall return premises to a like-original condition to match adjacent areas, which were not affected by the Work subject to approval, by the University. Any restoration of the site shall include replacement of landscaping with ‘like’ plants of same species, size and shape; grass remediation shall be by sod method rather than seeding. All work shall be approved by the University.

3. If the University cannot determine which Prime Contractors are responsible for the damage, the cost for the repairs will be divided equally between all Prime Contractors exclusive of the University bearing any costs.

1.11 EXISTING UTILITY SERVICES

A. The location of existing utilities and equipment is shown on Drawings in an approximate way only and has not been independently verified by the University. Contractors shall determine the location of all utilities and equipment, including those overhead and underground, before commencing work and take all necessary precautions to prevent injury or damage during the performance of the work. The Contractor agrees to be fully responsible for any and all damages that might be occasioned by the Contractor’s failure to exactly locate and preserve any and all items at no cost to the System.

B. Any Contractor performing excavation or demolition work shall fully comply with the requirements of P.L. 852, Act. 287, approved December 10, 1974, relative to protection of underground utilities, which shall include, but not be limited to, the following actions:

1. Ascertain the approximate location and type of utility lines at the site by inspecting drawings or by obtaining a list of utility companies’ lines on the site from the county Recorder of Deeds and then contacting the utility companies.

2. A minimum of five (5) working days before excavation or demolition, request from the utility companies the steps contractors should take to avoid any damage.

3. Report to the utility company and the University any damage to a utility line made or discovered in the course of the work.

CWU-L-2027/1 Work Order Contracts for Construction, Renovation, and Repair 011000 - 8

4. Alert the University Project Manager as to any emergency created or discovered in the course of the work.

5. Provisions above do not apply in an emergency. An emergency is any condition constituting a clear and present danger to life or property by escaping gas, exposed wires, or other utility line breaks or defects.

C. The Contractor shall locate, identify, shut-off, and disconnect utility services that are indicated for removal or replacement. The Contractor shall also locate and identify utility services that are not indicated for removal or replacement. If the utility services that are not indicated for removal or replacement must be shut down during construction, the Contractor shall provide bypass connections, as necessary, to maintain continuity of service to occupied areas of buildings and the campus. All switching, securing, and disconnection of University utility services shall be in the presence of a knowledgeable University technician or utility representative.

D. During excavation around underground utilities, when the Contractor reaches a point approximately three feet from the estimated location of any underground utility, machine excavation shall be stopped and hand excavation shall be used to uncover the utility line. In the case of utilities as shallow as 12 inches below the surface, hand digging shall begin at the surface or immediately below any pavements. The Contractor is liable for the repair of any utility lines cut, broken or otherwise damaged at no additional cost to the University.

E. If a utility line is broken or damaged, or if service is interrupted in any way, the Contractor must immediately notify the University (or the Campus Police outside of normal working hours) and the appropriate utility company. The Contractor shall take immediate action to restore the utility to full service.

F. For any planned utility service interruptions, the Contractor shall furnish a request to the University for approval at least 72 hours in advance, or as specified by the University. The request shall identify the affected buildings and duration of planned outage. The University will coordinate with affected occupants, as applicable. If the discontinued service is due to any emergency breakdown, the Contractor shall notify the University as soon as possible and the University will notify those affected occupants as applicable.

1.12 OCCUPANCY REQUIREMENTS

A. General: Take all precautions necessary to protect the building and its occupants during the construction period. Repair damage caused by construction operations.

B. Occupied Areas:

1. Activities and normal office hours will be maintained by the University. Difficulties of working in an existing operational building are recognized; however, the Contractor must cooperate to keep noise, dirt and other interferences to a minimum. Housekeeping will be such to assure no disruption of the University’s operations. All Contractors will schedule their work well in advance and give notice to the University Project Manager of any disruption, who will provide notification to the building occupants.

2. Cleanliness: The building(s) must be maintained watertight and dust free at all times, especially the occupied areas. The Contractors will arrange to this end and will be responsible for any damage resulting from noncompliance with this requirement.

1.13 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the

Contract Documents, Contractor shall prepare and submit an RFI.

1. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

CWU-L-2027/1 Work Order Contracts for Construction, Renovation, and Repair 011000 - 9

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project Name and Number

2. Date

3. Name of Contractor

4. Name of Professional

5. RFI number, numbered sequentially

6. RFI subject

7. Specification Section number and title and related paragraphs, as appropriate.

8. Drawing number and detail references, as appropriate.

9. Field dimensions and conditions, as appropriate.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings and other information necessary to fully describe items needing interpretation.

Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. University and/or Professional’s Action: RFI’s will be reviewed, determine the action required, and respond. Allow five (5) working days for the University’s response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.

1.14 INDUSTRY STANDARDS

A. Applicability of Standards: Except where the contract documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the contract documents. Such standards are made a part of the contract documents by reference.

B. Publication Dates: Where the date of issue of a referenced standard is not specified, comply with the standard in effect as of date of contract documents.

C. Conflicting Requirements

1. Where compliance with two or more standards is specified, and the standards establish different or conflicting requirements for minimum quantities or quality levels, refer requirements that are different, but apparently equal, and uncertainties to the professional for a decision before proceeding.

2. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified or it may exceed the minimum within reasonable limits. In complying with these requirements, indicated numeric values are minimum or maximum, as appropriate for the context of the requirements. Refer uncertainties to the Professional for a decision before proceeding.

D. Copies of Standards: Each entity engaged in construction on the project is required to be familiar with industry standards applicable to that entity's construction activity. Copies of applicable standards are not bound with the contract documents.

CWU-L-2027/1 Work Order Contracts for Construction, Renovation, and Repair 011000 - 10

1. Where copies of standards are needed for performance of a required construction activity, the Contractor shall obtain copies directly from the publication source.

2. Although copies of standards needed for enforcement of requirements may be included as part of required submittals, the professional reserves the right to require the Contractor to submit additional copies as necessary for enforcement of requirements.

E. Abbreviations and Trade Names: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities indicated in Gale's "Encyclopedia of Associations" or in Columbia Books' "National Trade & Professional Associations of the United States."

1.15 PHOTOGRAPHS

A. This item is required only when specifically indicated in the Project’s Individual Work Order.

B. Before the start of construction work and in the presence of a University representative, the

Contractor shall take color photographs and/or a video tape recording of the work site and surrounding area to establish the existing condition. Supply a CD to the University.

1.16 RECORD DRAWINGS

A. This item is required only when specifically indicated in the Project’s Individual Work Order.

B. Contractor shall maintain a clean, undamaged set of prints of Project drawings and shop drawings. Mark the set to show the actual installation where the installation varies from the work as originally shown. Upon completion of the work, submit record drawings to the University with pay application.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 011000

SPECIAL PROVISIONS

01 11 01-11

SECTION 01 11 01

PART 1 - CONTRACTOR QUALIFICATIONS

1.1 Experience and Certifications

A. Prime Contractors shall have the following minimum experience requirements:

1. 5 years in business

2. Shall have successfully completed at least 5 projects that involve work of similar scope and scale as this Project.

3. All Bidders must be located in a 1 and half hour drive / 75 miles within the University to be able to be eligible to bid.

4. All selected bidders will be required to provide a certified letter from your bonding company that your firm has the capability of being bonded for $500,000.00 per year.

1.2 Contractor Qualification Statement

A. Selected Bidders are shall furnish American Institute of Architects Document A305 "Contractor’s

Qualification Statement", when requested after bid opening.

B. Selected Bidders, as an attachment to the Statement, provide the Staffing and Organization

Chart, including a list of the contractor's principal staff assignments, including the superintendent and other personnel in attendance at the site. Identify individuals, and their duties and responsibilities after bid opening.

PART 2 - STAFFING REQUIREMENTS

2.1 Superintendence

A. Superintendence at all times during the performance of the work at the project site, and until the work is completed and accepted, the contractor shall have on site a duly authorized and competent superintendent who shall directly supervise the work. Direct supervision shall be required any time the contractor or any subcontractors are carrying out work on the site.

Communications given by the University at the project site to the superintendent shall be as binding as if given to the contractor.

B. On project requiring multiple work crews and/or if the contractor has more than one separate prime contract, the contractor shall provide a separate superintendent for each separate prime contract and work crew.

C. The contractor shall not change the assigned superintendent without the approval of the System.

D. The Lead Prime Contractor and each Separate Prime Contractor are required to provide Superintendence in compliance with the requirements for this Contract. In addition, the Lead Prime Contractor is required to provide Superintendence when any Separate Prime Contractor is performing work on site during the working hours established in Section 01 1000 “Summary”.

The Lead Prime Contractor shall identify and provide an emergency contact phone number for personnel to be available at all times to respond to issues that arise on site outside of normal working hours.

2.2 Management

A. Management for the duration of the contract and until all contract requirements are completed and final payment is made, the contractor shall have a duly authorized and qualified project manager for the contract. The project manager shall be the primary point of contact between the contractor and the system, and between the contractor and the University. The project manager shall have the full authority to make decisions and approve contract changes for the contractor.

B. If the contractor has more than one separate prime contract, the contractor shall provide a separate project manager for each separate prime contract.

C. The contractor shall not change the assigned project manager without the approval of the system.

01 11 01-12

2.3 Resumes

A. The System will require the submission of resumes or statement of qualifications for the proposed Project Manager(s) and the Superintendent(s).

B. Resumes must be submitted no later than ten (10) days after the Notice of Award.

C. All are subject to the review and approval of the University.

2.4 Minimum Self-Performed Work

A. Each Prime Contractor shall adhere to minimum staffing levels for the Contractor’s Work Force

Staff for each crew, which shall be employees of the Contractor. These persons shall be part of the working crew that will be responsible for self-performing General Conditions work, such as daily cleaning, emergency and damage response, normal and unforeseen requirements and other general condition requirements. Also, each Prime Contractor shall have accident and safety personnel on site and shall provide traffic control personnel during all deliveries.

B. Additional employees shall be provided as necessary to complete all required work.

END OF SECTION 011101

CWU-L-2027/1 Work Order Contracts for Construction, Renovation, and

012200 - 1

SECTION 012200 – UNIT PRICES

A. Drawings and General Provisions of the Contract, including Special Requirements, General Conditions and other Division 1 Specifications Sections apply to this Section.

1.2 SUMMARY

A. This section includes administrative and procedural requirements for unit price bid items.

B. Unit Prices/General: An amount proposed by bidders, as stated on the Bid form, as a price per unit of measurement for material, equipment, labor and/or services used to calculate the Project’s Individual Work Order. Mileage is not reimbursable.

1. The purpose of unit prices is to establish prices for work for which the specific quantity is not known at the time of bid.

2. A Unit Price may be for work fully-anticipated to be part of the contract, but for which the actual quantity is not known at the time of bid. This type of unit price has an estimated quantity of one (1) or more. The Extended Price will be included as part of bid evaluation, and the Unit Price will be part of the contract price at time of contract award.

C. For Unit Prices identified in paragraph 1.2.B above, the following apply.

1. If on the bid form submitted by the Contractor there is a discrepancy in correlation between a Unit Price and an Extended Price, the unit price shall govern.

2. The Contractor will be paid for Unit Price work on the basis of actual measured quantities of work satisfactorily performed. Quantities of work different than the estimated quantity shall be ordered in writing by the University.

D. The University reserves the right to reject the contractor's measurement of work associated with

Unit Priced work, and may have the work measured by an independent agent acceptable to the Contractor at the University's expense.

1.3 PROCEDURES

A. Projects may be done either on a Not to Exceed Time & Material basis, or a Lump Sum Price, and will be determined by the nature of the work and after discussion between the University and the Contractor.

A. Labor Unit Price Rates:

1. Hourly labor rates shall be based upon either non-prevailing or prevailing wage rates according to the nature and estimated cost of the work. Rates shall include payroll, overhead, profit, and insurance.

2. The University anticipates that most of the work under the Contract will be repair/maintenance in nature with some renovation and new construction. Maintenance projects above $25,000, as defined by PA Department Labor & Industry are not subject to prevailing wage rate.

012200 - 2

3. If a renovation and/or new construction project cost is $25,000 or higher, the prevailing wage rate will be used.

4. Should the Contractor be asked to perform work for which there is not a contracted Unit Price rate (labor or equipment), the University shall pay the Contractor their cost plus 10% markup.

However, if a Unit Price is listed in the Contract, the Contractor shall only be paid at the Contract rate with no markup.

B. Subcontracted work is subject to prior approval by the University. Should the Contractor be asked to perform work, for which there is not a unit rate and a subcontractor is used, the University shall reimburse the Contractor the cost of the subcontracted labor plus 10% markup. Small tools (under $1,000) are considered overhead and property of the contractor and will not be reimbursable.

C. Material Unit Price: Material shall be paid on a cost plus 10% calculation. A copy of Contractor’s paid invoices must be submitted with payment applications for any material line item when the cost to the contractor is $500 or greater. The 10% markup shall be applied to the total material cost of each project IWO.

D. Equipment Unit Price:

1. The rate for a piece of equipment that is Contractor-owned or rented will be the same. The equipment rate includes overhead, profit, administrative/maintenance services associated with the equipment as well as fuel, oil, and its transportation to and from the site (including multiple times if necessary based on Contractor’s schedule).

2. Hand-held tools used in the everyday performance of contract work (such as hammers, ladders, concrete mixer, trowels, wheelbarrows, etc.) are not considered equipment and must be included in other overhead.

3. Company vehicles, cell phones, computers, and other field administrative items are not considered equipment and must be included in other overhead.

4. Equipment must be used through-out the day to be chargeable. University will not be charged for equipment stored on site and not used on a given day. University will not be charged for weekends/holidays unless the Contractor actually works on the project and uses the equipment those days.

5. Equipment will be charged on standard rates – no premium rates permitted.

6. The Contractor is required to get prior written approval from the University Project Manager for the use of any equipment not listed in the Contract Unit Price Schedule.

PART 2 - PRODUCTS – Not Applicable

012200 - 3

PART 3 - EXECUTION

3.1 UNIT PRICE SCHEDULE

A. The Contractor understands that the quantities on the Bid Form are estimates and are presented solely for the purpose of determining a total base bid. The Contractor understands the University may increase or decrease the quantities of work to be done, without any adjustment in the Unit Price quoted. If the Contractor’s bid proposal is accepted by the University, the Unit Price quoted is the only payment that the Contractor will receive for completed work as described in contract documents.

B. Unit Price Category 1: Labor - Non Prevailing Wage

1. General Description: Include all payroll, overhead, profit, insurance, and any other cost found to be pertinent to the labor indicated. Labor rates shall be non-prevailing wage.

2. Unit of Measurement: Dollar/Cents per Hour – in half-hour increments.

3. Subgroups – Refer to Bid Form for each Prime Trade labor categories

Note: General Construction, Unit Price for Superintendent. Only utilized upon request by the University, when the technical nature or size of the project deems appropriate.

C. Unit Price Category 2: Labor - Prevailing Wage

1. General Description: Include all payroll, overhead, profit, insurance, and any other cost found to be pertinent to the labor indicated. Labor rates shall meet the level of prevailing wages. The Prevailing Minimum Wage Determination for this project is list in the Special Instructions to Bidder..

2. Unit of Measurement: Dollar/Cents per Hour – in half-hour increments.

3. Subgroups – Refer to Bid Form for each Prime Trade labor categories

Note: General Construction, Unit Price for Superintendent. Only utilized upon request by the University, when the technical nature or size of the project deems appropriate.

D. Unit Price Item Category 3: Material

1. 10% Mark-Up

E. Unit Price Item Category 4: Equipment

1. General Description: Major equipment used on the project on a per day basis.

2. Subgroups – Refer to Bid Form for each Prime Trade for equipment list.

3.2 UNIT PRICE SCHEDULE - ASPHALT AND CONCRETE PAVING

Item 1 – Remove Soft and Yielding Subgrade (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to remove soft and yield subgrade and legally dispose off site. Include all services and appurtenances for a complete job.

012200 - 4

Unit of Measure: Cubic Yard

Item 2 – Remove Stone Sub-base Course (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to remove existing stone sub-base and legally dispose off site. Include all services and appurtenances for a complete job.

Unit of Measure: Cubic Yard

Item 3 – Remove Bituminous Paving (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to remove existing asphalt, pavement, curbs, and related debris. Include saw cutting of edges at the limits of work and legal disposal off site. Include all services and appurtenances for a complete job.

Unit of Measure: Square Yard

Item 4 – Mill Bituminous Paving Surface (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to mill existing 2” bituminous paving and legally dispose of millings and associated debris off site. Include all services and appurtenances for a complete job.

Unit of Measure: Square Yard

Item 5 – New Excavation (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to excavate the subsoil and topsoil with legal disposal offsite. Include all services and appurtenances for a complete job.

Unit of Measure: Cubic Yard

Item 6 – New Stone sub-base course (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to furnish and install new 6” depth PADOT 2A aggregate and compact in six inch lifts. Include all services and appurtenances for a complete job. Reference PennDot 508 Section 350 (latest edition).

Unit of Measure: Cubic Yard

Item 7 – New 2 ½” bituminous concrete binder course (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to furnish and install a ID-2 bituminous binder course compacted to a thickness of 2 ½”. Include all services and appurtenances for a complete job.

Unit of Measure: Square Yard

012200 - 5

Item 8 – New 1 ½” bituminous wearing course (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to furnish and install a ID-2 bituminous binder course compacted to a thickness of 1 ½”. Include all services and appurtenances for a complete job.

Unit of Measure: Square Yard

Item 9 – New Asphalt Walkway (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to excavate and furnish and install a 2” wearing course, 6” compacted stone subbase. Include all services and appurtenances for a complete job.

Unit of Measure: Square Yard

Item 10 – Tack Coat (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to excavate and furnish and install tack coat to existing bituminous surfaces. Include all services and appurtenances for a complete job. Reference PennDot 508 Section 460 (latest edition)

Unit of Measure: Square Yard

Item 11 – Replace Existing Concrete Curb with New Concrete Curb (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to remove curb, excavation and installation of new 8” x 18” concrete curb. Include all services and appurtenances for a complete job. Reference Sketch PAV 3.

Unit of Measure: Linear Foot

Item 12 – Replace Existing Concrete Paving with New 6” Concrete Paving (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to remove paving, excavation, and installation of new 6” thick concrete paving and 4” stone base. Include all services and appurtenances for a complete job. Reference Sketch PAV 6.

Unit of Measure: Square Foot

Item 13 – Replace Precast Concrete Inlet Basin (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to excavate, furnish and install 2’ x 4’ x 4’ concrete storm water catch basin with outflow opening, connect to pipe, HD50 Bicycle Safety Grate. Dispose existing basin. Assume site restoration to be sub-base compaction, 6” compacted 2A aggregate, 4 ½” binder course, and 1-1/2” bituminous wearing course, seal top. Include all services and appurtenances for a complete job.

Unit of Measure: Each

012200 - 6

Item 14 – New Precast Concrete Inlet Basin (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to excavate, furnish and install 2’ x 4’ x 4’ concrete storm water catch basin with outflow opening, connect to pipe, HD50 Bicycle Safety Grate. Include all services and appurtenances for a complete job.

Unit of Measure: Each

Item 15 – Recyclable Geotextile (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to install new recyclable geotextile fabric over existing asphalt prior to placement of an asphalt overlay. Include all services and appurtenances for a complete job.

Unit of Measure: Square Yard

Item 16 – New Bituminous Joint Sealer (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to install bituminous joint sealer along curbs and areas where new paving abuts existing. Include all services and appurtenances for a complete job. Reference PennDot 508 Section 469 (latest edition)

Unit of Measure: Linear Foot

Item 17 – Seal Coating (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to provide a uniform bituminous seal coat. Include all services and appurtenances for a complete job.

Reference PennDot 508 Section 469 (latest edition)

Unit of Measure: Square Foot

Item 18 – Line Painting / Yellow (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to layout and paint 3” wide traffic lines. Include all services and appurtenances for a complete job.

Unit of Measure: Linear Foot

Item 19 – Line Painting / White (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to layout and paint 3” wide traffic lines. Include all services and appurtenances for a complete job.

Unit of Measure: Linear Foot

012200 - 7

Item 20 – Stop Line/Bar (PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to layout and paint (white) 24 x 12’ line. Include all services and appurtenances for a complete job.

Unit of Measure: Each

NON PREVAILING WAGE UNIT PRICES

Item 21 – Remove Soft and Yielding Subgrade (NON-PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to remove soft and yield subgrade and legally dispose off site. Include all services and appurtenances for a complete job.

Unit of Measure: Cubic Yard

Item 22 – Remove Stone Sub-base Course (NON-PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to remove existing stone sub-base and legally dispose off site. Include all services and appurtenances for a complete job.

Unit of Measure: Cubic Yard

Item 23 – New Stone Sub-base Course (NON-PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to furnish and install new 6” depth PADOT 2A aggregate and compact in six inch lifts. Include all services and appurtenances for a complete job. Reference PennDot 508 Section 350 (latest edition).

Unit of Measure: Square Yard

Item 24 – Pot Hole Repair (NON-PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to remove loose debris, install 4” thick asphalt wearing course, compact and roll as required. Include all services and appurtenances for a complete job.

Unit of Measure: Square Yard

Item 25 – Asphalt Repair (NON-PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to sawcut and remove asphalt, install 1-1/2” wearing course and 2-1/2” binder course, compact and roll as required. Include all services and appurtenances for a complete job.

Unit of Measure: Square Yard

012200 - 8

Item 26 – Bituminous Crack Filling (NON-PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to provide bituminous crack sealer for cracks < 1” wide. Include all services and appurtenances for a complete job.

Unit of Measure: Linear Foot

Item 27 – Seal Coating (NON-PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to provide a uniform bituminous seal coat. Include all services and appurtenances for a complete job.

Reference PennDot 508 Section 469 (latest edition)

Unit of Measure: Square Foot

Item 28 - Line Painting / Yellow (NON-PREVAILING WAGE)

Description: Price shall include all materials, labor and equipment to layout and paint 3” wide traffic lines. Include all services and appurtenances for a complete job.

Unit of Measure: Linear Foot

Item 29 - Line…