6-Addendum 3 w attach.pdf
PDF 522 KB Posted
- Attached to
- Main Pump House and Dewatering Improvements
- Solicitation number
- US.250316
- Issued by
- Lehigh County, Pennsylvania
About this file
This is Addendum No. 3 to the solicitation for the Lehigh County Authority's Kline's Island Wastewater Treatment Plant Main Pump House and Dewatering Improvements project. The project consists of four separate construction contracts: General Construction (Bid No. 50661G), Mechanical Construction (Bid No. 50661M), Electrical Construction (Bid No. 50661E), and Plumbing Construction (Bid No. 50661P). The addendum extends the bid due date from Friday, October 16, 2026 at 11:00 a.m. to Tuesday, October 20, 2026 at 11:00 a.m. via PennBid, and extends the inquiries deadline from Monday, October 12, 2026 at 4:00 p.m. to Wednesday, October 14, 2026 at 4:00 p.m. A mandatory pre-bid conference and site visit is required on Thursday, September 17, 2026 at 10:00 a.m. at the Kline's Island Wastewater Treatment Plant Training Room, 112 Union Street, Allentown, Pennsylvania 18102, with bids from parties not attending rejected. Bidders must have a minimum of five years' experience and at least ten completed projects of similar nature.
The addendum modifies the specifications and drawings through clarifications, amendments, and deletions, including removal of duplicate "General Conditions" (Section 00 70 00) and "Health and Safety Requirements" (Section 00 73 19) sections. Key technical changes include revisions to structural steel framing quality assurance requirements per AWS D1.1/D1.1M, addition of concrete sill repair specifications on Drawing G-4.1, and modifications to door and hardware specifications on Drawing G-8.1. Each bid must be accompanied by bid security equal to ten percent of the bid total in the form of a bid bond or certified check. The Lehigh County Authority reserves the right to reject any or all bids and waive any omissions, errors, or irregularities. All documents and solicitation details are available at no cost through PennBid at www.pennbid.net.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 3 Page 1 of 3 10/15/26
Addendum No. 3 Issued: October 15, 2026
Project Name: Lehigh County Authority
Kline’s Island Wastewater Treatment Plant
Main Pump House and Dewatering Improvements
Bid # 50661
Project Owner: Lehigh County Authority
Construction: CHA Consulting, One East Broad St., Suite 310
Bethlehem, PA 18018
BID DUE DATE: Tuesday, October 20, 2026 @ 11:00 a.m. via PennBid (REVISED)
1.0 GENERAL INFORMATION:
1.1 The Bids Due Date was extended FROM “FRIDAY, OCTOBER 16, 2026, AT 11:00 A.M.”
TO “TUESDAY, OCTOBER 20, 2026, AT 11:00 A.M.” via Addendum No. 3.
1.2 The Inquiries Due Date from PennBid’s ‘Public Q&A’ Tab was extended FROM
“MONDAY, OCTOBER 12, 2026, AT 4:00 P.M.” TO “WEDNESDAY, OCTOBER 14, 2026,
AT 4:00 P.M.” via Addendum No. 3.
1.3 This addendum consists of 9 pages including the following attachments:
• 4 pages of 00 01 10 “Table of Contents”.
• 2 pages of 00 11 13 revised and reissued Specification Section 00 11 13 “Notice to
Bidders”.
2.0 CHANGES TO PREVIOUS ADDENDA:
2.1 None.
3.0 CHANGES TO THE BIDDING REQUIREMENTS, CONTRACT FORMS, &
CONDITIONS OF THE CONTRACT:
3.1 Duplicate “General Conditions” section 00 70 00 REMOVED from the Specifications.
3.2 Duplicate “Health and Safety Requirements”, section 00 73 19 REMOVED from the Table of
Contents and Specifications.
4.0 CHANGES TO THE SPECIFICATIONS:
The following clarifications, amendments, additions, deletions, revisions and/or modifications shall become part of the Contract and DELETE or modify the original bidding documents to the extent indicated or stated herein.
Addendum No. 3 Page 2 of 3 10/15/26
4.1 DELETE 00 01 10 Table of Contents in its entirety and REPLACE with the attached 00 01 10
Table of Contents, Addendum No. 3 dated 10/15/26.
4.2 Specifications Section 01 20 00, ADD the following to the end of Paragraph 1.04.D.1:
“Contractor shall assume a wall section equivalent to Wall Section 1/G-4.1”.
4.3 Specifications Section 05 12 00, “Structural Steel Framing”, DELETE paragraph 1.5 in its entirety and REPLACE with below:
1.5 QUALITY ASSURANCE
A. Fabricator qualifications: Company experienced in fabricating structural steel similar to that indicated for the project who has a successful in-service performance for a minimum of 5 continuous years and sufficient production capacity.
B. Installer qualifications: Company experienced in installing structural steel similar to that indicated for the project who has a successful performance for a minimum of 5 years and sufficient installation capacity.
C. Welding qualifications: Quality procedures and personnel in accordance with AWS
D1.1/D1.1M.
5.0 CHANGES TO THE DRAWINGS:
5.1 On Drawing G-4.1, ADD the following Concrete Sill Repair Note:
Rout along the entire length of the crack to 1/4" wide by 1/2" depth. Clean to remove all dust and dirt. Install bond breaker tape at back of groove. Install sika hyflex-150 LM, one-part, low modulus, hybrid sealant. Strike joint flush with surrounding surface using a flat tool. Follow all manufacturer's instructions for surface preparation, product mixing, application, clean up and curing.
5.2 On Drawing G-8.1, Main Pump House - Door and Frame Schedule, Door #102, DELETE the
Remarks and Notes and REPLACE with “2,5,9”.
5.3 On Drawing G-8.1, Main Pump House - Door and Frame Schedule, Door #103, DELETE the
Remarks and Notes and REPLACE with “3,5,7,10 (DOOR LEAFS – 3’ AND 2’)”.
5.4 On Drawing G-8.1, Door Hardware List, DELETE Hardware Set #9 and REPLACE with the following:
Addendum No. 3 Page 3 of 3 10/15/26
END OF ADDENDUM NO. 3
LEHIGH COUNTY AUTHORITY – KLINE’S ISLAND WWTP ISSUE FOR BID
LCA BID NO. 50661
MAIN PUMP HOUSE AND DEWATERING IMPROVEMENTS
TABLE OF CONTENTS 00 01 10 - 1
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
001113 Notice to Bidders .......................................................................................................................... 0-1
002113 Instructions to Bidders (LCA) .................................................................................................... 0-18
022113.1 Public Works Employment Verification Form............................................................................. 0-2
PROCUREMENT FORMS AND SUPPLEMENTS
004113G General Contract Bid Form (LCA) ............................................................................................... 0-6
004113M Mechanical Contract Bid Form (LCA) ......................................................................................... 0-6
004113P Plumbing Contract Bid Form (LCA) ............................................................................................ 0-6
004113E Electrical Contract Bid Form (LCA) ............................................................................................ 0-6
004117 Agreement of Surety ..................................................................................................................... 0-1
004313 Bid Bond (LCA) ........................................................................................................................... 0-2
004314 Certificate as to Corporate Principal ............................................................................................. 0-1
004336 List of Proposed Subcontractors ................................................................................................... 0-1
004513 Experience Questionnaire ............................................................................................................. 0-3
004519 Affidavit of Non-Collusion ........................................................................................................... 0-1
004520 Contractor's Certification of Authority and Qualification to do Business in Pennsylvania ......... 0-1
CONTRACTING AND PROJECT FORMS AND SUPPLEMENTS
005213 Agreement (LCA) ......................................................................................................................... 0-8
006113 Performance Bond (LCA)............................................................................................................. 0-3
006115 Payment Bond (LCA) ................................................................................................................... 0-3
006172 Waiver of Liens/Mechanic’s Lien Waiver ................................................................................... 0-3
006216 Sample Certificate of Insurance .................................................................................................... 0-1
CONDITIONS OF THE CONTRACT
007213 General Conditions including Supplementary Conditions (LCA) ............................................. 0-63
007343 Pennsylvania Prevailing Wage Rate Requirements ..................................................................... 0-2
007346.1 PA L&I Form LLC-25 Blank ....................................................................................................... 0-2
007346.13 Prevailing Wage Rate Determination Schedule ........................................................................... 0-8
008200 Safety and Health Management Plan Project Requirements ...................................................... 0-24
DIVISION 01 – GENERAL REQUIREMENTS
011000 Summary of Work ........................................................................................................................ 1-8
011400 Work Restrictions ......................................................................................................................... 1-6
012000 Measurement and Payment ........................................................................................................... 1-3
012100 Allowances .................................................................................................................................... 1-2
012200 Unit Prices ..................................................................................................................................... 1-1
012300 Alternates ...................................................................................................................................... 1-1
012600 Contract Modification Procedures ................................................................................................ 1-3
TABLE OF CONTENTS 00 01 10 - 2
DIVISION 01 – GENERAL REQUIREMENTS (CONTINUED)
012900 Payment Procedures ...................................................................................................................... 1-4
013100 Project Management and Coordination ........................................................................................ 1-4
013116 Multiple Contract Coordination .................................................................................................. 1-10
013200 Construction Progress Documentation ......................................................................................... 1-5
013300 Submittal Procedures .................................................................................................................... 1-5
014000 Quality Requirements ................................................................................................................... 1-6
014200 References ..................................................................................................................................... 1-2
015000 Temporary Facilities & Controls .................................................................................................. 1-9
016600 Product Storage and Handling Requirements ............................................................................... 1-3
017300 Execution Requirements ............................................................................................................... 1-5
017329 Cutting and Patching ..................................................................................................................... 1-3
017419 Construction Waste Management ................................................................................................. 1-3
017700 Closeout Procedures...................................................................................................................... 1-5
017839 Project Record Documents ........................................................................................................... 1-5
DIVISION 02 – EXISTING CONDITIONS
024119 Selective Demolition .................................................................................................................... 1-8
028233 Asbestos Containing Materials .................................................................................................... 1-8
028319 Lead Based Paint Awareness ........................................................................................................ 1-6
DIVISION 03 – CONCRETE
035416 Hydraulic Cement Underlayment ................................................................................................ 1-4
DIVISION 04 – MASONRY
040110 Masonry Cleaning ......................................................................................................................... 1-6
040120.63 Brick Masonry Repair ................................................................................................................... 1-6
040120.64 Brick Masonry Repointing ........................................................................................................... 1-4
042200 Concrete Unit Masonry ............................................................................................................... 1-12
DIVISION 05 – METALS
051200 Structural Steel Framing ............................................................................................................... 1-6
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
061000 Rough Carpentry ........................................................................................................................... 1-6
064023 Interior Architectural Woodwork ................................................................................................. 1-8
064116 Plastic-Laminate-Clad Architectural Cabinets ............................................................................. 1-6
064219 Plastic-Laminate-Faced Wood Paneling ...................................................................................... 1-4
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
072500 Weather Barriers ........................................................................................................................... 1-4
TABLE OF CONTENTS 00 01 10 - 3
DIVISION 08 – OPENINGS
081113 Hollow Metal Doors and Frames .................................................................................................. 1-8
081213 Hollow Metal Frames ................................................................................................................... 1-4
081416 Flush Wood Doors ........................................................................................................................ 1-8
084213 Aluminum Framed Entrances ....................................................................................................... 1-8
085413 Fiberglass Windows ...................................................................................................................... 1-6
088000 Glazing .......................................................................................................................................... 1-8
DIVISION 09 – FINISHES
092216 Non-Structural Metal Framing ..................................................................................................... 1-6
092900 Gypsum Board .............................................................................................................................. 1-6
093013 Ceramic Tiling .............................................................................................................................. 1-8
093023 Glass Mosaic Tiling ...................................................................................................................... 1-6
095123 Acoustical Tile Ceilings ................................................................................................................ 1-6
095436 Suspended Decorative Grids ......................................................................................................... 1-8
096723 Resinous Flooring ......................................................................................................................... 1-8
099123 Interior Painting ............................................................................................................................ 1-8
099600 High Performance Coatings .......................................................................................................... 1-4
DIVISION 10 – SPECIALTIES
101416 Plaques .......................................................................................................................................... 1-4
102600 Wall and Door Protection ............................................................................................................. 1-4
DIVISION 12 – FURNISHINGS
122413 Roller Window Shades ................................................................................................................. 1-6
123605 Metal Fabrications, Countertop Support Brackets ....................................................................... 1-6
123640 Stone Countertops ......................................................................................................................... 1-6
123653 Laboratory Worksurfaces ............................................................................................................. 1-8
123661.16 Solid Surfacing Countertops ......................................................................................................... 1-4
ATTACHMENTS
A - Asbestos Testing Results
TABLE OF CONTENTS 00 01 10 - 4
[THIS PAGE INTENTIONALLY LEFT BLANK]
NOTICE TO BIDDERS 00 11 13 - 1
SECTION 00 11 13
NOTICE TO BIDDERS
Online Sealed Bids will be received by the LEHIGH COUNTY AUTHORITY via the PennBid Program until 11:00 a.m. prevailing time on Tuesday, October 20, 2026. All bids will be publicly opened online and posted. The project is titled “Main Pump House and Dewatering Improvements” and will consist of four contracts:
General Construction Bid No. 50661G
Mechanical Construction Bid No. 50661M
Electrical Construction Bid No. 50661E
Plumbing Construction Bid No. 50661P
All documents and solicitation details are available online for no cost at PennBid (www.pennbid.net)
A mandatory pre-bid conference will be held at 10:00 AM prevailing time on Thursday, September
17, 2026 at the Kline’s Island Wastewater Treatment Plant, Training Room located at 112 Union
Street, Allentown, PA 18102. Bids from parties not present at the pre-bid conference and site visit will not be accepted.
Each Bid must be accompanied by Bid security in the form of a Bid bond (in the required form) or certified check for ten percent of the Bid total.
It is a requirement of this Contract that Bidder shall have a minimum of (5) years’ experience and at least
(10) completed projects of similar nature to the Work required by this Project.
Questions and inquiries should be addressed through PennBid’s “Public Q&A” tab. The deadline for all questions and inquiries is 4:00 PM Wednesday, October 14, 2026.
The Lehigh County Authority hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, or irregularities in any Bid.
Lehigh County Authority
Liesel M. Gross, CEO
NOTICE TO BIDDERS 00 11 13 - 2
[THIS PAGE INTENTIONALLY LEFT BLANK]
File details come from the government source that posted it. Updated .