This is a sealed civil engineering plan set for the Craig Park Seawall Replacement - Phase 1 project, prepared for the City of Tarpon Springs, Pinellas County, Florida. The project aims to protect Craig Park from tidal flooding by replacing failing seawall infrastructure and raising the elevation of the surrounding perimeter. The scope of work includes replacement of the existing seawall at a higher target elevation of 5.0 feet or more above mean sea level, reconstruction of the existing sidewalk at the new elevation, replacement of the observation deck on the east side of Spring Bayou, addition of a grassed berm on the western side of the park, replacement of seawall cap along the western side, protection of the War Memorial with additional drainage, and installation of drainage inlets, pipes, and stormwater check valves to prevent tidal influx. The plans detail multiple typical sections, miscellaneous structural details, masonry block wall specifications, landscape and hardscape designs, and comprehensive erosion and sediment control measures. The project area encompasses approximately 0.338 acres within a total property area of 9.496 acres, with construction activities including seawall removal and replacement using fiberglass reinforced polymer sheet pile, installation of helical anchors, concrete cap construction, and landscape restoration.
The plans include extensive erosion and sedimentation control requirements, with the contractor responsible for implementing best management practices during construction, maintaining sediment barriers and silt fences, and conducting daily inspections and maintenance of all erosion control devices. Material management practices address spill prevention, proper storage of hazardous materials and fuels with secondary containment requirements, and daily vehicle inspections to prevent leakage. The project is partially funded through a $2 million Federal Government grant secured through former Representative Gus Bilirakis, which covers the waterfront adjacent to Craig Park from the boat ramp to and including the observation deck. The remaining waterfront on the north side of Spring Bayou is designated for completion as a later second phase. The plans reference permits and approvals from Pinellas County, Southwest Florida Water Management District (SWFWMD), and the United States Army Corps of Engineers, including a Nationwide Permit (WND-23-00742, expiration 11/15/2025) and Environmental Resource Permit (ERP SAJ-2023-01746, expiration 3/14/2026). Professional engineering services were provided by Stantec Consulting Services Inc., with topographic survey by Suncoast Land Surveying, Inc. and geotechnical analysis by Tierra South Florida, Inc., dated May and June 2023 respectively.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PINELLAS COUNTY MAP
HOWARD FRANKLAND BRIDGE
GANDY BRIDGE
4T H
S T
LAKE
TARPON
EA
ST
LA
KE
AV
E
U S
ROAD
KLOSTERMAN
FL
O
R
ID
A TARPON AVE
TAMPA ROAD
ALDERMAN ROAD
M C
M U
LL
EN
-B O
O
TH
R D
MAIN ST
CURLEW ROAD
U S
AL
T
UNION ST
SUNSET POINT RD
DREW ST
MAIN ST
GULF TO BAY BLVD
ST
. J
O
SE
PH
'S
SO
U N
D
TH
S T
BAYSID
E
BR
ID
G E
TAMPA
BELLEAIR RD
WEST BAY DRIVE
ULMERTON RD
BE
LC
H
ER
R D
TH
S T
U S
9T H
S T
54TH AVE N
22ND AVE N
5TH AVE N
CENTRAL AVE
I-2
U S
PARK BLVD
PA
R
K
ST
ST
AR
KE
Y
R D
SE
M
IN
O
LE
B
LV
D
R
ID
G E
R D
CR
OS
S
BA
YO
U
LA
KE
S
EM
IN
O
LE
G U
LF
B
LV
D
O
AK
H U
R
ST
R D
IN
DI
AN
R
O
CK
S
RD
CL
EA
RW
AT
ER
H
AR
BO
R
BOCA CIEGA
BAYWAY
BAY
BR
ID
G E
22ND AVE S
54TH AVE S
GULF
OF
MEXICO
SU
N
SH
IN
E
SK
YW
AY
R O
AD
BAY
ROOSEVELT BLVD
COURTNEY CAMPBELL CAUSEWAY
CRAIG PARK
CITY OF TARPON SPRINGS
FOR:
PINELLAS COUNTY, FLORIDA
LOCATION MAP
SCALE: N.T.S.
PROJECT
LOCATION
CONTRACTOR TO REFERENCE THE FOLLOWING FOR CONSTRUCTION OF THIS PROJECT.
· TOPOGRAPHIC SURVEY: SUNCOAST LAND SURVEYING, INC. DATED: MAY 26, 2023 P: 813-854-1342
· GEOTECHNICAL REPORT: TIERRA SOUTH FLORIDA, INC. DATED: JUNE 22, 2023 P: 813-993-0093
REFERENCES
AGENCY APPROVALS
AGENCY PERMIT TYPE ISSUEDNUMBER EXPIRATION
PINELLAS COUNTY DREDGE & FILL
SWFWMD
USACE NATIONWIDE PERMIT
SCALE: N.T.S.
SECTION 12 - TOWNSHIP 27 - RANGE 15 EAST
324 E. PINE STREET
TARPON SPRINGS, FL 34689
5 BEEKMAN LANE
PROJECT
LOCATION
SEAWALL REPLACEMENT - PHASE 1
CIVIL PLANS
DRAWING NO. SHEET TITLE
C1.00 COVER SHEET
C1.01 GENERAL NOTES
C3.00 GENERAL PLAN
C1.02 STORMWATER POLLUTION PREVENTION PLAN
C1.03 EROSION CONTROL
ORIGINAL SHEET - ANSI D (22x34)
Permit-Seal
Drawing No.
Tit le
C lie nt /P ro je ct
Sheet of
Project Number:
Revision
Chkd.Dwn. Dsgn. MM.DD.YY
SCALE:
PN EB EB 10/3/2025
C
ITY
O F
TA
RP
O N
SP
RI
NG
S
PI
NE
LL
AS
C O
UN
TY
, F
LO
RI
DA
C
RA
IG
P
AR
K
SE
AW
AL
L R
EP
LA
C
EM
EN
T -
P
HA
SE
By Re vis io n Ap pd
YY
.M
M .D
D
C
Us er s\ ch ga m ac he
\O ne
Dr ive
St an te c\ At ta ch m en ts\ De sk to p\
\m isc \2
\c ad
\C 1.
_C ov er
S he et .d w g
/1 0/
:4
AM B
y:
G am ac he
, C hr ist op he r
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
St an te c
Co ns ul tin g Se rv ice s In c.
Pa rk P la ce
B lvd
. S ui te
C le ar w at er , F lo rid a w w w .st an te c.
co m Te l.
7.
1.
Fa x.
.4
.1
Christopher P. Gamache, PE Lic. No.: 82122
THE OFFICIAL RECORD OF THIS SHEET IS THE
ELECTRONIC FILE DIGITALLY SIGNED AND SEALED
UNDER RULE 61G15-23.004, F.A.C.
215618198
SHEET NO.
C1.00
C O
VE
R
SH
EE
T
N/A
C3.01 TYPICAL SECTIONS (1 OF 4)6
EXEMPTION
GOVERNING STANDARD PLANS:
FLORIDA DEPARTMENT OF TRANSPORTATION, FY2024-25 STANDARD PLANS FOR ROAD
AND BRIDGE CONSTRUCTION AVAILABLE AT THE FOLLOWING WEBSITE:
http://www.fdot.gov/design/standardplans
GOVERNING STANDARD SPECIFICATIONS:
FLORIDA DEPARTMENT OF TRANSPORTATION, FY2024-25 STANDARD SPECIFICATIONS
FOR ROAD AND BRIDGE CONSTRUCTION AVAILABLE AT THE FOLLOWING WEBSITE:
http://www.fdot.gov/programmanagement/Implemented/SpecBooks
THIS ITEM HAS BEEN DIGITALLY
SIGNED AND SEALED BY
ON THE DATE ADJACENT TO THE SEAL
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED
AND THE SIGNATURE MUST BE VERIFIED
ON ANY ELECTRONIC COPIES.
STATE OF
No.
P R O
FESSIONAL ENGIN
EE
R
C
RI
ST
OP+ER P. GA0A
C E
FLORIDA
82122
LICENSE
12/1/2024876640 N/A
11/15/2024WND-23-00742 11/15/2025
11/29/2024SAJ-2023-01746 3/14/2026
C3.02 TYPICAL SECTIONS (2 OF 4)7
C3.03 TYPICAL SECTIONS (3 OF 4)8
C3.04 TYPICAL SECTIONS (4 OF 4)9
C3.05 MISCELLANEOUS DETAILS10
C3.06 TYPICAL MASONRY BLOCK WALL DETAILS11
C3.07 CURB AND SIDEWALK12
LANDSCAPE PLANS
DRAWING NO. SHEET TITLE
L1.00 LANDSCAPE - GENERAL NOTES
L2.00 PAVEMENT GRADING PLAN
L5.00 LANDSCAPE PLAN
L3.00 HARDSCAPE PLAN & SCHEDULE
L4.00 HARDSCAPE DETAILS
SHEET NO.
L6.00 LANDSCAPE DETAILS18
ORIGINAL SHEET - ANSI D (22x34)
Permit-Seal
Drawing No.
Tit le
C lie nt /P ro je ct
Sheet of
Project Number:
Revision
Chkd.Dwn. Dsgn. YY.MM.DD
SCALE:
KDG CPG CPG 10/3/2025
C
ITY
O F
TA
RP
O N
SP
RI
NG
S
PI
NE
LL
AS
C O
UN
TY
, F
LO
RI
DA
C
RA
IG
P
AR
K
SE
AW
AL
L R
EP
LA
C
EM
EN
T -
P
HA
SE
By Re vis io n Ap pd
YY
.M
M .D
D
C
Us er s\ ch ga m ac he
\O ne
Dr ive
St an te c\ At ta ch m en ts\ De sk to p\
\m isc \2
\c ad
\C 1.
_G en er al N ot es
.d w g
/1
0/
:4
AM B
y:
G am ac he , C hr ist op he r
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
St an te c
Co ns ul tin g Se rv ice s In c.
Pa rk P la ce
B lvd
. S ui te
C le ar w at er , F lo rid a w w w .st an te c.
co m Te l.
7.
1.
Fa x.
.4
.1
Christopher P. Gamache, PE Lic. No.: 82122
THE OFFICIAL RECORD OF THIS SHEET IS THE
ELECTRONIC FILE DIGITALLY SIGNED AND SEALED
UNDER RULE 61G15-23.004, F.A.C.
215618198
18 2
C1.01
G
EN
ER
AL
N O
TE
S
N/A
SEQUENCE OF MAJOR ACTIVITIES
CONTROLS
EROSION AND SEDIMENT CONTROLS
STABILIZATION PRACTICES:
WIND EROSION STABILIZATION
TEMPORARY STABILIZATION
STRUCTURAL PRACTICES
STAKED SILT FENCES
STORM WATER MANAGEMENT
PERMANENT STABILIZATION
WASTE MATERIALS
HAZARDOUS WASTE
SANITARY WASTE
OFFSITE VEHICLE TRACKING
TIMING OF CONTROL MEASURES
MAINTENANCE INSPECTION PROCEDURES
NON-STORM WATER DISCHARGES
INVENTORY FOR POLLUTION PREVENTION PLAN
CONCRETE FERTILIZERS
SPILL PREVENTION
MATERIAL MANAGEMENT PRACTICES
GOOD HOUSEKEEPING:
DETERGENTS PETROLEUM BASED PRODUCTS AND FUELS
TAR
SAND
CLEANING SOLVENTS
STONE
WOOD
PETROLEUM PRODUCTS:
FERTILIZERS:
CONCRETE TRUCKS:
POLLUTION PREVENTION PLAN CERTIFICATION
CONTRACTOR'S AND ENGINEER'S CERTIFICATION
SIGNATURE: FOR: RESPONSIBLE FOR:
NAME: COMPANY:
TITLE: ADDRESS:
GENERAL
CONTRACTOR
DATE: PHONE:
OWNER: CITY OF TARPON SPRINGS
SIGNED:
ADDRESS:
DATE:
APPLICANT AUTHORIZED AGENT:
STORMWATER POLLUTION PREVENTION PLAN
SEDIMENT BASINS
WETLAND MITIGATION
NOTICE OF INTENT (NOI)
KEY PROVISIONS
WATER MANAGEMENT DISTRICT - KEY PROVISIONS
NAME: CHRISTOPHER P. GAMACHE, P.E.
TITLE: PROJECT MANGER
CERTIFIED ENGINEER
COMPANY: STANTEC
380 PARK PLACE BLVD., SUITE 300
CLEARWATER, FL 33759
PHONE: 727-531-1553
USE BEST MANAGEMENT PRACTICES (BMPs) DURING AND AFTER CONSTRUCTION TO MINIMIZE EROSION
AND SEDIMENTATION AND TO PROPERLY MANAGE RUNOFF FOR BOTH STORMWATER QUANTITY AND
QUALITY. CONTRACTOR TO ADHERE TO FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
EROSION AND SEDIMENTATION CONTROL MANUAL.
BEFORE SITE DISTURBANCE OCCURS, PERIMETER CONTROLS, SEDIMENT TRAPS, BASINS, AND
DIVERSIONS MUST BE SET IN PLACE BY THE CONTRACTOR TO CONTROL RUNOFF AND CAPTURE
SEDIMENTS. THE CONTRACTOR IS REQUIRED TO REVIEW THE SITE SPECIFIC EROSION CONTROL PLAN AS
SHOWN ON THE CONSTRUCTION DOCUMENTS.
THE CONTRACTOR MAY ALSO BE REQUIRED TO MODIFY THE PLAN OR MATERIALS TO ADAPT TO
SEASONAL VARIATIONS OR SITE CONDITIONS. CONTRACTOR WILL COMPLY WITH EROSION CONTROL PLAN AND DETAILS. ANY MODIFICATIONS TO THIS PLAN MUST BE SIGNED BY A PROFESSIONAL ENGINEER REPRESENTING THE CONTRACTOR. CONTRACTOR SHALL REMOVE ALL SEDIMENT THAT HAS MIGRATED OFF-SITE. THE EROSION CONTROL DEVISES FOR THESE ACTIVITIES ARE SPECIFIED IN THE PLANS AND
ACCORDING TO "DESIGN STANDARDS FOR DESIGN, CONSTRUCTION, MAINTENANCE AND UTILITY
OPERATIONS ON THE STATE HIGHWAY SYSTEM (CURRENT EDITION), SECTION 104. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING IF ADDITIONAL CONTROLS ARE NEEDED AND DEPLOYMENT SCHEDULES
FOR THE IMPLEMENTATION OF ALL EROSION CONTROL DEVICES.
THE CONTRACTOR WILL IMMEDIATELY NOTIFY THE PERMITTING AGENCY IN WRITING IF ANY HAZARDOUS
WASTE MATERIAL IS ENCOUNTERED DURING SITE INVESTIGATION AND CONSTRUCTION.
THE CONTRACTOR WILL ALSO BE RESPONSIBLE FOR NOTIFYING THE DEPARTMENT OF ENVIRONMENTAL
PROTECTION (FDEP) WITHIN 24 HOURS OF DISCOVERY.
THE CONTRACTOR SHALL PROVIDE LITTER CONTROL AND COLLECTION WITHIN THE PROJECT BOUNDARIES DURING CONSTRUCTION ACTIVITIES. ANY CHEMICAL CONTAINERS SHALL BE DISPOSED OF BY THE CONTRACTOR ACCORDING TO EPA'S STANDARD PRACTICES AS DETAILED BY THE MANUFACTURER. NO SOLID MATERIALS INCLUDING BUILDING & CONSTRUCTION MATERIALS SHALL BE DISCHARGE TO
ADJACENT WATERWAYS OR WETLANDS OR BURIED ON SITE.
MAINTENANCE AND INSPECTION
ALL OF THE CONTROLS SHALL BE MAINTAINED AT ALL TIMES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAILY INSPECTION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES THROUGHOUT THE
CONSTRUCTION PHASE OF THE PROJECT. MAINTENANCE SHALL BE IN ACCORDANCE WITH LOCAL
GOVERNMENT AGENCY TECHNICAL SPECIFICATIONS, AND THE PROJECT CONSTRUCTION CONTRACT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING THE FDEP NPDES / STORMWATER
POLLUTION PREVENTION PLAN (SWPPP) CONSTRUCTION INSPECTION REPORT AFTER ANY 1/2 INCH RAINFALL OR WEEKLY IF NO RAIN EVENT OCCURRED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN RAIN GAUGES ON THE PROJECT SITE AND RECORD WEEKLY RAIN FALL. CONTRACTOR SHALL
ALSO COMPLETE THE NPDES COMPLIANCE CHECKLIST FOR CONSTRUCTION SITES.
1. PAVEMENT WASH WATERS (WHERE NO SPILL OR LEAKS OF TOXIC OR VEHICLE AND HAZARDOUS
MATERIALS HAVE OCCURRED.
2. UNCONTAMINATED GROUNDWATER FROM DEWATERING ACTIVITIES
ALL NON-STORM WATER DISCHARGES WILL BE DIRECTED TO THE SEDIMENT BASIN PRIOR TO
DISCHARGE OR AS DIRECTED BY THE ENGINEER. IF CONTAMINATED SOIL OR GROUNDWATER IS
ENCOUNTERED, THE CONTRACTOR MUST NOTIFY THE OWNER AND ENGINEER.
THE CONTRACTOR MUST IDENTIFY A DESIGNATED FUEL TANK STORAGE AREA, AWAY FROM DRAINAGE STRUCTURES, PONDS, BASINS, WATERWAYS, AND WETLANDS, WITH SECONDARY CONTAINMENT (SPILL
COLLECTION).
SPILL CONTROL PRACTICES
FL. REG. NO. 82122
IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIALS MANAGEMENT PRACTICES DISCUSSED IN THE PREVIOUS SECTIONS OF THIS PLAN, THE FOLLOWING PRACTICES WILL BE FOLLOWED FOR SPILL
PREVENTION AND CLEANUP:
* MANUFACTURERS' RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE CLEARLY POSTED AND
SITE PERSONNEL WILL BE MADE AWARE OF THE PROCEDURES AND THE LOCATION OF THE
INFORMATION CLEANUP SUPPLIES.
*ALL SPILLS WILL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY.
*THE SPILL AREA WILL BE KEPT WELL VENTILATED AND PERSONNEL WILL WEAR APPROPRIATE
PROTECTIVE CLOTHING TO PREVENT INJURY FROM CONTACT WITH A HAZARDOUS SUBSTANCE.
*SPILLS OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED TO THE APPROPRIATE STATE OR
LOCAL GOVERNMENT AGENCY, REGARDLESS OF THE SIZE.
*THE SPILL PREVENTION PLAN WILL BE PREPARED BY THE CONTRACTOR AND KEPT IN THE
CONSTRUCTION OFFICE TRAILER AND WILL INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND HOW TO CLEAN UP THE SPILL IF THERE ARE OTHERS. A DESCRIPTION OF THE SPILL, WHAT CAUSED IT, AND THE CLEANUP MEASURES WILL ALSO BE INCLUDED. ALL SPILLS
AND RESPONSES WILL BE REPORTED TO THE APPROPRIATE AGENCY.
*THE CONTRACTOR WILL BE RESPONSIBLE FOR SPILL PREVENTION AND CLEANUP COORDINATION. HE WILL DESIGNATE OTHER SITE PERSONNEL WHO WILL RECEIVE SPILL PREVENTION AND CLEANUP TRAINING. THESE INDIVIDUALS WILL EACH BECOME RESPONSIBLE FOR A PARTICULAR PHASE OF PREVENTION AND CLEANUP. THE NAMES OF RESPONSIBLE SPILL PERSONNEL WILL BE POSTED IN THE MATERIAL STORAGE AREA AND IN THE OFFICE TRAILER ON SITE. *USE AND CHARACTERISTICS OF FUEL OR CHEMICAL STORAGE TANK ON SITE SHALL COMPLY WITH ALL RELATED FEDERAL, STATE, AND LOCAL REGULATIONS. STORAGE TANKS MUST BE LOCATED AS FAR AS POSSIBLE FROM ANY
DRAINAGE STRUCTURES, DITCHES, AND/OR SURFACE WATERS. IN ADDITION, THE CONTRACTOR
MUST PROVIDE A SECONDARY CONTAINMENT WITH A LINER CHEMICALLY RESISTANT TO THE FUEL
OR CHEMICAL STORED ON SITE. THE SECONDARY CONTAINMENT MUST BE SIZED TO CONTAIN
MINIMUM OF ONE AND A HALF TIME THE TOTAL CAPACITY OF STORAGE TANK BEING USED.
CONTRACTOR HAS TO PROVIDE A DAILY INSPECTION LOG FOR THE SECONDARY CONTAINMENT WITH
INDICATION OF DATE, INSPECTORS NAME AND INSPECTION REPORT.
FURTHERMORE, ANY CONTAMINATION HAS TO BE IMMEDIATELY CONTAINED AND THE OWNERS,
ENGINEER OF RECORD AND PERMITTING AGENT INSPECTOR MUST BE NOTIFIED OF THE NATURE AND
EXTEND OF THE CONTAMINATION.
(NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM)
ATTENTION: FAILURE TO MAINTAIN EROSION AND/OR SEDIMENTATION CONTROLS OR ANY ILLICIT DISCHARGE RESULTING FROM THEIR FAILURE WILL LIKELY RESULT IN FINE CITATIONS. CODE REGULATIONS AUTHORIZES
PENALTIES OF UP TO $10,000 FOR EACH OFFENSE.
DEWATERING
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL MATERIALS, EQUIPMENT, LABOR, AND SERVICES NECESSARY FOR CARE OF WATER AND EROSION CONTROL. EXCAVATION WORK SHALL NOT BEGIN BEFORE THE EROSION AND SEDIMENTATION CONTROL PLAN IS IN PLACE. DEWATERING TO BE
COMPLETED BY THE CONTRACTOR AND SHALL FOLLOW DEWATERING SPECIFICATION.
-TOP OF SOIL STOCK PILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR AT LEAST 21 DAYS WILL BE STABILIZED WITH TEMPORARY GRASS AND MULCH NO LATER THAN 14 DAYS FROM THE LAST CONSTRUCTION ACTIVITY. GRASS SEED SHALL BE A MIXTURE OF 20 PARTS OF BERMUDA SEED AND 80 PARTS OF PENSACOLA BAHIA. THE SEPARATE TYPES OF SEED USED SHALL BE THOROUGHLY DRY MIXED IMMEDIATELY BEFORE SOWING. SEED WHICH HAS BECOME WET SHALL NOT BE USED. THE MULCH MATERIAL USED SHALL NORMALLY BE DRY MULCH. DRY MULCH SHALL BE STRAW OR HAY, CONSISTING OF OAT, RYE OR WHEAT STRAW, OR OF PANGOLA, PEANUT, COASTAL BERMUDA OR BAHIA GRASS HAY. ONLY UNDETERIORATED MULCH, WHICH CAN BE READILY CUT INTO THE SOIL, SHALL BE USED. AREAS OF THE SITE, WHICH ARE TO BE PAVED, WILL BE TEMPORARILY
STABILIZED BY APPLYING STABILIZATION AND BASE. TREE BARRICADES WHERE REQUIRED.
1. INSTALL TURBIDITY BARRIER AND EROSION CONTROL AS SHOWN ON THE DEMOLITION PLAN.
2. INSTALL STABILIZED CONSTRUCTION ENTRANCE.
3. COMPLETE REPLACEMENT PER GENERAL PLAN AND ELEVATION.
4. INSTALL NEW UTILITIES, PER PLAN.
5. REPAIR ANY WASHED OUT AREAS, SOD, SEED, AND MULCH DISTURBED AREAS AS INDICATED ON PLANS.
6. WHEN CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE STABILIZED, REMOVE EROSION
PROTECTION DEVICES AND CONSTRUCTION ENTRANCE AS REQUIRED.
-THE CONTRACTOR SHALL DENUDE ONLY AREAS WHERE IT IS EXPECTED TO BE GRADED OR ALTERED WITHIN A TWO (2) WEEK TIME- FRAME. FINAL GRADES SHALL BE PERFORMED AND TEMPORARY OR PERMANENT SOIL STABILIZATION SHALL BE APPLIED. AREAS WHERE CONSTRUCTION OPERATIONS WILL BE CONTINUOUS, FUGITIVE DUST SHALL BE MANAGED BY APPLYING A WATER SPRAY TO SATURATE THE
SURFACE SOILS CONTINUOUSLY AND ADDITIONAL MEASURES MAY NEED TO BE TAKEN CONTROL
OFF-SITE TRANSPORT OF UNACCEPTABLE LEVELS OF DUST.
-IF APPLICABLE, SEDIMENT BASINS TO BE CONSTRUCTED BY THE CONTRACTOR TO DETAIN
SEDIMENT-LADEN RUNOFF FROM DISTURBED AREAS LONG ENOUGH FOR MOST OF THE SEDIMENT TO SETTLE OUT. SEDIMENT BASINS SHOULD BE USED TOGETHER WITH EROSION CONTROL PRACTICES SUCH AS TEMPORARY SEEDING, MULCHING, DIVERSION BERMS, ETC., TO REDUCE THE AMOUNT SEDIMENT
FLOWING INTO THE STORM SYSTEM.
-THE STAKED SILT FENCES WILL BE CONSTRUCTED ALONG THE CONSTRUCTION LIMITS OR AS DEPICTED ON THE EROSION CONTROL & DEMOLITION PLANS AND/OR ON OTHER CONSTRUCTION PLANS. THESE
DEVICES WILL STOP AND DIVERT RUNOFF FROM THE SITE TO OTHER SURFACE WATERS.
-DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES PERMANENTLY CEASES SHALL BE STABILIZED WITH SOD NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY.
IF ENCOUNTERED, HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL, STATE AND FEDERAL REGULATIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR SEEING
THAT THESE PRACTICES ARE FOLLOWED.
- ALL SANITARY WASTE WILL BE COLLECTED FROM PORTABLE UNITS A MINIMUM OF THREE TIMES PER
WEEK BY A LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR, IN ACCORDANCE WITH FDOT
STANDARD SPEC. FOR ROAD AN BRIDGE CONSTRUCTION 2010 EDITION SECTION 7-6, AND AS REQUIRED
BY LOCAL REGULATIONS.
STABILIZED CONSTRUCTION ENTRANCES SHALL BE PROVIDED TO HELP REDUCE VEHICLE TRACKING OF SEDIMENTS. THE PAVED STREETS WILL BE CLEANED AS NEEDED TO REMOVE ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS HAULING MATERIAL FROM OR TO THE SITE WILL BE
COVERED WITH A TARPUALIN AT ALL TIMES.
- ALL WASTE MATERIAL WILL BE COLLECTED AND STORED IN DUMPSTERS PER LOCAL SOLID WASTE REGULATIONS. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE WILL BE DEPOSITED IN THE
DUMPSTER. THE DUMPSTER WILL BE DUMPED A MINIMUM OF TWICE A WEEK OR MORE OFTEN IF
NECESSARY, AND THE TRASH WILL BE HAULED TO THE APPROPRIATE COUNTY LOCATION FOR DUMPING.
NO CONSTRUCTION MATERIALS WILL BE BURIED ON-SITE. ALL PERSONNEL WILL BE INSTRUCTED REGARDING THE CORRECT PROCEDURE FOR WASTE DISPOSAL. NOTICES STATING THESE PRACTICES WILL BE POSTED IN THE ON- SITE OFFICE TRAILER AND THE CONSTRUCTION MANAGER RESPONSIBLE FOR THE DAY-TO-DAY SITE OPERATIONS, WILL BE RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE
FOLLOWED.
AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, STAKED SILT BARRIERS, EROSION CONTROL, AND STABILIZED CONSTRUCTION ENTRANCES CONSTRUCTED PRIOR TO GRUBBING OR GRADING OF ANY OTHER PORTIONS OF THE SITE. AREAS WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR MORE THAN 21 DAYS WILL BE STABILIZED WITH A TEMPORARY GRASS AND MULCH WITHIN 14 DAYS OF THE LAST DISTURBANCE. ONCE CONSTRUCTED ACTIVITY CEASES PERMANENTLY IN THAT AREA, THAT AREA WILL BE STABILIZED WITH PERMANENT SOD. AFTER THE ENTIRE SITE IS STABILIZED, THE ACCUMULATED SEDIMENT WILL BE REMOVED FROM THE TRAPS AND THE STAKED SILT BARRIERS WILL
BE REMOVED.
EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES:
THESE ARE THE INSPECTION AND MAINTENANCE PRACTICES THAT SHALL BE USED TO MAINTAIN
EROSION AND SEDIMENT CONTROL.
LESS THAN ONE HALF OF THE SITE WILL BE DENUDED AT ONE TIME PRIOR TO ESTABLISHING EROSION CONTROL MANAGEMENT ALL CONTROL MEASURES WILL BE INSPECTED ONCE PER DAY AND FOLLOWING
ANY STORM EVENT OF 0.5 INCHES OR GREATER BY A CONTRACTOR'S REPRESENTATIVE.
ALL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT WILL BE
INITIATED WITHIN 24 HOURS OF REPORT.
BUILT UP SEDIMENT WILL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT OF THE FENCE. SILT FENCE WILL BE INSPECTED REGULARLY FOR DEPTH OF SEDIMENT, TEARS, TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE
POSTS ARE FIRMLY IN THE GROUND.
IF APPLICABLE, THE SEDIMENT BASINS WILL BE INSPECTED FOR DEPTH OF SEDIMENT, AND BUILT UP SEDIMENT WILL BE REMOVED WHEN IT REACHES 10 PERCENT OF THE DESIGN CAPACITY OR AT THE END
OF THE JOB.
A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION BY THE CONTRACTOR AND SHALL BE KEPT IN AN ACTIVE LOG READILY AVAILABLE AT THE JOB SITE CONSTRUCTION TRAILER.
THE SITE SUPERINTENDENT WILL SELECT INDIVIDUALS WHO WILL BE RESPONSIBLE FOR MAINTENANCE AND REPAIR ACTIVITIES. FILLING OUT THE INSPECTION AND MAINTENANCE REPORT WILL BE BY THE CONTRACTOR. PERSONNEL SELECTED FOR MAINTENANCE RESPONSIBILITIES WILL RECEIVE TRAINING FROM THE SITE SUPERINTENDENT. THEY WILL BE TRAINED IN ALL MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE EROSION AND SEDIMENT CONTROLS USED ON-SITE IN GOOD WORKING ORDER.
NO STORMWATER MANAGEMENT IS REQUIRED.
WETLAND MITIGATION IS NOT APPLICABLE FOR THE PROPOSED PROJECT.
IT IS EXPECTED THAT THE FOLLOWING NON-STORM WATER DISCHARGES WILL OCCUR FROM THE SITE
DURING THE CONSTRUCTION PERIOD:
AN ENVIRONMENTAL RESOURCE PERMIT (ERP) IS REQUIRED, THE FOLLOWING KEY PROVISIONS MUST BE MAINTAINED BY THE PERMITTEE AND CONTRACTOR: (IN ACCORDANCE WITH THE BASIS OF REVIEW
FOR ENVIRONMENTAL RESOURCE PERMIT (ERP) APPLICATIONS)
THE PERMITTEE AND CONTRACTOR SHALL AMEND THE CONSTRUCTION SURFACE WATER MANAGEMENT PLAN WHENEVER THE PROJECT IS ALTERED OR MODIFIED IN A MANNER THAT WILL RESULT IN:
(1) THE POTENTIAL DISCHARGE OF POLLUTANTS
(2) A CHANGE IN THE AMOUNT OF DISCHARGE
(3) A CHANGE IN THE NUMBER OF LOCATION OF STORM WATER DISCHARGE POINTS, OR
(4) ADVERSE IMPACTS TO WETLANDS, AND SUCH CHANGE(S) HAVE NOT OTHERWISE BEEN PREVIOUSLY ADDRESSED IN THE APPROVED PLAN. THE PERMITTEE AND CONTRACTOR SHALL ALSO AMEND THE PLAN IF ITS IMPLEMENTATION DOES NOT ELIMINATE OR MINIMIZE EROSION AND SEDIMENT DEPOSITION, OFF-SITE FLOODING, ADVERSE IMPACTS TO WETLAND, OR VIOLATIONS OF STATE WATER QUALITY STANDARDS. AMENDMENTS TO THE PLAN SHALL BE PREPARED AND KEPT AS SEPARATE DOCUMENTS
ALONG WITH THE ORIGINAL PLAN. ALL ALTERATIONS TO THE SYSTEM MUST BE SHOWN ON THE
AMENDED PLAN ALONG WITH THE DOCUMENTATION OR REQUIRED APPROVAL(S).
NAME OF RECEIVING WATERS:
THE PROPOSED IMPROVEMENTS WILL DISCHARGE STORMWATER ON-SITE SIMILAR TO HISTORIC
CONDITIONS. ULTIMATE DISCHARGE TO SPRING BAYOU.
PROJECT NAME: CRAIG PARK SEAWALL REPLACEMENT
PROJECT ADDRESS:
CRAIG PARK
5 BEEKMAN LANE
TARPON SPRINGS, FL 34689
OWNER'S ADDRESS:
CITY OF TARPON SPRINGS
324 EAST PINE STREET
TARPON SPRINGS, FL 34688
DESCRIPTION OF PURPOSE AND TYPES OF SOIL DISTURBING ACTIVITIES:
PROPERTY AREA APPROXIMATELY = 9.496 ACRES
PROJECT AREA APPROXIMATELY = 0.338 ACRES
CONSTRUCTION PROPOSED: REPLACE EXISTING SEAWALL AND ADJACENT SIDEWALK. NO NEW
STORMWATER MANAGEMENT IS PROPOSED.
SOIL DISTURBING ACTIVITIES WILL INCLUDE:
GRADING TO NEW SIDEWALK.
WETLAND ACTIVITIES INCLUDE:
NO WETLAND IMPACTS ARE PROPOSED FOR THE PROJECT. ACTIVITIES TO OCCUR ON OPEN WATER WITH
APPROPRIATE BEST MANAGEMENT PRACTICES INSTALLED AND MAINTAINED.
CONSTRUCTION REMOVAL ACTIVITIES WILL INCLUDE:
REMOVAL OF THE EXISTING CONCRETE SIDEWALK AND ADJACENT CONCRETE SEAWALL CAP.
STORMWATER DRAINAGE AREA:
BASIN AREA: N/A ACRES
PRE-DEVELOPMENT CURVE NUMBER (CN): N/A
POST DEVELOPMENT CURVE NUMBER (CN): N/A
WATER QUALITY: N/A
WATER QUANTITY: N/A
OTHER CONTROLS / WASTE DISPOSAL
THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT WILL BE USED TO REDUCE THE
RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSURE OF MATERIALS AND SUBSTANCES TO STORM
WATER RUNOFF.
THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED ON-SITE DURING THE
CONSTRUCTION PROJECT:
AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCTS REQUIRED TO DO THE JOB.
ALL MATERIALS STORED ON-SITE SHALL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR
APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A ROOF OR OTHER CONTAINED ENCLOSURE.
PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL MANUFACTURER'S LABELED CONTAINERS. SUBSTANCES
SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER.
WHENEVER POSSIBLE, ALL OF A PRODUCT SHALL BE USED UP BEFORE DISPOSING OF THE CONTAINER.
MANUFACTURERS RECOMMENDATIONS FOR PROPER USE AND DISPOSAL SHALL BE FOLLOWED.
THE SITE SUPERINTENDENT SHALL INSPECT DAILY TO ENSURE PROPER USE AND DISPOSAL OF
MATERIALS ON-SITE.
ALL ON-SITE VEHICLES WILL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTIVE
MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE. PETROLEUM PRODUCTS WILL BE STORED IN TIGHTLY SEALED CONTAINERS, WHICH ARE CLEARLY LABELED. ANY ASPHALT SUBSTANCES USED
ON-SITE WILL BE APPLIED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS.
FERTILIZERS USED WILL BE APPLIED ONLY IN THE MINIMUM AMOUNTS RECOMMENDED BY THE
MANUFACTURER. ONCE APPLIED, FERTILIZER WILL BE WORKED INTO THE SOIL TO LIMIT EXPOSURE TO
STORM WATER. STORAGE WILL BE IN A SEALABLE PLASTIC BIN TO AVOID SPILLS.
CONTRACTOR SHALL DESIGNATE AN AREA AWAY FROM DRAINAGE STRUCTURES, PONDS, BASINS,
WATERWAYS, AND WETLANDS FOR DISCHARGE OF SURPLUS CONCRETE OR DRUM WASH WATER AND
SHALL INSTALL A CONTAINMENT BERM AROUND THIS AREA TO PREVENT RUNOFF TO THE REMAINDER OF THE SITE. HARD DEBRIS SHALL BE DISPOSED OF BY CONTRACTOR UPON COMPLETION OF THE PROJECT. CONTRACTOR TO PREPARE A DETAILED SITE PLAN FOR APPROVAL FOR THE CONCRETE
DISCHARGE AND WASH DOWN ACTIVITIES.
THE MATERIALS OR SUBSTANCES LISTED BELOW ARE EXPECTED, BUT NOT LIMITED, TO BE PRESENT ON-SITE DURING
CONSTRUCTION:
I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS HAVE BEEN READ BY ME OR MY DESIGNATED REPRESENTATIVE AND UNDERSTAND THAT THIS SYSTEM HAS BEEN PREPARED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATE THE INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSONS WHO MANAGE THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE INFORMATION SUBMITTED IS, TO THE BEST OF MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBILITY OF FINE AND
IMPRISONMENT FOR KNOWING VIOLATIONS.
324 E PINE STREET
TARPON SPRINGS, FL 34688
I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND THE TERMS AND CONDITIONS OF THE GENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT THAT AUTHORIZES THE STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY FROM THE CONSTRUCTION SITE IDENTIFIED AS PART OF THIS CERTIFICATION. I UNDERSTAND, AND SHALL COMPLY WITH THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA "GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES" (CGP), AND THIS STORMWATER POLLUTION PREVENTION PLAN PREPARED FOR THE CITY OF TARPON SPRINGS.
NPDES NOTIFICATION
ALL ACTIVITIES MUST CONFORM WITH FDEP NOTICE OF INTENT TO USE GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES. POLLUTION PREVENTION FROM THE PROPOSED CONSTRUCTION ACTIVITIES WILL BE IMPLEMENTED IN ACCORDANCE WITH SWFWMD BASIS OF REVIEW SUBSECTION 2.8.4.
1. IMPLEMENTATION OF THIS STORMWATER POLLUTION PREVENTION PLAN (SWPPP).
2. CONDUCTING AND DOCUMENTING ROUTINE INSPECTIONS AS REQUIRED.
3. RETENTION OF RECORDS REQUIRED BY THE PERMIT, INCLUDING RETENTION OF A COPY OF THE SWPPP AT THE CONSTRUCTION SITE, FROM THE DATE OF PROJECT INITIATION TO THE DATE OF FINAL SITE STABILIZATION.
A "NOTICE OF INTENT TO USE GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES" (NOI) IS NOT REQUIRED FOR THIS SITE SINCE THE OVERALL SITE AREA IS LESS THAN ONE
ACRE IN SIZE.
PH: 727-942-5610
ORIGINAL SHEET - ANSI D (22x34)
Permit-Seal
Drawing No.
Tit le
C lie nt /P ro je ct
Sheet of
Project Number:
Revision
Chkd.Dwn. Dsgn. YY.MM.DD
SCALE:
KDG CPG CPG 10/3/2025
C
ITY
O F
TA
RP
O N
SP
RI
NG
S
PI
NE
LL
AS
C O
UN
TY
, F
LO
RI
DA
C
RA
IG
P
AR
K
SE
AW
AL
L R
EP
LA
C
EM
EN
T -
P
HA
SE
By Re vis io n Ap pd
YY
.M
M .D
D
C
Us er s\ ch ga m ac he
\O ne
Dr ive
St an te c\ At ta ch m en ts\ De sk to p\
\m isc \2
\c ad
\C 1.
_S to rm w at er .D
W G
/1 0/
:4
AM B
y:
G am ac he
, C hr ist op he r
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
St an te c
Co ns ul tin g Se rv ice s In c.
Pa rk P la ce
B lvd
. S ui te
C le ar w at er , F lo rid a w w w .st an te c.
co m Te l.
7.
1.
Fa x.
.4
.1
Christopher P. Gamache, PE Lic. No.: 82122
THE OFFICIAL RECORD OF THIS SHEET IS THE
ELECTRONIC FILE DIGITALLY SIGNED AND SEALED
UNDER RULE 61G15-23.004, F.A.C.
215618198
18 3
C1.02
ST
O
RM
W
AT
ER
P O
LL
UT
IO
N
PR
EV
EN
TIO
N
PL
AN
N/A
FlowNOTES:
1. DROP INLET SEDIMENT BARRIERS ARE TO BE USED FOR SMALL,
NEARLY LEVEL DRAINAGE AREAS. (LESS THAN 5%)
2. USE 2"x 4" WOOD OR EQUIVALENT METAL STAKES. (3 FT. MIN. LENGTH)
3. INSTALL 2"x 4" WOOD TOP FRAME TO INSURE STABILITY.
4. THE TOP OF THE FRAME (PONDING HEIGHT) MUST BE WELL BELOW THE
GROUND ELEVATION DOWNSLOPE TO PREVENT RUNOFF FROM
BYPASSING THE INLET. A TEMPORARY DIKE MAY BE NECESSARY ON
THE DOWNSLOPE SIDE OF THE STRUCTURE.
PONDING HT.
TOP FRAME NECESSARY
FOR STABILITY
2"x 4" WOOD FRAME
4 SIDES OF D.I.
ATTACH FILTER FABRIC
SECURELY TO 2"x 4" WOOD
FRAME, OVERLAPPING
FABRIC TO NEXT STAKE
"M
AX
" M
AX
" M
IN
GATHER EXCESS
FABRIC AT CORNERS
2" x 4" WOOD FRAME
1.
5'
M
AX
3' M
IN
STAKE
FABRIC
" M
IN
SPECIFIC APPLICATION
THIS METHOD OF INLET PROTECTION IS APPLICABLE
WHERE THE INLET DRAINS IN A RELATIVELY FLAT
AREA (SLOPE NO GREATER THAN 5%) WHERE THE
INLET SHEET OF OVERLAND FLOWS (NOT
EXCEEDING 1 C.F.S.) ARE TYPICAL. THE METHOD
SHALL NOT APPLY TO INLETS RECEIVING
CONCENTRATED FLOWS, SUCH AS IN STREET OR
HIGHWAY MEDIANS.
STAKED SEDIMENT BARRIER
FILTERED WATER
RUNOFF WATER
WITH SEDIMENT
AREA INLET
WITH GRATE
A A
THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A
RELATIVELY FLAT AREA (SLOPES NO GREATER THAN 5%) WHERE SHEET OR OVERLAND
FLOWS (NOT EXCEEDING 0.5 CFS) ARE TYPICAL. THE METHOD SHALL NOT APPLY TO
INLETS RECEIVING CONCENTRATED FLOWS, SUCH AS STREET OR HIGHWAY MEDIANS.
STAKED AND ENTRENCHED
50 LB (APPROX.) SEDIMENT BARRIER
COMPACTED SOIL TO
PREVENT PIPING
SEDIMENT LADEN
RUNOFF
BINDING WIRE
OR TWINE
FILTERED
RUNOFF
BARRIER
WIDTH
4"
ANGLE FIRST STAKE
TOWARD PREVIOUSLY
LAID BALE
1" X 2" STAKE
WEDGE LOOSE SYNTHETIC
MATERIAL BETWEEN BARRIERS
BARRIERS MUST BE TIGHTLY
ABUTTING WITH NO GAPS
TE
M
PO
R
AR
Y
D
IK
E
IF
N
EE
D
ED
DROP
INLET
SECTION A-A
FLOW
LESS
THAN
5%
SLOPE
3. BACKFILL AND COMPACT
THE EXCAVATED SOIL
2. PLACE AND STAKE SEDIMENT
BARRIER
PROPERLY INSTALLED
SEDIMENT BARRIER
(CROSS-SECTION)
1. EXCAVATE
THE TRENCH
6" Min.
SEDIMENT BARRIERS ARE
TO BE PLACED 4 INCHES
IN THE SOIL. TIGHTLY
ABUTTING WITH NO
GAP. STAKED AND
BACKFILLED AROUND THE
ENTIRE OUTSIDE
PERIMETER.
PLAN VIEW
ISOMETRIC VIEW
ELEVATION OF STAKE AND
FABRIC ORIENTATION
SECTION A-A
PLAN VIEW
ORIGINAL SHEET - ANSI D (22x34)
Permit-Seal
Drawing No.
Tit le
C lie nt /P ro je ct
Sheet of
Project Number:
Revision
Chkd.Dwn. Dsgn. YY.MM.DD
SCALE:
KDG CPG CPG 10/3/2025
C
ITY
O F
TA
RP
O N
SP
RI
NG
S
PI
NE
LL
AS
C O
UN
TY
, F
LO
RI
DA
C
RA
IG
P
AR
K
SE
AW
AL
L R
EP
LA
C
EM
EN
T -
P
HA
SE
By Re vis io n Ap pd
YY
.M
M .D
D
C
Us er s\ ch ga m ac he
\O ne
Dr ive
St an te c\ At ta ch m en ts\ De sk to p\
\m isc \2
\c ad
\C 1.
_S to rm w at er .D
W G
/1 0/
:0
AM B
y:
G am ac he
, C hr ist op he r
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
St an te c
Co ns ul tin g Se rv ice s In c.
Pa rk P la ce
B lvd
. S ui te
C le ar w at er , F lo rid a w w w .st an te c.
co m Te l.
7.
1.
Fa x.
.4
.1
Christopher P. Gamache, PE Lic. No.: 82122
THE OFFICIAL RECORD OF THIS SHEET IS THE
ELECTRONIC FILE DIGITALLY SIGNED AND SEALED
UNDER RULE 61G15-23.004, F.A.C.
215618198
18 4
C1.03
ER
O
SIO
N
C O
NT
RO
L
N/A
TEMPORARY SEDIMENT BARRIER AT DROP INLET
N.T.S.
TEMPORARY SYNTHETIC SEDIMENT
BARRIER AT STORM DRAIN DROP INLET
N.T.S.
TEMPORARY SYNTHETIC SEDIMENT BARRIER
N.T.S.
EROSION AND SEDIMENTATION CONTROL NOTES
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTROL AND
PREVENT EROSION AND THE TRANSPORTATION OF SEDIMENT TO
SURFACE DRAINS AND OUTFALLS. REFER TO CONSTRUCTION PLANS,
DETAILS, SPECIFICATIONS AND APPROVED PERMITS FOR DETAILS.
SEDIMENT DEPOSITS SHALL BE REMOVED WHEN THEY REACH SIX INCHES
ON AN EROSION DEVICE.
2. DURING THE CONSTRUCTION OF DRAINAGE STRUCTURES, AND OTHER
STRUCTURES REQUIRING EXCAVATION, THE CONTRACTOR SHALL PLACE
APPROVED BARRIERS OR OTHER APPROVED DEVICES AROUND SUCH
STRUCTURES TO PREVENT EROSION AND THE MIGRATION OF SEDIMENT
TO POINTS OUTSIDE THE CONSTRUCTION AREA. THE APPROVED
BARRIERS OR OTHER APPROVED DEVICES SHALL BE PLACED IN
ACCORDANCE WITH REQUIREMENTS OF THE STATE OF FLORIDA EROSION
AND SEDIMENT CONTROL DESIGNER AND REVIEWER MANUAL, FDEP, OR
AS DIRECTED BY THE ENGINEER.
3. REQUIRED EROSION CONTROL MEASURES MUST REMAIN INTACT
THROUGHOUT CONSTRUCTION. FAILURE TO INSTALL OR PROPERLY
MAINTAIN REQUIRED EROSION CONTROL WILL RESULT IN ENFORCEMENT
ACTION. ALL EROSION CONTROL MEASURES, SAND, SILT, AND DEBRIS
SHALL BE REMOVED FROM ALL DRAINAGE PIPES AND STRUCTURES
AFTER CONSTRUCTION HAS BEEN COMPLETED AND PRIOR TO COUNTY
FINAL WALK-THROUGH.
4. OUTFALL PROTECTION - PROJECT PIPE OR DITCH DISCHARGES INTO
OFF-SITE OUTFALLS SHALL BE INSPECTED DAILY FOR POSSIBLE
SEDIMENT BUILDUP OR TRANSPORT. OUTFALLS SHALL BE PROTECTED
THROUGH USE OF EROSION CONTROL FEATURES AS NECESSARY TO
CONTAIN ANY SEDIMENT LOSS TO THE IMMEDIATE AREA OF THE
PROJECT. ANY SEDIMENT BUILDUP OR TRANSPORT OFF-SITE SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO REMEDY. THE CONTRACTOR
SHALL USE APPROPRIATE MEASURES AS DIRECTED BY THE PROJECT
ENGINEER FOR OUTFALL PROTECTION.
5. APPROVED BARRIERS (OR OTHER APPROVED SEDIMENT CONTROL
DEVICES): THESE SHALL BE PLACED AT THE BASE OF ANY SLOPE WHERE
A RAINFALL EVENT COULD ERODE A SLOPE AND TRANSPORT SEDIMENTS
OFF-SITE. APPROVED BARRIERS SHALL BE DOUBLE STAKED IN
ACCORDANCE WITH THE STATE OF FLORIDA EROSION AND SEDIMENT
CONTROL DESIGNER AND REVIEWER MANUAL OR FDEP. IF EROSION
DEPOSITS REACH THE TOP ELEVATION OF EXISTING APPROVED
BARRIERS, THEN SEDIMENTS SHOULD BE REMOVED. ANY DAMAGED OR
INEFFECTIVE APPROVED BARRIERS ARE TO BE REPLACED WITH NEW
ONES. THE LOCATION AND INSTALLATION OF APPROVED BARRIERS SHALL
BE AS DIRECTED BY THE PROJECT ENGINEER.
6. BACK OF SIDEWALK INLETS OR MEDIAN INLETS: THESE SHALL BE
PROTECTED FROM SEDIMENT INTAKE UNTIL PROJECT IS COMPLETE.
ELEVATION OF GROUND OUTSIDE INLET TOP SHALL NOT BE HIGHER THAN
INLET TOP. APPROVED BARRIERS OR OTHER APPROVED SEDIMENT
CONTROL DEVICES SHALL BE INSTALLED AROUND INLET TOP. A SECOND
ROW OF APPROVED BARRIERS OR OTHER APPROVED SEDIMENT
CONTROL DEVICES SHALL BE PLACED AROUND INLET APPROXIMATELY 4"
OUTSIDE FIRST ROW. BETWEEN ROWS THERE SHALL BE A DEPRESSION
TO ACT AS A SEDIMENT BASIN. COMPLETED INLETS IN PAVED AREAS
SHALL ALSO BE PROTECTED WITH A SINGLE LINE OF APPROVED
BARRIERS OR OTHER APPROVED SEDIMENT CONTROL DEVICES TO
PREVENT SEDIMENT INTAKE FROM OTHER AREAS.
7. STOCKPILED MATERIALS SHALL BE PROTECTED BY COVER, APPROVED
BARRIERS OR OTHER APPROVED SEDIMENT CONTROL DEVICES.
8. ALL DISTURBED AREAS SHALL BE STABILIZED WITHIN 3 DAYS AFTER 1/2"
RAIN EVENT DISTURBANCE.
9. SEDIMENT TRAPPING MEASURES: SEDIMENT BASINS AND TRAPS,
PERIMETER BERMS, FILTER FENCES, BERMS, SEDIMENT BARRIERS,
VEGETATIVE BUFFERS AND OTHER MEASURES INTENDED TO TRAP
SEDIMENT AND/OR PREVENT THE TRANSPORT OF SEDIMENT INTO
WATERS OF THE STATE OR NEIGHBORING PROPERTIES SHALL BE
INSTALLED, CONSTRUCTED OR, IN THE CASE OF VEGETATIVE BUFFERS,
PROTECTED FROM DISTURBANCE, AS A FIRST STEP IN THE LAND
ALTERATION PROCESS.
10. WHERE PUMPS ARE TO BE USED TO REMOVE TURBID WATER FROM THE
CONSTRUCTION AREA, THE WATER SHALL BE TREATED TO REDUCE
TURBIDITY TO STATE WATER QUALITY STANDARDS PRIOR TO DISCHARGE
TO THE WETLANDS. TREATMENT METHODS INCLUDE, FOR EXAMPLE,
TURBID WATER BEING PUMPED INTO GRASSED SWALES OR
APPROPRIATE VEGETATED AREAS (OTHER THAN UPLAND PRESERVATION
AREAS AND WETLAND BUFFERS), SEDIMENTS BASINS, OR AREAS
CONFINED BY AN APPROPRIATE ENCLOSURE SUCH AS TURBIDITY
BARRIERS, AND KEPT CONFINED UNTIL ITS TURBIDITY LEVEL MEETS
STATE WATER QUALITY STANDARDS.
11. IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION, THE
CONTRACTOR SHALL STABILIZE THE AFFECTED AREA USING SPRINKLING,
IRRIGATION, OR OTHER ACCEPTABLE METHODS.
12. THERE IS TO BE NO DISCHARGE (I.E. PUMPING, SHEET FLOW, SWALE,
DITCH, ETC.) INTO EXISTING DITCHES OR CANALS WITHOUT THE USE OF
SETTLING PONDS OR DEVICES. IF THE CONTRACTOR DESIRES TO
DISCHARGE INTO EXISTING DITCHES OR CANALS, A SETTLING PLAN
PREPARED BY THE CONTRACTOR MUST BE SUBMITTED TO AND
APPROVED BY THE ENGINEER OF RECORD AND LOCAL REGULATORY
AGENCY PRIOR TO CONSTRUCTION.
13. WHERE APPLICABLE, SOIL TRACKING PREVENTION DEVICES SHALL BE
PROVIDED AND MAINTAINED PER THE STATE OF FLORIDA EROSION AND
SEDIMENT CONTROL DESIGNER AND REVIEWER MANUAL OR FDEP.
14. THE EROSION CONTROL DEVICE QUANTITIES SHOWN ON THE BID FORMS
ARE ESTIMATES OF THE ACTUAL QUANTITIES THAT MAY BE
ENCOUNTERED DURING CONSTRUCTION. IT IS THE RESPONSIBILITY OF
THE CONTRACTOR TO SPECIFY ACTUAL QUANTITIES AND COSTS
ASSOCIATED WITH THIS SPECIFIC EROSION CONTROL IMPLEMENTATION
SCHEDULE. EROSION CONTROL ITEMS MAY BE ADDED OR DELETED FROM
THE PAY ITEM LIST AS THE EROSION CONTROL IMPLEMENTATION
SCHEDULE PROVIDED BY THE CONTRACTOR IS MODIFIED TO MEET SITE
SPECIFIC CONDITIONS.
15. ALL EROSION CONTROL FENCES, BARRIERS, AND SILTATION DEVICES
SHALL BE ERECTED PRIOR TO ANY LAND ALTERATIONS, SHALL BE
MAINTAINED IN GOOD WORKING ORDER DURING CONSTRUCTION, AND
REMOVED FOLLOWING SOIL STABILIZATION AND FINAL DRESSING.
BUILT-UP SEDIMENT WILL BE REMOVED FROM SILT FENCES AND STAKED
TURBIDITY BARRIERS WHEN IT HAS REACHED ONE THIRD THE HEIGHT OF
THE FENCE/BARRIER. STOCKPILE AREAS SHALL INCLUDE SILT FENCE
AROUND THE PERIMETER.
16. THE CONTRACTOR SHALL NOT RESTRICT OR BLOCK THE EXISTING
DRAINAGE FLOW OVERLAND OR WITHIN RESHAPED SWALES. FLOW
WITHIN EXISTING DRAINAGE PIPES SHALL BE MAINTAINED AT ALL TIMES.
STORMWATER WILL BE CONVEYED VIA EXISTING SWALES, DITCHES, OR
PROPOSED DITCHES, EXISTING AND PROPOSED STORM SEWERS.
17. DURING DEWATERING OPERATIONS, THE CONTRACTOR SHALL NOT
DISCHARGE DIRECTLY TO RECEIVING WATERS, EXISTING CONVEYANCES
TO RECEIVING WATERS, OR WETLAND SYSTEMS. TEMPORARY SEDIMENT
BASINS, TRAPS, OR SILTATION REDUCTION DEVICES SHALL BE UTILIZED
TO COLLECT THE DISCHARGE FROM DEWATERING ACTIVITIES TO
ELIMINATE THE POTENTIAL FOR OFF-SITE SEDIMENT TRANSPORT AND TO
INSURE THAT DIRECT DISCHARGE DOES NOT OCCUR.
18. BANKS SHALL BE PROTECTED FROM EROSION OR COLLAPSE DURING
CONSTRUCTION. BANK PROTECTION MATERIAL SHALL BE CAREFULLY
PLACED FROM THE BANK AND NOT DUMPED FROM ABOVE IN AN
UNCONTROLLED MANNER. EROSION CONTROL FABRIC SHALL BE USED
FOR EROSION PROTECTION WHERE SOD WILL NOT HOLD OR BECOME
ESTABLISHED IN TIME TO PROTECT THE BANKS. UNLESS OTHERWISE
SPECIFIED IN THE PLANS, UPON COMPLETION OF CONSTRUCTION, ALL
BANKS AND WATERWAYS SHALL BE RESTORED TO THEIR PRE-
CONSTRUCTION CONFIGURATION AND PROTECTION FROM EROSION.
19. IF APPLICABLE, THE CONTRACTOR SHALL BE RESSPONSIBLE FOR
PROTECTING POND FILTRATION SYSTEMS FROM BEING CLOGGED UNTIL
THE CITY OF TARPON SPRINGS DETERMINES THE CONSTRUCTION IS
COMPLETE. IF FILTER MATERIAL IS CONTAMINATED, IT SHALL BE
REPLACED AT THE EXPENSE OF THE CONTRACTOR.
20. CONTRACTOR TO COORDINATE WITH LOCAL MUNICIPALITY REGARDING
PREPARATION AND PERMITTING WITHIN THE NPDES PROGRAM.
786'-0"±
(REPAIR ONLY)
57'-5"±
51'-9"±
4"
793'-2"±
1,972'-0"± (LIMITS OF WALL REPAIR/REPLACEMENT)
SPRING BAYOU
NORTH SPRING BOULEVARD
WHITCOMB
BAYOU
N
OR
TH
SOUTH
B
OU
LE
V
AR
D
SPRING BOULE
VARD
SOUTH SPRING BOULEVARD
B E E K M
AN
L
AN
E
MANATEE GRATE
EXTEND EXIST. 36" RCP
MANATEE GRATE
EXTEND EXIST.
12" RCP
REMOVE & RESET
GANGWAY
A
A D
D
CONCRETE SEAWALL
CAP (TYP.)
8'-0" WIDE CONCRETE
SIDEWALK (TYP.)
BRICK PLANTER
(TYP.)
F
F
MANATEE GRATE
PIPE INVERT EL = -0.80'
MANATEE GRATE
PIPE INVERT EL = -0.80'
MANATEE GRATE
PIPE INVERT EL = -0.80'
DITCH BOTTOM INLET
FDOT TYPE C, TRAVERSABLE
STANDARD PLANS 425-052
RIM EL.=3.20'
INV. EL.=2.20'
23LF OF 12" PVC PIPE
18 LF OF 12" PVC PIPE
MANATEE GRATE
PIPE INVERT EL.=1.50'
D
D
C
C
MASONRY
WALL (2)
MASONRY WALL (1)
MASONRY WALL (1)
GRASSED BERM MANATEE GRATE
PIPE INVERT EL.=1.50'
B
B
G G
B-6
B-7
B-8
B-9
B-10
B-11
23 LF OF 12" PVC PIPE
8% SLOPE
REPLACE FAILED
WALL (20'-0")
MATCH NEW SIDEWALK
TO EXISTING STEPS
D
D
REMOVE AND REPLACE
CONCRETE LANDING
33'-0" REMOVE AND REPLACE
SIDEWALK AND CURB
MANATEE GRATE
PIPE INVERT
EL = 1.50
DITCH BOTTOM INLET
FDOT TYPE C, TRAVERSABLE
STANDARD PLANS 425-052
RIM EL.=3.50'
INV. EL.=2.50'17 LF OF 12" PVC PIPE
℄ GRASSED BERM
OBSERVATION
DECK
SECT.F-F
SECT.D-D
221'-11"
MANATEE GRATE
EXTEND EXIST.
29"x45" ERCP
5% (MAX.) SLOPE
REMOVE CONCRETE SWALE
MANATEE GRATE
PIPE INVERT EL = -0.80'
MANATEE GRATE
EXTEND EXIST. 12" RCP
FDOT CURB INLET TYPE 3
(4 FOOT ROUND P-BOTTOM)
W/ 3 FOOT DIA. MANHOLE COVER
STANDARD PLANS 425-001 & 425-020
RIM ELEV. = 4.85'
THROAT ELEV. = 4.02'
INVERT ELEV. (N) = 2.50'
40 LF OF 12" PVC PIPE
REMOVE & RESET CURB
REMOVE & REPLACE ASPHALT
IN KIND (6' x 13')
20 LF OF 18" RCP
2% (MAX.) SLOPE
5% (MAX.)
SLOPE
LANDSCAPE ROCK
(MATCH EXISTING)
2" THICK OVER GEOTEXTILE FABRIC
REMOVE AND RESET
MEMORIAL PLAQUE
REMOVE AND RESET MONUMENT
REMOVE AND RESET
MEMORIAL PLAQUE
REMOVE AND RESET
EXISTING GROUND LIGHTING (TYP.)
24"x24" HDPE CATCH BASIN
RIM EL.=4.00'
E
E
ADJUST MANHOLE
TO RIM ELEV. = 5.80
MANATEE GRATE
EXTEND EXIST. 12" RCP
TOP OF BERM
ELEV. = 5.80
REMOVE SIDEWALK
40 LF OF 12" PVC PIPE
DITCH BOTTOM INLET
FDOT TYPE C, TRAVERSABLE
STANDARD PLANS 425-052
RIM EL.=3.45'
INV. EL.=2.45'
5% (MAX.)
SLOPE
REMOVE
SIDEWALK
DITCH BOTTOM INLET
FDOT TYPE C, TRAVERSABLE
STANDARD PLANS 425-052
RIM EL.=3.10'
INV. EL.=2.10'
40 LF OF 12" PVC PIPE
REMOVE MANHOLE COVER
AND REPLACE WITH DRAINAGE GRATE COVER
ADJUST TO RIM ELEV. = 3.45
REMOVE CURB AND CONSTRUCT ASPHALT FLUME
25'-0" GRAVITY WALL & GUIDERAIL, HEIGHT
VARIES FROM 0.00' TO 3.25' (SEE NOTE 7)
MATCH EXISTING
GRADE
S P R
IN
G
15'-0" ALUMINUM PIPE GUIDERAIL
FDOT STANDARD PLANS 515-070 (TYP.)
DITCH BOTTOM INLET
FDOT TYPE C, TRAVERSABLE
STANDARD PLANS 425-052
RIM EL.=3.63'
INV. EL.=2.63'
DITCH BOTTOM INLET
FDOT TYPE C, TRAVERSABLE
STANDARD PLANS 425-052
RIM EL.=3.80'
INV. EL.=2.80'
4" CONCRETE SIDEWALK
6'-0" WIDE x 18'-0" LONG (TYP.)
RESET BM 872 DISK IN SIMILAR LOCATION
ON TOP OF NEW SEAWALL CAP
33'-0" GRAVITY WALL & GUIDERAIL,
HEIGHT VARIES FROM 0.00' TO 3.25'
(SEE NOTE 7)H H
ADJUST MANHOLE TO
RIM ELEV. = 5.10
INSTALL TIDAL CHECK VALVE
EXISTING LAMP POSTS TO REMAIN
EXISTING LIGHT POLE TO REMAIN
50 25 0 50
SCALE: 1" = 50'
GENERAL PLAN
SCALE: 1" = 50'
NOTES:
1. LENGTH OF SEAWALL IS MEASURED ALONG THE
CENTERLINE OF THE PROPOSED CONCRETE CAP.
2. REMOVE AND RESET ALL ELECTRICAL PANEL POSTS TO
MATCH PROPOSED GRADE IN FILL AREA.
3. REMOVE AND RELOCATE ALL POST MOUNTED BENCHES
WITHIN GRASSED BERM.
4. ADJUST/RAISE ALL EXISTING IRRIGATION HEADS IN FILL
AREAS OR REPLACE IN KIND.
5. FLOATING TURBIDITY BARRIER SHALL BE IN PLACE
PRIOR TO ANY IN-WATER WORK.
6. SEE SHEETS C3.01 THROUGH C3.04 FOR TYPICAL
SECTIONS A-A THROUGH H-H.
7. CONSTRUCT CONCRETE GRAVITY WALL AT THE EDGE OF
THE WALKWAY PER FDOT STANDARD PLANS 400-011,
SCHEME 1. HEIGHT VARIES FROM 0.00' TO 3.25'.
INSTALL ALUMINUM PIPE GUIDERAIL ON TOP OF WALL
PER FDOT STANDARD PLANS 515-070
8. REMOVE AND REPLACE ALL LAMPPOSTS & FOUNDATIONS.
9. INSTALL 6 CLEATS, IN SIMILAR LOCATION TO EXISTING,
ON SEAWALL CAP SURROUNDING THE OBSERVATION
PLATFORM.
ORIGINAL SHEET - ANSI D (22x34)
Permit-Seal
Drawing No.
Tit le
C lie nt /P ro je ct
Sheet of
Project Number:
Revision
Chkd.Dwn. Dsgn. YY.MM.DD
SCALE:
KDG CPG CPG 10/3/2025
C
ITY
O F
TA
RP
O N
SP
RI
NG
S
PI
NE
LL
AS
C O
UN
TY
, F
LO
RI
DA
C
RA
IG
P
AR
K
SE
AW
AL
L R
EP
LA
C
EM
EN
T -
P
HA
SE
By Re vis io n Ap pd
YY
.M
M .D
D
C
Us er s\ ch ga m ac he
\O ne
Dr ive
St an te c\ At ta ch m en ts\ De sk to p\
\m isc \2
\c ad
\C 3.
_G en P la n.
dw g
/1 0/
:4
AM B
y:
G am ac he
, C hr ist op he r
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
St an te c
Co ns ul tin g Se rv ice s In c.
Pa rk P la ce
B lvd
. S ui te
C le ar w at er , F lo rid a w w w .st an te c.
co m Te l.
7.
1.
Fa x.
.4
.1
Christopher P. Gamache, PE Lic. No.: 82122
THE OFFICIAL RECORD OF THIS SHEET IS THE
ELECTRONIC FILE DIGITALLY SIGNED AND SEALED
UNDER RULE 61G15-23.004, F.A.C.
215618198
18 5
C3.00
G
EN
ER
AL
P
LA
N
AS SHOWN
LEGEND:
STANDARD PENETRATION TEST BORING
NGS SURVEY DISK (EXIST./PROP.)
SURVEY TEMPORARY BENCHMARK
EXIST. CONCRETE LAMPPOST (TO REMAIN)
ALUMINUM LAMPPOST (EXIST./PROP.)
LIMIT OF DISTURBED AREA
LIMITS OF GRASSED BERM
MHW ELEV. 0.85
MSL ELEV. -0.21
MHHW ELEV. 1.22
MLW ELEV. -1.32
MLLW ELEV. -1.83
-1
-2
-3
DATUM
NAVD88 -4
1'-6"
1' -4
CONSTRUCT CONCRETE CAP
TO MATCH EXISTING TOP ELEVATION
10-YR FLOOD ELEV. 5.80
1'-0"
GRASSED BERM
ELEV. 5.80
EXISTING CONCRETE
SIDEWALK (TO REMAIN)
REMOVE EXISTING
CONCRETE CAP
SUPPLEMENTAL HELICAL ANCHOR
SPACED AT 15'-0" O.C.
EXISTING GROUND
-1
-2
-3
-4
EXISTING CONCRETE
PANEL (TO REMAIN)
FLOATING TURBIDITY BARRIER
20°
EXISTING DEADMAN
ANCHOR (TO REMAIN)
MIN. 11'-6"
EXISTING ANCHOR
ROD (TO REMAIN)
1'-0"
℄ GRASSED BERM
GRASSED BERM
ELEV. 5.80
-1
-2
-3
-4
MASONRY
BLOCK WALL
12" PVC PIPE
MHW ELEV. 0.85
MSL ELEV. -0.21
MHHW ELEV. 1.22
MLW ELEV. -1.32
MLLW ELEV. -1.83
-1
-2
-3
DATUM
NAVD88 -4
1'-6"
1' -4
CONSTRUCT CONCRETE CAP
TO MATCH EXISTING TOP ELEVATION
10-YR FLOOD ELEV. 5.80
REMOVE EXISTING CONCRETE CAP
EXISTING GROUND
EXISTING CONCRETE
PANEL (TO REMAIN)
FLOATING TURBIDITY BARRIER
CUT HOLE IN EXISTING CONCRETE PANEL
AND SEAL PIPE PENETRATION
WITH NON-SHRINK GROUT
MANATEE
GRATE
1'-0" 1'-0"
℄ GRASSED BERM
6" COMPACTED GRANULAR
BASE LEVELING PAD
TIDAL CHECK VALVE
REMOVE EXISTING
CONCRETE SIDEWALK
PRECAST DITCH BOTTOM INLET
FDOT TYPE C, TRAVERSABLE
INDEX 425-052
4" CONCRETE
SIDEWALKSTEEL GRATE
TYPICAL SECTION A-A - CAP REPLACEMENT & BERM
(BETWEEN DRAINAGE STRUCTURES)
SCALE: 12" = 1'-0"
ORIGINAL SHEET - ANSI D (22x34)
Permit-Seal
Drawing No.
Tit le
C lie nt /P ro je ct
Sheet of
Project Number:
Revision
Chkd.Dwn. Dsgn. YY.MM.DD
SCALE:
KDG CPG CPG 10/3/2025
C
ITY
O F
TA
RP
O N
SP
RI
NG
S
PI
NE
LL
AS
C O
UN
TY
, F
LO
RI
DA
C
RA
IG
P
AR
K
SE
AW
AL
L R
EP
LA
C
EM
EN
T -
P
HA
SE
By Re vis io n Ap pd
YY
.M
M .D
D
C
Us er s\ ch ga m ac he
\O ne
Dr ive
St an te c\ At ta ch m en ts\ De sk to p\
\m isc \2
\c ad
\C 3.
_T yp ic al S ec tio ns .d w g
/1 0/
:4
AM B
y:
G am ac he
, C hr ist op he r
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
St an te c
Co ns ul tin g Se rv ice s In c.
Pa rk P la ce
B lvd
. S ui te
C le ar w at er , F lo rid a w w w .st an te c.
co m Te l.
7.
1.
Fa x.
.4
.1
Christopher P. Gamache, PE Lic. No.: 82122
THE OFFICIAL RECORD OF THIS SHEET IS THE
ELECTRONIC FILE DIGITALLY SIGNED AND SEALED
UNDER RULE 61G15-23.004, F.A.C.
215618198
18 6
C3.01
TY
PI
C
AL
S
EC
TIO
NS
(1 O
F 4)
AS SHOWN
TYPICAL SECTION A-A - CAP REPLACEMENT & BERM
(AT DRAINAGE STRUCTURE)
SCALE: 12" = 1'-0"
MHW ELEV. 0.85
MSL ELEV. -0.21
MHHW ELEV. 1.22
MLW ELEV. -1.32
MLLW ELEV. -1.83
-1
-2
-3
-4
1'-6"
1' -4
CONSTRUCT CONCRETE CAP
TO MATCH EXISTING TOP ELEVATION
10-YR FLOOD ELEV. 5.80
REMOVE EXISTING CONCRETE CAP
SUPPLEMENTAL HELICAL ANCHOR
SPACED AT 15'-0" O.C.
EXISTING GROUND
-1
-2
-3
-4
EXISTING CONCRETE
PANEL (TO REMAIN)
FLOATING TURBIDITY BARRIER
EXISTING CONCRETE
SIDEWALK
EXISTING DEADMAN
ANCHOR (TO REMAIN)
DATUM
NAVD88
MIN. 11'-6"
20°
7 7
MHW ELEV. 0.85
MSL ELEV. -0.21
MHHW ELEV. 1.22
MLW ELEV. -1.32
MLLW ELEV. -1.83
-1
-2
-3
-4
1'-10"
1' -4
CONSTRUCT CONCRETE CAP
TO MATCH EXISTING TOP ELEVATION
10-YR FLOOD ELEV. 5.80
REMOVE EXISTING CONCRETE CAP
EXISTING GROUND
-1
-2
-3
-4
REMOVE EXISTING
CONCRETE PANEL
FLOATING TURBIDITY BARRIER
FRP SHEET PILE
DATUM
NAVD88
EXISTING DEADMAN
ANCHOR (TO REMAIN)
MIN. 11'-6"
HELICAL ANCHOR
2 ANCHORS SPACED AT 10'-0" O.C.
WITHIN REPLACEMENT SECTION
ELEV. -10.50
20°
1'-0"
ELEV. 5.80
1'-0"
℄ GRASSED BERM
TYPICAL SECTION B-B - SEAWALL REPLACEMENT AT FAILED WALL
SCALE: 12" = 1'-0"
ORIGINAL SHEET - ANSI D (22x34)
Permit-Seal
Drawing No.
Tit le
C lie nt /P ro je ct
Sheet of
Project Number:
Revision
Chkd.Dwn. Dsgn. YY.MM.DD
SCALE:
KDG CPG CPG 10/3/2025
C
ITY
O F
TA
RP
O N
SP
RI
NG
S
PI
NE
LL
AS
C O
UN
TY
, F
LO
RI
DA
C
RA
IG
P
AR
K
SE
AW
AL
L R
EP
LA
C
EM
EN
T -
P
HA
SE
By Re vis io n Ap pd
YY
.M
M .D
D
C
Us er s\ ch ga m ac he
\O ne
Dr ive
St an te c\ At ta ch m en ts\ De sk to p\
\m isc \2
\c ad
\C 3.
_T yp ic al S ec tio ns .d w g
/1 0/
:4
AM B
y:
G am ac he
, C hr ist op he r
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
St an te c
Co ns ul tin g Se rv ice s In c.
Pa rk P la ce
B lvd
. S ui te
C le ar w at er , F lo rid a w w w .st an te c.
co m Te l.
7.
1.
Fa x.
.4
.1
Christopher P. Gamache, PE Lic. No.: 82122
THE OFFICIAL RECORD OF THIS SHEET IS THE
ELECTRONIC FILE DIGITALLY SIGNED AND SEALED
UNDER RULE 61G15-23.004, F.A.C.
215618198
18 7
C3.02
TY
PI
C
AL
S
EC
TIO
NS
(2 O
F 4)
AS SHOWN
TYPICAL SECTION C-C - CAP REPLACEMENT W/O BERM
-1
-2
-3
-4
MHW ELEV. 0.85
MSL ELEV. -0.21
MHHW ELEV. 1.22
MLW ELEV. -1.32
MLLW ELEV. -1.83
10-YR FLOOD ELEV. 5.80
2'-0"
ELEV. 5.80
ELEV. 5.00
1'-10"
1' -4
4" CONCRETE SIDEWALK
FRP SHEET PILE
CONCRETE CAP
1'-6"
(MAX.)
EXISTING CONCRETE
PANEL (TO REMAIN)
HELICAL ANCHOR
SPACED AT 10'-0" O.C.
REMOVE EXISTING CONCRETE
SIDEWALK & CURB
GRASSED BERM
TYPE A CONCRETE CURB
-1
-2
-3
-4
FLOATING TURBIDITY BARRIER
8'-0"
EXISTING GROUND
EXISTING DEADMAN
ANCHOR (TO REMAIN)
20°
MIN. 17'-0"
DATUM
NAVD88
-5
-6
-7
-5
-6
-7ELEV. -15.50
Slope: 0.01 Ft/Ft
PLACE FLOWABLE FILL BETWEEN EXISTING
CONCRETE PANEL AND PROPOSED SHEET PILE
-1
-2
-3
-4
MHW ELEV. 0.85
MSL ELEV. -0.21
MHHW ELEV. 1.22
MLW ELEV. -1.32
MLLW ELEV. -1.83
10-YR FLOOD ELEV. 5.80
ELEV. 5.00
1'-10"
1' -4
4" CONCRETE SIDEWALK
FRP SHEET PILE
CONCRETE CAP
1'-6"
(MAX.)
EXISTING CONCRETE
PANEL (TO REMAIN)
HELICAL ANCHOR
SPACED AT 10'-0" O.C.
REMOVE EXISTING
CONCRETE
SIDEWALK & CURB
LANDSCAPE ROCK
(MATCH EXISTING)
2" THICK OVER
GEOTEXTILE FABRIC
-1
-2
-3
-4
FLOATING TURBIDITY BARRIER
8'-0"
EXISTING GROUND
EXISTING DEADMAN
ANCHOR (TO REMAIN)
20°
MIN. 17'-0"
DATUM
NAVD88
-5
-6
-7
-5
-6
-7ELEV. -15.50
Slope: 0.01 Ft/Ft
EXISTING CONCRETE
(TO REMAIN)
EXISTING FLAG POLE
(TO REMAIN)
EXISTING SHRUB
(TO REMAIN)
PLACE FLOWABLE FILL BETWEEN EXISTING
CONCRETE PANEL AND PROPOSED SHEET PILE
ORIGINAL SHEET - ANSI D (22x34)
Permit-Seal
Drawing No.
Tit le
C lie nt /P ro je ct
Sheet of
Project Number:
Revision
Chkd.Dwn. Dsgn. YY.MM.DD
SCALE:
KDG CPG CPG 10/3/2025
C
ITY
O F
TA
RP
O N
SP
RI
NG
S
PI
NE
LL
AS
C O
UN
TY
, F
LO
RI
DA
C
RA
IG
P
AR
K
SE
AW
AL
L R
EP
LA
C
EM
EN
T -
P
HA
SE
By Re vis io n Ap pd
YY
.M
M .D
D
C
Us er s\ ch ga m ac he
\O ne
Dr ive
St an te c\ At ta ch m en ts\ De sk to p\
\m isc \2
\c ad
\C 3.
_T yp ic al S ec tio ns .d w g
/1 0/
:4
AM B
y:
G am ac he
, C hr ist op he r
Th e
C on tra ct or sh al l v er ify a nd b e re sp on sib le fo r a ll d im en sio ns
. D O
N O
T s ca le th e dr aw in g
- a ny e rro rs or o m iss io ns sh al l b e re po rte d to S ta nt ec w ith ou t d el ay
Th e
C op yr ig ht s t o al l d es ig ns a nd d ra w in gs a re th e pr op er ty o f S ta nt ec
. R ep ro du ct io n or u se fo r a ny p ur po se o th er th an th at a ut ho riz ed b y St an te c is fo rb id de n.
St an te c
Co ns ul tin g Se rv ice s In c.
Pa rk P la ce
B lvd
. S ui te
C le ar w at er , F lo rid a w w w .st an te c.
co m Te l.
7.
1.
Fa x.
.4
.1
Christopher P. Gamache, PE Lic. No.: 82122
THE OFFICIAL RECORD OF THIS SHEET IS THE
ELECTRONIC FILE DIGITALLY SIGNED AND SEALED
UNDER RULE 61G15-23.004, F.A.C.
215618198
18 8
C3.03
TY
PI
C
AL
S
EC
TIO
NS
(3 O
F 4)
AS SHOWN
TYPICAL SECTION D-D - SEAWALL & SIDEWALK REPLACEMENT, FLATLAND CONDITION
SCALE: 12" = 1'-0"
TYPICAL SECTION E-E - SEAWALL & SIDEWALK REPLACEMENT AT WAR MEMORIAL
1'-10"
1' -4
" 6"
EL. 5.000
EXISTING CONCRETE
PANEL (TO REMAIN)
REMOVE EXISTING
CONCRETE WALKWAY
-1
-2
-3
-4
-1
-2
-3
-4
MHW ELEV. 0.85
MSL ELEV. -0.21
MHHW ELEV.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .