About this file

This is a structural calculations document prepared by BHB Consulting Engineers for the State of Utah Division of Facilities Construction and Management (DFCM) for a Cedar City UDOT Salt and Equipment Storage facility located at 1510 N Bulldog Road, Cedar City, Utah 84721. The project, identified as Job #260508 and CR27017-27292900, involves the design of a new pre-engineered metal building for equipment and salt storage to replace an existing shed building, with minor site work included in the scope. The calculations were prepared in accordance with IBC 2024 building codes and include comprehensive structural analysis for wind loads, seismic loads, and foundation design. The document provides detailed design data for a 17-foot roof height structure with a 60-foot plan length and 40-foot plan width, established at an elevation of 5,637 feet with Seismic Design Category D classification.

The calculations document includes critical engineering specifications for a cantilevered retaining wall designed for salt storage with a retained height of 12 feet and a 20-foot wall height above soil. Two design scenarios are analyzed: one without seismic effects demonstrating acceptable wall stability with overturning ratio of 1.99 and sliding factor of safety of 1.52, and a second scenario incorporating seismic effects (with 34 psf lateral load) that shows reduced but acceptable stability ratios of 1.83 overturning and 1.43 sliding, though the latter ratio falls below the 1.5 standard. The footing design specifies concrete with 5,000 psi compressive strength and includes detailed rebar specifications using #7 reinforcing bars at various spacings throughout the toe, heel, and key sections. The soil bearing pressure at the toe is calculated at 2,817 psf under seismic conditions, exceeding the allowable 2,650 psf, indicating the design is noted as acceptable for temporary conditions. Wind load analysis establishes a basic wind speed of 101 mph with combined pressure coefficients ranging from -14.9 to 7.9 psf, while seismic design incorporates site-specific response spectra with maximum considered earthquake spectral acceleration parameters and a design spectral acceleration coefficient.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2766 South Main Street - SLC, Utah 84115 - Phone: 801.355.5656 - Fax: 801.355.5950 www.bhbengineers.com

Prepared For:

Prepared By:

Structural Calculations

BHB Project # 260508

Cedar City UDOT Salt and Equipment Storage

These calculations were prepared solely for the client and project listed on the cover sheet.

They shall not be copied or used for the benefit of any other party or project.

Rev 0

7/28/2026

Salt Lake City, UT 84111

AP

577 S 200 E

Galloway US

1510 N Bulldog Road Cedar City, UT 84721

28JUL26

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

09/02/2026

REVIEWED FOR CODE

COMPLIANCE

Site Data ft

Building Data ft ft ft

Soils Report

Recommendations Summary in psf

Frost Depth in

Lateral Pressures pcf pcf pcf

0.3

Varies

N/A

D

N/A

N/A

Mr. Riley Champneys (P.E.) on behalf of the State of Utah

February 11, 2025

N/A

Shallow footings

General Information

-113

1510 N Bulldog Road

Cedar City, UT 84721

17.3

42.7

Cedar City UDOT Salt and Equipment

Storage

37.704794

-113.078529

II

Iron

260508

7/28/26

2766 South Main Street - SLC, Utah 84115

Phone: 801.355.5656 - Fax: 801.355.5950

AP

Address

County

IBC

Latitude

Longitude

Elevation

Risk Category

Roof Height, h

Plan Length, L

Plan Width, B

Author

Dated

Coeff of Friction

Job #

Foundation Type

Structural Fill

Soil Bearing

Transient Increase

Soil Site Class

Active

At Rest

Passive

Project: Sheet:

Job#:

Date:

By:

Site Mapping

Cedar City UDOT Salt and Equipment

Storage 260508

7/28/26

2766 South Main Street - SLC, Utah 84115

Phone: 801.355.5656 - Fax: 801.355.5950

AP

Project: Sheet:

Job#:

Date:

By:

Map Not Generarated

Click HERE or press

"Geocode Location" in BHB

Project ribbon to generate map image

Design Data ft ft ft ft deg mph

Importance Factor, Iw

Main Wind Force Resisting System

Surface

Windward Walls at

1 1 L1, z= 17 ft or

0 ft

0 ft

0 ft

0 ft

Leeward Walls or

Side Walls or

Roof Parallel and or

Normal, θ < 10 or or or

Roof (Normal, θ > 10, WW) or

Roof (Normal, θ > 10, LW) or

Windward Parapet

Leeward Parapet

0.85

-6.6

-0.90 18.6 -12.1 0.18

1.5 23.7

18.6 -6.7 0.18-0.50

18.6 -12.1 0.18

0.85

0.85

0.85

0.85 -0.70 18.6 -9.4 0.18

-0.30 18.6 -4.0

0.85 -0.70

0 - h/2 h/2 - h h - 2h

> 2h

2.8 -9.2

18.6 -9.4 0.18 2.8

2.8 2.6

2.8 -6.6

0.85 0.80 18.6 10.7 0.18 2.8 13.6

Cedar City UDOT Salt and Equipment

Storage

0.85

0.85

0.18

18.6

0.85

Wind Loads

G Cp q q Kd G Cp

C

Mean Roof Height, h

Building Length, L

Building Width, B

Parapet Height, hp

Roof Angle

IBC

Basic Wind Speed, V

Exposure Category

1.00

260508

7/28/26

2766 South Main Street - SLC, Utah 84115

Phone: 801.355.5656 - Fax: 801.355.5950

AP

Full q Kd GCpi

0.87

Enclosure

Gust Factor, G

Topographic Factor, Kzt

Directionality Factor, Kd

Velocity Pressure Factor, Kh

Velocity Pressure, qh

Internal Pressure, GCPi

0.82

Combined [psf]

Elevation Factor, Ke

-3.1

2.8 -1.2

-14.9

2.8 -9.2 -14.9

-9.6

-6.9

2.8 -3.9

-12.2

0.18

GCpi

7.9

-0.90

-0.50 18.6 -6.7 0.18 2.8 -3.9 -9.6

-1 -15.8

-23.7

0.85 -0.02 18.6 -0.2 0.18

-12.2

15.8

Project: Sheet:

Job#:

Date:

By:

Design Data deg Building Period, T = Ta s deg ft s

Max Period Coefficient s s s s

Seismic Force Resisting System

Response Modifiction Coefficient, R

System Overstrength Factor, Ωo

Deflection Amplification Factor, Cd

0.61 (Eq.12.8-2)

Response Spectrum Data

Spectral Response Paramaters TRUE

SS g Cs = Sa/(R/Ie) (Eq.12.8-2)

S1 g Cs (Lower Bound) (Eq.12.8-6)

MCE Spectral Acceleration Paramaters Design Spectral Acceleration Paramaters

SMS g SDS g

SM1 g SD1 g

MCE Spectral Acceleration Design Spectral Acceleration

Sa = Sa_max g Sa = Sa_max g ρ 1.3

Steel Ordinary Moment Frames

0.121

0.607

T0 = 0.2 * SD1 / SDS

TS = SD1 / SDS

0.620

Seismic Response Coefficient - Method 1

Cs[Method 1] = Sa/(R/Ie) > Lower Bound

0.177

0.930

6.00

0.510

0.560

0.340

0.840

3.5

0.670

Site Specific Ground Motion

1.4

Calculated Period, Ta

Max Allowed Period, Tmax

Lattitude

Longitude

IBC

Risk Category

Site Class

Importance Factor, Ie

-113.079

37.705

Period Parameter, x

260508

7/28/26

D

0.028

0.8

0.270

0.378

2766 South Main Street - SLC, Utah 84115

Phone: 801.355.5656 - Fax: 801.355.5950

AP

Seismic Loads

D

0.270

II

Cedar City UDOT Salt and Equipment

Storage

Seismic Design Category

2024 Period Parameter, Ct

Building Height, hn

1.00

FALSE

0.200 0.025

0.177

Long Period Transition, TL

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5

A cc e le ra ti o n

[g

Period, [s]

Maximum Considered Earthquake Response Spectrum

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0 0.5 1 1.5 2 2.5 3 3.5

A cc e le ra ti o n

[g

Period, [s]

Design Earthquake Response Spectrum

Project: Sheet:

Job#:

Date:

By:

PEMB verify

Cantilevered Retaining Wall LIC# : KW-06014581, Build:20.26.04.17 BHB CONSULTING ENGINEERS (c) ENERCALC, LLC 1982-2026

DESCRIPTION: Salt storage retaining wall

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

Project Descr:

Referenced Design Standard(s) : ACI 318-19

Code References

Governing Code : IBC 2024

12.00

0.00

2.00

18.00

2,650.0

40.0

0.0

300.0

Criteria Soil Data

Retained Height = ft

Wall height above soil = ft Active Heel Pressure = psf/ft

Slope Behind Wall

Height of Soil over Toe in

Water table above = ft

110.00= pcf

Soil Density, Heel

Passive Pressure = psf/ft

Allow Soil Bearing = psf

Soil Density, Toe 110.00 pcf

Footing||Soil Friction = 0.350

Soil height to ignore for passive pressure = 12.00 in

Equivalent Fluid Pressure Method bottom of footing

Surcharge Loads Adjacent Footing Load

Load Type

0.0 Lateral Load = 0.0 #/ft

0.0

0.0 0.0 0.0

Axial Load Applied to Stem

Wall to Ftg CL Dist = 0.00 ft

Wind on Exposed Stem psf0.0=

Lateral Load Applied to Stem

Surcharge Over Heel = psf Adjacent Footing Load = 0.0 lbs

Axial Dead Load

(Strength Level)

= lbs

Footing Type Line Load

Surcharge Over Toe Footing Width = 0.00 ft...Height to Top = 0.00 ft Eccentricity = 0.00 in...Height to Bottom = 0.00 ft

Used To Resist Sliding & Overturning

Used for Sliding & Overturning

= 0.000 ft

Axial Live Load =

Base Above/Below Soil lbs

Axial Load Eccentricity = =Poisson's Ratio 0.300 at Back of Wall in (Strength Level)

Seismic (E)=

Design Summary

Wall Stability Ratios Overturning = 1.99

Global Stability = 1.99

OK

Sliding = 1.52 OK

Total Bearing Load = 10,883 lbs ...resultant ecc. = 17.91 in

Eccentricity outside middle third Soil Pressure @ Toe = 2,561 psf OK Soil Pressure @ Heel = 0 psf OK

Allowable = 2,650 psf Soil Pressure Less Than Allowable

ACI Factored @ Toe = 3,586 psf ACI Factored @ Heel = 0 psf

Footing Shear @ Toe = 27.0 psi OK

Footing Shear @ Heel = 23.0 psi OK

Allowable = 106.1 psi

Sliding Calcs

Lateral Sliding Force = 4,753.5 lbs

Masonry Block Type =

Stem Construction Bottom

Stem OK

Shear.....Actual

Design Height Above Ftg = 0.00ft

Wall Material Above "Ht" = Concrete

Thickness = 12.00 Rebar Size = # 7

Rebar Spacing = 12.00

Rebar Placed at = 9 in Design Data fb/FB + fa/Fa = 0.789

Total Force @ Section

=lbs

Moment....Actual

=ft-#

Moment.....Allowable = 23,344.2

=psi

Shear.....Allowable = 75.1psi

Wall Weight = 150.0psf

Rebar Depth 'd' = 9.00in

Masonry Data f'm =psi Fs =psi Solid Grouting =

Modular Ratio 'n' =

Equiv. Solid Thick. =

Concrete Data f'c = 5,000.0psi

Fy = 60,000.0

Masonry Design Method ASD=

Load Factors Building Code

Dead Load 1.200

Live Load 1.600

Earth, H 1.600

Wind, W 1.600

Seismic, E 1.000 psi

Service Level

= 4,608.0lbsStrength Level

Service Level

Strength Level = 18,432.0ft-#

Service Level

Strength Level = 42.7psi

Design Method = SD SD SD

Vertical component of active lateral soil pressure IS NOT considered in the calculation of soil bearing pressures.

Anet (Masonry) =in2

Salt storage

DESCRIPTION: Salt storage retaining wall

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

Project Descr:

Summary of Sliding Forces

FS = 1.0 FS = 1.5

Lateral Force @ Base of Footing 4,753.47 lbs 7,130.21 lbs less 100% Passive Force - 3,854.17 lbs - 3,854.17 lbs less 100% Friction Force - 3,372.03 lbs - 3,372.03 lbs

Added Resisting Force Required 0.0 lbs

Added Resisting Force Required for 1.5 Factor of Safety 0.00 lbs

Sliding Factor of Safety = 1.520: 1.00

DESCRIPTION: Salt storage retaining wall

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

Project Descr:

Concrete Stem Rebar Area Details

Bottom Stem Vertical Reinforcing Horizontal Reinforcing

As (based on applied moment) : 0.4708 in2/ft

0.0018bh : 0.0018(12)(12) : 0.2592 in2/ft Horizontal Reinforcing Options :

============ One layer of : Two layers of :

Required Area : 0.4708 in2/ft #4@ 9.26 in #4@ 18.52 in

Provided Area : 0.6 in2/ft #5@ 14.35 in #5@ 28.70 in

Maximum Area : 2.295 in2/ft #6@ 20.37 in #6@ 40.74 in

3.50

4.50

20.00

=Min. As % 0.0018

Footing Data f'c = 5,000 psi

Toe Width = ft Heel Width =

Key Distance from Toe

Key Depth Key Width = in

= in

12.00 24.00

3.50 ft

Footing Thickness = in

8.00=

Cover @ Top =2.00 in@ Btm.= 3.00 in

Total Footing Width

= 150.00 pcfFooting Concrete Density Fy = 60,000 psi

Footing Design Results

Toe Heel Key

Factored Pressure = 3,586 0 psf Mu' : Upward = 18,557 2,195 ft-# Mu' : Downward = 3,050 12,483 ft-# Mu: Design = 15,507 10,288 5,349 ft-#

Toe Reinforcing = # 7 @ 12.00 in Heel Reinforcing = # 7 @ 16.66 in

Key Reinforcing = # 7 @ 12.00 in

As min req'd 0.0018bh : 0.0018(12)(20) : 0.432 in2/ft OK

As provided #7@12.0 in o.c. 0.6 in2/ft

As min req'd 0.0018bh : 0.0018(12)(20) : 0.432 in2/ft OK

As provided #7@16.66 in o.c. 0.4322 in2/ft

As min req'd 0.0018bh : 0.0018(12)(12) : 0.2592 in2/ft OK

As provided #7@12.0 in o.c. 0.6 in2/ft

Mu:Design @ Toe 15,506.79 ft-# OK phiMn Toe 43,766 ft-#

Mu:Design @ Heel 10,288.00 ft-# OK phiMn Heel 33,663 ft-#

Mu:Design @ Key 5,348.81 ft-# OK phiMn Key 15,247 ft-#

As Max : 4.2075 in2/ft OK

As Max : 4.4625 in2/ft OK

As Max : 1.5300 in2/ft OK

DESCRIPTION: Salt storage retaining wall

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

Project Descr:

Summary of Overturning & Resisting Forces & Moments

.....RESISTING..........OVERTURNING

Force Distance Moment Distance Moment

Item Force ft-# lbs ftft ft-#lbs

Sloped Soil Over Heel 336.9 6.83 2,302.0

=Surcharge over Heel

Surcharge Over Heel

Adjacent Footing Load

=Adjacent Footing Load

Axial Dead Load on Stem =

=* Axial Live Load on Stem

Soil Over Toe

Surcharge Over Toe

Surcharge Over Toe

Load @ Stem Above Soil

577.5 1.75 1,010.6=

Stem Weight(s)

1,800.0 4.00 7,200.0

Earth @ Stem Transitions

=Footing Weight

2,000.0 4.00 8,000.0

Key Weight

300.0 4.00 1,200.0

Added Lateral Load lbs

= 24,427.6

Vert. Component

Total

9,634.4 48,587.6

* Axial live load NOT included in total displayed, or used for overturning resistance, but is included for soil pressure calculation.

Total = R.M.

=4,753.5 O.T.M.

Resisting/Overturning Ratio = 1.99

Vertical Loads used for Soil Pressure = 10,883.1 lbs

Soil Over HL (ab. water tbl) 4,620.0 6.25 28,875.0HL Act Pres (ab water tbl) 4,753.5 5.14 24,427.6 Soil Over HL (bel. water tbl) 6.25HL Act Pres (be water tbl) Water TableHydrostatic Force

Buoyant Force =

Vertical component of active lateral soil pressure IS NOT considered in the calculation of Sliding Resistance.

Vertical component of active lateral soil pressure IS NOT considered in the calculation of Overturning Resistance.

Tilt

Horizontal Deflection at Top of Wall due to settlement of soil

(Deflection due to wall bending not considered)

Soil Spring Reaction Modulus 250.0 pci

Horizontal Defl @ Top of Wall (approximate only) 0.107 in

The above calculation is not valid if the heel soil bearing pressure exceeds that of the toe, because the wall would then tend to rotate into the retained soil.

DESCRIPTION: Salt storage retaining wall

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

Project Descr:

Rebar Lap & Embedment Lengths Information

Stem Design Segment: Bottom

Stem Design Height: 0.00 ft above top of footing

Lap Splice length for #7 bar specified in this stem design segment (25.4.2.4a) = 28.96 in

Development length for #7 bar specified in this stem design segment = 22.27 in

Hooked embedment length into footing for #7 bar specified in this stem design segment = 11.79 in

As Provided = 0.6000 in2/ft

As Required = 0.4708 in2/ft ψ r: Confining Reinforcement Factor = 1.00 ψ o: Location Factor = 1.00 ψ c: Concrete Strength Factor = 0.93

DESCRIPTION: Salt storage retaining wall

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

Project Descr:

DESCRIPTION: Salt storage retaining wall

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

DESCRIPTION: Salt storage retaining wall with E

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

Project Descr:

Referenced Design Standard(s) : ACI 318-19

Code References

Governing Code : IBC 2024

12.00

0.00

2.00

18.00

2,650.0

40.0

0.0

300.0

Criteria Soil Data

Retained Height = ft

Wall height above soil = ft Active Heel Pressure = psf/ft

Slope Behind Wall

Height of Soil over Toe in

Water table above = ft

110.00= pcf

Soil Density, Heel

Passive Pressure = psf/ft

Allow Soil Bearing = psf

Soil Density, Toe 110.00 pcf

Footing||Soil Friction = 0.350

Soil height to ignore for passive pressure = 12.00 in

Equivalent Fluid Pressure Method bottom of footing

Surcharge Loads Adjacent Footing Load

Load Type

0.0 Lateral Load = 34.0 #/ft

0.0

0.0 0.0 0.0

Axial Load Applied to Stem

Wall to Ftg CL Dist = 0.00 ft

Wind on Exposed Stem psf0.0=

Lateral Load Applied to Stem

Surcharge Over Heel = psf Adjacent Footing Load = 0.0 lbs

Axial Dead Load

(Strength Level)

= lbs

Footing Type Line Load

Surcharge Over Toe Footing Width = 0.00 ft...Height to Top = 12.00 ft Eccentricity = 0.00 in...Height to Bottom = 0.00 ft

Used To Resist Sliding & Overturning

Used for Sliding & Overturning

= 0.000 ft

Axial Live Load =

Base Above/Below Soil lbs

Axial Load Eccentricity = =Poisson's Ratio 0.300 at Back of Wall in (Strength Level)

Seismic (E)=

Design Summary

Wall Stability Ratios Overturning = 1.83

Global Stability = 1.99

OK

Sliding = 1.43 Ratio < 1.5!

Total Bearing Load = 10,883 lbs ...resultant ecc. = 20.63 in

Eccentricity outside middle third Soil Pressure @ Toe = 2,817 psf NG Soil Pressure @ Heel = 0 psf OK

Allowable = 2,650 psf Soil Pressure Exceeds Allowable!

ACI Factored @ Toe = 3,943 psf ACI Factored @ Heel = 0 psf

Footing Shear @ Toe = 29.7 psi OK

Footing Shear @ Heel = 25.8 psi OK

Allowable = 106.1 psi

Sliding Calcs

Lateral Sliding Force = 5,039.1 lbs

Masonry Block Type =

Stem Construction Bottom

Stem OK

Shear.....Actual

Design Height Above Ftg = 0.00ft

Wall Material Above "Ht" = Concrete

Thickness = 12.00 Rebar Size = # 7

Rebar Spacing = 12.00

Rebar Placed at = 9 in Design Data fb/FB + fa/Fa = 0.894

Total Force @ Section

=lbs

Moment....Actual

=ft-#

Moment.....Allowable = 23,344.2

=psi

Shear.....Allowable = 75.1psi

Wall Weight = 150.0psf

Rebar Depth 'd' = 9.00in

Masonry Data f'm =psi Fs =psi Solid Grouting =

Modular Ratio 'n' =

Equiv. Solid Thick. =

Concrete Data f'c = 5,000.0psi

Fy = 60,000.0

Masonry Design Method ASD=

Load Factors Building Code

Dead Load 1.200

Live Load 1.600

Earth, H 1.600

Wind, W 1.600

Seismic, E 1.000 psi

Service Level

= 5,016.0lbsStrength Level

Service Level

Strength Level = 20,880.0ft-#

Service Level

Strength Level = 46.4psi

Design Method = SD SD SD

Vertical component of active lateral soil pressure IS NOT considered in the calculation of soil bearing pressures.

Anet (Masonry) =in2 with seismic effects. Add Fp = 0.4*0.56g*150pcf = 34 psf

DESCRIPTION: Salt storage retaining wall with E

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

Project Descr:

Summary of Sliding Forces

FS = 1.0 FS = 1.5

Lateral Force @ Base of Footing 5,039.07 lbs 7,558.61 lbs less 100% Passive Force - 3,854.17 lbs - 3,854.17 lbs less 100% Friction Force - 3,372.03 lbs - 3,372.03 lbs

Added Resisting Force Required 0.0 lbs

Added Resisting Force Required for 1.5 Factor of Safety 332.41 lbs

Sliding Factor of Safety = 1.434: 1.00

Okay for temporary conditions like E

DESCRIPTION: Salt storage retaining wall with E

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

Project Descr:

Concrete Stem Rebar Area Details

Bottom Stem Vertical Reinforcing Horizontal Reinforcing

As (based on applied moment) : 0.5333 in2/ft

0.0018bh : 0.0018(12)(12) : 0.2592 in2/ft Horizontal Reinforcing Options :

============ One layer of : Two layers of :

Required Area : 0.5333 in2/ft #4@ 9.26 in #4@ 18.52 in

Provided Area : 0.6 in2/ft #5@ 14.35 in #5@ 28.70 in

Maximum Area : 2.295 in2/ft #6@ 20.37 in #6@ 40.74 in

3.50

4.50

20.00

=Min. As % 0.0018

Footing Data f'c = 5,000 psi

Toe Width = ft Heel Width =

Key Distance from Toe

Key Depth Key Width = in

= in

12.00 24.00

3.50 ft

Footing Thickness = in

8.00=

Cover @ Top =2.00 in@ Btm.= 3.00 in

Total Footing Width

= 150.00 pcfFooting Concrete Density Fy = 60,000 psi

Footing Design Results

Toe Heel Key

Factored Pressure = 3,943 0 psf Mu' : Upward = 20,033 1,233 ft-# Mu' : Downward = 3,050 12,483 ft-# Mu: Design = 16,983 11,250 5,349 ft-#

Toe Reinforcing = # 7 @ 12.00 in Heel Reinforcing = # 7 @ 16.66 in

Key Reinforcing = # 7 @ 12.00 in

As min req'd 0.0018bh : 0.0018(12)(20) : 0.432 in2/ft OK

As provided #7@12.0 in o.c. 0.6 in2/ft

As min req'd 0.0018bh : 0.0018(12)(20) : 0.432 in2/ft OK

As provided #7@16.66 in o.c. 0.4322 in2/ft

As min req'd 0.0018bh : 0.0018(12)(12) : 0.2592 in2/ft OK

As provided #7@12.0 in o.c. 0.6 in2/ft

Mu:Design @ Toe 16,982.93 ft-# OK phiMn Toe 43,766 ft-#

Mu:Design @ Heel 11,249.90 ft-# OK phiMn Heel 33,663 ft-#

Mu:Design @ Key 5,348.81 ft-# OK phiMn Key 15,247 ft-#

As Max : 4.2075 in2/ft OK

As Max : 4.4625 in2/ft OK

As Max : 1.5300 in2/ft OK

DESCRIPTION: Salt storage retaining wall with E

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

Project Descr:

Summary of Overturning & Resisting Forces & Moments

.....RESISTING..........OVERTURNING

Force Distance Moment Distance Moment

Item Force ft-# lbs ftft ft-#lbs

Sloped Soil Over Heel 336.9 6.83 2,302.0

=Surcharge over Heel

Surcharge Over Heel

Adjacent Footing Load

=Adjacent Footing Load

Axial Dead Load on Stem =

=* Axial Live Load on Stem

Soil Over Toe

Surcharge Over Toe

Surcharge Over Toe

Load @ Stem Above Soil

577.5 1.75 1,010.6=

Stem Weight(s)

1,800.0 4.00 7,200.0

Earth @ Stem Transitions

=Footing Weight

2,000.0 4.00 8,000.0

Key Weight

300.0 4.00 1,200.0

Added Lateral Load lbs

= 26,617.2

Vert. Component

Total

9,634.4

285.6 7.67 2,189.6

48,587.6

* Axial live load NOT included in total displayed, or used for overturning resistance, but is included for soil pressure calculation.

Total = R.M.

=5,039.1 O.T.M.

Resisting/Overturning Ratio = 1.83

Vertical Loads used for Soil Pressure = 10,883.1 lbs

Soil Over HL (ab. water tbl) 4,620.0 6.25 28,875.0HL Act Pres (ab water tbl) 4,753.5 5.14 24,427.6 Soil Over HL (bel. water tbl) 6.25HL Act Pres (be water tbl) Water TableHydrostatic Force

Buoyant Force =

Vertical component of active lateral soil pressure IS NOT considered in the calculation of Sliding Resistance.

Vertical component of active lateral soil pressure IS NOT considered in the calculation of Overturning Resistance.

Tilt

Horizontal Deflection at Top of Wall due to settlement of soil

(Deflection due to wall bending not considered)

Soil Spring Reaction Modulus 250.0 pci

Horizontal Defl @ Top of Wall (approximate only) 0.117 in

The above calculation is not valid if the heel soil bearing pressure exceeds that of the toe, because the wall would then tend to rotate into the retained soil.

DESCRIPTION: Salt storage retaining wall with E

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

Project Descr:

Rebar Lap & Embedment Lengths Information

Stem Design Segment: Bottom

Stem Design Height: 0.00 ft above top of footing

Lap Splice length for #7 bar specified in this stem design segment (25.4.2.4a) = 28.96 in

Development length for #7 bar specified in this stem design segment = 22.27 in

Hooked embedment length into footing for #7 bar specified in this stem design segment = 11.79 in

As Provided = 0.6000 in2/ft

As Required = 0.5333 in2/ft ψ r: Confining Reinforcement Factor = 1.00 ψ o: Location Factor = 1.00 ψ c: Concrete Strength Factor = 0.93

DESCRIPTION: Salt storage retaining wall with E

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

DESCRIPTION: Salt storage retaining wall with E

Project File: 20JUL26.ec6

Project Title:

Engineer:

Project ID:

File details come from the government source that posted it. Updated .