5-5-CR27017-27292900 Geotechnical Study.pdf

PDF 687 KB Posted

Attached to
DFCM Construction - Prequalified General Stage II - Department of Transportation- Cedar City Salt & Equipment Building - Project #27292900
Solicitation number
CR27017
Issued by
Utah

About this file

This is a Geotechnical Study report prepared for the State of Utah's Division of Facilities Construction and Management (DFCM) related to the Cedar City Salt & Equipment Building project. The geotechnical investigation was conducted on December 16, 2024, at the Cedar City Tow Plow Shed site to characterize subsurface soil conditions prior to construction. One test pit (TP-1) was excavated to a depth of 12 feet, revealing soil composition consisting of silty gravel and rotomill tailings at the surface, followed by sandy silt and silty to poorly graded gravel with occasional cobbles and boulders up to 12 inches in size. The soils exhibited varying moisture content and density characteristics, with moisture percentages ranging from 2.5 to 11.3 percent. No groundwater was encountered during the investigation, and the test pit excavation encountered unstable soil conditions at depths beginning around 4 feet where the sides commenced sloughing.

The geotechnical study supports the Stage II Invitation to Bid for construction of a new pre-engineered metal building for equipment and salt storage, with a construction cost estimate of $423,486. This project is restricted to contractors who have been prequalified under DFCM's Stage I Prequalification process and appear on the current DFCM Prequalified Contractors list as of the solicitation date. The scope of work includes replacement of an existing shed building with minor site work also included. The subsurface investigation findings regarding soil stability, composition, and absence of groundwater conditions will inform foundation design and site preparation requirements for the proposed structure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Geotechnical Study 4476 - Cedar City Maintenance Tow Plow Shed

February 11, 2025 https://adobesigne.na1.documents.adobe.com/verifier?tx=CBJCHBCAABAAfgaCi5lQYq3BRdp8Hw2cVWYYCfrK8l_I

Vicinity Map

Cedar City Tow Plow Shed Figure 1

Site Plan

Approximate Test Pit Location

TP-1

Cedar City Tow Plow Shed Figure 2

Figure 3

Project Cedar City Tow Plow Shed Date 12/16/2024 By Riley C.

Depth (ft) Description (USCS) Moisture

Gravel % Sand % Fines LL/PI

Silty Gravel (GM)/Rotomill Tailings, dark brown, dry, 2.5", fill

Silty Gravel (GM), reddish brown, dry, dense

Sandy Silt (ML), reddish brown, dry, medium dense, 8" thick 11.3 11 29 60 NP Silty to Poorly Graded Gravel (GM/GP), reddish brown, slightly moist, includes some cobbles up to 6" 2.5 59 30 11 NP

Sides of excavation began to slough and are unstable

Grades with occasional boulders up to +12"

Complete to 12.0 feet. Groundwater was not encountered.

Test Pit

TP- 1

Cover Page (1).pdf
0521_001.pdf
Vicinity Map.pdf
Sheet1
Site Plan.pdf
Sheet1

TP-1 Test Pit Soils Log - Google Sheets.pdf

File details come from the government source that posted it. Updated .