This is a specification section for communications equipment room fittings for Project No. 22125, the Covington City Hall Communications Equipment Room, prepared for the implementation of communication, information, and related technologies for the new Covington City Hall facility in Kentucky. The specification outlines requirements for backboards, racks, cabinets, power strips, and uninterruptible power supply (UPS) equipment. Products specified include A/C grade plywood backboards measuring 3/4 by 48 by 96 inches with fire-retardant treatment; modular steel distribution frames compatible with the EIA 310 standard 19-inch panel mounting; 84-inch high floor-mounted racks and 4-post network and server racks with specified screw and cage nut mounting; metal horizontal cable management units with hinged covers; 125-volt, 20-amp power strips with surge protection rated at 33 kA per phase; and a Smart-UPS Lithium-Ion 3000VA, 120V unit with 2U rack height. Installation must comply with NECA standards and BICSI's telecommunications distribution and installation manuals, with qualified BICSI-certified personnel required for layout, installation supervision, and field inspection.
The specification requires submission of product data, shop drawings detailing equipment assemblies and workspace requirements, and qualification documentation for installer personnel. Backboards must be installed between 6 inches and 8 feet, 6 inches above finished floor with fire-rating stamps visible after two coats of paint. Dedicated electrical circuits are required, including 120-volt, 20-ampere circuits to duplex receptacles on backboards, 120-volt, 30-ampere circuits to NEMA L5-30R receptacles, and 120-volt, 20-ampere circuits for rack-mounted power strips. Telecommunications grounding requirements include copper main and subsidiary grounding bus bars meeting TIA-607 and NECA-BICSI-607 standards with a maximum ground resistance of 1 ohm. Labeling must comply with TIA-606 and UL 969 standards per approved owner standards. All work must include firestopping and penetration sealing in accordance with TIA-569 and applicable building codes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO. 22125 COVINGTON CITY HALL
COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 1
SECTION 271100 COMMUNICATIONS EQUIPMENT ROOM FITTINGS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Backboards.
2. Racks.
3. Cabinets.
4. Power strips.
5. UPS.
1.3 DEFINITIONS
A. Access Provider: An operator that provides a circuit path or facility between the service provider and user. An access provider can also be a service provider.
B. RCDD: Registered communications distribution designer.
C. Service Provider: The operator of a telecommunications transmission service delivered through access provider facilities.
D. TGB: Telecommunications grounding bus bar.
E. TMGB: Telecommunications main grounding bus bar.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for equipment racks and cabinets.
2. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.
COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 2
B. Shop Drawings: For communications equipment room fittings. Include plans, elevations, sections, details, and attachments to other work.
1. Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.
2. Equipment Racks and Cabinets: Include workspace requirements and access for cable connections.
3. Grounding: Indicate location of grounding bus bar and its mounting detail showing standoff insulators and wall mounting brackets.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer, qualified layout technician, installation supervisor, and field inspector.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: Cabling installer must have personnel certified by BICSI on staff.
1. Layout Responsibility: Preparation of Shop Drawings shall be under direct supervision of Technician.
2. Installation Supervision: Installation shall be under direct supervision of Technician, who shall always be present when Work of this Section is performed at Project site.
3. Field Inspector: Currently registered by BICSI as Technician to perform the on-site inspection.
PART 2 - PRODUCTS
2.1 BACKBOARDS
A. Backboards: A/C grade, 3/4 by 48 by 96 inches (19 by 1220 by 2440 mm) Plywood, fire-retardant treated, comply with requirements for plywood backing panels specified in Division 06 Section "Rough Carpentry."
2.2 RACKS
A. Manufacturers: Subject to compliance with requirements.
B. General Frame Requirements:
COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 3
1. Distribution Frames: Freestanding and wall-mounting, modular-steel units designed for telecommunications terminal support and coordinated with dimensions of units to be supported.
2. Module Dimension: Width compatible with EIA 310 standard, 19-inch (480-mm) panel mounting.
3. Finish: Manufacturer's standard, baked powder coat.
C. Floor-Mounted Racks:
1. 84” high, modular-type, steel construction.
2. 6 inch (150 mm) wide vertical cable management with metal hinged covers.
Plastic removable covers are prohibited.
3. Baked powder coat finish, black in color.
D. 4-Post Network Racks:
1. Shall have round standard screw mounting
E. 4-Post Server Racks:
1. Shall have cage nut mounting
2.3 OPTICAL FIBER HORIZONTAL CABLE MANAGEMENT FOR RACKS AND CABINETS
1. Metal, 3.5-inch-high (89 mm) (2RU) front integral wire retaining fingers and hinged front cover. Plastic removable covers are prohibited.
2. Baked-polyester black powder coat finish.
3. Provide one (1) 2RU horizontal cable manager below each optical patch panel.
2.4 POWER STRIPS
A. Power Strips: Equipment rack power strips shall be 125-volt, 20-amp, 3 wire, single circuit type with 10 NEMA 5-20R single receptacle outlets on 6" centers.
1. Horizontal rack mounting.
2. Six, 15-A, 120-VAC, NEMA WD 6, Configuration 5-20R receptacles.
3. LED indicator lights for power and protection status.
4. LED indicator lights for reverse polarity and open outlet ground.
5. Circuit Breaker and Thermal Fusing: When protection is lost, circuit opens and cannot be reset.
6. Circuit Breaker and Thermal Fusing: Unit continues to supply power if protection is lost.
7. Cord connected with 15-foot (4.5-m) line cord.
8. Peak Single-Impulse Surge Current Rating: 33 kA per phase.
9. Protection modes shall be line to neutral, line to ground, and neutral to ground.
UL 1449 clamping voltage for all 3 modes shall be not more than 330 V.
COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 4
2.5 RACK MOUNT UPS
A. UPS: Equipment UPS shall be Smart-UPS, Lithium-Ion, 3000VA, 120V with SmartConnect Port.
1. Horizontal rack mounting.
2. Output power capacity: 2.7kWatts / 2.88kVA
3. Rack Height: 2U
4. Output Connections: (2) NEMA 5-20R (Battery Backup); (6) NEMA 5-15R (Battery
Backup)
5. Nominal Output Voltage: 110V, 120V, 125V
6. Nominal Input Voltage: 110V, 120V, 125V
7. Input Connections: NEMA L5-30P
8. Cord Length: 8.01ft (2.4meters)
2.6 GROUNDING
A. Comply with requirements in Division 27 Section "Grounding and Bonding for Communications Systems." for grounding conductors and connectors.
B. Telecommunications Main Grounding Bus Bar:
1. Connectors: Mechanical type, cast silicon bronze, solder less compression-type wire terminals, and long-barrel, two-bolt non-twisting connection to ground bus bar.
2. Main Telecommunications Ground Bus (MTGB) bar: Copper, minimum 1/4-inch-thick by 4 inches wide (6 mm thick by 100 mm wide) with two vertical 5/16-inch (8-mm) holes spaced 5/8 inches (16 mm) apart.
3. Telecommunications Ground Bus (TGB) bar: Copper, minimum 1/4-inch-thick by 2 inches wide (6 mm thick by 50 mm wide) with two vertical 5/16-inch (8-mm) holes spaced 5/8 inches (16 mm) apart.
4. Stand-Off Insulators: Comply with UL 891 for use in switchboards, 600 V. Lexan or PVC, impulse tested at 5000 V.
5. Provide a TMGB in the Main Equipment Room and a TGB in each Telecommunications Room.
C. Comply with TIA-607.
D. Comply with NECA-BICSI-607.
2.7 LABELING
A. Comply with TIA-606 and UL 969 for a system of labeling materials, including label stocks, laminating adhesives, and inks used by label printers. Reference sheet T-601 for owner approved labeling standard
COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 5
PART 3 - EXECUTION
3.1 INSTALLATION
A. Comply with NECA 1.
B. Comply with BICSI's "Telecommunications Distribution Methods Manual" for layout of communications equipment spaces.
C. Comply with BICSI's "Information Technology Systems Installation Methods Manual" for installation of equipment in communications equipment spaces.
D. Bundle, lace, and train conductors and cables to terminal points without exceeding manufacturer's limitations on bending radii. Install lacing bars and distribution spools.
E. Coordinate layout and installation of communications equipment in tracks and in room. Coordinate service entrance configuration with service provider.
1. Meet jointly with systems providers, equipment suppliers, and Owner to exchange information and agree on details of equipment configurations and installation interfaces.
2. Record agreements reached in meetings and distribute them to other participants.
3. Adjust configurations and locations of distribution frames, cross-connects, and patch panels in equipment rooms to accommodate and optimize configurations and space requirements of communications equipment.
4. Adjust configurations and locations of equipment with distribution frames, cross-connects, and patch panels of cabling systems of other communications, electronic safety and security, and related systems that share space in equipment room.
F. Coordinate location of power raceways and receptacles with locations of communications equipment requiring electrical power to operate.
G. Backboards:
1. Install from 6 inches (150 mm) to 8 feet, 6 inches (2588 mm) above finished floor.
If plywood is fire rated, ensure that fire-rating stamp is visible after installation.
2. Paint all sides of backboard with two coats of paint, leaving fire rating stamp visible.
3. Comply with requirements for backboard installation in BICSI's "Information Technology Systems Installation Methods Manual" and TIA-569.
3.2 BE ROOM AND TR REQUIREMENTS
A. Provide ceiling-hung lighting with a wall switch at the door.
COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271100 - 6
B. Provide power to HVAC equipment.
C. Provide dedicated 120-volt, 20 ampere circuits to duplex receptacles 48" AFF and 10' apart on the plywood backboards. Plywood backboards are by others.
D. Provide dedicated 120-volt, 30 ampere circuits to NEMA L5-30R receptacles and provide dedicated 120-volt, 20 ampere circuits to power strips on the telecom equipment racks. See Standard Details.
E. In rooms with DAS, ERRC, and Security equipment plywood backboards, provide two dedicated 120-volt, 20 ampere circuits to quad receptacles on each DAS backboard.
F. Provide one 120-volt, 20 ampere normal power circuit to a duplex receptacle on the wall near the door.
G. Coordinate all receptacle locations with Owner.
H. Provide a copper ground bus bar where shown. Connect it to the unit substation room ground bus bar and to the ground bus bars in the receptacle panels feeding the telecom room receptacles. Ground cables shall be No. 6 AWG green insulated, stranded, copper. The resistance to building ground shall be 1 ohm maximum.
3.3 SLEEVE AND SLEEVE SEAL INSTALLATION FOR ELECTRICAL PENETRATIONS
A. Install sleeves and sleeve seals at penetrations of exterior floor and wall assemblies.
3.4 FIRESTOPPING
A. Comply with requirements in Section 078413 "Penetration Firestopping."
B. Comply with TIA-569, Annex A, "Firestopping."
C. Comply with BICSI's "Information Technology Systems Installation Methods Manual," "Firestopping Practices" Ch.
END OF SECTION 271100
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section Includes: |
| 1.3 DEFINITIONS |
| A. Access Provider: An operator that provides a circuit path or facility between the service provider and user. An access provider can also be a service provider. |
| B. RCDD: Registered communications distribution designer. |
| C. Service Provider: The operator of a telecommunications transmission service delivered through access provider facilities. |
| D. TGB: Telecommunications grounding bus bar. |
| E. TMGB: Telecommunications main grounding bus bar. |
| 1.4 ACTION SUBMITTALS |
| A. Product Data: For each type of product. |
| B. Shop Drawings: For communications equipment room fittings. Include plans, elevations, sections, details, and attachments to other work. |
| 1.5 INFORMATIONAL SUBMITTALS |
| A. Qualification Data: For Installer, qualified layout technician, installation supervisor, and field inspector. |
| 1.6 QUALITY ASSURANCE |
| A. Installer Qualifications: Cabling installer must have personnel certified by BICSI on staff. |
| PART 2 - PRODUCTS |
| 2.1 BACKBOARDS |
| A. Backboards: A/C grade, 3/4 by 48 by 96 inches (19 by 1220 by 2440 mm) Plywood, fire-retardant treated, comply with requirements for plywood backing panels specified in Division 06 Section "Rough Carpentry." |
| 2.2 RACKS |
| A. Manufacturers: Subject to compliance with requirements. |
| B. General Frame Requirements: |
| C. Floor-Mounted Racks: |
| D. 4-Post Network Racks: |
| E. 4-Post Server Racks: |
| 2.3 OPTICAL FIBER HORIZONTAL CABLE MANAGEMENT FOR RACKS AND CABINETS |
| 2.4 POWER STRIPS |
| A. Power Strips: Equipment rack power strips shall be 125-volt, 20-amp, 3 wire, single circuit type with 10 NEMA 5-20R single receptacle outlets on 6" centers. |
| 2.5 RACK MOUNT UPS |
| A. UPS: Equipment UPS shall be Smart-UPS, Lithium-Ion, 3000VA, 120V with SmartConnect Port. |
| 2.6 GROUNDING |
| A. Comply with requirements in Division 27 Section "Grounding and Bonding for Communications Systems." for grounding conductors and connectors. |
| B. Telecommunications Main Grounding Bus Bar: |
| C. Comply with TIA-607. |
| D. Comply with NECA-BICSI-607. |
| 2.7 LABELING |
| A. Comply with TIA-606 and UL 969 for a system of labeling materials, including label stocks, laminating adhesives, and inks used by label printers. Reference sheet T-601 for owner approved labeling standard |
| PART 3 - EXECUTION |
| 3.1 INSTALLATION |
| A. Comply with NECA 1. |
| B. Comply with BICSI's "Telecommunications Distribution Methods Manual" for layout of communications equipment spaces. |
| C. Comply with BICSI's "Information Technology Systems Installation Methods Manual" for installation of equipment in communications equipment spaces. |
| D. Bundle, lace, and train conductors and cables to terminal points without exceeding manufacturer's limitations on bending radii. Install lacing bars and distribution spools. |
| E. Coordinate layout and installation of communications equipment in tracks and in room. Coordinate service entrance configuration with service provider. |
| F. Coordinate location of power raceways and receptacles with locations of communications equipment requiring electrical power to operate. |
| G. Backboards: |
| 3.2 BE ROOM AND TR REQUIREMENTS |
| 3.3 SLEEVE AND SLEEVE SEAL INSTALLATION FOR ELECTRICAL PENETRATIONS |
| A. Install sleeves and sleeve seals at penetrations of exterior floor and wall assemblies. |
| 3.4 FIRESTOPPING |
| A. Comply with requirements in Section 078413 "Penetration Firestopping." |
| B. Comply with TIA-569, Annex A, "Firestopping." |
| C. Comply with BICSI's "Information Technology Systems Installation Methods Manual," "Firestopping Practices" Ch. |