6-24U005 ACCC One Stop MEP Bid Spec.pdf

PDF 7 MB Posted

Attached to
BID 1883 - Atlantic City One Stop
Solicitation number
BID 1883
Issued by
Atlantic County, New Jersey

About this file

This is a specification document for the Atlantic City One Stop renovation project at Atlantic Cape Community College in Atlantic City, New Jersey, which includes detailed requirements for fire protection, plumbing, sleeves, escutcheons, valves, and hangers and supports. The project encompasses interior renovations at the College's Atlantic City Campus located at 1535 Bacharach Boulevard and requires construction and related work in accordance with the plans and specifications provided. The fire protection work includes modifications to existing sprinkler systems to comply with NFPA 13-2019 standards, dry sprinkler system updates to corridors and the Geothermal Building as noted on plans, and the provision of "Fire Watch" personnel during any sprinkler system downtime in occupied areas. The plumbing contractor must furnish all fixtures, piping systems, water heaters, floor drains, site piping modifications, equipment insulation, permits, approvals, as-built drawings, operation and maintenance manuals, and coordinate with electrical and mechanical contractors for integrated system installations. The specifications detail comprehensive requirements for materials, joining methods, installation procedures, and quality control testing for all fire suppression and plumbing systems, with work to be completed by the date of substantial completion as set by the Architect.

All contractors are required to provide a two-year warranty on materials, labor, and systems commencing from the date of Substantial Completion issued by the Architect, with warranty terms superseding any notations in individual specification sections. Equipment warranties begin only after Substantial Completion, regardless of when equipment is ordered, delivered, or installed, and factory startup reports must be submitted with the final payment request or final payment will be withheld. The contractor bears responsibility for obtaining all necessary permits, approvals, and fees; employing local Underwriters' Inspection Agency services; providing manufacturer startup and commissioning; performing system balancing, testing, and flushing; and coordinating with other trade contractors to ensure complete and operational systems ready for use. The specifications reference MSS standards, NFPA guidelines, ASME codes, AWS welding standards, and various product manufacturer requirements to ensure quality and compliance with industry standards and local fire marshal requirements.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE PROTECTION SUMMARY OF WORK 210000-1

SECTION 210000 – FIRE PROTECTION SUMMARY OF WORK

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Divisions Specification Sections, apply to this Section.

B. The requirements of all other sections of Division 21 apply to this section.

1.2 WARRANTY FOR PROJECT

A. The Contractor shall provide the Owner with a 2-year warranty on all materials, labor and systems from the date of Substantial Completion. The date of Substantial completion will be as set in a letter issued by the Architect – no exceptions.

1.3 DEFINITIONS

A. For a complete list of definitions for this contract refer to the Division 1 specifications.

B. Provide: Means to provide, install, and make the equipment/system completely functional and operational with testing, commissioning and training.

C. Install: Means to provide, install, and make the equipment/system completely functional and operational with testing, commissioning, and training.

1.4 SCOPE OF WORK

A. Work Included: It is the intent of these specifications and the accompanying drawings that the Contractor shall, unless otherwise specified herein, furnish all labor, materials, tools, and equipment necessary, together with the necessary accessories to constitute a satisfactory and complete installation, to complete the installation of the fire protection work, as indicated on the drawings and described hereinafter. The Contractor shall properly install, equip, adjust, and put in perfect condition, the respective portions of the work specified, and to so interconnect the various items or sections of the work to form a complete and properly operating whole. The work shall consist of, but shall not necessarily be limited to the following:

1. Contract requirements the modifications of the existing sprinkler systems as defined in the contract drawings. Any downtime associated with the modification of the existing system to the current areas covered will require a “Fire Watch” as defined by the Local Fire Marshal and State Standards. The provision and maintaining personnel for this fire watch is a Fire Protection Contract Requirement.

2. Provide (if required per project scope) dry sprinkler system updates to corridors and Geothermal Building as noted on plans and details.

B. Contract Requirements require that all sprinkler modifications meet the requirements of NFPA- 13-2019. Contractor is to study carefully review all Separate Disciplines (Architectural, Mechanical, Plumbing, Electrical etc). Contract Drawings to determine final head locations and amounts.

C. Existing Buildings shall be occupied during the Construction Period. Downtime associated with the system downtimes shall require a Fire Marshal approved Fire Watch. This “Fire Watch” will

FIRE PROTECTION SUMMARY OF WORK 210000-2

be the responsibility of the Contractor to Provide and coordinate with the Local Fire Marshal.

D. The following is a Summary of Contract Requirements (NOTE: This list is not all inclusive)

1. Provide Downtime “Fire Watch” for all work involving sprinkler system downtime in occupied areas modified as part of this contract.

2. Provide new piping, sprinkler heads, supports and tie-ins to existing piping, etc., as needed to have a fully operational sprinkler system upon project completion.

3. Contractor to remove and replace existing ceiling tiles as required for the installation of new sprinkler piping where required. Replace damaged tiles.

4. Provide complete system balancing at the completion of the project per contract specifications.

5. Provide all associated control equipment required unless otherwise noted.

6. Providing all necessary permits, approvals, fees, etc.

7. Provide instructions to the owner as outlined in these Specifications.

8. Provide all cutting and patching as required to perform the work of this contract.

9. Provide all necessary rigging as required to perform the work of this contract.

10. Provide manufacturer startup for all systems specified as outlined in these Specifications.

11. Provide removal of trash and general clean-up.

12. Provide as-built drawings.

13. Provide operation and maintenance manuals.

14. Employ the services of the local Underwriters' Inspection Agency and pay for all associated fees.

15. Completion Date: All Fire Protection work shall be completed on the date of substantial completion for the project as set in the Division 1 specifications.

E. The work shall include all materials, equipment and systems shown on the drawings and work for other Divisions required to complete all the work ready for operation.

F. The Contractor shall provide all labor, material, equipment and services for the complete and proper installation and operation of the electrical work as indicated, required, or implied by the drawings and as specified herein.

G. All contract specifications and all of the contract drawings are part of the Contract Documents of the Contractor. The Contractor shall review all drawings and specification divisions to determine the full scope of his work.

H. It will be the responsibility of the Contractor to examine all Drawings (Architectural, Electrical

Mechanical, Plumbing and Fire Protection) to determine the full extent of the work. All field measurements and verifications of conditions and materials will be the obligation of the Contractor. The submission of a Proposal by the Contractor will be considered an indication that all work, in compliance with these specifications and the drawings, has been included in the Proposal. It will also be considered an indication that a thorough review of conditions, materials, and all related specifications have been investigated by the Contractor, and the results of such investigations have been included in the Contractor's Proposal.

L. WARRANTY

1. Contractors shall note that all equipment warranties, as described in the various sections of the Specifications, will begin after Substantial Completion. It will not make any difference when equipment is ordered, delivered, or installed, warranties will commence after the Architect issues his letter of “Substantial Completion.”

FIRE PROTECTION SUMMARY OF WORK 210000-3

2. All equipment is to include factory start-up unless the Contractor receives written permission, from the owner, for Contractor start-up. Copies of the start-up report must be included with the Request for Final Payment; otherwise, final payment will be withheld until the factory reports are submitted.

3 All equipment furnished for this Owner shall include a two-year warranty on parts and labor. This warranty shall supersede all notations in all the other Division 21 specification sections.

PART 3 - EXECUTION

3.1 “FIRE WATCH” SCOPE OF WORK

A. Personnel performing the fire watch shall NOT be performing any other duties that would take their attention away from the areas that are not covered by the fire alarm system.

3.2 “FIRE WATCH” RESPONSIBILITIES AND SPECFIC PROGRAM COMPONENTS

A. Construction Services

1. Know how to report a fire or emergency situation

2. Be trained in fire safety procedures and the use of fire extinguishing equipment

3. Must have quick access to at least a 2A:10ABC fire extinguisher at all times.

4. Be familiar with the surrounding facilities to sound an alarm in the event of a fire.

5. Have means of emergency communications to the local fire department.

6. Perform checks and complete the Fire Watch Log during the specified period.

3.3 “FIRE WATCH” PROGRAM COMPONENTS

A. Entire Building

1. In the event that the Fire Alarm System is inoperable, signs must be posted on the doors of rooms where the system is inoperable.

2. The Contractor is responsible for posting the signs in appropriate locations. The following language should be included on the sign: The Fire alarm System is out of order in the following locations/rooms: In case of emergency, please call 911 or from a cell phone call the number to be provided by the Fire Marshall.

B. Building Automatic Sprinkler System

1. In the event the Automatic Sprinkler System is inoperable, signs must be posted in locations where the system is inoperable and also on the doors of each entrance to the building.

3.4 “FIRE WATCH” REPORTING REQUIREMENTS

A. Fire Watch Log

1. A Fire Watch log must be maintained and is included as part of this specification.

2. The completed Fire Watch Log should be delivered to the Owners Representative at the end of each day.

FIRE PROTECTION SUMMARY OF WORK 210000-4

END OF SECTION 210000

SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 210517 - 1

SECTION 210517 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Sleeves.

2. Sleeve-seal systems.

3. Grout.

1.2 SUBMITTALS

A. Product Data: For each type of product indicated.

PART 2 - PRODUCTS

2.1 SLEEVES

A. Galvanized-Steel-Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, zinc coated, with plain ends.

B. Galvanized-Steel-Sheet Sleeves: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint.

2.2 SLEEVE-SEAL SYSTEMS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Advance Products & Systems, Inc.

2. Metraflex Company (The).

3. Pipeline Seal and Insulator, Inc.

4. Proco Products, Inc.

B. Description: Modular sealing-element unit, designed for field assembly, for filling annular space between piping and sleeve.

1. Sealing Elements: EPDM-rubber interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.

2. Pressure Plates: Carbon steel.

3. Connecting Bolts and Nuts: Carbon steel, with corrosion-resistant coating, of length required to secure pressure plates to sealing elements.

SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 210517 - 2

2.3 GROUT

A. Standard: ASTM C 1107/C 1107M, Grade B, post-hardening and volume-adjusting, dry, hydraulic-cement grout.

B. Characteristics: Nonshrink; recommended for interior and exterior applications.

C. Design Mix: 5000-psi, 28-day compressive strength.

D. Packaging: Premixed and factory packaged.

PART 3 - EXECUTION

3.1 SLEEVE INSTALLATION

A. Install sleeves for piping passing through penetrations in floors, partitions, and walls.

B. For sleeves that will have sleeve-seal system installed, select sleeves of size large enough to provide 1-inch annular clear space between piping and concrete slabs and walls.

1. Sleeves are not required for core-drilled holes.

C. Install sleeves for pipes passing through interior partitions.

1. Cut sleeves to length for mounting flush with both surfaces.

2. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation.

3. Seal annular space between sleeve and piping or piping insulation; use joint sealants appropriate for size, depth, and location of joint. Comply with requirements for sealants specified in Division 07 Section "Joint Sealants."

D. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials.

3.2 SLEEVE-SEAL-SYSTEM INSTALLATION

A. Select type, size, and number of sealing elements required for piping material and size and for sleeve ID or hole size. Position piping in center of sleeve. Center piping in penetration, assemble sleeve-seal system components, and install in annular space between piping and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make a watertight seal.

3.3 SLEEVE AND SLEEVE-SEAL SCHEDULE

A. Use sleeves and sleeve seals for the following piping-penetration applications:

1. Concrete Slabs above Grade:

SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 210517 - 3

a. Piping Smaller Than NPS 6: Galvanized-steel-pipe sleeves.

2. Interior Partitions:

a. Piping Smaller Than NPS 4: Galvanized-steel-pipe sleeves.

END OF SECTION 210517

ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING 210518 - 1

SECTION 210518 - ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Escutcheons.

2. Floor plates.

1.2 SUBMITTALS

A. Product Data: For each type of product indicated.

PART 2 - PRODUCTS

2.1 ESCUTCHEONS

A. One-Piece, Cast-Brass Type: With polished, chrome-plated finish and setscrew fastener.

B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped brass with chrome-plated finish and spring-clip fasteners.

C. One-Piece, Stamped-Steel Type: With chrome-plated finish and spring-clip fasteners.

2.2 FLOOR PLATES

A. One-Piece Floor Plates: Cast-iron flange with holes for fasteners.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install escutcheons for piping penetrations of walls, ceilings, and finished floors.

B. Install escutcheons with ID to closely fit around pipe, tube, and insulation of piping and with

OD that completely covers opening.

1. Escutcheons for New Piping:

a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type.

b. Chrome-Plated Piping: One-piece, cast-brass type with polished, chrome-plated finish.

ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING 210518 - 2

c. Insulated Piping: One-piece, stamped-steel type.

d. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, cast-brass type with polished, chrome-plated finish.

e. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece, stamped-steel type.

f. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece, cast-brass type with polished, chrome-plated finish.

g. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece, stamped-steel type.

h. Bare Piping in Unfinished Service Spaces: One-piece, cast-brass type with polished, chrome-plated finish.

i. Bare Piping in Unfinished Service Spaces: One-piece, stamped-steel type.

j. Bare Piping in Equipment Rooms: One-piece, cast-brass type with polished, chrome-plated finish.

k. Bare Piping in Equipment Rooms: One-piece, stamped-steel type.

C. Install floor plates for piping penetrations of equipment-room floors.

D. Install floor plates with ID to closely fit around pipe, tube, and insulation of piping and with OD that completely covers opening.

1. New Piping: One-piece, floor-plate type.

3.2 FIELD QUALITY CONTROL

A. Replace broken and damaged escutcheons and floor plates using new materials.

END OF SECTION 210518

WET-PIPE SPRINKLER SYSTEMS 211313 - 1

SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Pipes, fittings, and specialties.

2. Fire-protection valves.

3. Fire-department connections.

4. Sprinklers.

5. Alarm devices.

6. Pressure gages.

1.2 SYSTEM DESCRIPTIONS AND REQUIREMENTS

A. Wet-Pipe Sprinkler System: Automatic sprinklers are attached to piping containing water and that is connected to water supply through alarm valve. Water discharges immediately from sprinklers when they are opened. Sprinklers open when heat melts fusible link or destroys frangible device. Hose connections are included if indicated.

B. All concealed sprinkler heads caps shall be a specific color as chosen by Architect.

1.3 PERFORMANCE REQUIREMENTS

A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.

B. Sprinkler system design shall be approved by authorities having jurisdiction.

1. Margin of Safety for Available Water Flow and Pressure: 10 percent, including losses through water-service piping, valves, and backflow preventers.

2. Sprinkler Occupancy Hazard Classifications:

a. Building Service Areas: Ordinary Hazard, Group 1.

b. Electrical Equipment Rooms: Ordinary Hazard, Group 1.

c. General Storage Areas: Ordinary Hazard, Group 1.

d. Mechanical Equipment Rooms: Ordinary Hazard, Group 1.

e. Office and Public Areas: Light Hazard.

3. Minimum Density for Automatic-Sprinkler Piping Design:

a. Light-Hazard Occupancy: 0.10 gpm over 1500-sq. ft. area.

b. Ordinary-Hazard, Group 1 Occupancy: 0.15 gpm over 1500-sq. ft. area.

4. Maximum Protection Area per Sprinkler: Per UL listing.

5. Maximum Protection Area per Sprinkler:

WET-PIPE SPRINKLER SYSTEMS 211313 - 2

a. Patient Areas: 400 sq. ft.

b. Office Spaces: 225 sq. ft.

c. Storage Areas: 130 sq. ft.

d. Mechanical Equipment Rooms: 130 sq. ft.

e. Electrical Equipment Rooms: 130 sq. ft.

f. Other Areas: According to NFPA 13 recommendations unless otherwise indicated.

C. Seismic Performance: Sprinkler piping shall withstand the effects of earthquake motions determined according to NFPA 13 and ASCE/SEI 7.

1.4 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: For wet-pipe sprinkler systems. Include plans, elevations, sections, details, and attachments to other work.

1. Wiring Diagrams: For power, signal, and control wiring.

C. Delegated-Design Submittal: For sprinkler systems indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

D. Qualification Data: For qualified Installer and professional engineer.

E. Approved Sprinkler Piping Drawings: Working plans, prepared according to NFPA 13, that have been approved by authorities having jurisdiction, including hydraulic calculations if applicable.

F. Field Test Reports and Certificates: Indicate and interpret test results for compliance with performance requirements and as described in NFPA 13. Include "Contractor's Material and

Test Certificate for Aboveground Piping."

G. Field quality-control reports.

H. Operation and maintenance data.

1.5 QUALITY ASSURANCE

A. Installer Qualifications:

1. Installer's responsibilities include designing, fabricating, and installing sprinkler systems and providing professional engineering services needed to assume engineering responsibility. Base calculations on results of fire-hydrant flow test.

a. Engineering Responsibility: Preparation of working plans, calculations, and field test reports by a qualified professional engineer.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

WET-PIPE SPRINKLER SYSTEMS 211313 - 3

C. NFPA Standards: Sprinkler system equipment, specialties, accessories, installation, and testing shall comply with the following:

1. NFPA 13, "Installation of Sprinkler Systems."

PART 2 - PRODUCTS

2.1 PIPING MATERIALS

A. Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, and fitting materials, and for joining methods for specific services, service locations, and pipe sizes.

2.2 STEEL PIPE AND FITTINGS

A. Standard Weight, Galvanized-Steel Pipe: ASTM A 53/A 53M, Type E, Grade B. Pipe ends may be factory or field formed to match joining method.

B. Galvanized-Steel Pipe Nipples: ASTM A 733, made of ASTM A 53/A 53M, standard-weight, seamless steel pipe with threaded ends.

C. Steel Flanges and Flanged Fittings: ASME B16.5, Class 150.

D. Grooved-Joint, Steel-Pipe Appurtenances:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Anvil International, Inc.

b. Corcoran Piping System Co.

c. National Fittings, Inc.

d. Tyco Fire & Building Products LP.

e. Victaulic Company.

2. Pressure Rating: 175 psig minimum.

3. Galvanized, Grooved-End Fittings for Steel Piping: ASTM A 47/A 47M, malleable-iron casting or ASTM A 536, ductile-iron casting; with dimensions matching steel pipe.

4. Grooved-End-Pipe Couplings for Steel Piping: AWWA C606 and UL 213, rigid pattern, unless otherwise indicated, for steel-pipe dimensions. Include ferrous housing sections, EPDM-rubber gasket, and bolts and nuts.

E. Steel Pressure-Seal Fittings: UL 213, FM-approved, 175-psig pressure rating with steel housing, rubber O-rings, and pipe stop; for use with fitting manufacturers' pressure-seal tools.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Victaulic Company.

WET-PIPE SPRINKLER SYSTEMS 211313 - 4

2.3 PIPING JOINING MATERIALS

A. Pipe-Flange Gasket Materials: AWWA C110, rubber, flat face, 1/8 inch thick.

1. Class 125, Cast-Iron Flat-Face Flanges: Full-face gaskets.

B. Metal, Pipe-Flange Bolts and Nuts: ASME B18.2.1, carbon steel unless otherwise indicated.

2.4 LISTED FIRE-PROTECTION VALVES

A. General Requirements:

1. Valves shall be UL listed or FM approved.

2. Minimum Pressure Rating: 175 psig.

B. Check Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the

a. American Cast Iron Pipe Company; Waterous Company Subsidiary.

b. Crane Co.; Crane Valve Group; Crane Valves.

c. Metraflex, Inc.

d. NIBCO INC.

e. Reliable Automatic Sprinkler Co., Inc.

f. Tyco Fire & Building Products LP.

g. Victaulic Company.

h. Viking Corporation.

i. Watts Water Technologies, Inc.

2. Standard: UL 312.

3. Pressure Rating: 250 psig minimum.

4. Type: Swing check.

5. Body Material: Cast iron.

6. End Connections: Flanged or grooved.

C. Iron OS&Y Gate Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following

a. American Cast Iron Pipe Company; Waterous Company Subsidiary.

b. American Valve, Inc.

c. Crane Co.; Crane Valve Group; Crane Valves.

d. Hammond Valve.

e. Milwaukee Valve Company.

f. Mueller Co.; Water Products Division.

g. NIBCO INC.

h. Tyco Fire & Building Products LP.

i. United Brass Works, Inc.

j. Watts Water Technologies, Inc.

WET-PIPE SPRINKLER SYSTEMS 211313 - 5

2. Standard: UL 262.

3. Pressure Rating: 250 psig minimum.

4. Body Material: Cast or ductile iron.

5. End Connections: Flanged or grooved.

D. Indicating-Type Butterfly Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following

a. Anvil International, Inc.

b. Global Safety Products, Inc.

c. Kennedy Valve; a division of McWane, Inc.

d. Milwaukee Valve Company.

e. NIBCO INC.

f. Tyco Fire & Building Products LP.

g. Victaulic Company.

2. Standard: UL 1091.

3. Pressure Rating: 175 psig minimum.

4. Valves NPS 2 and Smaller:

a. Valve Type: Ball or butterfly.

b. Body Material: Bronze.

c. End Connections: Threaded.

5. Valves NPS 2-1/2 and Larger:

a. Valve Type: Butterfly.

b. Body Material: Cast or ductile iron.

c. End Connections: Flanged, grooved, or wafer.

6. Valve Operation: Integral electrical, 115-V ac, prewired, single-circuit, supervisory switch indicating device.

2.5 TRIM AND DRAIN VALVES

A. General Requirements:

1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.

2. Minimum Pressure Rating: 175 psig.

B. Ball Valves:

a. Conbraco Industries, Inc.; Apollo Valves.

b. Kennedy Valve; a division of McWane, Inc.

c. Milwaukee Valve Company.

WET-PIPE SPRINKLER SYSTEMS 211313 - 6

d. NIBCO INC.

e. Potter Roemer.

f. Tyco Fire & Building Products LP.

g. Victaulic Company.

h. Watts Water Technologies, Inc.

2.6 SPECIALTY VALVES

A. General Requirements:

1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.

2. Minimum Pressure Rating: 175 psig (1200 kPa).

3. Body Material: Cast or ductile iron.

4. Size: Same as connected piping.

5. End Connections: Flanged or grooved.

B. Alarm Valves:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following

a. AFAC Inc.

b. Globe Fire Sprinkler Corporation.

c. Reliable Automatic Sprinkler Co., Inc.

d. Tyco Fire & Building Products LP.

e. Venus Fire Protection Ltd.

f. Victaulic Company.

g. Viking Corporation.

2. Standard: UL 193.

3. Design: For horizontal or vertical installation.

4. Include trim sets for bypass, drain, electrical sprinkler alarm switch, pressure gages, retarding chamber, and fill-line attachment with strainer.

5. Drip Cup Assembly: Pipe drain without valves and separate from main drain piping.

2.7 FIRE-DEPARTMENT CONNECTIONS

A. Flush-Type, Fire-Department Connection:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. AFAC Inc.

b. Elkhart Brass Mfg. Company, Inc.

c. GMR International Equipment Corporation.

d. Guardian Fire Equipment, Inc.

e. Potter Roemer.

2. Standard: UL 405.

WET-PIPE SPRINKLER SYSTEMS 211313 - 7

3. Type: Flush, for wall mounting. To be approved by the local Fire Company.

4. Pressure Rating: 175 psig minimum.

5. Body Material: Corrosion-resistant metal.

6. Inlets: Brass with threads according to NFPA 1963 and matching local fire-department sizes and threads. Include extension pipe nipples, brass lugged swivel connections, and check devices or clappers.

7. Caps: Brass, lugged type, with gasket and chain.

8. Escutcheon Plate: Rectangular, brass, wall type.

9. Outlet: With pipe threads.

10. Body Style: Horizontal.

11. Number of Inlets: Two.

12. Outlet Location: Back.

13. Escutcheon Plate Marking: Similar to "AUTO SPKR & STANDPIPE."

14. Finish: Polished chrome plated.

15. Outlet Size: NPS 4 or as requested by the local Fire Company..

2.8 SPRINKLER SPECIALTY PIPE FITTINGS

A. Branch Outlet Fittings:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Anvil International, Inc.

b. National Fittings, Inc.

c. Tyco Fire & Building Products LP.

d. Victaulic Company.

2. Standard: UL 213.

3. Pressure Rating: 175 psig minimum.

4. Body Material: Ductile-iron housing with EPDM seals and bolts and nuts.

5. Type: Mechanical-T and -cross fittings.

6. Configurations: Snap-on and strapless, ductile-iron housing with branch outlets.

7. Size: Of dimension to fit onto sprinkler main and with outlet connections as required to match connected branch piping.

8. Branch Outlets: Grooved, plain-end pipe, or threaded.

B. Branch Line Testers:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Elkhart Brass Mfg. Company, Inc.

b. Fire-End & Croker Corporation.

c. Potter Roemer.

2. Standard: UL 199.

3. Pressure Rating: 175 psig minimum.

4. Body Material: Brass.

5. Size: Same as connected piping.

WET-PIPE SPRINKLER SYSTEMS 211313 - 8

6. Inlet: Threaded.

7. Drain Outlet: Threaded and capped.

8. Branch Outlet: Threaded, for sprinkler.

C. Sprinkler Inspector's Test Fittings:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. AGF Manufacturing Inc.

b. Triple R Specialty.

c. Tyco Fire & Building Products LP.

d. Victaulic Company.

e. Viking Corporation.

2. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.

3. Pressure Rating: 175 psig minimum.

4. Body Material: Cast- or ductile-iron housing with sight glass.

5. Size: Same as connected piping.

6. Inlet and Outlet: Threaded.

D. Adjustable Drop Nipples:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following::

a. CECA, LLC.

b. Corcoran Piping System Co.

c. Merit Manufacturing; a division of Anvil International, Inc.

2. Standard: UL 1474.

3. Pressure Rating: 250 psig minimum.

4. Body Material: Steel pipe with EPDM-rubber O-ring seals.

5. Size: Same as connected piping.

6. Length: Adjustable.

7. Inlet and Outlet: Threaded.

E. Flexible, Sprinkler Hose Fittings:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Fivalco Inc.

b. FlexHead Industries, Inc.

c. Gateway Tubing, Inc.

2. Standard: UL 1474.

3. Type: Flexible hose for connection to sprinkler, and with bracket for connection to ceiling grid.

4. Pressure Rating: 175 psig minimum.

WET-PIPE SPRINKLER SYSTEMS 211313 - 9

5. Size: Same as connected piping, for sprinkler.

2.9 SPRINKLERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. AFAC Inc.

2. Globe Fire Sprinkler Corporation.

3. Reliable Automatic Sprinkler Co., Inc.

4. Tyco Fire & Building Products LP.

5. Victaulic Company.

6. Viking Corporation.

B. General Requirements:

1. Standard: UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.

2. Pressure Rating for Automatic Sprinklers: 175 psig minimum.

C. Sprinkler Finishes:

1. Chrome plated.

2. Bronze.

3. Painted.

D. Special Coatings:

1. Wax.

2. Lead.

3. Corrosion-resistant paint.

E. Sprinkler Escutcheons: Materials, types, and finishes for the following sprinkler mounting applications. Escutcheons for concealed, flush, and recessed-type sprinklers are specified with sprinklers.

1. Ceiling Mounting: Plastic, white finish, one piece, flat.

2. Sidewall Mounting: Plastic, white finish, one piece, flat.

F. Sprinkler Guards:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Reliable Automatic Sprinkler Co., Inc.

b. Tyco Fire & Building Products LP.

c. Victaulic Company.

d. Viking Corporation.

2. Standard: UL 199.

3. Type: Wire cage with fastening device for attaching to sprinkler.

WET-PIPE SPRINKLER SYSTEMS 211313 - 10

3.1 WATER-SUPPLY CONNECTIONS

A. Connect sprinkler piping to building's interior water-distribution piping.

3.2 PIPING INSTALLATION

A. Locations and Arrangements: Drawing plans, schematics, and diagrams indicate general location and arrangement of piping. Install piping as indicated, as far as practical.

1. Deviations from approved working plans for piping require written approval from authorities having jurisdiction. File written approval with Architect before deviating from approved working plans.

B. Piping Standard: Comply with requirements for installation of sprinkler piping in NFPA 13.

C. Install seismic restraints on piping (if required for project scope). Comply with requirements for seismic-restraint device materials and installation in NFPA 13.

D. Use listed fittings to make changes in direction, branch takeoffs from mains, and reductions in pipe sizes.

E. Install unions adjacent to each valve in pipes NPS 2 and smaller.

F. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 and larger end connections.

G. Install "Inspector's Test Connections" in sprinkler system piping, complete with shutoff valve, and sized and located according to NFPA 13.

H. Install sprinkler piping with drains for complete system drainage.

I. Install sprinkler control valves, test assemblies, and drain risers adjacent to standpipes when sprinkler piping is connected to standpipes.

J. Install alarm devices in piping systems.

K. Install hangers and supports for sprinkler system piping according to NFPA 13. Comply with requirements for hanger materials in NFPA 13.

L. Install pressure gages on riser or feed main, at each sprinkler test connection, and at top of each standpipe. Include pressure gages with connection not less than NPS 1/4 and with soft metal seated globe valve, arranged for draining pipe between gage and valve. Install gages to permit removal, and install where they will not be subject to freezing.

M. Fill sprinkler system piping with water.

WET-PIPE SPRINKLER SYSTEMS 211313 - 11

N. Install electric heating cables and pipe insulation on sprinkler piping in areas subject to freezing.

Comply with requirements for heating cables in Division 21 "Heat Tracing for Fire-Suppression

Piping" and for piping insulation in Division 21 Section "Fire-Suppression Systems Insulation."

O. Install sleeves for piping penetrations of walls, ceilings, and floors. Comply with requirements for sleeves specified in Division 21 Section "Sleeves and Sleeve Seals for Fire-Suppression

Piping."

P. Install sleeve seals for piping penetrations of concrete walls and slabs. Comply with requirements for sleeve seals specified in Division 21 Section "Sleeves and Sleeve Seals for

Fire-Suppression Piping."

Q. Install escutcheons for piping penetrations of walls, ceilings, and floors. Comply with requirements for escutcheons specified in Division 21 Section "Escutcheons for Fire-

Suppression Piping."

3.3 JOINT CONSTRUCTION

A. Install couplings, flanges, flanged fittings, unions, nipples, and transition and special fittings that have finish and pressure ratings same as or higher than system's pressure rating for aboveground applications unless otherwise indicated.

B. Install unions adjacent to each valve in pipes NPS 2 and smaller.

C. Install flanges, flange adapters, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 and larger end connections.

D. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

E. Remove scale, slag, dirt, and debris from inside and outside of pipes, tubes, and fittings before assembly.

F. Flanged Joints: Select appropriate gasket material in size, type, and thickness suitable for water service. Join flanges with gasket and bolts according to ASME B31.9.

G. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged.

H. Twist-Locked Joints: Insert plain end of steel pipe into plain-end-pipe fitting. Rotate retainer lugs one-quarter turn or tighten retainer pin.

I. Steel-Piping, Pressure-Sealed Joints: Join lightwall steel pipe and steel pressure-seal fittings with tools recommended by fitting manufacturer.

1. Shop weld pipe joints where welded piping is indicated. Do not use welded joints for galvanized-steel pipe.

WET-PIPE SPRINKLER SYSTEMS 211313 - 12

J. Steel-Piping, Cut-Grooved Joints: Cut square-edge groove in end of pipe according to

AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe and grooved-end fittings according to AWWA C606 for steel-pipe joints.

K. Steel-Piping, Roll-Grooved Joints: Roll rounded-edge groove in end of pipe according to

AWWA C606. Assemble coupling with housing, gasket, lubricant, and bolts. Join steel pipe and grooved-end fittings according to AWWA C606 for steel-pipe grooved joints.

L. Dissimilar-Material Piping Joints: Make joints using adapters compatible with materials of both piping systems.

3.4 VALVE AND SPECIALTIES INSTALLATION

A. Install listed fire-protection valves, trim and drain valves, specialty valves and trim, controls, and specialties according to NFPA 13 and authorities having jurisdiction.

B. Install listed fire-protection shutoff valves supervised open, located to control sources of water supply except from fire-department connections. Install permanent identification signs indicating portion of system controlled by each valve.

C. Specialty Valves:

1. General Requirements: Install in vertical position for proper direction of flow, in main supply to system.

2. Alarm Valves: Include bypass check valve and retarding chamber drain-line connection.

3.5 SPRINKLER INSTALLATION

A. Install sprinklers in suspended ceilings in center of acoustical ceiling panels.

B. Install sprinklers into flexible, sprinkler hose fittings and install hose into bracket on ceiling grid.

3.6 FIRE-DEPARTMENT CONNECTION INSTALLATION

A. Install wall-type, fire-department connections.

B. Install automatic (ball drip) drain valve at each check valve for fire-department connection.

3.7 IDENTIFICATION

A. Install labeling and pipe markers on equipment and piping according to requirements in

NFPA 13.

B. Identify system components, wiring, cabling, and terminals. Comply with requirements for identification specified in Division 26 Section "Identification for Electrical Systems."

WET-PIPE SPRINKLER SYSTEMS 211313 - 13

3.8 FIELD QUALITY CONTROL

A. Perform tests and inspections.

B. Tests and Inspections:

1. Leak Test: After installation, charge systems and test for leaks. Repair leaks and retest until no leaks exist.

2. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

3. Flush, test, and inspect sprinkler systems according to NFPA 13, "Systems Acceptance"

Chapter.

4. Energize circuits to electrical equipment and devices.

5. Coordinate with fire-alarm tests. Operate as required.

6. Coordinate with fire-pump tests. Operate as required.

7. Verify that equipment hose threads are same as local fire-department equipment.

C. Sprinkler piping system will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

3.9 CLEANING

A. Clean dirt and debris from sprinklers.

B. Remove and replace sprinklers with paint other than factory finish.

3.10 PIPING SCHEDULE

A. Sprinkler specialty fittings may be used, downstream of control valves, instead of specified fittings.

B. Wet-pipe sprinkler system, NPS 2 and smaller, shall be one of the following:

1. Standard-weight, black-steel pipe with threaded ends; uncoated, gray-iron threaded fittings; and threaded joints.

C. Standard-pressure, wet-pipe sprinkler system, NPS 2-1/2 to NPS 6, shall be one of the

1. Standard-weight, black-steel pipe with cut-or roll-grooved ends; uncoated, grooved-end fittings for steel piping; grooved-end-pipe couplings for steel piping; and grooved joints.

3.11 SPRINKLER SCHEDULE

A. Use sprinkler types in subparagraphs below for the following applications:

1. Rooms without Ceilings: Upright sprinklers.

2. Rooms with Suspended Ceilings: Concealed sprinklers.

WET-PIPE SPRINKLER SYSTEMS 211313 - 14

3. Wall Mounting: Sidewall sprinklers.

4. Spaces Subject to Freezing: Upright sprinklers.

5. Special Applications: Extended-coverage, flow-control, and quick-response sprinklers where indicated.

B. Provide sprinkler types in subparagraphs below with finishes indicated.

1. Concealed Sprinklers: Rough brass, with factory-painted white cover plate.

2. Upright Pendent and Sidewall Sprinklers: Chrome plated in finished spaces exposed to view; rough bronze in unfinished spaces not exposed to view; wax coated where exposed to acids, chemicals, or other corrosive fumes.

END OF SECTION 211313

PLUMBING SUMMARY OF WORK 220000-1

SECTION 220000 –PLUMBING SUMMARY OF WORK

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Divisions Specification Sections, apply to this Section.

1.2 WARRANTY FOR PROJECT

A. The Contractor shall provide the Owner with a 2-year warranty on all materials, labor and systems from the date of Substantial Completion. The date of Substantial completion will be as set in a letter issued by the Architect – no exceptions.

1.3 DEFINITIONS

A. For a complete list of definitions for this contract refer to the Division 1 specifications.

B. Provide: Means to provide, install and make the equipment/system completely functional and

C. Install: Means to provide, install and make the equipment/system completely functional and

1.4 SCOPE OF WORK

A. The following description of work will use the following abbreviations:

1. General Contractor – GC

2. Electrical Contractor – EC

3. Mechanical Contractor (HVAC) – MC

4. Plumbing Contractor – PC

B. Work Included: It is the intent of these specifications and the accompanying drawings that the Contractor shall, unless otherwise specified herein, furnish all labor, materials, tools, and equipment necessary, together with the necessary accessories to constitute a satisfactory and complete installation, to complete the installation of the mechanical work, as indicated on the drawings and described hereinafter. The Contractor shall properly install, equip, adjust and put in perfect condition, the respective portions of the work specified, and to so interconnect the various items or sections of the work to form a complete and properly operating whole. The work shall consist of, but shall not necessarily be limited to the following:

1. For detailed scope of work for each plumbing system, refer to the respective Division 22 specification section.

2. Provide all plumbing fixtures, clean outs, access panels, sanitary waste and vent piping, domestic hot, cold water and recirculation piping, gas piping and water heaters and all valves, hangers and supports as needed.

3. Provide all floor drains as indicated on contract drawings.

4. Provide all new site piping removal and installation as noted on plans.

5. Provide insulation of all plumbing equipment and piping.

6. Providing all necessary permits, approvals, fees, etc.

7. Provide instructions to the owner as outlined in these Specifications.

8. Provide all cutting and patching as required to perform the work of this contract.

PLUMBING SUMMARY OF WORK 220000-2

9. Provide all necessary rigging as required to perform the work of this contract.

10. Provide manufacturer startup for all systems specified as outlined in these Specifications.

11. Provide removal of trash and general clean-up.

12. Provide as-built drawings.

13. Provide operation and maintenance manuals.

14. Employ the services of the local Underwriters' Inspection Agency and pay for all associated fees.

15. Completion Date: All plumbing work shall be completed on the date of substantial completion for the project as set in the Division 1 specifications.

C. The work shall include all materials, equipment and systems shown on the drawings and work for other Divisions required to complete all the work ready for operation.

D. The Contractor shall provide all labor, material, equipment and services for the complete and proper installation and operation of the electrical work as indicated, required or implied by the drawings and as specified herein.

E. All of the specifications listed, and all of the drawings listed are part of the Contract Documents of the Contractor. The Contractor shall review all drawings and specification divisions to determine the full scope of his work.

F. It will be the responsibility of the Contractor to examine all Drawings (Architectural, Structural, Mechanical, Electrical and Plumbing) to determine the full extent of the work. All field measurements and verifications of conditions and materials will be the obligation of the Contractor. The submission of a Proposal by the Contractor will be considered an indication that all work, in compliance with these specifications and the drawings, has been included in the Proposal. It will also be considered an indication that a thorough review of conditions, materials, and all related specifications have been investigated by the Contractor, and the results of such investigations have been included in the Contractor's Proposal.

G. Coordination Between Plumbing and Electrical Contractors:

1. PC to provide transformers for lavatory faucets, urinal flush valves and water closet flush valves. EC to install transformers. PC to provide and install low voltage wiring between transformer and sensor operated device. Wiring in wall shall be installed in conduit. EC to install conduit in wall for low voltage wiring. PC to provide and install recessed junction boxes, as required for water closet and urinal flushometers.

2. The Electrical Contractor shall:

a. Receive and install the wall-mounted electrical control devices, thermal switches, etc., and provide all wiring for same.

b. Provide all fused or unfused disconnect switches and circuit breakers not supplied as part of the Plumbing system and as required by the National Electrical Code, or as shown on the drawings, or as specified.

3. The Plumbing Contractor will:

a. Furnish and set all motors for equipment provided as part of the Plumbing contract.

b. Furnish all motor starters, contactors, push buttons and switches for local and remote control of Plumbing equipment that is not provided by the Electrical

PLUMBING SUMMARY OF WORK 220000-3

Contractor and turn over to the Electrical Contractor for installation. Combination starters shall be furnished for individual (not attached to the equipment) and for packaged equipment regardless of if specified or not in the respective sections of the specification.

c. Provide pre-wired control panels, including relays, switches, pilot lights, etc., all as shown and/or specified, complete with wiring to numbered terminal strips.

d. Provide all-control wiring for all equipment, including all 120 V. controls. Only power supply connection to the equipment will be by the Electrical Contractor.

1.5 WARRANTY

A. Contractors shall note that all equipment warranties, as described in the various sections of the Specifications, will begin after Substantial Completion. It will not make any difference when equipment is ordered, delivered, or installed, warranties will commence after the Architect issues his letter of “Substantial Completion.”

B. All equipment is to include factory start-up unless the Contractor receives written permission, from the owner, for Contractor start-up. Copies of the start-up report must be included with the Request for Final Payment, otherwise final payment will be withheld until the factory reports are submitted.

C. All equipment furnished for this Owner shall include, minimally, a two-year warranty on parts and labor. This warranty shall supercede all notations in all the other Division 22 specification sections.

PART 2 - PRODUCTS (Not applicable).

PART 3 - EXECUTION (Not applicable).

END OF SECTION 220000

COMMON WORK RESULTS FOR PLUMBING 220500 - 1

SECTION 220500 - COMMON WORK RESULTS FOR PLUMBING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Piping materials and installation instructions common to most piping systems.

2. Transition fittings.

3. Dielectric fittings.

4. Mechanical sleeve seals.

5. Sleeves.

6. Escutcheons.

7. Grout.

8. Plumbing demolition.

9. Equipment installation requirements common to equipment sections.

10. Painting and finishing.

11. Concrete bases.

12. Supports and anchorages.

1.3 DEFINITIONS

A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe chases, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.

B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.

D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in chases.

E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures.

Examples include installations within unheated shelters.

F. The following are industry abbreviations for plastic materials:

COMMON WORK RESULTS FOR PLUMBING 220500 - 2

1. ABS: Acrylonitrile-butadiene-styrene plastic.

2. CPVC: Chlorinated polyvinyl chloride plastic.

3. PVC: Polyvinyl chloride plastic.

G. The following are industry abbreviations for rubber materials:

1. EPDM: Ethylene-propylene-diene terpolymer rubber.

2. NBR: Acrylonitrile-butadiene rubber.

1.4 SUBMITTALS

A. Product Data: For the following:

1. Transition fittings.

2. Dielectric fittings.

3. Mechanical sleeve seals.

4. Escutcheons.

B. Welding certificates.

1.5 QUALITY ASSURANCE

A. Steel Support Welding: Qualify processes and operators according to AWS D1.1, "Structural

Welding Code--Steel."

B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure

Vessel Code: Section IX, "Welding and Brazing Qualifications."

1. Comply with provisions in ASME B31 Series, "Code for Pressure Piping."

2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current.

C. Electrical Characteristics for Plumbing Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified. If minimum energy ratings or efficiencies are specified, equipment shall comply with requirements.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and moisture.

B. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending.

COMMON WORK RESULTS FOR PLUMBING 220500 - 3

1.7 COORDINATION

A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for plumbing installations.

B. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.

C. Coordinate requirements for access panels and doors for plumbing items requiring access that are concealed behind finished surfaces. Access panels and doors are specified in Division 08

Section "Access Doors and Frames."

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. In other Part 2 articles where subparagraph titles below introduce lists, the following requirements apply for product selection:

1. Manufacturers: Subject to compliance with requirements, provide products by the manufacturers specified.

2.2 PIPE, TUBE, AND FITTINGS

A. Refer to individual Division 22 piping Sections for pipe, tube, and fitting materials and joining methods.

B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings.

2.3 JOINING MATERIALS

A. Refer to individual Division 22 piping Sections for special joining materials not listed below.

B. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.

1. ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch maximum thickness unless thickness or specific material is indicated.

a. Full-Face Type: For flat-face, Class 125, cast-iron and cast-bronze flanges.

b. Narrow-Face Type: For raised-face, Class 250, cast-iron and steel flanges.

2. AWWA C110, rubber, flat face, 1/8 inch thick, unless otherwise indicated; and full-face or ring type, unless otherwise indicated.

C. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated.

COMMON WORK RESULTS FOR PLUMBING 220500 - 4

D. Solder Filler…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .