6-2-CR27001-27093730 Approved Plans.pdf

PDF 9 MB Posted

Attached to
DFCM Construction - Standard Low Bid - Southern Utah University- Multipurpose Electrical Upgrades- Project #27093730
Solicitation number
CR27001
Issued by
Utah

About this file

This is a set of construction documents prepared by Spectrum Engineers for the Southern Utah University (SUU) Multi-Purpose Building Electrical Updates project in Cedar City, Utah, in coordination with the State of Utah Division of Facilities Construction and Management (DFCM). The project involves the replacement of select older electrical equipment serving the multipurpose building, including a medium voltage transformer rated at 300 kVA (12,470V delta to 208/120V wye), distribution boards, and multiple panelboards designated A through M. The construction documents include electrical site plans, demolition and power plans for basement, level 1, and level 2, one-line diagrams, panel schedules, conduit routing details, grounding diagrams, and typical installation details. The project requires coordination with DFCM for all inspections, and a code inspection report recommending certificate of occupancy issuance is mandatory before the building can be occupied. All power outages must be coordinated with SUU and documented in writing at least two weeks prior to occurrence, with the contractor required to submit a signed outage plan and method of procedure identifying risks and mitigation strategies. The transformer lead time shall not exceed four months from order placement.

The construction documents establish that all work must comply with current National Electrical Code (NEC), International Building Code (IBC), National Fire Protection Association (NFPA), and International Fire Code (IFC) standards, with final compliance and approval subject to on-site field inspection by the Authority Having Jurisdiction. The project involves extensive underground raceway and cable work, with the electrical contractor responsible for all trenching, backfill, compaction, and concrete or asphalt cutting and replacement associated with underground installations. Equipment specifications include NEMA 3R enclosures for outdoor equipment, seismic restraint compliance per ASCE 7-05, and arc flash and coordination studies from the medium voltage transformer to all branch panelboards. The contractor must provide detailed submittals in PDF format with bookmarks and highlighting, and deferred submittals for seismic restraint of nonstructural components must be submitted to DFCM a minimum of two weeks prior to planned installation. The construction cost estimate for the project is $413,678.00.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

SE PROJECT #: SE PROJECT #:

P2502349

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:2

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

COVER SHEET

E1

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

MULTI-PURPOSE BUILDING

ELECTRICAL UPDATES

240787

654 W 200 S MULTIPURPOSE CENTER #212F,

CEDAR CITY, UT 84720

CONSTRUCTION DOCUMENTS - 05/29/2026

Mark: Date: Description

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

07/01/2026

REVIEWED FOR CODE

COMPLIANCE

North: ______ South: ______ East: ______ West: ______

Special Use and Occupancy (e.g. High Rise, Covered Mall): __________________

d) Unlimited Area Building: Yes ______ No ______ Code Section: ______ a a

3) Three Story: A (3)______

2) Two Story: A (2)______

1) One Story: ______

c) Total Allowable Area for:

1_< Allowable Area Actual Area

b) Sum of the Ratio Calculations for Mixed Occupancies:

a) 0.25I = 100f F P 30

WstA I 100100 fIAt taA = A + +

Official for Complex Buildings. Including, but not limited to:

g) Fire Stopping, Including Tested Design Number.

f) Exterior and Interior Accessibility Route.

e) Fire Assembly Locator Sheet.

a) High Rise Requirements.

b) Atriums.

c) Performance Based Criteria.

d) Means or Egress Analysis.

2) Additional Code Information shall be provided at the discretion of the Building

Code Accessibility Chapters, the more restrictive requirement shall govern.

through - ADA Guidelines and specific reference to the International Building

1) In case of conflict with the U.S. Department of Justice Federal Registers Parts

FOOTNOTES:

d) Drinking Fountains: ______ Service Sinks: ______

c) Bath Tubs or Showers: ______

b) Lavatories - Required (m) ______ (f) ______ Provided (m) ______ (f) _____

a) Water Closets - Required (m) ______ (f) ______ Provided (m) ______ (f) ____

M. Minimum Number of Required Plumbing Facilities:

Exit Width Required: ______ Exit Width Provided: ______

Element Hours Assembly ListingListing

Element AssemblyHours

Smoke Partitions Fire Partitions

Exterior Bearing Walls Interior Bearing Walls Exterior Non-Bearing Walls Structural Frame Partitions - Permanent Fire Barriers

Floors - Ceiling Floors Roofs - Ceiling Roofs Exterior Doors and Windows Shaft Enclosures Fire Walls

BAHTBABABA

Design Wind Speed: ______ mphB. Seismic Design Category: ______

L. Design Occupant Load: ______

K. Fire Resistance Rating Requirements for Building Elements (hours).

Area Modifications:J:

____________________________________________Tabular Area:I:

per Floor (square feet): __________________________Actual AreaH:

Number of Stories: ______ Building Height: ______G:

Required: ______ Provided: ______ Type of Sprinkler System: ____________

Sprinklers:F:

Mixed Occupancies: ______ Nonseparated Uses: ______E.

separation distance (in hours):

Requirements for the Exterior Walls based on the fireFire Resistance RatingD.

C. Type of Construction (circle one):

Change in Use: Yes ______ No ______ Mixed Occupancy: Yes ______ No _____

Guidelines ADA Accessibility Building Conservation Uniform Code for National Electrical Code

Conservation Code International Energy International Fire Code International Plumbing Code International Mechanical Code International Building Code

YearYear

APPLICABLE CODES

A. Occupancy and Group: ________ ________ ________ ________ ______

CODE ANALYSIS

SPECIAL NOTE:

THIS PROJECT IS TO BE INSPECTED BY DFCM. THE ELECTRICAL CONTRACTOR

IS TO COORDINATE WITH DFCM FOR INSPECTIONS. A CODE INSPECTION

REPORT IS REQUIRED. MORE THAN SP INSPECTION MAY BE REQUIRED.

N/A N/A N/A

N/A

N/A

BII

N/A N/A N/A N/A

N/A

N/A N/A

N/A N/A N/A N/A

N/A N/A

N/A N/A N/A

1 20

21,250

N/A

N/A N/A

N/A

N/A N/A N/A

N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A

N/A

N/A N/A

N/A N/A N/A N/A

N/AN/AN/AN/A

N/A N/A N/A

No. 12735266 Mario S.

Martinez

E

ED

P ROF E S S

ENG

I ONA L

IN

E

E R

S N

CI

L

S T A T E O F T A H U

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

P2502349

05/29/2026

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:2

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

ELECTRICAL COVER

SHEET

E2

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

ELECTRICAL SHEET INDEX

E1 COVER SHEET

E2 ELECTRICAL COVER SHEET

E3 ELECTRICAL SITE PLAN

E4 ENLARGED ELECTRICAL SITE PLANS

E5 CONDUIT ROUTING DETAILS

E6 BASEMENT OVERALL ELECTRICAL DEMOLITION PLAN

E7 LEVEL 1 OVERALL ELECTRICAL DEMOLITION PLAN

E8 LEVEL 2 OVERALL ELECTRICAL DEMOLITION PLAN

E9 BASEMENT OVERALL POWER PLAN

E10 LEVEL 1 OVERALL POWER PLAN

E11 LEVEL 2 OVERALL POWER PLAN

E12 ONE-LINE DIAGRAMS

E13 PANEL SCHEDULES

E14 PANEL SCHEDULES

E15 TYPICAL DETAILS

E16 LABELING DETAILS

E17 GROUNDING DIAGRAMS AND DETAILS

GENERAL ELECTRICAL NOTES

1. CLARIFICATION METHODS: AT THE TIME OF BIDDING, BIDDERS SHALL FAMILIARIZE

THEMSELVES WITH THE DRAWINGS AND SPECIFICATIONS. ANY QUESTIONS,

MISUNDERSTANDINGS, CONFLICTS, DELETIONS, DISCONTINUED PRODUCTS,

CATALOG NUMBER DISCREPANCIES, DISCREPANCIES BETWEEN THE EQUIPMENT

SUPPLIED AND THE INTENT OR FUNCTION OF THE EQUIPMENT, ETC, SHALL BE

SUBMITTED TO THE ARCHITECT/ENGINEER IN WRITING FOR CLARIFICATION PRIOR

TO ISSUANCE OF THE FINAL ADDENDUM AND BIDDING OF THE PROJECT. WHERE

DISCREPANCIES OR MULTIPLE INTERPRETATIONS OCCUR, THE MOST STRINGENT

(WHICH IS GENERALLY RECOGNIZED AS THE MOST COSTLY) THAT MEETS THE

INTENT OF THE DOCUMENTS SHALL BE ENFORCED.

2. OWNER FURNISHED ITEMS: THE OWNER WILL FURNISH MATERIAL AND

EQUIPMENT AS INDICATED IN THE CONTRACT DOCUMENTS TO BE INCORPORATED

INTO THE WORK. THESE ITEMS ARE ASSIGNED TO THE INSTALLER AND COSTS

FOR RECEIVING, HANDLING, STORAGE, IF REQUIRED, AND INSTALLATION ARE

INCLUDED IN THE CONTRACT SUM.

A. THE INSTALLER'S RESPONSIBILITIES ARE THE SAME AS IF THE INSTALLER

FURNISHED THE MATERIALS OR EQUIPMENT.

B. THE OWNER WILL ARRANGE AND PAY FOR DELIVERY OF OWNER

FURNISHED ITEMS FREIGHT ON BOARD JOB SITE AND THE INSTALLER WILL

INSPECT DELIVERIES FOR DAMAGE. IF OWNER FURNISHED ITEMS ARE

DAMAGED, DEFECTIVE OR MISSING, DOCUMENT DAMAGED ITEMS WITH

THE TRANSPORT COMPANY AND THE OWNER WILL ARRANGE

FOR REPLACEMENT. THE OWNER WILL ALSO ARRANGE FOR

MANUFACTURER'S FIELD SERVICES, AND THE DELIVERY OF

MANUFACTURER'S WARRANTIES AND BONDS TO THE INSTALLER.

C. THE INSTALLER IS RESPONSIBLE FOR DESIGNATING THE DELIVERY DATES

OF OWNER FURNISHED ITEMS AND FOR RECEIVING, UNLOADING AND

HANDLING OWNER FURNISHED ITEMS AT THE SITE.THE INSTALLER IS

RESPONSIBLE FOR PROTECTING OWNER FURNISHED ITEMS FROM

DAMAGE, INCLUDING DAMAGE FROM EXPOSURE TO THE ELEMENTS, AND

TO REPAIR OR REPLACE ITEMS DAMAGED AS A RESULT OF HIS

OPERATIONS.

SITE COORDINATION

THE LOCATION, CAPACITY, AND VOLTAGE OF THE LINES ARE ALL IN ACCORDANCE

WITH DATA GIVEN THIS OFFICE BY THE UTILITY COMPANY. COORDINATE WITH

THE LOCAL UTILITY COMPANY FOR THE INSTALLATION OF THE ELECTRICAL

SERVICE. COMPLY WITH UTILITY REGULATIONS. REPORT DISCREPANCIES TO

THE ENGINEER.

SUU

PERSON CONTACTED: MATT VANDENBERG

PHONE NUMBER: (435) 559-1859

EMAIL: VANDENBERGHE@SUU.EDU

ELECTRIC UTILITY

DEFINITIONS

NOTE: ALL DEFINITIONS MAY NOT BE USED.

INDICATED: THE TERM "INDICATED" REFERS TO GRAPHIC REPRESENTATIONS,

NOTES, OR SCHEDULES ON THE DRAWINGS, OTHER PARAGRAPHS OR

SCHEDULES IN THE SPECIFICATIONS, AND SIMILAR REQUIREMENTS IN THE

CONTRACT DOCUMENTS. WHERE TERMS SUCH AS "SHOWN", "NOTED",

"SCHEDULED", AND "SPECIFIED" ARE USED, IT IS TO HELP THE READER LOCATE

THE REFERENCE, NO LIMITATION ON LOCATION IS INTENDED.

DIRECTED: TERMS SUCH AS "DIRECTED", "REQUESTED", AUTHORIZED",

"SELECTED", "APPROVED", "REQUIRED", AND "PERMITTED" MEAN "DIRECTED BY

THE ENGINEER", "REQUESTED BY THE ENGINEER", AND SIMILAR PHRASES.

APPROVED: THE TERM "APPROVED", WHERE USED IN CONJUNCTION WITH THE

ENGINEER'S ACTION ON THE CONTRACTOR'S SUBMITTALS, APPLICATIONS, AND

REQUESTS, IS LIMITED TO THE ENGINEER'S DUTIES AND RESPONSIBILITIES AS

STATED IN GENERAL AND SUPPLEMENTARY CONDITIONS.

FURNISH: THE TERM "FURNISH" IS USED TO MEAN "SUPPLY AND DELIVER TO

THE PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY,

INSTALLATION, AND SIMILAR OPERATIONS."

INSTALL: THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT PROJECT

SITE INCLUDING THE ACTUAL "UNLOADING, UNPACKING, ASSEMBLY, ERECTION,

PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING,

CURING, PROTECTING, CLEANING, AND SIMILAR OPERATIONS."

PROVIDE: THE TERM "PROVIDE" MEANS "TO FURNISH AND INSTALL, COMPLETE

AND READY FOR THE INTENDED USE."

INSTALLER: AN "INSTALLER" IS THE CONTRACTOR OR AN ENTITY ENGAGED BY

THE CONTRACTOR, EITHER AS AN EMPLOYEE, SUBCONTRACTOR, OR SUB-

SUBCONTRACTOR, FOR PERFORMANCE OF A PARTICULAR CONSTRUCTION

ACTIVITY, INCLUDING INSTALLATION, ERECTION, APPLICATION, AND SIMILAR

OPERATIONS. INSTALLERS ARE REQUIRED TO BE EXPERIENCED IN THE

OPERATIONS THEY ARE ENGAGED TO PERFORM.

TECHNOLOGY SYSTEMS: THE TERM "TECHNOLOGY SYSTEMS" IS USED TO

DESCRIBE ALL LOW VOLTAGE SYSTEMS GENERALLY REFERRED TO AS

"SPECIAL SYSTEMS". THESE SYSTEMS INCLUDE BUT ARE NOT NECESSARILY

LIMITED TO ALL SYSTEMS WHICH UTILIZE VOLTAGES OF LESS THAN 71 VOLTS

SUCH AS SOUND SYSTEMS, VIDEO SYSTEMS, TV SYSTEMS, SECURITY

SYSTEMS, VOICE AND DATA CABLING SYSTEMS, ETC...

ABBREVIATIONS

NOTE: ALL ABBREVIATIONS MAY NOT BE USED.

1P SINGLE POLE

1PH SINGLE-PHASE

1WAY ONE-WAY

2/C TWO-CONDUCTOR

2WAY TWO-WAY

3/C THREE-CONDUCTOR

3WAY THREE-WAY

4OUT QUADRUPLE RECEPTACLE

OUTLET

4PDT FOUR-POLE DOUBLE THROW

4PST FOUR-POLE SINGLE THROW

4W FOUR-WIRE

4WAY FOUR-WAY

A ABOVE COUNTER

AC ARMORED CABLE

ACS ACCESS CONTROL SYSTEM

ADA AMERICANS WITH DISABILITIES

ACT

ADJ ADJACENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AIC AMPERE INTERRUPTING

CAPACITY

ALUM ALUMINUM

AMP AMPERE

ANN ANNUNCIATOR

AP ACCESS POINT (WIRELESS

DATA)

AR AS REQUIRED

ASC AMPS SHORT CIRCUIT

ATS AUTOMATIC TRANSFER

SWITCH

AV AUDIO VISUAL

AWG AMERICAN WIRE GAGE

BB

XFMR

BUCK-BOOST TRANSFORMER

BFF BELOW FINISHED FLOOR

BFG BELOW FINISHED GRADE

C CEILING MOUNTED

CAT CATEGORY

CATV COMMUNITY ANTENNA

TELEVISION

CB CIRCUIT BREAKER

CCBA CUSTOM COLOR AS SELECTED

BY ARCHITECT

CCTV CLOSED CIRCUIT TELEVISION

CF/CI CONTRACTOR FURNISHED/

CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/

OWNER INSTALLED

CFBA CUSTOM FINISH AS SELECTED

BY ARCHITECT

CI CONTACT INDICATOR

CKT CIRCUIT

CM CONSTRUCTION MANAGER

CND CONDUIT

CO CONVENIENCE OUTLET

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CP CONTROL PANEL

CR CARD READER

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CU COPPER

dBA UNIT OF SOUND LEVEL

DPDT DOUBLE POLE, DOUBLE

THROW

DS DISCONNECT SWITCH

E ENHANCED

EA EACH

EM EMERGENCY

EMT ELECTRICAL METALLIC TUBING

ENT ELECTRIC NONMETALLIC

TUBING

EPO EMERGENCY POWER OFF

EQUIP EQUIPMENT

ER EQUIPMENT ROOM

EX EXISTING

F FURNITURE MOUNTED

FA FIRE ALARM

FCP FIRE ALARM CONTROL PANEL

FLA FULL LOAD AMPS

FMC FLEXIBLE METAL CONDUIT

FOB FREIGHT ON BOARD

FPP FIBER PATCH PANEL

FVNR FULL VOLTAGE

NON-REVERSING

FVR FULL VOLTAGE REVERSING

GEN GENERATOR

GFCI GROUND FAULT INTERRUPTER

GFP GROUND FAULT PROTECTION

GIG GIGA HERTZ

GND GROUND

HD HEAVY DUTY

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSE POWER

HPF HIGH POWER FACTOR

HPS HIGH PRESSURE SODIUM

HV HIGH VOLTAGE

HWM HORIZONTAL WIRE

MANAGEMENT

HZ HERTZ

I/O INPUT/ OUTPUT

IG ISOLATED GROUND

IMC INTERMEDIATE METAL

CONDUIT

IN/IS INSULATED/ ISOLATED

IR INFRARED

J-BOX JUNCTION BOX

kV KILOVOLT kVA KILOVOLT AMPERE kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWh KILOWATT HOUR

LED LIGHT EMITTING DIODE

LFMC LIQUID TIGHT FLEXIBLE METAL

CONDUIT

LFNC LIQUID TIGHT FLEXIBLE

NONMETALLIC CONDUIT

LPS LOW PRESSURE SODIUM

LRA LOCKED ROTOR AMPS

LTG LIGHTING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION

SYSTEM

MAX MAXIMUM

MC METAL CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MCP MOTOR CIRCUIT PROTECTION

MDP MAIN DISTRIBUTION PANEL

MG MOTOR GENERATOR

MH MANHOLE

MIN MINIMUM

MLO MAIN LUGS ONLY

MOCP MAXIMUM OVERCURRENT

PROTECTION

MTS MANUAL TRANSFER SWITCH

NA NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS

ASSOCIATION

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OCP OVER CURRENT PROTECTION

OE OWNER ELECTRONICS

OF/CI OWNER FURNISHED/

CONTRACTOR INSTALLED

OF/OI OWNER FURNISHED/ OWNER

INSTALLED

OFP OBTAIN FROM PLANS

OH DR OVERHEAD (COILING) DOOR

OL OVERLOAD

PB PUSHBUTTON

PF POWER FACTOR

PH PHASE

PNL PANEL

PNM PLENUM

PR PAIR

PS POWER SUPPLY

PT POTENTIAL TRANSFORMER

PTZ PAN/TILT/ZOOM

PV PHOTO VOLTAIC

QTY QUANTITY

R REMOVE

RCP REFLECTED CEILING PLAN

RMC RIGID METAL CONDUIT

RNC RIGID NONMETAL CONDUIT

RO REMOTE DOOR OPEN

RPM REVOLUTIONS PER MINUTE

RPP RISER PATCH PANEL

RR REMOVE AND RELOCATE

S/S START/STOP

SCA SHORT CIRCUIT AMPS

SCBA STANDARD COLOR AS

SELECTED BY ARCHITECT

SEC SECURITY

SF SQUARE FOOT (FEET)

SFBA STANDARD FINISH AS

SELECTED BY ARCHITECT

SPD SURGE PROTECTIVE DEVICE

SPDT SINGLE POLE, DOUBLE THROW

SPEC SPECIFICATION

SPP STATION PATCH PANEL

SPST SINGLE POLE, SINGLE THROW

ST SINGLE THROW

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TL TWIST LOCK

TP TELEPHONE POLE

TP TWISTED PAIR

TR TELECOMMMUNICATIONS

ROOM

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TVSS TRANSIENT VOLTAGE SURGE

SUPPRESSER

TYP TYPICAL

UF UNDERFLOOR

UGND UNDERGROUND

UPS UNINTERRUPTIBLE POWER

SUPPLY

V VOLTS

VA VOLT AMPERE

VFC/VF

D

VARIABLE FREQUENCY MOTOR

CONTROLLER

VIC VIDEO INTERCOM SYSTEM

VSS VIDEO SURVEILLANCE SYSTEM

VWM VERTICAL WIRE MANAGEMENT

W/ WITH

W/O WITHOUT

WP WEATHERPROOF

WPP WIRELESS PATCH PANEL

XFMR TRANSFORMER

WIRING METHODS

SYMBOL DESCRIPTION

SYMBOLS LEGEND

WIRING.

CONDUIT STUB. DIMENSION RECORD DRAWINGS AND MARK.

CONDUCTOR & CONDUIT ("CC") SCHEDULE INDICATOR. REFER

TO ONE-LINE DIAGRAM.1

JUNCTION BOX.J

JUNCTION BOX, SYSTEMS FURNITURE COMMUNICATION

CONNECTION.SCJ

JUNCTION BOX, SYSTEMS FURNITURE POWER CONNECTION.SPJ

PULL BOX.PB

JUNCTION BOX, CEILING.CJ

WIRING DEVICES

RECEPTACLE, DUPLEX: NEMA 5-20R.

RECEPTACLE, DUPLEX WITH GROUND FAULT CIRCUIT

INTERRUPTER, WET LABEL, "WEATHERPROOF IN USE":

NEMA 5-20R.W

RECEPTACLE, DUPLEX WITH GROUND FAULT CIRCUIT

INTERRUPTER, WEATHERPROOF: NEMA 5-20R.WP

RECEPTACLE, QUADRAPLEX: NEMA 5-20R.

SYMBOL DESCRIPTION

SYMBOLS LEGEND

SYMBOL DESCRIPTION

SYMBOLS LEGEND

GROUND BUSBAR. REFER TO GROUNDING RISER DIAGRAM FOR

ADDITIONAL INFORMATION.

SINGLE BRANCH CIRCUIT HOME RUN TO PANELBOARD WITH

DEDICATED NEUTRAL CONDUCTOR. LETTER AND NUMBER

NOTATION IDENTIFY PANEL AND CIRCUIT NUMBER.A-1

3. EXPOSED STRUCTURE AREAS: INSTALL RACEWAYS BETWEEN DECK AND

STRUCTURE WHEREVER POSSIBLE IN EXPOSED STRUCTURE CEILING AREAS.

ROUTE RACEWAYS IN CONCEALED AREAS WHEREVER POSSIBLE. REFER ALL

CONDITIONS WHERE RACEWAYS MUST BE INSTALLED WHICH CANNOT COMPLY

WITH THESE REQUIREMENTS TO THE ARCHITECT.

4. SUBMITTALS: PROVIDE ORIGINAL ELECTRONIC PDF FORMAT, BOUND,

BOOKMARKED (EACH SECTION AND PRODUCT), AND HIGHLIGHTED. JOB NAME

AND SUBCONTRACTOR SHALL BE ON THE FRONT COVER. PREPARE INDEX OF

EQUIPMENT SUBMITTED IN EACH TAB.

5. ALL WORK SHALL BE DONE ACCORDING TO THE CURRENT NATIONAL ELECTRIC

CODE (NEC), IBC, NFPA, AND IFC. COMPLIANCE AND FINAL APPROVAL IS SUBJECT

TO THE ON SITE FIELD INSPECTION OF THE AHJ.

6. PROJECT DRAWINGS MEET DFCM STANDARDS.

7 THE FOLLOWING DOCUMENTS ARE REQUIRED BEFORE A CERTIFICATE OF

OCCUPANCY IS ISSUED:

• A CODE INSPECTION REPORT RECOMMENDING THAT A CERTIFICATE OF

OCCUPANCY BE ISSUED.

• CERTIFICATE OF FIRE CLEARANCE FROM THE STATE FIRE MARSHALL.

REFERENCE AND LINE SYMBOLS

DETAIL INDICATOR: A5 INDICATES DETAIL NUMBER, E-501

INDICATES DRAWING SHEET WHERE DETAIL IS SHOWN.

A5 E-501

ELEVATION OR SECTION INDICATOR, EXTERIOR: A5 INDICATES

ELEVATION OR SECTION NUMBER, E-201 INDICATES DRAWING

SHEET WHERE ELEVATION OR SECTION IS SHOWN.

A5 E-201

ELEVATION OR SECTION INDICATOR, INTERIOR: A5 INDICATES

ELEVATION OR SECTION NUMBER, E-201 INDICATES DRAWING

SHEET WHERE ELEVATION OR SECTION IS SHOWN.

A5 E-201

ROOM IDENTIFIER WITH ROOM NAME AND NUMBER.

ROOM NAME

KEYNOTE INDICATOR.1

REVISION INDICATOR.1

CU-1 EQUIPMENT INDICATOR.

BREAK, STRAIGHT: TO BREAK PARTS OF DRAWING

BREAK, ROUND

MATCH LINE INDICATOR: CENTER, EXTRA WIDE LINE.MATCH LINE

SEE XX/X-XXX

NEW LINE: MEDIUM LINE.

HIDDEN FEATURES LINE: HIDDEN, THIN LINE

EXISTING TO REMAIN LINE: THIN LINE.

DEMOLITION LINE: DASHED, MEDIUM LINE

PROPERTY LINE: DASHED, WIDE LINE.

CONTRACT LIMIT LINE: DASHDOT, WIDE LINE.

ELECTRICAL EQUIPMENT INDICATOR. "XXX" INDICATES TYPE OF

EQUIPMENT OR EQUIPMENT ID. "EF-X" IDENTIFIES MECHANICAL

EQUIPMENT BEING SERVED. REFER TO EQUIPMENT SCHEDULE

FOR ADDITIONAL INFORMATION.

EF-X

XXX

EQUIPMENT INDICATOR. "X-X" INDICATES EQUIPMENT MARK

SHOWN ON EQUIPMENT SCHEDULE. "1LA-3" IDENTIFIES PANEL

EQUIPMENT IS CIRCUITED TO. REFER TO EQUIPMENT SCHEDULE

FOR ADDITIONAL INFORMATION.

1LA-3

X-X

MECHANICAL EQUIPMENT INDICATOR. "X-X" INDICATES

EQUIPMENT MARK SHOWN ON EQUIPMENT SCHEDULE. "XMDP"

IDENTIFIES PANEL EQUIPMENT IS CIRCUITED TO. REFER TO

EQUIPMENT SCHEDULE FOR ADDITIONAL INFORMATION.

XMDP

X-X

IN-GRADE PULLBOX INDICATOR. "XXXET" INDICATES LABEL

SHOWN ON SCHEDULE. "#" IDENTIFIES SEQUENCE NUMBER

SHOWN ON SITE AND RISER DIAGRAM. REFER TO PLANS AND

EXTERIOR PULLBOX SCHEDULE FOR ADDITIONAL INFORMATION.

XXXET

SITE ELECTRICAL AND COMMUNICATIONS UTILITIES

IN-GRADE PULLBOX, HAND HOLE. OPTIONS WITH SQUARE OR

ROUND CORNERS. REFER TO PLANS AND EXTERIOR PULLBOX

SCHEDULE FOR ADDITIONAL INFORMATION. . .

ELECTRICAL POWER AND DISTRIBUTION

FUSE WITH RATING (ONE-LINE DIAGRAM).

DISCONNECT, FUSED (ONE-LINE DIAGRAM).

DISCONNECT, NONFUSED (ONE-LINE DIAGRAM).

CIRCUIT BREAKER (ONE-LINE DIAGRAM).

CIRCUIT BREAKER WITH SHUNT TRIP (ONE-LINE DIAGRAM).

S.T.

CIRCUIT BREAKER, MOTOR CIRCUIT PROTECTION

(ONE-LINE DIAGRAM).

MCP

MOTOR.

TRANSFORMER (ONE-LINE DIAGRAM).

DELTA CONNECTION (ONE-LINE DIAGRAM).

WYE CONNECTION (ONE-LINE DIAGRAM).

PANELBOARD (ONE-LINE DIAGRAM)."1H"

PANELBOARD WITH MAIN LUGS ONLY. BUS SIZE AND PHASE AS

SHOWN (ONE-LINE DIAGRAM).

225/3

"1H"

PANELBOARD WITH MAIN CIRCUIT BREAKER. SIZE AND PHASE AS

SHOWN (ONE-LINE DIAGRAM).

225/3

"1H"

PANELBOARD WITH MAIN AND SUB FEED CIRCUIT BREAKER

(ONE-LINE DIAGRAM).

60/3

225/3

"1H"

ELECTRICAL POWER AND DISTRIBUTION

PANELBOARD WITH SUB FEED LUGS (ONE-LINE DIAGRAM).

225/3 225/3 "1H" "1H"

PANELBOARD WITH CIRCUIT BREAKER AND SUB FEED LUGS

(ONE-LINE DIAGRAM).

225/3 "1H" "1H"

CT CABINET PER UTILITY'S REQUIREMENTS (ONE-LINE DIAGRAM).

CT CABINET PER UTILITY'S REQUIREMENTS (ONE-LINE DIAGRAM).

TRANSFER SWITCH (ONE-LINE DIAGRAM).

DIGITAL MULTIMETER (ONE-LINE DIAGRAM).DMM

SERVICE ENTRANCE SURGE PROTECTION (ONE-LINE DIAGRAM).

GENERATOR, ANNUNCIATOR (ONE-LINE DIAGRAM).ANN

GENERATOR, POWER (ONE-LINE DIAGRAM).G

METER.M

EARTH GROUND (ONE-LINE DIAGRAM).

PUSH BUTTON, REMOTE EMERGENCY STOP.EPO

KIRK-KEY MECHANICAL INTERLOCK (ONE-LINE DIAGRAM)K

DISTRIBUTION PANELBOARD, MOTOR CONTROL CENTER,

PLUG-IN BUSWAY, MEDIUM VOLTAGE SWITCHBOARD

(ONE-LINE DIAGRAM).

"1DPHA"

CIRCUIT BREAKER, ADJUSTABLE TRIP. “#AF” REPRESENTS FRAME

RATING. “#AT” REPRESENTS TRIP UNIT. (ONE-LINE DIAGRAM).

#AF

#AT

PANELBOARD WITH MAIN LUGS ONLY AND SURGE PROTECTION

WITH CIRCUIT BREAKER (ONE-LINE DIAGRAM).

25/3

225/3

"1H"

CIRCUIT BREAKER, SOLID STATE WITH ARC ENERGY REDUCTION

SYSTEM INCLUDING ENERGY REDUCING MAINTENANCE

SWITCHING WITH LOCAL STATUS INDICATOR FULLY COMPLIANT

WITH NEC 240.87 (ONE-LINE DIAGRAM)

CIRCUIT BREAKER, ADJUSTABLE TRIP CURVE. L=LONG TIME

CURVE ADJUSTMENT, S=SHORT TIME CURVE ADJUSTMENT,

I=INSTANTANEOUS CURVE ADJUSTMENT, G=GROUND FAULT

ADJUSTMENT FULLY COMPLIANT WITH NEC 210.13, 215.10 AND

230.95. (ONE-LINE DIAGRAM).

LSIG

CURRENT TRANSFORMER (CT) (ONE-LINE DIAGRAM).

CONDUIT TYPES

CONDUIT, POWER 208V

(ONELINE) TRANSFORMER TERMINATION

PROJECT SCOPE

THIS PROJECT CONSISTS OF BUT NOT LIMITED TO THE REPLACEMENT OF

SELECT OLDER ELECTRICAL EQUIPMENT SERVING THE MULTIPURPOSE

BUILDING: INCLUDING THE MEDIUM VOLTAGE TRANSFORMER, DISTRIBUTION

BOARDS, AND PANELBOARDS.

PROJECT POWER OUTAGES

ALL POWER OUTAGES SHALL BE COORDINATED AND ADJUSTED TO OWNERS

SCHEDULE AND BE NOTIFIED IN WRITING 2 WEEKS PRIOR TO OUTAGE.

CONTRACTOR SHALL BE REQUIRED TO HAVE SIGNED AND REVIEWED OUTAGE

PLAN ALONG WITH METHOD OF PROCEDURE (MOP). CONTRACTOR SHALL

INDICATE ALL RISKS AND PROPOSE HOW TO MITIGATE THE RISKS. THE

FOLLOWING ARE SPECIFIC REQUIREMENTS PER LOCATION:

ALL PANELS REPLACEMENTS AND FEEDERS SHALL OCCUR AFTER HOURS OR AS

APPROVED BY SUU. REPLACEMENT OF TRANSFORMERS AND INSTALLATION OF

NEW SWITCHBOARD SHALL BE PHASED TO REDUCE OR ELIMINATE A BUILDING

OUTAGE. SUBJECT TO CONTRACTOR MEANS AND METHODS, DESIGN INTENT IS

AS FOLLOWS:

1. INSTALLATION OF TRANSFORMER PAD, TRANSFORMER, AND ASSOCIATED

CONDUITS.

2. PROVIDE TEMPORARY CABLING OF EXISTING MDP AND SECONDARY SERVICE

DISCONNECT SWITCH.

3. INSTALL NEW SWITCHBOARD, CONDUITS AND WIRING.

4. REMOVE TEMPORARY CABLING AND TERMINATE PERMANENT CABLING.

PANELBOARD CABINET, FLUSH MOUNTED.

PANELBOARD CABINET, SURFACE MOUNTED, 1 SECTION.

PANELBOARD CABINET, SURFACE MOUNTED, 2 SECTION.

DP#__

DISTRIBUTION PANEL OR SWITCHBOARD.

LP

LIGHTING RELAY, CONTACTOR PANEL, OR DIMMING ENCLOSURE.

SWITCH, TOGGLE MOTOR STARTER WITH OVERLOAD

PROTECTION.ST

TRANSFORMER (SEE ONE-LINE FOR SIZE)

1.

2.

3.

4.

Deferred submittals for seismic restraint of nonstructural components must be submitted to the DFCM Building Official a minimum of two weeks prior to the planned installation in order to allow for plan review and forwarding to inspectors. In the event that the submittal is deficient additional time may become necessary.

When seismic restraint of non-structural components is installed prior to receiving DFCM approval it shall not be covered or concealed until receiving both plan review and inspection approval. Further, installers are proceeding at their own risk until plan review and inspection approval occurs.

The requirements for seismic restraint of nonstructural components cannot be satisfied by a general reference to Design Manuals.

The design professional may utilize these manuals as a basis of their design, but must provide all supporting documentation to ensure that the design conforms to the requirements of ASCE 7-05, Chapter 13.

Submittals must include details of the proposed seismic restraint of nonstructural components. These details must show specific information relating to the materials, type, size, and locations of anchorages; materials used for bracing; attachment requirements of bracing to structure and component; and locations of transverse and longitudinal sway bracing and rod stiffeners. Submittals may also require structural calculations, engineering reports, test data, and/or specifications to ensure code compliance.

MEP Components:

Fire Sprinklers

Mechanical Equipment (i.e. HVAC, fans, air handlers, boilers, furnaces, tanks, chillers, water heaters, heat exchangers, evaporators, engines, turbines, pumps, compressors, MFR equipment, etc.)

Electrical Equipment (i.e. generators, batteries, inverters, transformers, MCC, panel boards, switch gear, cabinets, etc.)

Elevator & Escalator Components

Communication Equipment, Computers, Instrumentation, and Controls

Roof-mounted Chimneys, Stacks, Cooling & Electrical Towers

Lighting Fixtures

Vibration Isolated Components

Piping & Conduit Systems

Ductwork (including in-line components)

Conveyors

Cable Trays

Other:

NOT

REQUIRED

ON CONST.

DOCUMENTS

DEFERRED

SUBMITTAL COMMENTS

X

X

X

X

X

X

X

X

X

X

X

X

X

NONSTRUCTURAL COMPONENT CHECKLIST

Equipment Pads

Mark: Date: Description

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

07/01/2026

E4 A1

D1

E3

MULTIPURPOSE BUILDING

(EX)

"S10"

(EX)

"TX-MP"

E4 A3

E4 E3

E4 E1

EXISTING MV

TRANSFORMER

EXISTING LADDER

TO LOWER VAULT

No. 12735266 Mario S.

Martinez

E

ED

P ROF E S S

ENG

I ONA L

IN

E

E R

S N

CI

L

S T A T E O F T A H U

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

P2502349

05/29/2026

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:3

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

ELECTRICAL SITE

PLAN

E3

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

1 CONTRACTOR IS RESPONSIBLE FOR ALL TRENCHING, BACKFILL, AND COMPACTION

ASSOCIATED TO ALL ELECTRICAL UNDERGROUND RACEWAYS AND CABLES. SEE

UNDERGROUND RACEWAY DETAILS FOR REQUIREMENTS FOR EACH TRENCH.

2 THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CONCRETE/ASPHALT

CUTTING AND REPLACEMENT OF CONCRETE/ASPHALT TO MATCH EXISTING

ASSOCIATED WITH UNDERGROUND RACEWAYS PROVIDED AS PART OF THIS

PROJECT.

3 REFER TO PLANS FOR CONSTRAINTS ON PHYSICAL DIMENSIONS AND CLEARANCE

REQUIREMENTS OF EQUIPMENT. PROVIDE EQUIPMENT DIMENSIONS THAT FALL

WITHIN THE CONSTRAINTS OF EACH SPECIFIC LOCATION.

4 PROVIDE SERVICE RATED EQUIPMENT AT EACH SERVICE ENTRANCE.

5 SERVICE EQUIPMENT SHALL BE LEGIBLY MARKED IN THE FIELD WITH THE MAXIMUM

AVAILABLE FAULT CURRENT. VERIFY OR RE-CALCULATE THE AVAILABLE FAULT

CURRENT AT THE SERVICE WHERE MODIFICATIONS TO THE ELECTRICAL

INSTALLATION OCCUR. PLEASE INCLUDE NOTES IN THE ELECTRICAL DRAWINGS OR

SUPPLY CALCULATIONS WHERE APPLICABLE. SEE NEC 110.24. (B)

GENERAL SHEET NOTES

SCALE: 1/16" = 1'-0"A1 ELECTRICAL SITE PLAN - (FOR REFERENCE)

SCALE: NTSD1 SITE TRANSFORMER LOCATION (FOR REFERENCE)

NORTH

SHEET KEYNOTES

1 PROTECT AND MAINTAIN EXISTING SWITCH.

2 EXISTING COMMUNICATIONS CONDUIT.

3 EXISTING WATER LINE.

4 EXISTING IRRIGATION MAIN.

5 EXISTING WATER MANHOLE.

6 DEMOLISH EXISTING CABLING IN EXISTING RACEWAYS.

Mark: Date: Description

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

07/01/2026

(EX)

"TX-MP"

C1

E5

"TX-MP"

C1

E5

A3

E5

"MDP" 5

A1 E15

(EX)

"TX-MP"

(EX)

"TX-MP"

(EX)

"MDP"

C1

E5

UTILITY

103A

C1

E5

UTILITY

103A

No. 12735266 Mario S.

Martinez

E

ED

P ROF E S S

ENG

I ONA L

IN

E

E R

S N

CI

L

S T A T E O F T A H U

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

P2502349

05/29/2026

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:5

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

ENLARGED

ELECTRICAL SITE

PLANS

E4

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

1 CONTRACTOR IS RESPONSIBLE FOR ALL TRENCHING, BACKFILL, AND COMPACTION

ASSOCIATED TO ALL ELECTRICAL UNDERGROUND RACEWAYS AND CABLES. SEE

UNDERGROUND RACEWAY DETAILS FOR REQUIREMENTS FOR EACH TRENCH.

2 THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CONCRETE/ASPHALT

CUTTING AND REPLACEMENT OF CONCRETE/ASPHALT TO MATCH EXISTING

ASSOCIATED WITH UNDERGROUND RACEWAYS PROVIDED AS PART OF THIS

PROJECT.

3 REFER TO PLANS FOR CONSTRAINTS ON PHYSICAL DIMENSIONS AND CLEARANCE

REQUIREMENTS OF EQUIPMENT. PROVIDE EQUIPMENT DIMENSIONS THAT FALL

WITHIN THE CONSTRAINTS OF EACH SPECIFIC LOCATION.

4 PROVIDE SERVICE RATED EQUIPMENT AT EACH SERVICE ENTRANCE.

5 SERVICE EQUIPMENT SHALL BE LEGIBLY MARKED IN THE FIELD WITH THE MAXIMUM

AVAILABLE FAULT CURRENT. VERIFY OR RE-CALCULATE THE AVAILABLE FAULT

CURRENT AT THE SERVICE WHERE MODIFICATIONS TO THE ELECTRICAL

INSTALLATION OCCUR. PLEASE INCLUDE NOTES IN THE ELECTRICAL DRAWINGS OR

SUPPLY CALCULATIONS WHERE APPLICABLE. SEE NEC 110.24. (B)

GENERAL SHEET NOTES

SHEET KEYNOTES

1 PROTECT AND MAINTAIN EXISTING CONDUITS. DEMOLISH EXISTING CABLING.

2 DEMOLISH TREES AND SHRUBS.

3 PROVIDE NEW CABLING IN EXISTING RACEWAYS.

4 EXISTING LADDER ENTRY INTO AREA BELOW.

5 INTERCEPT EXISTING SPARE CONDUIT IN DUCTBANK AND EXTEND TO NEW

TRANSFORMER LOCATION. PROVIDE NEW WIRING AND TERMINATIONS FROM SWITCH

TO TRANSFORMER.

6 PROJECT SHALL BE PHASED SUCH THAT THE NEW TRANSFORMER IS INSTALLED

WITH WIRING AND TERMINATION AND NEW CONDUITS ARE INSTALLED FROM TO NEW

TRANSFORMER TO THE LOCATION OF THE NEW SWITCHBOARD, PRIOR TO THE

DEMOLITION OF THE EXISTING TRANSFORMER. TEMPORARY CABLES SHALL BE

PROVIDED FROM TRANSFORMER TO EXISTING MDP DURING THE INSTALLATION OF

THE NEW SWITCHBOARD.

7 DEMOLISH EXISTING CABLING IN EXISTING RACEWAYS.

8 EXISTING COMMUNICATIONS CONDUIT.

9 EXISTING WATER LINE.

10 EXISTING WATER MANHOLE.

11 EXISTING IRRIGATION MAIN.

12 DEMOLISH EXISTING TRANSFORMER. RETAIN CONDUITS AND PAD FOR REUSE.

13 PROVIDE (4) 3" CONDUIT STUBBED INTO BUILDING.

14 PROVIDE NEW GROUND ROD IN MDP.

15 EXTEND EXISTING TRANSFORMER PAD FOR NEW SWITCHBOARD.

16 VACUUM EXCAVATE AROUND EXISTING CONDUITS, MANHOLE, AND UTILITIES. UPON

FINDINGS, SUBMIT A LAYOUT PLAN SHOWING PROPOSED CONDUIT ROUTING IN

RELATION TO EXISTING SITE UTILITIES.

17 PROVIDE TEMPORARY FENCING DURING CONSTRUCTION OF THE SWITCHBOARD AND

TRANSFORMER. PROPOSED PLACEMENT SHOWN. FIRE DEPARTMENT CONNECTION

MUST MAINTAIN ACCESS.

18 PROVIDE NEW PULLBOX CONNECTING EXISTING CONDUITS AND EXTENDED

CONDUITS. PROVIDE SUPPORTS AS REQUIRED.

19 PROVIDE GROUND.

20 EXTEND EXISTING (4) 4" CONDUITS TO NEW PULLBOX.

21 PROVIDE GATE FOR FIRE DEPARTMENT ACCESS AT FIRE DEPARTMENT CONNECTION

(FDC). COORDINATE FINAL GATE LOCATION AND SITE ACCESS REQUIREMENTS WITH

SUU AND THE LOCAL FIRE MARSHAL FOR FINAL APPROVAL.

22 COORDINATE WITH THE SUU GROUNDS DEPARTMENT FOR WATER SHUTOFF UPON

TRENCHING.

23 PROVIDE (4) 2" CONDUIT STUBBED INTO BUILDING.

24 EXISTING FIRE DEPARTMENT CONNECTION. SHOWN FOR REFERENCE ONLY.

SCALE: 1/4" = 1'-0"A1 DEMOLITION ELECTRICAL SITE PLAN

SCALE: 1/4" = 1'-0"A3 NEW CONSTRUCTION ELECTRICAL SITE PLAN

SCALE:C1 DEMOLITION TRANSFORMER ISO VIEW

SCALE: NTSC3 NEW TRANSFORMER ISO VIEW

NORTH NORTH

SCALE: 1/4" = 1'-0"

UTILITY 103A ENLARGED

ELECTRICAL DEMOLITION PLANE1 SCALE: 1/4" = 1'-0"

NEW UTILITY 103A ENLARGED

ELECTRICAL PLANE3

NORTH NORTH

Mark: Date: Description

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

07/01/2026

LADDER FOR ENTRY

EXISTING CABLE TRAY FOR CABLING

EXISTING CONDUITS TO MDP

EXISTING CABLE TRAY FOR CABLING

EXISTING CONDUITS TO

EXISTING TRANSFORMER

No. 12735266 Mario S.

Martinez

E

ED

P ROF E S S

ENG

I ONA L

IN

E

E R

S N

CI

L

S T A T E O F T A H U

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

P2502349

05/29/2026

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:5

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

CONDUIT ROUTING

DETAILS

E5

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

1 CONTRACTOR IS RESPONSIBLE FOR ALL TRENCHING, BACKFILL, AND COMPACTION

ASSOCIATED TO ALL ELECTRICAL UNDERGROUND RACEWAYS AND CABLES. SEE

UNDERGROUND RACEWAY DETAILS FOR REQUIREMENTS FOR EACH TRENCH.

2 THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CONCRETE/ASPHALT

CUTTING AND REPLACEMENT OF CONCRETE/ASPHALT TO MATCH EXISTING

ASSOCIATED WITH UNDERGROUND RACEWAYS PROVIDED AS PART OF THIS

PROJECT.

3 REFER TO PLANS FOR CONSTRAINTS ON PHYSICAL DIMENSIONS AND CLEARANCE

REQUIREMENTS OF EQUIPMENT. PROVIDE EQUIPMENT DIMENSIONS THAT FALL

WITHIN THE CONSTRAINTS OF EACH SPECIFIC LOCATION.

4 PROVIDE SERVICE RATED EQUIPMENT AT EACH SERVICE ENTRANCE.

5 SERVICE EQUIPMENT SHALL BE LEGIBLY MARKED IN THE FIELD WITH THE MAXIMUM

AVAILABLE FAULT CURRENT. VERIFY OR RE-CALCULATE THE AVAILABLE FAULT

CURRENT AT THE SERVICE WHERE MODIFICATIONS TO THE ELECTRICAL

INSTALLATION OCCUR. PLEASE INCLUDE NOTES IN THE ELECTRICAL DRAWINGS OR

SUPPLY CALCULATIONS WHERE APPLICABLE. SEE NEC 110.24. (B)

GENERAL SHEET NOTES

SHEET KEYNOTES

SCALE: NTSC1 CONDUIT ROUTING PHOTO (FOR REFERENCE)

SCALE: NTSA3 CONDUIT VAULT ROUTING PHOTO (FOR REFERENCE)

SCALE: NTSC3 CONDUIT ROUTING PHOTO (FOR REFERENCE)

Mark: Date: Description

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

07/01/2026

A

(EX)

"C"

No. 12735266 Mario S.

Martinez

E

ED

P ROF E S S

ENG

I ONA L

IN

E

E R

S N

CI

L

S T A T E O F T A H U

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

P2502349

05/29/2026

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:5

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

BASEMENT OVERALL

ELECTRICAL

DEMOLITION PLAN

E6

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

GENERAL SHEET NOTES

SHEET KEYNOTES

1 PROTECT AND MAINTAIN ALL RACEWAYS AND WIRING ASSOCIATED WITH ALL

PANELBOARDS UNLESS SPECIFICALLY DIRECTED.

2 PROVIDE ARC FLASH AND COORDINATION STUDY FOR ELECTRICAL

INFRASTRUCTURE FROM THE MEDIUM TRANSFORMER TO ALL BRANCH

PANELBOARDS.

3 PROVIDE ALL NEW PRINTED LABELS FOR ALL EQUIPMENT, INCLUDING NEW PANEL

SCHEDULES.

4 CONTRACTOR SHALL FIELD VERIFY ALL PANELBOARDS FOR RETROFITTING WITH

THE EXISTING PANELBOARD BUCKET IN THE EXISTING CMU WALL CAVITY.

CONTRACTOR SHALL REDUE SPARE CIRCUIT BREAKERS AS NEEDED TO MEET SIZE

REQUIREMENTS.

SCALE: 1/8" = 1'-0"A1 BASEMENT ELECTRICAL DEMOLITION PLAN

NORTH

Mark: Date: Description

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

07/01/2026

(E X) "e

UTILITY

GYM

RESTROOM

102A

UTILITY

103A

CUSTODIAL

104A

OFFICE

OFFICE

WOMENS

LOCKER

STEAM RM

104B

TOWEL CAGE

104C

OUTDOOR PATIO

SHOWER

TOWEL CAGE

114A

SHOWER

LAUNDRY

106A

CUSTODIAL

DANCE LAB

DANCE LAB

116 A

CORRIDOR

100B

STORAGE

STORAGE

112A

CUSTODIAL

SHOWER

OFFICE

106B

OFFICE

106B

CORRIDOR

100A

ELEVATOR

111C

ELEVATOR

100D

ELEC

111D

CUSTODIAL

111E

HALLWAY

DRESSING

107E

OFFICE

107D

OFFICE

107C

CORRIDOR

MENS DRESSING

OFFICE

108B

RM

CUSTODIAL

107B

SHOWERS

CUSTODIAL

COMPUTER LAB

108A

CORRIDOR

100C

TOWEL CAGE

107A

CUSTODIAL

CLASSROOM

CLASSROOM

STORAGE

111B

STORAGE

111A

COMPUTER LAB

STORAGE

106D

VESTIBULE

116B

CUSTODIAL

110A

LADDER

(EX)

"DS"

(EX)

"FDS"

A B

(EX)

"D"

(EX)

"J"

(EX)

"E"

(EX)

"MDP"

(EX)

"G"

(EX)

"K"

No. 12735266 Mario S.

Martinez

E

ED

P ROF E S S

ENG

I ONA L

IN

E

E R

S N

CI

L

S T A T E O F T A H U

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

P2502349

05/29/2026

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:5

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

LEVEL 1 OVERALL

ELECTRICAL

DEMOLITION PLAN

E7

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

GENERAL SHEET NOTES

SHEET KEYNOTES

1 PROTECT AND MAINTAIN ALL RACEWAYS AND WIRING ASSOCIATED WITH ALL

PANELBOARDS UNLESS SPECIFICALLY DIRECTED.

2 PROVIDE ARC FLASH AND COORDINATION STUDY FOR ELECTRICAL

INFRASTRUCTURE FROM THE MEDIUM TRANSFORMER TO ALL BRANCH

PANELBOARDS.

3 PROVIDE ALL NEW PRINTED LABELS FOR ALL EQUIPMENT, INCLUDING NEW PANEL

SCHEDULES.

4 CONTRACTOR SHALL FIELD VERIFY ALL PANELBOARDS FOR RETROFITTING WITH

THE EXISTING PANELBOARD BUCKET IN THE EXISTING CMU WALL CAVITY.

CONTRACTOR SHALL REDUE SPARE CIRCUIT BREAKERS AS NEEDED TO MEET SIZE

REQUIREMENTS.

SCALE: 1" = 10'-0"A1 LEVEL 1 OVERALL DEMOLITION POWER PLAN

NORTH

Mark: Date: Description

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

07/01/2026

(EX)

"LA"

(EX)

"F"

(EX)

"LB"

N.C.A.T.E RM

CLASSROOM

CLASSROOM

CORRIDOR

CONFERENCE

205-K

CUSTODIAL

WORKROOM

205-A

RECEPTION

CORRIDOR

CLASSROOM

STORAGE

211-A

STORAGE

210-A

CUSTODIAL

MENS RR

OFFICE

205-I

OFFICE

205-J

WOMENS RR

CORRIDOR

OFFICE

205-H

OFFICE

205-G

OFFICE

205-F

OFFICE

205-E

OFFICE

205-D

OFFICE

205-C

OFFICE

205-B

STORAGE

202-A

CUSTODIAL

ELEVATOR

200B

DEPT STORAGE

221-A

RECEPTION

OFFICE

209-A

MECHANICAL

209-J

OFFICE

209-B

OFFICE

209-C

OFFICE

209-D

OFFICE

209-E

OFFICE

209-F

OFFICE

209-G

OFFICE

209-H

STORAGE

209-A

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

N.C.A.T.E.

CUSTODIAL

RECEPTION

OFFICE

212-A

CONFERENCE

212-B

OFFICE

212-C

OFFICE

212-D

OFFICE

212-E

OPEN TO

BELOW

OPEN TO

BELOW

DEPT STORAGE

A B

(EX)

"A"

(EX)

"B"

No. 12735266 Mario S.

Martinez

E

ED

P ROF E S S

ENG

I ONA L

IN

E

E R

S N

CI

L

S T A T E O F T A H U

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

P2502349

05/29/2026

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:5

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

LEVEL 2 OVERALL

ELECTRICAL

DEMOLITION PLAN

E8

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

GENERAL SHEET NOTES

SHEET KEYNOTES

1 PROTECT AND MAINTAIN EXISTING PANELBOARD AND ALL ASSOCIATED LOADS.

SCALE: 1" = 10'-0"A1 LEVEL 2 OVERALL DEMOLITION POWER PLAN

NORTH

1 PROTECT AND MAINTAIN ALL RACEWAYS AND WIRING ASSOCIATED WITH ALL

PANELBOARDS UNLESS SPECIFICALLY DIRECTED.

2 PROVIDE ARC FLASH AND COORDINATION STUDY FOR ELECTRICAL

INFRASTRUCTURE FROM THE MEDIUM TRANSFORMER TO ALL BRANCH

PANELBOARDS.

3 PROVIDE ALL NEW PRINTED LABELS FOR ALL EQUIPMENT, INCLUDING NEW PANEL

SCHEDULES.

4 CONTRACTOR SHALL FIELD VERIFY ALL PANELBOARDS FOR RETROFITTING WITH

THE EXISTING PANELBOARD BUCKET IN THE EXISTING CMU WALL CAVITY.

CONTRACTOR SHALL REDUE SPARE CIRCUIT BREAKERS AS NEEDED TO MEET SIZE

REQUIREMENTS.

Mark: Date: Description

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

07/01/2026

"C"

A

No. 12735266 Mario S.

Martinez

E

ED

P ROF E S S

ENG

I ONA L

IN

E

E R

S N

CI

L

S T A T E O F T A H U

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

P2502349

05/29/2026

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:5

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

BASEMENT OVERALL

POWER PLAN

E9

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

GENERAL SHEET NOTES

SHEET KEYNOTES

1 PROTECT AND MAINTAIN ALL RACEWAYS AND WIRING ASSOCIATED WITH ALL

PANELBOARDS UNLESS SPECIFICALLY DIRECTED.

2 PROVIDE ARC FLASH AND COORDINATION STUDY FOR ELECTRICAL

INFRASTRUCTURE FROM THE MEDIUM TRANSFORMER TO ALL BRANCH

PANELBOARDS.

3 PROVIDE ALL NEW PRINTED LABELS FOR ALL EQUIPMENT, INCLUDING NEW PANEL

SCHEDULES.

4 CONTRACTOR SHALL FIELD VERIFY ALL PANELBOARDS FOR RETROFITTING WITH

THE EXISTING PANELBOARD BUCKET IN THE EXISTING CMU WALL CAVITY.

CONTRACTOR SHALL REDUE SPARE CIRCUIT BREAKERS AS NEEDED TO MEET SIZE

REQUIREMENTS.

NORTH

SCALE: 1/8" = 1'-0"A1 BASEMENT ELECTRICAL POWER PLAN

Mark: Date: Description

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

07/01/2026

"D"

"M"

UTILITY

GYM

RESTROOM

102A

UTILITY

103A

CUSTODIAL

104A

OFFICE

OFFICE

WOMENS

LOCKER

STEAM RM

104B

TOWEL CAGE

104C

OUTDOOR PATIO

SHOWER

TOWEL CAGE

114A

SHOWER

LAUNDRY

106A

CUSTODIAL

DANCE LAB

DANCE LAB

116 A

CORRIDOR

100B

STORAGE

STORAGE

112A

CUSTODIAL

SHOWER

OFFICE

106B

OFFICE

106B

CORRIDOR

100A

ELEVATOR

111C

ELEVATOR

100D

ELEC

111D

CUSTODIAL

111E

HALLWAY

DRESSING

107E

OFFICE

107D

OFFICE

107C

CORRIDOR

MENS DRESSING

OFFICE

108B

RM

CUSTODIAL

107B

SHOWERS

CUSTODIAL

COMPUTER LAB

108A

CORRIDOR

100C

TOWEL CAGE

107A

CUSTODIAL

CLASSROOM

CLASSROOM

STORAGE

111B

STORAGE

111A

COMPUTER LAB

STORAGE

106D

VESTIBULE

116B

CUSTODIAL

110A

A B

"MDP"

"E"

"J"

"G"

"K"

"FUT GP"

No. 12735266 Mario S.

Martinez

E

ED

P ROF E S S

ENG

I ONA L

IN

E

E R

S N

CI

L

S T A T E O F T A H U

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

P2502349

05/29/2026

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:0

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

LEVEL 1 OVERALL

POWER PLAN

E10

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

GENERAL SHEET NOTES

SHEET KEYNOTES

1 FORMERLY LABELED AS PANEL "E"

1 PROTECT AND MAINTAIN ALL RACEWAYS AND WIRING ASSOCIATED WITH ALL

PANELBOARDS UNLESS SPECIFICALLY DIRECTED.

2 PROVIDE ARC FLASH AND COORDINATION STUDY FOR ELECTRICAL

INFRASTRUCTURE FROM THE MEDIUM TRANSFORMER TO ALL BRANCH

PANELBOARDS.

3 PROVIDE ALL NEW PRINTED LABELS FOR ALL EQUIPMENT, INCLUDING NEW PANEL

SCHEDULES.

4 CONTRACTOR SHALL FIELD VERIFY ALL PANELBOARDS FOR RETROFITTING WITH

THE EXISTING PANELBOARD BUCKET IN THE EXISTING CMU WALL CAVITY.

CONTRACTOR SHALL REDUE SPARE CIRCUIT BREAKERS AS NEEDED TO MEET SIZE

REQUIREMENTS.

SCALE: 1" = 10'-0"A1 LEVEL 1 OVERALL POWER PLAN

NORTH

Mark: Date: Description

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

07/01/2026

(EX)

"LA"

(EX)

"F"

(EX)

"LB"

N.C.A.T.E RM

CLASSROOM

CLASSROOM

CORRIDOR

CONFERENCE

205-K

CUSTODIAL

WORKROOM

205-A

RECEPTION

CORRIDOR

CLASSROOM

STORAGE

211-A

STORAGE

210-A

CUSTODIAL

MENS RR

OFFICE

205-I

OFFICE

205-J

WOMENS RR

HALLWAY

OFFICE

205-H

OFFICE

205-G

OFFICE

205-F

OFFICE

205-E

OFFICE

205-D

OFFICE

205-C

OFFICE

205-B

STORAGE

202-A

CUSTODIAL

ELEVATOR

200B

DEPT STORAGE

221-A

RECEPTION

OFFICE

209-A

MECHANICAL

209-J

OFFICE

209-B

OFFICE

209-C

OFFICE

209-D

OFFICE

209-E

OFFICE

209-F

OFFICE

209-G

OFFICE

209-H

STORAGE

209-A

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

N.C.A.T.E.

CUSTODIAL

RECEPTION

OFFICE

212-A

CONFERENCE

212-B

OFFICE

212-C

OFFICE

212-D

OFFICE

212-E

OPEN TO

BELOW

OPEN TO

BELOW

DEPT STORAGE

A B

"A"

"B"

No. 12735266 Mario S.

Martinez

E

ED

P ROF E S S

ENG

I ONA L

IN

E

E R

S N

CI

L

S T A T E O F T A H U

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

P2502349

05/29/2026

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:0

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

LEVEL 2 OVERALL

POWER PLAN

E11

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

GENERAL SHEET NOTES

SHEET KEYNOTES

1 PROTECT AND MAINTAIN ALL RACEWAYS AND WIRING ASSOCIATED WITH ALL

PANELBOARDS UNLESS SPECIFICALLY DIRECTED.

2 PROVIDE ARC FLASH AND COORDINATION STUDY FOR ELECTRICAL

INFRASTRUCTURE FROM THE MEDIUM TRANSFORMER TO ALL BRANCH

PANELBOARDS.

3 PROVIDE ALL NEW PRINTED LABELS FOR ALL EQUIPMENT, INCLUDING NEW PANEL

SCHEDULES.

4 CONTRACTOR SHALL FIELD VERIFY ALL PANELBOARDS FOR RETROFITTING WITH

THE EXISTING PANELBOARD BUCKET IN THE EXISTING CMU WALL CAVITY.

CONTRACTOR SHALL REDUE SPARE CIRCUIT BREAKERS AS NEEDED TO MEET SIZE

REQUIREMENTS.

SCALE: 1" = 10'-0"A1 LEVEL 2 OVERALL POWER PLAN

NORTH

Mark: Date: Description

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

07/01/2026

600/3

GROUND BUS

NEUTRAL BUS

100/3

100/3

"D"

(EX)

225/3

100/3

100/3

"J"

(EX)

100/3

100/3

"K"

(EX)

150/3

"F"

(EX)

225/3

225/3

"G"

(EX)

50/3

50/3

"E"

(EX)

40/3

100/3

"LB"

(EX)

AC-1AC-1

(EX)

AC-2AC-2

(EX)

30/3

100/3

GROUND

PER NEC

#3/0 CU

EXEXEXEX EX

EXEXEX

EX

50/3

50/3

"e"

(EX)

100/3

100/3

"C"

(EX)

100/3

100/3

"B"

(EX)

EXEX

100/3

100/3

"A"

(EX)

EX

100/3

"LA"

EX

EX

100/3

150/3

EX

100/3

100A

EX

100/3

EX

100/3

100A

(EX) ELEV(EX) ELEV

EX

M

70/370/3

EXEX

(EX) GYM(EX) GYM

(EX) POOL(EX) POOL

EX

150/3

"F"

(EX)

40/3

100/3

"LB"

(EX)

AC-1AC-1

(EX)

AC-2AC-2

(EX)

30/3

100/3

GROUND BUS

NEUTRAL BUS

100/3

100/3

"D"

100/3

100/3

"J"

100/3

100/3

"K"

225/3

225/3

"G"

50/3

50/3

"E"

GROUND

PER NEC

EX

EXEXEX

70/3 70/3 50/3

SPARE

50/3

SPARE

50/3

SPARE

DMMTP

LSIG

1000/3 AF

1000/3 AT

LSIGLSIG

1000/3 AF

1000/3 AT

LSIG

LSI

600/3 AF

600/3 AT

LSI

SPARE

400/3 AF

400/3 AT

LSI

SPARE

200/3 AF

200/3 AT

LSI

SPARE

42C

52C

GROUND BUS

NEUTRAL BUS

12C

50/3

50/3

"M"

100/3

100/3

"C"

100/3

100/3

"B"

22C22C

100/3

100/3

"A"

22C

100/3

"LA"

EX

EX

100/3

12C 22C 22C 30C

150/3

70CEX

100/3

100A

(EX) ELEV(EX) ELEV

EX

100/3

EXEX

(EX) GYM(EX) GYM

(EX) POOL(EX) POOL

M

100/3 AF

100/3 AT

LSI

SPARE

100/3 AF

100/3 AT

LSI

SPARE

SPD

60/3

LSI

SPARE

400/3 AF

400/3 AT

LSI

SPARE

EXEX

(EX) DISTRIBUTION PANELBOARD "MDP"

208/120V, 3Ø, 4W

600 A, 65000AIC

GROUND BUS

100% NEUTRAL

SPACE

(EX) "TX-MP" PAD MOUNTED XFMR

300KVA

12,470V DELTA-480/277V WYE

3P, 4W, 1.73%Z

MV05

600 600 600 600 600

SPARE

(EX) "S10"

PAD-MOUNTED SWITCH

(EX)

"S11"

(EX)

"S16"

(EX)

"S9"

5 5 5 5 5 5 5 5 56

6 6

(EX)

"FDS"

(EX)

"DS"100 A

6 6 6

1 DISTRIBUTION PANELBOARD "MDP"

208/120V, 3Ø, 4W

600 A, 65000AIC

GROUND BUS

100% NEUTRAL

MV05

600 600 600 600 600

SPARE

(EX) "S10"

PAD-MOUNTED SWITCH

(EX)

"S11"

(EX)

"S16"

(EX)

"S9"

"TX-MP" PAD MOUNTED XFMR

300KVA, NEMA 3R

12,470V DELTA-208/120V WYE

3P, 4W

DISTRIBUTION PANEL BOARD "M"

208/120V, 3Ø, 4W

1000 A, 65000AIC

GROUND BUS

100% NEUTRAL

NEMA 3R

7 7 7 7 7 7 77 7

22222222

No. 12735266 Mario S.

Martinez

E

ED

P ROF E S S

ENG

I ONA L

IN

E

E R

S N

CI

L

S T A T E O F T A H U

324 S. State St., Suite 400 Salt Lake City, UT 84111

801-328-5151 www.spectrum-engineers.com

C

A

B

2 3

D

E

1 2 3

C

4 5

2026 Spectrum Engineers, Inc.

SHEET TITLE

SUU PROJECT NO:

DRAWN BY:

CHECKED BY:

SIGNATURE:

RECORD DRAWING DATE:

DESIGNED BY:

A

ISSUE:

DATE:

B

4 5

D

E

SPECTRUM PROJECT NO:

P2502349

05/29/2026

Au to de sk

D oc s:

//2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es /2

- S

U U

M ul ti- Pu rp os e Bu ild in g El ec tri ca l U pd at es

El ec

.rv t

7/ 1/

1:

:0

AM

MSM

LSK

JKC

240787 05/29/2026

CONSTRUCTION

DOCUMENTS

ONE-LINE DIAGRAMS

E12

SOUTHERN

UTAH

UNIVERSITY

MULTI-PURPOSE

BUILDING

ELECTRICAL

UPDATES

654 W 200 S

MULTIPURPOSE

CENTER #212F,

CEDAR CITY, UT

84720

1. CONDUCTORS SHOWN ARE SHOWN FOR EACH CONDUIT WITH MODIFICATIONS

AS NOTED IN NOTE 5. ALL CONDUCTORS SHOWN ARE THWN UNLESS

OTHERWISE NOTED.

2. PROVIDE EQUIPMENT GROUND CONDUCTORS PER TABLE 250-122 WHEN

CIRCUIT BREAKERS ARE SIZED GREATER THAN AMPERE RATING SHOWN IN

TABLE.

3. PROVIDE #10 NEUTRALS FOR MULTIWIRE BRANCH CIRCUITS SERVING

COMPUTERS.

4. GROUND (G) CONDUCTOR MAY BE DELETED ON SERVICE ENTRANCE

CONDUCTORS.

5. SYMBOL SUBSCRIPTS:

6. RACEWAY ONLY. CONDUCTORS PROVIDED BY UTILITY.

IG

(E.G.)

COPPER CONDUCTOR AND

CONDUIT SCHEDULE

SUBSCRIPT (NOTE 5)

SCHEDULE NUMBER

5C

"2N": INCLUDE TWO NEUTRAL CONDUCTORS SIZED AS SCHEDULED FOR

PHASE AND NEUTRAL CONDUCTORS WHERE THE CONDUCTOR IS #1/0

OR LARGER. INCLUDE A SINGLE 200% RATED CONDUCTOR THAT IS

TWICE THE AMPACITY OF THE SCHEDULED PHASE AND NEUTRAL

CONDUCTOR WHERE THE CONDUCTOR IS BELOW #1/0 IN SIZE.

"CI": PROVIDE CIRCUIT INTEGRITY CABLE; TYPE TWO-HOUR FIRE

RESISTIVE CABLES IN CONDUIT OR PROVIDE FEEDER ENCASED IN

CONCRETE.

"FG" FULL SIZE GROUND, SIZE EQUIPMENT GROUNDING CONDUCTOR TO

BE SAME SIZE AS THE PHASE CONDUCTORS.

"HH": NEUTRAL CURRENTS EXIST DUE TO HIGH HARMONIC "NONLINEAR"

LOADS. CURRENT CARRYING CONDUCTORS DERATED

ACCORDINGLY. PROVIDE THE IG/HH SIZE FOR THE EQUIPMENT

GROUNDING CONDUCTOR.

"IG": INCLUDE IG (INSULATED/ISOLATED GROUND CONDUCTOR)

SCHEDULED ALONG WITH THE GROUND OF EQUIPMENT GROUND

CONDUCTOR.

"MC": PROVIDE FEEDER IN METAL-CLAD CABLE; TYPE MC IN PLACE OF

SINGLE CONDUCTORS IN CONDUIT.

"SE": SUBSTITUTE "SE" CONDUCTOR FOR "G" CONDUCTOR SHOWN, WHICH

IS SIZED FOR THE GROUNDING OF THE SECONDARY OF THE

SEPARATELY DERIVED SYSTEM.

"SER": PROVIDE SERVICE-ENTRANCE CABLE; TYPE SE OR SER IN PLACE OF

SINGLE CONDUCTORS IN CONDUIT.

CONDUCTOR AND CONDUIT SCHEDULE NOTES

SYM AMP

HH

AMPS

CONDUIT

SIZE

CONDCUTOR (NOTE 1)

IG/HH SE NOTESQTY SIZE G

1C 20 - 0.75 2 12 12 12 8 2 2C 20 - 0.75 3 12 12 12 8 2 3C 20 24 0.75 4 12 12 12 8 2 4C 30 - 0.75 2 10 10 10 8 2 5C 30 - 0.75 3 10 10 10 8 2 6C 30 32 0.75 4 10 10 10 8 2 7C 40 - 1 2 8 10 8 6 2 8C 40 - 1 3 8 10 8 6 2 9C 40 44 1 4 8 10 8 6 2 10C 55 - 1 2 6 10 8 4 2 11C 55 - 1 3 6 10 8 4 2 12C 55 60 1.25 4 6 10 8 4 2 13C 70 - 1 2 4 8 4 2 2 14C 70 - 1.25 3 4 8 4 2 2 15C 70 76 1.25 4 4 8 4 2 2 16C 85 - 1.25 2 3 8 3 2 2 17C 85 - 1.25 3 3 8 3 2 2 18C 85 92 1.25 4 3 8 3 2 2 19C 95 - 1.25 3 2 8 2 2 2 20C 95 104 1.5 4 2 8 2 2 2 21C 130 - 1.5 3 1 6 2 2 2 22C 130 116 1.5 4 1 6 2 2 2 23C 150 - 2 3 1/0 6 2 1/0 2 24C 150 136 2 4 1/0 6 2 1/0 2 27C 200 - 2 3 3/0 6 2 2/0 2 28C 200 180 2.5 4 3/0 6 2 2/0 2 29C 230 - 2.5 3 4/0 4 2 2/0 2 30C 230 208 2.5 4 4/0 4 2 2/0 2 34C 310 280 3 4 350 3 1/0 3/0 2 35C 380 - 3.5 3 500 3 3/0 3/0 2

37C 400 - 2 EA 2 3 3/0 3 3/0 3/0 2

38C 400 360 2 EA 2.5 4 3/0 3 3/0 3/0 2

41C 620 - 2 EA 3 3 350 1/0 4/0 3/0 2

42C 620 560 2 EA 3 4 350 1/0 4/0 3/0 2

52C 1240 1120 4 EA 3 4 350 3/0 4/0 3/0 4

70C 150 - 2 4 2/0 4 - - -

SCALE: NTSA1 ONE-LINE DIAGRAM - DEMOLITION

SCALE: NTSA3 ONE-LINE DIAGRAM - NEW

SHEET KEYNOTES

1 DEMOLISH PANELBOARD. RETAIN EXISTING PANELBOARD BUCKET, ALL WIRING AND

CONDUITS ENTERING THE ENCLOSURE TO BE REUSED FOR NEW WORK.

2 PROVIDE NEW PANELBOARD. NEW PANEL SHALL HAVE THE ABILITY TO FIT WITHIN

THE EXISTING PANELBOARD BUCKET IN THE WALL CAVITY FOR ALL RECESSED

PANELS. RECONNECT ALL WIRING AND CONDUITS ENTERING THE ENCLOSURE.

MATCH WIRE SIZE AND EXTEND ALL BRANCH CIRCUIT WIRING AS REQUIRED.

PROVIDE TERMINATION BLOCKS FOR ALL EXTENSIONS FOR PRICING. COORDINATE

WITH SUU FOR APPROVAL OF METHODS OF SPLICING.

3 PROVIDE NEW CONDUIT AND WIRE WHERE SHOWN ON PLANS. REUSE EXISTING

CONDUIT WHERE SHOWN ON PLANS.

4 PROTECT AND MAINTAIN EXISTING PANELBOARD.

5 CONTRACTOR TO DEMOLISH EXISTING CABLING AND TO PROTECT AND MAINTAIN

EXISTING CONDUIT FOR RE-USE.

6 CONTRACTOR TO PROTECT AND MAINTAIN EXISTING FEEDER.

7 CONTRACTOR TO PROVIDE NEW WIRING IN EXISTING CONDUIT.

8 DEMOLISH EXISTING CABLING, PROTECT AND MAINTAIN EXISTING CONDUITS.

9 PROVIDE (4) 3" CND TO INSIDE OF BUILDING. REFER TO PLANS.

10 DISCONNECT EXISTING VITALITY METER FOR REUSE.

11 RECONNECT EXISTING VITALITY METER AND INTEGRATE INTO THE BUILDING

MANAGEMENT. COORDINATE WITH SUU FOR INSTALLATION.

12 EXTEND SPARE CONDUIT FROM EXISTING DUCT BANK. PROVIDE NEW DUCT BANK

EXTENSION AND INSTALL NEW CONTINUOUS CABLING FOR THE ENTIRE RUN.

13 REFER TO TYPICAL PAD MOUNT TRANSFORMER GROUNDING RISER DIAGRAM.

14 PROVIDE 100% RATED CIRCUIT BREAKER.

15 DEMOLISH EXISTING CONDUIT AND WIRING.

16 PROVIDE (4)…

This is the start of the file's text. The full file is on GovTribe.