This document is a List of Subcontractors form for Indian River County, specifically for Project No. NAT25-01 with Bid No. 202560, which relates to Sector 5 Hurricanes Ian and Nicole Beach and Dune Restoration. The form requires bidders to list the name and address of each subcontractor performing work exceeding 0.5% of the total bid price, along with the specific portion of work they will complete.

The document stipulates that after bid opening, no additions, changes, or substitutions to the subcontractor list will be allowed without written approval from Indian River County. Subcontractors must be properly licensed and hold a valid Certificate of Competency, with an exception for roadway projects unless the subcontractor is installing fencing on private property. The form provides space for listing up to 14 subcontractors, with the ability to attach additional sheets if needed, allowing bidders to comprehensively detail their proposed subcontractor team for the beach and dune restoration project.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

List of Subcontractors – 00458-1

SECTION 00458 – List of Subcontractors

The Bidder MUST list below the name and address of each Subcontractor who will perform work under this Contract in excess of one-half percent of the total bid price, and shall also list the portion of the work which will be done by such Subcontractor. After the opening of Bids, additions, changes or substitutions will not be allowed unless approved by Indian River County after a request for such a change has been submitted in writing by the Contractor, which shall include reasons for such request. Subcontractors must be properly licensed and hold a valid Certificate of Competency (with the exception of Roadway projects, unless the sub will be installing fencing on private property).

Documentation Submitted with Project No. for

Work to be Performed Subcontractor’s Name/Address Portion of Work (%)

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

Note: Attach additional sheets if required.

* * END OF SECTION

SECTION 00458 – List of Subcontractors

Textfield: Sector 5 Hurricanes Ian and Nicole Beach and Dune Restoration
Documentation Submitted with Project No: NAT25-01/Bid 2025060
1:
1-0:
1-1:
2:
2-0:
2-1:
3:
3-0:
3-1:
4:
4-0:
4-1:
5:
5-0:
5-1:
6:
6-0:
6-1:
7:
7-0:
7-1:
8:
8-0:
8-1:
9:
9-0:
9-1:
10:
10-0:
10-1:
11:
11-0:
11-1:
12:
12-0:
12-1:
13:
13-0:
13-1:
14:
14-0:
14-1:

File details come from the government source that posted it. Updated .