10-Appendix C - Contractor Daily Report Format.pdf

PDF 247 KB Posted

Attached to
Sector 5 Hurricanes Ian and Nicole Beach and Dune Restoration Project
Solicitation number
2025060
Issued by
Indian River County, Florida

About this file

This document is a Daily Quality Control Report for the Indian River County Sector 5 - Hurricanes Ian and Nicole Beach Restoration Project. The form is designed to track daily progress, weather conditions, and various operational details of a beach restoration effort. It includes sections for recording weather information, grading and dressing operations, fill placement operations, and dune vegetation installation, with spaces to document the specific profile lines and linear feet of work completed.

The report requires comprehensive documentation of daily activities, including work performed, sand and water quality monitoring, safety inspections, equipment usage, and overall project progress. It includes specific compliance checks such as verifying adherence to Florida Department of Environmental Protection Permit No. 0363427-001-JC and water quality protection laws. The form must be completed by the contractor's authorized representative and submitted by 2:00 p.m. of the following day, providing a detailed daily record of the beach restoration project's progress, challenges, and environmental compliance.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DAILY QUALITY CONTROL REPORT

INDIAN RIVER COUNTY

SECTOR 5 – HURRICANES IAN AND NICOLE BEACH RESTORATION PROJECT

DAILY QUALITY CONTROL REPORT

Date: ___________________ Contract Day: __________________

(Report is due by 2:00 p.m. of the following day)

Beach Access Utilized: _______________________________________________

WEATHER: (Clear) (P. Cloudy) (Cloudy) (Rain) TEMP. Min. Max.

Wind Speed: _____________ mph Wind Direction: _________

Wave Height: _____________feet Wave Direction: _________

GRADING/DRESSING OPERATIONS:

COMPLETE FROM: ______ feet (north/south) of profile line no. _______

COMPLETE TO: ______ feet (north/south) of profile line no. _______

FILL PLACEMENT OPERATIONS:

COMPLETE FROM: ______ feet (north/south) of profile line no. _______

COMPLETE TO: ______ feet (north/south) of profile line no. _______

DUNE VEGETATION INSTALLATION:

COMPLETE FROM: ______ feet (north/south) of profile line no. _______

COMPLETE TO: ______ feet (north/south) of profile line no. _______

1. Work Performed Today: (Indicate location and description of work performed. Provide beach fill advance over last 24 hours.

2. Results of Surveillance: (Include satisfactory work completed or deficiencies with action to be taken.)

3. Sand Quality Monitoring Did all sand placed today meet the requirements of the contract?

Yes/No? ______________.

4. Water Quality Monitoring: Was water quality monitoring conducted today in compliance with project permit requirements of the Florida Department of Environmental Protection

Permit No. 0363427-001-JC and water quality protection laws, and the results provided to the ENGINEER and COUNTY?

(Yes/No)?______________.

Beach sampling occurred at the following times:

5. Verbal Instructions Received: (List any instructions given by the DESIGN

PROFESSIONAL or PROJECT MANAGER, construction deficiencies, retesting required, etc., with action to be taken.)

5. Remarks: (Cover delays and any conflicts in Plans, Specifications or instructions.)

6. Safety Inspection: (Report violations noted; corrective instructions given; and corrective actions taken.)

7. Equipment Data: (Indicate items of construction equipment other than hand tools at job site and whether or not used and if operable.)

8. Progress Summary:

Description This Day To Date

Worked Hours

Downtime Hours (Explain Below)

Length of Fill Placement Advance on Beach (ft)

Number of Truck Deliveries

Sand Volume Placed (estimated c.y.)

Volume Pay (cy in accepted sections only)

Linear % Completed

Explanation of Downtime:

CONTRACTOR's Verification: The above report is complete and correct, equipment used, and works performed during this reporting period are in compliance with the contract drawings and

Specifications except as noted above.

Contractor’s Approved Authorized Representative