9-PWCAT010 - 2025.08.21 - Addendum 1.pdf

PDF 180 KB Posted

Attached to
McBurney Road Culvert Remediation
Solicitation number
US.195400
Issued by
Washington County, Camp Hill Borough, Pennsylvania

View the file

Other files

File Type Posted
7-01. Signed Cover Sheet.pdf PDF
5-07. Technical Specifications.pdf PDF
8-08. Project Plans (12 Sheets).pdf PDF
3-05. Wage Rate Determination.pdf PDF
2-03. Proposal Section.pdf PDF
1-02. Notice to Bidders.pdf PDF
6-04. Information for Bidders.pdf PDF
4-06. General Conditions.pdf PDF
10-PWCAT010 - PennBid Bid Table.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

AUGUST 21, 2025

ADDENDUM

TO ALL BIDDERS FOR CONTRACT

MCBURNEY ROAD CULVERT REMEDIATION

BOROUGH OF CANONSBURG

WASHINGTON COUNTY, PA

You are hereby notified in accordance with the paragraph entitled “Addenda, Bid Specification Challenges and Interpretations” of the above captioned project that the following has been issued to clarify the meaning of the specifications and the conditions and specifications set forth in said addendum are to be considered as binding as if the same was set forth in the original contract documents.

IMPORTANT NOTE: When submitting a bid, the Bidder must acknowledge receipt of this addenda by completing one (1) of the following options:

1. List this addendum on the "Acknowledgement of Receipt of Changes to Bid Documents Form," which is provided in the Proposal Section of the bid documents; or

2. Include a signed copy of this addendum with the Bidder’s electronic bid submitted to PennBid.

The following revisions, corrections and/or clarifications are hereby made to the contract plans and/or specifications:

1. Clarification 1: Who pays for the water for jetting? Answer: The Borough will pay for water used from the PA American Water meter to be placed on the hydrant.

2. Clarification 2: Can the headwall be cast-in-place, as precast is difficult to find in the sizes noted?

Answer: Yes headwalls can be cast-in-place, and the contractor must field measure the height based on a minimum slope of the pipe of 1% and blended fill over the pipe to existing grade.

3. The location, date and time of the Bid Opening for this project have not been changed.

By signing this addendum, the undersigned hereby acknowledges receipt of this addendum and certifies that the submitted bid takes into account the provisions of this addenda, including any changes to the bid advertisement, specifications or bid documents.

Name of Bidder (print) Name of Authorized Representative (print)

Signature of Authorized Representative Date

File details come from the government source that posted it. Updated .