5b. RMMA Boiler Replace -Permit_ 03.21.25 (1).pdf
PDF 6 MB Posted
- Attached to
- Boiler Replacement Project
- Solicitation number
- 25-4958CP-RMMA
- Issued by
- Broomfield County, Colorado
About this file
The document is a comprehensive set of engineering and mechanical design plans for a Boiler Replacement Project at the Jefferson County RMMA Airport in Broomfield, Colorado, prepared by ST+B Engineering. The project involves replacing existing hydronic boilers and associated equipment in the airport terminal building due to end-of-life conditions. The scope of work includes demolishing existing heating water pumps, boilers, expansion tanks, and intake air louvers, and installing new equipment such as boiler B-1, boiler pump BP-1, system pumps P-1 and P-2, a new unit heater UH-2, and an expansion tank ET-1. The project is permitted through March 21, 2025, with the goal of completing the replacement before October 1, 2025, to ensure continuous heating for the building.
The technical specifications detail precise mechanical and electrical requirements, including specific codes and standards to be followed (such as International Building Code, Mechanical Code, and National Electrical Code), and comprehensive installation guidelines. The project involves routing new 8-inch double-wall stainless steel flue venting, installing a new louver for combustion air, connecting to existing gas and water systems, and integrating with the building's existing control systems. The design emphasizes thorough coordination with existing infrastructure, proper equipment mounting on concrete housekeeping pads, and compliance with all local, city, county, state, and federal agency requirements. The control integration will be performed by the owner's preferred controls vendor, with the mechanical contractor providing necessary support and assistance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JEFFERSON COUNTY
RMMA AIRPORT
BOILER REPLACEMENT
BROOMFIELD, CO 80021
DRAWING PACKAGE PROJECT TEAM PROJECT DESCRIPTION PROJECT GENERAL NOTES
NUMBER NAME
SHEET INDEX
G-000 PROJECT COVER SHEET
M-100 OVERALL MECHANICAL PLANS ●
DELIVERABLE
DELIVERABLE KEY:
ISSUED '●'
DISCONTINUED '◊'
REFERENCE ONLY '○'
PROJECT LOCATION
JEFFERSON COUNTY AIRPORT TERMINAL
11755 AIRPORT WAY
BROOMFIELD, COLORADO 80021
DESIGN TEAM
MECHANICAL
PROJECT MANAGER
TODD SPACEK, PE
TELEPHONE: (303) 900-8782
EMAIL: TSPACEK@STB.ENGINEERING
FACILITIES MANAGEMENT
SHANE BLAES
ELECTRICAL
ERIK JOHNSON , PE
PROJECT SCOPE OVERVIEW
· PURPOSE OF PROJECT IS TO REPLACE EXISTING HYDRONIC
BOILERS AND ACCESSORIES DUE TO END OF LIFE WITH NEW
EQUIPMENT AT THE JEFFERSON COUNTY AIRPORT TERMINAL.
APPLICABLE CODES
INTERNATIONAL BUILDING CODE (IBC)
INTERNATIONAL EXISTING BUILDING CODE (IEBC)
INTERNATIONAL MECHANICAL CODE
INTERNATIONAL PLUMBING CODE
INTERNATIONAL FUEL GAS CODE
BUILDING INFORMATION
OCCUPANCY TYPE (PER IBC CHAPTER 3)
NATIONAL ELECTRICAL CODE (NEC / NFPA 70)
GROUP B
SITE LEVEL KEY MAPPRIMARY AREA OF WORK
TELEPHONE: (303) 900-8782
EMAIL: EJOHNSON@STB.ENGINEERING
TELEPHONE: (720) 625-0519
EMAIL: SBLAES@FLYRMMA.COM
INTERNATIONAL FIRE CODE 2018AUTHORITY HAVING JURISDICTION
JEFFERSON COUNTY COLORADO
AIRPORT AUTHORITY
11755 AIRPORT WAY
TELEPHONE: (303) 271-8260
INTERNATIONAL ENERGY CONSERVATION CODE 2018
M-200 CONTROLS AND ISOMETRICS
E-001 ELECTRICAL LEGEND ●
E-100 ELECTRICAL PLANS ●
AREA OF WORK
M-300 MECHANICAL DETAILS
P
ER
MI
T
.14 .25
GENERAL NOTES
1. CONFORM TO THE REQUIREMENTS OF ALL LOCAL, CITY, COUNTY, STATE AND FEDERAL AGENCIES WHICH HAVE AUTHORITY OVER THE PROJECT. INCLUDE ALL ITEMS OF LABOR AND MATERIAL REQUIRED TO MEET SUCH REQUIREMENTS REGARDLESS OF THE FAILURE TO
SPECIFY IN THE PROJECT MANUAL OR INDICATED ON THE DRAWINGS EACH INDIVIDUAL ITEM.
2. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. BE ADVISED THAT ALL LOCATIONS
ARE APPROXIMATE.
3. DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS PRIOR TO COMMENCEMENT OF WORK.
4. THESE DRAWINGS ARE NECESSARILY DIAGRAMMATIC IN NATURE. NOT ALL FITTINGS, OFFSETS, AND SLOPES ARE SHOWN. THE
CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING AND INCLUDE ALL FITTINGS, OFFSETS, AND SLOPES AS REQUIRED TO
PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
5. UNLESS SPECIFICALLY DESIGNATED OTHERWISE, THIS CONTRACTOR SHALL FURNISH AND/OR INSTALL EACH AND EVERY ITEM OF EQUIPMENT SHOW OR DESCRIBED, TOGETHER WITH ALL COMPONENTS AND INCIDENTALS (MATERIAL LABOR, FEES, TRANSPORTATION, TOOLS, STORAGE, CUTTING PATCHING, TRENCHING, CLEAN-UP, ETC.) NECESSARY TO COMPLETE THE WORK WITH
NO ADDITIONAL EXPENSE TO OWNER.
6. IN CASE OF DIFFERENCES BETWEEN BUILDING CODES, SPECIFICATIONS, STATE LAWS, LOCAL ORDINANCES, INDUSTRY STANDARDS, UTILITY COMPANY REGULATIONS, AND THE CONTRACT DOCUMENTS, THE MOST STRINGENT SHALL GOVERN. SHOULD THE CONTRACTOR PERFORM ANY WORK THAT DOES NOT COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE BUILDING CODES, SPECIFICATIONS, STATE LAWS, LOCAL ORDINANCES, INDUSTRY STANDARDS, AND ORDINANCES, INDUSTRY STANDARDS, AND UTILITY COMPANY REGULATIONS, THEY SHALL BEAR ALL COST ARISING IN CORRECTING THESE DEFICIENCIES.
7. LOCATIONS, QUANTITIES AND OTHER MEASUREMENTS OF THE BUILDING AND EQUIPMENT ARE OFFERED AS A GENERAL GUIDE ONLY, WITHOUT GUARANTEE AS TO COMPLETE ACCURACY. THE CONTRACTOR SHALL EXAMINE THE DRAWINGS AND EQUIPMENT AND VERIFY TO HIS OWN SATISFACTION; ALL CONDITIONS AND THEIR RELATIONS AND EFFECT REQUIRED FOR A COMPLETE AND
CORRECTLY OPERATING MECHANICAL SYSTEM.
8. EACH CONTRACTOR SHALL VISIT THE SITE, ASCERTAIN THE CONDITIONS TO BE MET THEREIN IN INSTALLING THE WORK. AND MAKE DUE PROVISIONS FOR SAME IN HIS BID SUM. FAILURE TO COMPLY WITH THIS REQUIREMENT SHALL NOT BE CONSIDERED AS JUSTIFICATION FOR THE OMISSION OF WORK, FAULTY WORK OR FOR PAYMENT OF EXTRA COMPENSATION.
9. AT ALL TIMES, TAKE CARE TO PROTECT APPARATUS FROM DAMAGE. ADEQUATELY PROTECT STORED APPARATUS AT THE SITE, PROVIDE TARPAULINS OR OTHER PROTECTION COVERING AS REQUIRED TO THE SATISFACTION OF THE OWNER.
10. LOCATE ALL EQUIPMENT, FIXTURES, PIPING, ETC., APPROXIMATELY IN GENERAL LOCATION AS SHOWN, BUT CONFORM TO ALL
STRUCTURAL AND FINISH CONDITIONS OF BUILDING.
11. COOPERATE WITH OTHER CONTRACTORS TO KEEP THE AREA CLEAN AND FREE OF UNNECESSARY MATERIALS OR DEBRIS. WHEN WORK IS COMPLETE, REMOVE ALL TOOLS, SCAFFOLDING, MACHINERY, AND DEBRIS. BROOM SWEEP THE AREA.
12. COOPERATE WITH THE OWNER AND GENERAL CONTRACTOR TO MEET CONSTRUCTION SCHEDULES. COOPERATE IN ESTABLISHING
THESE SCHEDULES AND AVOID DELAYING OTHER CONTRACTORS.
13. PREPARE AS-BUILT DRAWINGS INDICATING ACTUAL ROUTINGS OF PIPING INCLUDING LABELING OF EACH LINE SHOWING SIZE, ETC.
14. AT TIME OF FINAL INSPECTION, TEST ALL CONNECTIONS, OPERATION OF ALL EQUIPMENT, ETC, ALL EQUIPMENT, AND SYSTEMS SHALL
BE DEMONSTRATED TO OWNER & ENGINEER.
15. BRING TO THE ATTENTION OF THE ENGINEER ANY DISCREPANCIES SO THAT AN ADDENDUM MAY BE ISSUED BEFORE BIDDING. ANY
OMISSIONS OR ERRORS FOUND AFTER BIDDING WILL BE AT THE EXPENSE OF THE CONTRACTOR.
PE
RM
IT
.21
.25
FIRE DISTRICT - WEST METRO FIRE PROTECTION DISTRICT (303)-989-4307
M-000 MECHANICAL LEGEND AND SCHEDULES ● ●
a B C d e
F
PROJECT AREA
M-101 ENLARGED PLANS
M-301 MECHANICAL DETAILS ●
G-000 project cover sheet
13 12 11 10 9 8 7 6 5 4 3 2 1
A B
C D
E F
G H
141516
A B
C D
E F
G H
13 12 11 10 9 8 7 6 5 4 3 2 1141516
/2
/2
:3
A
M x3
Z B o x\
S
TB
P ro je c ts
\2 .1
J ef fC o R
M M
A A ir po rt B o il er R ep la c em en t\
.D ra w in g s \G
_C o ve r.
d w g
I J
I J
SUBMISSION DATENO
J ef fe rs o n C o u n ty r m m a a ir po rt A
IR
P O
R T
W A Y
B R
O O
M F
IE
L D
C O
Sheet Name
Sheet No.
ST 2864.10+B Project No.:
B o il er R ep la c em en t
STAMP
E n g in e e r in
G(3
-8
G
E N
E S
E E T
R A
IL
R D
S
U
IT
E
G
O L D
E N
C
O
H
TT
P /S
TB
.E
N G
IN
E E R
IN
G
JEFFCO.US
(303) 271-6511
100 JEFFERSON COUNTY PKWY
GOLDEN, CO 80419
1 03/21/25PERMIT
03-21-2025
ROUND
DUCTWORK LEGEND
RECTANGULAR
DUCT RISER
DUCT DROP
90° ELBOW DOWN
(NEGATIVE PRESSURE)
90° ELBOW DOWN
(POSITIVE PRESSURE)
90° ELBOW UP
(NEGATIVE PRESSURE)
90° ELBOW UP
(POSITIVE PRESSURE)
CHANGE IN ELEVATION
SIZE TRANSITION
90° RADIUS ELBOW
90° MITERED ELBOW
W/ TURNING VANES
90° STRAIGHT TEE
90° CONICAL TEE
45° BRANCH
45° CONICAL BRANCH
FIRE DAMPER
SMOKE DAMPER
FIRE/SMOKE DAMPER
MANUAL BALANCING DAMPER
MOTORIZED BALANCING DAMPER
BACKDRAFT DAMPER
DESCRIPTION
RIGID DUCT TO FLEX DUCT
CONNECTION
AMERICANS WITH DISABILITIES ACT
ABBREVIATIONS
ADA
AMP FRAME, AMP TRIPAF/AT
ABOVE FINISHED FLOORAFF
ABOVE FINISHED GRADEAFG
AMPERES INTERRUPTING CAPACITY (SYMMETRICAL)AIC
AMPEREAMP or A
AMP SWITCH, AMP FUSEAS/AF
AUTOMATIC TRANSFER SWITCHATS
AVERAGEAVG
AMERICAN WIRE GAUGEAWG
CONDUITC
CIRCUIT BREAKERCB
CIRCUITCIRC, CKT
CURRENT TRANSFORMERCT
DISCONNECTDISC
EXISTING(E)
EXHASUT FANEF
ELECTRICAL METALLIC TUBINGEMT
ELECTRICAL NON-METALLIC TUBINGENT
EMERGENCY POWER OFFEPO
FIRE ALARMFA
FULL LOAD AMPSFLA
FIRE SMOKE DAMPERFSD
FEETFT or '
GROUND FAULT CIRCUIT INTERRUPTERGFCI
GROUND FAULT PROTECTIONGFP
GROUNDGRD
WIDTH, DEPTH, HEIGHT, LENGTHW,D,H,L
HAND-OFF-CUTHOA
HORSEPOWERHP
HEATING, VENTILATION, AND AIR CONDITIONINGHVAC
ISOLATED GROUNDIG
INCHESIN or "
JUNCTION BOXJBOX
KILOVOLT AMPERESKVA
KILOWATTKW
KILOWATT HOURKWH
LINEAR FEETLF
LIGHTINGLTG or LTS
METERM
MAXIMUMMAX
MINIMUM CIRCUIT AMPACITYMCA
MAIN CIRCUIT BREAKERMCB
MOTOR CONTROL CENTERMCC
THOUSAND CIRCULAR MILSMCM
MOTOR CIRCUIT PROTECTORMCP
MANUFACTURERMFR
MINIMUMMIN
MAIN LUGS ONLYMLO
MAXIMUM OVERCURRENT PROTECTIONMOCP
MONITORINGMON
MOUNTEDMTD
NORMALLY CLOSED / NORMALLY OPENNC / NO
NATIONAL ELECTRIC CODENEC
NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATIONNEMA
NON-FUSEDNF
NOT IN CONTRACTNIC
NIGHT LIGHTNL
NUMBERNo. or #
NOT TO SCALENTS
OWNER, FURNISHED, CONTRACTOR INSTALLEDOFCI
POLEP
PHOTOCELLPC
PHASEPH
FURNISH AND INSTALLPROVIDE
POTENTIAL TRANSFORMERPT
POLYVINYL CHLORIDEPVC
RECEPTACLEREC or RECPT
RIGID GALVANIZED STEELRGS
ROOT MEAN SQUARERMS
SURGE PROTECTION DEVICESPD
SINGLE-POLE, SINGLE-THROWSPST
SQUARESQ
TIMECLOCKTC
TELEPHONE/DATATEL/DATA
TELEVISIONTV
TYPICALTYP
UNDERGROUND PULL SECTIONUGPS
UNLESS OTHERWISE NOTEDUON
UNITERRUPTABLE POWER SYSTEMUPS
VOLTSV
VOLT AMPERESVA
VARIABLE AIR VOLUMEVAV
VOLTAGE DROPVD
WIREW
WEATHERPROOFWP
TRANSFORMERXFRM
PERCENTAGE IMPEDANCE%Z
MISCELLANEOUSMISC
NEW(N)
FUTURE(F)
RELOCATED(R)
DEMOLISH(D) or DEMO
REFER TORE:
VARIABLE FREQUENCY DRIVEVFD
FOR CONTINUATIONFCT
FOR FURTHER INFORMATIONFFI
BUILDING AUTOMATION SYSTEMBAS
BELOW FINISHED GRADEBFG
WITHw/
SQUARE FEETSF
AIR ADMITTANCE VALVEAAV
PIPE SYSTEM DESIGNATIONS
CONDENSER SUPPLY - CLOSEDCCS
CONDENSER RETURN - CLOSEDCCR
CONDENSER RETURNCR
CS CONDENSER SUPPLY
CHILLED WATER RETURNCHR or CWR CHILLED WATER RETURNCHS or CWS
RADIANT FLOOR RETURNRFR
RADIANT FLOOR SUPPLYRFS
GLYCOL FEEDGF
GEOTHERMAL LOOP RETURNGLR
GEOTHERMAL LOOP SUPPLYGLS
SNOWMLET HEATING RETURNSMR
SNOWMLET HEATING SUPPLYSMS
HEATING WATER RETURNHWR
HEATING WATER SUPPLYHWS
CONDENSATE RETURN - HIGH PRESSUREHPR
CONDENSATE RETURN - LOW PRESSURELPR
STEAM SUPPLY - LOW PRESSURELPS
CONDENSATE RETURN - MEDIUM PRESSUREMPR
STEAM SUPPLY - MEDIUM PRESSUREMPS
PUMP CONDENSATEPC
STEAM SUPPLY - HIGH PRESSUREHPS
STEAM SYSTEMS
HYDRONIC SYSTEMS
F S
FS
F S
FS
M
BD
M
BD
DESCRIPTION
DRAWING FLAG NOTE
DEMOLITION DRAWING FLAG NOTE
MECHANICAL EQUIPMENT CALLOUT
MISC./OWNER EQUIPMENT CALLOUT
MEDICAL EQUIPMENT CALLOUT
ELEVATION/SECTION CALLOUT
xxx
XXX
xxx
PLAN
PLAN SYMBOLS LEGEND
SYSTEM DISCONNECT SYMBOL
SYSTEM NEW CONNECTION SYMBOL
REVISION CLOUD TAG#
DESCRIPTIONPLAN
PIPING LEGEND
PIPE TEE
PIPE DN
PIPE UP
PIPE / PIPE FITTINGS / PIPE CONNECTIONS
PIPE CAP
PIPE EXPANSION JOINT
PIPE FLEXIBLE CONNECTION
PIPE ANCHOR
FLOOR DRAIN
FLOOR SINK
FLOOR CLEANOUT
HORIZONTAL CLEANOUT
HOSE BIBB OR WALL HYDRANT
FIXTURES / DRAINS / CLEANOUTS /TRAPS
ROOF DRAIN
VENTURI / FLOW INDICATOR
PUMP / EQUIPMENT CONNECTOR
STEAM TRAP
FT
TD
IB
FLOAT & THERMOSTATIC
THERMODYNAMIC
INVERTED BUCKET
TS
BP
THERMOSTATIC
BALANCED PRESSURE
STEAM TRAP TEST CHAMBER
DRAIN VALVE WITH HOSE END
VALVES / ACCESSORIES
BUTTERFLY VALVE
AIR VENT
CHECK VALVE
DOUBLE CHECK BACKFLOW PREVENTER
SAFTY RELIEF VALVE
GATE VALVE
GLOBE VALVE
PRESSURE REDUCING STATION
ISOLATION BALL VALVE
PLUG VALVE
FLOW BALANCING VALVE
PRESSURE GAUGE
PRESSURE TEMPERATURE TAP
FLOW SWITCHFS
STRAINER
STRAINER WITH BLOW-OFF VALVE
2-WAY TEMPERATURE CONTROL VALVE
3-WAY TEMPERATURE CONTROL VALVE
STRAINER WITH VALVE
SOLENOID VALVE
SHOCK ABSORBER
THERMOMETER
UNION
TEMPERTURE CONTROLLER OR SENSORTC
SENSOR (MISCELLANEOUS, REFER TO PLANS)S
VACUUM BREAKER
N/A
EXPANSION TANK SCHEDULE
TAG SYSTEM SERVED TYPE TANK PRESSURE
RATING
SYSTEM
TEMPERATURE
RANGE
MAX
ACCEPT.
VOLUME
(GALLONS)
TANK
VOLUME
(GALLONS)
BASIS OF
DESIGN DRY / OPT WEIGHT,
LBM ACCESSORIES REMARKS
MFG MODEL
ET-1 HEATING / PLANT
SYSTEM
FLOOR MOUNT,
BLADDER 125 PSI 180°F - 40°F 53 53 AMTROL 200 - L 190 / 750 AS PER DETAIL 4 / M-300 1, 2, 3
REMARKS:
1 ASME RATED.
2 FACTORY PRE-CHARGE PRESSURE 12 PSIG. CONTRACTORS TO FINALIZE REQUIRED CHARGE PRESSURE AT SYSTEM STARTUP.
3 PROVIDE WITH REPLACEABLE ACCEPTANCE BLADDER DESIGN.
AIR SEPARATOR SCHEDULE
TAG TYPE SERVICES FLUID MAX FLOW PD IN.WC CONNECTION MANUFACTURER MODEL NUMBER REMARKS
AS-1 COALESCING AIR & DIRT
SEPARATOR
HEATED WATER
SYSTEM 30% GLYCOL 75 GPM .78 2.5 SPIROTHERM VDT-2-12 1, 2, 3
REMARKS
1 STANDARD VELOCITY RATING WITH REMOVABLE HEAD AND MAGNETIC INSERT.
2 CONTRACTOR SHALL COORDINATE SERVICE REQUIREMENTS NECESSARY WITH PURCHASED EQUIPMENT AND ENSURE MINIMUM REQUIREMENTS ARE PROVIDED.
3 ASME RATED.
HYDRONIC BOILER SCHEDULE
TAG BOILER TYPE BURNER TYPE FUEL TYPE INPUT @ SL
(MBH)
OUTPUT @ ALT
(MBH)
WATER FLOW
RATE AT
(GPM)
EWT (°F) LWT (°F)
MINIMUM
EFFICIENCY
PRSS.
DROP (FT.
HD.)
ELECTRICAL BASIS OF DESIGN
REMARKS
MOTOR HP AMPS VOLTS PHASE HZ EMERGENCY
POWER MANUFACTURER MODEL
B-1 CAST IRON NON
CONDENSING
COPPER
FINTUBE
NATURAL
GAS 1000 673.2 75 160 180 85% 3.24 1-1/2 7.5 120 1 60 NO THERMAL SOLUTIONS EVS-1000 ALL APPLY
REMARKS
1. RATINGS: BOILERS SHALL BE UL LISTED AND CONSTRUCTED PER ASME CODE AND SHALL BE RATED FOR MAXIMUM ALLOWABLE WORKING PRESSURE OF 160 PSIG AND MAXIMUM ALLOWABLE TEMPERATURE OF 250 DEGRESS F.
2. COMBUSTION AIR FROM SPACE VIA EXISTING COMBUSTION AIR LOUVERS & INDIVIDUAL DIRECT BOILER FLUE VENTS.
3. BOILER SHALL BE FACTORY SUPPLIED WITH NECESSARY CONTROLS AND COMPONENTS FOR OPERATION AT PROJECT ELEVATION OF 5344 FT.
4. BOILER GAS TRAIN INLET PRESSURE RANGE MINIMUM 7" W.C. AND MAXIMUM 14" W.C..
5. BOILER HEATING FLUID IS 30% PROPYLENE GLYCOL.
6. PROVIDE WITH BOILER CONTROLLER (TSBC) FROM MANUFACTURER WITH PEER-TO-PEER INTEGRATION FOR ADVANCED BOILER MODULATION. PROVIDE INETRAGRATION AND UPDATED GRAPHICS WITHIN EXISTING BUILDING CONTROL SYSTEMS TO CORRELATE WITH NEW EQUIPMENT.
7. PROVIDE CONDENSATE NEUTRALIZATION KITS FOR BOILER FLUE AND VENT DRAIN.
8. BOILER CONTROLLERS SHALL HAVE BACNET INTERFACE.
9. PROVIDE A SAFETY RELIEF VALVE OF 125 PSI.
10. PROVIDE MINIMUM TURNDOWN RATIO OF 3:1.
11. PROVIDE CONTROLS FOR MODULATING BURNER AND OPERATION AT BOILER MINIMUM FLOW. COORDINATE WITH PURCHASED EQUIPMENT. BASIS OF DESIGN MINIMUM FLOW IS 44 GPM.
PUMP SCHEDULE
TAG SERVICE TYPE FLUID TYPE FLOW RATE
GPM
HEAD
FEET RPM
SUCTION
DIAMETER
INCH
DISCHARGE
DIAMETER
INCH
CONNECTION
SIZE INCH
MIN PUMP
EFFICIENCY % NPSHr FEET
ELECTRICAL BASIS OF DESIGN
REMARKS
BHP HP VOLTS PHASE HZ EMERGENCY
POWER
VFD (Y/N) MANUFACTURER MODEL
BP-1 HYDRONIC
BOILER INLINE
30%
PROPYLENE
GLYCOL
75 20 1800 2.0 2.0 2.5 75.1 6.66 .533 .75 120 1 60 NO NO BELL & GOSSETT E-90 2AAC 1, 2, 3, 4, 5
P-1 SYSTEM
DISTRIBUTION INLINE
30%
PROPYLENE
GLYCOL
75 45 1800 2.0 2.0 2.5 69.8 7 1.21 2.0 460 3 60 NO YES BELL & GOSSETT E-90 2AB 1, 2, 3, 4, 5
P-2 SYSTEM
DISTRABUTION INLINE
30%
PROPYLENE
GLYCOL
75 45 1800 2.0 2.0 2.5 69.8 7 1.21 2.0 460 3 60 NO YES BELL & GOSSETT E-90 2AB 1, 2, 3, 4, 5
REMARKS
1. PREMIUM EFFICIENCY DUTY MOTOR.
2. PROVIDE PUMP WITH STARTER COMPLYING WITH DIV. 26 SPECIFICATIONS. STARTED PROVIDED BY DIV. 23 CONTRACTOR AND INSTALLED BY DIV. 26 CONTRACTOR.
3. STATED SPEED IS THE MAXIMUM MOTOR SPEED ALLOWED.
4. PERFORM PRE-TAB OF EXISTING HEATING WATER SYSTEM. VERIFY EXISTING FLOW, DEMAND AND PUMP HEAD CRITERIA PRIOR TO PUMP PROCUREMENT. REPORT FINDINGS TO ENGINEER FOR DIRECTION BEFORE PROCUREMENT.
5. PROVIDE INVERTER DUTY RATED MOTOR.
6. PROVIDE VFD WITH INTEGRAL DISCONNECT MEETING THE REQUIREMENTS OF DIV. 26 SPECIFICATIONS.
7. 100% REDUNDANT PUMP.
LOUVER SCHEDULE
TAG USE PATTERN CFM / S.P.
MIN. FREE AREA
(SQFT) SIZE (IN) L X W X D MANUFACTURER & MODEL No. REMARKS
L-1 BOILER COMBUSTION AIR FIXED 300 / .025 1.8 24 X 24 X 6 GREENHECK - ESD-635-24x24
LOUVER SHALL BE DRAINABLE.
CONTRACTOR SHALL MATCH COLOR TO
EXISTING EXTERIOR COLOR. PROVIDE
BIRD SCREEN.
UNIT HEATER SCHEDULE (HYDRONIC)
TAG TYPE SERVICE
FAN DATA
HEATING COIL DATA
MANUFACTURER*
& MODEL No. ACCESSORIES REMARKSAIR CONDITIONS WATER CONDITIONS
CFM @ ALT VOLT / PH WATTS
EAT DB
(°F)
LAT DB
(°F)
TOTAL
BTUH
EWT
(°F)
LWT
(°F) GPM FLUID
MAX. WATER
PD (FT. W.C.)
UH-2 HOT WATER BOILER
ROOM 107 245 120-1 16 60 90 5000 180 160 0.8 30%
GLYCOL 0.8 TRANE / S-A08
PROVIDE WITH SPEED
CONTROLLER AND
THERMOSTAT
ALL
REMARKS
1. PERFORMANCE SHALL BE BASED ON PROJECT ALTITUDE OF 5,344 FT.
2. CONTROLLED VIA WALL MOUNTED THERMOSTAT.
3. PROVIDE WITH COPPER TUBES.
4. PROVIDE WITH FAN GUARD.
5. PROVIDE WITH FACTORY SUPPLIED DISCONNECT AND STARTER MEETING THE REQUIREMENTS PER DIV. 26 SPECIFICATIONS.
M-000 mechanical legend & schedules
13 12 11 10 9 8 7 6 5 4 3 2 1
A B
C D
E F
G H
141516
A B
C D
E F
G H
13 12 11 10 9 8 7 6 5 4 3 2 1141516
/2
/2
:3
A
M x3
Z B o x\
S
TB
P ro je c ts
\2 .1
J ef fC o R
M M
A A ir po rt B o il er R ep la c em en t\
.D ra w in g s \M
_L eg en d .d w g
I J
I J
SUBMISSION DATENO
J ef fe rs o n C o u n ty r m m a a ir po rt A
IR
P O
R T
W A Y
B R
O O
M F
IE
L D
C O
Sheet Name
Sheet No.
ST 2864.10+B Project No.:
B o il er R ep la c em en t
STAMP
E n g in e e r in
G(3
-8
G
E N
E S
E E T
R A
IL
R D
S
U
IT
E
G
O L D
E N
C
O
H
TT
P /S
TB
.E
N G
IN
E E R
IN
G
JEFFCO.US
(303) 271-6511
100 JEFFERSON COUNTY PKWY
GOLDEN, CO 80419
a B C d e
F a B C d e
F
0 5' 10'
SCALE: 1/16" = 1'-0"
OVERALL FIRST FLOOR PLAN1
M-100 0 5' 10'
SCALE: 1/16" = 1'-0"
OVERALL SECOND FLOOR PLAN2
M-100
RE: M-101 FOR ENLARGED
PLAN OF THIS AREA.
RE: M-101 FOR ENLARGED
PLAN OF THIS AREA.
GENERAL MECHANICAL NOTES:
1. GENERAL NOTES, LEGENDS AND DETAILS ARE APPLICABLE TO M-SERIES DRAWINGS.
2. PERFORM WORK IN ACCORDANCE WITH APPLICABLE REGULATIONS, CODES AND
STANDARDS, INCLUDING BUT NOT LIMITED TO, LOCAL, STATE AND FEDERAL
REGULATIONS, CODES AND STANDARDS.
3. WORK AND EQUIPMENT SHOWN IS DIAGRAMMATIC AND IN APPROXIMATE LOCATIONS.
DETERMINE AND COORDINATE EXACT LOCATIONS OF SYSTEMS, EQUIPMENT AND
COMPONENTS IN THE FIELD.
4. PROVIDE NEW MATERIALS AND EQUIPMENT UNLESS SPECIFICALLY INDICATED
OTHERWISE.
5. COORDINATE WORK OF THIS DIVISION WITH THAT OF OTHER DIVISIONS.
6. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS PERTAINING TO THESE
DOCUMENTS.
7. PROVIDE INFORMATION AND HARDWARE AS NECESSARY TO COORDINATE CONCRETE
PADS AND STEEL PLATFORMS REQUIRED FOR WORK OF THIS DIVISION.
8. FOR FLOOR MOUNTED MECHANICAL EQUIPMENT, PROVIDE 6-INCH TALL CONCRETE
HOUSEKEEPING PADS THAT EXTEND A MINIMUM OF 6-INCHES BEYOND THE EQUIPMENT
FOOTPRINT ON EACH SIDE. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL DETAILS.
9. COORDINATE ROOF AND EXTERIOR WALL PENETRATIONS WITH WORK OF OTHER
DIVISIONS AND WITH PROJECT FLASHING REQUIREMENTS.
10. EXTERIOR LOUVERS ARE INDICATED FOR COORDINATION AND INFORMATION ONLY.
DETAILED DESCRIPTIONS AND DIMENSIONS ARE PROVIDED IN THE SPECIFICATIONS AND
ARCHITECTURAL DRAWINGS.
11. RUN DUCTS AND PIPING CONCEALED, UNLESS NOTED OTHERWISE. INSTALL DUCTWORK
AS CLOSE AS POSSIBLE TO UNDERSIDE OF BEAMS AND JOISTS, UNLESS NOTED
OTHERWISE.
12. PROVIDE OFFSETS IN PIPING AND DUCTS (INCLUDING DIVIDED DUCTS AND
TRANSITIONS) AROUND OBSTRUCTIONS AT NO ADDITIONAL COST TO THE OWNER.
13. VERIFY EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS AND
INSTALLATION INSTRUCTIONS. VERIFY AND PROVIDE DUCT TRANSITIONS TO FURNISHED
EQUIPMENT. FIELD VERIFY AND COORDINATE DIMENSIONS BEFORE FABRICATION.
14. PROVIDE ACCESS PANELS WHERE REQUIRED TO SERVICE DAMPERS, HEATERS, VALVES,
MOTORS, AND CONCEALED MECHANICAL EQUIPMENT.
15. SUPPORT EQUIPMENT, PIPING AND DUCTWORK FROM BUILDING STRUCTURE AND
PROVIDE A VIBRATION-FREE INSTALLATION. NOTIFY ARCHITECT AND STRUCTURAL
ENGINEER OF WEIGHTS AND METHODS OF SUPPORT.
16. SECURELY INSTALL SHEET METAL DUCTWORK AND FITTINGS, STEEL ANGLE
REINFORCED AND SUPPORTED IN ACCORDANCE WITH THE LATEST SMACNA
STANDARDS.
17. REFER TO SPECIFICATIONS FOR DUCTWORK CONSTRUCTION, SEAL AND LEAKAGE
CLASSES.
18. PROVIDE ACCESS DOORS IN DUCTWORK NEAR FIRE DAMPERS, FIRE/SMOKE DAMPERS,
DUCT SMOKE DETECTORS OR OTHER DEVICES REQUIRING DUCT ACCESS FOR ROUTINE
INSPECTION AND MAINTENANCE.
19. PROVIDE FIRE DAMPERS WHERE SHOWN ON THE DRAWINGS AND WHERE REQUIRED BY
CODE FOR DUCTS THAT PENETRATE RATED CONSTRUCTION.
20. ALL FIRE AND SMOKE DAMPERS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH
SMACNA AND THEIR UL LISTING.
21. DUCT SMOKE DETECTORS SHALL BE FURNISHED AND WIRED TO THE FIRE ALARM
SYSTEM UNDER DIVISIONS 26 AND 28. UNDER DIVISION 23, MOUNT THE DETECTORS IN
THE DUCTWORK AND WIRE THE DETECTORS TO THE BAS AND FAN STARTERS FOR
SHUTDOWN.
22. INTERNAL AIR FLOW DIMENSIONS ARE SHOWN FOR DUCTS. INCREASE SIZE TO
ACCOMMODATE DUCT LINER WHERE LINER IS PROVIDED.
23. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF AIR
TERMINAL DEVICES.
24. DIFFUSER SIZES SHOWN ARE NECK SIZES. REGISTER AND GRILLE SIZES ARE NOMINAL.
25. BRANCH DUCT SIZES TO INDIVIDUAL AIR TERMINAL DEVICES SHALL BE THE SAME SIZE
AS THE NECK OF THE AIR TERMINAL DEVICE UNLESS NOTED OTHERWISE. SEE AIR
TERMINAL DEVICE SCHEDULE FOR NECK SIZE.
26. PROVIDE VOLUME DAMPERS OR OTHER APPROVED BALANCING DEVICES AT ALL DUCT
BRANCH CONNECTIONS AND IN RUN-OUTS TO INDIVIDUAL AIR TERMINAL DEVICES.
WHERE CEILING CONSTRUCTION DOES NOT ALLOW DIRECT ACCESS FOR BALANCING,
PROVIDE REMOTE OPERATED BALANCING DAMPERS ADJUSTABLE FROM AIR TERMINAL
DEVICE FACE.
27. THE INSIDE OF ALL UNLINED DUCTWORK VISIBLE THROUGH AN AIR TERMINAL DEVICE
SHALL BE PAINTED FLAT BLACK.
28. ALL RETURN, TRANSFER AND EXHAUST AIR OPENINGS ABOVE THE CEILING SHALL BE
PROVIDED WITH A 1/2-INCH WIRE MESH SCREEN.
29. RETURN AIR, OUTDOOR AIR AND EXHAUST AIR DUCTS SHALL BE PROVIDED WITH RADIUS
ELBOWS. MITERED ELBOWS WITH TURNING VANES SHALL BE AVOIDED. IF MITERED
ELBOWS ARE UNAVOIDABLE, PROVIDE ACCESS DOORS UPSTREAM AND DOWNSTREAM
OF FITTING FOR CLEANING OF TURNING VANES.
30. MITERED ELBOWS WITHIN SUPPLY AIR DUCTS SHALL BE PROVIDED WITH TURNING
VANES. PROVIDE ACCESS DOORS UPSTREAM AND DOWNSTREAM OF FITTING FOR
CLEANING OF TURNING VANES.
31. INSTALL THERMOSTATS 48 INCHES ABOVE THE FINISHED FLOOR OR AS DIRECTED
OTHERWISE HEREIN. COORDINATE EXACT MOUNTING LOCATION WITH THE ARCHITECT.
32. ALL CONTROL AND BAS WIRING SHALL COMPLY WITH NEC AND DIVISION 26.
33. PROVIDE HANGERS, CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS
NECESSARY TO PREVENT STRESS ON PIPING.
34. PROVIDE VENTS AT ALL HIGH POINTS IN PIPING SYSTEMS AND DRAIN VALVES AT ALL
LOW POINTS.
35. PROVIDE AT LEAST THREE ELBOW SWING FOR PIPING TAKE-OFFS TO RISERS AND
EQUIPMENT.
36. ALL CONDENSATE DRAIN LINES SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH "P"-TRAP, AND CONNECTED TO PLUMBING SYSTEM AS INDICATED.
37. ALL EXISTING BUILDING CONSTRUCTION, DUCTWORK, PIPING, CONDUITS, ETC. ARE NOT
SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ROUTING
THE NEW DUCTWORK AND PIPING WITH ALL NECESSARY DROPS, OFFSETS, RISERS AND
TRANSITIONS AS REQUIRED FOR A COMPLETE INSTALLATION.
38. EQUIPMENT SHUTDOWNS OR CONNECTIONS TO EXISTING EQUIPMENT SHALL NOT BE
MADE WITHOUT PRIOR APPROVAL OF THE OWNER.
39. NEW WORK SHALL NOT ENCROACH UPON SERVICE ACCESS AND CLEARANCES FOR
EXISTING EQUIPMENT.
40. THE CONTRACTOR SHALL CONFIRM THE SIZE OF CONNECTIONS TO EXISTING
EQUIPMENT, DUCTWORK AND PIPING IN THE FIELD PRIOR TO FABRICATION.
41. PROVIDE TEMPORARY PARTITIONS FOR DUST CONTROL AND TO SEPARATE WORK
AREAS FROM OCCUPIED AREAS.
42. PROVIDE DUST PROTECTION FOR ALL NEW AND EXISTING TO REMAIN DUCTWORK AND
EQUIPMENT.
43. EXISTING DUCTWORK AND AIR HANDLING EQUIPMENT SHALL NOT BE USED TO SERVE
THE WORK AREA DURING CONSTRUCTION WITHOUT WRITTEN PERMISSION FROM THE
OWNER. IF THEIR USE IS ALLOWED, THE CONTRACTOR SHALL PROVIDE CONSTRUCTION
FILTERS AT ALL RETURN AND EXHAUST AIR OPENINGS AND WITHIN AIR HANDLING
EQUIPMENT. AT COMPLETION OF WORK, ALL TEMPORARY FILTERS SHALL BE REMOVED
AND NEW FILTERS INSTALLED.
44. ALL EXISTING SMOKE DETECTORS WITHIN THE WORK AREA SHALL BE PROTECTED FROM
DUST, ETC. BY ENCAPSULATION IN A PLASTIC BAG DURING AT THE START OF THE WORK
DAY AND UNCOVERED AT THE END OF EACH WORK DAY.
45. ALL MEANS OF EGRESS SHALL BE MAINTAINED FREE AND CLEAR OF OBSTRUCTIONS
AND EXISTING LIFE SAFETY SYSTEMS SHALL REMAIN OPERATIONAL AT ALL TIMES.
46. DUCTWORK, PIPING, AND EQUIPMENT INDICATED TO BE REMOVED, SHALL BE REMOVED
IN THEIR ENTIRETY, INCLUDING ALL ASSOCIATED WIRING AND SUPPORTS.
47. ALL MATERIAL INDICATED TO BE REMOVED, INCLUDING LIQUIDS, SHALL BECOME THE
PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE NOTED, AND SHALL BE REMOVED
FROM THE SITE. REMOVALS AND DISPOSAL SHALL COMPLY WITH THE RULES AND
REGULATIONS OF ALL AUTHORITIES HAVING JURISDICTION.
48. COORDINATE REMOVALS WITH ALL OTHER TRADES AND WITH ANY REMEDIATION
ACTIVITIES.
49. REMOVE PIPING AND DUCTWORK BACK TO THE POINTS INDICATED AND CAP. WHERE NO
SPECIFIC POINT IS INDICATED, REMOVE BACK TO THE NEAREST MAIN DUCT OR PIPE.
50. WHERE REMOVALS EXTEND THROUGH THE ROOF OR EXTERIOR WALL, PROVIDE
TEMPORARY WEATHER PROTECTION OF THE OPENING AFTER REMOVAL.
51. PROTECT ITEMS IDENTIFIED FOR SALVAGE FROM WEATHER AND PHYSICAL DAMAGE.
COORDINATE DELIVERY OF THESE ITEMS TO THE OWNER.
MECHANICAL PRE-TAB NOTES:
1. THE PROJECT CONSISTS OF MODIFICATION, EXTENSION, REPLACEMENT AND/OR RE-USE OF
EXISTING HVAC SYTSEMS. PRIOR TO ANY DEMOLITION PRESCRIBED HEREIN, A PRELIMINARY
TAB EXERCISE SHALL BE PERFORMED TO DETERMINE EXISTING CONDITIONS THAT CANNOT
OTHERWISE BE VERIFIED THROUGH SIMPLE VISUAL INSPECTION. REFER TO SECTION 23 0593
-TESTING, ADJUSTING, AND BALANCING FOR DETAILED INFORMATION REGARDING PROCEDURES
AND PROTOCOLS SPECIFIC TO THE TYPE OF EQUIPMENT REQUIRING PRELIMINARY TAB
EXERCISE.
2. THE FIELD PORTION OF THE PRE-TAB EXERCISE SHALL CONSIST OF THE TESTING COMPONENT ONLY, AS SPECIFIED IN SECTION 23 0593 - TESTING, ADJUSTING AND BALANCING. ADJUSTMENT AND BALANCING OF EXISTINGS SYSTEMS ARE NOT REQUIRED AS PART OF THE PRE-TAB SCOPE.
UPON COMPLETION OF THE FIELD PORTION OF PRE-TAB EXERCISE, COMPLETE AND SUBMIT TO
ENGINEER FOR REVIEW A CERTIFIED TAB REPORT OF ALL TESTS AND MEASUREMENTS TAKEN.
3. SYSTEMS TO BE INVESTIGATED DURING PRE-TAB EXERCISE:
A. SYSTEM WATER FLOW (GPM) AND PRESSURE DROP (FT WC OR PSI) AT ALL HYDRONIC
TERMINAL DEVICES WITHIN THE RENOVATION SPACE.
B. AIRFLOW (CFM) AT ALL SUPPLY, RETURN, AND EXHAUST REGISTERS WITHIN THE
RENOVATION SPACE.
C. PERFORMANCE OF CENTRALIZED SYSTEMS SUCH AS AIR HANDLING UNITS, MAKE-UP AIR
UNITS, EXHAUST FANS, ETC PROVIDING HVAC SERVICE TO THE RENOVATION SPACE.
MEASURE TOTAL CFM, AIR PRESSURE, AND MOTOR PARAMETERS (RPM, HZ IF VFD, RLA,
ETC AS SPECIFIED IN 23 0593). PROVIDE FAN MANUFACTURER'S DATA SHEETS AS WELL AS
NAMEPLATE DATA SUCH AS MOTOR FLA.
D. PERFORMANCE OF CENTRAL PUMPS PROVIDING HYDRONIC SERVICE (HEATING, CHILLED,
CONDENSER WATER, ETC) TO THE RENOVATION SPACE. MEASURE TOTAL GPM,
DISCHARGE WATER PRESSURE AND MOTOR PARAMETERS (RPM, HZ IF VFD, RLA, ETC AS
SPECIFIED IN 23 0593). PROVIDE PUMP MANUFACTURER'S DATA SHEETS AS WELL AS
NAMEPLATE DATA SUCH AS MOTOR FLA.
MECHANICAL DEMOLITION NOTES:
1. EXISTING CONDITIONS DEPICTED IN THESE DRAWINGS ARE DERIVED FROM ORIGINAL DESIGN
DRAWINGS, RENOVATION DRAWINGS, AND/OR VARIOUS VERSIONS OF CONTRACTOR AS-BUILT
AND DESIGN TEAM RECORD DRAWINGS. WHILE A CONCERTED EFFORT HAS BEEN MADE BY THE
ENGINEER TO FIELD VERIFY EXISTING CONDITIONS, THE ENGINEER CANNOT VERIFY THE
ABSOLUTE ACCURACY OF THE EXISTING CONDITIONS DEPICTED HEREIN. INDIVIDUALS AND
ENTITIES UTILIZING THESE DRAWINGS FOR ANY PURPOSE, INCLUDING BIDDING AND/OR
CONSTRUCTION, SHALL BE RESPONSIBLE TO INDEPENDENTLY VERIFY EXISTING CONDITIONS AS
THEY RELATE TO THEIR RESPECTIVE SPECIALTY OR DISCIPLINE.
2. THE EXISTING BUILDING SHALL REMAIN IN CONTINUOUS AND NON-INTERRUPTED OPERATION
DURING REMODELING/ALTERING OF THE EXISTING BUILDING. THE SPECIFIC AREA(S) BEING
REMODELED/ALTERED AT ANY SCHEDULED TIME ARE OBVIOUSLY EXCLUSIVE OF THIS
STATEMENT. SERVICES TO EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION
INCLUDING PLUMBING SERVICES, HVAC SERVICES AND POWER SERVICES STEAM, HEATING,
CHILLED, SUPPLY, RETURN, EXHAUST, RELIEF, AND OUTSIDE AIR, ETC. ANY ABSOLUTELY
NECESSARY INTERRUPTION OF THESE SERVICES TO ACCOMPLISH PROJECT CONSTRUCTION,
SHALL BE ARRANGED WITH THE OWNER THROUGH THE GENERAL CONTRACTOR, A MINIMUM OF
TWO (2) WEEKS IN ADVANCE. TEMPORARY SERVICES SHALL BE FURNISHED WHERE NECESSARY
TO ACCOMPLISH THIS PURPOSE. TEMPORARY SERVICES SHALL BE REMOVED ONLY AFTER NEW
PERMANENT SERVICES ARE INSTALLED AND FULLY OPERATIONAL.
3. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING
EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND
REFINISHING, SHALL MATCH THE EXISTING CONSTRUCTION AS NEARLY AS POSSIBLE AND SHALL
RESULT IN A COMPLETE, INSULATED, AND OPERATIONAL SYSTEM.
4. EXCEPT WHERE OTHERWISE SHOWN OR NOTED ON DRAWING - "TO BE RETAINED, RELOCATED"
OR HEREINAFTER NOTED, ALL EXISTING EQUIPMENT AND MATERIAL IN AREAS TO BE
REMODELED/ALTERED SHALL BE REMOVED WHERE THEY INTERFERE WITH PROPOSED NEW
CONSTRUCTION AND/OR INTERFERE WITH PROPOSED USAGE OF SPACE BY OWNER AS
FOLLOWS:
A. REMOVE ANY DUCTS PROTRUDING ABOVE FINISHED FLOOR OR THROUGH WALL, CAP AND
SEAL, AND FINISH OVER WITH MATERIAL TO MATCH EXISTING.
B. REMOVE ALL AIR DEVICES AND DAMPERS AS NOTED. CAP AT NEAREST ACTIVE MAIN.
REMOVE ABANDONDED DUCTWORK BACK TO MAINS.
C. IN REMODELED/ALTERED AREAS ANY DUCTWORK PASSING THROUGH THE REMODELED
AREAS TO SERVE (OR BEING SERVED FROM EXISTING ADJACENT, REMOTE, OR
SURROUNDING AREA THAT ARE TO REMAIN) SHALL BE RETAINED AND KEPT OPERATIONAL
AND SHALL BE REROUTED IN ALL CASES WHERE THEY INTERFERE WITH ANY NEW WORK
OR USAGE TO BE ACCOMPLISHED IN THE REMODELED AREA.
D. PENETRATIONS THROUGH EXISTING WALLS AND FLOORS FORMERLY OCCUPIED BY
REMOVED DUCTWORK SHALL BE PATCHED TO MATCH EXISTING CONSTRUCTION.
ST-2
ST-2
M-100
OVERALL
MECHANICAL
PLANS & NOTES
13 12 11 10 9 8 7 6 5 4 3 2 1
A B
C D
E F
G H
141516
A B
C D
E F
G H
13 12 11 10 9 8 7 6 5 4 3 2 1141516
/2
/2
:3
A
M x3
Z B o x\
S
TB
P ro je c ts
\2 .1
J ef fC o R
M M
A A ir po rt B o il er R ep la c em en t\
.D ra w in g s \M
_P la n s .d w g
I J
I J
SUBMISSION DATENO
J ef fe rs o n C o u n ty r m m a a ir po rt A
IR
P O
R T
W A Y
B R
O O
M F
IE
L D
C O
Sheet Name
Sheet No.
ST 2864.10+B Project No.:
B o il er R ep la c em en t
STAMP
E n g in e e r in
G(3
-8
G
E N
E S
E E T
R A
IL
R D
S
U
IT
E
G
O L D
E N
C
O
H
TT
P /S
TB
.E
N G
IN
E E R
IN
G
JEFFCO.US
(303) 271-6511
100 JEFFERSON COUNTY PKWY
GOLDEN, CO 80419
(D) HWS
(D) HWR
TO/FROM
BUILDING
TO/FROM
BUILDING
(D) AS
(E) BOILER
TO / FROM
BUILDING
TO / FROM
BUILDING
0 5' 10'
SCALE: 1/2" = 1'-0"
FIRST FLOOR MECHANICAL DEMOLITION PLAN1
M-101 0 5' 10'
SCALE: 1/2" = 1'-0"
FIRST FLOOR MECHANICAL HYDRONIC PIPING PLAN2
M-101
0 5' 10'
SCALE: 1/2" = 1'-0"
FIRST FLOOR MECHANICAL HVAC PLAN3
M-101
6" ø
(N) 8"ø EA
DUCT UP.
24W x 12H x 8D
PLENUM BOX.
T
T
DEMOLISH EXISTING HEATING WATER PUMPS WITH ASSOCIATED
APPURTENANCES.
DEMOLISH EXISTING BOILER AND ALL APPURTENANCES
ASSOCIATED WITH UNIT.
DEMOLISH EXISTING 12ӯ FLUE VENT THROUGH SECOND-LEVEL
ROOF. TEMPORARILY CAP ROOF FOR FUTURE FLUE VENT. REFER
TO NEW MECHANICAL PLAN FOR ADDITIONAL INFORMATION.
DEMOLISH EXISTING EXPANSION TANK AND ALL APPURTENANCES
ASSOCIATED WITH UNIT.
DEMOLISH EXISTING INTAKE AIR LOUVER AND ASSOCIATED
DUCTWORK. REFER TO NEW MECHANICAL HVAC SCHEMATIC FOR
MORE INFORMATION.
DEMOLISH EXISTING HEATING WATER PIPING AND VALVES UP TO
EXTENT SHOWN IN MECHANICAL ROOM. CAP EXISTING PIPING
MAINS FOR FUTURE CONNECTIONS. REFER TO NEW MECHANICAL
PLAN FOR MORE INFORMATION.
DEMOLISH EXISTING AIR SEPARATOR AND ALL APPURTENANCES
ASSOCIATED WITH UNIT.
DEMOLISH EXISTING UNIT HEATER AND ALL APPURTENANCES
ASSOCIATED WITH UNIT. DEMOLISH EXISTING THERMOSTAT.
EXISTING GLYCOL FEEDER SHALL REMAIN. DEMOLISH
CONNECTIONS TO EXISTING HEATING WATER SYSTEM AND CAP TO
ALLOW FOR CONNECTION TO NEW EQUIPMENT/PIPING.
EXISTING CHEMICAL POT FEEDER SHALL REMAIN. DEMOLISH PIPING
CONNECTION TO HEATING WATER SYSTEM AND CAP TO ALLOW
FOR CONNECTION TO NEW EQUIPMENT/PIPING.
DISCONNECT EXISTING GAS PIPING FROM EXISTING BOILER.
PROVIDE TEMPORARY CAP TO ALLOW FOR CONNECTION TO NEW
EQUIPMENT.
DEMOLITION KEYNOTES:
ROUTE NEW 8” DOUBLE-WALL STAINLESS STEEL FLUE VENT
THROUGH 1ST-FLOOR DECK VIA EXISTING CHASE AND EXTEND
THROUGH THE ROOF. THIS IS REQUIRED TO BE 2' ABOVE THE
DESIGN SNOW LOAD ON THE ROOF. PROVIDE FLASHING AND
STORM COLLAR AT ROOF PENETRATION. PATCH ROOF WITH LIKE
MATERIALS. REFER TO BOILER MANUFACTURER'S INSTRUCTIONS
FOR MORE INFORMATION. CONTRACTOR TO FIELD VERIFY ENISTING
SHAFT UP TO ROOF IS NOT RATED.
PROVIDE NEW LOUVER L-1 IN EXISTING PARTITION WALL.
CONSTRUCT A 24" X 24" X 12” DEEP PLENUM BOX ON L-1 AND
CONNECT 6” COMBUSTION AIR DUCTWORK FROM THE BOILER TO
THE PLENUM. SEAL AROUND LOUVER OPENING TO PROVIDE
WEATHER/WATER TIGHT INSTALLATION.
NEW WORK HVAC KEYNOTES:
BOILER B-1. REFER TO SCHEDULE FOR CAPACITIES. REFER TO SHEET
M-200 FOR PIPING SCHEMATIC. REFER TO MANUFACTURER'S
INSTRUCTIONS FOR ADDITIONAL INSTALLATION REQUIREMENTS.
BOILER PUMP BP-1. REFER TO SCHEDULE FOR CAPACITIES. REFER TO
SHEET M-200 FOR PIPING SCHEMATIC. REFER TO MANUFACTURER'S
INSTRUCTIONS FOR ADDITIONAL INSTALLATION REQUIREMENTS.
SYSTEM PUMPS P-1&2. REFER TO SCHEDULE FOR CAPACITIES. REFER
TO M-200 FOR PIPING SCHEDULE. REFER TO MANUFACTURER'S
INSTRUCTIONS FOR ADDITIONAL INSTALLATION REQUIREMENTS.
CONNECT NEW 2-1/2” HEATING WATER SUPPLY AND RETURN TO
EXISTING HEATING WATER PIPING CONNECTIONS. REFER TO SHEET
M-200 FOR PIPING SCHEMATIC.
UNIT HEATER UH-2. REFER TO SCHEDULE FOR CAPACITIES. REFER TO
SHEET M-200 FOR PIPING SCHEMATIC.
EXPANSION TANK ET-1. REFER TO SCHEDULE FOR CAPACITIES.
CONTRACTOR SHALL PROVIDE WITH A 4" THICK CONCRETE
HOUSEKEEPING PAD. REFER TO DETAIL FOR MORE INFORMATION. THE
EQUIPMENT PAD SHALL BE A MINIMUM OF 4” LARGER THAN THE
EQUIPMENT FOOTPRINT. COORDINATE FINAL SIZE WITH PURCHASED
EQUIPMENT.
CONNECT NEW 1-1/4” NATURAL GAS PIPING TO EXISTING 3” RISER.
PROVIDE A GAS PRESSURE REGULATOR AT 10 IN.WC. WITH ISOLATION
VALVES. INSTALL REGULATOR PER MANUFACTURER'S INSTRUCTIONS.
PROVIDE NEW PIPING AND ACCESSORIES TO CONNECT EXISTING
GLYCOL FEEDER AND CHEMICAL POT FEEDER TO NEW HEATING
WATER SYSTEM LOOP. SEE PIPING SCHEMATIC ON M-200 FOR
ADDITIONAL INFORMATION.
NEW WORK HVAC KEYNOTES:
(N) ET-1
(N) UH-2
(N) B-1
(N) P-1
(N) P-2
(N) ET-1
(N) B-1 (N) AS-1
(N) UH-2
(N) BP-1
(N) HWR
(N) HWS
(N) HWR
(N) HWS
0 5' 10'
SCALE: 1/4" = 1'-0"
SECOND FLOOR MECHANICAL HVAC PLAN4
M-101
VF
D
VF
D
(N) L-1
CONTRACTOR SHALL ENSURE THAT FINAL BOILER INSTALLATION
COMPLIES WITH THE MANUFACTURER'S MINIMUM SERVICE
CLEARANCE REQUIREMENTS.
PROVIDE DRAIN AT BOTTOM OF FLUE STACK.
GENERAL NOTES:
1 REFER TO NEW MECHANICAL HYDRONIC PIPING SCHEMATIC FOR PIPE
SIZES, AND MORE INFORMATION
GENERAL NOTES:
1 REFER TO NEW MECHANICAL HVAC SCHEMATIC FOR MORE
INFORMATION.
EXISTING GLYCOL
FEEDER
EXISTING CHEMICAL
POT FEEDER
(E) FPVAV-27
(E ) 1
4/1
(E) 8"ø(E) 8"ø
(E) 8/10
DPT
(E ) H
W R
(E ) H
W S
(E ) 1
8/1
LOCATION OF NEW
DIFFERENTIAL
PRESSURE SENSOR.
M-101
MECHANICAL
PLANS
13 12 11 10 9 8 7 6 5 4 3 2 1
A B
C D
E F
G H
141516
A B
C D
E F
G H
13 12 11 10 9 8 7 6 5 4 3 2 1141516
/2
/2
:3
A
M x3
Z B o x\
S
TB
P ro je c ts
\2 .1
J ef fC o R
M M
A A ir po rt B o il er R ep la c em en t\
.D ra w in g s \M
_E n la rg ed
P la n s .d w g
I J
I J
SUBMISSION DATENO
J ef fe rs o n C o u n ty r m m a a ir po rt A
IR
P O
R T
W A Y
B R
O O
M F
IE
L D
C O
Sheet Name
Sheet No.
ST 2864.10+B Project No.:
B o il er R ep la c em en t
STAMP
E n g in e e r in
G(3
-8
G
E N
E S
E E T
R A
IL
R D
S
U
IT
E
G
O L D
E N
C
O
H
TT
P /S
TB
.E
N G
IN
E E R
IN
G
JEFFCO.US
(303) 271-6511
100 JEFFERSON COUNTY PKWY
GOLDEN, CO 80419
1. THE CONTROL INTEGRATION OF THE NEW HYDRONIC HEATING
SYSTEM TO BE PERFORMED BY OWNER'S PREFERRED CONTROLS
(RELIABLE CONTROLS) VENDOR. THE CONTROL PORTION OF
PROJECT DOCUMENTS PROVIDED ARE A GENERAL REFERENCE
REGARDING CONTROL INTENT AND EXPECTATIONS. DIV. 23
CONTRACTOR TO PROVIDE ALL NECESSARY LABOR AND
MATERIALS FOR EQUIPMENT START UP AND TO ASSIST OWNER'S
CONTROL VENDOR IN THE SYSTEM CONTROL IMPLEMENTATION.
DIV. 23 CONTRACTOR IS RESPONSIBLE FOR THE INITIAL SET UP OF
HYDRONIC BOILER BURNER MANAGEMENT AND COMBUSTION
CONTROLS BOILER CONNECTIONS TO THE EXISTING BAS TO BE
PROVIDED BY RELIABLE CONTROLS.
2. TEMPERATURE CONTROL CONTRACTOR TO PROVIDE A COMPLETE
CONTROL SYSTEM, INCLUDING SENSORS, RELAYS, WIRING,
CONDUIT, CONTROLLERS, AND OTHER COMPONENTS. INSTALL ALL
CONTROL COMPONENTS PER MANUFACTURER'S
RECOMMENDATIONS. TCC TO INSTALL ALL MFG PROVIDED
CONTROLS / COMPONENTS FURNISHED LOOSE FROM FACTORY.
3. ALL DIFFERENTIAL / STATIC PRESSURE TRANSMITTERS ARE TO BE
HARDWIRED BACK TO THEIR CONTROLLERS IN LIEU OF BE
TRANSMITTED OVER THE COMMUNICATION NETWORK.
4. ALL SENSORS ARE TO BE SUPPLIED WITH APPROPRIATE RANGES
TO ACCOMPLISH STATED CONTROL SEQUENCES.
GENERAL CONTROL NOTES
NO SCALE
HYDRONIC UNIT HEATER - CONTROLS4
M-200
STARTER
P-2
P-1
VFD
BOILER
FACTORY
BOILER
CONTROLLER
B-1
BP-1
DO-PUMP ENABLE
STARTER
T TO BUILDING
T
T
T
FROM BUILDING
TO BUILDING
FROM BUILDING
FM
DP
INSTALL UPSTREAM OF LAST FPVAV.
REFER TO MECHANICAL FLOOR
PLANS FOR MORE INFORMATION.
EXISTING
BAS
CONTROLLER
T
OUTSIDE AIR TEMPERATURE SENSOR
FLOW METER TEMPERATURE
SENSOR
TEMPERATURE
SENSOR
TEMPERATURE
SENSOR
TEMPERATURE
SENSOR
TEMPERATURE
SENSOR
BOILER
STARTER
T
UNIT HEATER CONTROL SEQUENCE:
1. GENERAL OPERATION
THE UNIT SHALL OPERATE AS A STANDALONE THERMOSTAT CONTROL PER THE
MANUFACTURER’S PROVIDED SEQUENCE.
2. ENABLING/DISABLING
THE UNIT SHALL CYCLE AS NECESSARY TO MAINTAIN A SPACE TEMPERATURE
SETPOINT OF 50°F (ADJ.) BASED ON THE WALL MOUNTED THERMOSTAT.
3. HEATING OPERATION
UPON A CALL FOR HEAT, THE ROOM THERMOSTAT SHALL START THE MOTOR,
ENERGIZING THE UNIT.
HOT WATER SHALL BE CONTINUOUSLY SUPPLIED TO THE UNIT HEATER DURING
OPERATION.
ONCE THE THERMOSTAT IS SATISFIED, THE MOTOR SHALL DISABLE AND THE
CONTROL VALVE SHALL CLOSE.
NO SCALE
HYDRONIC BOILER - CONTROLS 3
M-200
NOTE:
ALL DEVICES AND SENSOR SHOWN SHALL BE
NEW AND INTEGRATED INTO THE EXISTING
BUILDING CONTROL SYSTEM INCLUDING
PROVIDING NEW GRAPHICS AND TRENDING
BOILER AND PUMPS CONTROL SEQUENCE:
OA TEMPERATURE - BOILER CONTROLLER
HWR TEMPERATURE - BOILER CONTROLLER
BOILER PUMP - BOILER CONTROLLER
BURNER MANAGEMENT - BOILER CONTROLLER
BOILER ENABLE - THRU EXISTING BAS ( RELIABLE CONTROLS ) CONTROLLER
BUILDING PUMP - THRU EXISTING BAS ( RELIABLE CONTROLS ) CONTROLLER
CONTROL INTENT: BOILER CONTROLLER SHALL MAINTAIN THE BOILER LOOP SUPPLY TEMPERATURE SETPOINT OF 180° (ADJ.) WITH A 20°F DELTA TEMPERATURE PER THE BOILER'S OUTDOOR AIR RESET TEMPERATURE SEQUENCE AS NOTED BELOW.
EXISTING BAS ( RELIABLE CONTROLS) SHALL ENABLE / DISABLE THE NEW BOILER AND CONTROL THE NEW BUILDING PUMPS P-1 & P-2. A CALL FOR HEAT FROM ANY OF THE EXISTING OR NEW EQUIPMENT SHALL ENERGIZE THE NEW PRIMARY BUILDING PUMP AND BOILER PUMP. BOILER PUMP SHALL BE CONSTANT SPEED. THE BUILDING PUMPS (P-1 & P-2) SHALL OPERATE IN PRIMARY/STANDBY MODE. SHOULD THE PRIMARY PUMP FAIL TO ENERGIZE, AN ALARM SHALL BE SENT TO THE BAS AND THE LAG PUMP SHALL BE ENERGIZED. THE BAS SHALL RECORD THE NUMBER OF HOURS OPERATION OF ALL PUMPS AND RECORD THOSE HOURS FOR MAINTENANCE RECORDS. THE PUMPS SHALL AUTOMATICALLY SWITCH FROM PRIMARY TO STANDBY AFTER EVERY 240 HOURS OPERATION OR AT THE NEXT OPPORTUNE TIME. THE BAS SHALL DESIGNATE "PRIMARY" AND "STANDBY" PUMPS AND SHALL ROTATE THE DUTIES. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER TO VERIFY THE SWITCHOVER OPERATION SCHEDULE.
WHENEVER THE HEATING SYSTEM IS ENABLED BY THE BAS, THE LEAD PRIMARY HEATING PUMP SHALL BE STARTED AND GRADUALLY BROUGHT UP TO SPEED OVER A 30 SECOND PERIOD, AND A SYSTEM BY-PASS VALVE SHALL BE OPENED. THE PUMP SPEED SHALL BE VARIED BY THE VARIABLE FREQUENCY DRIVE (VFD) TO MAINTAIN THE REQUIRED DIFFERENTIAL PRESSURE IN THE PIPING SYSTEM THROUGH A CONTROL SYSTEM INTERFACE WITH THE DRIVE.
THE INITIAL PIPING SYSTEM DIFFERENTIAL PRESSURE CONTROL POINT SHALL BE AS DETERMINED BY THE TESTING AND BALANCING CONTRACTOR AND SHALL SERVE AS THE INITIAL AND HIGHEST SETTING. WHEN THE PRIMARY HEATING WATER PUMP IS AT MINIMUM SPEED AND THE DIFFERENTIAL PRESSURE SENSOR INDICATES A PRESSURE 5 PSI (ADJUSTABLE) GREATER THAN SETPOINT, THE REVERSE SHALL OCCUR. THE DIFFERENTIAL PRESSURE BYPASS VALVE SHALL ALWAYS BE CLOSED UNLESS THE PRIMARY HEATING WATER PUMP IS AT ITS MINIIMUM SPEED. THE MINIMUM SPEED SHALL BE DETERMINED BASED ON MANUFACTURER'S MINIMUM REQUIRED FLOWRATE FOR THE BOILER. THE MINIMUM FLOW THROUGH THE BOILER SHALL MEET THE
MINIMUM FLOW REQUIREMENTS AT ALL TIMES.
HEATING WATER BOILER SHALL HAVE UNIT MOUNTED CONTROLS AND A BOILER MANAGEMENT CONTROL PANEL PROVIDED BY BOILER MANUFACTURER.
BOILER MANUFACTURER TO PROVIDE GATEWAY INTERFACE CARD(S) COMPATIBLE WITH THE EXISTING RELIABLE CONTROL COMMUNICATION PROTOCOL
FOR THE HEATING WATER CONTROL SYSTEM.
HEATING SYSTEM SUPPLY TEMPERATURE SETPOINT SHALL BE TYPICALLY SET AT 180°F (ADJ.) BOILER CONTROLLER SHALL HAVE OUTSIDE AIR RESET CAPABILITIES, 180°F (ADJ.) WHEN OUTSIDE AIR IS BELOW 30°F (ADJ.), AND 160°F (ADJ.) WHEN OUTSIDE AIR TEMPERATURE IS ABOVE 65°F (ADJ.). SETPOINT
SHALL BE LINEAR BETWEEN THOSE POINTS.
BOILER SHALL BE ENABLED IF OUTSIDE AIR TEMPERATURE IS BELOW 50°F (ADJ.).
ALARMS, INTERLOCKS AND SAFETIES.
BOILER TO BE FURNISHED COMPLETE WITH FACTORY MOUNTED CONTROLS AND SAFETIES.
ALL BOILER ALARMS SHALL BE COMMUNICATED TO THE BOILER DISPLAY PANEL AND THE EXISTING BAS FRONT END.
ALL PUMP ALARMS SHALL BE COMMUNICATED TO THE EXISTING BAS IN THE EVENT OF AN ENABLE, START/STOP, OR STATUS FAILURE TO MONITOR THE
PUMP.
BAS POINTS LIST
TAG NAME / FUNCTION GRAPHIC
ANALOG DIGITAL
REMARKS QTY
AO AI DO DI
UNIT HEATER X 1
1 FAN MOTOR , START /STOP X 1
2 FAN MOTOR, STATUS X 1
3 HEATING COIL CONTROL VALVE X 1
4 ROOM TEMP, DEGREES F X 1
BAS POINTS LIST
TAG NAME / FUNCTION GRAPHIC
ANALOG DIGITAL
REMARKS QTY
AO AI DO DI
HEATING WATER SYSTEM X
1 BOILER, START /STOP X 1
2 BOILER STATUS X 1
3 BOILER PUMP, START/STOP X 1
4 BOILER PUMP, STATUS X 1
5 HEATING SYSTEM DIFF. PRESS., PSI X 1
6 HW SUPPLY TEMP SET POINT. DEGREES F X 1
7 PRIMARY HW RETURN TEMP, DEGREES F X 1
8 PRIMARY HW SUPPLY TEMP, DEGREES F X 1
9 SECONDARY HW FLOW, GPM X 1
10 SECONDARY HW PUMP, SPEED X 2
11 SECONDARY HW PUMP, START / STOP X 2
12 SECONDARY HW, STATUS X 2
13 SECONDARY HW RETURN TEMP, DEGREES F X 1
14 SECONDARY HW SUPPLY TEMP, DEGREES F X 1
HW SYSTEM BYPASS CONTROL VALVE, POSITION X 1
HOT WATER
BY PASS
SCALE: NONE
BOILER ROOM - NEW MECHANCIAL HYDRONIC PIPING SCHEMATIC1
M-200
(N) ET-1
(N) AS-1
(N) B-1
(N) BP-1
(N) P-2
(N) P-1
2-1/2" HWR
2-1/2" HWS
2-1/2" HWR
2-1/2" HWS
2-1/2" HWS
1" HWS
2-1/2" HWR
2-1/2" HWS
2-1/2" HWR
2-1/2" HWS
(N) ET-1
(N) B-1
6 INCH INTAKE AIR DUCT
(N) L-1
8 INCH FLUE VENT
8" FLUE THROUGH ROOF.
TERMINATE PER
MANUFACTURER'S
INSTRUCTIONS.
2ND FLOOR
CONNECT COMBUSTION INTAKE DUCT TO
24 X 24 X 12" DEEP PLENUM BOX.
REFER TO MANUFACTURER'S
INSTRUCTIONS FOR VENT AND
COMBUSTION AIR BOILER
CONNECTIONS.
REMOVABLE EXTERIOR PARTITION WALL:
THE CONTRACTOR SHALL TEMPORARILY
REMOVE THE EXISTING EXTERIOR
PARTITION TO ALLOW FOR INSTALLATION
OF THE NEW EQUIPMENT. THE PARTITION
SHALL BE REPLACED AFTER THE
EQUIPMENT HAS BEEN INSTALLED. ANY
DAMAGED SECTION SHALL BE REPLACED
WITH NEW PANEL MATCHING THE EXISTING
CONSTRUCTION.
SCALE: NONE
BOILER ROOM - NEW MECHANCIAL HVAC SCHEMATIC2
M-200
(E) 3" NG UP
1-1/4" NG
(N) UH-2
ROOF PA
RA
PI
T
PROVIDE CONDENSATE
NEUTRALIZER TANK WITH BOILER.
PROVIDE INLET PIPE FROM TRAP &
OUTLET PIPE TO FLOOR DRAIN
(N) UH-2
3/4" GLYCOL
EXISTING
GLYCOL FEEDER.
EXISTING
CHEMICAL
FEEDER,
SEAL BOTTOM OF EXISTING
SHAFT AROUND FLUE VENT.
MATCH EXISTING
CONSTRUCTION TYPE
2-1/2" HWS
2-1/2" HWR
3/4" HWS
3/4" HWR 2-1/2" BYPASS
3/4"
TRANSITION TO
24X24 PLUM BOX
3/4"
M-200 controls and isometrics
13 12 11 10 9 8 7 6 5 4 3 2 1
A B
C D
E F
G H
141516
A B
C D
E F
G H
13 12 11 10 9 8 7 6 5 4 3 2 1141516
/2
/2
:3
A
M x3
Z B o x\
S
TB
P ro je c ts
\2 .1
J ef fC o R
M M
A A ir po rt B o il er R ep la c em en t\
.D ra w in g s \M
_C o n tr o ls
.d w g
I J
I J
SUBMISSION DATENO
J ef fe rs o n C o u n ty r m m a a ir po rt A
IR
P O
R T
W A Y
B R
O O
M F
IE
L D
C O
Sheet Name
Sheet No.
ST 2864.10+B Project No.:
B o il er R ep la c em en t
STAMP
E n g in e e r in
G(3
-8
G
E N
E S
E E T
R A
IL
R D
S
U
IT
E
G
O L D
E N
C
O
H
TT
P /S
TB
.E
N G
IN
E E R
IN
G
JEFFCO.US
(303) 271-6511
100 JEFFERSON COUNTY PKWY
GOLDEN, CO 80419
TO PUMP
SUCTION
AIR SEPARATOR
SYSTEM RETURN
BLOWDOWN
VALVE
SCALE: NONE
AIR SEPARATOR DETAIL3
M-300
ISOLATION VALVE, TYP.
GAS PRESSURE REGULATOR.
PRESSURE SWITCH, TYP.
GAS VALVE, TYP.
LEAK TEST COCK, TYP.
PILOT
BURNER.
(N) BOILER
DIRT LEG.
NOTE
CONFIRM GAS TRAIN REQ'MTS WITH
BOILER/BURNER MANUFACTURER
AND PROVIDE ANY ADDITIONAL
RECOMMENDED COMPONENTS.
VENT REGULATOR TO
OUTDOORS, TYP.
SERVICE VALVE AND UNION
UPSTREAM OF DIRT LEG.
PROVIDE DOWNWARD GAS
FLOW INTO DIRT LEG.
NO EXCEPTIONS.
SCALE: NONE
BOILER GAS PIPING DETAIL2
M-300 23 2123
ADD FULL LINE SIZE ISOLATION
VALVES TO BOTH SIDES OF AIR
SEPARATOR
SCALE: NONE
INLINE PUMP DETAIL1
M-300 23 2123
FULL PORT BALL VALVES FOR PUMP
SERVICE ISOLATION, TYP 2.
GLOBE STYLE MULTI-TURN
CALIBRATED BALANCE
VALVE.
CHECK VALVE (NON-SEAM).
PROVIDE UNION UNLESS
PUMP IS FLANGED TYPE.
ECCENTRIC REDUCER, TYP.
PROVIDE STRAINER W/ BLOW DOWN
VALVE, HOSE-END THREAD, GASKETED
CAP, AND BEADED RETENTION CHAIN.
INLINE PUMP ( BP-1, P-1 AND P-2 )
1/4" GALVANIZED PIPE. INSULATE
GAUGE PIPING ON CHW PUMPS.
REDUCED PORT THREADED 1/4" FPT
BRASS VALVES FOR GAUGE PIPING.
COMPOUND
DIFFERENTIAL
PRESSURE
GAUGE.
2.5-INCH INLET
PIPING
2.5-INCH OUTLET
PIPING
SCALE: NONE
EXPANSION TANK DETAIL 4
M-300 23 2113
1" MAKEUP FROM (E)
MUW RACK ON WALL.
FIELD VERIFY
LOCATION.
1/2"
MANUFACTURER'S
SCHRAEDER AIR
CHARGE VALVE.
(N) 3/4" DRAIN BALL
VALVE WITH HOSE
END THREAD.
NEW EXPANSION TANKS
ET-2 & ET-3, RE-USE
EQUIPMENT PAD
(N) PRESSURE GAUGE.
UNION.
HEATED WATER RETURN,
UPSTREAM OF PUMPS AT
AIR SEPARATOR
CONNECT TO TOP
OF PIPE MAIN.
FULL SIZE BYPASS
NORMALLY CLOSED
VALVE
N.C.
NOTE:
DISTANCE REQUIRED TO
REMOVE COALESCING MEDIUM
ON DESIGN BASIS UNIT IS 13.5
INCHES, DISTANCE TO SLIDE
MAGNETIC INSERT FROM TANK
16 INCHES. VERIFY DIMENSIONS
WITH MANUFACTURER.
P&T PORTS IN
PRESSURE GAUGE
PIPING (TYP. OF 3
LOCATIONS
SCALE: NONE
EQUIPMENT PAD DETAIL6
M-300
NOTES:
1. EXTEND PAD A MINIMUM OF 4" PAST
EDGE OF EQUIPMENT.
2. EQUIPMENT PAD SHALL BE 4" TALL AND
LEVEL UNLESS OTHERWISE SPECIFIED.
CHAMFER EDGES,
TYPICAL.
SCORE SURFACE OF
EXISTING CONCRETE.
FLEX CONNECTOR, TYP.
SPRING VIBRATION ISOLATOR, TYP.
SCALE: NONE
HOT WATER UNIT HEATER5
M-300 23 8200-05
UNIT HEATER.
SWAY
BRACING.
UNIT SUPPORTED BY THREADED
HANGER RODS BOLTED TO 2-1/2"
x 2-1/2" x1/4" ANGLES SECURED
TO UNDERSIDE OF STRUCTURE.
MANUAL AIR
VENT, TYP.
HWS
HWR
BALL VALVE, TYP.
BALANCE VALVE.
AUTOMATIC
CONTROL
VALVE.
STRAINER.
UNION, TYP.
NIPPLE w/ CAP.
SCALE: NONE
MANUAL AIR VENT DETAIL7
M-300 23 2113-01
3/8" GALVANIZED
PIPING.
BALL VALVE.
PACE 3/8" WELDOLET AS
CLOSE TO ELBOW AS
POSSIBLE.
NOTE:
PROVIDE MANUAL AIR VENT AT HIGH
POINT IN HW OR CHW PIPING.
CAP.
FLOW
SCALE: NONE
BOILER FLUE DETAIL8
M-300 23 3432-02
ROOF DECK.
NECK.
D-124
MI
N.
SPEC. STACK CAP
HEIGHT ABOVE
ROOF. DETERMINE BY
LOCAL CODE
BOILER STACK
COUNTER FLASHING CAP
AROUND DUCT. SEAL TO
DUCT & CURB
WATERTIGHT.
PRE-FAB INSULATED
CURB w/ WOOD NAILER.
22 GAUGE COUNTER
FLASHING.
ROOF FLASHING BY GC.
REFER TO
MANUFACTURER'S
RECOMMENDED ROOF
HEIGHT
SCALE: NONE
CHEMICAL FILLPOT DETAIL - HOT WATER & CHILLED WATER SYSTEMS0
X000 23 5216-01
CHEMICAL FILLPOT DETAIL - HOT WATER & CHILLED WATER SYSTEMS0
X000 23 5216-01
3/4" FROM PUMP
DISCHARGE.
3/4" TO PUMP
SUCTION.
3/4" DRAIN, PIPE
TO NEAREST
FLOOR DRAIN.
3/4"
UNION, TYP.
LINE SIZED, FULL
PORT BALL
VALVE, TYP.
LINE SIZED, FULL PORT
BALL VALVE, TYP.
5 GALLON CHEMICAL
FEEDER.
SIR VENT w/ 1/4"
BALL VALVE.
M-300 mechanical details
13 12 11 10 9 8 7 6 5 4 3 2 1
A B
C D
E F
G H
141516
A B
C D
E F
G H
13 12 11 10 9 8 7 6 5 4 3 2 1141516
/2
/2
:3
A
M x3
Z B o x\
S
TB
P ro je c ts
\2 .1
J ef fC o R
M M
A A ir po rt B o il er R ep la c em en t\
.D ra w in g s \M
_D et a il s .d w g
I J
I J
SUBMISSION DATENO
J ef fe rs o n C o u n ty r m m a a ir po rt A
IR
P O
R T
W A Y
B R
O O
M F
IE
L D
C O
Sheet Name
Sheet No.
ST 2864.10+B Project No.:
B o il er R ep la c em en t
STAMP
E n g in e e r in
G(3
-8
G
E N
E S
E E T
R A
IL
R D
S
U
IT
E
G
O L D
E N
C
O
H
TT
P /S
TB
.E
N G
IN
E E R
IN
G
JEFFCO.US
(303) 271-6511
100 JEFFERSON COUNTY PKWY
GOLDEN, CO 80419
GLYCOL1
M-301 SCALE: NONE DETAIL_NUMBER
3/4" OVERFLOW OPEN
SIGHT TO FLOOR DRAIN
STORAGE TANK
TO PUMP
SUCTION
AIR SEPARATOR
SYSTEM RETURN
BLOWDOWN
VALVE
DRAIN PAN.
3/4" DRAIN w/ HOSE
BIB END.
4" CONCRETE
HOUSEKEEPING
PAD.
GATE VALVE, TYP.
STRAINER.
UNION, TYP.
CHECK VALVE.
GLOBE VALVE.
COLD WATER MAKE-
UP BY DIV 21
SCALE: NONE
HOT WATER BOILER PIPING DETAIL3
M-301 23 5216-01
HWS
HWR
PRESSURE RELIEF DISCHARGE
TO NEAREST FLOOR DRAIN.
AUTOMATIC
AIR VENT.
BOILER AIR
FITTING.
COMBINATION TEMPERATURE
AND LIMIT CONTROL.
COMBINATION PRESSURE
TEMPERATURE AND
ALTITUDE GAUGE.
LOW WATER CUT OFF.
6" HIGH CONCRETE
HOUSEKEEPING PAD.
GAS PIPING.
6" DIRT LEG w/
BRASS CAP.
DRAIN VALVE.
FULL SIZE FLANGE
CONNECTION.
GATE VALVE, TYP.
THERMOMETER, TYP.
HOT WATER
BOILER
NOTES:
RE: FILL & EXPANSION DETAIL
FOR MAKE-UP WATER
CONNECTIONS.
TO NEAREST
FLOOR DRAIN
D
SCALE: NONE
PIPING HANGER & SUPPORT DETAILS2
M-301 23 0529-38
TRAPEZE HANGER STRUT CLAMP HANGER
CLEVIS HANGER VERTICAL PIPE SUPPORT
THREADED ROD
CLEVIS HANGER
INSULATION
INSULATION SHIELD
HIGH DENSITY INSULATION INSERT OR, FOR
APPLICATIONS PERMITTED IN SECTION 23
0529, STEEL SADDLE FILLED WITH
INSULATION.
PIPE SHIELD -
MINIMUM 20"
LONG
HIGH DENSITY INSULATION INSERT OR,
FOR APPLICATIONS PERMITTED IN
SECTION 23 0529, STEEL SADDLE
FILLED WITH INSULATION.
THREADED ROD (TYP)
PIPE INSULATION (TYP)
INSTALL CLAMP ON ALL
PIPES LESS THAN 4"ø
UNI-STRUT OR EQUIVALENT
INSULATION SHIELD (TYP)
RISER CLAMP
INSULATION AND NEOPRENE MOUNTS
PER SECTION 23 0529 FOR COLD PIPES
LUG, COUPLING, OR
HUB
INSULATION
OVERSIZE HANGER TO ALLOW
LONGITUDINAL PIPE EXPANSION
AND PIPE INSULATION TO PASS
THROUGH UNBROKEN (TYP)
6" MIN
AIR GAP
EXPANSION TANK
CONNECTION
M-301 mechanical details
13 12 11 10 9 8 7 6 5 4 3 2 1
A B
C D
E F
G H
141516
A B
C D
E F
G H
13 12 11 10 9 8 7 6 5 4 3 2 1141516
/2
/2
:3
A
M x3
Z B o x\
S
TB
P ro je c ts
\2 .1
J ef fC o R
M M
A A ir po rt B o il er R ep la c em en t\
.D ra w in g s \M
_D et a il s .d w g
I J
I J
SUBMISSION DATENO
J ef fe rs o n C o u n ty r m m a a ir po rt A
IR
P O
R T
W A Y
B R
O O
M F
IE
L D
C O
Sheet Name
Sheet No.
ST 2864.10+B Project No.:
B o il er R ep la c em en t
STAMP
E n g in e e r in
G(3
-8
G
E N
E S
E E T
R A
IL
R D
S
U
IT
E
G
O L D
E N
C
O
H
TT
P /S
TB
.E
N G
IN
E E R
IN
G
JEFFCO.US
(303) 271-6511
100 JEFFERSON COUNTY PKWY
GOLDEN, CO 80419
03/21/2025
03/21/2025
| Sheets and Views |
| G000_Cover-24x36 |
| M000_Legend-24x36 |
| M100_Plans-24x36 |
| M101_Enlarged Plans-24x36 |
| M200_Controls-24x36 |
| M300_Details-24x36 |
| M301_Details-24x36 |
| E001_Legend-24x36 |
| E100_Plans-24x36 |
File details come from the government source that posted it. Updated .