This document contains responses to pre-proposal inquiries for solicitation number 5999917 to waterproof the roof deck and wood arches of Building 1318 at Naval Station Newport in Rhode Island. The scope of work includes removing the existing coating, preparing the concrete substrate, and applying a new high-performance coating. The contractor is responsible for providing fall protection equipment if needed, obtaining generator power if none is available on site, and completing work during normal business hours using equipment that may cause noise disruptions. The government will not provide surface protection for exposed concrete areas and prohibits using existing building components to support temporary protection. Ambient temperatures must meet coating manufacturer requirements for application.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C D E F G H

Page Section Paragraph

9 08/24/23 Amendment 0001

Based on the response to PPI #1. We want to make the occupant aware that during the construction process an industrial grinder will be used to remove the existing surface material. The noise created by the grinders may bother the occupants.

Please confirm that all phases of construction will take place during normal working hours.

All phases of construction will be performed during working hours as called out in the specifications.

10 08/24/23 Can the Navy provide power for construction activities at B1318? If power isn't available, where can a generator be located on site to be able to provide power to the roof area?

There are no electrical connections available for use by the contractor. A generator can be located where needed for performance of the work.

11 08/24/23 Are there any weight restrictions for the roof deck? The roof deck was designed to support a live load of 80 psf.

12 08/24/23 Drawing A-1 Please confirm that the contractor is not responsible for removing any of the mechanical track/mounts located on platform Arch A1, and that all removal of existing and installation of new coatings will be performed around the mechanical track/mounts.

The contractor is not responsible for removing any of the mechanical track/mounts located on platform Arch A1. All removals of existing and installation of new coatings will be performed around the mechanical track/mounts.

13 08/24/23

Excluding the needed treatment to the various perimeter safety railing post connections into the concrete. Many were observed to be loose and taking in water along the base connections. If left untreated, the existing condition will continue to deteriorate the base of the post, as well as the adjoining concrete connections. I’m not certain if OSHA rules and regulations are stringently adhered to on the lower portion of this Government base. However, if OSHA rules are acknowledged, then the condition of the existing safety rails for the purpose of fall protection may be suspect of future potential liability issues (if left untreated)

Upon inspection, the government has no concerns regarding the safety of existing perimeter railings. If the contractor does not feel the perimeter railings are suitable to meet fall protection requirements for this project, then they can supply fall protection equipment as they deem necessary.

14 08/24/23

Excluding the existing / adjoining porous concrete planes from receiving new liquid applied roof coatings. Many examples of these porous concrete surfaces were observed along the rear S.E stairs leading down to the cable tray mechanism. As explained, if water is allowed to migrate through adjoining areas of the porous concrete, this condition will undermine the new liquid applied coatings. The water that is allowed to migrate below the new coatings will eventually freeze, then expand, then delaminate the new coatings from the substrate. Although this delamination process may take some time, it would certainly adversely affect the longevity of the coating installation.

The building has been in place for over 25 years and upon inspection, the government has not seen any evidence of coating delamination. Furthermore, the rooftop, including the perimeter curbs, is a monolithic slab and was installed as a continuous concrete pour. Concrete is not a very porous material and air entrained concrete contains air pockets to contain any moisture that makes it way beneath the surface. As this is a raised slab and not a slab on grade, and based on past history, it is the governments opinion that any moisture that enters the roofdeck at the uncoated perimeter would have a difficult time traveling down into the concrete, underneath the curb, into the pool area of the deck and back up to the concrete surface. However, to ease the concerns of the contractor, extend the new coating to 24" outside of the back edge of the outer curb. Prepare the uncoated concrete surface in accordance with the specifications. Key in the outside edge of the new coating to end flush with the existing concrete surface.

15 08/24/23

Excluding the roof cap encapsulation on ALL of the glue-lam arch beams (in lieu of only addressing the just the one missing S.E section along the same rear stair area leading to the cable tray mechanism). According to what was observed, the existing Reinforced EPDM membrane adhered over the tops of these wood beams was found to be dry-rotted. An excessive amount of spot patching has been performed along the existing areas, which suggests known failures within the existing adhered membrane. The fact that the missing area delaminated from the wood substrate suggests that the bonding agents originally used to adhere the dry-rotted EPDM membrane had failed. Since its assumed that all EPDM membrane areas were all installed at the same original timeframe, its logical to assume that all EPDM areas will soon experience the same delamination process (and similarly fail as was experienced along the S.E beam). Since special equipment will be needed to gain access for the re-encapsulation of this one missing S.E beam area established under the original scope, it would be prudent to make good use of the special equipment and address ALL membrane areas simultaneously (under this base project scope).

Replacement of the existing EPDM membrane shall be limited to Arch A1 as specified on the drawings.

16 08/24/23

Are there any records for the original concrete substrate regarding the concrete’s approx. density (+/- 150 lbs / ft), or any additional admixtures found within the composition of the concrete? The concern is that some liquid applied coating manufacturers do not allow foreign admixtures to be present within the concrete, as they may sometimes adversely affect the adherence of the new coating to the substrate. As an example, a concrete admixture called “Vapor Lock”, allows a quicker cure timeframe for new concrete pours (reducing the typical 28 days to approximately 7 days cure time). This particular admixture also helps prevent moisture absorption after the concrete has cured to an approximate 1/8” surface depth (instead of allowing latent moisture to penetrate and remain within greater depths of the concrete slab). Therefore, please clarify if any such admixtures are present within the existing concrete substrates which are meant to receive new coatings

There are no records of the concrete mix used to pour the rooftop deck.

17 08/24/23

If no such admixtures are known to be present to help prevent water absorption beyond an 1/8” surface depth, and the existing concrete substrate will become unprotected from absorbing water (once the existing coating is removed), what will be the expected protocol for coating over these exposed porous concrete substrates? Since the open nature of the area to be coated is designed to hold water, how will intermittent rain events be factored into the coating installation process?

For example, will an independent inspector be present to perform various ASTM moisture tests in order to evaluate these exposed concrete substrates (following intermittent rain events)? Which party will be responsible for determining whether the concrete substrates are suitable for daily coating installations; (I.E; an independent Government Inspector, The General Contractor, The Coating Manufacturer’s Representative, etc)? Please note that the level of concrete moisture testing can vary from the most basic ASTM D 4263 Plastic Sheet Method, to the more elaborate Moisture meter testing (some involving depth probes into the concrete to measure moisture below the surface). Please also note that most coating manufactures require a moisture content of 7% or less to allow a proper application.

Please read the specifications in their entirety, specifically section 09 96 00 HIGH-PERFORMANCE COATINGS.

Manufacturers field technical support is a requirement of this project and is to be provided by the contractor. On site field testing and inspection is to be performed by the manufacturers technical representative.

18 08/24/23

Due to the open nature of the areas that are to receive roof coatings (once the existing coating is removed by others), what will be the protocol for temporary protection of the porous concrete from the elements (and which party will be responsible for the temporary protection from the elements)? 3 (a), Will use of the existing beams, (or cables) be allowed for use in temporary protection in order to potentially rig tensile tarpaulin structures over the affected areas?

The contractor is responsible for all aspects of this project. The government will not provide surface protection of any kind. Use of existing beams, cables or any building components to support temporary protection is prohibited.

19 08/24/23

What is the intended Project timeframe in relation to the open nature of the roof surfaces to be coated? Note that Liquid applied roof coatings not only require adequate moisture content levels before application over porous concrete substrates, but also require temperatures at or above 40 degrees.

The work shall be performed and completed within the time period specified in the contract documents. Concrete deck surface preparation is to begin immediately after removal of the existing coating with work performed continuously and expeditiously until completion. The new coating is to be applied immediately after completion of concrete surface preparation, taking into account the coating manufacturers quality control requirements. Do not leave the concrete deck exposed after existing coating removal or surface preparation for an extended length of time. Ambient installation temperatures for waterproofing material varies by product and manufacturer.

Government Response

Pre-Proposal Inquiry Submission Form for SOLICITATION N4008523R1318 Building 1318 Roof Deck Wood Arch Waterproofing, NAVAL STATION NEWPORT, NEWPORT, RHODE ISLAND

Date Submitted Question

Reference

PPI # LEAVE

BLANK

A B C D E F G H

20 08/24/23

Multiple corroded portions of steel embedded into the surface of the concrete substrate was observed to be delaminating (expanding from corrosion). These locations have caused pre-mature breach failures within the existing coating system. Is there a specific treatment intended for these noted steel areas to help reduce the potential for continued corrosion / delamination process?

Follow concrete repair material manufacturers requirements for exposed steel. As a minimum following concrete removal, inspect the condition of all exposed steel. Remove oxidation, scale and rust from exposed reinforcing steel per ICRI Technical Guideline No. 310.1R Guide to Surface Preparation For the Repair of Deteriorated Concrete Resulting From Reinforcing Steel Corrosion. Apply anti-corrosion coating to all exposed steel prior to concrete repair material application.

Provide 3/4 inch minimum clearance around steel reinforcing, or 1/4 inch plus the maximum aggregate in the repair material

21 08/24/23 Is this facility utilized in winter months which would require any mechanical or chemical methods for snow or ice removal?

The facility is utilized in winter months. The rooftop pool is not flooded if conditions would result in a frozen pool of water.