This document contains responses to pre-proposal inquiries for solicitation number N4008523R1318 for waterproofing services at Building 1318 and its wood arches at Naval Station Newport in Rhode Island. The services required include removing existing coatings, preparing and repairing concrete surfaces, and applying new coatings to match the limits of coatings being removed. This will be done for the roof deck, perimeter spillway, and exterior walls. Arch hardware and fasteners will not be cleaned or painted. A laydown area is available behind the building and the area around the building can be used for equipment movement. The revised Attachment 4 Bid Schedule must be used for submitting bids, which includes acknowledging any amendments, providing pricing, and including required documents like a bid bond and representations and certifications.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C D E F G H

Page Section Paragraph

1 08/15/23 Drawing A-1 Will the building be occupied during construction? Yes

2 08/15/23 Drawing A-1 Can you please provide the location for a laydown area for materials and equipment? The area behind the building is available for storage of materials and equipment. The entire area around the building is available for equipment movement during construction operations.

3 08/15/23 Drawing A-1 Please confirm that the pool drain and well area of the roof deck are not being replaced. The pool drain and the well area are not being replaced. Only the drains in the perimeter spillway are to be replaced.

4 08/15/23 Drawing A-1 Photos were not allowed during the site visit. Can you please provide additional photos of the platform at Arch A1?

Specifically the existing lightning protection connection and the existing coating?

See attached photos. There is no existing lightning protection for the building or arches. New lightning protection air terminal and cabling is to be installed as shown. Cabling is to be connected to a new ground rod as indicated.

5 08/15/23 Drawing A-1 There is existing coating that runs from the top roof deck, down the exterior wall to platform Arch A1. Is the existing coating on the exterior wall to be removed? Does the installation of the new coating need to be installed on the exterior wall as well?

The coating on the exterior wall shall be removed, the concrete surface repaired as specified and a new coating applied.

6 08/15/23 Drawing A-2 The details call out the cleaning and staining of the wood arches, but no mention of any cleaning or painting any of the arch hardware/fasteners. Please confirm that the arch hardware/fasteners will not be cleaned or painted?

Arch hardware and fasteners will not be cleaned or painted under this project.

7 08/15/23 Drawing A-1 Wall Section 2/A-1

The existing coating at the ramp location of the roof deck runs to the edge of the roof. The details call out the installation of the new coating to start 36" from the edge of the roof. Will this 36" area of removed existing coating be left as exposed roof deck?

Remove the existing coating at the ramp in its entirety to the edge of the roof deck and prep the concrete surface as specified.

Install new coating at the ramp to match limits of existing coating. All existing coatings are to be removed, concrete surfaces prepared as specified and a new coating installed to match limits of existing coating. This includes all surfaces of the perimeter spillway, including the back exterior vertical face of the spillway.

8 08/10/23 Bid Schedule N/A

During the Site Visit, Cam Orniston mentioned that bidders are required to acknowlege issued Amendments on the Bid Form. The Bid Form that was issued in the solicitation does not have spaces for that acknowlegement. Should we use the issued Bid Form or will another form be issued? Copy of the the Bid Form is attached.

A revised Attachment 4 has been provided for offerors to complete when submitting their bid. Bidders shall utilize the revised Attachment 4 -- Bid Schedule (Dated 17 August 2023). The Bid Schedule includes sections for the price schedule, acknowledgment of amendments and a signature of an authorized person to sign the offer.. Parts 1-3 of the revised bid schedule shall be completed in full. If a section is incomplete, the bidder will be found non-responsive to the solicitation requirements. Please note that the Bid Bond, a Cover Page, and a Copy of Representation and Certifications are still required with bid submission as stated in the N4008523R1318 Solicitation.

Government Response

Pre-Proposal Inquiry Submission Form for SOLICITATION N4008523R1318 Building 1318 Roof Deck Wood Arch Waterproofing, NAVAL STATION NEWPORT, NEWPORT, RHODE ISLAND

Date Submitted Question

Reference

PPI # LEAVE

BLANK

PPI Submission Form

File details come from the government source that posted it. Updated .