580-22-110 DRAWINGS REPAIR WATER LEAK MAIN COMPUTER SERVER ROOM.pdf
PDF 17 MB Posted
- Solicitation number
- 36C25625R0065
About this file
These are architectural and engineering drawings for a federal construction project at the Michael E. DeBakey VA Medical Center in Houston, Texas. The project involves investigating and stopping water infiltration in the main server rooms (Project #580-22-110), with work focused on the building's canteen/CLC inner courtyard. The comprehensive drawing set includes detailed plans for demolition, waterproofing, landscaping, plumbing, electrical, and fire suppression systems, covering both first floor and basement levels. Key project elements include removing existing pavers and soil, installing a new waterproofing membrane, replacing landscaping, and repairing damaged fireproofing on structural steel, with extensive infection control and construction safety protocols outlined throughout the documents. The project is fully sprinklered and designed to be completed without disrupting medical center operations, with an anticipated 420-calendar day performance period.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
CANTEEN / CLC INNER COURTYARD CANTEEN / CLC INNER COURTYARD GAZEBO
/2
/2
:5
:3
A
M C
U s e rs
\a c a b ra
\D o c u m e n ts \A
-2
-V A
H o u s to n -R e p r S rv r
R m a c a b ra
M U
S
.r v t
G-001
COVER
1 4AC
INVESTIGATE AND STOP
WATER INFILTRATION IN MAIN
SERVER ROOMS
MICHAEL E. DEBAKEY VA
MEDICAL CENTER
2002 HOLCOMBE BLVD
HOUSTON, TX 77030 JANUARY 31, 2025
100% BID DOCUMENTS
580-22-11022-228-Q39
INVESTIGATE AND STOP WATER
INFILTRATION IN MAIN SERVER ROOMS
MICHAEL E. DEBAKEY VA MEDICAL CENTER
2002 HOLCOMBE BLVD
HOUSTON, TX 77030
VA PROJECT #: 580-22-110
WVS
N N
PROJECT LOCATION
DRAWING LIST
GENERAL
G-001 COVER 1 4
G-002 CAMPUS MAP AND LOGISTICS PLAN 2 4
G-003 FIRST FLOOR LIFE SAFETY 3 4
G-004 ICRA INFORMATION AND DETAILS 4 4
LANDSCAPE
LP101 COURTYARD LANDSCAPE PLAN 1 2
LP501 COURTYARD LANDSCAPE DETAILS 2 2
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 15
A-101 OVERALL FIRST FLOOR PLAN 2 15
A-102 ENLARGED COURTYARD DEMOLITION PLAN 3 15
A-103 ENLARGED COURTYARD SLOPE FIRST FLOOR PLAN 4 15
A-104 ENLARGED COURTYARD FIRST FLOOR PLAN 5 15
A-301 BUILDING SECTIONS 6 15
A-501 PLANTER DETAILS 7 15
A-901 AXONOMETRIC VIEWS 8 15
AB101 OVERALL BASEMENT PLAN 9 15
AB102 PARTIAL ENLARGED BASEMENT PLAN 10 15
AB103 MCR ENLARGED EXISTING CONDITION PLANS 11 15
AB104 MCR ENLARGED PROPOSED SCAFFOLDING PLANS 12 15
AB105 MCR BC-275 ENLARGED REFLECTED CEILING PLANS 13 15
AB106 MCR BC-301 ENLARGED REFLECTED CEILING PLANS 14 15
AB107 STRUCTURAL FRAMING PLAN 15 15
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 2
FX101 PARTIAL BASEMENT FIRE SUPPRESSION PLAN 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION, DETAILS, AND SCHEDULES 1 2
P-101 COURTYARD PLUMBING FLOOR PLANS 2 2
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 3
E-101 FIRST FLOOR ELECTRICAL PLAN 2 3
E-102 BASEMENT ELECTRICAL PLANS 3 3
PROJECT LOCATION
W
AL
TE
R DAVID VAN SCOTER
REG. NO. 9953
Docusign Envelope ID: 4F0E9E21-7A0C-4CF7-B642-CCE5C59F0065
1/31/2025
FISHER HOUSE 2
FISHER HOUSE 3
ENTRANCE 71
ENTRANCE 70
ENTRANCE 73
E N
E R
G Y
C E
N T
E R
D R
O
LD
SPAN
ISH
TR
AIL
CAMBRIDGE
LE CAPITAN
C A
T E
T E
R R
A C
E
HO
LCO
M
BE BLVD.
RINGNESS
AVE
ALMEDA
S O
U T
H L
E E
WEST LEE
EAST LEE
MIXON AVE
ENTRANCE (Locked)
ENTRANCE
M
IX
O N
A V
E
SHEEHAN AVE
ENGINEERING
STEAM PLANT
ENERGY CONTROL
CENTER
GROUNDS
E D
U C
A T
IO
N C
T R
WASTE DISPOSAL
HO
LC
OM
BE
R
ET
AI
L C
EN
TE
R
INTR
OGE
N TH
ERA
PEU
TIC
S IN
C
FISHER HOUSE 1
VA
REGIONAL
OFFICE
102 103 104
106 -107
104A
102A
STORAGE
REGIONAL OFFICE
MAIN ENTRANCE
108A
CHP
XXX
CENTERPOINT
ADMIN BLDG
GARAGE
NEW PARKING
INTR
OGE
N TH
ERA
PEU
TIC
S IN
C
H
BUILDING IN SCOPE
PROPOSED CONTRACTOR
PARKING AND STAGING AREA
(LIMITED TO 2 VEHICLES)
CONSTRUCTION MATERIALS
ACCESS ROUTE
AREA OF WORK
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:5
:3
A
M C
U s e rs
\a c a b ra
\D o c u m e n ts \A
-2
-V A
H o u s to n -R e p r S rv r
R m a c a b ra
M U
S
.r v t
G-002
CAMPUS MAP AND LOGISTICS PLAN
2 4AC
INVESTIGATE AND STOP
WATER INFILTRATION IN MAIN
SERVER ROOMS
MICHAEL E. DEBAKEY VA
MEDICAL CENTER
2002 HOLCOMBE BLVD
HOUSTON, TX 77030 JANUARY 31, 2025
100% BID DOCUMENTS
580-22-11022-228-Q39
WVS
Scale: 1" = 100'-0"
CAMPUS MAP AND LOGISTICS PLAN
NORTH
0 10050 200
LEGEND
A. LOCATION AND EXTENTS OF STAGING AREA
SHALL BE FULLY COORDINATED WITH THE
VA/COR.
B. BEFORE PROCEEDING WITH ANY WORK, IT
SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO PROVIDE NECESSARY
SAFEGUARDS TO MAINTAIN ALL PARTS OF
THIS PROJECT UNDER THIS CONTRACT IN A
SAFE CONDITION AT ALL TIMES AND PROTECT
FROM DAMAGE THOSE PORTIONS WHICH
ARE TO REMAIN.
C. CONTRACTOR SHALL REPAIR DAMAGES TO
THE EXISTING PAVED AREAS, CURB,
LANDSCAPE/VEGETATION, ETC. CAUSED
BY WORK.
D. PLAZA WORK TO TAKE PLACE DURING
NORMAL WORKING HOURS.
1 CONTRACTOR PARKING, SHUTTLE
AVAILABLE TO MAIN BLDG.
W
AL
FD FD
FD
FD
FD FD
FD FDFD
FD
FD
CSWK 52
FHVEC
T6A
4" CONC PAD
THA01
(VV)
GMA031GMA031
TD
GP35
GP35
GP35
GP26
Z1G04
Z1G03
Z1G05
STAIR
OFFICE
STUD WRKM
NUR INST
STORAGE
CORR
CORR
VEST
SOC WK
BATH
KIT
CORR
PVA SECY
PVA OFF
BR
LIV/DIN
CORR
TWO BR
T
TWO BR
ELEVATOR ELEVATOR
STAIR
CORR
PT EDUCATION
CORR
NON-FOOD STOR HAC
KITCHEN
LC
EQ STOR
TWO BR
T
TC
TWO BR
TWO BR
T
TWO BR
TWO BR
T
TWO BR
TWO BR
TWO BR
TWO BR
TWO BR
TWO BR
PVA OFF
T
T
T
PVA SECY
CORR
LIV/DIN KIT SOC WK
BR
SOC WK
CLO
BATH FAC
T
BREAK RM EX/TMT
DIN/RECREATION
NURSE EXECUTIVE
WAITING/RECEPTIONIST/WORK AREA
NUR STA
CORR
CORR
CORR
STF T
COPY/WORK ROOM
CONFERENCE ROOM
SUPERVISORS OFFICEOFFICEOFFICE
CORRIDOR
OFFICE
MED
ELEVATOR ELEVATOR
STORAGE
CORR
PT EDUCATION
HACHAC
VENDING
DINING
ELEVATOR
ELEVATOR
P ELEV. LOBBY
ELEVATORFUT ELEVATOR
MECHANICAL BAY-6
STAIR
ELEVATORELEVATOR ELEVATOR
CORR
MAIL CHUTE
EXAM
T
OFFICE
OFFICE
MEDS/
SUPPLY
TLT
HAC
ELEVATOR
ELEVATOR
STAIR
ELEVATOR
STAFF
CORRIDOR
VEST
STAIR
CORR
HAC
ATS
STO
OFFICE OFFICE
OFFICE
TUB ROOM
1B-160
1B-172
1B-170
C1B-111
C1B-112
ST-3
1A-590
1B-168
1C-158D
1C-158A
C1B-108
1B-164
1C-158B
1C-158
C1C-108
1C-154
1C-152A
1C-152
1C-125
1C-126A
1C-122A
1C-143A
1C-129
1C-143
1C-144A
1C-148A
1C-116
1C-112
1C-118A
1C-114
1C-111C
1C-160
1C-152A
1B-164A
1C-158E
1C-160F
CIC-102
1C-108
CIC-102
1C-111B 1C-111A
1C-111
1C-109
1C-118
1C-120
1C-122
1C-124
1C-126 1C-146
1C-148
1C-150
1C-152
1C-154
1B-164
C1C-108
1C-158 1C-158A 1B-166
1C-158B
1B-168
1C-127
CIC-106
C1C-107
C1C-105
C1C-104
ST-4
P-12P-11
1C-109D
1C-109C1C-109B1C-109A
CIC-103
1C-204
1C-206
1C-160B
1C-160A
1C-160C1C-160D1C-160E
CIC-160
1C-206
1C-204
1C-110
1C-108
1A-660A
1A-660
1A-660B 1A-632
P-6
C1C-100
P-10 P-9
P-7 P-8
1A-640
ST-9
CIA-600
T-4
T-3
1C-327A
1C-325
1C-321
1C-109C1C-109B1C-109A
1C-109 1C-109D
1C-327A
1A-660B
P-6
ST-9
1C-204
1C-323 C1A-601
1A-590
ST-8
C1C-112
1A-632
1C-204A
1C-111
1C-143B
S S
S S
S S
S S
S
S
S
?CAPACITYCLR
EXIT
PASSAGEWAY
42" 210
CAPACITYCLR
EXIT
PASSAGEWAY
44" 220
A ?B
?C
CANTEEN
COURTYARD
BC-403
EGRESS PATH
EGRESS PATH TAG
EGRESS IDENTIFICATION
FIRE EXTINGUISHER CABINET
XXX
FEC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS CAPACITY
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:5
:3
A
M C
U s e rs
\a c a b ra
\D o c u m e n ts \A
-2
-V A
H o u s to n -R e p r S rv r
R m a c a b ra
M U
S
.r v t
G-003
FIRST FLOOR LIFE SAFETY
3 4AC
INVESTIGATE AND STOP
WATER INFILTRATION IN MAIN
SERVER ROOMS
MICHAEL E. DEBAKEY VA
MEDICAL CENTER
2002 HOLCOMBE BLVD
HOUSTON, TX 77030 JANUARY 31, 2025
100% BID DOCUMENTS
580-22-11022-228-Q39
WVS
Scale: 1/8" = 1'-0"
FIRST FLOOR PLAN LIFE SAFETY
LIFE SAFETY LEGEND
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
N O R
TH
0 4 8 16
PROJECT NAME: INVESTIGATE AND STOP
WATER INFILTRATION IN MAIN
SERVER ROOMS
PROJECT ADDRESS: MICHAEL E. DEBAKEY
VA MEDICAL CENTER
2002 HOLCOMBE BLVD
HOUSTON, TX 77030
PROPOSED USE: HEALTHCARE
OWNED BY: FEDERAL GOVERNMENT
AUTHORITY HAVING JURISDICTION: US DEPARTMENT OF VETERAN AFFAIRS
PROJECT DESCRIPTION:
REMOVE THE SOIL LOCATED IN THE PLANTERS AND SIDE AREA AND ALL THE PAVERS AT
HARD SURFACES AND INSTALL A NEW WATERPROOFING MEMBRANE AT THE ENTIRE
CANTEEN/CLC COURTYARD AND REPAIR DAMAGED FIREPROOFING TO STEEL BELOW.
(APPROX. 8,500 S.F.)
APPLICABLE CODES:
2021 NFPA 101 LIFE SAFETY CODE
2021 NFPA 220 STANDARDS ON TYPES OF BUILDING CONSTRUCTION
2021 INTERNATIONAL BUILDING CODE
2010 AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS
2017 PG-18-13 VA BARRIER FREE DESIGN STANDARD
GENERAL CODE INFORMATION:
CONSTRUCTION TYPE: I (332) PER
NFPA 220
PRIMARY OCCUPANCY: HEALTHCARE
CONSTRUCTION SCOPE: RENOVATION
SPRINKLERS: FULLY
SPRINKLERED
ALLOWABLE STORIES ABOVE GRADE: UNLIMITED (2021 IBC, T504.4)
ACTUAL STORIES: 6
ALLOWABLE HEIGHT: UNLIMITED
(2021 IBC, T504.3)
ACTUAL HEIGHT: 116'-0"
ALLOWABLE AREA:
UNLIMITED (2021 IBC, T506.2)
FIRE RESISTANCE RATING REQUIREMENTS (NFPA 220 TABLE 4.1.1):
COLUMNS:
3 HR
BEAMS, GIRDERS, TRUSSES, AND ARCHES: 3 HR
FLOOR/CEILING ASSEMBLIES: 2 HR
LIFE SAFETY SYSTEMS:
EMERGENCY LIGHTING: YES
EXIT SIGNS: YES
FIRE ALARM: YES
SMOKE DETECTION: YES
BUILDING AREA PER LEVEL EXISTING (SF)
BASEMENT 220,624
FIRST 294,739
SECOND 268,195
THIRD 207,081
FOURTH 189,652
FIFTH 186,199
SIXTH 121,579
CODE SUMMARY
CODE STANDARDS AND EXECUTIVE
ORDERS (PG-18-3 TOPIC 1)
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND
STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE
MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL
PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS
AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA
FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY
REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC) 2021
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF
MECHANICAL ENGINEERS (ASME) A 17.1.
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING
VA SUPPLEMENT, BARRIER FREE DESIGN STANDARD (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN
CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF
STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW
FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS
AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:
MEMORANDUM OF UNDERSTANDING (MOU)
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE
GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1-
2022.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 –
2022.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES
WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION,
ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS
MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY
NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF
THE JOINT COMMISSION. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR
DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS
OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN
THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH
THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE
REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101
SHALL BE USED EXCLUSIVELY.
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA
REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND
VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT
SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE
CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO
ENSURE A CONSISTENCY SYSTEM WIDE.
EGRESS PATH "A"
TOTAL PATH LENGTH: 125' - 6"
EGRESS PATH "B"
TOTAL PATH LENGTH: 245' - 0"
EGRESS PATH "C"
TOTAL PATH LENGTH: 172' - 6"
A. SEE SHEET AB102 FOR ICRA MEASURES AT
BASEMENT AREA.
W
AL
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y EXISTING CEILING SYSTEM
EXISTING FLOOR
FIRE RESISTANT
SEALANT, BOTH SIDES TO
WALL ABOVE OPENING
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED
U.L. DESIGN NO. U419
1-HR RATED
U.L. DESIGN NO. U419
TEMPORARY PREFABRICATED
ICRA WALL SYSTEM. BASIS OF
DESIGN: STARC WALL OR
EDGEGUARD OR EQUAL.
EXISTING CEILING
SYSTEM TO HAVE
INTEGRATED CEILING
SEAL.
EXISTING PARTITION WALL
O P
E N
IN
G
A.F.F.
9'-0"
CORRIDOR
CBC300
FIELD DETERMINED
TELEPHONE
ROOM
BC275
MAIN
COMPUTER
ROOM
BC301
EXISTING CEILING SYSTEM
EXISTING FLOOR
FIRE RESISTANT
SEALANT, BOTH SIDES TO
WALL ABOVE OPENING
2-HR RATED
U.L. DESIGN NO. U419
EXISTING CMU WALL
D O
O R
O P
E N
IN
G
H E
IG
H
T
A.F.F.
9'-0"
TOP OF TEMPORARY DOOR
OPENING
DEMO CMU WALL
FOR DOOR TD03
INSTALLATION
FIELD DETERMINED
VEHICLE
TUNNEL
DEMO PORTION OF CEILING
FOR 2 HR RATED TEMPORARY
HARD BARRIER COVER
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
[INVESTIGATE AND STOP WATER
INFILTRATION IN MAIN BC-275 AND BC-301]
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE DESIGNATION FOR THIS
PROJECT IS LEVEL IV FOR THE CLASS OF PRECAUTIONS OR LEVEL OF INFECTION CONTROL
ACTIVITIES. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON
THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK
AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE
A STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES -
CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA
AND LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL
BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON
COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED
CAREFULLY TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
[AFTER EACH PHASE, PERFORM TASKS STATED IN CONTAMINATION OF PATIENT ROOMS,
SUPPLIES, EQUIPMENT AND RELATED AREAS NOTE 2.
3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE SPACES
(CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT
THE SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL
1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS
PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING
SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER
THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT
OF THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED
BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF
ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE
USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN
NOT IN USE. FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF
THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-
CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY
ADJACENT EXCAVATION DEBRIS.
6. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL BE COVERED AND
PROTECTED PRIOR STARTING EACH CONSTRUCTION PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE
ADDED OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR
MUST FLOW FROM CLEAN TO DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE
WITH RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF
ADJACENT AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE
TO REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-
CIRCULATED AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST
TO PREVENT CONTAMINATION OF THE DUCTS.
3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-FLANGE
HANGER HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM OF 7'-2" A.F.F.
4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY
AND ENSURE AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS
1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL
AND DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT
WORN (E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE
USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR
CHANGING CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT,
TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE
MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL
CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL
CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE
CLEANING.
ICRA NOTES
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 V
V
IV
V
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects Includes, but is not limited to:
• Removal or replacement of building system component(s).
• Removal/installation of drywall partitions.
• Invasive large-scale new building construction.
• Renovation work in two or more rooms.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
• Removal of preexisting floor covering, walls, casework or other building components.
• New drywall placement.
• Renovation work in a single room.
• Nonexisting cable pathway or invasive electrical work above ceilings.
• The removal of drywall where a moderate amount of dust and debris is created.
• Dry sanding where a moderate amount of dust and debris is created.
• Work creating significant vibration and/or noise.
• Any activity that cannot be completed in a single work shift.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
• Fan shutdown/startup.
• Installation of electrical devices or new flooring that produces minimal dust and debris.
• The removal of drywall where minimal dust and debris is created.
• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Inspection and Non-Invasive Activities Includes, but is not limited to:
• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
• Clean plumbing activity limited in nature.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Physical Therapy
• Radiology departments
• All patient waiting rooms
• All outpatient clinics
• Research Areas
• Respiratory Therapy
• Office areas (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Emergency Room
• Clinical Laboratories (specimen)
• Same Day Surgery
• Pharmacy
• Nutrition and Food
Service/Canteen
• Procedural Areas (GI)
• Inpatient Mental Health
• Any area caring for immunocompromised patients
• Cardiac Cath Lab/IR
• Central Sterile Supply
• Sterile Processing Service
• Intensive Care Units
IIII
TYPE DTYPE CTYPE B
Class IV or control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
14. Contain all trash and debris in the work area.
15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
16. Worker clothing must be clean and free of visible dust before leaving the work area.
HEPA vacuuming of clothing or use of cover suites is acceptable.
17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
• Medical/Surgical Units
• Negative pressure isolation rooms
• Outpatient Chemotherapy
Areas
• Operating rooms
• Post Anesthesia Care Unit
• Dialysis
• Dental
C
LA
S S
V
1. Includes all activities required by Class IV
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management
Maintenance and Engineering department before construction begins.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
7. Personnel will be required to wear coveralls at all times during Class V work activities.
Coveralls must be removed before leaving the anteroom.
8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
15. Contain all trash and debris in the work area.
16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).
Damaged shoe covers must be immediately changed.
19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Upon Completion of Project
1. Execute work by methods to minimize raising dust from construction operations.
2. Perform noninvasive work activity as to not block or interrupt patient care.
3. Perform noninvasive work activities in areas that are not directly occupied with patients.
4. Perform noninvasive work activity in a manner that does not create dust.
5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
C
LA
S S
II
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
1. Includes all activities required by Class I
2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
4. This Class of Precautions must never be used for construction or renovation activities.
5. Provide active means to prevent airborne dust from dispersing into atmosphere.
6. Water mist work surfaces to control dust while cutting.
7. Seal unused doors with duct tape.
8. Block off and seal air vents.
9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
1. Carefully remove screws and painter tape.
2. If dust will be generated during screw removal, use hand-held HEPA vacuum.
3. Drywall cutting is prohibited during removal process.
4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
5. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Provide active means to prevent airborne dust dispersion into the occupied areas.
4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
7. If work area is contained, then it must be neutrally to negatively pressurized at all times.
8. Seal all doors with tape that will not leave residue.
9. Contain all trash and debris in the work area.
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.
For Type C activities, follow procedures for Class IV.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
A
.F .F
A P
P R
O X
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
HEPA NEGATIVE
AIR UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
REMOVE CMU AT EXTERIOR
WALL FOR EXHAUST. SEAL
ALL AROUND. SECURE
OPENING WITH 3/4" PLYWOOD
AT EACH END OF SHIFT
COORDINATE LOCATION AND
HEIGHT WITH COR.
V .I
.F
E X
IS
T
IN
G
W A
L L
FLOOR SLAB ABOVE
CEILING
PLASTIC
WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H
E
IG
H T
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING
CEILING
FLEX DUCT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:5
:3
A
M C
U s e rs
\a c a b ra
\D o c u m e n ts \A
-2
-V A
H o u s to n -R e p r S rv r
R m a c a b ra
M U
S
.r v t
G-004
ICRA INFORMATION AND DETAILS
4 4AC
INVESTIGATE AND STOP
WATER INFILTRATION IN MAIN
SERVER ROOMS
MICHAEL E. DEBAKEY VA
MEDICAL CENTER
2002 HOLCOMBE BLVD
HOUSTON, TX 77030 JANUARY 31, 2025
100% BID DOCUMENTS
580-22-11022-228-Q39
WVS
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: 1/4" = 1'-0"
PLASTIC BARRIER ENCLOSURE ELEVATION
Scale: 1/4" = 1'-0"
CROSS SECTION "A"
Scale: 1/4" = 1'-0"
ICRA MOBILE CONTAINMENT CART
W
AL
CORRIDOR
CIA-600
CLC
COURTYARD
DINING
1A-660
MECHANICAL
BAY - 6
1A-640
BR
1C-158B
LIV/DIN
1C-158
KITCHEN
1C-158A
BATH
1C-158D
CORRIDOR
1C-108
PVA SECY
1B-164
WAITING/RECEPTIONIST/WORK
AREA
1C-160
SUPERVISORS
OFFICE
1C-160C
NURSE
EXECUTIVE
1C-160F
CORRIDOR
1C-105
DIN/RECREATION
1C-111C
KITCHEN
1C-111
OFFICE
1C-109D
OFFICE
1C-109C
ELEVATOR
P-9
ELEVATOR
LOBBY
C1C-100
ELEVATOR
P-8
OFFICE
1C-160E
OFFICE
1C-160D
CANTEEN
COURTYARD
BC-403
MEXICAN FEATHER GRASS
AUTUMN CORAL® ENCORE® AZALEA
BLUE BOY DWARF ROSEMARY
ANNUAL FLOWERS
BLUE BOY DWARF ROSEMARY
NEW 6' HEIGHT WOOD
FENCE
VEGETABLE GARDEN (TYP.)
COMMON YARROW (YELLOW)
ENDLESS SUMMER® THE ORIGINAL HYDRANGEA
GARDEN SAGE
BUTTERFLY MILKWEED
MEXICAN FEATHER GRASS
AUTUMN CORAL® ENCORE® AZALEA
RED YUCCA
ANNUAL FLOWERS
ENDLESS SUMMER® THE ORIGINAL HYDRANGEA
COMMON YARROW (YELLOW)
SPIKE SPEEDWELL
BIG BLUE LILYTURF
HEAVY METAL SWITCH GRASS
1" = 5'
SCALE IN FEET
5 2.5 5 10
Foresite Group, LLC 3740 Davinci Ct.
Suite 100 Peachtree Corners, GA 30092 o | 770.368.1399 f | 770.368.1944 w | www.foresitegroup.net o | 770.368.1399 f | 770.368.1944 w | www.foresitegroup.net
1) CONTRACTOR SHALL NOTIFY DESIGN PROFESSIONAL OF ANY
DISCREPANCIES BETWEEN THE EXISTING CONDITIONS IN THE
FIELD AND THE SURVEY SHOWN ON THE PLANS BEFORE
PROCEEDING WITH ANY NEW CONSTRUCTION.
2) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE
PLANS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO FIELD VERIFY THE LOCATIONS OF ALL
UTILITIES WITHIN THE LIMITS OF CONSTRUCTION AND NOTIFY
THE ENGINEER AND COR IN CASE OF DISCREPANCIES THAT
AFFECT THE CONSTRUCTION PROJECT.
3) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS
AND SPECIFICATIONS WITHOUT THE PRIOR WRITTEN
CONSENT OF THE VA COR.
4) ALL BUFFERS, TREE SAVE AREAS, AND UNDISTURBED AREAS
SHALL BE CLEARLY IDENTIFIED BY FLAGGING AND/OR
FENCING PRIOR TO COMMENCEMENT OF ANY LAND
DISTURBANCE.
5) NO OUTSIDE STORAGE BEYOND THE WORK AREA IS
PROPOSED. THIS INCLUDES SUPPLIES, VEHICLE, EQUIPMENT,
PRODUCTS, ETC.
6) ALL EROSION, SEDIMENT CONTROL AND TREE PROTECTION
MEASURES SHALL BE INSTALLED PRIOR TO ANY WORK
INCLUDING DEMOLITION.
7) CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION
AND MAINTENANCE OF EROSION AND SEDIMENTATION
CONTROLS DURING CONSTRUCTION UNTIL PERMANENT
GROUNDCOVER IS ESTABLISHED IN ALL DISTURBED AREAS.
8) SEE LP501 AND SPECIFICATIONS SECTIONS 32900 FOR ALL
LANDSCAPE PLANT MATERIAL REQUIREMENTS.
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
100% BID DOCUMENTS
22-228-Q39
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
INVESTIGATE AND STOP
WATER INFILTRATION INTO
MAIN SERVER ROOMS
MICHAEL E. DEBAKEY VA
MEDICAL CENTER
2002 HOLCOMBE BLVD
HOUSTON, TX 77030
580-22-110
LP101
1 2YHJANUARY 31, 2025 PT
COURTYARD LANDSCAPE PLAN
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
100% BID DOCUMENTS
22-228-Q39
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
INVESTIGATE AND STOP
WATER INFILTRATION INTO
MAIN SERVER ROOMS
MICHAEL E. DEBAKEY VA
MEDICAL CENTER
2002 HOLCOMBE BLVD
HOUSTON, TX 77030
580-22-110
1) CONTRACTOR SHALL NOTIFY DESIGN PROFESSIONAL OF ANY
DISCREPANCIES BETWEEN THE EXISTING CONDITIONS IN THE
FIELD AND THE SURVEY SHOWN ON THE PLANS BEFORE
PROCEEDING WITH ANY NEW CONSTRUCTION.
2) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE
PLANS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO FIELD VERIFY THE LOCATIONS OF ALL
UTILITIES WITHIN THE LIMITS OF CONSTRUCTION AND NOTIFY
THE ENGINEER AND COR IN CASE OF DISCREPANCIES THAT
AFFECT THE CONSTRUCTION PROJECT.
3) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS
AND SPECIFICATIONS WITHOUT THE PRIOR WRITTEN
CONSENT OF THE VA COR.
4) ALL BUFFERS, TREE SAVE AREAS, AND UNDISTURBED AREAS
SHALL BE CLEARLY IDENTIFIED BY FLAGGING AND/OR
FENCING PRIOR TO COMMENCEMENT OF ANY LAND
DISTURBANCE.
5) NO OUTSIDE STORAGE BEYOND WORK LIMITS IS PROPOSED.
THIS INCLUDES SUPPLIES, VEHICLE, EQUIPMENT, PRODUCTS,
ETC.
6) ALL EROSION, SEDIMENT CONTROL AND TREE PROTECTION
MEASURES SHALL BE INSTALLED PRIOR TO ANY WORK
INCLUDING DEMOLITION.
7) CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION
AND MAINTENANCE OF EROSION AND SEDIMENTATION
CONTROLS DURING CONSTRUCTION UNTIL PERMANENT
GROUNDCOVER IS ESTABLISHED IN ALL DISTURBED AREAS.
8) SEE LP501 AND SPECIFICATIONS SECTIONS 32900 FOR ALL
LANDSCAPE PLANT MATERIAL REQUIREMENTS.
9) COORDINATE LANDSCAPE PLANS WITH EROSION CONTROL
FINAL STABILIZATION MEASURES.
10) REFER TO SHEET LP101 FOR OVERALL LANDSCAPE PLAN .
Foresite Group, LLC 3740 Davinci Ct.
Suite 100 Peachtree Corners, GA 30092 o | 770.368.1399 f | 770.368.1944 w | www.foresitegroup.net o | 770.368.1399 f | 770.368.1944 w | www.foresitegroup.net
SHRUB PLANTING
3/4" = 1'-0"
NOTES:
1- SHRUBS SHALL BE OF SPECIMEN QUALITY.
2- SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS RELATED TO THIS DETAIL.
LOOSEN ALL HARDPAN.
USE 50/50 PLANTING
MIX WITH NATIVE SOIL.
3x's widest dimension of root ball.
ROOTBALL.
4" HIGH X 8" WIDE ROUND -
TOPPED SOIL BERM ABOVE
ROOT BALL SURFACE SHALL BE
CONSTRUCTED AROUND THE
ROOT BALL. BERM SHALL BEGIN
AT ROOT BALL PERIPHERY.
PRIOR TO MULCHING, LIGHTLY
TAMP SOIL AROUND THE ROOT
BALL IN 6" LIFTS TO BRACE
SHRUB. DO NOT OVER
COMPACT. WHEN THE
PLANTING HOLE HAS BEEN
BACKFILLED, POUR WATER
AROUND THE ROOT BALL TO
SETTLE THE SOIL.
3" LAYER OF MULCH.
NO MORE THAN 1" OF
MULCH ON TOP OF ROOT
BALL. (SEE NOTES ON
LANDSCAPE PLAN FOR
TYPE OF MULCH).
ROOT BALL RESTS
ON EXISTING OR
RECOMPACTED
SOIL.
SLOPE SIDES OF
LOOSENED SOIL.
EXISTING SOIL.
FINISHED GRADE.
SHRUB.
SECTION VIEW
URBAN TREE FOUNDATION © 2014
OPEN SOURCE FREE TO USE
0001-01
GROUNDCOVER
3/4" = 1'-0"
EQ.EQ.
NOTES:
1- SEE PLANTING LEGEND FOR GROUNDCOVER SPECIES, SIZE, AND SPACING DIMENSION.
2- SMALL ROOTS (14" OR LESS) THAT GROW AROUND, UP, OR DOWN THE ROOT BALL PERIPHERY ARE CONSIDERED A NORMAL CONDITION IN CONTAINER PRODUCTION AND ARE ACCEPTABLE HOWEVER THEY SHOULD BE ELIMINATED AT THE TIME OF PLANTING. ROOTS ON THE PERIPERHY CAN BE REMOVED AT THE TIME OF PLANTING. (SEE ROOT BALL SHAVING CONTAINER DETAIL).
3- SETTLE SOIL AROUND ROOT BALL OF EACH GROUNDCOVER PRIOR TO MULCHING.
PLAN
SECTION VIEW
PAVEMENT.
SHREDDED HARDWOOD MULCH.
GROUNDCOVER PLANTS TO BE
TRIANGULARLY SPACED.
EXISTING SOIL.
8" OF MODIFIED SOIL TILLED WITH 50/50 MIX OF
4" PLANTING SOIL AND 4" NATIVE SOIL.
2 - 3" THICK LAYER OF
SHREDDED HARDWOOD MULCH.
FINISHED GRADE.
6" m in
URBAN TREE FOUNDATION © 2014
OPEN SOURCE FREE TO USE1
0003-01
SYMBOL QTY BOTANICAL / COMMON NAME CONT SPACING
SHRUBS
61 ASCLEPIAS TUBEROSA / BUTTERFLY MILKWEED 3 GAL 24" o.c.
27 HESPERALOE PARVIFLORA / RED YUCCA 3 GAL 30" o.c.
40 HYDRANGEA MACROPHYLLA `BAILMER` / ENDLESS SUMMER® THE ORIGINAL HYDRANGEA 3 GAL 42" o.c.
63 RHODODENDRON X `CONLED` / AUTUMN CORAL® ENCORE® AZALEA 3 GAL 30" o.c.
22 SALVIA ROSMARINUS `BLUE BOY` / BLUE BOY DWARF ROSEMARY 3 GAL 24" o.c.
GROUND COVERS
83 ACHILLEA MILLEFOLIUM / COMMON YARROW (YELLOW) 1 GAL 12" o.c.
47 SF ANNUAL FLOWERS 4"POT
191 SF LIRIOPE MUSCARI 'BIG BLUE' / BIG BLUE LILYTURF 4"POT
204 NASSELLA TENUISSIMA / MEXICAN FEATHER GRASS 1 GAL 18" o.c.
39 PANICUM VIRGATUM `HEAVY METAL` / HEAVY METAL SWITCH GRASS 1 GAL 30" o.c.
113 SALVIA OFFICINALIS / GARDEN SAGE 1 GAL 12" o.c.
19 VERONICA SPICATA / SPIKE SPEEDWELL 1 GAL 24" o.c.
PLANT SCHEDULE
LP501
2 2YHJANUARY 31, 2025 PT
COURTYARD LANDSCAPE DETAILS
S SS
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE WINDOW TYPE
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA.