These are bid documents for a Generator Exhaust Modification project at the Durham VA Medical Center in Durham, North Carolina, with project number 558-23-155. The project involves installing a new exhaust fan system with two exhaust fans (EF-01 and EF-02) on the roof, creating a new ductwork system to connect the generators' exhaust pipes, and integrating the new system with the existing building controls. The modifications include stainless steel ductwork, steel support framing, and electrical connections to panel ESB-2, with a requirement to carefully coordinate work to minimize disruption to the hospital's operations.
The bid documents specify a detailed construction sequence that involves installing the roof-mounted exhaust fans, constructing ductwork, connecting to existing exhaust pipes, and ensuring the entire system is leak-free. The electrical scope includes running conduits from panel ESB-2, providing power to the new exhaust fans and motor dampers, and integrating the new equipment with the existing Siemens DDC control system. The project requires coordination with the Contracting Officer's Representative (COR), adherence to VA technical standards, and commissioning of all installed equipment. The bid documents are dated 05-16-2025 and are marked as fully sprinklered.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24626B0002 0002.pdf | ||
| Drawing E102 Addendum No 1.pdf | ||
| 36C24626B0002 0001.pdf | ||
| Site Visit Attendance 12.16.25.pdf | ||
| Contractor Invoice Form.pdf | ||
| 558-23-155 Specifications.pdf | ||
| 36C24626B0002_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF DRAWINGS
GI001
SHEET
NO.
DRAWING TITLE
GENERAL
ARCHITECTURAL
COVER SHEET
GENERATOR EXHAUST MODIFICATION
PROJECT NUMBER: 558-23-155
BID DOCUMENTS
DURHAM VA MEDICAL CENTER
DURHAM, NORTH CAROLINA
MECHANICAL
MECHANICAL LEGEND, ABBREVIATIONS, AND MECHANICAL NOTESM001
PARTIAL FOURTH FLOOR MECHANICAL PLAN - NEW WORKM101
LOCATION MAP
NOT TO SCALE
AREA MAP
NOT TO SCALE
BUILDING 1
F-WING
PROJECT LOCATION
PARTIAL GROUND FLOOR PLAN, ROOF PLAN AND DETAILSAE101
TRUE
NORTH
PLAN
NORTH
TRUE
NORTH
PLAN
NORTH
GI002 LEGENDS, ABBREVIATIONS AND NOTES
PARTIAL EXTERIOR ELEVATIONS AND DETAILSAE201
VA STATION CONTROL NOTES, LEGEND, CONTROL SCHEMATIC, SEQUENCE OF CONTROL, AND CONTROL POINTM800
ELECTRICAL
ELECTRICAL GENERAL NOTES, ABBREVIATION AND SYMBOLSE001
PARTIAL FOURTH FLOOR MECHANICAL POWER PLAN - NEW WORKE101
SCHEDULESE601
PARTIAL MECHANICAL SECTION - NEW WORKM102
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ KB
558-23-155
05-16-2025REVISIONS:
A
B
C
D
E
F
GENERATOR EXHAUST MODIFICATION
DURHAM, NORTH CAROLINA
COVER SHEET
GI001
ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGEND
GENERAL ARCHITECTURAL NOTES
GENERAL PROJECT NOTES
A
GA4
A301
A201
A401
ROOM
NAME
+ 0'-6"
F.E.C.
AIR CONDITIONING
ACOUSTICAL CEILING TILE
ABOVE FINISH FLOOR
ALUMINUM
BATT INSULATION
BOTTOM OF
CEMENTITIOUS BACKER BOARD
CEMENTITIOUS CRYSTALLINE WATERPROOFING
COLD-FORMED METAL FRAMING
CORNER GUARD
CENTERLINE
CONCRETE MASONRY UNIT
CASED OPENING
COMMUNICATION
CONCRETE
SEALED CONCRETE
CONTINUOUS
CONTRACTING OFFICER'S REPRESENTATIVE
CERAMIC TILE
CERAMIC TILE BASE
CARPET
DIAMETER
EXPANSION JOINT
ELECTRICAL
EPOXY FLOORING
EXPOSED STRUCTURE
ET CETERA
EXISTING
EXPOSED
FACTORY FINISH
FLOOR DRAIN
FIRE EXTINGUISHER CABINET
FIRE HOSE CABINET
FINISHED FLOOR
FINISH
FLOOR
FACE OF
FIELD VERIFY
FABRIC WALLCOVERING
GAGE
GRANITE
GYPSUM (WALL) BOARD
HANDICAPPED
HOLLOW METAL
HANDRAIL
HEATING VENTILATION AND AIR-CONDITIONING
MATERIAL
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MASONRY OPENING
METAL
NOT IN CONTRACT
NOT TO SCALE
ON CENTER
OPPOSITE HAND
PLASTER
PLASTIC LAMINATE
PORCELAIN TILE
PAIR
PAINT
QUARRY TILE
RESILIENT BASE
REFRIGERATOR
REQUIRED
RESINOUS FLOORING
RESINOUS EPOXY WALL-CEILING
ROUGH OPENING
RUBBER FLOORING
RECESSED PAPER HOLDER
SEALED HIGH BUILD GLAZED COATING
SOLID CORE WOOD
SIMILAR
SPECIAL FACED
STAINLESS STEEL
STEEL
SUBSTRATE
SHEET VINYL
SOLID VINYL TILE
TELEPHONE
TOP OF
TYPICAL
UNLESS NOTED OTHERWISE
VINYL COMPOSITION TILE
VINYL WALL COVERING
WALL COVERING
WALL PROTECTION
WOOD
WELDED SEAM SHEET FLOORING
AC
AT
AFF
AL
BATT
BO
CBB
CCW
CFMF
CG
C
CMU
CO
COMM
CONC
SCONC
CONT
COR
CT
CTB
CP
DIA
EJ
ELEC
EPY
ES
ETC
EXIST
EXP
FAC FIN
FD
FEC
FHC
FF
FIN
FLR
FO
FV
FWC
GA
GRA
GYP BD/GWB
HC
HM
HR
HVAC
MATL
MAX
MECH
MFR
MIN
MO
MTL
NIC
NTS
OC
OH
PLS
PL
PT
PR
P
QT
RB
REF
REQ'D
RES
RES-W
RO
RF
RPH
SC
SCW
SIM
SP
SS
STL
SUBS
SV
SVT
TELE
TO
TYP
UNO
VCT
VWC
WC
WP
WD
WSF
L
FIRE EXTINGUISHER CABINET
ROOM NAME AND NUMBER
DOOR NUMBER
KEY NOTE
WINDOW TYPE
PARTITION TYPE
DETAIL CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
SECTION CALLOUT
VERTICAL ELEVATION
COLUMN CENTERLINE DESIGNATION
DEMOLITION KEY NOTE
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
INTERIOR ELEVATION CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
CARD READERCR
HIGH-PRESSURE LAMINATEHPL
LUXURY VINYL TILELVT
EDGE OF DECKEOD
DOWNSPOUTDS
CONTROL JOINTCJ
DRINKING FOUNTAINDF
FIRE RETARDANT TREATEDFRT
EXTERIOR INSULATION FINISHING SYSTEMEIFS
WATER RESISTANTWR
J1
SECTION CUT
HEAD/JAMB/SILL DETAIL NUMBER EQUALEQ
CARPET TILECPT
REFLECTED CEILING PLANRCP
SOLID SURFACE MATERIALSSM
X1045 EQUIPMENT JSN NUMBER
ALUMINUM COMPOSITE METAL PANELSACMP
A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:
• FACE OF EXISTING WALL SURFACE
• FACE OF MASONRY
• FACE OF WALL STUDS
• TOP OF SLAB
• TOP OF MASONRY
• ALIGN WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED.
B. COORDINATE WITH ALL DISCIPLINES DRAWINGS FOR ADDITIONAL REQUIREMENTS.
COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE NEW HOLES IN EXISTING
WALLS AND SLABS ARE CREATED FOR PENETRATIONS, COORDINATE SIZE AND LOCATION.
PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT,
GRILLES, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE,
MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.
C. COORDINATE AND PROVIDE GALVANIZED METAL BACKER PLATE OR SOLID FIRE
RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS. COORDINATE
LOCATIONS WITH COR FOR GOVERNMENT PROVIDED/CONTRACTOR INSTALLED
EQUIPMENT.
D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING,
INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED.
E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND
FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF
THE WALL OR SLAB. PROVIDE UL LISTED ASSEMBLIES.
F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING.
G. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE
DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR .
H. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS
REQUIRED FOR CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE
REPAIRED TO ACCEPT NEAT INSTALLATION OF CONSTRUCTION OR FINISHES. WHERE
EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.)
EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES
SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF
MATERIALS.
I. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM
CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN AT NO ADDITIONAL COST TO
THE GOVERNMENT WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE
DAMAGED.
A. THE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAN UP THE WORK AREA
AS DIRECTED IN MEDICAL SITUATIONS REQUIRING SUCH ACTION.
B. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL
SUBMITTALS FOR SUCH HAVE BEEN APPROVED.
C. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL
TIMES BY THE CONTRACTOR TO REDUCE THE POSSIBILITY OF ANY OF THESE TOOLS BEING A
HAZARD TO PATIENTS, VISITORS AND STAFF.
D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF
HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE
WITH COR.
E. THE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAINING EACH MEMBER OF
HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORK BEFORE ANY MEMBER WILL BE
ALLOWED TO PERFORM WORK ON VA PREMISES.
F. ABSOLUTELY NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN BY THE VA
TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCE AT ANY TIME.
G. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE,
DUST AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM DURING
CONSTRUCTION. ALL SUCH ACTION MUST BE FIRST COORDINATED AN CLEARED WITH THE COR
AND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICES SHALL BE ACTIVE
WHENEVER THE CONTRACTOR'S FORCES ARE NOT PRESENT IN THE WORK AREA.
H. THE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY
WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND
FOUND TO BE SECURE, SAFE AND FREE OF ANY FLAMMABLE LIQUIDS.
I. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER.
J. SEE SPECIFICATIONS SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.
K. ALL FINISH COLORS TO BE SELECTED BY COR/ VA INTERIOR DESIGNER WHERE NOT
OTHERWISE INDICATED. CONTRACTOR SHALL SUBMIT COLORS FROM THE MANUFACTURER'S
FULL RANGE OF COLORS.
L. THE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENT WITHOUT
AUTHORIZATION FROM VAMC ENGINEERING SERVICE UNLESS AN EMERGENCY SITUATION
OCCURS.
M. CONTRACTOR SHALL MAINTAIN ALL FIRE-RATED ASSEMBLIES WITHIN THE PROJECT AREA
DURING PERFORMANCE OF THE WORK.
N. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL REQUIRED EXIT LIGHTING AND SIGNAGE
REQUIRED FOR EGRESS WITHIN AND ADJACENT TO THE PROJECT AREA DURING
PERFORMANCE OF THE WORK.
O. INDICATED EXISTING CONDITIONS ARE BASED UPON LIMITED FIELD INVESTIGATION AND DID
NOT INCLUDE DESTRUCTIVE INVESTIGATION OR TESTING. CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS INCLUDING DIMENSIONS OF THE INSTALLED CONSTRUCTION PRIOR TO
COMMENCING WITH THE WORK. IF DISCREPANCIES ARE DISCOVERED, THE CONTRACTOR
SHALL NOTIFY THE COR FOR INTERPRETATION AND DIRECTION PRIOR TO PROCEEDING WITH
THE WORK.
A ACCESSORY TYPE
UL DETAIL W-L-2038
ANY UL ASSEMBLY MEETING CRITERIA MAY BE UTILIZED. ASSEMBLIES
INDICATED ON THIS SHEET ARE FOR INFORMATION ONLY.
WALL
FLOOR
AND
WALL
FLOOR
AND
WALL
UL DETAIL C-AJ-1254
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ KB
558-23-155
05-16-2025REVISIONS:
A
B
C
D
E
F
GENERATOR EXHAUST MODIFICATION
DURHAM, NORTH CAROLINA
LEGENDS, ABBREVIATIONS AND NOTES
GI002
AE201
AE201
TYP
MAXIMUM
12' - 0"
CURB RAIL TO
BE 19" ABOVE
ROOF SURFACE
CURB RAIL TO
BE 6" ABOVE
ROOF SURFACE
CURB RAIL TO
BE 19" ABOVE
ROOF SURFACE
CURB RAIL TO
BE 6" ABOVE
ROOF SURFACE
1235.66.77.7
26' - 0"26' - 0"26' - 0"26' - 0"
8.89.8
26' - 0"26' - 0"
11.3
26' - 0"
7.6814.3
13' - 0 1/2"
M
N
K.9
K
/2
K.8
1/
2"
J
K.6
O
5'
1"
4' - 0"20' - 0"
26' - 0" 1' - 5"
4'
1/
2"
5 TYP
5' -6
TYP
4' -1
0" 4'
-1 0"
5' -6
ROOF PLAN GENERAL NOTES
A. PROVIDE PREFABRICATED DUCT SUPPORTS AND ANCORAGE IN ACCORANCE
WITH ASCE 7-16.
B. REPAIR ROOF SYSTEM PER MANUFACTURER'S RECOMMENDED INSTALLATION
REQURIEMENTS WHERE IMPACTED BY THE WORK.
C. CONFIRM DUCT ROUTING WITH VA COR PRIOR TO PROCEDING WITH THE WORK.
PROVIDE PREFABRICATED DUCT SUPPORTS AS INDICATED PER SMACMA SPACING
REQUIREMENTS. SEE DETAIL 4/AE101. SEE OTHER DISCIPLINES' DRAWINGS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
REMOVE EXISITNG FALL PROTECTION RAIL TO ALLOW DUCT ROUTE TO TRANSITION
HORIZONTALLY OVER THE EXISITNG ROOF PARAPET. PROVIDE A SHORTER
LENGTH FALL PROTECTION RAIL WITH NEW BASE. MATCH EXISTING RAIL SYSTEM.
REMOVE AND PATCH EXISTING ROOF MEMBRANE AS NEEDED TO INSTALL DUCT
SUPPORTS. SEE DETAIL 4/AE101. SEE OTHER DISCIPLINES' DRAWINGS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS. ATTACHMENT OF EXHAUST DUCT
TO SUPPORT SHALL BE BY THE CONTRACTOR.
ALIGN MECHANICAL EQUIPMENT ON CENTER OF COLUMN GRIDLINES, BOTH
DIRECTIONS.
PROVIDE PREFABRICATED EQUIPMENT CURB RAILS. VERIFY AND COORDINATE
HEIGHT AND LENGTH INDICATED WITH PURCHASED EQUIPMENT. SEE DETAIL
3/AE101.SEE OTHER DISCIPLINES' DRAWINGS FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
ROOF PLAN KEY NOTES
LINE OF
SOFFIT
ABOVEAE201
AE201
11.314.3
M
N
O
EXISTING COMPOSITE ROOF DECK
NOTE:
REPAIR EXISTING MOD. BIT. ROOF SYSTEM AS REQUIRED TO INSTALL DUCT SUPPORTS PER MANUFACTURER'S INSTALLATION REQUIREMENTS TO MAINTAIN A FULLY WARANTED INSTALLATION. CONTRACTOR'S CURB MANUFACTURER SHALL DESIGN ALL ANCHORAGE TO THE EXISTING CONCRETE ROOF DECK TO RESIST THE
FOLLOWING SERVICE LOADS:
1. SELF WEIGHT OF EQUIPMENT.
2. HORIZONTAL SHEAR = 600 PLF
3. UPLIFT = 40 PLF
PREFABRICATED DUCT SUPPORT
BASE ANCHORS INTO ROOF SLAB
BASE SUPPORT
EXISTING MOD BIT ROOF, PEEL BACK FROM CUT
OPENING AND PROTECT FOR REINSTALLATION, TYP.
REMOVE AND REINSTALL AS REQUIRED TO ANCHOR
DUCT SUPPORT
CONT EDGE
SEALANT POINTS
CANT STRIP
RIGID INSULATION
CONT SEALANT
STAINLESS STEEL CLAMPING RING
COVERBOARD
TURN MEMBRANE UP AT CURB. ATTACH PER
MANUFACTURER'S RECOMMENDATION
AS REQUIRED
NOTE:
PATCH AND REPAIR EXISTING MOD. BIT. ROOF SYSTEM AS REQUIRED TO INSTALL CURB RAIL PER MANUFACTURER'S INSTALLATION REQUIREMENTS TO MAINTAIN A FULLY WARANTED INSTALLATION. CONTRACTOR'S CURB MANUFACTURER SHALL DESIGN ALL ANCHORAGE TO THE EXISTING CONCRETE ROOF DECK TO RESIST THE FOLLOWING SERVICE LOADS:
1. SELF WEIGHT OF EQUIPMENT.
2. HORIZONTAL SHEAR = 600 PLF
3. UPLIFT = 40 PLF
PREFABRICATED CURB RAIL SUPPORT. COORDINATE
LOCATION AND LENGTH WITH PURCHASED EQUIPMENT
2x WOOD NAILERS ANCHORED TO DECK
EXISTING MOD BIT ROOF. X-CUT, PEEL BACK FROM CUT
OPENING AND PROTECT FOR REINSTALLATION, TYP. REMOVE
AND REINSTALL AS REQUIRED TO ANCHOR EQUIPMENT
SUPPORT
TURN MEMBRANE UP AT CURB. ATTACH PER
MANUFACTURER'S RECOMMENDATION
FASTENER
PREFINISHED METAL CAP WITH FLASHING ON METAL
CLEAT
MECHANICAL EQUIPMENT. ATTACHMENT OF EQUIPMIENT
CURB SHALL BE B Y THE EQUIPMENT MANUFACTURER.
EXISTING COMPOSITE ROOF DECK
S E
E P
LA
N
CONT EDGE SEALANT POINTS
CANT STRIP
RIGID INSULATION
COVERBOARD
PREFINISHED METAL
FLASHING ON METAL CLEAT.
LIQUID FLASHING
BASE ANCHORS
INTO ROOF SLAB
CONT. SEALANT
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ KB
558-23-155
05-16-2025REVISIONS:
A
B
C
D
E
F
GENERATOR EXHAUST MODIFICATION
DURHAM, NORTH CAROLINA
PARTIAL GROUND FLOOR PLAN, ROOF PLAN
AND DETAILS
AE101
TRUE
NORTH
PLAN
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"
1/8" = 1'-0"AE101
1 PARTIAL ROOF PLAN
1/8" = 1'-0"AE101
2 PARTIAL GROUND FLOOR PLAN
1 1/2" = 1'-0"AE101
4 TYPICAL DUCT SUPPORT DETAIL
1 1/2" = 1'-0"AE101
3 EQUIPMENT CURB DETAIL
GROUND LEVEL
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
FV11
'-6
FV11
'-6
FV11
'-6
FV12
'-8
FV12
'-0
A
LC
O V
E O
P E
N
IN
G EXISTING ELECTRICAL PULL BOX
AND CONDUITS TO REMAIN, TYP
FV
3'-2 1/2"
AE201
TYP ALL
LOCATIONS
11.314.3
GARAGE LEVEL
T.O. CONCRETE
SLAB
FV2'
2"
FV
1'
6'
8" M
IN2
3 GROUND LEVEL
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
TYP ALL
LOCATIONS
NO
GARAGE LEVEL
T.O. CONCRETE
SLAB
2" MIN
EXISTING UTILITY
BOXES TO REMAIN, TYP
EXISTING CONDUITS
TO REMAIN, TYP
6" M
IN
2'-0"
2' -0
1/
2"
6"
DUCT SEE
MECHANICAL
HSS3x3x1/4 TYP ALL
MEMBERS
EXISTING BRICK. REMOVE AS REQUIRED
TO INSTALL STEEL FRAMING.
EXISTING CONCRETE
BEAM
1/2"x9"x9" PLATE WITH (4) 1/2" DIA x 2 1/2"
EMBED HILT KWIK BOLT TZ2 ANCHORS TYP
1/
2"
FJP TYP
3/16
TYP
3/16
TYP
3/16
TYP
DUCT SEE
MECHANICAL
HSS3x3x1/4 TYP ALL
MEMBERS
1/2"x9"x9" PLATE WITH (4) 1/2" DIA x 2 1/2"
EMBED HILT KWIK BOLT TZ2 ANCHORS TYP
EXISTING BRICK. REMOVE AS REQUIRED
TO INSTALL STEEL FRAMING
EXISTING CONCRETE
BEAM
7" 6"
1/
2"
TYPICAL PLAN VIEW AT DUCT SUPPORT
A-A A-A
SECTION A-A
NOTE: ALL STEEL SHALL BE HOT
DIPPED GALVANIZED
NOTES:
1. ALL STEEL SHALL BE HOT DIPPED GALVANIZED.
2. DO NOT DAMAGE EXISTING CONCRETE BEAM REBAR DURING ANCHOR INSTALLATION. LOCATE EXISTING
REINFORCING THOROUGH NON-DESTRUCTIVE MEANS PRIOR TO SUBMISSION OF SHOP DRAWINGS FOR REVIEW.
SEALANT AS REQUIRED AT
TUBE STEEL LOCATIONS
1' - 0"
3/16
TYP
L3x3x14 GA RADIUSED ANGLE. CONNECT TO DUCT
WITH #10 SDS AT 6" O.C. PROVIDE DIALECTIC
SEPARATION BETWEEN DUCT AND ANGLE.
L3x3x14 GA RADIUSED ANGLE. CONNECT TO DUCT
WITH #10 SDS AT 6" O.C. PROVIDE DIALECTIC
SEPARATION BETWEEN DUCT AND ANGLE.
4TH FLOOR
3RD FLOOR
2ND FLOOR
FI
E
LD
V
E R
IF
Y
'-6
FI
E
LD
V E
R
IF
Y
'-6
FI
E
LD
V
E R
IF
Y
'-6
TYPICAL DUCT
SUPPORT FRAME
EXISTING BRICK.
REMOVE AS
REQUIRED TO INSTALL
STEEL FRAMING
EXISTING CONCRETE
BEAM, TYP
DUCT SEE
MECHANICAL
NOTE: ALL STEEL
SHALL BE HOT DIPPED
GALVANIZED
OFFSET DUCT TO
BIPASS EXISTING
ELECTRICAL CONDUT
1ST FLOOR
AE201
AE201
5 TYP
UNO
EXTERIOR ELEVATION GENERAL NOTES
A. THE EXTERIOR BLACK MASTIC TYPE WATERPROOFING IS PRESUMED ASBESTOS CONTAINING MATERIAL (PACM) PER THE VA DURHAM NC. ACCORDINGLY, CONTRACTOR SHALL PERFORM ANCHOR INSTALLATION UNDER THE PRESUMPTION THAT ASBESTOS IS PRESENT AND PERFORM WORK AS AN OSHA CLASS III PROJECT, WHICH MEANS, REPAIR AND MAINTENANCE OPERATIONS, WHERE “ACM”, INCLUDING THERMAL SYSTEM INSULATION AND SURFACING ACM AND PACM, IS LIKELY TO BE DISTURBED. THE INTENT OF THIS PROJECT IS TO INSTALL NEW DUCT AND NOT THE ABATEMENT OF ASBESTOS. THE CONTRACTOR SHALL PERFORM INSTALLATION WORK IN ACCORDANCE WITH 29 CFR 1926.1101 (G)(9) METHODS OF COMPLIANCE FOR CLASS III ASBESTOS WORK. THE CONTRACTOR MAY REBUT THE PACM DESIGNATION BY THE VA, BY FOLLOWING 29 CFR 1926.1101 (K)(5) CRITERIA TO REBUT THE DESIGNATION OF INSTALLED MATERIAL AS PACM.
REMOVE AND SALVAGE EXISTING BRICK VENEER TO THE EXTENT REQUIRED FOR ANCHOR INSTALLATION OF STRUCTURAL STEEL DUCT SUPPORT SYSTEM. REINSTALL EXISTING SALVAGED BRICK AND MATCH EXISTING MORTOR. TOOTH-IN EXISTING SALVAGED BRICK WHERE POSSIBLE. PROVIDE BRICK TO MATCH EXISTING COLOR, TEXTURE AND SIZE WHERE
SALVAGED BRICK IS DAMAGED.
PROVIDE DUCT SUPPORT FRAME. SEE DETAIL 6/AE201 FOR ADDITIONAL INFORMATION.
PROVIDE DUCT SUPPORT FRAME. SEE DETAIL 7/AE201 FOR ADDITIONAL INFORMATION.
EXTERIOR ELEVATION KEY NOTES
1'-6"
2' -0
1/
2"
6"
DUCT SEE
MECHANICAL
HSS3x3x1/4 TYP
ALL MEMBERS
EXISTING BRICK. REMOVE AS REQUIRED
TO INSTALL STEEL FRAMING.
EXISTING CONCRETE
BEAM
1/2"x9"x9" PLATE WITH (4) 1/2" DIA x 2 1/2"
EMBED HILT KWIK BOLT TZ2 ANCHORS TYP
1/
2"
FJP TYP
3/16
TYP
3/16
TYP
3/16
TYP
DUCT SEE
MECHANICAL
HSS3x3x1/4 TYP ALL
MEMBERS
1/2"x9"x9" PLATE WITH (4) 1/2" DIA x 2 1/2"
EMBED HILT KWIK BOLT TZ2 ANCHORS TYP
EXISTING BRICK. REMOVE AS REQUIRED
TO INSTALL STEEL FRAMING.
EXISTING CONCRETE
BEAM
7" 6"
1/
2"
LEVEL 1 DUCT SUPPORT
A-A A-A
SECTION A-A
NOTE: ALL STEEL SHALL BE HOT
DIPPED GALVANIZED
FV
1'-3"
SEALANT AS REQUIRED AT
TUBE STEEL LOCATIONS
NOTES:
1. ALL STEEL SHALL BE HOT DIPPED GALVANIZED.
2. DO NOT DAMAGE EXISTING CONCRETE BEAM REBAR DURING ANCHOR INSTALLATION. LOCATE EXISTING
REINFORCING THOROUGH NON-DESTRUCTIVE MEANS PRIOR TO SUBMISSION OF SHOP DRAWINGS FOR REVIEW.
L3x3x14 GA RADIUSED ANGLE. CONNECT TO DUCT
WITH #10 SDS AT 6" O.C. PROVIDE DIALECTIC
SEPARATION BETWEEN DUCT AND ANGLE.
3/16
TYP
DUCT, SEE
MECHANICAL
2'-0"
3/16
TYP
3/16
TYP
3/16
1/2"x9"x0'-9" PLATE W/ (4) 1/2"x2 3/4" EMBED HILTI
KWIK BOLT TZ2 ANCHORS.
EXISTING SLAB
NOTES:
1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND
DIMENSIONS PRIOR TO SUBMISSION OF SHOP DRAWINGS
2. DUCT ATTACHMENT TO FRAME BY CONTRACTOR
3. ALL EXTERIOR EXPOSED STEEL TO BE HOT DIPPED GALVANIZED
4. PROVIDE DIALECTIC SEPARATION BETWEEN DUCT AND ANGLE.
V A
R
IE
S 8'
-6 "M
A X
1'
-6
1/4" CAP PLATE TYP
1/8
TYP
HSS3x3x1/4
H S
S 3x
3x 1/
H S
S 3x
3x 1/
DUCT, SEE
MECHANICAL
1/2"x9"x0'-9" PLATE W/ (4) 1/2"x2 3/4" EMBED HILTI
KWIK BOLT TZ2 ANCHORS.
EXISTING SLAB
NOTES:
1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND
DIMENSIONS PRIOR TO SUBMISSION OF SHOP DRAWINGS
2. DUCT ATTACHMENT TO FRAME BY CONTRACTOR
3. ALL EXTERIOR EXPOSED STEEL TO BE HOT DIPPED GALVANIZED
4. PROVIDE DIALECTIC SEPARATION BETWEEN DUCT AND ANGLE.
V A
R
IE
S 8'
-6 "M
A X
1'
-6
1/4" CAP PLATE, TYP
1/8
TYP
HSS3x3x1/4
H S
S 3x
3x 1/
H S
S 3x
3x 1/
FJP TYP
8 1/2" 1'-5"
3/16
3/16
TYP
3/16
TYP
3/16
2'-0"
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
SJ KB
558-23-155
05-16-2025REVISIONS:
A
B
C
D
E
F
GENERATOR EXHAUST MODIFICATION
DURHAM, NORTH CAROLINA
PARTIAL EXTERIOR ELEVATIONS AND DETAILS
AE201
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"
1/8" = 1'-0"AE201
2 PARTIAL WEST EXTERIOR ELEVATION
1/8" = 1'-0"AE201
1 PARTIAL SOUTH EXTERIOR ELEVATION
1 1/2" = 1'-0"AE201
5 TYPICAL DUCT FRAME SUPPORT DETAIL
1/4" = 1'-0"AE201
3 DUCT SUPPORT SECTION ELEVATION
0' 2' 4' 8' 12'
SCALE: 1/4" = 1' - 0"
0' 4" 8" 1' - 4" 2'
SCALE: 1-1/2" = 1' - 0"
1 1/2" = 1'-0"AE201
4 LEVEL 1 DUCT FRAME SUPPORT DETAIL
3/4" = 1'-0"AE201
7 LEVEL 1 DUCT SUPPORT FRAME ELEVATION DETAIL 1
3/4" = 1'-0"AE201
6 LEVEL 1 DUCT SUPPORT FRAME ELEVATION DETAIL 2
PIPING SYMBOLS AND ABBREVIATIONSHVAC SYMBOLS AND ABBREVIATIONS
EXISTING DUCT TAG
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)
ROUND DUCT SIZE TAG (DIAMETER)
DUCT BEING DEMOLISHED
RECTANGULAR SUPPLY/OUTSIDE AIR
DUCT RISE
RECTANGULAR RETURN/TRANSFER AIR
DUCT RISE
ROUND SUPPLY/OUTSIDE AIR DUCT RISE
ROUND RETURN/TRANSFER AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF AIR
DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP ROUND EXHAUST/RELIEF AIR DUCT RISE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
ROOM NAME AND NUMBER
CONNECT NEW TO EXISTING
EXISTING PIPE TAG
AREA NOT IN CONTRACT
PIPING BEING DEMOLISHED
PIPE SIZE TAG (DIAMETER)
LIMIT OF DEMOLITION
NEW WORK NOTES
DEMOLISHED WORK NOTES
ACCESS DOOR ON TOP OF DUCT
ACCESS DOOR ON SIDE OF DUCT
ACCESS DOOR ON BOTTOM OF DUCT
SHEET NOMENCLATURE
M P # # #
SERIES
0 - SYMBOLS AND NOTES
1 - PLAN VIEWS
3 - ELEVATIONS AND SECTIONS
4 - LARGE SCALE - PLANS AND SECTIONS
5 - SCHEMATICS AND DETAILS
6 - SCHEDULES
8 - CONTROLS
EQUIPMENT
TAG
EQUIPMENT TAG
SYMBOL
TYPE (SEE SCHEDULE)
CFM
ACTIVE SLOT LENGTH
(PLENUM LENGTH)
GRILLES, REGISTERS & DIFFUSERS TAG
DAMPER TAGS AND ABBREVIATIONS
PROJECT ABBREVIATIONS
DATA DEVICE TAGS AND ABBREVIATIONS
MECHANICAL EQUIPMENT TAGS
CONDENSER WATER SUPPLY (FROM TOWER)
CONDENSER WATER RETURN (TO TOWER)
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
PUMPED CONDENSATE DISCHARGE
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
GLYCOL-WATER HEATING SUPPLY
GLYCOL-WATER HEATING RETURN
STEAM VENT PIPE
REFRIGERANT SUCTION AND REFRIGERANT LIQUID
CHILLED WATER SUPPLY
CHILLED WATER RETURN
MAKE-UP WATER
DRAIN PIPING
CONDENSATE DRAIN
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
CONDENSATE TRANSFER PUMP DISCHARGE
CONDENSATE TRANSFER PUMP SUCTION
CONTINUOUS BLOWDOWN
BOILER WATER SAMPLE
BOILER BLOWOFF
FEEDWATER SAMPLE (FROM DEAERATOR)
OVERFLOW
COMPRESSED AIR
NATURAL GAS MAIN FUEL
NATURAL GAS IGNITER FUEL
FUEL OIL SUPPLY
FUEL OIL RETURN
SOFTENED WATER
SUPPLY
DIFFUSER
NECK SIZE
CFM
RETURN
GRILLE
EXHAUST
GRILLE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL
OTHER DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS
SHOWN ON THIS SHEET MAY OR MAY NOT BE USED IN THIS SET OF
DRAWINGS.
DESCRIPTION DESCRIPTION
LPS
LPR
MPS
MPR
HPS
HPR
PCD
SV
HWS
GHS
HWR
GHR
RS/RL
CWS
CWR
CHS
CHR
MW
D
CD
FWPD
FWPS
CTPD
CTPS
BO
CBD
BWS
FWS
OFL
A
G
G(I)
FOS
FOR
SW
DCW
DHW
(E) 2"
(E) 2"
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
HUMIDITY SENSOR
HUMIDISTAT
TEMPERATURE & HUMIDITY
SENSOR
DISPLAY
THERMOSTAT
SENSOR
PRESSURE SENSOR
RTU-XX
TU-XX
(E)RTU-XX
(E)TU-XX
VAV BOX
48"x2 1/2"
(E)LINEAR BAR
GRILLE
6"Ø A
8"Ø
B
6"x6" C
Room
22"x8"
22"/8"
22"Ø
(E)22"Ø
FD
SD
AVD
MVD
BDD
FSD
MANUAL VOLUME
DAMPER
BACKDRAFT DAMPER
COMBINATION
FIRE/SMOKE
DAMPER
FIRE DAMPER
SMOKE DAMPER
AUTOMATIC VOLUME
DAMPER
AD
TH
S
DIS
T
H
CO2
CO
HS
NO2
PS
IRH INFRARED HEATER
IU INDUCTION UNIT
JB JUNCTION BOX
JL JUSTIFIED LEFT
JR JUSTIFIED RIGHT
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
LOOP LOCK ONLY OPEN POSITION
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOCP MINIMUM OVERCURRENT PROTECTION
MOV MOTOR OPERATED VALVE
MTD MEAN TEMPERATURE DIFFERENCE
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NG NATURAL GAS
NO NORMALLY OPEN
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD
AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD
REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OD OUTSIDE DIAMETER
P PUMP
Pa PASCAL
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE)
STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
QNTY QUANTITY
RA RETURN AIR
RAF RETURN AIR FAN
RAT RETURN AIR TEMPERATURE
RD REFRIGERANT DISCHARGE
REA RELIEF AIR
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RS/RL REFRIGERANT SUCTION AND
REFRIGERANT LIQUID
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SEA SMOKE EXHAUST AIR
SEN SENSIBLE HEAT
SF SUPPLY FAN
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
TAB TESTING, ADJUSTING, BALANCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
V VENT
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VP VACUUM PUMP
VR VACUUM (STEAM CONDENSATE)
RETURN
W WATTS
Wb WET-BULB (TEMPERATURE)
WFMS WATER FLOW MEASURING STATION
WG WATER GAGE
WPD WATER PRESSURE DROP
YR YEAR
EJ EXPANSION JOINT
ENT ENTERING
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FCU FAN COIL UNIT
FD FLOOR DRAIN
FF FINAL FILTER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FLAT ON TOP
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPU FAN POWERED TERMINAL UNIT
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFIER
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HRC HEAT RECOVERY COIL
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HVU HEATING AND VENTILATING UNIT
HWC HOT WATER COIL
HWP HEATING HOT WATER PUMP
HTX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
ACD AUTOMATIC CONTROL DAMPER
AD ACCESS DOOR
AF AFTER FILTER
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU AIR-HANDLING UNIT
AMP AMPERE
APD AIR PRESSURE DROP
AS AIR SEPARATOR
B BOILER
BAS BUILDING AUTOMATION SYSTEM
BBR BASE BOARD RADIATOR
BE BOTTOM ELEVATION
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CV CONSTANT AIR VOLUME
CC COOLING COIL
CD COOLING COIL CONDENSATE DRAIN
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CH CHILLER
CHP CHILLED WATER PUMP
CHS/R CHILLER WATER
CL CENTER LINE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
COR CONTRACTING OFFICER
REPRESENTATIVE
CP CONDENSATE PUMP
CST CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CWP CONDENSER WATER PUMP
DDC DIRECT DIGITAL CONTROLS
DIA DIAMETER
DI DEIONIZED WATER
DP DEW POINT TEMPERATURE
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
ES EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
NECK SIZE
CFM
NECK SIZE
CFM
(S) STEAM
(H) HVAC
(P) PIPING
(D) DEMO
MECHANICAL
SERIES
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
RBS CC
558-23-155
05-16-2025REVISIONS:
A
B
C
D
E
F
GENERATOR EXHAUST MODIFICATION
DURHAM, NORTH CAROLINA
MECHANICAL LEGEND, ABBREVIATIONS, AND
MECHANICAL NOTES
M001
MECHANICAL SHEET INDEX
SHEET
NUMBER SHEET TITLE
M001 MECHANICAL LEGEND, ABBREVIATIONS, AND MECHANICAL NOTES
M101 PARTIAL FOURTH FLOOR MECHANICAL PLAN - NEW WORK
M102 PARTIAL MECHANICAL SECTION - NEW WORK
M800 VA STATION CONTROL NOTES, LEGEND, CONTROL SCHEMATIC, SEQUENCE OF CONTROL,
AND CONTROL POINT
A. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS,
BOTH EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS, AS
WELL AS THOSE WHICH CAN BE REASONABLY ANTICIPATED
INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,
PLUMBING, FIRE PROTECTION, AND OTHER SYSTEMS INVOLVED ON
THIS PROJECT.
B. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM
AND SHALL CONFORM TO ALL CURRENT REQUIREMENTS FOUND IN
THE UNITED STATES DEPARTMENT OF VETERANS AFFAIRS TECHNICAL
INFORMATION LIBRARY, INCLUDING BUT NOT LIMITED TO THE
PHYSICAL SECURITY MANUAL, HVAC DESIGN MANUAL, AND STEAM,
HEATING HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEM DESIGN
MANUAL. ALL WORK SHALL ALSO CONFORM TO ALL FEDERAL, STATE,
AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO THE
INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL
CODE.
C. INSTALL ALL EQUIPMENT AND DEVICES IN ACCORDANCE WITH THEIR
RESPECTIVE MANUFACTURER’S INSTALLATION INSTRUCTIONS AT A
LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH THESE
DOCUMENTS. ANY DEVIATIONS BETWEEN THE INSTALLATION
INSTRUCTIONS AND THESE DOCUMENTS WILL BE BROUGHT TO THE
ATTENTION TO THE COR BEFORE ANY COURSE OF ACTION BY THE
CONTRACTOR IS INITIATED, INCLUDING PURCHASE OF EQUIPMENT.
D. CONTRACTOR SHALL COORDINATE ALL WORK DESCRIBED AND
ILLUSTRATED IN THESE DRAWINGS. LOCATIONS OF PIPING,
DUCTWORK AND EQUIPMENT AS INDICATED ON THESE DRAWINGS
ARE APPROXIMATE AND SUBJECT TO ADJUSTMENTS IN THE FIELD.
OFFSET DUCTS, PIPING, AND SHIFT EQUIPMENT AS REQUIRED TO
AVOID INTERFERENCE AND CONFLICTS IN THE FIELD. COORDINATE
DUCT AND PIPE ROUTING AND EQUIPMENT LOCATIONS WITH
PLUMBING AND ELECTRICAL INSTALLATIONS AND WITH BUILDING
STRUCTURAL MEMBERS.
E. THESE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE
NOT TO BE SCALED. BEFORE BEGINNING WORK, THE CONTRACTOR
SHALL VISIT THE SITE AND COMPLETE MEASURED SURVEY AND
CREATE LAYOUT DRAWINGS AS REQUIRED BY THE
SPECIFICATIONS. WORK SHALL NOT BEGIN UNTIL ALL LAYOUT
DRAWINGS ARE APPROVED BY THE COR.
F. DUCT SIZES INDICATED ARE MINIMUM CLEAR INSIDE DIMENSIONS.
WHERE DUCT LINER OCCURS, INCREASE SHEET METAL DUCT SIZES
TO ACCOMMODATE LINER.
G. DUCT AND PIPE SUPPORTS ARE NOT SHOWN ON DRAWINGS.
H. SUPPORT ALL DUCTS, PIPING, AND EQUIPMENT FROM PRIMARY
BUILDING STRUCTURAL MEMBERS. PROVIDE ADDITIONAL
STRUCTURAL MEMBERS WHERE NECESSARY TO ACCOMPLISH THIS
REQUIREMENT.
I. NEW AND EXISTING SUPPORT, RODS, AND ASSOCIATED
APPURTENANCES SHALL NOT RESTRICT EQUIPMENT SERVICE AND
MAINTENANCE ACCESS. EXISTING SUPPORTS SHALL BE MODIFIED TO
PROVIDE FOR EQUIPMENT SERVICE AND MAINTENANCE ACCESS.
J. DUCT SUPPORTS SHALL BE IN STRICT ACCORDANCE WITH SMACNA
HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE -
SECOND EDITION EXCEPT THAT HANGER WIRE SHALL NOT BE USED
TO SUPPORT DUCTS OR EQUIPMENT, AND HANGERS THAT REQUIRE
PENETRATION OF DUCT WITH BOLTS, RIVETS, SCREWS, WIRES OR
ANY OTHER FASTENER SHALL NOT BE USED.
K. CONTRACTOR SHALL REWORK EXISTING HANGERS AND OTHER
SUPPORT FOR DUCT AND PIPING TO COORDINATE WITH NEW
EQUIPMENT AND WALL LOCATIONS. ADD SUPPORT (TRAPEZE, CLEVIS,
ETC) AT EQUIPMENT AND ON EACH SIDE OF NEW WALLS SO FULL
WEIGHT OF DUCT AND PIPING IS SUPPORTED FROM STRUCTURE AND
EQUIPMENT AND NEW WALLS BEAR NO WEIGHT.
L. CONTRACTOR SHALL PROVIDE A LIST OF ALL MECHANICAL
EQUIPMENT, DEVICES, AND ALL APPURTENANCES REQUIRING POWER
TO THE COR FOR REVIEW AND APPROVAL AS PART OF COORDINATION
FOR THIS PROJECT. LIST ALL ELECTRICAL REQUIREMENT
CHARACTERISTICS, INCLUDING BUT NOT LIMITED TO VOLTAGE,
AMPERAGE, PHASE, DISCONNECTING MEANS, OVER CURRENT
PROTECTION AND ALL CHARACTERISTICS FOR A FULLY FUNCTIONAL
AND COORDINATED SYSTEM. REFER TO ELECTRICAL DRAWINGS FOR
VOLTAGE REQUIREMENTS OF ALL EQUIPMENT.
M. CONTROL DEVICES ASSOCIATED WITH THE WORK OF THIS PROJECT
SHALL BE RELOCATED AS NECESSARY SO THAT THE FINAL PRODUCT
RESULTS IN A FULLY FUNCTIONAL AND FULLY ACCESSIBLE SYSTEM.
CONTRACTOR SHALL RELOCATE ALL EXISTING CONTROLS, SENSORS,
PROBES, OR OTHER DEVICES AND PROVIDE NEW WIRING, CONDUIT,
AND/OR TUBING TO EXTEND SUCH DEVICES AS NECESSARY TO
PRODUCE A FULLY FUNCTIONAL SYSTEM EQUAL OR BETTER THAN
EXISTING. PROTECT AND STORE ALL SUCH RELOCATED DEVICES.
N. CONTRACT SHALL COORDINATE OUTAGE REQUIREMENTS WITH THE
COR AT LEAST FOUR (4) WEEKS IN ADVANCE OF SHUTDOWN OF
GENERATORS.
O. CONTRACTOR SHALL HIRE A COMMISSIONING AGENT TO
COMMISSION ALL EQUIPMENT INSTALLED FOR THIS PROJECT.
GENERAL MECHANICAL NOTES
A. CONTRACTOR SHALL PHASE ALL WORK AS REQUIRED TO MAINTAIN
CONTINUOUS OPERATION OF THE HOSPITAL.
B. HOSPITAL OPERATIONS SHALL NOT BE INTERRUPTED DUE TO THE
WORK OF THIS PROJECT EXCEPT FOR SCHEDULED SHUTDOWNS OF
NO LONGER THAN ONE HOUR. CONTRACTOR SHALL GIVE
REASONABLE NOTICE TO COR BEFORE ANY SUCH SHUTDOWN OR
INTERRUPTION.
C. WHERE LONGER SHUTDOWNS ARE REQUIRED TO COMPLETE THE
WORK DESCRIBED IN THIS DOCUMENT, THE CONTRACTOR SHALL
SCHEDULE THE EVENT A MINIMUM OF 4 WEEKS PRIOR TO
COMMENCING WORK. ALL SUCH SHUTDOWNS AND INTERRUPTIONS
SHALL BE MINIMIZED AND SHALL UTILIZE WEEKENDS, FEDERAL
HOLIDAYS, NIGHTS, AND OTHER TIMES WHEN HOSPITAL OPERATIONS
ARE MINIMIZED AND OTHER SUCH TIMES AGREEABLE TO THE COR.
D. WHERE NECESSARY TO INTERRUPT CONTINUOUS OPERATION OF THE
HOSPITAL, THE CONTRACTOR SHALL DIVIDE WORK INTO PHASED
CONSTRUCTION THAT IS NOT NECESSARILY SHOWN ON THESE
DOCUMENTS. AS PART OF SCHEDULING AN INTERRUPTION OR
SHUTDOWN, THE CONTRACTOR SHALL PROVIDE THE COR WITH A
DETAILED SHUTDOWN PLAN INDICATING THE SYSTEMS AFFECTED,
INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,
MECHANICAL, PLUMBING, FIRE PROTECTION, AND OTHER SYSTEMS
INVOLVED. THE PLAN SHALL INCLUDE THE WORK TO BE PERFORMED,
THE LENGTH OF INTERRUPTION, AND A DETAILED PHASING AND
MANNING DESCRIPTION. THE PLAN SHALL INCLUDE AND ADDRESS
CONTINGENCY FOR MITIGATING ANY DELAYS THAT MAY OCCUR IN THE
PLANNED WORK. PROVIDE THIS PLAN TO THE COR 5 WEEKS BEFORE
THE EVENT FOR APPROVAL.
E. CONTROL OF ALL CONSTRUCTION-ASSOCIATED HAZARDS THAT
AFFECT FACILITIES, OCCUPANTS OR SERVICES SHALL BE ADDRESSED
BY THE CONTRACTOR AS PART OF THE PRE-CONSTRUCTION RISK
ASSESSMENT. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE
FACILITY SAFETY MANAGER/OFFICER. CONTRACTOR SHALL FURNISH
ALL MATERIALS AND MEANS AND METHODS TO MEET THE
REQUIREMENTS IN SPECIFICATION SECTION 013526 SAFETY
REQUIREMENTS, INCLUDING FILTRATION, MAINTAINING NEGATIVE
PRESSURE IN THE CONSTRUCTION AREA, DUST CONTROL, AND USE OF
A PORTABLE CEILING ACCESS MODULE IN AREAS OUTSIDE THE
CONSTRUCTION AREA. THE CONTRACTOR SHALL SUBMIT PLAN IN
ACCORDANCE WITH THESE DOCUMENTS.
A. DATA LINK COMMUNICATION IS ETHERNET (ISO 8802-3) AND BACNET/IP.
B. GROUND CABLE SHIELDS, DRAIN CONDUCTORS, AND EQUIPMENT TO
ELIMINATE SHOCK HAZARD AND TO MINIMIZE GROUND LOOPS,
COMMON-MODE RETURNS, NOISE PICKUP, CROSS TALK, AND OTHER
IMPAIRMENTS.
C. CABLE CONDUCTORS SHALL PROVIDE PROTECTION AGAINST
INDUCTION IN CIRCUITS. CROSSTALK ATTENUATION WITHIN THE
SYSTEM SHALL BE IN EXCESS OF -80 DB THROUGHOUT ALL
FREQUENCY RANGES USED.
D. CABLE RUNS: KEEP CABLE RUNS AS SHORT AS POSSIBLE. ALLOW
EXTRA LENGTH FOR CONNECTING TO THE TERMINAL BOARD. DO NOT
BEND FLEXIBLE COAXIAL CABLES IN A RADIUS LESS THAN TEN TIMES
THE CABLE OUTSIDE DIAMETER.
E. LABEL SYSTEM’S CABLES ON EACH END. TEST AND CERTIFY CABLES
IN WRITING TO THE VA BEFORE CONDUCTING PROOF-OF-
PERFORMANCE TESTING. MINIMUM CABLE TEST REQUIREMENTS ARE
FOR IMPEDANCE COMPLIANCE, INDUCTANCE, CAPACITANCE, SIGNAL
LEVEL COMPLIANCE, OPENS, SHORTS, CROSS TALK, NOISE, AND
DISTORTION, AND SPLIT PAIRS ON ALL CABLES IN THE FREQUENCY
RANGES USED. MAKE AVAILABLE ALL CABLE INSTALLATION AND TEST
RECORDS AT THE DEMONSTRATION TO THE VA.
F. POWER WIRING SHALL NOT BE RUN IN CONDUIT WITH
COMMUNICATIONS TRUNK WIRING OR SIGNAL OR CONTROL WIRING
OPERATING AT 100 VOLTS OR LESS.
G. PROVIDE NEMA 4 ENCLOSURE FOR EXTERIOR LOCATIONS.
H. PROVIDE BACNET-COMPLIANT ROUTER, BRIDGE, SWITCH, HUB,
MODEM, GATEWAY, INTERFACE, AND SIMILAR COMMUNICATION
EQUIPMENT TO INTEGRATE INTO THE EXISTING SYSTEM.
I. FIT ALL EQUIPMENT CONTAINED IN CABINETS OR PANELS WITH
SERVICE LOOPS, EACH LOOP BEING AT LEAST 300 MM (12 INCHES)
LONG. EQUIPMENT FOR FIBER OPTICS SYSTEM SHALL BE RACK
MOUNTED, AS APPLICABLE, IN VENTILATED, SELF-SUPPORTING, CODE
GAUGE STEEL ENCLOSURE. CABLES SHALL BE SUPPORTED FOR
MINIMUM SAG.
J. OPTICAL DIGITAL COMMUNICATION FIBER, IF USED, SHALL BE
MULTIMODE OR SINGLE MODE FIBER, 50/125 MICRON FOR MULTIMODE
OR 10/125 MICRON FOR SINGLE MODE MICRON WITH SC OR ST
CONNECTORS AS SPECIFIED IN TIA-568-C.1. TERMINATIONS, PATCH
PANELS, AND OTHER HARDWARE SHALL BE COMPATIBLE WITH THE
SPECIFIED FIBER. FIBER-OPTIC CABLE SHALL BE SUITABLE FOR USE
WITH THE 100BASE-FX OR THE 100BASE-SX STANDARD (AS
APPLICABLE) AS DEFINED IN IEEE STD 802.3.
PHASING MECHANICAL NOTES
GENERAL CONTROL ELEMENT REQUIREMENT
A. EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED FROM
THE PROJECT SITE IN ITS ENTIRETY INCLUDING ALL HANGERS,
ELECTRICAL CONDUIT, WIRING, JUNCTION BOXES, PIPING, CONTROLS,
ACCESSORIES AND ALL APPURTENANCES THAT ARE RENDERED
USELESS OR ABANDONED BY THE REMOVAL OF THE INDICATED
EQUIPMENT.
B. WHERE THESE DOCUMENTS REQUIRE REMOVAL OF DUCTWORK,
PIPING, EQUIPMENT OR ASSOCIATED APPURTENANCES, CONTRACTOR
SHALL PROTECT ALL EXISTING-TO-REMAIN COMPONENTS FROM
DAMAGE. CONTRACTOR SHALL COVER ALL OPENINGS IN DUCT,
PIPING, EQUIPMENT, AND ANY OTHER DEVICE FROM CONSTRUCTION
DUST AND DEBRIS.
C. WHERE EQUIPMENT, DUCTWORK, OR PIPING IS TO BE REMOVED THAT
IS IN-SERVICE, CONTRACTOR SHALL GIVE NOTICE TO THE COR OF ANY
INTERRUPTIONS ANTICIPATED. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO COORDINATE ALL SHUTDOWNS OR INTERRUPTIONS
TO THE SATISFACTION OF THE COR AND HOSPITAL STAFF.
DEMOLITION MECHANICAL NOTES
¢¢ft 05/16/2025
M101
ROOF
ROOF
ROOF
24"ø E/A
24"ø E/A
EF-02
EF-01
MD-01
MD-02
1235.66.77.78.89.811.3 7.6814.3
M
N
K.9
K
K.8
J
K.6
O
STAINLESS STEEL
STAINLESS STEEL
STAINLESS STEEL
Level G - Exist 0' - 0"
Level 1 - Exist 12' - 0"
Level 2 - Exist 24' - 8"
Level 3- Exist 36' - 2"
Level 4 -Exist 47' - 8"
18"x24" E/A
ELECTRICAL
PULL BOX
4"ø
4"ø 4"ø
4"ø
4"ø 4"ø
2"ø 2"ø 2"ø
2"ø
4"ø
CONDUIT
CONDUIT
CONDUIT
CONDUIT
CONDUIT
1/2"ø D
11.314.3
"ø
E /A
STAINLESS STEEL
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
RBS CC
558-23-155
05-16-2025REVISIONS:
A
B
C
D
E
F
GENERATOR EXHAUST MODIFICATION
DURHAM, NORTH CAROLINA
PARTIAL FOURTH FLOOR MECHANICAL PLAN -
NEW WORK
M101
# M101 - NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR TO MODIFY EXISTING EXHAUST DUCT TO CONNECT
TO NEW STAINLESS STEEL 18”x24” DUCT. CONTRACTOR TO COORDINATE LOCATION OF NEW STAINLESS STEEL 18”x24” DUCT SO
THE ELECTRICAL PULL BOX CAN FULLY OPEN / CLOSED AND WORK
CAN BE ACCOMPLISHED.
2 CONTRACTOR SHALL INSTALL INSULATION ON THE STAINLESS
STEEL 18" X 24" DUCT RUN.
3 CONTRACTOR SHALL MAKE THE DRAIN PIPING SYSTEM USING
STAINLESS STEEL.
4 CONTRACTOR SHALL PIPE THE DRAIN PIPING SYSTEM TO SPILL TO
GRADE.
5 CONTRACTOR SHALL INSTALL A GASKET BETWEEN THE 24"
STAINLESS STEEL ROUND DUCT AND GALVANIZED STEEL. GASKET
MATERIAL SUCH AS BLUE-GARD STYLE 3000 OR EQUAL SHALL BE
USED.
1/8" = 1'-0"M101
1 PARTIAL FOURTH FLOOR - MECHANICAL PLAN - NEW WORK
8' 16'4'0 1/4" = 1'-0"M101
2 SECTION 1
0 4' 8'2'
4. NONE PRV-POWER ROOF VENTILATOR KEF-KITCHEN EXHAUST FAN 4. INVERTER DUTY MOTOR
3. ADDITIONAL BY-PASS AIR FOR 7141 CFM. RF-RETURN FAN PRF-PROPELLER ROOF FAN 3. GRAVITY DAMPER
2. IGNORE ZERO VALUES UNLESS APPLICABLE. EF-EXHAUST FAN HPF-HIGH PLUME FAN 2. MOTORIZED DAMPER
1. MOTRO HP IS MAXIMUM VALUE. SF-SUPPLY FAN PWF-PROPELLER WALL FAN 1. BYPASS PLENUM
NOTES: FAN TYPE ABBREVIATION VSF-VENT SET FAN ACCESSORIES
FAN SCHEDULE
MARK
LAYOUT BASIS FAN PROPERTIES AIRFLOW PROPERTIES ELECTRICAL
WEIGHT
(LBS)
NOISE
CRITERIA
(SONES) NOTESMANUFACTURER MODEL FAN TYPE DRIVE TYPE
WHEEL
(IN)
OUTLET
VELOCITY
(FPM) RPM CLASS ACCESSORIES
MAX
AIRFLOW
(CFM)
MIN
AIRFLOW
(CFM)
TSP
(IN.WG) CONTROLLER
POWER EA.
(HP)
EF-01 GREENHECK VEKTOR-CD HPF BELT 27 5777 1725 II 1:2: 9150 9150 2.00 VFD 20.00 2130 lb 78 1:2:3:
EF-02 GREENHECK VEKTOR-CD HPF BELT 27 5777 1725 II 1:2: 9150 9150 2.00 VFD 20.00 2130 lb 78 1:2:3:
GROUND LEVEL GROUND LEVEL
LEVEL 1 LEVEL 1
LEVEL 2 LEVEL 2
LEVEL 3LEVEL 3
NO
GARAGE LEVEL GARAGE LEVEL
T.O. CONCRETE
SLAB
T.O. CONCRETE
SLAB
NO
1/2"ø D
4"ø
24"x18" E/A
CONDUIT
ELECTRICAL
PULL BOX
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
RBS CC
558-23-155
05-16-2025REVISIONS:
A
B
C
D
E
F
GENERATOR EXHAUST MODIFICATION
DURHAM, NORTH CAROLINA
PARTIAL MECHANICAL SECTION - NEW WORK
M102
1/4" = 1'-0"M102
1 PARTIAL MECHANICAL SECTION - NEW WORK
0 4' 8'2'
EXISTING
EXHAUST
DISCHARGE
MANIFOLD
M102 - NEW WORK NOTES
NOTE
NUMBER NOTE TEXT
1 CONTRACTOR SHALL WELD NEW BLACK PIPE ONTO EXISTING
EXHAUST DISCHARGE.
2 CONTRACTOR SHALL USE A FLANGED CONNECTION TO CONNECT
NEW BLACK PIPE TO 24"X18" DUCT MANIFOLD.
3 CONTRACTOR SHALL INSTALL A GASKET BETWEEN THE 18" X 24"
STAINLESS STEEL DUCT AND NEW BLACK PIPE TO PREVENT
CORROSION. GASKET MATERIAL SUCH AS BLUE-GARD STYLE 3000
OR EQUAL SHALL BE USED.
CONTROL LEGEND
FLUID FLOW METER ROUND CONTROL DAMPERAPPLICATION SPECIFIC CONTROLLER
PADDLE TYPE FLOW SWITCH
DUCT MOUNTED TEMP. SENSOR
COOLING COIL
DIFFERENTIAL AIR PRESSURE SWITCH
HEAT EXCHANGER
SENSIBLE WHEEL
REFRIGERANT GAS SENSOR
PARALLEL BLADE DAMPER OPPOSED BLADE DAMPER
AFMS AIR FLOW MEASURING STATION
DIFFERENTIAL PRESSURE SENSOR
DUCT MOUNTED, AVERAGING TEMP. SENSOR
DX COIL
AIR FILTER
CURRENT TRANSDUCER
FAN WITH INLET GUIDE VANES
VARIABLE FREQUENCY DRIVE
TWO WAY ELECTRONIC CONTROL VALVE
THREE WAY ELECTRONIC CONTROL VALVE
PIPE MOUNTED TEMPERATURE SENSOR
FAN
DO
DATA TSTAT
AFMS
NO
NC
AO
DI
BDD
AI
DIGITAL OUTPUT
AIR FLOW MEASUREMENT STATION
NORMALLY OPEN
NORMALLY CLOSED
BINARY DATA LINK THERMOSTAT
HAND-OFF-AUTO SWITCH
SMOKE DETECTOR CONTACTS
SHIELDED BULB AIR TEMPERATURE SENSOR
THERMAL OVERLOADS-NUMBER AS REQUIRED
SMOKE DETECTOR
ANALOG INPUT
DIGITAL INPUT
ANALOG OUTPUT
BACKDRAFT DAMPER
MOTOR START SOLENOID SPACE HUMIDITY SENSOR
SPACE TEMPERATURE SENSOR
DAMPER ACTUATOR (ELECTRONIC)
DUCT MOUNTED HUMIDITY SENSOR
FREEZE PROTECTION THERMOSTAT
STEAM PIT SUMP LEVEL SWITCH
FIRE THERMOSTAT
OCCUPANCY SENSOR
PUMP
HEATING COIL
MOTOR STARTER
FA FIRE ALARM CONTACTS
STROBE/HORN
C COMMONC COMMON
UVC RADIATION SENSOR
ISOLATION ROOM PRESSURE
CONTROLLER KEY SWITCH
PROPORTIONAL HIGH LIMIT HUMIDISTAT
ELECTRIC HEAT STEP CONTROLLER
ELECTRIC HEAT SCR CONTROLLER
EMERGENCY AIR SYSTEM TURN OFF BUTTON
PRESSURE INDEPENDENT CONTROL VALVE
I INPUT / OUTPUT
OXYGEN MONITORING SENSOR
O/ TERMINAL EQUIPMENT CONTROLLER
C C
T
D
T
X
R
AF
DPT
DPS
FFM
PFS
ASC
VFD
T
CT
SD
OL
SD
HOA
M
T
DA
FT
H
FZ
FS
O
T
H
H C
SH
HH
STEP
SCR
EO
PICV
TEC
O2
DA
PHO
K
120 VAC BY DIV 26
SWITCH
SWITCH
FUSE
24 VAC TO
TERMINAL UNIT
CONTROL
TO LOW VOLTAGE
EQUIPMENT/CONTORLLERS
LOW VOLTAGE
POWER BY DIV 23
AHU DDC
CONTROL PANEL
BY DIV 23
CPT CONTROL
PANEL BY DIV 23
NOTE: 120 V/24 VAC CONTROL
PANEL TRANSFORMER SIZED
TO MEET LOAD REQUIREMENTS
SERVED EQUIPMENT
TERMINAL
UNIT
(EXAMPLE)
EXHAUST FANS
CONTROL POINTS SCHEDULE (EXHAUST FANS ONLY)
NC
ATM.
TYPE
MARK
DESCRIPTION NOTES
EF-01
DM
DPT
A. EXHAUST FAN OPERATING AND SAFETY CONTROLS SHALL INCLUDE:
1. WALL MOUNTED DISCONNECT
2. VARIABLE FREQUENCY MOTOR DRIVE
3. FAN DIFFERENTIAL PRESSURE SENSOR
4. BYPASS DAMPER AND DAMPER ACTUATOR
B. THE EXHAUST FANS SHALL OPERATE AT ALL TIMES ON A LEAD / LAG BASIS.
C. THE CONTROL SYSTEM SHALL ROTATE LEAD / LAG FANS ON A WEEKLY BASIS TO MAINTAIN EQUAL RUN TIMES ON BOTH FANS.
THE CHANGE OVER SHALL OCCUR AT 2:00 AM ON FOLLOWING DAY. COORDINATE WITH COR FOR TESTING SCHEDULE.
D. UPON FAILURE OF THE LEAD FAN AS DETERMINED BY THE MOTOR CURRENT TRANSDUCER BEING OFF SETPOINT THE CONTROL SYSTEM SHALL START THE LAG FAN, DISABLE THE WEEKLY LEAD / LAG CHANGE OVER AND SHALL ALARM THE
CONTROL SYSTEM USER INTERFACE.
E. FOR EF-01, MD-01 WILL BE NORMALLY OPEN. FOR EF-02, MD-02 WILL BE NORMALLY CLOSED. UPON FAILURE OF EF-01, MD-01
WILL CLOSE. MD-02 WILL OPEN AND EF-02 WILL ACTIVATE.
F. THE CONTROL SYSTEM SHALL MODULATE THE FAN BYPASS DAMPER TO MAINTAIN EXHAUST DUCT STATIC PRESSURE AT
SETPOINT AND FAN CFM CONSTANT.
G. THE STATIC PRESSURE SETPOINTS SHALL BE DETERMINED BY THE TAB CONTRACTOR DURING TAB WORK.
H. FANS SHALL RUN AN ADDITIONAL 30 SECONDS AFTER THE GENERATORS STOP RUNNING TO CLEAR EXCESS EXHAUST
WITHING THE DUCTWORK.
I. ALARMS: THE CONTROL SYSTEM SHALL ALARM THE USER INTERFACE AND TAKE INDICATED ACTION WHENEVER ANY OF THE
FOLLOWING CONDITIONS OCCURS:
1. MOTOR CURRENT PLUS OR MINUS 10% OF FULL LOAD AMPS FOR 10 SECONDS OR LONGER. STOP LEAD FAN AND TURN ON LAG FAN AND SUSPEND WEEKLY LEAD / LAG SWITCH OVER. FULL LOAD CURRENT SHALL BE AS DETERMINED DURING
TEST AND BALANCE.
2. NO AIR FLOW FOR 5 SECONDS OR LONGER. STOP LEAD FAN AND TURN ON LAG FAN AND SUSPEND WEEKLY LEAD / LAG
SWITCH OVER.
3. EXHAUST PRESSURE NOT AT SETPOINT FOR 30 SECONDS OR LONGER. STOP LEAD FAN AND TURN ON LAG FAN. SUSPEND
WEEKLY LEAD / LAG SWITCH OVER.
4. WHEN THE EXHAUST FAN IS OPERATING IN MANUAL OVERRIDE AS DETERMINED BY FAN OPERATION OUTSIDE THE CONTROL OF THE CONTROL SYSTEM. THE ALARM SHALL TOTALIZE THE MINUTES OF MANUAL OVERRIDE OPERATION.
4VFD
NOTES:
1. DISPLAY ALL SEIMENS DATA AVAILABLE ON VFD. PROVIDE VFD WITH SEIMENS PROTOCOL.
DI DAMPER FEEDBACK 100% OPEN/100% CLOSED
AO EXHAUST DAMPER MODULATION
AI EXHAUST DUCT DIFFERENTIAL PRESSURE
DATA EF-01/EF-02 VFD STATUS
AO EXHAUST FAN SPEED CONTROL EF-01/EF-02
DO EXHAUST FAN ENABLE/DISABLE EF-01/EF-02
DO DAMPER OPEN/CLOSED
1:
SPARE
SPARE
BY-PASS
NC
ATM.
EF-02
DM
DPT
4VFD
BY-PASS
M
NC M
NO
SPARE
MD-01MD-02
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
RBS CC
558-23-155
05-16-2025REVISIONS:
A
B
C
D
E
F
GENERATOR EXHAUST MODIFICATION
DURHAM, NORTH CAROLINA
VA STATION CONTROL NOTES, LEGEND,
CONTROL SCHEMATIC, SEQUENCE OF
CONTROL, AND CONTROL POINT
M800
1. CONTRACTOR SHALL PROVIDE COMPLETE DDC AUTOMATIC TEMPERATURE CONTROL SYSTEM COMPATIBLE
WITH THE EXISTING SYSTEM.
2. THE EXISTING CONTROLS SYSTEM IS SEIMENS INSIGHT WITH P2 NETWORK CONTROLS. THE CONTRACTOR SHALL PROVIDE NEW DDC CONTROLS THAT SHALL BE CONNECTED TO THE EXISTING SYSTEM AND BE INCORPORATED INTO THE EXISTING USER INTERFACE (UI). THE FINAL PRODUCT SHALL BE A COMPLETE, FUNCTIONING SYSTEM THAT IS FULLY INTEGRATED.
3. THE CONTRACTOR SHALL INCLUDE GRAPHICS IN THE EXISTING UI FOR ALL NEW SYSTEMS AND MODIFY ANY
AND ALL EXISTING GRAPHICS TO ACCURATELY DEPICT THE NEW WORK AND FUNCTIONALITY.
4. THE CONTRACTOR SHALL INTEGRATE THE CONTROLS SO THAT ALL NEW CONTROL POINTS CAN BE FULLY
OVERRIDDEN BY THE EXISTING DDC SYSTEM THROUGH THE UI.
5. THE EXISTING DDC CONTROL UI SHALL PROVIDE HIGH AND LOW ALARMS AS APPLICABLE FOR ALL INDICATED
CONTROL INPUTS.
6. THE NEW GENERATOR EXHAUST FANS UTILIZES A LEAD/LAG OPERATING SCHEDULE AND SHALL ALTERNATE ON
A WEEKLY BASIS AFTER EACH TESTING. COORDINATE WITH COR FOR TESTING SCHEDULE.
7. CHANGE-OVER SHALL ALSO TAKE PLACE AT 2:00 AM AFTER RUN-TIME DIFFERENCE EXCEEDS 8 HOURS
(ADJUSTABLE). MANUAL CHANGE-OVER CAPABILITY SHALL BE INCLUDED.
8. CONTRACTOR SHALL COORDINATE LEAD/LAG OPERATING SCHEDULE AND PROGRAM WITH COR BEFORE WORK
BEGINS.
GENERAL NOTES FOR HVAC CONTROLS
NOT TO SCALEM800
2 LOW VOLTAGE POWER WIRING DETAIL
NOT TO SCALEM800
1 EXHAUST FAN
1. CONTRACTOR SHALL INSTALL EXHAUST FANS (EF-01 AND EF-02) ONTO ROOF AS SHOWN IN THE DRAWINGS (1/M101). CONTRACTOR SHALL INSTALL ALL
DUCTWORK AND MECHANICAL DAMPERS ON ROOF TOP ONLY.
2. CONTRACTOR SHALL COMPLETE THE DUCT CONSTRUCTION ON THE ROOF TOP AS SHOWN IN THE DRAWINGS 1/M101. CONTRACTOR SHALL ENSURE THE FAN IS POWERED, DDC PROGRAMMED, TESTED, AND CONFIRMED TO BE WORKING BEFORE MOVING OFF THE ROOF.
3. AFTER ALL THE ROOFTOP CONSTRUCTION IS COMPLETED, CONTRACTOR SHALL BEGIN TO CONSTRUCT THE DUCT SYSTEM TOWARDS THE EXHAUST PIPES AS SHOWN IN DRAWINGS (2/M101). DO NOT PLACE THE MANIFORLD OR DUCTS OVER THE EXHAUST PIPES ON THE BOTTOM LEVEL.
4. CONTRACTOR SHALL ENSURE THAT ALL THE DUCTING SYSTEM BEYOND THE MANIFOLD IS CONNECTED AND READY TO HAVE THE MANIFOLD AND
SNAPLOCK DUCTS TO BE ATTACHED TO THE DUCTING SYSTEM.
5. CONTRACTOR SHALL BEGIN THE CONSTRUCTION OF THE MANIFOLD AND SNAPLOCK DUCTS. THE SNAPLOCK DUCTS WILL GO OVER THE EXHAUST PIPES PENETRATING FROM THE WALL. DO NOT PLACE THE MANIFOLD OR ANY SNAPLOCK DUCTS. ENSURE BOTH EF-01 AND EF-02 ARE COMMISSIONED AND
FULLY OPERATIONAL BEFORE MOVING ON TO STEP 6.
6. AFTER CONSTRUCTION OF THE MANIFOLD AND SNAPLOCK DUCTS ARE COMPLETED, CONTRACTOR WILL ATTACH THE SNAPLOCK DUCTS OVER THE EXHAUST PIPES FIRST, FOLLOWED BY THE MANIFOLD SECOND. THE MANIFOLD WILL NEED TO BE CONNECTED TO THE 3 SNAPLOCK DUCTS AND THE
DUCTING SYSTEM RUNNING DOWN FROM THE ROOF.
7. AFTER THE CONNECTIONS ARE COMPLETED, 1 OF THE 3 GENERATORS WILL NEED TO BE TAKEN OFFLINE. CONTRACTOR SHALL COORDINATE WITH THE COR ATLEAST 4 WEEKS IN ADVANCE. THE SNAPLOCK DUCT ON THE EXHAUST PIPE FROM THE GENERATOR THAT IS OFFLINE, WILL NEED TO HAVE THE SNAPLOCK DUCT REMOVED. A STAINLESS STEEL DUCT WILL BE PLACED OVER THE EXHAUST PIPE AND WELDED. AFTER THE WELDED STAINLESS STEEL DUCT IS ATTACHED TO EXHAUST PIPE, THE WELDED DUCT WILL NEED TO BE ATTACHED TO THE MANIFOLD.
8. CONTRACTOR SHALL ENSURE THAT THERE ARE NO LEAKS IN THE ENTIRE DUCT SYSTEM, THEN BRING THE GENERATOR THAT IS OFFLINE BACK ONLINE.
9. CONTRACTOR SHALL REPEAT STEPS 7 AND 8 UNTIL ALL 3 EXHAUST PIPES HAVE WELDED STAINLESS STEEL DUCT AND ARE ATTACHED TO THE
MANIFOLD. ENSURE NO LEAKS ARE FOUND WITHIN THE DUCT SYSTEM AS FINAL CHECK.
CONSTRUCTION SEQUENCE OF DUCT SYSTEM
ELECTRICAL GENERAL NOTES:
1. THE WORK SHALL CONFORM WITH ALL REQUIREMENTS OF:
A. NFPA 70-2023 (NATIONAL ELECTRICAL CODE)
B. ANSI C2-2023 (NATIONAL ELECTRICAL SAFETY CODE)
C. APPLICABLE LOCAL CODES…