558-23-155 Drawings.pdf

PDF 5 MB Posted

Attached to
Y1JZ--558-23-155 Generator Exhaust Modification GC
Solicitation number
36C24626B0002
Issued by

About this file

These are bid documents for a Generator Exhaust Modification project at the Durham VA Medical Center in Durham, North Carolina, with project number 558-23-155. The project involves installing a new exhaust fan system with two exhaust fans (EF-01 and EF-02) on the roof, creating a new ductwork system to connect the generators' exhaust pipes, and integrating the new system with the existing building controls. The modifications include stainless steel ductwork, steel support framing, and electrical connections to panel ESB-2, with a requirement to carefully coordinate work to minimize disruption to the hospital's operations.

The bid documents specify a detailed construction sequence that involves installing the roof-mounted exhaust fans, constructing ductwork, connecting to existing exhaust pipes, and ensuring the entire system is leak-free. The electrical scope includes running conduits from panel ESB-2, providing power to the new exhaust fans and motor dampers, and integrating the new equipment with the existing Siemens DDC control system. The project requires coordination with the Contracting Officer's Representative (COR), adherence to VA technical standards, and commissioning of all installed equipment. The bid documents are dated 05-16-2025 and are marked as fully sprinklered.

View the file

Other files

File Type Posted
36C24626B0002 0002.pdf PDF
Drawing E102 Addendum No 1.pdf PDF
36C24626B0002 0001.pdf PDF
Site Visit Attendance 12.16.25.pdf PDF
Contractor Invoice Form.pdf PDF
558-23-155 Specifications.pdf PDF
36C24626B0002_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF DRAWINGS

GI001

SHEET

NO.

DRAWING TITLE

GENERAL

ARCHITECTURAL

COVER SHEET

GENERATOR EXHAUST MODIFICATION

PROJECT NUMBER: 558-23-155

BID DOCUMENTS

DURHAM VA MEDICAL CENTER

DURHAM, NORTH CAROLINA

MECHANICAL

MECHANICAL LEGEND, ABBREVIATIONS, AND MECHANICAL NOTESM001

PARTIAL FOURTH FLOOR MECHANICAL PLAN - NEW WORKM101

LOCATION MAP

NOT TO SCALE

AREA MAP

NOT TO SCALE

BUILDING 1

F-WING

PROJECT LOCATION

PARTIAL GROUND FLOOR PLAN, ROOF PLAN AND DETAILSAE101

TRUE

NORTH

PLAN

NORTH

TRUE

NORTH

PLAN

NORTH

GI002 LEGENDS, ABBREVIATIONS AND NOTES

PARTIAL EXTERIOR ELEVATIONS AND DETAILSAE201

VA STATION CONTROL NOTES, LEGEND, CONTROL SCHEMATIC, SEQUENCE OF CONTROL, AND CONTROL POINTM800

ELECTRICAL

ELECTRICAL GENERAL NOTES, ABBREVIATION AND SYMBOLSE001

PARTIAL FOURTH FLOOR MECHANICAL POWER PLAN - NEW WORKE101

SCHEDULESE601

PARTIAL MECHANICAL SECTION - NEW WORKM102

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

SJ KB

558-23-155

05-16-2025REVISIONS:

A

B

C

D

E

F

GENERATOR EXHAUST MODIFICATION

DURHAM, NORTH CAROLINA

COVER SHEET

GI001

ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGEND

GENERAL ARCHITECTURAL NOTES

GENERAL PROJECT NOTES

A

GA4

A301

A201

A401

ROOM

NAME

+ 0'-6"

F.E.C.

AIR CONDITIONING

ACOUSTICAL CEILING TILE

ABOVE FINISH FLOOR

ALUMINUM

BATT INSULATION

BOTTOM OF

CEMENTITIOUS BACKER BOARD

CEMENTITIOUS CRYSTALLINE WATERPROOFING

COLD-FORMED METAL FRAMING

CORNER GUARD

CENTERLINE

CONCRETE MASONRY UNIT

CASED OPENING

COMMUNICATION

CONCRETE

SEALED CONCRETE

CONTINUOUS

CONTRACTING OFFICER'S REPRESENTATIVE

CERAMIC TILE

CERAMIC TILE BASE

CARPET

DIAMETER

EXPANSION JOINT

ELECTRICAL

EPOXY FLOORING

EXPOSED STRUCTURE

ET CETERA

EXISTING

EXPOSED

FACTORY FINISH

FLOOR DRAIN

FIRE EXTINGUISHER CABINET

FIRE HOSE CABINET

FINISHED FLOOR

FINISH

FLOOR

FACE OF

FIELD VERIFY

FABRIC WALLCOVERING

GAGE

GRANITE

GYPSUM (WALL) BOARD

HANDICAPPED

HOLLOW METAL

HANDRAIL

HEATING VENTILATION AND AIR-CONDITIONING

MATERIAL

MAXIMUM

MECHANICAL

MANUFACTURER

MINIMUM

MASONRY OPENING

METAL

NOT IN CONTRACT

NOT TO SCALE

ON CENTER

OPPOSITE HAND

PLASTER

PLASTIC LAMINATE

PORCELAIN TILE

PAIR

PAINT

QUARRY TILE

RESILIENT BASE

REFRIGERATOR

REQUIRED

RESINOUS FLOORING

RESINOUS EPOXY WALL-CEILING

ROUGH OPENING

RUBBER FLOORING

RECESSED PAPER HOLDER

SEALED HIGH BUILD GLAZED COATING

SOLID CORE WOOD

SIMILAR

SPECIAL FACED

STAINLESS STEEL

STEEL

SUBSTRATE

SHEET VINYL

SOLID VINYL TILE

TELEPHONE

TOP OF

TYPICAL

UNLESS NOTED OTHERWISE

VINYL COMPOSITION TILE

VINYL WALL COVERING

WALL COVERING

WALL PROTECTION

WOOD

WELDED SEAM SHEET FLOORING

AC

AT

AFF

AL

BATT

BO

CBB

CCW

CFMF

CG

C

CMU

CO

COMM

CONC

SCONC

CONT

COR

CT

CTB

CP

DIA

EJ

ELEC

EPY

ES

ETC

EXIST

EXP

FAC FIN

FD

FEC

FHC

FF

FIN

FLR

FO

FV

FWC

GA

GRA

GYP BD/GWB

HC

HM

HR

HVAC

MATL

MAX

MECH

MFR

MIN

MO

MTL

NIC

NTS

OC

OH

PLS

PL

PT

PR

P

QT

RB

REF

REQ'D

RES

RES-W

RO

RF

RPH

SC

SCW

SIM

SP

SS

STL

SUBS

SV

SVT

TELE

TO

TYP

UNO

VCT

VWC

WC

WP

WD

WSF

L

FIRE EXTINGUISHER CABINET

ROOM NAME AND NUMBER

DOOR NUMBER

KEY NOTE

WINDOW TYPE

PARTITION TYPE

DETAIL CALLOUT

DETAIL NUMBER

SHEET WHERE DETAIL IS DRAWN

SECTION CALLOUT

VERTICAL ELEVATION

COLUMN CENTERLINE DESIGNATION

DEMOLITION KEY NOTE

DETAIL NUMBER

SHEET WHERE DETAIL IS DRAWN

INTERIOR ELEVATION CALLOUT

DETAIL NUMBER

SHEET WHERE DETAIL IS DRAWN

CARD READERCR

HIGH-PRESSURE LAMINATEHPL

LUXURY VINYL TILELVT

EDGE OF DECKEOD

DOWNSPOUTDS

CONTROL JOINTCJ

DRINKING FOUNTAINDF

FIRE RETARDANT TREATEDFRT

EXTERIOR INSULATION FINISHING SYSTEMEIFS

WATER RESISTANTWR

J1

SECTION CUT

HEAD/JAMB/SILL DETAIL NUMBER EQUALEQ

CARPET TILECPT

REFLECTED CEILING PLANRCP

SOLID SURFACE MATERIALSSM

X1045 EQUIPMENT JSN NUMBER

ALUMINUM COMPOSITE METAL PANELSACMP

A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:

• FACE OF EXISTING WALL SURFACE

• FACE OF MASONRY

• FACE OF WALL STUDS

• TOP OF SLAB

• TOP OF MASONRY

• ALIGN WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED.

B. COORDINATE WITH ALL DISCIPLINES DRAWINGS FOR ADDITIONAL REQUIREMENTS.

COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE NEW HOLES IN EXISTING

WALLS AND SLABS ARE CREATED FOR PENETRATIONS, COORDINATE SIZE AND LOCATION.

PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT,

GRILLES, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE,

MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY.

C. COORDINATE AND PROVIDE GALVANIZED METAL BACKER PLATE OR SOLID FIRE

RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS. COORDINATE

LOCATIONS WITH COR FOR GOVERNMENT PROVIDED/CONTRACTOR INSTALLED

EQUIPMENT.

D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING,

INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED.

E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND

FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF

THE WALL OR SLAB. PROVIDE UL LISTED ASSEMBLIES.

F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING.

G. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE

DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR .

H. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS

REQUIRED FOR CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE

REPAIRED TO ACCEPT NEAT INSTALLATION OF CONSTRUCTION OR FINISHES. WHERE

EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.)

EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES

SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF

MATERIALS.

I. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM

CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN AT NO ADDITIONAL COST TO

THE GOVERNMENT WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE

DAMAGED.

A. THE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAN UP THE WORK AREA

AS DIRECTED IN MEDICAL SITUATIONS REQUIRING SUCH ACTION.

B. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL

SUBMITTALS FOR SUCH HAVE BEEN APPROVED.

C. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY SECURED AT ALL

TIMES BY THE CONTRACTOR TO REDUCE THE POSSIBILITY OF ANY OF THESE TOOLS BEING A

HAZARD TO PATIENTS, VISITORS AND STAFF.

D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF

HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE

WITH COR.

E. THE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAINING EACH MEMBER OF

HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORK BEFORE ANY MEMBER WILL BE

ALLOWED TO PERFORM WORK ON VA PREMISES.

F. ABSOLUTELY NO VA TOOLS, MATERIALS OR EQUIPMENT WILL BE LOANED OR GIVEN BY THE VA

TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCE AT ANY TIME.

G. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE,

DUST AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM DURING

CONSTRUCTION. ALL SUCH ACTION MUST BE FIRST COORDINATED AN CLEARED WITH THE COR

AND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM DEVICES SHALL BE ACTIVE

WHENEVER THE CONTRACTOR'S FORCES ARE NOT PRESENT IN THE WORK AREA.

H. THE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY

WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND

FOUND TO BE SECURE, SAFE AND FREE OF ANY FLAMMABLE LIQUIDS.

I. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER.

J. SEE SPECIFICATIONS SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES.

K. ALL FINISH COLORS TO BE SELECTED BY COR/ VA INTERIOR DESIGNER WHERE NOT

OTHERWISE INDICATED. CONTRACTOR SHALL SUBMIT COLORS FROM THE MANUFACTURER'S

FULL RANGE OF COLORS.

L. THE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENT WITHOUT

AUTHORIZATION FROM VAMC ENGINEERING SERVICE UNLESS AN EMERGENCY SITUATION

OCCURS.

M. CONTRACTOR SHALL MAINTAIN ALL FIRE-RATED ASSEMBLIES WITHIN THE PROJECT AREA

DURING PERFORMANCE OF THE WORK.

N. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL REQUIRED EXIT LIGHTING AND SIGNAGE

REQUIRED FOR EGRESS WITHIN AND ADJACENT TO THE PROJECT AREA DURING

PERFORMANCE OF THE WORK.

O. INDICATED EXISTING CONDITIONS ARE BASED UPON LIMITED FIELD INVESTIGATION AND DID

NOT INCLUDE DESTRUCTIVE INVESTIGATION OR TESTING. CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS INCLUDING DIMENSIONS OF THE INSTALLED CONSTRUCTION PRIOR TO

COMMENCING WITH THE WORK. IF DISCREPANCIES ARE DISCOVERED, THE CONTRACTOR

SHALL NOTIFY THE COR FOR INTERPRETATION AND DIRECTION PRIOR TO PROCEEDING WITH

THE WORK.

A ACCESSORY TYPE

UL DETAIL W-L-2038

ANY UL ASSEMBLY MEETING CRITERIA MAY BE UTILIZED. ASSEMBLIES

INDICATED ON THIS SHEET ARE FOR INFORMATION ONLY.

WALL

FLOOR

AND

WALL

FLOOR

AND

WALL

UL DETAIL C-AJ-1254

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

SJ KB

558-23-155

05-16-2025REVISIONS:

A

B

C

D

E

F

GENERATOR EXHAUST MODIFICATION

DURHAM, NORTH CAROLINA

LEGENDS, ABBREVIATIONS AND NOTES

GI002

AE201

AE201

TYP

MAXIMUM

12' - 0"

CURB RAIL TO

BE 19" ABOVE

ROOF SURFACE

CURB RAIL TO

BE 6" ABOVE

ROOF SURFACE

CURB RAIL TO

BE 19" ABOVE

ROOF SURFACE

CURB RAIL TO

BE 6" ABOVE

ROOF SURFACE

1235.66.77.7

26' - 0"26' - 0"26' - 0"26' - 0"

8.89.8

26' - 0"26' - 0"

11.3

26' - 0"

7.6814.3

13' - 0 1/2"

M

N

K.9

K

/2

K.8

1/

2"

J

K.6

O

5'

1"

4' - 0"20' - 0"

26' - 0" 1' - 5"

4'

1/

2"

5 TYP

5' -6

TYP

4' -1

0" 4'

-1 0"

5' -6

ROOF PLAN GENERAL NOTES

A. PROVIDE PREFABRICATED DUCT SUPPORTS AND ANCORAGE IN ACCORANCE

WITH ASCE 7-16.

B. REPAIR ROOF SYSTEM PER MANUFACTURER'S RECOMMENDED INSTALLATION

REQURIEMENTS WHERE IMPACTED BY THE WORK.

C. CONFIRM DUCT ROUTING WITH VA COR PRIOR TO PROCEDING WITH THE WORK.

PROVIDE PREFABRICATED DUCT SUPPORTS AS INDICATED PER SMACMA SPACING

REQUIREMENTS. SEE DETAIL 4/AE101. SEE OTHER DISCIPLINES' DRAWINGS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

REMOVE EXISITNG FALL PROTECTION RAIL TO ALLOW DUCT ROUTE TO TRANSITION

HORIZONTALLY OVER THE EXISITNG ROOF PARAPET. PROVIDE A SHORTER

LENGTH FALL PROTECTION RAIL WITH NEW BASE. MATCH EXISTING RAIL SYSTEM.

REMOVE AND PATCH EXISTING ROOF MEMBRANE AS NEEDED TO INSTALL DUCT

SUPPORTS. SEE DETAIL 4/AE101. SEE OTHER DISCIPLINES' DRAWINGS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS. ATTACHMENT OF EXHAUST DUCT

TO SUPPORT SHALL BE BY THE CONTRACTOR.

ALIGN MECHANICAL EQUIPMENT ON CENTER OF COLUMN GRIDLINES, BOTH

DIRECTIONS.

PROVIDE PREFABRICATED EQUIPMENT CURB RAILS. VERIFY AND COORDINATE

HEIGHT AND LENGTH INDICATED WITH PURCHASED EQUIPMENT. SEE DETAIL

3/AE101.SEE OTHER DISCIPLINES' DRAWINGS FOR ADDITIONAL INFORMATION AND

REQUIREMENTS.

ROOF PLAN KEY NOTES

LINE OF

SOFFIT

ABOVEAE201

AE201

11.314.3

M

N

O

EXISTING COMPOSITE ROOF DECK

NOTE:

REPAIR EXISTING MOD. BIT. ROOF SYSTEM AS REQUIRED TO INSTALL DUCT SUPPORTS PER MANUFACTURER'S INSTALLATION REQUIREMENTS TO MAINTAIN A FULLY WARANTED INSTALLATION. CONTRACTOR'S CURB MANUFACTURER SHALL DESIGN ALL ANCHORAGE TO THE EXISTING CONCRETE ROOF DECK TO RESIST THE

FOLLOWING SERVICE LOADS:

1. SELF WEIGHT OF EQUIPMENT.

2. HORIZONTAL SHEAR = 600 PLF

3. UPLIFT = 40 PLF

PREFABRICATED DUCT SUPPORT

BASE ANCHORS INTO ROOF SLAB

BASE SUPPORT

EXISTING MOD BIT ROOF, PEEL BACK FROM CUT

OPENING AND PROTECT FOR REINSTALLATION, TYP.

REMOVE AND REINSTALL AS REQUIRED TO ANCHOR

DUCT SUPPORT

CONT EDGE

SEALANT POINTS

CANT STRIP

RIGID INSULATION

CONT SEALANT

STAINLESS STEEL CLAMPING RING

COVERBOARD

TURN MEMBRANE UP AT CURB. ATTACH PER

MANUFACTURER'S RECOMMENDATION

AS REQUIRED

NOTE:

PATCH AND REPAIR EXISTING MOD. BIT. ROOF SYSTEM AS REQUIRED TO INSTALL CURB RAIL PER MANUFACTURER'S INSTALLATION REQUIREMENTS TO MAINTAIN A FULLY WARANTED INSTALLATION. CONTRACTOR'S CURB MANUFACTURER SHALL DESIGN ALL ANCHORAGE TO THE EXISTING CONCRETE ROOF DECK TO RESIST THE FOLLOWING SERVICE LOADS:

1. SELF WEIGHT OF EQUIPMENT.

2. HORIZONTAL SHEAR = 600 PLF

3. UPLIFT = 40 PLF

PREFABRICATED CURB RAIL SUPPORT. COORDINATE

LOCATION AND LENGTH WITH PURCHASED EQUIPMENT

2x WOOD NAILERS ANCHORED TO DECK

EXISTING MOD BIT ROOF. X-CUT, PEEL BACK FROM CUT

OPENING AND PROTECT FOR REINSTALLATION, TYP. REMOVE

AND REINSTALL AS REQUIRED TO ANCHOR EQUIPMENT

SUPPORT

TURN MEMBRANE UP AT CURB. ATTACH PER

MANUFACTURER'S RECOMMENDATION

FASTENER

PREFINISHED METAL CAP WITH FLASHING ON METAL

CLEAT

MECHANICAL EQUIPMENT. ATTACHMENT OF EQUIPMIENT

CURB SHALL BE B Y THE EQUIPMENT MANUFACTURER.

EXISTING COMPOSITE ROOF DECK

S E

E P

LA

N

CONT EDGE SEALANT POINTS

CANT STRIP

RIGID INSULATION

COVERBOARD

PREFINISHED METAL

FLASHING ON METAL CLEAT.

LIQUID FLASHING

BASE ANCHORS

INTO ROOF SLAB

CONT. SEALANT

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

SJ KB

558-23-155

05-16-2025REVISIONS:

A

B

C

D

E

F

GENERATOR EXHAUST MODIFICATION

DURHAM, NORTH CAROLINA

PARTIAL GROUND FLOOR PLAN, ROOF PLAN

AND DETAILS

AE101

TRUE

NORTH

PLAN

NORTH

0' 4' 8' 16' 24'

SCALE: 1/8" = 1' - 0"

1/8" = 1'-0"AE101

1 PARTIAL ROOF PLAN

1/8" = 1'-0"AE101

2 PARTIAL GROUND FLOOR PLAN

1 1/2" = 1'-0"AE101

4 TYPICAL DUCT SUPPORT DETAIL

1 1/2" = 1'-0"AE101

3 EQUIPMENT CURB DETAIL

GROUND LEVEL

LEVEL 1

LEVEL 2

LEVEL 3

LEVEL 4

LEVEL 5

FV11

'-6

FV11

'-6

FV11

'-6

FV12

'-8

FV12

'-0

A

LC

O V

E O

P E

N

IN

G EXISTING ELECTRICAL PULL BOX

AND CONDUITS TO REMAIN, TYP

FV

3'-2 1/2"

AE201

TYP ALL

LOCATIONS

11.314.3

GARAGE LEVEL

T.O. CONCRETE

SLAB

FV2'

2"

FV

1'

6'

8" M

IN2

3 GROUND LEVEL

LEVEL 1

LEVEL 2

LEVEL 3

LEVEL 4

LEVEL 5

TYP ALL

LOCATIONS

NO

GARAGE LEVEL

T.O. CONCRETE

SLAB

2" MIN

EXISTING UTILITY

BOXES TO REMAIN, TYP

EXISTING CONDUITS

TO REMAIN, TYP

6" M

IN

2'-0"

2' -0

1/

2"

6"

DUCT SEE

MECHANICAL

HSS3x3x1/4 TYP ALL

MEMBERS

EXISTING BRICK. REMOVE AS REQUIRED

TO INSTALL STEEL FRAMING.

EXISTING CONCRETE

BEAM

1/2"x9"x9" PLATE WITH (4) 1/2" DIA x 2 1/2"

EMBED HILT KWIK BOLT TZ2 ANCHORS TYP

1/

2"

FJP TYP

3/16

TYP

3/16

TYP

3/16

TYP

DUCT SEE

MECHANICAL

HSS3x3x1/4 TYP ALL

MEMBERS

1/2"x9"x9" PLATE WITH (4) 1/2" DIA x 2 1/2"

EMBED HILT KWIK BOLT TZ2 ANCHORS TYP

EXISTING BRICK. REMOVE AS REQUIRED

TO INSTALL STEEL FRAMING

EXISTING CONCRETE

BEAM

7" 6"

1/

2"

TYPICAL PLAN VIEW AT DUCT SUPPORT

A-A A-A

SECTION A-A

NOTE: ALL STEEL SHALL BE HOT

DIPPED GALVANIZED

NOTES:

1. ALL STEEL SHALL BE HOT DIPPED GALVANIZED.

2. DO NOT DAMAGE EXISTING CONCRETE BEAM REBAR DURING ANCHOR INSTALLATION. LOCATE EXISTING

REINFORCING THOROUGH NON-DESTRUCTIVE MEANS PRIOR TO SUBMISSION OF SHOP DRAWINGS FOR REVIEW.

SEALANT AS REQUIRED AT

TUBE STEEL LOCATIONS

1' - 0"

3/16

TYP

L3x3x14 GA RADIUSED ANGLE. CONNECT TO DUCT

WITH #10 SDS AT 6" O.C. PROVIDE DIALECTIC

SEPARATION BETWEEN DUCT AND ANGLE.

L3x3x14 GA RADIUSED ANGLE. CONNECT TO DUCT

WITH #10 SDS AT 6" O.C. PROVIDE DIALECTIC

SEPARATION BETWEEN DUCT AND ANGLE.

4TH FLOOR

3RD FLOOR

2ND FLOOR

FI

E

LD

V

E R

IF

Y

'-6

FI

E

LD

V E

R

IF

Y

'-6

FI

E

LD

V

E R

IF

Y

'-6

TYPICAL DUCT

SUPPORT FRAME

EXISTING BRICK.

REMOVE AS

REQUIRED TO INSTALL

STEEL FRAMING

EXISTING CONCRETE

BEAM, TYP

DUCT SEE

MECHANICAL

NOTE: ALL STEEL

SHALL BE HOT DIPPED

GALVANIZED

OFFSET DUCT TO

BIPASS EXISTING

ELECTRICAL CONDUT

1ST FLOOR

AE201

AE201

5 TYP

UNO

EXTERIOR ELEVATION GENERAL NOTES

A. THE EXTERIOR BLACK MASTIC TYPE WATERPROOFING IS PRESUMED ASBESTOS CONTAINING MATERIAL (PACM) PER THE VA DURHAM NC. ACCORDINGLY, CONTRACTOR SHALL PERFORM ANCHOR INSTALLATION UNDER THE PRESUMPTION THAT ASBESTOS IS PRESENT AND PERFORM WORK AS AN OSHA CLASS III PROJECT, WHICH MEANS, REPAIR AND MAINTENANCE OPERATIONS, WHERE “ACM”, INCLUDING THERMAL SYSTEM INSULATION AND SURFACING ACM AND PACM, IS LIKELY TO BE DISTURBED. THE INTENT OF THIS PROJECT IS TO INSTALL NEW DUCT AND NOT THE ABATEMENT OF ASBESTOS. THE CONTRACTOR SHALL PERFORM INSTALLATION WORK IN ACCORDANCE WITH 29 CFR 1926.1101 (G)(9) METHODS OF COMPLIANCE FOR CLASS III ASBESTOS WORK. THE CONTRACTOR MAY REBUT THE PACM DESIGNATION BY THE VA, BY FOLLOWING 29 CFR 1926.1101 (K)(5) CRITERIA TO REBUT THE DESIGNATION OF INSTALLED MATERIAL AS PACM.

REMOVE AND SALVAGE EXISTING BRICK VENEER TO THE EXTENT REQUIRED FOR ANCHOR INSTALLATION OF STRUCTURAL STEEL DUCT SUPPORT SYSTEM. REINSTALL EXISTING SALVAGED BRICK AND MATCH EXISTING MORTOR. TOOTH-IN EXISTING SALVAGED BRICK WHERE POSSIBLE. PROVIDE BRICK TO MATCH EXISTING COLOR, TEXTURE AND SIZE WHERE

SALVAGED BRICK IS DAMAGED.

PROVIDE DUCT SUPPORT FRAME. SEE DETAIL 6/AE201 FOR ADDITIONAL INFORMATION.

PROVIDE DUCT SUPPORT FRAME. SEE DETAIL 7/AE201 FOR ADDITIONAL INFORMATION.

EXTERIOR ELEVATION KEY NOTES

1'-6"

2' -0

1/

2"

6"

DUCT SEE

MECHANICAL

HSS3x3x1/4 TYP

ALL MEMBERS

EXISTING BRICK. REMOVE AS REQUIRED

TO INSTALL STEEL FRAMING.

EXISTING CONCRETE

BEAM

1/2"x9"x9" PLATE WITH (4) 1/2" DIA x 2 1/2"

EMBED HILT KWIK BOLT TZ2 ANCHORS TYP

1/

2"

FJP TYP

3/16

TYP

3/16

TYP

3/16

TYP

DUCT SEE

MECHANICAL

HSS3x3x1/4 TYP ALL

MEMBERS

1/2"x9"x9" PLATE WITH (4) 1/2" DIA x 2 1/2"

EMBED HILT KWIK BOLT TZ2 ANCHORS TYP

EXISTING BRICK. REMOVE AS REQUIRED

TO INSTALL STEEL FRAMING.

EXISTING CONCRETE

BEAM

7" 6"

1/

2"

LEVEL 1 DUCT SUPPORT

A-A A-A

SECTION A-A

NOTE: ALL STEEL SHALL BE HOT

DIPPED GALVANIZED

FV

1'-3"

SEALANT AS REQUIRED AT

TUBE STEEL LOCATIONS

NOTES:

1. ALL STEEL SHALL BE HOT DIPPED GALVANIZED.

2. DO NOT DAMAGE EXISTING CONCRETE BEAM REBAR DURING ANCHOR INSTALLATION. LOCATE EXISTING

REINFORCING THOROUGH NON-DESTRUCTIVE MEANS PRIOR TO SUBMISSION OF SHOP DRAWINGS FOR REVIEW.

L3x3x14 GA RADIUSED ANGLE. CONNECT TO DUCT

WITH #10 SDS AT 6" O.C. PROVIDE DIALECTIC

SEPARATION BETWEEN DUCT AND ANGLE.

3/16

TYP

DUCT, SEE

MECHANICAL

2'-0"

3/16

TYP

3/16

TYP

3/16

1/2"x9"x0'-9" PLATE W/ (4) 1/2"x2 3/4" EMBED HILTI

KWIK BOLT TZ2 ANCHORS.

EXISTING SLAB

NOTES:

1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND

DIMENSIONS PRIOR TO SUBMISSION OF SHOP DRAWINGS

2. DUCT ATTACHMENT TO FRAME BY CONTRACTOR

3. ALL EXTERIOR EXPOSED STEEL TO BE HOT DIPPED GALVANIZED

4. PROVIDE DIALECTIC SEPARATION BETWEEN DUCT AND ANGLE.

V A

R

IE

S 8'

-6 "M

A X

1'

-6

1/4" CAP PLATE TYP

1/8

TYP

HSS3x3x1/4

H S

S 3x

3x 1/

H S

S 3x

3x 1/

DUCT, SEE

MECHANICAL

1/2"x9"x0'-9" PLATE W/ (4) 1/2"x2 3/4" EMBED HILTI

KWIK BOLT TZ2 ANCHORS.

EXISTING SLAB

NOTES:

1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND

DIMENSIONS PRIOR TO SUBMISSION OF SHOP DRAWINGS

2. DUCT ATTACHMENT TO FRAME BY CONTRACTOR

3. ALL EXTERIOR EXPOSED STEEL TO BE HOT DIPPED GALVANIZED

4. PROVIDE DIALECTIC SEPARATION BETWEEN DUCT AND ANGLE.

V A

R

IE

S 8'

-6 "M

A X

1'

-6

1/4" CAP PLATE, TYP

1/8

TYP

HSS3x3x1/4

H S

S 3x

3x 1/

H S

S 3x

3x 1/

FJP TYP

8 1/2" 1'-5"

3/16

3/16

TYP

3/16

TYP

3/16

2'-0"

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

SJ KB

558-23-155

05-16-2025REVISIONS:

A

B

C

D

E

F

GENERATOR EXHAUST MODIFICATION

DURHAM, NORTH CAROLINA

PARTIAL EXTERIOR ELEVATIONS AND DETAILS

AE201

0' 4' 8' 16' 24'

SCALE: 1/8" = 1' - 0"

1/8" = 1'-0"AE201

2 PARTIAL WEST EXTERIOR ELEVATION

1/8" = 1'-0"AE201

1 PARTIAL SOUTH EXTERIOR ELEVATION

1 1/2" = 1'-0"AE201

5 TYPICAL DUCT FRAME SUPPORT DETAIL

1/4" = 1'-0"AE201

3 DUCT SUPPORT SECTION ELEVATION

0' 2' 4' 8' 12'

SCALE: 1/4" = 1' - 0"

0' 4" 8" 1' - 4" 2'

SCALE: 1-1/2" = 1' - 0"

1 1/2" = 1'-0"AE201

4 LEVEL 1 DUCT FRAME SUPPORT DETAIL

3/4" = 1'-0"AE201

7 LEVEL 1 DUCT SUPPORT FRAME ELEVATION DETAIL 1

3/4" = 1'-0"AE201

6 LEVEL 1 DUCT SUPPORT FRAME ELEVATION DETAIL 2

PIPING SYMBOLS AND ABBREVIATIONSHVAC SYMBOLS AND ABBREVIATIONS

EXISTING DUCT TAG

OVAL DUCT SIZE TAG (WIDTH / HEIGHT)

SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)

ROUND DUCT SIZE TAG (DIAMETER)

DUCT BEING DEMOLISHED

RECTANGULAR SUPPLY/OUTSIDE AIR

DUCT RISE

RECTANGULAR RETURN/TRANSFER AIR

DUCT RISE

ROUND SUPPLY/OUTSIDE AIR DUCT RISE

ROUND RETURN/TRANSFER AIR DUCT RISE

RECTANGULAR EXHAUST/RELIEF AIR

DUCT RISE

DROP

DROP

DROP

DROP

DROP

DROP ROUND EXHAUST/RELIEF AIR DUCT RISE

CONTINUATION SYMBOL

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET

REVISION NUMBER - SHOWN ON PLANS

GENERAL MECHANICAL SYMBOLS

ROOM NAME AND NUMBER

CONNECT NEW TO EXISTING

EXISTING PIPE TAG

AREA NOT IN CONTRACT

PIPING BEING DEMOLISHED

PIPE SIZE TAG (DIAMETER)

LIMIT OF DEMOLITION

NEW WORK NOTES

DEMOLISHED WORK NOTES

ACCESS DOOR ON TOP OF DUCT

ACCESS DOOR ON SIDE OF DUCT

ACCESS DOOR ON BOTTOM OF DUCT

SHEET NOMENCLATURE

M P # # #

SERIES

0 - SYMBOLS AND NOTES

1 - PLAN VIEWS

3 - ELEVATIONS AND SECTIONS

4 - LARGE SCALE - PLANS AND SECTIONS

5 - SCHEMATICS AND DETAILS

6 - SCHEDULES

8 - CONTROLS

EQUIPMENT

TAG

EQUIPMENT TAG

SYMBOL

TYPE (SEE SCHEDULE)

CFM

ACTIVE SLOT LENGTH

(PLENUM LENGTH)

GRILLES, REGISTERS & DIFFUSERS TAG

DAMPER TAGS AND ABBREVIATIONS

PROJECT ABBREVIATIONS

DATA DEVICE TAGS AND ABBREVIATIONS

MECHANICAL EQUIPMENT TAGS

CONDENSER WATER SUPPLY (FROM TOWER)

CONDENSER WATER RETURN (TO TOWER)

HOT WATER HEATING SUPPLY

HOT WATER HEATING RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

LOW PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

PUMPED CONDENSATE DISCHARGE

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

GLYCOL-WATER HEATING SUPPLY

GLYCOL-WATER HEATING RETURN

STEAM VENT PIPE

REFRIGERANT SUCTION AND REFRIGERANT LIQUID

CHILLED WATER SUPPLY

CHILLED WATER RETURN

MAKE-UP WATER

DRAIN PIPING

CONDENSATE DRAIN

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

CONDENSATE TRANSFER PUMP DISCHARGE

CONDENSATE TRANSFER PUMP SUCTION

CONTINUOUS BLOWDOWN

BOILER WATER SAMPLE

BOILER BLOWOFF

FEEDWATER SAMPLE (FROM DEAERATOR)

OVERFLOW

COMPRESSED AIR

NATURAL GAS MAIN FUEL

NATURAL GAS IGNITER FUEL

FUEL OIL SUPPLY

FUEL OIL RETURN

SOFTENED WATER

SUPPLY

DIFFUSER

NECK SIZE

CFM

RETURN

GRILLE

EXHAUST

GRILLE

DOMESTIC COLD WATER

DOMESTIC HOT WATER

* NOTE *

ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL

OTHER DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS

SHOWN ON THIS SHEET MAY OR MAY NOT BE USED IN THIS SET OF

DRAWINGS.

DESCRIPTION DESCRIPTION

LPS

LPR

MPS

MPR

HPS

HPR

PCD

SV

HWS

GHS

HWR

GHR

RS/RL

CWS

CWR

CHS

CHR

MW

D

CD

FWPD

FWPS

CTPD

CTPS

BO

CBD

BWS

FWS

OFL

A

G

G(I)

FOS

FOR

SW

DCW

DHW

(E) 2"

(E) 2"

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

NITROGEN DIOXIDE SENSOR

HUMIDITY SENSOR

HUMIDISTAT

TEMPERATURE & HUMIDITY

SENSOR

DISPLAY

THERMOSTAT

SENSOR

PRESSURE SENSOR

RTU-XX

TU-XX

(E)RTU-XX

(E)TU-XX

VAV BOX

48"x2 1/2"

(E)LINEAR BAR

GRILLE

6"Ø A

8"Ø

B

6"x6" C

Room

22"x8"

22"/8"

22"Ø

(E)22"Ø

FD

SD

AVD

MVD

BDD

FSD

MANUAL VOLUME

DAMPER

BACKDRAFT DAMPER

COMBINATION

FIRE/SMOKE

DAMPER

FIRE DAMPER

SMOKE DAMPER

AUTOMATIC VOLUME

DAMPER

AD

TH

S

DIS

T

H

CO2

CO

HS

NO2

PS

IRH INFRARED HEATER

IU INDUCTION UNIT

JB JUNCTION BOX

JL JUSTIFIED LEFT

JR JUSTIFIED RIGHT

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

LOOP LOCK ONLY OPEN POSITION

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND

(OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOCP MINIMUM OVERCURRENT PROTECTION

MOV MOTOR OPERATED VALVE

MTD MEAN TEMPERATURE DIFFERENCE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NO NORMALLY OPEN

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD

AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD

REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OD OUTSIDE DIAMETER

P PUMP

Pa PASCAL

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE)

STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PTAC PACKAGED TERMINAL AIR

CONDITIONER

QNTY QUANTITY

RA RETURN AIR

RAF RETURN AIR FAN

RAT RETURN AIR TEMPERATURE

RD REFRIGERANT DISCHARGE

REA RELIEF AIR

RF RETURN FAN

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RS/RL REFRIGERANT SUCTION AND

REFRIGERANT LIQUID

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

SEA SMOKE EXHAUST AIR

SEN SENSIBLE HEAT

SF SUPPLY FAN

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SS STAINLESS STEEL

SSR SOLID SEPARATOR

ST STEAM TRAP

TAB TESTING, ADJUSTING, BALANCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UC UNDER CUT

UH UNIT HEATER

V VENT

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VP VACUUM PUMP

VR VACUUM (STEAM CONDENSATE)

RETURN

W WATTS

Wb WET-BULB (TEMPERATURE)

WFMS WATER FLOW MEASURING STATION

WG WATER GAGE

WPD WATER PRESSURE DROP

YR YEAR

EJ EXPANSION JOINT

ENT ENTERING

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FA FREE AREA

FCU FAN COIL UNIT

FD FLOOR DRAIN

FF FINAL FILTER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FLAT ON TOP

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPU FAN POWERED TERMINAL UNIT

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFIER

HB HOSE BIBB

HC HEATING COIL

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HRC HEAT RECOVERY COIL

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HVU HEATING AND VENTILATING UNIT

HWC HOT WATER COIL

HWP HEATING HOT WATER PUMP

HTX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

A/E ARCHITECT / ENGINEER

AAV AUTOMATIC AIR VENT

ACD AUTOMATIC CONTROL DAMPER

AD ACCESS DOOR

AF AFTER FILTER

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AHU AIR-HANDLING UNIT

AMP AMPERE

APD AIR PRESSURE DROP

AS AIR SEPARATOR

B BOILER

BAS BUILDING AUTOMATION SYSTEM

BBR BASE BOARD RADIATOR

BE BOTTOM ELEVATION

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

CV CONSTANT AIR VOLUME

CC COOLING COIL

CD COOLING COIL CONDENSATE DRAIN

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CH CHILLER

CHP CHILLED WATER PUMP

CHS/R CHILLER WATER

CL CENTER LINE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

COR CONTRACTING OFFICER

REPRESENTATIVE

CP CONDENSATE PUMP

CST CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CWP CONDENSER WATER PUMP

DDC DIRECT DIGITAL CONTROLS

DIA DIAMETER

DI DEIONIZED WATER

DP DEW POINT TEMPERATURE

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

ES EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

NECK SIZE

CFM

NECK SIZE

CFM

(S) STEAM

(H) HVAC

(P) PIPING

(D) DEMO

MECHANICAL

SERIES

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

RBS CC

558-23-155

05-16-2025REVISIONS:

A

B

C

D

E

F

GENERATOR EXHAUST MODIFICATION

DURHAM, NORTH CAROLINA

MECHANICAL LEGEND, ABBREVIATIONS, AND

MECHANICAL NOTES

M001

MECHANICAL SHEET INDEX

SHEET

NUMBER SHEET TITLE

M001 MECHANICAL LEGEND, ABBREVIATIONS, AND MECHANICAL NOTES

M101 PARTIAL FOURTH FLOOR MECHANICAL PLAN - NEW WORK

M102 PARTIAL MECHANICAL SECTION - NEW WORK

M800 VA STATION CONTROL NOTES, LEGEND, CONTROL SCHEMATIC, SEQUENCE OF CONTROL,

AND CONTROL POINT

A. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS,

BOTH EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS, AS

WELL AS THOSE WHICH CAN BE REASONABLY ANTICIPATED

INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,

PLUMBING, FIRE PROTECTION, AND OTHER SYSTEMS INVOLVED ON

THIS PROJECT.

B. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM

AND SHALL CONFORM TO ALL CURRENT REQUIREMENTS FOUND IN

THE UNITED STATES DEPARTMENT OF VETERANS AFFAIRS TECHNICAL

INFORMATION LIBRARY, INCLUDING BUT NOT LIMITED TO THE

PHYSICAL SECURITY MANUAL, HVAC DESIGN MANUAL, AND STEAM,

HEATING HOT WATER, AND OUTSIDE DISTRIBUTION SYSTEM DESIGN

MANUAL. ALL WORK SHALL ALSO CONFORM TO ALL FEDERAL, STATE,

AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO THE

INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL

CODE.

C. INSTALL ALL EQUIPMENT AND DEVICES IN ACCORDANCE WITH THEIR

RESPECTIVE MANUFACTURER’S INSTALLATION INSTRUCTIONS AT A

LEVEL OF QUALITY AND WORKMANSHIP CONSISTENT WITH THESE

DOCUMENTS. ANY DEVIATIONS BETWEEN THE INSTALLATION

INSTRUCTIONS AND THESE DOCUMENTS WILL BE BROUGHT TO THE

ATTENTION TO THE COR BEFORE ANY COURSE OF ACTION BY THE

CONTRACTOR IS INITIATED, INCLUDING PURCHASE OF EQUIPMENT.

D. CONTRACTOR SHALL COORDINATE ALL WORK DESCRIBED AND

ILLUSTRATED IN THESE DRAWINGS. LOCATIONS OF PIPING,

DUCTWORK AND EQUIPMENT AS INDICATED ON THESE DRAWINGS

ARE APPROXIMATE AND SUBJECT TO ADJUSTMENTS IN THE FIELD.

OFFSET DUCTS, PIPING, AND SHIFT EQUIPMENT AS REQUIRED TO

AVOID INTERFERENCE AND CONFLICTS IN THE FIELD. COORDINATE

DUCT AND PIPE ROUTING AND EQUIPMENT LOCATIONS WITH

PLUMBING AND ELECTRICAL INSTALLATIONS AND WITH BUILDING

STRUCTURAL MEMBERS.

E. THESE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE

NOT TO BE SCALED. BEFORE BEGINNING WORK, THE CONTRACTOR

SHALL VISIT THE SITE AND COMPLETE MEASURED SURVEY AND

CREATE LAYOUT DRAWINGS AS REQUIRED BY THE

SPECIFICATIONS. WORK SHALL NOT BEGIN UNTIL ALL LAYOUT

DRAWINGS ARE APPROVED BY THE COR.

F. DUCT SIZES INDICATED ARE MINIMUM CLEAR INSIDE DIMENSIONS.

WHERE DUCT LINER OCCURS, INCREASE SHEET METAL DUCT SIZES

TO ACCOMMODATE LINER.

G. DUCT AND PIPE SUPPORTS ARE NOT SHOWN ON DRAWINGS.

H. SUPPORT ALL DUCTS, PIPING, AND EQUIPMENT FROM PRIMARY

BUILDING STRUCTURAL MEMBERS. PROVIDE ADDITIONAL

STRUCTURAL MEMBERS WHERE NECESSARY TO ACCOMPLISH THIS

REQUIREMENT.

I. NEW AND EXISTING SUPPORT, RODS, AND ASSOCIATED

APPURTENANCES SHALL NOT RESTRICT EQUIPMENT SERVICE AND

MAINTENANCE ACCESS. EXISTING SUPPORTS SHALL BE MODIFIED TO

PROVIDE FOR EQUIPMENT SERVICE AND MAINTENANCE ACCESS.

J. DUCT SUPPORTS SHALL BE IN STRICT ACCORDANCE WITH SMACNA

HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE -

SECOND EDITION EXCEPT THAT HANGER WIRE SHALL NOT BE USED

TO SUPPORT DUCTS OR EQUIPMENT, AND HANGERS THAT REQUIRE

PENETRATION OF DUCT WITH BOLTS, RIVETS, SCREWS, WIRES OR

ANY OTHER FASTENER SHALL NOT BE USED.

K. CONTRACTOR SHALL REWORK EXISTING HANGERS AND OTHER

SUPPORT FOR DUCT AND PIPING TO COORDINATE WITH NEW

EQUIPMENT AND WALL LOCATIONS. ADD SUPPORT (TRAPEZE, CLEVIS,

ETC) AT EQUIPMENT AND ON EACH SIDE OF NEW WALLS SO FULL

WEIGHT OF DUCT AND PIPING IS SUPPORTED FROM STRUCTURE AND

EQUIPMENT AND NEW WALLS BEAR NO WEIGHT.

L. CONTRACTOR SHALL PROVIDE A LIST OF ALL MECHANICAL

EQUIPMENT, DEVICES, AND ALL APPURTENANCES REQUIRING POWER

TO THE COR FOR REVIEW AND APPROVAL AS PART OF COORDINATION

FOR THIS PROJECT. LIST ALL ELECTRICAL REQUIREMENT

CHARACTERISTICS, INCLUDING BUT NOT LIMITED TO VOLTAGE,

AMPERAGE, PHASE, DISCONNECTING MEANS, OVER CURRENT

PROTECTION AND ALL CHARACTERISTICS FOR A FULLY FUNCTIONAL

AND COORDINATED SYSTEM. REFER TO ELECTRICAL DRAWINGS FOR

VOLTAGE REQUIREMENTS OF ALL EQUIPMENT.

M. CONTROL DEVICES ASSOCIATED WITH THE WORK OF THIS PROJECT

SHALL BE RELOCATED AS NECESSARY SO THAT THE FINAL PRODUCT

RESULTS IN A FULLY FUNCTIONAL AND FULLY ACCESSIBLE SYSTEM.

CONTRACTOR SHALL RELOCATE ALL EXISTING CONTROLS, SENSORS,

PROBES, OR OTHER DEVICES AND PROVIDE NEW WIRING, CONDUIT,

AND/OR TUBING TO EXTEND SUCH DEVICES AS NECESSARY TO

PRODUCE A FULLY FUNCTIONAL SYSTEM EQUAL OR BETTER THAN

EXISTING. PROTECT AND STORE ALL SUCH RELOCATED DEVICES.

N. CONTRACT SHALL COORDINATE OUTAGE REQUIREMENTS WITH THE

COR AT LEAST FOUR (4) WEEKS IN ADVANCE OF SHUTDOWN OF

GENERATORS.

O. CONTRACTOR SHALL HIRE A COMMISSIONING AGENT TO

COMMISSION ALL EQUIPMENT INSTALLED FOR THIS PROJECT.

GENERAL MECHANICAL NOTES

A. CONTRACTOR SHALL PHASE ALL WORK AS REQUIRED TO MAINTAIN

CONTINUOUS OPERATION OF THE HOSPITAL.

B. HOSPITAL OPERATIONS SHALL NOT BE INTERRUPTED DUE TO THE

WORK OF THIS PROJECT EXCEPT FOR SCHEDULED SHUTDOWNS OF

NO LONGER THAN ONE HOUR. CONTRACTOR SHALL GIVE

REASONABLE NOTICE TO COR BEFORE ANY SUCH SHUTDOWN OR

INTERRUPTION.

C. WHERE LONGER SHUTDOWNS ARE REQUIRED TO COMPLETE THE

WORK DESCRIBED IN THIS DOCUMENT, THE CONTRACTOR SHALL

SCHEDULE THE EVENT A MINIMUM OF 4 WEEKS PRIOR TO

COMMENCING WORK. ALL SUCH SHUTDOWNS AND INTERRUPTIONS

SHALL BE MINIMIZED AND SHALL UTILIZE WEEKENDS, FEDERAL

HOLIDAYS, NIGHTS, AND OTHER TIMES WHEN HOSPITAL OPERATIONS

ARE MINIMIZED AND OTHER SUCH TIMES AGREEABLE TO THE COR.

D. WHERE NECESSARY TO INTERRUPT CONTINUOUS OPERATION OF THE

HOSPITAL, THE CONTRACTOR SHALL DIVIDE WORK INTO PHASED

CONSTRUCTION THAT IS NOT NECESSARILY SHOWN ON THESE

DOCUMENTS. AS PART OF SCHEDULING AN INTERRUPTION OR

SHUTDOWN, THE CONTRACTOR SHALL PROVIDE THE COR WITH A

DETAILED SHUTDOWN PLAN INDICATING THE SYSTEMS AFFECTED,

INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL,

MECHANICAL, PLUMBING, FIRE PROTECTION, AND OTHER SYSTEMS

INVOLVED. THE PLAN SHALL INCLUDE THE WORK TO BE PERFORMED,

THE LENGTH OF INTERRUPTION, AND A DETAILED PHASING AND

MANNING DESCRIPTION. THE PLAN SHALL INCLUDE AND ADDRESS

CONTINGENCY FOR MITIGATING ANY DELAYS THAT MAY OCCUR IN THE

PLANNED WORK. PROVIDE THIS PLAN TO THE COR 5 WEEKS BEFORE

THE EVENT FOR APPROVAL.

E. CONTROL OF ALL CONSTRUCTION-ASSOCIATED HAZARDS THAT

AFFECT FACILITIES, OCCUPANTS OR SERVICES SHALL BE ADDRESSED

BY THE CONTRACTOR AS PART OF THE PRE-CONSTRUCTION RISK

ASSESSMENT. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE

FACILITY SAFETY MANAGER/OFFICER. CONTRACTOR SHALL FURNISH

ALL MATERIALS AND MEANS AND METHODS TO MEET THE

REQUIREMENTS IN SPECIFICATION SECTION 013526 SAFETY

REQUIREMENTS, INCLUDING FILTRATION, MAINTAINING NEGATIVE

PRESSURE IN THE CONSTRUCTION AREA, DUST CONTROL, AND USE OF

A PORTABLE CEILING ACCESS MODULE IN AREAS OUTSIDE THE

CONSTRUCTION AREA. THE CONTRACTOR SHALL SUBMIT PLAN IN

ACCORDANCE WITH THESE DOCUMENTS.

A. DATA LINK COMMUNICATION IS ETHERNET (ISO 8802-3) AND BACNET/IP.

B. GROUND CABLE SHIELDS, DRAIN CONDUCTORS, AND EQUIPMENT TO

ELIMINATE SHOCK HAZARD AND TO MINIMIZE GROUND LOOPS,

COMMON-MODE RETURNS, NOISE PICKUP, CROSS TALK, AND OTHER

IMPAIRMENTS.

C. CABLE CONDUCTORS SHALL PROVIDE PROTECTION AGAINST

INDUCTION IN CIRCUITS. CROSSTALK ATTENUATION WITHIN THE

SYSTEM SHALL BE IN EXCESS OF -80 DB THROUGHOUT ALL

FREQUENCY RANGES USED.

D. CABLE RUNS: KEEP CABLE RUNS AS SHORT AS POSSIBLE. ALLOW

EXTRA LENGTH FOR CONNECTING TO THE TERMINAL BOARD. DO NOT

BEND FLEXIBLE COAXIAL CABLES IN A RADIUS LESS THAN TEN TIMES

THE CABLE OUTSIDE DIAMETER.

E. LABEL SYSTEM’S CABLES ON EACH END. TEST AND CERTIFY CABLES

IN WRITING TO THE VA BEFORE CONDUCTING PROOF-OF-

PERFORMANCE TESTING. MINIMUM CABLE TEST REQUIREMENTS ARE

FOR IMPEDANCE COMPLIANCE, INDUCTANCE, CAPACITANCE, SIGNAL

LEVEL COMPLIANCE, OPENS, SHORTS, CROSS TALK, NOISE, AND

DISTORTION, AND SPLIT PAIRS ON ALL CABLES IN THE FREQUENCY

RANGES USED. MAKE AVAILABLE ALL CABLE INSTALLATION AND TEST

RECORDS AT THE DEMONSTRATION TO THE VA.

F. POWER WIRING SHALL NOT BE RUN IN CONDUIT WITH

COMMUNICATIONS TRUNK WIRING OR SIGNAL OR CONTROL WIRING

OPERATING AT 100 VOLTS OR LESS.

G. PROVIDE NEMA 4 ENCLOSURE FOR EXTERIOR LOCATIONS.

H. PROVIDE BACNET-COMPLIANT ROUTER, BRIDGE, SWITCH, HUB,

MODEM, GATEWAY, INTERFACE, AND SIMILAR COMMUNICATION

EQUIPMENT TO INTEGRATE INTO THE EXISTING SYSTEM.

I. FIT ALL EQUIPMENT CONTAINED IN CABINETS OR PANELS WITH

SERVICE LOOPS, EACH LOOP BEING AT LEAST 300 MM (12 INCHES)

LONG. EQUIPMENT FOR FIBER OPTICS SYSTEM SHALL BE RACK

MOUNTED, AS APPLICABLE, IN VENTILATED, SELF-SUPPORTING, CODE

GAUGE STEEL ENCLOSURE. CABLES SHALL BE SUPPORTED FOR

MINIMUM SAG.

J. OPTICAL DIGITAL COMMUNICATION FIBER, IF USED, SHALL BE

MULTIMODE OR SINGLE MODE FIBER, 50/125 MICRON FOR MULTIMODE

OR 10/125 MICRON FOR SINGLE MODE MICRON WITH SC OR ST

CONNECTORS AS SPECIFIED IN TIA-568-C.1. TERMINATIONS, PATCH

PANELS, AND OTHER HARDWARE SHALL BE COMPATIBLE WITH THE

SPECIFIED FIBER. FIBER-OPTIC CABLE SHALL BE SUITABLE FOR USE

WITH THE 100BASE-FX OR THE 100BASE-SX STANDARD (AS

APPLICABLE) AS DEFINED IN IEEE STD 802.3.

PHASING MECHANICAL NOTES

GENERAL CONTROL ELEMENT REQUIREMENT

A. EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED FROM

THE PROJECT SITE IN ITS ENTIRETY INCLUDING ALL HANGERS,

ELECTRICAL CONDUIT, WIRING, JUNCTION BOXES, PIPING, CONTROLS,

ACCESSORIES AND ALL APPURTENANCES THAT ARE RENDERED

USELESS OR ABANDONED BY THE REMOVAL OF THE INDICATED

EQUIPMENT.

B. WHERE THESE DOCUMENTS REQUIRE REMOVAL OF DUCTWORK,

PIPING, EQUIPMENT OR ASSOCIATED APPURTENANCES, CONTRACTOR

SHALL PROTECT ALL EXISTING-TO-REMAIN COMPONENTS FROM

DAMAGE. CONTRACTOR SHALL COVER ALL OPENINGS IN DUCT,

PIPING, EQUIPMENT, AND ANY OTHER DEVICE FROM CONSTRUCTION

DUST AND DEBRIS.

C. WHERE EQUIPMENT, DUCTWORK, OR PIPING IS TO BE REMOVED THAT

IS IN-SERVICE, CONTRACTOR SHALL GIVE NOTICE TO THE COR OF ANY

INTERRUPTIONS ANTICIPATED. IT IS THE RESPONSIBILITY OF THE

CONTRACTOR TO COORDINATE ALL SHUTDOWNS OR INTERRUPTIONS

TO THE SATISFACTION OF THE COR AND HOSPITAL STAFF.

DEMOLITION MECHANICAL NOTES

¢¢ft 05/16/2025

M101

ROOF

ROOF

ROOF

24"ø E/A

24"ø E/A

EF-02

EF-01

MD-01

MD-02

1235.66.77.78.89.811.3 7.6814.3

M

N

K.9

K

K.8

J

K.6

O

STAINLESS STEEL

STAINLESS STEEL

STAINLESS STEEL

Level G - Exist 0' - 0"

Level 1 - Exist 12' - 0"

Level 2 - Exist 24' - 8"

Level 3- Exist 36' - 2"

Level 4 -Exist 47' - 8"

18"x24" E/A

ELECTRICAL

PULL BOX

4"ø

4"ø 4"ø

4"ø

4"ø 4"ø

2"ø 2"ø 2"ø

2"ø

4"ø

CONDUIT

CONDUIT

CONDUIT

CONDUIT

CONDUIT

1/2"ø D

11.314.3

"ø

E /A

STAINLESS STEEL

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

RBS CC

558-23-155

05-16-2025REVISIONS:

A

B

C

D

E

F

GENERATOR EXHAUST MODIFICATION

DURHAM, NORTH CAROLINA

PARTIAL FOURTH FLOOR MECHANICAL PLAN -

NEW WORK

M101

# M101 - NEW WORK NOTES

NOTE

NUMBER NOTE TEXT

1 CONTRACTOR TO MODIFY EXISTING EXHAUST DUCT TO CONNECT

TO NEW STAINLESS STEEL 18”x24” DUCT. CONTRACTOR TO COORDINATE LOCATION OF NEW STAINLESS STEEL 18”x24” DUCT SO

THE ELECTRICAL PULL BOX CAN FULLY OPEN / CLOSED AND WORK

CAN BE ACCOMPLISHED.

2 CONTRACTOR SHALL INSTALL INSULATION ON THE STAINLESS

STEEL 18" X 24" DUCT RUN.

3 CONTRACTOR SHALL MAKE THE DRAIN PIPING SYSTEM USING

STAINLESS STEEL.

4 CONTRACTOR SHALL PIPE THE DRAIN PIPING SYSTEM TO SPILL TO

GRADE.

5 CONTRACTOR SHALL INSTALL A GASKET BETWEEN THE 24"

STAINLESS STEEL ROUND DUCT AND GALVANIZED STEEL. GASKET

MATERIAL SUCH AS BLUE-GARD STYLE 3000 OR EQUAL SHALL BE

USED.

1/8" = 1'-0"M101

1 PARTIAL FOURTH FLOOR - MECHANICAL PLAN - NEW WORK

8' 16'4'0 1/4" = 1'-0"M101

2 SECTION 1

0 4' 8'2'

4. NONE PRV-POWER ROOF VENTILATOR KEF-KITCHEN EXHAUST FAN 4. INVERTER DUTY MOTOR

3. ADDITIONAL BY-PASS AIR FOR 7141 CFM. RF-RETURN FAN PRF-PROPELLER ROOF FAN 3. GRAVITY DAMPER

2. IGNORE ZERO VALUES UNLESS APPLICABLE. EF-EXHAUST FAN HPF-HIGH PLUME FAN 2. MOTORIZED DAMPER

1. MOTRO HP IS MAXIMUM VALUE. SF-SUPPLY FAN PWF-PROPELLER WALL FAN 1. BYPASS PLENUM

NOTES: FAN TYPE ABBREVIATION VSF-VENT SET FAN ACCESSORIES

FAN SCHEDULE

MARK

LAYOUT BASIS FAN PROPERTIES AIRFLOW PROPERTIES ELECTRICAL

WEIGHT

(LBS)

NOISE

CRITERIA

(SONES) NOTESMANUFACTURER MODEL FAN TYPE DRIVE TYPE

WHEEL

(IN)

OUTLET

VELOCITY

(FPM) RPM CLASS ACCESSORIES

MAX

AIRFLOW

(CFM)

MIN

AIRFLOW

(CFM)

TSP

(IN.WG) CONTROLLER

POWER EA.

(HP)

EF-01 GREENHECK VEKTOR-CD HPF BELT 27 5777 1725 II 1:2: 9150 9150 2.00 VFD 20.00 2130 lb 78 1:2:3:

EF-02 GREENHECK VEKTOR-CD HPF BELT 27 5777 1725 II 1:2: 9150 9150 2.00 VFD 20.00 2130 lb 78 1:2:3:

GROUND LEVEL GROUND LEVEL

LEVEL 1 LEVEL 1

LEVEL 2 LEVEL 2

LEVEL 3LEVEL 3

NO

GARAGE LEVEL GARAGE LEVEL

T.O. CONCRETE

SLAB

T.O. CONCRETE

SLAB

NO

1/2"ø D

4"ø

24"x18" E/A

CONDUIT

ELECTRICAL

PULL BOX

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

RBS CC

558-23-155

05-16-2025REVISIONS:

A

B

C

D

E

F

GENERATOR EXHAUST MODIFICATION

DURHAM, NORTH CAROLINA

PARTIAL MECHANICAL SECTION - NEW WORK

M102

1/4" = 1'-0"M102

1 PARTIAL MECHANICAL SECTION - NEW WORK

0 4' 8'2'

EXISTING

EXHAUST

DISCHARGE

MANIFOLD

M102 - NEW WORK NOTES

NOTE

NUMBER NOTE TEXT

1 CONTRACTOR SHALL WELD NEW BLACK PIPE ONTO EXISTING

EXHAUST DISCHARGE.

2 CONTRACTOR SHALL USE A FLANGED CONNECTION TO CONNECT

NEW BLACK PIPE TO 24"X18" DUCT MANIFOLD.

3 CONTRACTOR SHALL INSTALL A GASKET BETWEEN THE 18" X 24"

STAINLESS STEEL DUCT AND NEW BLACK PIPE TO PREVENT

CORROSION. GASKET MATERIAL SUCH AS BLUE-GARD STYLE 3000

OR EQUAL SHALL BE USED.

CONTROL LEGEND

FLUID FLOW METER ROUND CONTROL DAMPERAPPLICATION SPECIFIC CONTROLLER

PADDLE TYPE FLOW SWITCH

DUCT MOUNTED TEMP. SENSOR

COOLING COIL

DIFFERENTIAL AIR PRESSURE SWITCH

HEAT EXCHANGER

SENSIBLE WHEEL

REFRIGERANT GAS SENSOR

PARALLEL BLADE DAMPER OPPOSED BLADE DAMPER

AFMS AIR FLOW MEASURING STATION

DIFFERENTIAL PRESSURE SENSOR

DUCT MOUNTED, AVERAGING TEMP. SENSOR

DX COIL

AIR FILTER

CURRENT TRANSDUCER

FAN WITH INLET GUIDE VANES

VARIABLE FREQUENCY DRIVE

TWO WAY ELECTRONIC CONTROL VALVE

THREE WAY ELECTRONIC CONTROL VALVE

PIPE MOUNTED TEMPERATURE SENSOR

FAN

DO

DATA TSTAT

AFMS

NO

NC

AO

DI

BDD

AI

DIGITAL OUTPUT

AIR FLOW MEASUREMENT STATION

NORMALLY OPEN

NORMALLY CLOSED

BINARY DATA LINK THERMOSTAT

HAND-OFF-AUTO SWITCH

SMOKE DETECTOR CONTACTS

SHIELDED BULB AIR TEMPERATURE SENSOR

THERMAL OVERLOADS-NUMBER AS REQUIRED

SMOKE DETECTOR

ANALOG INPUT

DIGITAL INPUT

ANALOG OUTPUT

BACKDRAFT DAMPER

MOTOR START SOLENOID SPACE HUMIDITY SENSOR

SPACE TEMPERATURE SENSOR

DAMPER ACTUATOR (ELECTRONIC)

DUCT MOUNTED HUMIDITY SENSOR

FREEZE PROTECTION THERMOSTAT

STEAM PIT SUMP LEVEL SWITCH

FIRE THERMOSTAT

OCCUPANCY SENSOR

PUMP

HEATING COIL

MOTOR STARTER

FA FIRE ALARM CONTACTS

STROBE/HORN

C COMMONC COMMON

UVC RADIATION SENSOR

ISOLATION ROOM PRESSURE

CONTROLLER KEY SWITCH

PROPORTIONAL HIGH LIMIT HUMIDISTAT

ELECTRIC HEAT STEP CONTROLLER

ELECTRIC HEAT SCR CONTROLLER

EMERGENCY AIR SYSTEM TURN OFF BUTTON

PRESSURE INDEPENDENT CONTROL VALVE

I INPUT / OUTPUT

OXYGEN MONITORING SENSOR

O/ TERMINAL EQUIPMENT CONTROLLER

C C

T

D

T

X

R

AF

DPT

DPS

FFM

PFS

ASC

VFD

T

CT

SD

OL

SD

HOA

M

T

DA

FT

H

FZ

FS

O

T

H

H C

SH

HH

STEP

SCR

EO

PICV

TEC

O2

DA

PHO

K

120 VAC BY DIV 26

SWITCH

SWITCH

FUSE

24 VAC TO

TERMINAL UNIT

CONTROL

TO LOW VOLTAGE

EQUIPMENT/CONTORLLERS

LOW VOLTAGE

POWER BY DIV 23

AHU DDC

CONTROL PANEL

BY DIV 23

CPT CONTROL

PANEL BY DIV 23

NOTE: 120 V/24 VAC CONTROL

PANEL TRANSFORMER SIZED

TO MEET LOAD REQUIREMENTS

SERVED EQUIPMENT

TERMINAL

UNIT

(EXAMPLE)

EXHAUST FANS

CONTROL POINTS SCHEDULE (EXHAUST FANS ONLY)

NC

ATM.

TYPE

MARK

DESCRIPTION NOTES

EF-01

DM

DPT

A. EXHAUST FAN OPERATING AND SAFETY CONTROLS SHALL INCLUDE:

1. WALL MOUNTED DISCONNECT

2. VARIABLE FREQUENCY MOTOR DRIVE

3. FAN DIFFERENTIAL PRESSURE SENSOR

4. BYPASS DAMPER AND DAMPER ACTUATOR

B. THE EXHAUST FANS SHALL OPERATE AT ALL TIMES ON A LEAD / LAG BASIS.

C. THE CONTROL SYSTEM SHALL ROTATE LEAD / LAG FANS ON A WEEKLY BASIS TO MAINTAIN EQUAL RUN TIMES ON BOTH FANS.

THE CHANGE OVER SHALL OCCUR AT 2:00 AM ON FOLLOWING DAY. COORDINATE WITH COR FOR TESTING SCHEDULE.

D. UPON FAILURE OF THE LEAD FAN AS DETERMINED BY THE MOTOR CURRENT TRANSDUCER BEING OFF SETPOINT THE CONTROL SYSTEM SHALL START THE LAG FAN, DISABLE THE WEEKLY LEAD / LAG CHANGE OVER AND SHALL ALARM THE

CONTROL SYSTEM USER INTERFACE.

E. FOR EF-01, MD-01 WILL BE NORMALLY OPEN. FOR EF-02, MD-02 WILL BE NORMALLY CLOSED. UPON FAILURE OF EF-01, MD-01

WILL CLOSE. MD-02 WILL OPEN AND EF-02 WILL ACTIVATE.

F. THE CONTROL SYSTEM SHALL MODULATE THE FAN BYPASS DAMPER TO MAINTAIN EXHAUST DUCT STATIC PRESSURE AT

SETPOINT AND FAN CFM CONSTANT.

G. THE STATIC PRESSURE SETPOINTS SHALL BE DETERMINED BY THE TAB CONTRACTOR DURING TAB WORK.

H. FANS SHALL RUN AN ADDITIONAL 30 SECONDS AFTER THE GENERATORS STOP RUNNING TO CLEAR EXCESS EXHAUST

WITHING THE DUCTWORK.

I. ALARMS: THE CONTROL SYSTEM SHALL ALARM THE USER INTERFACE AND TAKE INDICATED ACTION WHENEVER ANY OF THE

FOLLOWING CONDITIONS OCCURS:

1. MOTOR CURRENT PLUS OR MINUS 10% OF FULL LOAD AMPS FOR 10 SECONDS OR LONGER. STOP LEAD FAN AND TURN ON LAG FAN AND SUSPEND WEEKLY LEAD / LAG SWITCH OVER. FULL LOAD CURRENT SHALL BE AS DETERMINED DURING

TEST AND BALANCE.

2. NO AIR FLOW FOR 5 SECONDS OR LONGER. STOP LEAD FAN AND TURN ON LAG FAN AND SUSPEND WEEKLY LEAD / LAG

SWITCH OVER.

3. EXHAUST PRESSURE NOT AT SETPOINT FOR 30 SECONDS OR LONGER. STOP LEAD FAN AND TURN ON LAG FAN. SUSPEND

WEEKLY LEAD / LAG SWITCH OVER.

4. WHEN THE EXHAUST FAN IS OPERATING IN MANUAL OVERRIDE AS DETERMINED BY FAN OPERATION OUTSIDE THE CONTROL OF THE CONTROL SYSTEM. THE ALARM SHALL TOTALIZE THE MINUTES OF MANUAL OVERRIDE OPERATION.

4VFD

NOTES:

1. DISPLAY ALL SEIMENS DATA AVAILABLE ON VFD. PROVIDE VFD WITH SEIMENS PROTOCOL.

DI DAMPER FEEDBACK 100% OPEN/100% CLOSED

AO EXHAUST DAMPER MODULATION

AI EXHAUST DUCT DIFFERENTIAL PRESSURE

DATA EF-01/EF-02 VFD STATUS

AO EXHAUST FAN SPEED CONTROL EF-01/EF-02

DO EXHAUST FAN ENABLE/DISABLE EF-01/EF-02

DO DAMPER OPEN/CLOSED

1:

SPARE

SPARE

BY-PASS

NC

ATM.

EF-02

DM

DPT

4VFD

BY-PASS

M

NC M

NO

SPARE

MD-01MD-02

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

BID DOCUMENTS

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

RBS CC

558-23-155

05-16-2025REVISIONS:

A

B

C

D

E

F

GENERATOR EXHAUST MODIFICATION

DURHAM, NORTH CAROLINA

VA STATION CONTROL NOTES, LEGEND,

CONTROL SCHEMATIC, SEQUENCE OF

CONTROL, AND CONTROL POINT

M800

1. CONTRACTOR SHALL PROVIDE COMPLETE DDC AUTOMATIC TEMPERATURE CONTROL SYSTEM COMPATIBLE

WITH THE EXISTING SYSTEM.

2. THE EXISTING CONTROLS SYSTEM IS SEIMENS INSIGHT WITH P2 NETWORK CONTROLS. THE CONTRACTOR SHALL PROVIDE NEW DDC CONTROLS THAT SHALL BE CONNECTED TO THE EXISTING SYSTEM AND BE INCORPORATED INTO THE EXISTING USER INTERFACE (UI). THE FINAL PRODUCT SHALL BE A COMPLETE, FUNCTIONING SYSTEM THAT IS FULLY INTEGRATED.

3. THE CONTRACTOR SHALL INCLUDE GRAPHICS IN THE EXISTING UI FOR ALL NEW SYSTEMS AND MODIFY ANY

AND ALL EXISTING GRAPHICS TO ACCURATELY DEPICT THE NEW WORK AND FUNCTIONALITY.

4. THE CONTRACTOR SHALL INTEGRATE THE CONTROLS SO THAT ALL NEW CONTROL POINTS CAN BE FULLY

OVERRIDDEN BY THE EXISTING DDC SYSTEM THROUGH THE UI.

5. THE EXISTING DDC CONTROL UI SHALL PROVIDE HIGH AND LOW ALARMS AS APPLICABLE FOR ALL INDICATED

CONTROL INPUTS.

6. THE NEW GENERATOR EXHAUST FANS UTILIZES A LEAD/LAG OPERATING SCHEDULE AND SHALL ALTERNATE ON

A WEEKLY BASIS AFTER EACH TESTING. COORDINATE WITH COR FOR TESTING SCHEDULE.

7. CHANGE-OVER SHALL ALSO TAKE PLACE AT 2:00 AM AFTER RUN-TIME DIFFERENCE EXCEEDS 8 HOURS

(ADJUSTABLE). MANUAL CHANGE-OVER CAPABILITY SHALL BE INCLUDED.

8. CONTRACTOR SHALL COORDINATE LEAD/LAG OPERATING SCHEDULE AND PROGRAM WITH COR BEFORE WORK

BEGINS.

GENERAL NOTES FOR HVAC CONTROLS

NOT TO SCALEM800

2 LOW VOLTAGE POWER WIRING DETAIL

NOT TO SCALEM800

1 EXHAUST FAN

1. CONTRACTOR SHALL INSTALL EXHAUST FANS (EF-01 AND EF-02) ONTO ROOF AS SHOWN IN THE DRAWINGS (1/M101). CONTRACTOR SHALL INSTALL ALL

DUCTWORK AND MECHANICAL DAMPERS ON ROOF TOP ONLY.

2. CONTRACTOR SHALL COMPLETE THE DUCT CONSTRUCTION ON THE ROOF TOP AS SHOWN IN THE DRAWINGS 1/M101. CONTRACTOR SHALL ENSURE THE FAN IS POWERED, DDC PROGRAMMED, TESTED, AND CONFIRMED TO BE WORKING BEFORE MOVING OFF THE ROOF.

3. AFTER ALL THE ROOFTOP CONSTRUCTION IS COMPLETED, CONTRACTOR SHALL BEGIN TO CONSTRUCT THE DUCT SYSTEM TOWARDS THE EXHAUST PIPES AS SHOWN IN DRAWINGS (2/M101). DO NOT PLACE THE MANIFORLD OR DUCTS OVER THE EXHAUST PIPES ON THE BOTTOM LEVEL.

4. CONTRACTOR SHALL ENSURE THAT ALL THE DUCTING SYSTEM BEYOND THE MANIFOLD IS CONNECTED AND READY TO HAVE THE MANIFOLD AND

SNAPLOCK DUCTS TO BE ATTACHED TO THE DUCTING SYSTEM.

5. CONTRACTOR SHALL BEGIN THE CONSTRUCTION OF THE MANIFOLD AND SNAPLOCK DUCTS. THE SNAPLOCK DUCTS WILL GO OVER THE EXHAUST PIPES PENETRATING FROM THE WALL. DO NOT PLACE THE MANIFOLD OR ANY SNAPLOCK DUCTS. ENSURE BOTH EF-01 AND EF-02 ARE COMMISSIONED AND

FULLY OPERATIONAL BEFORE MOVING ON TO STEP 6.

6. AFTER CONSTRUCTION OF THE MANIFOLD AND SNAPLOCK DUCTS ARE COMPLETED, CONTRACTOR WILL ATTACH THE SNAPLOCK DUCTS OVER THE EXHAUST PIPES FIRST, FOLLOWED BY THE MANIFOLD SECOND. THE MANIFOLD WILL NEED TO BE CONNECTED TO THE 3 SNAPLOCK DUCTS AND THE

DUCTING SYSTEM RUNNING DOWN FROM THE ROOF.

7. AFTER THE CONNECTIONS ARE COMPLETED, 1 OF THE 3 GENERATORS WILL NEED TO BE TAKEN OFFLINE. CONTRACTOR SHALL COORDINATE WITH THE COR ATLEAST 4 WEEKS IN ADVANCE. THE SNAPLOCK DUCT ON THE EXHAUST PIPE FROM THE GENERATOR THAT IS OFFLINE, WILL NEED TO HAVE THE SNAPLOCK DUCT REMOVED. A STAINLESS STEEL DUCT WILL BE PLACED OVER THE EXHAUST PIPE AND WELDED. AFTER THE WELDED STAINLESS STEEL DUCT IS ATTACHED TO EXHAUST PIPE, THE WELDED DUCT WILL NEED TO BE ATTACHED TO THE MANIFOLD.

8. CONTRACTOR SHALL ENSURE THAT THERE ARE NO LEAKS IN THE ENTIRE DUCT SYSTEM, THEN BRING THE GENERATOR THAT IS OFFLINE BACK ONLINE.

9. CONTRACTOR SHALL REPEAT STEPS 7 AND 8 UNTIL ALL 3 EXHAUST PIPES HAVE WELDED STAINLESS STEEL DUCT AND ARE ATTACHED TO THE

MANIFOLD. ENSURE NO LEAKS ARE FOUND WITHIN THE DUCT SYSTEM AS FINAL CHECK.

CONSTRUCTION SEQUENCE OF DUCT SYSTEM

ELECTRICAL GENERAL NOTES:

1. THE WORK SHALL CONFORM WITH ALL REQUIREMENTS OF:

A. NFPA 70-2023 (NATIONAL ELECTRICAL CODE)

B. ANSI C2-2023 (NATIONAL ELECTRICAL SAFETY CODE)

C. APPLICABLE LOCAL CODES…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .