Drawing E102 Addendum No 1.pdf
PDF 871 KB Posted
- Solicitation number
- 36C24626B0002
About this file
This document is an Addendum (No. 1) for the Durham VAMC Generator Exhaust Modification project, VA Project No. 558-23-155, issued by Toland-Mizell-Molnar, LLC on January 7, 2026. The addendum specifically addresses modifications to Drawing E102 for Lightning Protection Systems, requiring contractors to add all associated work indicated. The addendum is to be incorporated into the Contractor's Bid Documents and follows VA requirements for the project located in Durham, North Carolina. No changes were made to the project specifications, with the only update being the lightning protection systems drawing modification.
The accompanying drawing (E102) details a Partial Fourth Floor Mechanical Lightning Protection Plan for new work, including keynotes for existing Class II lightning protection system, air terminal placement, grounding/bonding points, and connection requirements. The drawing is part of the bid documents for the U.S. Department of Veterans Affairs Office of Construction and Facilities Management, with the project originally dated May 16, 2025 and the addendum dated January 7, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24626B0002 0002.pdf | ||
| 36C24626B0002 0001.pdf | ||
| Site Visit Attendance 12.16.25.pdf | ||
| Contractor Invoice Form.pdf | ||
| 558-23-155 Specifications.pdf | ||
| 558-23-155 Drawings.pdf | ||
| 36C24626B0002_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
512 Means St NW, Suite 400 Atlanta, GA 30318
(404) 214-9774
January 7, 2026
Addendum NO. 1
Durham VAMC Generator Exhaust Modification VA Project No.: 558-23-155
This addendum is issued for the purpose of revising selected requirements contained in the Contract Documents. The following changes, corrections, deletions, and/or additions are hereby made a part of the Contract Documents for the above noted project, fully and completely as if the same were fully contained therein.
TO BIDDERS
A. SPECIFICATIONS
No Changes.
B. DRAWINGS
Drawing E102 – LIGHTNING PROTECTION SYSTEMS
1. Add all associated work indicated.
This addendum is issued in accordance with VA requirements and shall be incorporated into the Contractor’s Bid Documents.
END OF DOCUMENT
Toland-Mizell-Molnar, LLC
Scott Jeffries, Project Manager
1235.66.77.78.89.811.3 7.68
14.3
M
N
K.9
K
K.8
J
K.6
O
1235.66.77.78.89.8
11.3
7.68
14.3
M
N
K.9
K
K.8
J
K.6
O
EF-02
EF-01
3 3
NEW HVAC
DUCT BRACING
(TYPICAL)
3 4
NEW HVAC
DUCT
(TYPICAL)
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
BID DOCUMENTS
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
CB TD
558-23-155
05-16-2025REVISIONS:
A
B
C
D
E
F
GENERATOR EXHAUST MODIFICATION
DURHAM, NORTH CAROLINA
LIGHTNING PROTECTION PLAN
E102
SCALE: 1/8" = 1'-0"1
PARTIAL FOURTH FLOOR MECHANICAL LIGHTNING PROTECTION
PLAN - NEW WORK
SHEET NOTES:
1. REFER TO E-001 & E-002 FOR ELECTRICAL GENERAL NOTES, ABBREVIATIONS &
LEGEND.
2. REFER TO MECHANICAL DRAWING FOR EXACT LOCATION AND REQUIREMENTS.
3. REFER TO E-601 FOR ELECTRICAL MECHANICAL CONNECTIONS REQUIREMENTS.
KEYNOTES:
1. EXISTING CLASS II LIGHTNING PROTECTION SYSTEM TO REMAIN.
2. AIR TERMINAL. LOCATE AS SHOWN. TAKE CARE TO ENSURE THAT ALL BENDS HAVE
AT LEAST AN 8" RADIUS.
3. TYPICAL GROUNDING/BONDING POINTS. USE FULL SIZE CONDUCTOR AND
APPROPRIATE FITTING SHOWN FOR CONNECTION.
4. CONNECT TO EXISTING GROUNDING CONDUCTOR AT A 90 DEGREE ANGLE AND
MAKE BONDING CONNECTIONS AND FITTINGS TO MEET CODES AND UL LISTING
MASTER LISTING REQUIREMENTS. ADJUST FITTING TYPE AS REQUIRED TO SUIT
FIELD CONDITIONS.
TRUE
NORTH
PLAN
NORTH
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"
ADDENDUM No. 1 01-07-2025
5-16-20251/7/2025
File details come from the government source that posted it. Updated .