552-22-201_Renovate Catholic Chapel B119_100 Drawings reduced size.pdf
PDF 17 MB Posted
- Attached to
- Z2FE--Renovate B119 Catholic Chapel [552-22-201]
- Solicitation number
- 36C25026B0013_1
About this file
This document is a detailed architectural and civil engineering set of drawings for the renovation of the Catholic Chapel B119 at the Department of Veterans Affairs Medical Center in Dayton, Ohio. The project, identified as VA Project No. 552-22-201, involves comprehensive renovation of the existing chapel, including infrastructure improvements, structural repairs, and system updates. The drawings, prepared by RDC/JPA Architecture and dated 06.30.2025, include extensive technical specifications covering architectural, civil, mechanical, electrical, and utility aspects of the renovation.
Key technical elements include site utility plans showing storm and sanitary sewer connections, grading and erosion control details, demolition plans, and comprehensive architectural drawings detailing existing and proposed floor plans, elevations, and interior modifications. The project scope addresses critical infrastructure items while maintaining the historic character of the chapel, with specific attention to preserving architectural integrity. The renovation will update systems deemed necessary for the building's continued functionality, with work to be completed between March 2025 and March 2026 on a 0.38-acre site with approximately 0.06 acres of disturbed area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WISCONSIN
IOWA
CEMETERY
K A N S A S
CEMETERY
A V E
McMAHO N
CEMETERY
AVE.
KENTUCKY
C O L O R A D O
A V E
BROWN
IN
D
IA
N A
A V E
AV
E
MONUMENT
McMA
HON
AVE.
AVE.
IL
L
IN
O
IS
A V E
AVE.
NEW
O H
IO
YORK
KENTUCKY
S O U T H
AVE.
P E N N S Y L V A N
IA
AVE.
A V E
O H
IO
WEST VIR
GIN
IA
AVE
AV
E
AVE.
A V E
G E T T Y S B U R G
A V E
WEST
THIR
D
ST
CEMETERY
MICHIGAN AVE
C O N N E C T
IC
U T A V E
M A
IN
E
A V E
DAKOTA AVE.
LAKE
LAKE-
V E R M O N T A V E
O R E G O N
A V E
E
A
B
C
D
118 400
CITY OF DAYTON
FIRE HOUSE NO. 17
131 26
34139
RETENTION
POND
NE
W
ME
XI
CO
P
LA
CE
A V E
AVE.
A V E
B R O W N
AVE.
S E R V I C E
R D
R D
E
I C E
R V
S
MICHIGAN AV
E
E
D R
R
C I V
S E
KENTUCKYAVE.
AVE.
WISCONSIN AVE.
TEN
N
ESSEE
P E N N S Y L V A N
IA
HAWAII
PLACE
Liscum Dr.
Secondary
Supply
AVE.
4100 WEST THIRD STREET
U.S. ROUTE 35
U .S
. R O
UTE 3
S E R
VI
C E R D
N HAMPSHIR
E
DELAWARE
DELAWARE
N
J E R S E Y
CIRCLE
R H O D E
IS
L A N D
A V E
MISSOURI AVE
M
IN
N E S O T A
A V E
MASSACHUSETTS BLVD.
M A R Y L A N D
A V E
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER
M
IN
N E S O T A
A V E
TEXAS AVE.
Dayton, Ohio 45428
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X
X
XX.X-X
XX
X
1/A101
X
A101
XX
TOILET ACCESSORY TAGX SIGNAGE TAG
A101
SIM
X
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Department of Veterans Affairs Medical Center
HEAPY ENGINEERING
MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY
1400 WEST DOROTHY LANE
DAYTON, OH 45409
937.224.0861 P
937.224.5777 F
ARCHITECTURE PLANNING INTERIOR DESIGN
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
RDC / JPA ARCHITECTURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
SCHAEFER ASSOCIATES, INC.
STRUCTURAL DESIGN
537 EAST PETE ROSE WAY, SUITE 400
CINCINNATI, OH 45202
513.542.3300 P
513.542.5540 F
KLEINGERS GROUP
CIVIL ENGINEERING
6219 CENTRE PARK DRIVE
WEST CHESTER, OH 45069
513.779.7851 P
/2
/2
:1
:2
P
M
VA Dayton Renovate Catholic Chapel B119
06.30.2025
COVER SHEET
G001
EDSO
552-22-201
Dayton, Ohio
VA Dayton Renovate Catholic Chapel B119 4100 W. Third St. Dayton, OH 45428 PROJECT #: 552-22-201
GREG HOPPER
100% BID DOCUMENTS
22039.00
VA-M000 TitlePage
S001 GENERAL NOTES
S101 NEW WORK PLANS
S201 TYPICAL DETAILS, SECTIONS & SCHEDULES
S002 GENERAL NOTES & SPECIAL INSPECTIONS
S102 NEW WORK PLANS
C300 DEMOLITION PLAN
C400 LOCATION PLAN
C500 UTILITY PLAN AND PROFILES
C600 GRADING PLAN
C700 EROSION CONTROL NOTES
C701 EROSION CONTROL DETAILS
G001 COVER SHEET
G100 CODE DATA
A101 EXISTING PLAN - FIRST FLOOR
A102 EXISTING PLAN - FIRST FLOOR
A103 EXISTING PLAN - LOFT
A104 EXISTING EXTERIOR
AD100 DEMOLITION PLANS
A101-N NEW WORK PLANS
A102-N REFLECTED CEILING & ROOF PLANS
A201 EXTERIOR ELEVATIONS
A301 BUILDING SECTIONS
A401 INTERIOR ELEVATIONS
A402 INTERIOR ELEVATIONS
A403 INTERIOR ELEVATIONS, CASEWORK DETAILS & FINISH LEGEND
A601 DOOR & WINDOW SCHEDULES & DETAILS
A602 DETAILS
A603 ROOF AND WINDOW DETAILS
AF101-F FLOOR, WALL FINISH & SIGNAGE PLANS
P001 ABBREVIATIONS, LEGEND, GENERAL NOTES
PD100 BASEMENT - CRAWLSPACE PLAN - REMOVALS
PD101 FIRST FLOOR PLAN - REMOVALS
PS101 SITE PLAN
PP099 FOUNDATION PLAN - DRAINAGE & DISTRIBUTION
PP100 BASEMENT - CRAWLSPACE PLAN - DRAINAGE & DISTRIBUTION
PP101 FIRST FLOOR PLAN - DRAINAGE & DISTRIBUTION
P601 SCHEDULES & DETAILS
P901 DIAGRAM - DRAINAGE
P902 DIAGRAM - DISTRIBUTION
M001 ABBREVIATIONS, LEGEND, GENERAL NOTES
MD100 BASEMENT PLAN - REMOVALS
MD101 FIRST FLOOR PLAN - REMOVALS
MH101 FIRST FLOOR PLAN - DUCTWORK
MH100 BASEMENT PLAN - DUCTWORK
MH102 LOFT PLAN - DUCTWORK
MP101 FIRST FLOOR PLAN - PIPING
MP100 BASEMENT PLAN - PIPING
M501 DETAILS
M601 SCHEDULES
M502 DETAILS
E001 ABBREVIATIONS, LEGEND, GENERAL NOTES
E002 SITE PLAN
ED100 BASEMENT PLAN - REMOVALS
ED101 FIRST FLOOR PLAN - REMOVALS
EL100 BASEMENT PLAN - LIGHTING
EL101 FIRST FLOOR PLAN - LIGHTING
EP100 BASEMENT PLAN - NEW WORK - POWER & SYSTEMS
EP101 FIRST FLOOR PLAN - NEW WORK - POWER & SYSTEMS
E600 SCHEDULES & SINGLE LINE DIAGRAM
T001 ABBREVIATIONS, LEGEND, GENERAL NOTES
TD101 FIRST FLOOR PLAN - REMOVALS
TA100 BASEMENT PLAN - NEW WORK
TA101 FIRST FLOOR PLAN - NEW WORK
T501 DETAILS & ELEVATIONGENERAL CONSTRUCTION NOTES
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO
THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY
CODE, INTERNATIONAL BUILDING CODE, AND OTHER COES AS
IDENTIFIED IN VHA PROGRAM GUIDE PG-18-3, TOPIC 01, CODES,
STANDARDS AND EXECUTIVE ORDERS WHICH CAN BE FOUND ON
THE DEPARTMENT OF VETERAN AFFAIRS, TECHNICAL INFORMATION
LIBRRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS)
AND DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN
GUIDE PG-18-13 WHICH CAN BE FOUND ON THE DEPARTMENT OF
VETERANS AFFAIRS TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND
ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO
BE COORDINATED WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO
MATCH ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS
TO REMAIN THAT ARE DAMAGED DURING THE COURSE OF
DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR
INSTALLATION OF NEW WORK, CONTRACTOR SHALL REPAIR
EXISTING CONSTRUCTION TO REMAIN OR PROVIDE NEW
CONSTRUCTION TO MATCH EXISTING ADJACENT SURFACES TO
REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS
AND DIMENSIONS PRIOR TO ORDERING, FABRICATING OR
INSTALLING NEW MATERIALS.
DRAWING INDEXVICINITY MAP
N N.T.S.Scale:
CAMPUS MAP
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL
EQUIPMENT, ETC. TO BE INSTALLED AS PART OF THIS PROJECT, AND
WHERE NECESSARY, MAKE SPECIAL PROVISIONS TO INSTALL
EQUIPMENT THAT IS TOO LARGE TO FIT THROUGH FINISHED
OPENINGS.
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET
ACCESSORIES, HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK,
MOUNTING BRACKETS AND OTHER WALL MOUNTED ITEMS, AS
INDICATED IN THE CONTRACT DOCUMENTS AND AS RECOMMENDED
BY PRODUCT MANUFACTURERS. ALL WOOD BLOCKING SHALL BE
FIRE RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS
SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A
PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS
INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL
SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS.
WHERE THE OMISSION OF A PART OR ELEMENT OF A SYSTEM
WOULD RESULT IN THE NON-OPERATION, OR INCORRECT
OPERATION OF A SYSTEM, CONTRACTOR SHALL INCLUDE SAID PART
OR ELEMENT AS PART OF THE WORK.
11. CONTRACTOR IS RESPONSIBLE TO VERIFY HISTORIC AND RELIGIOUS
CHARACTER OF THE STRUCTURE REMAINS INTACT AS MUCH AS
POSSIBLE. CONTRACTOR IS TO MINIMIZE EXPOSED CONDUIT, DUCTS,
PIPING, ETC. AS MUCH AS POSSIBLE.
12. EXISTING CRAWLSPACE HAS LIMITED ACCESS AND CLEARANCES.
CONTRACOR IS RESPONSIBLE FOR EXECUTING THE MEANS AND
METHOD FOR INSTALLATION OF NEW WORK IN THE CRAWLSPACE.
PROJECT SITE
LEGEND
Revisions Date
DN
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
Means of Egress
Existing Wall to Remain
New Wall
CODE LEGEND
SACRISTY
ALTAR
CHAPLAIN
CHAPEL
ADA
RESTROOM
VESTIBULE
VESTIBULE
#126
#63
#63
F.E.
F.E.
CRAWLSPACE
CRAWLSPACE
CRAWLSPACE
Permanent fixed ladder
Permanent fixed ladder
Non- Occupiable
Non- Occupiable
Non- Occupiable
F.E.
F.E.
STORAGE
CHOIR LOFT
#28
F.E.
F.E.
ICC Existing Building Code 2021
Existing Building - No Change of Use
Not sprinklered
Maximum Occupants: 224 Fixed Seating @18" per person 28 Standing Space @ 5 net
Occupancy Type A-3 (No Change) Allowable Actual
Height Above Grade: 55 69 (Existing, no change) Ocupiable Stories Above Grade: 3 1 (Crawlspace, Loft, and Bell Tower excluded) Area per Floor: 28,000 sf 5,123 sf max
Construction Type: IIIB Primary Structural Frame: 0 Exterior Bearing Walls: 2 Interior Bearing Walls: 0 Nonbearing Walls: 0 Floor Construction: 0 Roof Construction: 0
Chapter 12
1201.1 This Chapter is intended to provide means for the preservation of historic buildings. Historic buildings shall comply with the provisions of this chapter relating to their repair, alterations, relocation and change of occupancy.
1202.1 Repairs to any portion of a historic building or structure shall be permitted with original or like materials and original methods of construction, subject to the provisions of this chapter. Hazardous materials such as asbestos and lead-based paint, shall not be used where the code for new construction would not permit their use in buildings of similar occupancy, purpose and location.
1202.2 Replacement of existing or missing features using original materials shall be permitted.
Partial replacement for repairs that match the original in configuration, height and size shall be permitted.
1203 Fire Safety
1203.1 Historic Buildings undergoing alterations, changes of occupancy or that are moved shall comply with Section 1203.
1203.5 The existing interior finishes shall be accepted where it is demonstrated that they are historic finishes.
1203.9 Grand stairways shall be accepted without complying with the handrail and guard requirements. Existing handrails and guards at all stairways shall be permitted to remain, provided they are not structurally dangerous.
1203.10 Guards shall comply with section 1203.10.1 and 1203.10.2.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/2
/2
:1
:2
P
M
VA Dayton Renovate Catholic Chapel B119
06.30.2025
CODE DATA
G100
EDSO
552-22-201
Dayton, Ohio
GREG HOPPER
100% BID DOCUMENTS
22039.00
N Scale: 1/8" = 1'-0"1 Code Plan - First Floor
N Scale: 1/8" = 1'-0"0 Code Plan - Crawlspace
N Scale: 1/8" = 1'-0"2 Code Plan - Loft
CODE NOTES
06.30.2025 DTW
KLEINGERS
GROUP
THE www.kleingers.com
CIVIL ENGINEERING
SURVEYING
LANDSCAPE
ARCHITECTURE
West Chester, OH 45069 513.779.7851
6219 Centre Park Dr.
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
VA Dayton Renovate Catholic Chapel B119
552-22-201Office of Construction and Facilities Management
100% BID DOCUMENTS 22039.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date AMB
DAYTON, OHIO
H :\2
3\
\0
D W
G \C ha pe l\_ Sh ee ts
\2
0C
G
EN
C ha pe l.d w g, /2
7/
2:
P M
, A nd re w
B er nh ar d
GENERAL NOTES & DETAILS
C100
GENERAL NOTES
1. THE VA, AND THE CURRENT EDITION OF THE STATE OF OHIO DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIAL SPECIFICATIONS (ODOT
CMS), INCLUDING ALL SUPPLEMENTS, SHALL GOVERN ALL MATERIALS AND WORKMANSHIP INVOLVED IN THE IMPROVEMENTS SHOWN ON THIS PLAN.
IGNORE REFERENCES TO MEASUREMENT AND PAYMENT IN THE ODOT CMS UNLESS NOTED OTHERWISE. IN THE CASE OF CONFLICTS BETWEEN THE ODOT
CMS AND THE VA REQUIREMENTS, THE VA REQUIREMENTS SHALL PREVAIL.
2. THE CONTRACTOR IS RESPONSIBLE FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION, AND RESTORATION OF ALL EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THESE PLANS OR NOT. THE CONTRACTOR SHALL EXPOSE ALL UTILITIES OR STRUCTURES PRIOR TO CONSTRUCTION TO VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED CONSTRUCTION. THE CONTRACTOR SHALL CALL, TOLL FREE, THE OHIO UTILITIES PROTECTION SERVICE (1-800-362-2764) 48 HOURS PRIOR TO CONSTRUCTION AND SHALL NOTIFY ALL UTILITY COMPANIES WHO ARE NON-MEMBERS OF THE OHIO UTILITIES PROTECTION SERVICE AT LEAST 48 HOURS PRIOR TO WORK IN THE VICINITY OF THEIR UNDERGROUND LINES.
3. CONTRACTOR SHALL OBTAIN A PERMIT FOR ALL CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH LOCAL, STATE, & FEDERAL REGULATIONS.
4. THE CONTRACTOR IS TO PERFORM ALL INSPECTIONS AS REQUIRED BY THE OHIO EPA FOR THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
(NPDES) PERMIT AND FURNISH OWNERS REPRESENTATIVE WITH WRITTEN REPORTS.
5. THE CONTRACTOR IS REQUIRED TO VISIT THE SITE AND FULLY INFORM HIMSELF CONCERNING ALL CONDITIONS AFFECTING THE SCOPE OF THE WORK.
FAILURE TO VISIT THE SITE SHALL NOT RELIEVE HIM FROM ANY RESPONSIBILITY IN THE PERFORMANCE OF THE CONTRACT.
6. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED FOR EXPENSES INCURRED DUE TO SOIL CONDITIONS, GROUNDWATER, AND/OR ROCK EXCAVATION, ALL OF THESE ITEMS SHALL BE INCLUDED IN THE PRICE BID FOR THE PROJECT.
7. THE COST OF ALL DEWATERING REQUIRED FOR THE CONSTRUCTION OF THIS PROJECT SHALL BE INCLUDED IN THE PRICE BID FOR THE PROJECT.
8. THE DIRECT OR INDIRECT DISCHARGE OR PUMPING OF UNFILTERED SEDIMENT-LADEN WATER INTO THE STORM DRAINAGE SYSTEM OR WATERCOURSE IS
ILLEGAL AND PROHIBITED.
9. ANY WELL, WELL POINT, PIT, OR OTHER DEVICE INSTALLED FOR THE PURPOSE OF LOWERING THE GROUND WATER TO FACILITATE CONSTRUCTION OF THIS PROJECT SHALL BE PROPERLY ABANDONED IN ACCORDANCE WITH THE PROVISIONS OF SECTION 3745-9-10 OF THE OHIO ADMINISTRATIVE CODE OR IN ACCORDANCE WITH THE PROVISIONS OF THIS PLAN AS DIRECTED BY THE DIRECTOR OF PUBLIC UTILITIES OR HIS REPRESENTATIVE.
10. ANY CONTRACTOR INSTALLING ANY WELL, WELL POINT, PIT, OR OTHER DEVICE USED FOR THE PURPOSE OF REMOVING GROUND WATER FROM AN AQUIFER SHALL COMPLETE AND FILE A WELL LOG AND DRILLING REPORT FORM WITH THE OHIO DEPARTMENT OF NATURAL RESOURCES (ODNR), DIVISION OF WATER, WITHIN 30 DAYS OF THE WELL COMPLETION IN ACCORDANCE WITH THE OHIO REVISED CODE SECTION 1521.01 AND 1521.05 IN ADDITION, ANY SUCH FACILITY IS COMPLETED IN ACCORDANCE WITH SECTION 1521.16 OF THE OHIO REVISED CODE. FOR COPIES OF THE NECESSARY WELL LOG, DRILLING REPORT, OR REGISTRATION FORMS, PLEASE CONTACT: DIVISION OF WATER, OHIO DEPARTMENT OF NATURAL RESOURCES, FOUNTAIN SQUARE, COLUMBUS, OHIO 43224, (614)2656717.
11. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO THE ODNR FOR THE REGISTRY, MAINTENANCE AND ABANDONMENT OF ANY WITHDRAWAL DEVICE
USED IN CONSTRUCTION OF THIS PROJECT.
12. ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT AND/OR FACE OF CURB, UNLESS OTHERWISE NOTED.
13. ALL SITE SIGNAGE, STRIPING COLOR AND WIDTH SHALL BE PER THE OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
14. ALL EXISTING PAVEMENTS, WALKS, CURBS, ETC. SHALL BE SAWCUT BEFORE REMOVAL. IF, DURING CONSTRUCTION, THE PAVEMENT, WALKWAY, CURB, ETC. IS DAMAGED BEYOND THE ORIGINAL SAWCUT, THE DAMAGED AREA SHALL BE RECUT TO NEAT LINES AS DIRECTED BY THE ENGINEER. PAYMENT FOR
SAWCUTTING SHALL BE INCLUDED IN THE PRICE BID FOR THE PROJECT.
15. THE CONTRACTOR SHALL SAWCUT EXISTING PAVEMENT TO PROVIDE A SMOOTH VERTICAL FULL DEPTH BUTT JOINT BETWEEN THE EXISTING PAVEMENT OR CURB AND THE PROPOSED PAVEMENT. CONTRACTOR SHALL LOCATE SOUND PAVEMENT EDGE AND CUT AND TRIM PAVEMENT TO A NEAT LINE.
INCLUDE THE COST OF PAVEMENT REMOVAL AND DISPOSAL IN THE PRICE BID FOR THE PROJECT.
GRADING NOTES
1. CONTRACTOR TO REMOVE TREES AND CLEAR AREAS AS NECESSARY TO PERFORM ALL SITE WORK INCLUDING GRADING AND UTILITY WORK.
2. PROTECTION OF EXISTING TREES AND VEGETATION: PROTECT EXISTING TREES AND OTHER VEGETATION INDICATED TO REMAIN IN PLACE AGAINST UNNECESSARY CUTTING, BREAKING OR SKINNING OF ROOTS, SKINNING OR BRUISING OF BARK, SMOTHERING OF TREES BY STOCKPILING CONSTRUCTION MATERIALS OR EXCAVATED MATERIALS WITHIN DRIP LINE, EXCESS FOOT OR VEHICULAR TRAFFIC, OR PARKING OF VEHICLES WITHIN DRIP LINE. PROVIDE
TEMPORARY GUARDS TO PROTECT TREES AND VEGETATION TO BE LEFT STANDING.
3. ALL ELEVATIONS SHOWN ARE FINISHED GRADE ELEVATIONS.
4. SITE BUILDING PAD EXCAVATION AND CONSTRUCTION TO BE PER GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. BUILDING PAD PREPARATION SHALL BEGIN BY CLEARING & STRIPPING UNSUITABLE MATERIAL FROM PAD SITE. THEN PLACE & COMPACT BACKFILL MATERIAL AT GEOTECHNICAL ENGINEER'S AND ARCHITECT'S RECOMMENDATIONS. ALL BACKFILL MATERIAL MUST BE ACCEPTABLE TO THE GEOTECHNICAL ENGINEER.
5. ALL FILL UNDER PAVEMENT SHALL BE COMPACTED TO THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR BALANCING THE SITE EARTHWORK ON SITE. THE CONTRACTOR IS RESPONSIBLE FOR BURY/BORROW PITS AS NEEDED TO BALANCE THE SITE. GEOTECH AND ENGINEER MUST APPROVE AREAS PRIOR TO BURY/BORROW OPERATIONS. AS-BUILT OF BURY/BORROW PIT WILL BE REQUIRED AT COMPLETION OF CONTRACTOR WORK AND MUST BE SUBMITTED TO THE CONSTRUCTION MANAGER.
7. CONTRACTOR SHALL IMPLEMENT ALL SOIL AND EROSION CONTROL PRACTICES REQUIRED BY THE VA AND THE OHIO EPA.
8. ALL GROUND SURFACE AREAS THAT HAVE BEEN EXPOSED OR LEFT BARE AS A RESULT OF CONSTRUCTION AND ARE TO FINAL GRADE AND ARE TO REMAIN SO, SHALL BE SEEDED AND MULCHED AS SOON AS PRACTICAL IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. IF NO SPECIFICATIONS ARE
SUPPLIED, USE ODOT ITEM 659.
9. CONTRACTOR TO LAYOUT BUILDING BASED ON ARCHITECTURAL/FOUNDATION PLANS. SITE PLAN IS FOR CONCEPTUAL PURPOSES ONLY.
UTILITY NOTES
1. ALL DRAIN TILE AND STORM SEWERS DAMAGED, DISTURBED OR REMOVED AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE REPLACED WITH
THE SAME QUALITY PIPE OR BETTER, MAINTAINING THE SAME GRADIENT AS EXISTING. THE DRAIN TILE AND/OR STORM SEWER SHALL BE CONNECTED TO THE CURB SUBDRAIN, STORM SEWER SYSTEM OR OUTLETTED INTO THE ROADWAY DITCH AS APPLICABLE. REPLACED DRAIN TILE/STORM SEWER SHALL BE LAID ON COMPACTED BEDDING EQUAL IN DENSITY TO SURROUNDING STRATUM. REPLACEMENT SHALL BE DONE AT THE TIME OF THE BACKFILL
OPERATION. COST OF THIS WORK TO BE INCLUDED IN THE PRICE BID FOR THE PROJECT.
2. ALL EXISTING UTILITIES KNOWN TO EXIST HAVE BEEN SHOWN ON THESE PLANS IN THEIR APPROXIMATE LOCATION. PRIOR TO THE BEGINNING OF CONSTRUCTION OR EARTH MOVING OPERATIONS, THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF THE UTILITIES SHOWN. THE CONTRACTOR IS ALSO RESPONSIBLE FOR THE PROTECTION AND/OR RELOCATION OF ANY UTILITIES THAT MAY EXIST AND ARE NOT SHOWN.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE RELOCATION AND/OR PROTECTION OF ANY UTILITIES AS REQUIRED BY THE PLAN
WITH THE OWNER OF THE AFFECTED UTILITY.
4. UTILITY POLES WITHIN INFLUENCE OF THE UTILITY OPERATIONS SHALL BE REINFORCED BY THE UTILITY COMPANY PRIOR TO THESE CONSTRUCTION ACTIVITIES. NOTIFICATION OF THE UTILITY COMPANY PRIOR TO CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
5. COMPACTED FILLS ARE TO BE MADE TO A MINIMUM OF THREE FEET ABOVE THE CROWN OF ANY PROPOSED SEWER PRIOR TO CUTTING OF TRENCHES FOR PLACEMENT OF SAID SEWERS. ALL FILLS SHALL BE CONTROLLED, COMPACTED, AND INSPECTED BY AN APPROVED TESTING LABORATORY OR AN
INSPECTOR FROM THE APPROPRIATE GOVERNMENTAL AGENCY.
6. CONTRACTOR TO REPLACE ANY PAVEMENT OR UTILITIES DAMAGED WHICH ARE NOT SPECIFIED TO BE REMOVED ON THESE PLANS.
7. ALL CATCH BASINS PLACED WITHIN THE PAVEMENT SHALL HAVE HEAVY DUTY FRAMES AND GRATES AND CONFORM TO ADA REQUIREMENTS.
8. ADJUST ALL EXISTING CASTINGS AND CLEANOUTS WITHIN PROJECT AREA TO GRADE AS REQUIRED.
9. ALL CATCH BASINS WITH DEPTH GREATER THAN 4.5' SHALL BE PROVIDED WITH STEPS. STEPS SHALL MEET THE REQUIREMENTS OF ODOT ITEM 611.
10. ALL STORM AND SANITARY SEWER MANHOLES WITH A DEPTH GREATER THAN 4' SHALL BE PROVIDED WITH STEPS. STEPS SHALL MEET THE
REQUIREMENTS OF ODOT ITEM 611.
11. DISTANCES SHOWN FOR BOTH SANITARY AND STORM SEWER PIPES ARE MEASURED FROM CENTER OF STRUCTURE. THE CONTRACTOR IS RESPONSIBLE FOR ACTUAL FIELD CUT LENGTH. COORDINATES FOR STORM AND SANITARY STRUCTURES ARE SHOWN TO THE CENTER OF STRUCTURE, UNLESS
OTHERWISE NOTED.
12. IMMEDIATELY AFTER PLACEMENT OF ANY CONDUITS, THE CONTRACTOR SHALL CONSTRUCT THE END TREATMENTS REQUIRED BY THE PLANS AT BOTH THE OUTLET AND INLET ENDS. THIS SHALL INCLUDE HEADWALLS, CONCRETE, RIP RAP, ROCK CHANNEL PROTECTION, SODDING, POURING BOTTOMS, MUDDING LIFT HOLES, ETC.
13. ALL PROPOSED STORM SEWERS, SURFACE OR OTHER DRAINAGE FACILITIES ARE TO BE PRIVATE AND MAINTAINED BY THE OWNER. EROSION CONTROL MEASURES MUST PROVIDE PROTECTION UNTIL COMPLETION OF THE PROJECT AND VEGETATIVE STABILIZATION.
14. THE CONTRACTOR IS TO CONSTRUCT CURBS, CATCH BASINS, DOWNSPOUTS, PIPING AND CONNECTIONS ETC. AS REQUIRED TO CONVEY THE ROOF AND
PAVED SURFACE DRAINAGE TO THE DETENTION BASIN.
15. ROOF DRAINS, FOUNDATION DRAINS AND ALL OTHER CLEAR WATER CONNECTIONS TO THE SANITARY SEWER SYSTEMS ARE PROHIBITED.
16. SITE CONTRACTOR SHALL PICK UP ALL UTILITIES, WITH THE EXCEPTION OF DOWNSPOUTS, 5' OUTSIDE BUILDING WALL. COORDINATE WITH
CONSTRUCTION MANAGER.
17. ALL STORM STRUCTURES ARE ODOT TYPES UNLESS OTHERWISE INDICATED.
18. STORM SEWER PIPE LABELED "STM" SHALL BE ONE OF THE FOLLOWING: PVC SDR-35 PER ODOT ITEM 707.45, PVC PROFILE PIPE PER ODOT ITEM 707.43, HIGH DENSITY POLYETHYLENE PER ODOT ITEM 707.33, ALUMINIZED CORRUGATED METAL, ODOT ITEM 707.01, 707.02, OR REINFORCED CONCRETE PIPE, ODOT ITEM 706.02 CLASS IV. STORM SEWER PIPE LABELED "RCP" SHALL BE REINFORCED CONCRETE PIPE, ODOT ITEM 706.02 CLASS IV. ALL STORM IS TO BE INSTALLED PER ODOT ITEM 611. ALL STORM PIPE USED MUST HAVE A MANUFACTURER SPECIFIED FRICTION FACTOR OF 0.013 (N=0.013) OR LESS.
19. ALL CATCH BASINS IN THE PAVEMENT ARE TO HAVE 4, 4" PERFORATED UNDERDRAINS EXTENDING 10 LF FROM THE CATCH BASIN IN THE UPHILL DIRECTION AND CAPPED. ALL CATCH BASINS IN THE CURB ARE TO HAVE 2, 4" PERFORATED UNDERDRAINS EXTENDING 10 LF FROM THE CATCH BASIN IN
THE UPHILL DIRECTION AND CAPPED.
20. FOR EXACT LOCATION OF DOWN SPOUTS & ROOF DRAINS, COORDINATE WITH CONSTRUCTION MANAGER. ALL ROOF DRAINS ARE TO BE 8" UNLESS
OTHERWISE NOTED.
21. ALL YARD DRAINS SHALL BE ONE OF THE FOLLOWING: NYLOPLAST-ADS DRAIN BASIN, NDS DURACAST FABRICATED PVC CATCH BASIN, AGRI-DRAIN CATCH
BASIN, OR APPROVED EQUAL.
22. ALL EXISTING INVERTS ALONG PROPOSED PIPE ALIGNMENTS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION OF THE SEWER.
23. ANY FIELD TILE CUT IN EXCAVATION WHICH DRAINS IN AN OFFSITE AREA MUST BE TIED INTO THE STORM DRAINAGE SYSTEM.
24. THE FLOW IN ALL SEWERS, DRAINS, FIELD TILES AND WATERCOURSES ENCOUNTERED SHALL BE MAINTAINED BY THE CONTRACTOR AT HIS OWN EXPENSE, AND WHENEVER SUCH WATERCOURSES AND DRAINS ARE DISTURBED OR DESTROYED DURING THE PROSECUTION OF THE WORK, THEY SHALL BE RESTORED BY THE CONTRACTOR AT HIS OWN EXPENSE TO A CONDITION SATISFACTORY TO THE ENGINEER.
25. SANITARY SEWER SHALL BE SDR-35 OR APPROVED EQUAL AND CONFORM TO THE STANDARDS AND SPECIFICATIONS OF THE VA. PIPE MUST MEET MINIMUM SLOPE REQUIREMENTS OF THE VA AND OHIO EPA. SANITARY SEWER SHALL BE INSTALLED AT A MINIMUM DEPTH OF FOUR FEET (4') UNLESS OTHERWISE NOTED. A MINIMUM OF 18" CLEARANCE SHALL BE MAINTAINED AT ALL WATERLINE CROSSINGS. SANITARY SERVICE JOINTS SHALL CONFORM
TO ASTM D-3212.
26. SANITARY SEWER IS TO BE BEDDED WITH CLEAN GRANULAR MATERIAL-AGGREGATES NOT TO BE LARGER THAN 3/4" AND NOT SMALLER THAN NO. 8 SIEVE, FREE OF SILT AND FINES, AASHTO M43 SIZE #67, 7 OR 8. BEDDING TO BE MINIMUM OF 6" BELOW & 12" ABOVE THE PIPE.
27. ALL WATERLINE CROSSINGS SHALL MAINTAIN A VERTICAL SEPARATION OF 18" MINIMUM. SANITARY SEWER SHALL BE LOCATED A MINIMUM OF 18" BELOW WATERLINE AT ALL CROSSINGS. WATERLINE SHALL BE LOCATED A MINIMUM OF 10' HORIZONTALLY FROM ANY SANITARY SEWER. ALL MEASUREMENTS SHALL BE TAKEN FROM OUTSIDE OF SEWER PIPE TO THE OUTSIDE OF WATERLINE PIPE. ONE FULL LENGTH OF WATERLINE PIPE SHALL BE LOCATED AT ALL CROSSINGS TO ENABLE BOTH JOINTS TO BE LOCATED AS FAR FROM SEWER AS POSSIBLE. ALL WATER SHALL HAVE A MINIMUM OF 4' OF COVER.
28. WATERLINE SHALL BE DUCTILE IRON PIPE CLASS 52, MINIMUM 250 PSI.
EXTERIOR CONCRETE
SLAB WALK DETAIL
N.T.S.
NOTES:
1. INSTALL EXPANSION JOINTS AT 30' OC MAXIMUM AND WHERE SLAB ABUTS
STRUCTURES. WHERE NEW WALK ABUTS ADJOINING WALK, SAWCUT EXISTING
WALK TO NEAREST JOINT AND INSTALL EXPANSION JOINT. EXPANSION JOINTS
SHALL BE 1/2" WIDE BY DEPTH OF SLAB. SEAL ALL EXPANSION JOINTS.
2. INSTALL CONTROL JOINTS AT 6' OC MAXIMUM. CONTROL JOINTS SHALL BE 3/8"
WIDE BY 1 1/2" DEEP AND TOOLED, SAWED JOINTS ARE NOT PERMITTED.
3. WALK SHALL HAVE A MINIMUM CROSS SLOPE OF 1.00%, MAXIMUM CROSS
SLOPE OF 2.00%.
4. WATER AND UTILITY BOXES IN THE WALK AREA SHALL BE ADJUSTED FLUSH
WITH THE FINAL SURFACE.
5. REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL DETAIL AT ALL BUILDING
DOORS.
6. JOINTING PLANS MUST BE SUBMITTED FOR APPROVAL.
1/
2"
3/8"
CONTROL JOINT
1/2"
EXPANSION JOINT
2" TYP
EXPANSION JOINT
MATERIAL
JOINT SEALANT
WWR WWR
1/2"
WALK EDGE
AT BUILDING LINE
2"
EXPANSION JOINT
MATERIAL
JOINT SEALANT
WWR
BUILDING
LINE
1/2" R
7"
6"
WWR 2"
WALK EDGE
AT LAWN AREA
2"
5" ODOT
ITEM 304
5"
6x6 W1.4xW1.4
WWR
SLOPE
2"
WALK TYPICAL SECTION
C100
H:
\2
3\
\0
DW
G\
Ch ap el
Sh ee ts \2
0C
GE
N0
C ha pe l.d w g, /2
7/
2:
:1
PM
, a be rn ha rd
YD
PB
EO
SB
SP
15"
18"
T
D
D
S
21"
SB
SP
SB
W
T
PB
PB
EOEOEOEO
EX. BRICK CHAPEL
F.F. = 944.3
F.F. = 944.6
F.F. = 944.5
F.F. = 944.2 F.F. = 944.3
MH
TOP = 938.05
INV (S) = 930.40
INV (NE) = 930.40
INV (E) = 933.55
" C
LA
Y
" C
LA
Y
6" PVC
MH
TOP = 936.39
INV (NE) = 928.49
INV (S) = 928.64
INV (SE) = 932.64
INV (W) = 929.34
MH
TOP = 936.48
INV (NW) = 932.18
INV (SE) = 934.03
INV (S) = 933.63
DRAIN
TOP = 935.73
DRAIN
TOP = 939.86
(FULL OF DEBRIS)
2 - 8" CLAY
(FULL OF SILT)
INV = 940.30
INV = 940.41
" C
ON
C
12" CONC
6" CONC
8" C
ON
C
4" PVC
EX
. S
TE
AM
LI
NE
(P
ER
R
EC
OR
DS
EX. WATERLINE (PER RECORDS)
EX. SIGN
EX. SIGN
EX. SIGN
BENCHMARK
CROSS NOTCH
N: 639,721.61 E: 1,474,256.80
ELEV = 954.79
CONTROL POINT
CROSS NOTCH
N: 639520.88 E: 1474265.37
06.30.2025 DTW
KLEINGERS
GROUP
THE www.kleingers.com
CIVIL ENGINEERING
SURVEYING
LANDSCAPE
ARCHITECTURE
West Chester, OH 45069 513.779.7851
6219 Centre Park Dr.
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
VA Dayton Renovate Catholic Chapel B119
552-22-201Office of Construction and Facilities Management
100% BID DOCUMENTS 22039.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date AMB
DAYTON, OHIO
NOTE:
UNDERGROUND UTILITIES ARE PLOTTED FROM A
COMPILATION OF AVAILABLE RECORD INFORMATION AND
SURFACE INDICATIONS OF UNDERGROUND STRUCTURES AND
MAY NOT BE INCLUSIVE. PRECISE LOCATIONS AND THE
EXISTENCE OR NON EXISTENCE OF UNDERGROUND UTILITIES
CANNOT BE VERIFIED. CONTRACTOR IS REQUIRED TO HIRE A
PRIVATE LOCATOR TO DETERMINE LOCATIONS OF
UNDERGROUND UTILITIES BEFORE ANY PERIOD OF
EXCAVATION OR CONSTRUCTION ACTIVITY.
0 205 10
H :\2
3\
\0
D W
G \C ha pe l\_ Sh ee ts
\2
0C
SU
R
O
C ha pe l.d w g, /2 7/
2:
P
M , A nd re w B er nh ar d
C200
SURVEY BASEMAP
SITE
VICINITY MAP
N.T.S
NOTES:
1. SOURCE DOCUMENTS AS NOTED.
2. PROJECT COORDINATES ARE BASED ON THE OHIO STATE PLANE COORDINATE
SYSTEM.
3. ALL ELEVATIONS ARE ON THE NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD88) AS ESTABLISHED FROM A GPS SURVEY ORIGINATING ON ODOT CORS
STATION "OHDT" USING GEOID CONUS 18 WITH REFERENCE TO NGS MONUMENT
JZ3661 WITH A POSTED ELEVATION OF 737.56.
4. SITE BENCHMARK AS SHOWN HEREON.
LEGEND
BENCHMARK (CROSS NOTCH)
ELECTRIC OUTLET
LIGHT POST
PULL BOX
TRANSFORMER
WATER VALVE
FIRE HYDRANT
SPIGOT
SANITARY MANHOLE
INLET
STORM MANHOLE
YARD DRAIN
DOWN SPOUT
DECIDUOUS TREE
GUARD POST
SOIL BORING
SIGN (SINGLE POST)
BUSH LINE
UNDERGROUND ELECTRIC
UNDERGROUND STEAM LINE
WATER LINE
SANITARY SEWER
STORM SEWER
ASPHALT
CONCRETE
LANDSCAPE
PB
S
D
YD
GP
SB
UE
UU
W
W
EO
SP
H:
\2
3\
\0
DW
G\
Ch ap el
Sh ee ts \2
0C
SU
RO
Ch ap el
.d w g, /2 7/
2:
:2
PM
, a be rn
EO
SB
SP
T
D
D
S
SB
SP
SB
W
T
PB
PB
EOEOEOEO
" C
LA
Y
6" PVC
6" CONC
8" C
ON
C
4" PVC
15" 18"
21"
06.30.2025 DTW
KLEINGERS
GROUP
THE www.kleingers.com
CIVIL ENGINEERING
SURVEYING
LANDSCAPE
ARCHITECTURE
West Chester, OH 45069 513.779.7851
6219 Centre Park Dr.
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
VA Dayton Renovate Catholic Chapel B119
552-22-201Office of Construction and Facilities Management
100% BID DOCUMENTS 22039.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date AMB
DAYTON, OHIO
NOTE:
UNDERGROUND UTILITIES ARE PLOTTED FROM A
COMPILATION OF AVAILABLE RECORD INFORMATION AND
SURFACE INDICATIONS OF UNDERGROUND STRUCTURES AND
MAY NOT BE INCLUSIVE. PRECISE LOCATIONS AND THE
EXISTENCE OR NON EXISTENCE OF UNDERGROUND UTILITIES
CANNOT BE VERIFIED. CONTRACTOR IS REQUIRED TO HIRE A
PRIVATE LOCATOR TO DETERMINE LOCATIONS OF
UNDERGROUND UTILITIES BEFORE ANY PERIOD OF
EXCAVATION OR CONSTRUCTION ACTIVITY.
0 205 10
H :\2
3\
\0
D W
G \C ha pe l\_ Sh ee ts
\2
0C
D
EM
O
C ha pe l.d w g, /2 7/
2:
P
M , A nd re w B er nh ar d
DEMOLITION LEGEND
REMOVE CONCRETE
SAWCUT LINE
CODED NOTES
SAWCUT EXISTING SIDEWALK AT NEAREST JOINT
EXISTING STAIRS TO REMAIN
EXISTING SANITARY TO REMAIN. DO NOT DISTURB
EXISTING WATER LINE TO REMAIN. DO NOT
DISTURB
EXISTING SIGN TO REMAIN
EXISTING SANITARY LINE TO BE REMOVED
C300
DEMOLITION PLAN
H:
\2
3\
\0
DW
G\
Ch ap el
Sh ee ts \2
0C
DE
M O0
C ha pe l.d w g, /2 7/
2:
:3
PM
, a be rn
EO
SB
SP
T
D
D
S
SB
SP
SB
W
T
PB
PB
EOEOEOEO
" C
LA
Y
6" CONC
8" C
ON
C
4" PVC
15" 18"
21"
103A
101A
100A
EX
A
EX
06.30.2025 DTW
KLEINGERS
GROUP
THE www.kleingers.com
CIVIL ENGINEERING
SURVEYING
LANDSCAPE
ARCHITECTURE
West Chester, OH 45069 513.779.7851
6219 Centre Park Dr.
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
VA Dayton Renovate Catholic Chapel B119
552-22-201Office of Construction and Facilities Management
100% BID DOCUMENTS 22039.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date AMB
DAYTON, OHIO
NOTE:
UNDERGROUND UTILITIES ARE PLOTTED FROM A
COMPILATION OF AVAILABLE RECORD INFORMATION AND
SURFACE INDICATIONS OF UNDERGROUND STRUCTURES AND
MAY NOT BE INCLUSIVE. PRECISE LOCATIONS AND THE
EXISTENCE OR NON EXISTENCE OF UNDERGROUND UTILITIES
CANNOT BE VERIFIED. CONTRACTOR IS REQUIRED TO HIRE A
PRIVATE LOCATOR TO DETERMINE LOCATIONS OF
UNDERGROUND UTILITIES BEFORE ANY PERIOD OF
EXCAVATION OR CONSTRUCTION ACTIVITY.
0 205 10
H :\2
3\
\0
D W
G \C ha pe l\_ Sh ee ts
\2
0C
LO
C
C ha pe l.d w g, /2
7/
2:
P M
, A nd re w
B er nh ar d
CODED NOTES
CONNECT TO EXISTING SIDEWALK1
C400
LOCATION PLAN
PROPOSED LEGEND
CATCH BASIN
STORM SEWER CLEANOUT
CONCRETE WALK
C100
H:
\2
3\
\0
DW
G\
Ch ap el
Sh ee ts \2
0C
LO
C0
C ha pe l.d w g, /2
7/
2:
:5
PM
, a be rn
T
PB
EO
SB
SP
T
D
D
S
SB
SP
SB
W
W
T
PB
PB
EOEOEOEO
" C
LA
Y
" C
ON
C
6" CONC
8" C
ON
C
4" PVC
15" 18"
21"
103A
101A
100A
EX
43' - 6" STM @ 1.50%48' - 6" STM @ 1.50%
19' - 6" STM
1.54%
12' - 6" STM
@ 2.50%
35' - 6" STM@ 8.54%
43' - 6" STM @ 1.50%
30' - 6" STM @ 1.50%
5' - 6" STM
@ 1.50%
19' - 6" STM
@ 7.99%
24' - 6" STM
@ 5.36%
A
EX
28' - 6" SAN@ 2.00%
41' - 6" STM
4.69%
06.30.2025 DTW
KLEINGERS
GROUP
THE www.kleingers.com
CIVIL ENGINEERING
SURVEYING
LANDSCAPE
ARCHITECTURE
West Chester, OH 45069 513.779.7851
6219 Centre Park Dr.
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
VA Dayton Renovate Catholic Chapel B119
552-22-201Office of Construction and Facilities Management
100% BID DOCUMENTS 22039.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date AMB
DAYTON, OHIO
NOTE:
UNDERGROUND UTILITIES ARE PLOTTED FROM A
COMPILATION OF AVAILABLE RECORD INFORMATION AND
SURFACE INDICATIONS OF UNDERGROUND STRUCTURES AND
MAY NOT BE INCLUSIVE. PRECISE LOCATIONS AND THE
EXISTENCE OR NON EXISTENCE OF UNDERGROUND UTILITIES
CANNOT BE VERIFIED. CONTRACTOR IS REQUIRED TO HIRE A
PRIVATE LOCATOR TO DETERMINE LOCATIONS OF
UNDERGROUND UTILITIES BEFORE ANY PERIOD OF
EXCAVATION OR CONSTRUCTION ACTIVITY.
0 205 10
H :\2
3\
\0
D W
G \C ha pe l\_ Sh ee ts
\2
0C
U
TI
L0
C ha pe l.d w g, /2
7/
2:
P M
, A nd re w
B er nh ar d
CODED NOTES
CONNECT TO EXISTING CATCH BASIN.
UTILITY CROSSING. MAINTAIN 18' VERTICAL
CLEARANCE. CONTRACTOR TO VERIFY DEPTH
AND LOCATION PRIOR TO CONSTRUCTION.
TIE BUILDING DOWNSPOUT INTO PROPOSED
STRUCTURE
C500
UTILITY PLAN
PROPOSED LEGEND
STORM SEWER PIPE
CATCH BASIN
STORM SEWER CLEANOUT
SANITARY SEWER PIPE
SANITARY SEWER MANHOLE
SANITARY SEWER CLEANOUT
STM
SAN
CO
A
H:
\2
3\
\0
DW
G\
Ch ap el
Sh ee ts \2
0C
UT
IL
Ch ap el
.d w g, /2 7/
2:
:0
PM
, a be rn
STM 104 - EX
2.0
1.8
1.3
0.8
0.2
9.9
9.1
7.2
6.2
2.
1.
1.
0.
0.
9.
9.
7.
6.
0+00 1+00 1+95.23
STM 202 - EX
SAN A - EX
STM 103A - 103
0.7
0.3
0.1
0.0
7.9
6.5
6.5
0.
0.
0.
0.
7.
6.
6.
0+00 1+00 1+28.74
1.1
1.3
1.3
1.
1.
1.
0+00 0+25.28
43' - 6" STM @ 1.50%
IN
V
O U
T=
8.
(6
W R
IM
=9
.6
C
LE
AN
O U
T
N
4.
E
0.
IN
V
IN
=9
.0
(6
E
IN
V
O U
T=
8.
(6
W
IN
V
IN
=9
.0
(6
N
R
IM
=9
.1
C
LE
AN
O
U T
N
1.
E
7.
48' - 6" STM @ 1.50% 19' - 6" STM @ 1.54%
IN
V
IN
=9
.3
(6
E
IN
V
O U
T=
7.
(6
N
R
IM
=9
.2
C
LE
AN
O
U T
N
5.
E
9.
IN
V
IN
=9
.1
(6
S
E
IN
V O
U T=
5.
(6
N
IN
V
IN
=9
.1
(6
S
R
IM
=9
.1
C
LE
AN
O
U T
N
5.
E
6.
24' - 6" STM @ 5.36%
43' - 6" STM @ 1.50%
IN
V
O U
T=
7.
(6
W R
IM
=9
.9
C
LE
AN
O U
T
N
7.
E
5.
IN
V
IN
=9
.2
(6
E
IN
V
O U
T=
7.
(6
W
R
IM
=9
.6
C
LE
AN
O
U T
N
1.
E
2.
30' - 6" STM @ 1.50%
IN
V
O U
T=
6.
(6
N W
IN
V
IN
=9
.8
(6
E
R
IM
=9
.5
C
LE
AN
O
U T
N
4.
E
2.
35' - 6" STM @ 8.54%
IN
V
O U
T=
8.
(6
S R
IM
=9
.1
C
LE
AN
O U
T
N
6.
E
8.
103A
5' - 6" STM @ 1.50%
IN
V
IN
=9
.0
(6
E
IN
V
O U
T=
8.
(6
W
IN
V
IN
=9
.0
(6
N
R
IM
=9
.1
C
LE
AN
O
U T
N
1.
E
7.
IN
V
IN
=9
.8
(6
S
E
IN
V
IN
=9
.8
(6
S
IN
V O
U T=
2.
(1
2" ) N
W
IN
V
IN
=9
.6
(8
S
IN
V
IN
=9
.0
(6
S E
TO
P
=9
.4
O D
O T
C B
N O
. 3 B
C
N
9.
E
.5
EX
IN
V
IN
=9
.8
(6
S
E
IN
V
IN
=9
.8
(6
S
IN
V O
U T=
2.
(1
2" ) N
W
IN
V
IN
=9
.6
(8
S
IN
V
IN
=9
.0
(6
S E
TO
P
=9
.4
O D
O T
C B
N O
. 3 B
C
N
9.
E
.5
EX
STM 100A - 100
STM 101A - 101
9.6
7.0
9.
6.
0+00 0+47.81
6" SAN
APPROXIMATE LOCATION OF EX.
WATER LINE. CONTRACTOR TO VERIFY
DEPTH AND LOCATION PRIOR TO
CONSTRUCTION. LOWER WATERLINE
TO PROVIDE MINIMUM18" VERTICAL
CLEARANCE FROM STORM SEWER IF
NECESSARY.
EX. 15" SAN
EX. 15" SAN
APPROXIMATE LOCATION OF EX.
WATER LINE. CONTRACTOR TO VERIFY
DEPTH AND LOCATION PRIOR TO
CONSTRUCTION. MAINTAIN MINIMUM 18"
VERTICAL CLEARANCE
A
N
2.
E
4.
IN
V
O U
T=
1.
(6
N W
C
LE
AN
O
U T
R
IM
=9
.7
28' - 6" SAN @ 2.00%
EX
N
3.
E
9.
IN
V
IN
=9
.4
(6
S
E
IN
V
IN
=9
.4
(1 5"
) S
IN
V O
U T=
0.
(1
5" ) N
E
O D
O T
M H
N O
. 3 R
IM
=9
.8
9.6
9.0
9.
8.
0+00 0+31.69
9.0
7.5
8.
7.
0+00 0+38.76
IN
V
IN
=9
.0
(6
E
IN
V
IN
=9
.0
(6
S
IN
V
O U
T=
7.
(6
N
R
IM
=9
.0
C
LE
AN
O
U T
N
5.
E
8.
IN
V
O U
T=
7.
(6
W R
IM
=9
.6
C
LE
AN
O U
T
N
6.
E
0.
101A
12' - 6" STM @ 2.50%
IN
V
IN
=9
.0
(6
E
IN
V
IN
=9
.0
(6
S
IN
V
O U
T=
7.
(6
N
R
IM
=9
.0
C
LE
AN
O
U T
N
5.
E
8.
IN
V
O U
T=
6.
(6
N W
R
IM
=9
.6
C
LE
AN
O
U T
N
7.
E
3.
100A
19' - 6" STM @ 7.99%
IN
V
IN
=9
.1
(6
S
E
IN
V O
U T=
5.
(6
N
IN
V
IN
=9
.1
(6
S
R
IM
=9
.1
C
LE
AN
O
U T
N
5.
E
6.
41' - 6" STM @ 4.69%
APPROXIMATE LOCATION OF EX.
WATER LINE. CONTRACTOR TO VERIFY
DEPTH AND LOCATION PRIOR TO
CONSTRUCTION. LOWER WATERLINE
TO PROVIDE MINIMUM18" VERTICAL
CLEARANCE FROM STORM SEWER IF
NECESSARY.
6" STM
06.30.2025 DTW
KLEINGERS
GROUP
THE www.kleingers.com
CIVIL ENGINEERING
SURVEYING
LANDSCAPE
ARCHITECTURE
West Chester, OH 45069 513.779.7851
6219 Centre Park Dr.
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
VA Dayton Renovate Catholic Chapel B119
552-22-201Office of Construction and Facilities Management
100% BID DOCUMENTS 22039.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date AMB
DAYTON, OHIO
NOTE:
UNDERGROUND UTILITIES ARE PLOTTED FROM A
COMPILATION OF AVAILABLE RECORD INFORMATION AND
SURFACE INDICATIONS OF UNDERGROUND STRUCTURES AND
MAY NOT BE INCLUSIVE. PRECISE LOCATIONS AND THE
EXISTENCE OR NON EXISTENCE OF UNDERGROUND UTILITIES
CANNOT BE VERIFIED. CONTRACTOR IS REQUIRED TO HIRE A
PRIVATE LOCATOR TO DETERMINE LOCATIONS OF
UNDERGROUND UTILITIES BEFORE ANY PERIOD OF
EXCAVATION OR CONSTRUCTION ACTIVITY.
H :\2
3\
\0
D W
G \C ha pe l\_ Sh ee ts
\2
0C
U
TI
L0
C ha pe l.d w g, /2
7/
2:
P M
, A nd re w
B er nh ar d
C501
UTILITY PROFILES
H:
\2
3\
\0
DW
G\
Ch ap el
Sh ee ts \2
0C
UT
IL
Ch ap el
.d w g, /2 7/
2:
:1
PM
, a be rn
EO
SB
SP
T
D
D
S
SB
SP
SB
W
T
PB
PB
EOEOEOEO
" C
LA
Y
6" CONC
8" C
ON
C
4" PVC
15" 18"
21"
103A
101A
100A
EX
940.56± ME
940.46± ME
940.58± ME
940.40± ME
940.50± ME
940.59± ME
940.29± ME
940.26± ME
940.39± ME
940.55± ME
940.33± ME
940.27± ME
940.52± ME
940.55± ME
941.16± ME
940.99± ME
940.98± ME
941.00± ME 941.66 RIM
941.17 RIM
941.19 RIM940.23 RIM
940.68 RIM
940.60 RIM
938.10 RIM
940.57 RIM
940.68 RIM
940.91 RIM
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
EX
A
940.51± ME
940.78 RIM
940.00 RIM
06.30.2025 DTW
KLEINGERS
GROUP
THE www.kleingers.com
CIVIL ENGINEERING
SURVEYING
LANDSCAPE
ARCHITECTURE
West Chester, OH 45069 513.779.7851
6219 Centre Park Dr.
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
VA Dayton Renovate Catholic Chapel B119
552-22-201Office of Construction and Facilities Management
100% BID DOCUMENTS 22039.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date AMB
DAYTON, OHIO
NOTE:
UNDERGROUND UTILITIES ARE PLOTTED FROM A
COMPILATION OF AVAILABLE RECORD INFORMATION AND
SURFACE INDICATIONS OF UNDERGROUND STRUCTURES AND
MAY NOT BE INCLUSIVE. PRECISE LOCATIONS AND THE
EXISTENCE OR NON EXISTENCE OF UNDERGROUND UTILITIES
CANNOT BE VERIFIED. CONTRACTOR IS REQUIRED TO HIRE A
PRIVATE LOCATOR TO DETERMINE LOCATIONS OF
UNDERGROUND UTILITIES BEFORE ANY PERIOD OF
EXCAVATION OR CONSTRUCTION ACTIVITY.
0 205 10
H :\2
3\
\0
D W
G \C ha pe l\_ Sh ee ts
\2
0C
G R
D
C ha pe l.d w g, /2 7/
2:
P
M , A nd re w B er nh ar d
C600
GRADING PLAN
SPOT ELEVATION LEGEND
MANHOLE / CLEANOUT RIM ELEVATION
MATCH EXISTING ELEVATION
1215.00 RIM
1215.00 ME
PROPOSED EROSION CONTROL LEGEND
INLET PROTECTION
SILT FENCE
CONCRETE WASHOUT
CONSTRUCTION ENTRANCE
CWO
SF
IP
GRADING LEGEND
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED SPOT ELEVATION
1215.00
IP
CWO
C701
C701
C701
C701
H:
\2
3\
\0
DW
G\
Ch ap el
Sh ee ts \2
0C
GR
D0
C ha pe l.d w g, /2
7/
2:
:3
PM
, a be rn
KLEINGERS
GROUP
THE www.kleingers.com
CIVIL ENGINEERING
SURVEYING
LANDSCAPE
ARCHITECTURE
West Chester, OH 45069 513.779.7851
6219 Centre Park Dr.
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
VA Dayton Renovate Catholic Chapel B119
552-22-201Office of Construction and Facilities Management
100% BID DOCUMENTS 22039.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date AMB
DAYTON, OHIO
H :\2
3\
\0
D W
G \C ha pe l\_ Sh ee ts
\2
0C
G
EN
C ha pe l.d w g, /2
7/
2:
P M
, A nd re w
B er nh ar d
EROSION CONTROL NOTES
C700
PROJECT DATA
PROJECT DESCRIPTION
BUILDING ADDITION AND ASSOCIATED PEDESTRIAN CONNECTIONS.
LATITUDE: N 39°44'34.73"
LONGITUDE: W 84°15'29.84"
ESTIMATED CONSTRUCTION DATES: 03/01/2025 - 03/02/2026
TOTAL SITE AREA: 0.38 ACRES
TOTAL DISTURBED AREA: 0.06 ACRES
EXISTING IMPERVIOUS AREA: 0.19 ACRES
PROPOSED IMPERVIOUS AREA: 0.06 ACRES
TOTAL IMPERVIOUS AREA AFTER CONSTRUCTION: 0.25 ACRES
INCREASE IN IMPERVIOUS AREA: 31.6%
PRE-CONSTRUCTION RUNOFF COEFFICIENT : C=0.60
POST-CONSTRUCTION RUNOFF COEFFICIENT: C=0.69
IMMEDIATE RECEIVING WATER/MS4: UNNAMED TRIBUTARY TO THE MIAMI RIVER
ULTIMATE RECEIVING STREAM: MIAMI RIVER
EXISTING LAND USE: LIBRARY
SOILS: MIAMIAN-URBAN LAND COMPLEX, UNDULATING
CONSTRUCTION SEQUENCE
TO COMPLETE THE EXCAVATION AND CONSTRUCTION OF THE PROPOSED JOB IMPROVEMENTS, COORDINATION OF THE CONTRACTOR'S WORK CREWS WILL BE REQUIRED. THE EXISTING DITCHES WILL PERFORM TEMPORARY SEDIMENT CONTROL AND STORAGE DURING THE PROPOSED CONSTRUCTION. WORK WILL GENERALLY PROCEED FROM DOWNSTREAM TO UPSTREAM IN THESE
WORK AREAS. THE GENERAL CONSTRUCTION SEQUENCE IS AS FOLLOWS:
A) INSTALL EROSION CONTROL ITEMS.
B) STRIP TOPSOIL AND ANY UNSUITABLE MATERIAL THROUGH THE INCREMENTAL WORK AREA.
C) INSTALL TEMPORARY DITCH CHECKS IN DOWNSTREAM END OF EXISTING DITCH WITHIN 24 HOURS FOLLOWING THE
STRIPPING OPERATION.
D) IF U/G PIPE IS CALLED FOR IN THIS PORTION OF WORK AREA, PIPE CREW WILL INSTALL PIPE AS WELL AS MANHOLES.
E) AS PIPE INSTALLATION PROGRESSES, REPAIR OF THE ROADWAY WILL PROCEED BEHIND IT.
F) ANY DISTURBED OR EXPOSED AREAS SHALL BE STABILIZED PER OEPA TEMPORARY AND PERMANENT STABILIZATION
REGULATIONS INCLUDING:
1. SEEDING
2. DITCH MATTING
3. INLET PROTECTION
4. MULCHING
5. WATERING
EMERGENCY ACTION & SPILL PREVENTION PLAN
THE SCOPE OF WORK COVERED BY THIS PLAN INCLUDES EMERGENCY RESPONSE TO SPILLS, CONTAINMENT OF SPILLED LIQUIDS, EMERGENCY NOTIFICATION NUMBERS, AND SOIL EXCAVATION FOR SPILL CLEAN-UP.
IN THE EVENT OF A SPILL EVENT THE EMPLOYEE SHALL ASSESS THE SPILL AND IMMEDIATELY NOTIFY THE SAFETY OFFICER AND
SUPERVISOR IN CHARGE, OR OTHER INDIVIDUALS AS LISTED BELOW.
TITLE NAME PHONE NUMBER
SITE SUPERINTENDENT ______________________________________________________________________________
PROJECT ENGINEER ______________________________________________________________________________
IMMEDIATELY AFTER NOTIFICATION, THE EMPLOYEE WILL BE DIRECTED BY THE SAFETY OFFICER, OR RESPONSIBLE PARTY TO START CONTAINMENT PROCEDURES TO PREVENT THE MATERIAL FROM REACHING THE STORM SEWERS, DRAINAGE DITCH, AND OTHER OUTLETS USING THE FOLLOWING ACTIONS OR ANY OTHER MEANS NECESSARY WITHOUT COMPROMISING WORKER SAFETY:
1) CLEAR PERSONNEL FROM THE SPILL AREA AND ROPE OFF AREA.
2) STOP THE SPILL.
3) USE SORBENT MATERIALS, PLUG PUTTY, OR HOLE PUTTY AS NECESSARY TO CONTROL THE SPILL AT THE SOURCE.
4) CONSTRUCT A TEMPORARY CONTAINMENT DIKE OF SORBENT MATERIALS OR DIRT TO CONTAIN SPILL.
SPILL KITS WILL BE LOCATED ON THE PROJECT AS DESIGNATED ON THE SWPPP PLAN.
UPON COMPLETION OF CONTAINMENT OPERATIONS, PROPER CLEAN-UP PROCEDURES WILL BE IMPLEMENTED IN ACCORDANCE WITH
REGULATORY PROCEDURES.
IF THE SPILL EXCEEDS 25 GALLONS, THE FOLLOWING ORGANIZATIONS SHALL BE CONTACTED WITHIN 30 MINUTES OF THE INCIDENT:
EMERGENCY CONTACTS:
OHIO EPA EMERGENCY RESPONSE CENTER 800-282-9378 (24-HOUR PHONE NO.)
GENERAL NOTES
THE CONTRACTOR IS HEREBY ADVISED THAT STRICTER POLLUTION CONTROL STANDARDS AND ENFORCEMENT HAVE BEEN IMPOSED BY THE OHIO EPA SINCE MARCH 10, 2003 AND WITH REVISIONS IN APRIL 2018 AND IN APRIL 2023. ALSO, MANY PRIVATE CITIZEN ENVIRONMENTAL GROUPS, WHO HAVE BEEN KNOWN TO FILE CIVIL LEGAL ACTIONS, ARE PRESENT IN THE AREA AND OBSERVE ALL
CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL INFORM ALL SUBCONTRACTORS OF THE REQUIREMENTS AND RESPONSIBILITIES OF THE SWPPP AND
SHALL DOCUMENT ALL SUCH NOTIFICATIONS AND/OR DISCUSSIONS.
THE CONTRACTOR WILL BE REQUIRED TO PARTICIPATE IN SEDIMENT AND EROSION CONTROL INSPECTIONS ON A WEEKLY BASIS AND
SIGN AN APPROVED INSPECTION SHEET THAT SHALL BE KEPT ON FILE AT THE JOB SITE.
UNLESS OTHERWISE NOTED, STANDARDS AND SPECIFICATIONS ESTABLISHED IN THE LATEST EDITION OF THE OEPA "RAINWATER AND LAND DEVELOPMENT" HANDBOOK SHALL GOVERN THE EROSION AND SEDIMENT CONTROL INSTALLATIONS SPECIFIED ON THIS
PLAN.
THIS PROJECT WILL INVOLVE SEVERAL CONSTRUCTION PHASES AND SEQUENCING THROUGHOUT ITS LIFETIME. IT IS VERY IMPORTANT THAT ALL TEMPORARY SEDIMENT AND EROSION CONTROL (S&EC) FIELD METHODS ALONG WITH THIS PLAN, ARE UPDATED TO REFLECT THE ACTUAL FIELD CONDITIONS, CURRENT WEATHER CONDITIONS AND SITE GRADE CHANGES. THE
ENGINEER OR THE OHIO EPA CAN AND WILL MODIFY THIS PLAN AS NECESSARY.
THE CONTRACTOR WILL VOLUNTARILY SELF REPORT ANY POTENTIAL VIOLATIONS OF THE OEPA NPDES PERMIT TO THE ENGINEER
AND THE OEPA.
THE CONTRACTOR SHALL REMOVE EXISTING GROUND COVER ONLY AS NECESSARY FOR THE PROJECT PHASE CURRENTLY UNDER
CONSTRUCTION.
CONSTRUCTION AND DEMOLITION DEBRIS SHALL BE PROPERLY DISPOSED OF ACCORDING TO OHIO EPA REQUIREMENTS.
THE CONTRACTOR WILL BE REQUIRED TO BUILD SEDIMENT BASINS OR SEDIMENT TRAPS OR USE EQUAL METHODS TO DETAIN AND CLEAN WATER TO ACCEPTABLE EPA STANDARDS BEFORE RELEASING THE WATER BACK INTO THE STREAM.
THERE SHALL BE NO TURBID DISCHARGES TO SURFACE WATERS, RESULTING FROM DEWATERING ACTIVITIES. SEDIMENT-LADEN WATER MUST PASS THROUGH A SETTLING POND, FILTER BAG, OR OTHER COMPARABLE PRACTICE, PRIOR TO DISCHARGE.
NO SOLID OR LIQUID WASTE SHALL BE DISCHARGED INTO STORM WATER RUNOFF.
ALL PROCESS WASTEWATER (EQUIPMENT WASHING, LEACHATE FROM ON-SITE WASTE DISPOSAL, ETC.) SHALL BE COLLECTED AND
DISPOSED OF AT A PUBLICLY OWNED TREATMENT WORKS.
ALL CONSTRUCTION ACTIVITIES MUST COMPLY WITH ALL LOCAL EROSION/SEDIMENT CONTROL, WASTE DISPOSAL, SANITARY AND
HEALTH REGULATIONS.
OTHER EROSION CONTROL ITEMS MAY BE NECESSARY DUE TO ENVIRONMENTAL CONDITIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION AND IMPLEMENTATION OF ADDITIONAL EROSION CONTROL ITEMS, AT THE ENGINEER'S
DISCRETION.
NO SOIL, ROCK, DEBRIS OR OTHER MATERIAL SHALL BE DUMPED OR PLACED IN ANY AREAS NOT ADEQUATELY PROTECTED BY
EROSION CONTROL INSTALLATIONS.
IT IS PREFERRED TO USE PERMANENT EROSION CONTROL ITEMS AS SHOWN IN THE PLANS TO CONTROL CONSTRUCTION POLLUTION WHEN POSSIBLE. OTHERWISE, THE TEMPORARY POLLUTION PREVENTION ITEMS ARE TO BE USED.
MOST TEMPORARY S&EC METHODS, INCLUDING BUT NOT LIMITED TO, SILT FENCE AND DITCH CHECKS MAY ALL HAVE TO BE PERIODICALLY REMOVED AND REPLACED, OR MOVED FROM THE EXISTING ROAD DITCH OR STRIPPED AREAS AS WORK PROGRESSES. ANY CHANGES SHALL BE NOTED IN THE PLAN BY RED LINE AND DATED ON A CORRECTIVE ACTION LOG.
ALL TEMPORARY SEDIMENT CONTROLS AND STORM WATER QUALITY METHODS WILL BE BUILT/INSTALLED AS THE PROJECT PROGRESSES TO ELIMINATE UNNECESSARY DISTURBANCE AND REDUNDANCY. ALL TEMPORARY CONTROLS SHALL BE IN PLACE AND
FUNCTIONING PROPERLY WHEN THREATENING WEATHER IS IMMINENT.
"TEMPORARY STABILIZATION" MEANS THE ESTABLISHMENT OF TEMPORARY VEGETATION, MULCHING, GEOTEXTILES, SOD, PRESERVATION OF EXISTING VEGETATION AND OTHER TECHNIQUES CAPABLE OF QUICKLY ESTABLISHING COVER OVER DISTURBED
AREAS TO PROVIDE EROSION CONTROL BETWEEN CONSTRUCTION OPERATIONS.
"PERMANENT STABILIZATION" MEANS THE ESTABLISHMENT OF PERMANENT VEGETATION, DECORATIVE LANDSCAPE MULCHING, MATTING, SOD, RIP RAP AND LANDSCAPING TECHNIQUES TO PROVIDE PERMANENT EROSION CONTROL ON AREAS WHERE CONSTRUCTION OPERATIONS ARE COMPLETE OR WHERE NO FURTHER DISTURBANCE IS EXPECTED FOR AT LEAST A YEAR.
OFF-SITE TRACKING OF SEDIMENTS SHALL BE MINIMIZED. A STABILIZED CONSTRUCTION ENTRANCE WILL BE PROVIDED TO HELP REDUCE VEHICLE TRACKING OF SEDIMENTS. ALL PAVED STREETS ADJACENT TO THE SITE WILL BE SWEPT DAILY TO REMOVE ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS HAULING MATERIAL FROM THE CONSTRUCTION SITE WILL BE
COVERED WITH A TARP.
STABILIZATION PRACTICES
PERMANENT SEEDING AND MULCHING STABILIZATION SHALL BE PROVIDED PER OEPA GUIDELINES AS SET FORTH IN PART II.B OF
OHIO EPA PERMIT NO.: OHC000006. (SEE TABLE 1)
ALL TEMPORARY EROSION AND SEDIMENT CONTROL INSTALLATIONS SHALL BE REMOVED WHEN 70% VEGETATION HAS BEEN
REACHED.
SEEDING & MULCHING
MULCH AND/OR OTHER APPROPRIATE VEGETATIVE PRACTICES SHALL BE APPLIED TO DISTURBED AREAS WITHIN 7 DAYS OF GRADING IF THE AREA IS TO REMAIN DORMANT (UNDISTURBED) FOR MORE THAN 14 DAYS OR ON AREAS AND PORTIONS OF THE SITE
WHICH CAN BE BROUGHT TO FINAL GRADE.
MULCH SHALL CONSIST OF UNROTTED SMALL GRAIN STRAW APPLIED AT THE RATE OF 2 TONS/AC. OR 90 LB./1000 SQ. FT. (TWO TO THREE BALES). THE STRAW MULCH SHALL BE SPREAD UNIFORMLY BY HAND OR MECHANICALLY SO THE SOIL SURFACE IS COVERED.
FOR UNIFORM DISTRIBUTION OF HAND-SPREAD MULCH, DIVIDE AREA INTO APPROXIMATELY 1000-SQ.-FT. SECTIONS AND PLACE TWO
45-LB. BALES OF STRAW IN EACH SECTION.
MULCH SHALL BE ANCHORED IMMEDIATELY TO MINIMIZE LOSS BY WIND OR RUNOFF. THE FOLLOWING ARE ACCEPTABLE METHODS
FOR ANCHORING MULCH:
1) MECHANICAL-USE A DISK, CRIMPER, OR SIMILAR TYPE TOOL SET STRAIGHT TO PUNCH OR ANCHOR THE MULCH MATERIAL INTO THE SOIL. STRAW MECHANICALLY ANCHORED SHALL NOT BE FINELY CHOPPED BUT BE LEFT GENERALLY LONGER THAN
6 IN.
2) MULCH NETTINGS-USE ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS, FOLLOWING ALL PLACEMENT AND ANCHORING SUGGESTIONS. USE IN AREAS OF WATER CONCENTRATION AND STEEP SLOPES TO HOLD MULCH IN PLACE.
3) SYNTHETIC BINDERS-FOR STRAW MULCH, SYNTHETIC BINDERS SUCH AS ACRYLIC DLR (AGRI-TAC), DCA-70, PETROSET, TERRA TACK OR EQUAL MAY BE USED AT RATES RECOMMENDED BY THE MANUFACTURER. ALL APPLICATIONS OF SYNTHETIC BINDERS MUST BE CONDUCTED IN SUCH A MANNER WHERE THERE IS NO CONTACT WITH WATERS OF THE
STATE.
4) WOOD CELLULOSE FIBER - WOOD CELLULOSE FIBER MAY BE USED FOR ANCHORING STRAW. THE FIBER BINDER SHALL BE APPLIED AT A NET DRY WEIGHT OF 750 LB./ACRE. THE WOOD CELLULOSE FIBER SHALL BE MIXED WITH WATER AND THE
MIXTURE SHALL CONTAIN A MAXIMUM OF 50 LB./100 GAL. OF WOOD CELLULOSE FIBER.
STOCKPILE
SILT FENCING SHALL BE INSTALLED AROUND TEMPORARY SPOIL STOCKPILES. THESE STOCKPILES SHALL BE STRAW MULCHED AND/OR TEMPORARILY SEEDED WITHIN 7 WORKING DAYS IF LEFT DORMANT FOR 14 DAYS OR LONGER.
TIMING OF CONTROLS/MEASURES
AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, CONSTRUCTION ENTRANCE(S) AND SILT FENCE WILL BE CONSTRUCTED PRIOR TO CLEARING OR GRADING OF ANY OTHER PORTIONS OF THE SITE. SEDIMENT CONTROL DEVICES SHALL BE IMPLEMENTED FOR ALL AREAS REMAINING DISTURBED LONGER THAN 14 DAYS AND/OR WITHIN 7 DAYS OF ANY GRUBBING ACTIVITIES. AREAS WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR MORE THAN 14 DAYS WILL BE STABILIZED WITH A TEMPORARY SEED AND MULCH WITHIN 2 DAYS OF THE LAST DISTURBANCE IF THE AREA IS WITHIN 50 FEET OF A STREAM, AND WITHIN 7 DAYS OF THE LAST DISTURBANCE IF THE AREA IS MORE THAN 50 FEET AWAY FROM A STREAM. ONCE CONSTRUCTION ACTIVITY CEASES PERMANENTLY IN AN AREA, THAT AREA WILL BE STABILIZED WITH PERMANENT SEED AND MULCH. AFTER THE ENTIRE SITE IS
STABILIZED, THE ACCUMULATED SEDIMENT WILL BE REMOVED FROM THE BASIN.
INSPECTIONS
ALL BMPS ON THIS SITE SHALL BE INSPECTED BY "QUALIFIED INSPECTION PERSONNEL" ASSIGNED BY THE CONTRACTOR OR DESIGNATED REPRESENTATIVE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND BY THE END OF THE NEXT CALENDAR DAY, EXCLUDING WEEKENDS AND HOLIDAYS UNLESS WORK IS SCHEDULED, AFTER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .