This document is an Addendum No. 2 for the VA Dayton Project No. 552-19-102 to correct infrastructure deficiencies in Building 408, dated 08/22/2025. The addendum includes updates to multiple specification sections and drawings, with key modifications spanning quality control, asbestos abatement, and floor-related work. Specifically, the changes involve revising the Quality Control Organization's staffing requirements, updating the Traditional Asbestos Abatement work scope and quantities, and adding entire sections for subsurface floor preparation, ceramic and porcelain tiling, and carpeting. Drawing modifications include revisions to the First Floor Plan and First Floor Reflected Ceiling Plan, with added clouding for the Chaplains Office spaces 101A and 101C.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 91 - Photo 2.jpg | JPG image | |
| RFI 91 - Photo 5.jpg | JPG image | |
| 552-19-102 RFIs Tracker as of 20250822.docx | DOCX document | |
| RFI 91 - Photo 1.jpg | JPG image | |
| RFI 91 - Photo 4.jpg | JPG image | |
| 02 82 11 - Traditional Asbestos Abatement Rev1.pdf | ||
| 09 68 00 - Carpeting.pdf | ||
| 36C25025B0036 0007.docx | DOCX document | |
| 01 45 00 - Quality Control.pdf | ||
| Windows PLM Report.pdf | ||
| 09 30 13 - Ceramic and Porcelain Tiling.pdf | ||
| RFI 91 - Photo 3.jpg | JPG image | |
| RFI 91 - Photo 6.jpg | JPG image | |
| 09 05 16 - Subsurface Prep for Floor Finishes.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA DAYTON PROJECT NO. 552-19-102
CORRECT INFRASTRUCTURE DEFICIENCIES, B408
ADDENDUM NO. #2
08/22/2025
SPECIFICATIONS
ITEM NO. 1 Section 01 45 00 - Quality Control
A. Revise paragraph 3.4 QUALITY CONTROL ORGANIZATION: Staffing Requirements updated for CQC
ITEM NO. 2 Section 02 82 11 - Traditional Asbestos Abatement
A. Modified paragraph 1.1.2 EXTENT OF WORK: tables to update Scope of Work and Quantities.
DRAWINGS
ITEM NO. 1 Drawing No. AS101, FIRST FLOOR PLAN. Revised sheet attached.
A. Added Clouding for the Chaplains Office 101A and 101C.
ITEM NO. 2 Drawing No. AS111, FIRST FLOOR REFLECTED CEILING PLAN. Revised sheet attached.
A. Added Clouding for the Chaplains Office 101A and 101C.
ITEM NO. 3 Section 09 05 16 - Subsurface Prep for Floor Finishes
A. Add in it's entirety.
ITEM NO. 4 Section 09 30 13 - Ceramic & Porcelain Tiling
A. Add in it's entirety.
ITEM NO. 3 Section 09 68 00 - Carpeting
A. Add in it's entirety.