552-19-102_Addendum 2.pdf

PDF 126 KB Posted

Attached to
Y1AA--Infrastructure Deficiencies B408 [552-19-102] Dayton VAMC
Solicitation number
36C25025B0036Amend0007
Issued by

About this file

This document is an Addendum No. 2 for the VA Dayton Project No. 552-19-102 to correct infrastructure deficiencies in Building 408, dated 08/22/2025. The addendum includes updates to multiple specification sections and drawings, with key modifications spanning quality control, asbestos abatement, and floor-related work. Specifically, the changes involve revising the Quality Control Organization's staffing requirements, updating the Traditional Asbestos Abatement work scope and quantities, and adding entire sections for subsurface floor preparation, ceramic and porcelain tiling, and carpeting. Drawing modifications include revisions to the First Floor Plan and First Floor Reflected Ceiling Plan, with added clouding for the Chaplains Office spaces 101A and 101C.

View the file

Other files

File Type Posted
RFI 91 - Photo 2.jpg JPG image
RFI 91 - Photo 5.jpg JPG image
552-19-102 RFIs Tracker as of 20250822.docx DOCX document
RFI 91 - Photo 1.jpg JPG image
RFI 91 - Photo 4.jpg JPG image
02 82 11 - Traditional Asbestos Abatement Rev1.pdf PDF
09 68 00 - Carpeting.pdf PDF
36C25025B0036 0007.docx DOCX document
01 45 00 - Quality Control.pdf PDF
Windows PLM Report.pdf PDF
09 30 13 - Ceramic and Porcelain Tiling.pdf PDF
RFI 91 - Photo 3.jpg JPG image
RFI 91 - Photo 6.jpg JPG image
09 05 16 - Subsurface Prep for Floor Finishes.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA DAYTON PROJECT NO. 552-19-102

CORRECT INFRASTRUCTURE DEFICIENCIES, B408

ADDENDUM NO. #2

08/22/2025

SPECIFICATIONS

ITEM NO. 1 Section 01 45 00 - Quality Control

A. Revise paragraph 3.4 QUALITY CONTROL ORGANIZATION: Staffing Requirements updated for CQC

ITEM NO. 2 Section 02 82 11 - Traditional Asbestos Abatement

A. Modified paragraph 1.1.2 EXTENT OF WORK: tables to update Scope of Work and Quantities.

DRAWINGS

ITEM NO. 1 Drawing No. AS101, FIRST FLOOR PLAN. Revised sheet attached.

A. Added Clouding for the Chaplains Office 101A and 101C.

ITEM NO. 2 Drawing No. AS111, FIRST FLOOR REFLECTED CEILING PLAN. Revised sheet attached.

A. Added Clouding for the Chaplains Office 101A and 101C.

ITEM NO. 3 Section 09 05 16 - Subsurface Prep for Floor Finishes

A. Add in it's entirety.

ITEM NO. 4 Section 09 30 13 - Ceramic & Porcelain Tiling

A. Add in it's entirety.

ITEM NO. 3 Section 09 68 00 - Carpeting

A. Add in it's entirety.