551-22184.CAK - MSP-Ionia EB Scale - Spec 1 of 4.pdf

PDF 3 MB Posted

Attached to
551/22184. CAK; Ionia Weigh Station New Eastbound Station
Solicitation number
RFQ - 171 - 230000000797
Issued by
Ionia County, Michigan

About this file

This document is a State of Michigan Department of Technology, Management and Budget State Facilities Administration contract solicitation for the demolition of an existing weigh station building and scale, and the construction of a new weigh station building and scale along Interstate 96 in Ionia, Michigan. The project includes approximately 90 feet of concrete paving on each side of the new scale, as well as the installation of traffic signals, signs, speakers, and inspection lights. The new building will consist of a lobby, control room, public toilet, office, break room, staff toilet, locker room, multi-use room, electrical room, mechanical room, and fitness room/meeting room.

Bids are due by 2:00 PM ET on November 1, 2023 through the State of Michigan's SIGMA VSS website. A mandatory virtual pre-bid conference will be held on October 24, 2023, and contractors are encouraged to visit the site on October 25, 2023. The contract includes liquidated damages and the successful bidder will be required to provide performance and payment bonds. The project is funded by the State of Michigan.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR

STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT

MICHSPEC No. 97.0820 − 00020 THROUGH 97.0820 − 00440

File No. 551/22184.CAK Schley Nelson Architects Project No.: 22-120

Department/Agency – 551 State Police

Demolish & Construct New

Ionia Eastbound I-96 Scale 1728 I-96

Ionia, MI 48846 Orange Township, Ionia County

September 19, 2023

1997 Edition/R 03/22 Version

STATE OF MICHIGAN (OWNER & CONTRACTOR) TABLE OF CONTENTS

MICHSPEC DTMB 00010 − 1 (R 03/22)

SECTION 00010 TABLE OF CONTENTS

SECTION/PAGE NO.

SUBJECT INDEX

SECTION 00020 GLOSSARY ............................................................................................................................................. 00020 - 1 SECTION 00030 ADVERTISEMENT .................................................................................................................................. 00030 - 1 SECTION 00100 INSTRUCTIONS TO BIDDERS ............................................................................................................... 00100 - 1 ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS .................................................................................................. 00100 - 1 ARTICLE 2 QUALIFICATIONS OF BIDDERS ..................................................................................................................... 00100 - 1 ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS ....................................... 00100 - 2 ARTICLE 4 INTERPRETATIONS; ADDENDA .................................................................................................................... 00100 - 3 ARTICLE 5 BID SECURITY ................................................................................................................................................ 00100 - 3 ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES .................................................................................................. 00100 - 4 ARTICLE 7 MATERIALS AND EQUIPMENT ...................................................................................................................... 00100 - 4 ARTICLE 8 SUBCONTRACTORS ...................................................................................................................................... 00100 - 5 ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS ................................................................................................. 00100 - 5 ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS.................................................................................................. 00100 - 6 ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ........................................................................................................ 00100 - 6 ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ................................................................................................ 00100 - 7 ARTICLE 13 BIDS TO REMAIN OPEN .................................................................................................................................. 00100 - 7 ARTICLE 14 AWARD OF THE CONTRACT .......................................................................................................................... 00100 - 7 ARTICLE 15 EXECUTION OF THE AGREEMENT ................................................................................................................ 00100 - 9 ARTICLE 16 MOBILIZATION PAY ITEM ............................................................................................................................. 00100 -10 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .................................. 00100 -10 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST........................................................................................ 00110 - 1 SECTION 00120 SUPPLEMENTARY INSTRUCTIONS ..................................................................................................... 00120 - 1 SECTION 00210 INFORMATION FOR BIDDERS .............................................................................................................. 00210 - 1 SECTION 00300 BID SUMMARY ...................................................................................................................... 00300 - SUMMARY SECTION 00300 BID FORM ............................................................................................................................................... 00300 - 1 ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER"). ................................................. 00300 - 1 ARTICLE 2 THE BIDDER'S REPRESENTATIONS ............................................................................................................... 00300 - 1 ARTICLE 3 TIME OF COMPLETION ..................................................................................................................................... 00300 - 2 ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID .................................................................................................... 00300 - 2 ARTICLE 5 DEFINED TERMS ............................................................................................................................................... 00300 - 2 ARTICLE 6 BID SCHEDULE .................................................................................................................................................. 00300 - 3 ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES ...................................................................................................... 00300 - 5 ARTICLE 8 BID SUBMITTED ON ......................................................................................................................................... 00300 - 6 SECTION 00310 BID BOND ............................................................................................................................................... 00310 - 1 SECTION 00320 NONCOLLUSION AFFIDAVIT ................................................................................................................ 00320 - 1 SECTION 00410 BID BREAKDOWN ................................................................................................................................. 00410 - 1 SECTION 00420 QUESTIONNAIRE ................................................................................................................................... 00420 - 1 ARTICLE 1 ORGANIZATION ............................................................................................................................................... 00420 - 1 ARTICLE 2 SPECIALTY CONTRACTOR LICENSES .......................................................................................................... 00420 - 1 ARTICLE 3 EXPERIENCE ................................................................................................................................................... 00420 - 1 ARTICLE 4 ADDITIONAL QUALIFICATIONS ...................................................................................................................... 00420 - 2 ARTICLE 5 REFERENCES .................................................................................................................................................. 00420 - 2 REFERENCES ATTACHMENT ......................................................................................................................... 00420 - 3 SECTION 00430 LIST OF SUBCONTRACTORS ............................................................................................................... 00430 - 1 SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT .................................................................................. 00440 - 1 ARTICLE 1 BID MATERIALS AND EQUIPMENT −LISTED (NAMED OR SPECIFIED) ITEMS ........................................... 00440 - 1 ARTICLE 2 BID MATERIALS AND EQUIPMENT − OPEN SPECIFICATIONS .................................................................... 00440 - 3 SECTION 00500 AGREEMENT .......................................................................................................................................... 00500 - 1 ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK .............................................................................................. 00500 - 1 ARTICLE 2 CONTRACT DOCUMENTS .............................................................................................................................. 00500 - 1 ARTICLE 3 CONTRACT PRICE ........................................................................................................................................... 00500 - 2 ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES ................................................................................................... 00500 - 2 ARTICLE 5 PAYMENTS TO CONTRACTOR ...................................................................................................................... 00500 - 3

MICHSPEC DTMB 00010 − 2 (R 03/22)

ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR ......................................................................................... 00500 - 3 ARTICLE 7 CONTRACTOR'S REPRESENTATIONS .......................................................................................................... 00500 - 3 ARTICLE 8 MISCELLANEOUS ............................................................................................................................................ 00500 - 3 ARTICLE 9 NOTICE AND SERVICE .................................................................................................................................... 00500 - 4 SECTION 00520 ATTACHMENT “A” TO AGREEMENT ................................................................................................... 00520 - 1 SECTION 00610 PERFORMANCE BOND ........................................................................................................................ 00610 - 1 SECTION 00620 PAYMENT BOND ................................................................................................................................... 00620 - 1 SECTION 00700 GENERAL CONDITIONS ........................................................................................................................ 00700 - 1 ARTICLE 1 INTERPRETATIONS ........................................................................................................................................... 00700 - 1

1.1 Section 00020 Glossary:............................................................................................................................................... 00700 - 1

1.2 Intent of the Contract Documents: ................................................................................................................................ 00700 - 1

1.3 Priority of the Contract Documents: .............................................................................................................................. 00700 - 2

1.4 Interpretation of Indemnification Provisions: ................................................................................................................. 00700 - 2

1.5 Additional Interpretations: ............................................................................................................................................. 00700 - 2

1.6 Ownership and Use of the Contract Documents: .......................................................................................................... 00700 - 3

1.7 Copies of the Contract Documents: ............................................................................................................................... 00700 - 3

ARTICLE 2 THE OWNER−GENERAL PROVISIONS .......................................................................................................... 00700 - 3

2.1 Availability of Lands, Areas, Properties and Facilities: ................................................................................................. 00700 - 3

2.2 Reference Points; Base Lines and Benchmarks: .......................................................................................................... 00700 - 3

2.3 Stop Work Order: .......................................................................................................................................................... 00700 - 3

2.4 Limitations on the Owner’s Responsibilities: ................................................................................................................ 00700 - 4

2.5 Additional General Provisions: ...................................................................................................................................... 00700 - 4

2.6 Partnering Charter: ....................................................................................................................................................... 00700 - 4

ARTICLE 3 THE PROFESSIONAL − GENERAL PROVISIONS .......................................................................................... 00700 - 4

3.1 Owner’s Representative: ............................................................................................................................................. 00700 - 4

3.2 Clarifications and Interpretations: ................................................................................................................................. 00700 - 4

3.3 Minor Variations and No-Cost Changes; Minor Delays:................................................................................................ 00700 - 5

3.4 Determinations by the Professional: ........................................................................................................................... 00700 - 5

3.5 Limitations on the Professional’s Responsibilities: ....................................................................................................... 00700 - 5

ARTICLE 4 CONTROL OF WORK − GENERAL PROVISIONS ........................................................................................... 00700 - 5

4.1 Review of the Contract Documents: ............................................................................................................................. 00700 - 5

4.2 Management, Supervision, and Personnel: .................................................................................................................. 00700 - 5

4.3 Materials and Equipment: ............................................................................................................................................. 00700 - 6

4.4 Concerning Control of Work: ........................................................................................................................................ 00700 - 6

4.5 Patent Fees and Royalties: ........................................................................................................................................... 00700 - 7

4.6 Use of Premises: .......................................................................................................................................................... 00700 - 7

4.7 Record Documents: ...................................................................................................................................................... 00700 - 7

4.8 Emergencies: ................................................................................................................................................................ 00700 - 8

4.9 Indemnification: ............................................................................................................................................................ 00700 - 8

ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS .......................................................................................................... 00700 - 8

5.1 Employment of Subcontractors: .................................................................................................................................... 00700 - 8

5.2 "Or Equal" and Substitute Materials and Equipment:.................................................................................................... 00700 - 9

5.3 The Contractor’s Continuing Responsibilities: ............................................................................................................ 00700 - 9

ARTICLE 6 SUBMITTALS .................................................................................................................................................... 00700 - 9

6.1 Shop Drawing, Sample and Other Technical Submittals: ............................................................................................. 00700 - 9

6.2 Review and Return of Technical Submittals: .............................................................................................................. 00700 - 10

6.3 Progress Schedule Submittals: ................................................................................................................................... 00700 - 10

6.4 Review and Return of Progress Schedule Submittals: ............................................................................................... 00700 - 10

6.5 Additional Provisions Concerning Submittals: ............................................................................................................ 00700 - 10

ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ........................................................................................................ 00700 - 11

7.1 Laws; Permits (Which Include Approvals and Licenses): ........................................................................................... 00700 - 11

7.2 Sales and Use Tax and Other Similar Taxes: ............................................................................................................. 00700 - 12

7.3 Safety and Protection: ................................................................................................................................................ 00700 - 12

7.4 Bonds and Insurance - General Requirements: .......................................................................................................... 00700 - 12

7.5 The Contractor’s Liability Insurance:......................................................................................................................... 00700 - 12

7.6 Pollution Liability Insurance: ....................................................................................................................................... 00700 - 13

7.7 Property Insurance (Builder's All Risk Insurance): ...................................................................................................... 00700 - 13

7.8 Waiver of Rights: ........................................................................................................................................................ 00700 - 13

7.9 Receipt and Application of Proceeds: ......................................................................................................................... 00700 - 13

MICHSPEC DTMB 00010 − 3 (R 03/22)

7.10 Unfair Labor Practice: ................................................................................................................................................. 00700 - 13

7.11 Michigan Right-To-Know Law: .................................................................................................................................... 00700 - 13

7.12 Nondiscrimination: ...................................................................................................................................................... 00700 - 14

7.13 Michigan Residency for Employees: ........................................................................................................................... 00700 - 14

ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION ........................................................................................... 00700 - 15

8.1 Starting the Work: ....................................................................................................................................................... 00700 - 15

8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ................................................................................................... 00700 - 15

8.3 Compliance with Contract Time Requirements: .......................................................................................................... 00700 - 15

8.4 Substantial Completion: .............................................................................................................................................. 00700 - 15

8.5 Partial Use: ................................................................................................................................................................. 00700 - 16

8.6 Division of Responsibilities: ........................................................................................................................................ 00700 - 16

8.7 Suspension of Work: .................................................................................................................................................. 00700 - 16

8.8 Sharing of Total Float on Non-Critical Paths: .............................................................................................................. 00700 - 16

ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND

APPROVALS; CORRECTION OF WORK ....................................................................................................... 00700 - 17

9.1 Warranty: ................................................................................................................................................................... 00700 - 17

9.2 Tests, Inspections and Approvals: ............................................................................................................................. 00700 - 17

9.3 Uncovering Work: ...................................................................................................................................................... 00700 - 17

9.4 Correction of Work: .................................................................................................................................................... 00700 - 17

9.5 Special Correction Period Requirements: .................................................................................................................. 00700 - 18

9.6 Special Maintenance Requirements: ......................................................................................................................... 00700 - 18

ARTICLE 10 CHANGES ..................................................................................................................................................... 00700 - 19

10.1 Changes in the Work: ................................................................................................................................................ 00700 - 19

10.2 Differing Subsurface or Physical Site Conditions: ...................................................................................................... 00700 - 19

10.3 Responsibilities for Underground Utilities: ................................................................................................................. 00700 - 20

10.4 Hazardous Material Conditions: ................................................................................................................................. 00700 - 20

10.5 Incidents with Archaeological Features: .................................................................................................................... 00700 - 20

10.6 Unit Price Work: ......................................................................................................................................................... 00700 - 21

10.7 Cash Allowances; Provisionary Allowances: ............................................................................................................. 00700 - 21

10.8 Change Orders; Change Authorizations: ................................................................................................................... 00700 - 21

ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN

CONTRACT TIME ......................................................................................................................................... 00700 - 22

11.1 General Provisions: ................................................................................................................................................... 00700 - 22

11.2 Changes in Contract Time: ........................................................................................................................................ 00700 - 22

11.3 Methods for Making Adjustments in Contract Price: .................................................................................................. 00700 - 22

11.4 Labor, Subcontract and Material/Equipment Costs: .................................................................................................. 00700 - 23

11.5 Construction Equipment Costs: ................................................................................................................................. 00700 - 23

11.6 Rented or Leased Construction Equipment: .............................................................................................................. 00700 - 23

11.7 Owned Construction Equipment: ............................................................................................................................... 00700 - 24

11.8 General Conditions Costs: ......................................................................................................................................... 00700 - 24

11.9 Limitations on Allowable Costs: ................................................................................................................................. 00700 - 24

11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ........................ 00700 - 24

11.11 Limits on the Fee for the Work Involved: .................................................................................................................... 00700 - 25

11.12 Fee for Unabsorbed Home Office Overhead: ............................................................................................................. 00700 - 25

11.13 Changes in Contract Time for Early Completion: ........................................................................................................ 00700 - 25

11.14 Access to Records: ..................................................................................................................................................... 00700 - 26

11.15 Price Reduction for Defective Cost and Pricing Data: ................................................................................................ 00700 - 26

ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ............................................................................................... 00700 - 26

12.1. Schedule of Values: ................................................................................................................................................... 00700 - 26

12.2 Requests for Payment: .............................................................................................................................................. 00700 - 27

12.3 Review of Request for Payment; Intent of Review: .................................................................................................... 00700 - 27

12.4 Refusal to Make or to Recommend Payment: ........................................................................................................... 00700 - 27

12.5 Final Request for Payment: ....................................................................................................................................... 00700 - 27

12.6 Final Payment and Acceptance: ................................................................................................................................ 00700 - 28

12.7 Contractor’s Continuing Obligation: ......................................................................................................................... 00700 - 28

12.8 Waiver of Claims: ...................................................................................................................................................... 00700 - 28

ARTICLE 13 OTHER WORK .............................................................................................................................................. 00700 - 28

13.1 Related Work at Site: ................................................................................................................................................. 00700 - 28

13.2 Coordination Requirements: ...................................................................................................................................... 00700 - 29

13.3 Claims Between the Contractor and Other Parties: ................................................................................................. 00700 - 29

MICHSPEC DTMB 00010 − 4 (R 03/22)

ARTICLE 14 TERMINATION .............................................................................................................................................. 00700 - 29

14.1 Notice Requiring Assurance of Due Performance: .................................................................................................... 00700 - 29

14.2 Contractor Default and Termination for Cause: ........................................................................................................ 00700 - 30

14.3 Surety Default: ........................................................................................................................................................... 00700 - 31

14.4 Termination for Convenience of the Owner: .............................................................................................................. 00700 - 31

14.5 The Contractor May Suspend Work: ....................................................................................................................... 00700 – 31

ARTICLE 15 DISPUTES .................................................................................................................................................... 00700 - 31

15.1 Claims Under This Article: ......................................................................................................................................... 00700 - 31

15.2 Requirement for Certification of Contractor Claims: ................................................................................................. 00700 - 32

15.3 Recommendations or Decisions from the Professional:........................................................................................... 00700 - 32

15.4 Determinations by the Director-DCD: ....................................................................................................................... 00700 - 32

15.5 Supplements to AAA Arbitration: ............................................................................................................................... 00700 - 33

15.6 Interest on a Judgment; Payment of Judgment: ........................................................................................................ 00700 - 33

15.7 Venue; Flow-Through Provision: ............................................................................................................................... 00700 - 33

SECTION 00800 SUPPLEMENTARY CONDITIONS ....................................................................................................... 00800 - 1

SECTION 01310 PROGRESS SCHEDULE 01310 - 1

APPENDIX I - SPECIAL WORKING CONDITIONS:

DEPARTMENT OF STATE POLICE

APPENDIX II - SPECIAL PROJECT PROCEDURES:

SOIL EROSION AND SEDIMENTATION CONTROL (SESC) PROJECT PRECEDURES FOR

CONTRACTORS ON DTMB OWNED AND MANAGED PROPERTIES

DEMOLITION/REMODELING PROJECT PROCEDURES

HAZARDOUS MATERIALS PROJECT PROCEDURES

ASBESTOS ABATEMENT PROJECT PROCEDURES

LEAD ABATEMENT PROJECT PROCEDURES

ASBESTOS AND LEAD PAINT INSPECTION REPORT DATED FEBRUARY 23, 2018

GEOTECHNICAL REPORT DATED JULY 12, 2022 WHICH INCLUDES GROUND PENETRATING RADAR REPORT

IONIA COUNTY HEALTH DEPARTMENT SEPTIC PERMIT

TRAFFIC CONTROL – MDOT REQUIREMENTS

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 21 00 ALLOWANCES

DIVISION 02 – EXISTING CONDITIONS

SECTION 02 41 16 STRUCTURE DEMOLITION

DIVISION 03 – CONCRETE

SECTION 03 30 00 CAST-IN-PACE CONCRETE

DIVISION 04 – MASONRY

SECTION 04 20 00 UNIT MASONRY

DIVISION 05 – METALS

SECTION 05 12 00 STRUCTURAL STEEL FRAMING

SECTION 05 21 00 STEEL JOIST FRAMING

SECTION 05 31 00 STEEL DECKING

SECTION 05 40 00 COLD-FORMED METAL FRAMING

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

SECTION 06 10 53 ROUGH CARPENTRY

SECTION 06 16 00 SHEATHING

SECTION 06 41 00 INTERIOR ARCHITECTURAL WOODWORK

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

SECTION 07 10 00 DAMPROOFING & WATERPROOFING

SECTION 07 19 00 WATER REPELLENTS

SECTION 07 21 00 THERMAL INSULATION

SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

SECTION 07 42 43 METAL COMPOSITE WALL PANELS

SECTION 07 53 23 EPDM ROOFING

SECTION 07 60 00 FLASHING & SHEET METAL

SECTION 07 71 00 ROOF EDGE FLASHING & DRAINAGE

SECTION 07 71 29 ROOF EXPANSION JOINTS

SECTION 07 84 13 PENETRATION FIRESTOPPING

SECTION 07 90 00 SEALANTS

MICHSPEC DTMB 00010 − 5 (R 03/22)

DIVISION 08 – OPENINGS

SECTION 08 10 00 STEEL DOORS & FRAMES

SECTION 08 41 13 ALUMINUM-FRAMED ENTRANCES & STOREFRONTS

SECTION 08 70 00 DOOR HARDWARE

SECTION 08 80 00 GLAZING

DIVISION 09– FINISHES

SECTION 09 20 00 GYPSUM BOARD

SECTION 09 30 00 TILING

SECTION 09 51 13 ACOUSTICAL PANEL CEILINGS

SECTION 09 65 13 RESILIENT WALL BASE

SECTION 09 65 19 RESILIENT ATHLECTIC FLOORING

SECTION 09 69 00 RAISED ACCESS FLOOR SYSTEM

SECTION 09 90 00 PAINTING

DIVISION 10– SPECIALTIES

SECTION 10 00 00 SPECIALTIES

SECTION 10 14 00 CAST ALUMINUM PLAQUES

SECTION 10 51 16 METAL LOCKERS & HARDWOOD BENCH

DIVISION 20 – GENERAL MECHANICAL AND PLUMBING REQUIREMENTS

SECTION 20 00 10 GENERAL MECHANICAL REQUIREMENTS

SECTION 20 01 40 SUPPORTS & ANCHORS

SECTION 20 01 70 MOTORS

SECTION 20 01 90 MECHANICAL IDENTIFICATION

SECTION 20 02 60 PIPING INSULATION

SECTION 20 02 90 DUCTWORK INSULATION

DIVISION 22 – PLUMBING

SECTION 22 04 00 PLUMBING

SECTION 22 04 10 PLUMBING PIPING

SECTION 22 04 94 FIRESTOP FOR PLUMBING

SECTION 22 05 00 COMMON WORK RESULTS FOR PLUMBING

SECTION 22 05 13 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

SECTION 22 05 17 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

SECTION 22 05 18 ESCUTCHEONS FOR PLUMBING PIPING

SECTION 22 05 23 GENERAL DUTY VALVES FOR PLUMBING PIPING

SECTION 22 05 29 HANGERS AND SUPPORT S FOR PLUMBING PIPING AND EQUIPMENT

SECTION 22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION 22 07 19 PLUMBING PIPING INSULATION

SECTION 22 11 19 DOMESTIC WATER PIPING SPECIALTIES

SECTION 22 11 23.21 INLINE DOMESTIC-WATER PUMPS

SECTION 22 13 19 SANITARY WASTE PIPING SPECIALTIES

SECTION 22 31 00 DOMESTIC WATER SOFTENERS

SECTION 22 34 00 FUEL-FIRED, DOMESTIC-WATER HEATERS

SECTION 22 42 13 COMMERCIAL PLUMBING FIXTURES

DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING

SECTION 23 05 35 REFRIGERATION PIPING & SPECIALTIES

SECTION 23 06 23 FORCED AIR FURNACES

SECTION 23 06 71 AIR COOLED CONDENSING UNITS

SECTION 23 07 36 INFRA-RED RADIANT HEATERS

SECTION 23 08 00 AIR DISTRIBUTION SYSTEMS

SECTION 23 08 01 DUCTWORK

SECTION 23 08 02 DUCTWORK ACCESSORIES

SECTION 23 08 04 AIR OUTLESTS & INLETS

SECTION 23 08 60 CENTRIFUGAL FANS

SECTION 23 09 00 TEMPERATURE CONTROL SYSTEMS

SECTION 23 09 85 SEQUENCE OF OPERATION FOR HVAC CONTROLS

SECTION 23 09 90 TESTING, ADJUSTING & BALANCING

MICHSPEC DTMB 00010 − 6 (R 03/22)

DIVISION 26 – ELECTRICAL

SECTION 26 00 10 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL

SECTION 26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

SECTION 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 26 05 29 HANGERS AND SUPPORT S FOR ELECTRICAL SYSTEMS

SECTION 26 05 33 RACEWAY AND BOXES

SECTION 26 05 43 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS

SECTION 26 05 44 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 26 09 23 LIGHTING CONTROL DEVICES

SECTION 26 09 43.23 RELAY-BASED LIGHTING CONTROLS

SECTION 26 24 16 PANELBOARDS

SECTION 26 27 26 WIRING DEVICES

SECTION 26 28 13 FUSES

SECTION 26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION 26 29 13.03 MANUAL AND MAGNETIC MOTOR CONTROLLERS

SECTION 26 36 00 TRANSFER SWITCHES

SECTION 26 41 13 LIGHTNING PROTECTION FOR STRUCTURES

SECTION 26 43 13 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

SECTION 26 51 19 LED INTERIOR LIGHTING

SECTION 26 56 13 LIGHTING POLES AND STANDARDS

SECTION 26 56 19 LED EXTERIOR LIGHTING

DIVISION 31 – EARTHWORK

SECTION 31 10 00 SITE CLEARING

SECTION 31 20 00 EARTH MOVING

SECTION 31 31 16 TERMITE CONTROL

DIVISION 32 – EXTERIOR IMPROVEMENTS

SECTION 32 12 00 ASPHALT PAVING

SECTION 32 13 00 CONCRETE PAVING

SECTION 32 92 00 TURF AND GRASSES

DIVISION 33 – UTILITIES

SECTION 33 10 00 WATER DISTRIBUTION

SECTION 33 30 00 SANITARY SEWERAGE

SECTION 33 36 00 SEPTIC TANKS

SECTION 33 40 00 STORM DRAINAGE

APPENDIX A MDOT STANDARD DETAILS

APPENDIX C-1 CAD FILE TRANSFER AGREEMENT

MICHSPEC DTMB 00010 − 7 (R 03/22)

DRAWINGS - BOUND SEPARATELY

TITLE T1.0

GENERAL NOTES, CODE COMPLIANCE, RESPONSIBILITY MATRIX T1.1

EXISTING TOPOGRAPHIC SURVEY FOR REFERENCE V101

EXISTING TOPOGRAPHIC SURVEY FOR REFERENCE V102

ELECTRICAL SITE DEMOLITION PLAN ESD.2

ELECTRICAL SITE PLAN – AREA A ES.1

ELECTRICAL SITE PLAN – AREA B ES.2

ELECTRICAL SITE PLAN – AREA C ES.3

DEMOLITION PLAN C1.1

CIVIL LAYOUT PLAN C2.1

CIVIL GRADING & UTILITIES PLAN C3.1

CIVIL SITE DETAILS C4.1

CIVIL SITE DETAILS C4.2

CIVIL UTILITY PROFILE & UTILITY PLAN C4.3

STRUCTURAL GENERAL NOTES S0.1

STRUCTURAL GENERAL NOTES CONTINUED S0.2

FOUNDATION PLAN S1.0

FOUNDATION DETAILS S2.0

ROOF FRAMING PLAN S3.0

FRAMING DETAILS S4.0

FLOOR PLAN, CASEWORK PLAN A1.0

DOOR SCHEDULE KEY PLAN, DOOR & HARDWARE SCHEDULE, DOOR & FRAME TYPES A1.1

PARTIAL FLOOR PLAN – TOILET LAYOUT PLANS AND LOCKER ROOM PLAN A1.2

BUILDING ELEVATIONS A2.0

BUILDING SECTIONS, INTERIOR ELEVATIONS A3.0

BUILDING SECTIONS, INTERIOR ELEVATIONS A3.1

WALL SECTIONS, DETAILS A3.2

DETAILS A3.3

DETAILS A3.4

FLOOR & CASEWORK FINISH PLAN A4.0

REFLECTED CEILING & FINISH PLAN A4.1

ROOF PLAN & ROOF EDGE DETAILS A5.0

UNDERGROUND PLUMBING P0.1

PLUMBING PLAN P1.1

PLUMBING DETAILS P5.1

PLUMBING SCHEDULES P6.1

HVAC PLAN H1.1

HVAC DETAILS H5.1

HVAC LEGEND & ABBREVIATIONS H5.2

HVAC SCHEDULES H6.1

ELECTRICAL LEGENDS & ABBREVIATIONS E1.0

RISER DIAGRAMS & PANEL SCHEDULES E1.1

LIGHTING PLAN E2.1

POWER / SYSTEMS PLAN E3.1

ELECTRICAL DETAILS E6.1

EMERGENCY EGRESS LIGHTING LEVELS E9.1

STATE OF MICHIGAN (OWNER AND CONTRACTOR) GLOSSARY

MICHSPEC DTMB 00020 - 1 (R 03/22)

SECTION 00020 GLOSSARY

1.1 Defined Terms:

1.1.1. The following terms or relative pronouns used in

Division 0 of the Specifications have these intent and meanings:

Activity− An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.

Addenda− Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.

Agreement− The written agreement between the Owner and Contractor covering the Work to be furnished and performed.

Alternate− Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.

Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s preference is the lowest Bidder is considered the Apparent Low Bidder.

Archaeological Feature− Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.

As-Planned Schedule− The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.

Authorized Technical Data− Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph 3.0 of Section 00210 Information for Bidders.

Bar Chart Schedule− Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.

STATE OF MICHIGAN MODEL

Developed from FORMSPEC Michigan Model.

Bid− Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates. The term Bid includes a Rebid.

Bidder− The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.

Bidding Documents− The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.

Bid Price− The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.

Bid Security− A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.

Bidding Requirements− The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.

*AD Board− The Administrative Board of the State of Michigan.

Bonds− Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.

Business Day− Any Day except Saturdays, Sundays and holidays observed by the Owner.

Bulletin− A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.

Calendar Day− Every day shown on the calendar, Saturdays, Sundays, and holidays included.

Cash Allowance− An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents. Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently

MICHSPEC DTMB 00020 - 2 (R 03/22)

detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.

Change Authorization− A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.

Change Order− A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.

Contact Person− Individual in the employ of the Professional or the Owner who is designated as the sole point of contact for prospective Bidders for requests or inquiries concerning the Work and/or the Bidding Documents.

Contract− Refer to the definition in paragraph 1.1 of Section 00500 Agreement. The term “Contract” encompasses the legal obligations of the Owner and Contractor, as defined by the Contract Documents.

Contract Award− The official action of the Board, the Director-SFA or the Director-DCD awarding the Contract to the Contractor.

Contract Documents− Those documents itemized or designated in paragraphs 2.2 through 2.4 of Section 00500 Agreement.

Contract Float− Calendar Days between the Contractor's anticipated date for early completion of the Work, or of a specified portion of the Work, if any, and the corresponding Contract Time.

Contract Price− The Contract price for the Work, or a designated portion of the Work, as designated in Section 00500 Agreement or elsewhere in the Contract Documents, is the total compensation, including authorized adjustments, payable by the Owner to the Contractor (subject to provisions for Unit Price Work).

Contract Times− The Contract Times for the entire Work are the periods allowed, including authorized adjustments, for Substantial Completion and final completion of the Work. The Contract Times for a designated portion of the Work are the periods allowed for Substantial Completion and final completion of any such portion of the Work, as specified in the Contract Documents.

Contractor− Person named "the Contractor" in Section 00500 Agreement with whom the Owner has entered into the Contract.

Correction Period− The period during which the Contractor shall, in accordance with the Contract Documents, (a) correct or, if rejected, remove, and replace Defective Work, and (b) maintain warranties for materials and equipment in full force and effect.

Cost of the Work Involved− The sum of all costs that would be, or were, necessarily incurred by the Contractor in providing any Work Involved with the related change, less the costs that would be, or would have been, incurred by the Contractor to provide such Work without the related change.

CPM Schedule− Computerized, Activity-based Progress Schedule, using Critical Path Method (CPM) techniques, and accounting for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.

Critical Path Method (CPM)− The Critical Path Method of planning and scheduling. The term “Critical Path” denotes a sequence of Activities controlling achievement of a specified Contract Time.

Date of Commencement of the Contract Time− The date when the Contract Time starts to run.

Defective− An adjective which when referring to or when applied to the term “Work” refers to (a) Work not conforming to the Contract Documents or not meeting the requirements of any inspection, test, or approval, or (b) Work itemized in a Punch List which the Contractor fails to complete or correct within a reasonable time after issuance of the Punch List by the Professional.

Defective Work/Non-Compliance Notice – A DTMB-0499 form or equivalent issued to identify defective or non-compliant conditions requiring response and remedy by the Contractor.

Delay− Any act or omission or other event that in any manner adversely affects or alters the schedule, progress or completion of all or any part of the Work. Delay is a generic term intended to include deferral, stoppage, slow down, interruption and extended performance, and all related hindrance, rescheduling, disruption, interference, inefficiency and productivity and production losses.

*Department (DTMB)− Department of Technology, Management and Budget of the State of Michigan. Director is the Director of the Department.

Director-SFA- The Director of DTMB State Facilities Administration.

Director-DCD- The Director of DTMB State Facilities Administration, Design and Construction Division

Division− Each of the numbered, distinct parts (starting with Division 0) into which the Specifications are divided.

Drawings− Part of the Contract Documents showing the Work.

Drawings shall neither serve nor be used as Shop Drawings.

Early (Late) Dates− Early (late) times of performance for the Activities.

MICHSPEC DTMB 00020 - 3 (R 03/22)

Emergency− A condition affecting the safety or protection of persons, or the Work, or property at or adjacent to the site.

Fee for the Work Involved (Fee)− A negotiated, percentage mark-up on the Cost of the Work Involved which is allowed to the Contractor for (a) reasonable administrative costs, and (b) negotiated, reasonable profit on the Cost of the Work Involved.

General Requirements− Division 1 of the Specifications.

Hazardous Material− Asbestos, ACBMs, PCBs, petroleum products, such construction…

This is the start of the file's text. The full file is on GovTribe.