539-20-212 bldg 15 drawings 2020.0312.pdf
PDF 6 MB Posted
- Attached to
- Resolve HVAC Issues in Building 15 Federal contract opportunity
- Solicitation number
- 36C25020B0031
About this file
This notice announces an upcoming solicitation for project number 539-19-202 to resolve HVAC issues in Building 15 at the Veterans Administration Medical Center in Cincinnati, Ohio. The solicitation will be issued as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The project scope includes removing an existing air handling unit and related equipment, installing a new air handling unit, and modifying associated ductwork, piping, controls, and electrical systems. The estimated value is between $100,000 and $200,000. The NAICS code is 236210. The contractor must perform a minimum of 25% of construction work and complete the project within 365 calendar days of receiving notice to proceed. Bonds will be required. An optional pre-bid site visit will be scheduled. The full solicitation will be posted on www.fbo.gov on or about July 15, 2018 with proposals due approximately 30 days later. Interested parties should register at the site. Questions will be accepted only after documents are posted.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| sight visit signin sheet.jpg | JPG image | |
| 15-A101 -2020.0723.pdf | ||
| RFI answered 3.docx | DOCX document | |
| M-001 ADDENDUM.pdf | ||
| RFI 1 answered 2.docx | DOCX document | |
| RFI Form answered.docx | DOCX document | |
| 36C25020B0031 0001_1.docx | DOCX document | |
| 36C25020B0031 0001.docx | DOCX document | |
| 539-20-212 bldg 15 specs 2020 0401.pdf | ||
| 36C25020B0031.docx | DOCX document | |
| Contractor Certification Regarding EMR.docx | DOCX document | |
| WAGE DETERMINATIONS.6.23.20.docx | DOCX document | |
| Honeywell Fire Alarm Sole Source Justification 1.pdf | ||
| RFI Form.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15-M001
INDEX, LEGEND, AND GENERAL
NOTES -
INDEX OF DRAWINGS
SHEET DESCRIPTION
BASEMENT FLOOR PLAN BLDG 15 - REMOVALS & NEW WORK 15-M100
15-M101 FIRST FLOOR PLAN BLDG 15 - REMOVALS & NEW WORK
15-M103
15-M105
15-M102
15-M104
15-M501
15-M601
DETAILS
SCHEDULES
15-M502 DETAILS
15-M701 CONTROLS AND AUTOMATION
DUCT THERMOSTAT WITH AVERAGING ELEMENT
DUCT STATIC PRESSURE SENSOR
DUCT HUMIDITY SENSOR
ROOM SENSOR: TEMPERATURE, HUMIDITY
LENGTH IN DUCT WHEN SPACE PERMITS)
REMOTE BULB THERMOSTAT
ROOM CONTROL: THERMOSTAT, HUMIDISTAT
DIFFERENTIAL PRESSURE SWITCH
DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT
SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)
DUCT OR PIPE TEMP. SENSOR
DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.
AFTER FILTER
CURRENT SENSING RELAY
AIR FOIL WHEEL (FAN)
AIR HANDLING UNIT
ANALOG INPUT
AIR PRESSURE DROP
ANALOG OUTPUT
AUTOMATIC TEMPERATURE CONTROLS
BACKWARD INCLINED WHEEL (FAN)
AIR FLOW MEASURING DEVICE
ABOVE FINISHED FLOOR
DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER
COOLING COIL
CONVERTOR
CONVECTOR
CLEAN OUT
CEILING GRILLE
CENTRIFUGAL FAN
CEILING DIFFUSER
BOTTOM REGISTER (WALL TYPE)
BOTTOM GRILLE (WALL TYPE)
CEILING REGISTER
COLD WATER (POTABLE)
DIGITAL OUTPUT
DIGITAL INPUT
DIRECT DIGITAL CONTROLS
DRY BULB TEMPERATURE, DEG. F
AUTOMATIC CONTROL DAMPER
EXHAUST FAN
ENGINEERING CONTROL CENTER
DOUBLE WIDTH DOUBLE INLET (FAN)
DOOR UNDERCUT BY GENERAL CONTRACTOR
ITEM. (TO BE USED AS AN AID IN COORDINATING THE
LISTED SIZE OF DUCT, PIPE, DEVICE OR EQUIPMENT
APPROXIMATE ELEVATION FROM FLOOR TO CENTER OF
MANUAL VOLUME DAMPER
U/C
VARIOUS TRADES.)
FIRE DAMPER
BUTTERFLY VALVE
CIRCUIT SETTER
BALL VALVE
COMBINATION BALANCING/SHUT-OFF VALVE
MANUAL AIR VENT
AUTOMATIC FLOW CONTROL VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
STRAIGHT-THRU TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
STRAIGHT-THRU MODULATING CONTROL VALVE
EX.
EF
EXISTING
DWDI
ECC
DI
DO
DB
DDC
D
Db
DECIBELS
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO.3 IN BUILDING NO.1
SHEET NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
RETURN DUCT (UP & DOWN)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
EXHAUST OR RETURN TOP REGISTER OR GRILLE,
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
SUPPLY DUCT (UP & DOWN)
INCLINED RISE, IN DIRECTION OF AIR FLOW
NEW DUCT - WIDTH X DEPTH
RECTANGULAR ELBOWS WITH VANES EVEN IF
VANED ELBOW (PROVIDE ALL SQUARE OR
INCLINED DROP, IN DIRECTION OF AIR FLOW
ACOUSTICAL DUCT LINING
STANDARD RADIUS ELBOW
R
10/8
FC
D
SYMBOL IS MISSING)
FLEXIBLE CONNECTION
UP
(WALL TYPE)
(WALL TYPE)
DN
UP
1-01
1-SF3
AIR HANDLING UNIT NUMBER
TERMINAL UNIT DESIGNATION
TYPICAL UNIT NO.
DN
SECTION LETTER
ECCENTRIC REDUCER
DIRECTION OF FLOW
CAPPED OUTLET
SIDE CONNECTION
EXISTING WORK.
ACCESSORIES (SEE STANDARD DETAIL)
INVERTED BUCKET TRAP SET INCLUDING PIPING
POINT OF CONNECTION BETWEEN NEW AND
RISE OR DROP IN PIPE
BOTTOM CONNECTION, 45 DEG. OR 90 DEG.
TOP CONNECTION, 45 DEG. OR 90 DEG.
REDUCER OR INCREASER
DIRECTION OF PIPE PITCH (DOWN)
THERMOMETER
UNIVERSAL (2-BOLT) INVERTED BUCKET TRAP
STRAINER
GATE VALVE
PRESSURE GAGE
CHECK VALVE
GLOBE VALVE
PIPING ACCESSORIES (SEE STANDARD DETAIL)
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
GATE VALVE WITH 3/4" HOSE END ADAPTER
EXISTING PIPE TO BE REMOVED
DRAIN LINE
UNION
D
CONV
CW
CR
CO
CG
CF
CD
CC
C
BR
BIW
BG
ATC
AFW
AI
APD
AO
AHU
AFM
AFF
AF
VENT LINE
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG & BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
NUMBER INDICATES STEAM PRESSURE
NUMBER INDICATES STEAM PRESSURE
LPR
V
HWS
HWR
LPS (5)
MPS (30)
MPR
HEATING
SP
S F
T
H
T
T H
WET BULB TEMPERATURE, DEG. FWb
MAXIMUM
OUTSIDE AIR
(16 PSIG THRU 59 PSIG)
PRE-FILTER
PUMPED CONDENSATE
PREHEAT COIL
RELATIVE HUMIDITY
SUPPLY FAN
STEAM HUMIDIFIER
TRANSFER GRILLE
UNIT HEATER
STATIC PRESSURE (INCHES OF WATER)
PRESSURE REDUCING VALVE
MEDIUM PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM CONDENSATE RETURN
PRESSURE DROP (FEET OF WATER)
TOP REGISTER (WALL TYPE)
VARIABLE FREQUENCY DRIVE
STATIC PRESSURE SENSOR
DOOR UNDERCUT BY GENERAL CONTRACTOR
SPS
TR
U/C
VFD
UH
V
TG
VALVE
S.P.
SH
SF
Rh
PD
PF
PH
PRV
MPR
MAX
O.A.
NOM
MIN
PC
MPS
NOMINAL
MINIMUM
HEATING COIL
HORSEPOWER
MIXING BOX
POUNDS PER HOUR
HIGH PRESSURE STEAM SUPPLY (60 PSIG & ABOVE)
LOW PRESSURE STEAM SUPPLY (15 PSIG & BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM CONDENSATE RETURNHPR
HPS
LPR
LBS/HR
MB
LPS
FLR.
HC
HP
FLOOR
BLOW UNLESS OTHERWISE NOTED)
CEILING DIFFUSERS (FOUR WAY CHILLED WATER RETURN
CHILLED WATER SUPPLYCHS
CHR
AIR CONDITIONING
CONTROL CIRCUIT CONN.H1 N
ETCHED CLEAR LACQUERE.C.L.
WHITE BAKED ENAMELW.B.E.
BRAKE HORSEPOWERBHP
BRITISH THERMAL UNITBTU
BRITISH THERMAL UNIT PER HOURBTUH
CUBIC FEET PER MINUTECFM
DEGREEDEG
DIAMETERDIA
DIFFERENTIAL PRESSURE SENSORDPS
ENTERINGENT
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FPM FEET PER MINUTE
FT FEET
GALLONS PER MINUTEGPM
HEADHD
CHILLED WATER RETURNCHR
CHILLED WATER SUPPLYCHS
HEATING HOT WATER RETURNHWR
HEATING HOT WATER SUPPLYHWS
INCHESIN
INCHES WATER COLUMNIN WC
INCHES WATER GAUGEIN WG
LEAVING AIR TEMPERATURELAT
LEAVINGLVG
MBH 1000 BTUH
MERV MINIMUM EFFICIENCY REPORTING VALUE
NC NOISE CRITERIA
REVOLUTIONS PER MINUTERPM
SMOKE DAMPER (SUPPLY)SDS
SMOKE DAMPER (RETURN)SDR
STEAM PRESSURE REDUCING VALVESPRV
VOLUME DAMPERVD
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
NUMBER INDICATES STEAM PRESSURE
HPS (125)
HPR
PIPE UP
PIPE DOWN
IN-LINE CENTRIFUGAL FANICF
T
T
T
T
H dP
CS
DP SP
1-MS4
A
H7
9'-6"
MV MANUAL AIR VENT
ABBREVIATIONSCONTROLSPIPING SYMBOLSDRAWING SYMBOLS
DUCTWORK SYMBOLS
GENERAL NOTES
GENERAL
VALVES
ABBREVIATIONS
EXHAUST DUCT (UP & DOWN)UP DN
PUMPED CONDENSATE RETURNPC
COMBINATION HOT/CHILLED WATER SUPPLYHWS/CHS
COMBINATION HOT/CHILLED WATER RETURNHWR/CHR
EXPANSION TANK PIPEET
CONDENSATE PUMPCP
CABINET UNIT HEATERCUH
FCU FAN COIL UNIT
EXPANSION TANKET
PUMPP
PROPELLER UNIT HEATERPUH
RETURN FANRF
WATER FILTERWF
POWER TYPE ROOF VENTILATORRV
POWER TYPE WALL VENTILATORWV
COTR
PROPELLER TYPE EXHAUST FANPEF
RETURN AIRR.A.
SUPPLY AIRS.A.
SINGLE WIDTH SINGLE INLET (FAN)SWSI
SPECIFIC GRAVITYSP. GR.
ACCESS DOORAD
FD FLOOR DRAIN
FCW FOWARD CURVED WHEEL (FAN)
FC FLEXIBLE CONNECTION
ENERGY EFFICIENCY RATIOEER
EXHAUST AIRE.A.
CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE
CENTRIFUGAL OR HELICAL ROTARY SCREW CHILLER UNITCCU
AIR SEPARATORAS
ANGLE GLOBE VALVE
PIPE GUIDE
PIPE ANCHOR
ORIFICE UNION
TREATED DOMESTIC MAKE-UP WATER
STAINLESS STEEL DUCT
MU
GMU
FOR HUMIDIFIER
GLYCOL MAKEUP WATER
HOT GLYCOL WATER RETURN
HOT GLYCOL WATER SUPPLYGHS
GHR
DOMESTIC HOT WATER SUPPLYDHW
DOMESTIC HOT WATER RECIRCULATIONDHWR
COMBINATION AXIAL/BACKWARD CURVED WHEELA/BCW
UTILITY SET FANUSF
T
GENERAL
DOMESTIC COLD WATERW
FLOW METER
PIPE MOUNTED DDC TEMPERATURE SENSOR
TOP GRILLE (WALL TYPE)TG
WATER GAUGEWG
WATTSW
VARIABLE AIR VOLUMEVAV
THERMOSTATTSTAT
TOTAL STATIC PRESSURETSP
SMOKE DETECTORSD
SUPPLY AIR TEMPERATURESAT
OUTSIDE DIAMETEROD
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
MCA MINIMUM BRANCH CIRCUIT AMPACITY
LEAVING WATER TEMPERATURELWT
ENTERING WATER TEMPERATUREEWT
EXTERNAL STATIC PRESSUREESP
DIRECT EXPANSIONDX
ENTERING AIR TEMPERATUREEAT
CABINET CEILING FANCCF
1 ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
2 ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.
3 FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING
SCHEMATICS.
4 PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN HEATING MEDIUM
AND AIR.
5 WHERE DUCTS OR PIPES ARE REMOVED THRU BUILDING ELEMENT THAT IS TO REMAIN, PATCH BUILDING OPENING TO MATCH EXISTING
WHERE OPENING IS NOT RE-USED.
6 ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
7 ALL CUTTING AND PATCHING REQUIRED FOR THE PROJECT WORK SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE
DISTURBED UNDER THIS WORK TO MATCH EXISTING.
8 IN GENERAL, KEEP PIPING MAINS NEXT TO UNDERSIDE OF STRUCTURE.
9 ALL WALL & FLOOR PENETRATIONS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.
10 UPON THE DISCOVERY OF ANY ASBESTOS MATERIAL, STOP WORK IMMEDIATELY AND REPORT IT TO THE COR. THE COR WILL NOTIFY
CONTRACTOR WHEN WORK IS SAFE TO PROCEED.
11 ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE
PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.
12 REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
13 THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO
INSTALL THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY ANTICIPATED
INSTALLATION ISSUES.
14 FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO
PERFORMING WORK.
15 HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS.
COORDINATE WITH COR.
16 WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO ACTIVE MAIN AND CAPPED, AND CONTROL
WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.
17 ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE
EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE
USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND
STRAINERS, TRANSMITTERS, CONTROL DEVICES.
18 WHERE ROOFING WORK IS REQUIRED, THE EXISTING ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED AND RESTORED
AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH
INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON THE ROOF.
19 ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK TO BE
REMOVED IS SHOWN. REMOVE ALL INCIDENTAL ABANDONED UTILITY ITEMS THAT MAY NOT BE SHOWN BUT ARE ASSOCIATED WITH
THE REMOVAL WORK.
20 INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO GENERAL REQUIREMENTS SECTION 01 00 00.
21 WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL
BE PERFORMED ON WEEKENDS OR WEEK NIGHTS, IF REQUIRED BY THE COR. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE
COORDINATED AND SCHEDULED WELL IN ADVANCE WITH THE COR.
22 INSTALL ALL STRAINERS IN STEAM PIPING SIDEWAYS, WITH CLEANOUT LEG PARALLEL TO THE GROUND.
23 RE-INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED OR REMOVED IN THE PERFORMANCE OF
WORK IN THIS PROJECT.
24 ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.
25 EXISTING CONDITIONS SHOWN ARE BASED UPON AVAILABLE EXISTING DRAWINGS, AND MAY DIFFER FROM ACTUAL WORK IN PLACE.
THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE
EXECUTION OF THE WORK. ANY VARIATION BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS
WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN
WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.
26 ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING ASBESTOS-CONTAINING MATERIALS IS INCLUDED IN THIS CONSTRUCTION
CONTRACT. REFER TO DRAWINGS AND/OR SPECIFICATIONS FOR LOCATION AND QUANTITIES OF ASBESTOS. ANY ABATEMENT WORK
PERFORMED AS PART OF THIS PROJECT SHALL BE COMPLETED PRIOR TO STARTING ANY OTHER PROJECT WORK.
27 ALL 90° ELBOWS IN SUPPLY AND EXHAUST AIR DUCTWORK SHALL BE PROVIDED WITH AIR TURNING VANES.
28 SEAL ALL PIPE AND DUCT PENETRATIONS THRU NON-FIRE RATED WALLS AND CEILINGS WITH SILICONE SEALANT TO PREVENT
ENTRANCE OF INSECTS.
29 CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS SHALL
BE COORDINATED WITH THE COR.
30 HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY HVAC UNIT. UNIT SHALL BE UP AND OPERATIONAL BEFORE AHU-31 IS
TAKEN OFF LINE AND REPLACED. MAXIMUM DURATION FOR TEMPORARY UNIT OPERATION SHALL BE FOUR WEEKS.
31 ALL DUCTWORK ASSOCIATED WITH THE TEMPORARY UNIT SHALL BE GALVANIZED STEEL. THE USE OF FLEXIBLE DUCTWORK SHALL BE
LIMITED TO CONNECTION TO TEMPORARY UNIT AND CONNECTION TO EXISTING SUPPLY MAIN. REMOVE EXISTING UNIT AND
DUCTWORK AFTER NEW 15-AHU30 AIR HANDLING UNIT IS OPERATIONAL.
32 HVAC CONTRACTOR SHALL BE PROVIDE A SCHEDULE TO COR AND LINDSAY ZINSER WITH ANIMAL RESEARCH A MINIMUM OF ONE WEEK
PRIOR TO CHANGEOVER TO TEMPORARY UNIT, CHANGEOVER BACK TO NEW AHU-31 UNIT, AND REPLACEMENT OF 15-EF1. MAXIMUM
TIME FOR UNIT TO BE OFF IS 4 HOURS.
33 ALL CONTRACTORS SHALL COORDINATE ACCESS TO FIRST FLOOR ANIMAL RESEARCH ROOMS AND ADJOINING SPACES WITH COR AND
LINDSAY ZINSER OF ANIMAL RESEARCH. COORDINATE ACCESS REQUIREMENTS A MINIMUM OF ONE WEEK IN ADVANCE.
34 AHU-30 COMBINATION FIRE/SMOKE DAMPER REPLACEMENT MUST OCCUR DURING EVENING HOURS OR WEEKENDS WHILE 15-AHU-31 IS
BEING REPLACED. REPLACEMENT OF COMBINATION FIRE/SMOKE DAMPERS WHEN THE EXISTING AHU-31 OR NEW 15-AHU31 AIR
HANDLING UNIT IS OPERATING WILL NOT BE PERMITTED.
35 UNLESS NOTED OTHERWISE, ALL WORK ASSOCIATED WITH THE REPLACEMENT OF 15-AHU-31 SHALL TAKE PLACE BETWEEN APRIL 1ST -
MAY 1ST OR BETWEEN SEPTEMBER 15TH - OCTOBER 15TH. COORDINATE CONSTRUCTION TIMEFRAME WITH COR. REFER TO PLAN
NOTES FOR WORK REQUIRED TO BE PERFORMED DURING NIGHT AND ON WEEKENDS.
36 CONTRACTORS MUST KEEP NOISE AND VIBRATION TO ABSOLUTE MINIMUM FOR PROTECTION OF ANIMALS IN RESEARCH LABS.
37 CONTROL CONTRACTOR SHALL COORDINATE WITH COR THE LIST OF CONTROL POINTS TO BE SET UP FOR TRENDING.
DOMESTIC HOT WATER SUPPLYDHW
DOMESTIC HOT WATER RECIRCULATIONDHWR
FREE STEAM (LOW PRESSURE STEAM)FS(5)
MECHANICAL INDEX, LEGEND, AND GENERAL NOTES15-M001
M
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RESOLVE HVAC ISSUES
IN BUILDING 15
CINCINNATI, OH
539-20-212
Chief Engineer
03/12/2020Revisions: Date:
SCHEMATIC DESIGN SUBMITTAL 04/18/2019 JASON REEVES
CONSTRUCTION DOCUMENTS 08/30/2019
DESIGN DEVELOPMENT SUBMITTAL 06/10/2019
95% OWNER REVIEW 07/26/2019
BID DOCUMENTS 03/12/2020
SECOND FLOOR PLAN BLDG 15 - REMOVALS & NEW WORK
THIRD FLOOR PLAN BLDG 15 - REMOVALS & NEW WORK
FOURTH FLOOR PLAN BLDG 15 - REMOVALS & NEW WORK
ROOF PLAN BLDG 15 - REMOVALS & NEW WORK
MJG
1. EXISTING WATER COOLED CHILLER SERVING AHU-31 TO
REMAIN.
2. EXISTING PIPING SERVING AHU-31 TO REMAIN.
PLAN NOTES
A. ALL WORK SHALL BE CLOSELY COORDINATED WITH THE VA
COR PRIOR TO THE EXECUTION OF THE WORK. THIS WILL
REQUIRE A MINIMUM ONE MONTH PRIOR TO SHUTDOWN OF
THE EQUIPMENT.
B. ALL WORK ASSOCIATED WITH THE REMOVAL AND
REPLACEMENT OF 15-AHU-31 TO BE COMPLETED IN THE
FIRST FLOOR MECHANICAL ROOM CAN BE EXECUTED
DURING NORMAL BUSINESS HOURS. ALL WORK REQUIRED
TO BE COMPLETED IN THE ANIMAL ROOMS AND OTHER
OCCUPIED SPACES SHALL BE PERFORMED AFTER HOURS
AND ON WEEKENDS.
C. ALL WORK ASSOCIATED WITH THE MAIN BUILDING EXHAUST
AND BALANCING OF EXISTING SYSTEM SHALL BE
PERFORMED AFTER HOURS AND ON WEEKENDS.
D. COMBINATION FIRE/SMOKE DAMPER REPLACEMENT FOR
AHU-30 MUST TAKE PLACE DURING EVENING HOURS OR
WEEKEND WHILE AHU-31 IS BEING REPLACED.
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RESOLVE HVAC ISSUES
IN BUILDING 15
CINCINNATI, OH
539-20-212
Chief Engineer
03/12/2020Revisions: Date:
SCHEMATIC DESIGN SUBMITTAL 04/18/2019 JASON REEVES
CONSTRUCTION DOCUMENTS 08/30/2019
DESIGN DEVELOPMENT SUBMITTAL 06/10/2019
95% OWNER REVIEW 07/26/2019
BID DOCUMENTS 03/12/2020
15-M100
BASEMENT FLOOR PLAN - BLDG 15
REMOVALS & NEW WORK
SCALE: 1/8" = 1'-0"
BASEMENT PLAN - BUILDING 15
MJGJAC
UP
Mech. Room
B15
Stor.
B01A
Transformer Vault
B02
Stor.
B05A
A/c Shop Off.
B05
Glass Wash & Still
B04
Lobby
C*B*08
Elev. Equip.
Room
B03
Stair #1
S*B*1
Research Stor.
B04A
Air Comp
B06
Corridor
B08A
E-EF
E-EF
E-PRV 1
E-PRV 2
E-6" CHS
E-6" CHR
E-HEATING
WATER PUMPS
EXIST-HEATING
WATER HEAT
EXCHANGER EXIST-HEATING
WATER HEAT
EXCHANGER
E-CHLR
1. REMOVE 15-AHU-31 AND DISPOSE OFF SITE.
2. REMOVE CONTROLS ASSOCIATED WITH AHU-31. REMOVE
ALL WIRING, CONDUIT, AND DISPOSE OFF SITE.
3. REMOVE OUTSIDE DUCTWORK FROM THIS POINT BACK TO
UNIT AND DISPOSE OFF SITE. PREPARE DUCTWORK FOR
NEW CONNECTION.
4. REMOVE SUPPLY AIR DUCTWORK FROM THIS POINT BACK
TO UNIT AND DISPOSE OFF SITE. REMOVE DUCT MOUNTED
STEAM HUMIDIFIER AND DISPOSE OFF SITE.
5. REMOVE EXHAUST AIR DUCT BETWEEN THESE LOCATIONS
AND DISPOSE OFF SITE. PREPARE DUCT FOR NEW
CONNECTION. EXHAUST DUCT TO REMAIN ACTIVE UNTIL
15-AHU-31 IS INSTALLED AND READY TO OPERATE. AT THIS
TIME, CONNECT EXHAUST DUCT TO 15-AHU-31 AND REMOVE
DUCT BETWEEN THESE SECTIONS.
6. REMOVE HEATING WATER PIPING BETWEEN THESE
LOCATIONS AND DISPOSE OFF SITE. PREPARE EXISTING
PIPING FOR NEW CONNECTION.
7. REMOVE CHILLED WATER PIPING FROM THIS LOCATION TO
AIR HANDLING UNIT AND DISPOSE OFF SITE. PREPARE
PIPING FOR NEW CONNECTION.
8. REMOVE UNIT HEATER, ASSOCIATED PIPING AND
CONTROLS AND DISPOSE OFF SITE.
9. REMOVE STEAM VALVE AND PIPING BACK TO WALL AND
PREPARE FOR NEW CONNECTION.
10. CONNECT SUPPLY AIR GRILLE TO SUPPLY AIR DUCT ABOVE
CEILING.
11. REMOVE DUCTWORK OFF TOP OF CAGE WASHER BACK TO
MAIN AND DISPOSE OFF SITE. CAP DUCT AT MAIN.
CONTROL DAMPER ON EXHAUST OUTLET TO REMAIN.
12. PROVIDE CONDENSATE DRAIN PIPING OFF CONDENSATE
DRAIN PANS UNDER ENERGY RECOVERY HEAT EXCHANGER
AND COOLING COIL. ROUTE TO FLOOR DRAIN.
13. CONNECT NEW EXHAUST DUCT TO EXISTING CAGE WASHER
EXHAUST OUTLET.
14. DUCTWORK SHALL BE 304 WELDED STAINLESS STEEL.
SLOPE DUCTWORK AT 1/8"/FT BACK TO CAGE WASHER.
PROVIDE DRAIN IN LOW POINT OF DUCTWORK AND ROUTE
DRAIN TO NEAREST DRAIN OR SERVICE SINK.
15. REMOVE FLEX DUCT FROM CEILING DOWN TO FUME HOOD.
INSTALL NEW VENTURI VALVE IN VERTICAL CONFIGURATION
AS HIGH AS POSSIBLE. ANCHOR TO WALL. CONNECT
OUTLET TO EXHAUST DUCT AT CEILING. INTALL 8"Ø
EXHAUST DUCT FROM VALVE AND CONNECT TO FUME
HOOD. PROVIDE A MAXIMUM 6" FLEX DUCT AT HOOD
CONNECTION.
16. PROVIDE A TEMPORARY 100% OUTSIDE AIR, AIR
CONDITIONING UNIT. LOCATE UNIT ON EXTERIOR DRIVE AT
LOCATION SHOWN. UNIT SHALL BE CAPABLE OF PROVIDING
CONTINUOUS AIRFLOW RATE OF 3900 CFM AT 1.3 IN-WC
ESP, 144,000 BTUH (12 TON). UNIT SHALL CYCLE SELF
CONTAINED COOLING UNIT TO MAINTAIN A 55 F DISCHARGE
AIR TEMPERATURE. WHEN OUTSIDE AIR TEMPERATURE IS
BELOW 55°F, UNIT FAN SHALL RUN AND COOLING COIL
LOCKED OUT. UNIT POWER SHALL BE 460V/3PH, 30 AMP.
17. ROUTE SUPPLY DUCT FROM TEMPORARY UNIT THRU
BUILDING 14. REMOVE EXTERIOR DOOR FROM FRAME AND
PROVIDE TEMPORARY ENCLOSURE. ROUTE DUCT THRU
TEMPORARY ENCLOSURE. AFTER NEW 15-AHU31 IS
OPERATIONAL, REMOVE DUCTWORK AND TEMPORARY
ENCLOSURE AND DISPOSE OFF SITE. REINSTALL EXISTING
DOOR.
18. TURN DUCT UP AND ROUTE AS HIGH AS POSSIBLE TO GET
THRU DOORWAY. PROVIDE TEMPORARY SUPPORT FOR
DUCT FROM STRUCTURE ABOVE. REMOVE TEMPORARY
DUCT AND SUPPORTS AFTER 15-AHU31 IS OPERATIONAL.
19. EXISTING CEILING TO BE REMOVED BY GENERAL
CONTRACTOR.
20. CONNECT TO EXISTING SUPPLY DUCT IN CORRIDOR. AFTER
15-AHU31 IS OPERATIONAL, REMOVE CONNECTION AND CAP
DUCT. REMOVE TEMPORARY DUCT AND DISPOSE OFF SITE.
21. PROVIDE A FILTER BOX WITH MERV 14 RATED BAG FILTERS.
MINIMUM FACE AREA = 8 SF. MAXIMUM FILTER PD AT CLEAN
SHALL BE 0.36". CONTRACTOR TO MONITOR FILTERS AND
REPLACE WHEN PRESSURE DROPS RISES ABOVE 0.6".
22. CONSTRUCTION PATH FOR INSTALLATION OF 15-AHU31.
UNIT SHALL COME TO SITE BROKEN DOWN IN INDIVIDUAL
SECTIONS CAPABLE OF PASSING THRU 6'-0" DOUBLE DOOR.
23. REPAIR EXISTING VARI-TEK EXHAUST AIR CONTROL
DAMPER AND CONTROLLER. CONTROLS NOT WORKING.
24. LOCATION OF EXHAUST AIR STATIC PRESSURE SENSOR.
25. LOCATION OF SUPPLY AIR STATIC PRESSURE SENSOR.
26. LOCATION OF NEW DDC CONTROL PANEL(S).
27. LOCATION OF LOW VOLTAGE SWITCH FOR 15-AFCV8 FUME
HOOD VALVE. MOUNT AT 48" AFF. ALL EXPOSED WIRING
SHALL BE ROUTED IN EMT CONDUIT.
28. PROVIDE SHUTOFF VALVES IN CHILLED WATER AND
HEATING WATER PIPING.
29. FILL SYSTEM FROM THIS POINT TO AHU WITH WITH AND
PROVIDE HVAC WATER TREATMENT FOR PIPING SYSTEM
FROM THIS LOCATION TO AHU UNIT.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RESOLVE HVAC ISSUES
IN BUILDING 15
CINCINNATI, OH
539-20-212
Chief Engineer
03/12/2020Revisions: Date:
SCHEMATIC DESIGN SUBMITTAL 04/18/2019 JASON REEVES
CONSTRUCTION DOCUMENTS 08/30/2019
DESIGN DEVELOPMENT SUBMITTAL 06/10/2019
95% OWNER REVIEW 07/26/2019
BID DOCUMENTS 03/12/2020
SCALE: 1/8" = 1'-0"
FIRST FLOOR DEMOLITION PLAN - BUILDING 15
15-M101
FIRST FLOOR PLAN - BLDG 15
REMOVALS & NEW WORK
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - BUILDING 15
SCALE: 1/4" = 1'-0"
MECHANICAL ROOM DEMOLITION ENLARGEMENT PLAN
SCALE: 1/4" = 1'-0"
MECHANICAL ROOM HVAC ENLARGEMENT PLAN
SCALE: 1/4" = 1'-0"
MECHANICAL ROOM PIPING ENLARGEMENT PLAN
SCALE: 1/4" = 1'-0"
SECTION A-A
MJG
A. ALL WORK SHALL BE CLOSELY COORDINATED WITH THE VA
COR PRIOR TO THE EXECUTION OF THE WORK. THIS WILL
REQUIRE A MINIMUM ONE MONTH PRIOR TO SHUTDOWN OF
THE EQUIPMENT.
B. ALL WORK ASSOCIATED WITH THE REMOVAL AND
REPLACEMENT OF 15-AHU-31 TO BE COMPLETED IN THE
FIRST FLOOR MECHANICAL ROOM CAN BE EXECUTED
DURING NORMAL BUSINESS HOURS. ALL WORK REQUIRED
TO BE COMPLETED IN THE ANIMAL ROOMS AND OTHER
OCCUPIED SPACES SHALL BE PERFORMED AFTER HOURS
AND ON WEEKENDS.
C. ALL WORK ASSOCIATED WITH THE MAIN BUILDING EXHAUST
AND BALANCING OF EXISTING SYSTEM SHALL BE
PERFORMED AFTER HOURS AND ON WEEKENDS.
D. COMBINATION FIRE/SMOKE DAMPER REPLACEMENT FOR
AHU-30 MUST TAKE PLACE DURING EVENING HOURS OR
WEEKEND WHILE AHU-31 IS BEING REPLACED.
GENERAL NOTES
DNUPUP
E-24/18
E-24/18 EA
E-18/10E-22/14
E -1
/1
E-32/14
E-VARE-VAR
E-VAR
E-VARE-VAR E-VAR
E-VAV
E-VAV
E-VAR E-VAR
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-24/18 OA
E-FD
E-20/18 E-18/18 E-12"Ø
E-VAR
Mechanical Room
REFER TO ENLARGED
MECHANICAL PLAN
ON THIS SHEET FOR
WORK IN THIS AREA
23 15
DNUPUP
Corridor
C100G
Corridor
C100H
Clean Storage
Corridor
C115
Dry Storage
115A
Cage Dump
Cage Wash
104A
Animal Room
Dry Storage
Clean Procedure
Room
111A
Bottle Wash
Necropsy
Mechanical Room
Animal Room
Lobby
Clean Vestibule
C119A
Corridor
C116
Rack Set-up
H.A.C.
Stair 2
S*1*2
Stair #1
S*1*1
Animal Room
Animal Room
Animal Room
Animal Room
Animal Room
Animal Room
Clean Corridor
C117
Vestibule
117A
Animal Room
Clean Procedure
Room
Dirty Corridor
C103 Cage Setup
103A
Clean Corridor
C102
Animal Room
Sterilizer
103B
E-24/18
E-24/18 EA
E-18/10E-22/14
E -1
/1
E-32/14
E-VARE-VARE-VAR
E-VAR
E-VAR
E-VAV
E-VAV
E-VAR E-VAR
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-24/18 OA
E-FD
E-20/18 E-18/18 E-12"Ø
E-VAR
REFER TO ENLARGED
MECHANICAL PLAN
ON THIS SHEET FOR
WORK IN THIS AREA
RR
14/8
15-EF2
15-AFCV8
17 18
TEMPORARY
FILTER BOX
MERV 14 FILTERS
TEMPORARY
AHU 22
D R
SP
T T T T T T T
T
T
T
T
T
T
T
T T T
T
T
END OF OA DUCT OPEN
TO VENTILATION SHAFT.
4E-24/18 EA
E-24/18 OA
E-24/18 SA
E-24/18 EA
E-24/18 OA
E-24/18 SA
15-AHU-31
15-PUH1
24/18 SA
24/18 EA
24/20 OA
10/14 RA
32/14 RA
70/10
A
A
15-AFM1
15-AFM2
Mechanical Room
AIR TURNING
VANES (TYP)
SP
T
15-AHU-31
15-PUH1
2" CHR
2" CH
2" HWR
2" HWS
1 1/2" 1/2"
E-2" HWS
E-2" HWR
E-2" HWR
E-2" HWS
3/4" MPS
3/4" MPR
Mechanical Room
15-CCP1
15-CCP2
C
C
24/20 OA 32/14 RA
70/10
24/18 EA
20/24 SA
10/14
18/70 14/10
HEATING WATER PIPING
EXISTING CONDUIT
15-AHU-31
EXIST-FLOOR
EXISTING
HOUSEKEEPING PAD
Mechanical Room
AIR TURNING
VANES (TYP)
1. REMOVE EXISTING COMBINATION FIRE/SMOKE DAMPER IN
THE HOT AIR SUPPLY DUCT AND DISPOSE OFF SITE.
CONTROL CONTRACTOR SHALL REMOVE PNEUMATIC
TUBING AND CAP BACK AT MAIN.
2. REMOVE SUPPLY DUCTWORK FROM THIS LOCATION TO
COMBINATION FIRE/SMOKE DAMPER TO MAKE ROOM TO
INSTALL NEW COMBINATION FIRE/SMOKE DAMPERS.
REINSTALL DUCT OR PROVIDE NEW DOUBLE WALL DUCT OF
SAME SIZE. REMOVE AND REINSTALL WALL PANEL TO GAIN
ACCESS TO SHAFT.
3. REMOVE FUME HOOD AIR CONTROL VALVE AND
ASSOCIATED FUME HOOD CONTROLS AND DISPOSE OFF
SITE. PREPARE DUCTWORK FOR NEW CONNECTION. WORK
TO BE COMPLETED UNDER ALTERNATE #2.
4. PROVIDE NEW VENTURI AIR CONTROL VALVE FOR FUME
HOOD EXHAUST. EXISTING DAMPER AND CONTROLS TO
REMAIN UNDER DEDUCT ALTERNATE #2.
5. PROVIDE DOUBLE WALL INSULATED SHEETMETAL PANEL
AROUND DUCT PENETRATION TO COVER EXTERIOR WALL
OPENING. EXISTING DAMPER AND CONTROLS TO REMAIN
UNDER DEDUCT ALTERNATE #2.
6. PROVIDE A NEW COMBINATION FIRE/SMOKE DAMPER IN HOT
AIR SUPPLY DUCT. DAMPERS SHALL BE RATED FOR 1 1/2
HOUR OPERATION. DAMPER ACTUATORS SHALL BE
115V/1PH.
7. REMOVE CEILING EXHAUST GRILLE AND CAP DUCTWORK
ABOVE CEILING. GENERAL CONTRACTOR TO PROVIDE AND
INSTALL NEW CEILING PAD.
8. CONNECT TO EXISTING DUCT ABOVE CEILING AND ROUTE
TO NEW EXHAUST GRILLE. PROVIDE NEW MANUAL DAMPER
AND BALANCE TO EXHAUST AIRFLOW RATE ON SCHEDULE.
COORDINATE LOCATION WITH EXISTING LIGHTS.
9. REMOVE GRILLE AND PROVIDE A NEW 8"x8" EXHAUST
GRILLE WITH MANUAL DAMPER.
10. INSTALL MANUAL DAMPER IN EXHAUST DUCT AT THIS
LOCATION.
11. INSTALL NEW 24"x24" EXHAUST GRILLE IN CORRIDOR.
ROUTE NEW EXHAUST DUCT FROM GRILLE AND CONNECT
TO EXISTING EXHAUST DUCT AT LOCATION SHOWN.
12. PROVIDE A 18" WIDE BY 24" TALL REMOVABLE ACCESS
PANEL IN SHEETMETAL SIDEWALL PANEL FOR ACCESS INTO
CHASE.
13. REMOVE EXHAUST GRILLE. FOR WALL MOUNTED
REGISTERS, PROVIDE SHEETMETAL BLANK OFF PANEL TO
COVER EXISTING WALL OPENING. FOR CEILING MOUNTED
GRILLES, CAP GRILLE ABOVE CEILING. GENERAL
CONTRACTOR TO PROVIDE NEW CEILING PAD.
14. EXISTING VARI-TEK EXHAUST AIR CONTROL DAMPER AND
CONTROLLER NOT OPERATIONAL. REPAIR.
15. UNDER ALTERNATE BID #1, REMOVE EXISTING
COMBINATION FIRE/SMOKE DAMPER IN THE COLD AIR
SUPPLY DUCT AND DISPOSE OFF SITE. CONTROL
CONTRACTOR SHALL REMOVE PNEUMATIC TUBING AND CAP
BACK AT MAIN.
16. UNDER ALTERNATE BID #1, PROVIDE A NEW COMBINATION
FIRE/SMOKE DAMPER IN COLD AIR SUPPLY DUCT. DAMPERS
SHALL BE RATED FOR 1 1/2 HOUR OPERATION. DAMPER
ACTUATORS SHALL BE 115V/1PH. EXISTING COMBINATION
FIRE/SMOKE DAMPER AND ASSOCIATED PNEUMATIC
CONTROL TO REMAIN UNDER BASE BID.
17. ACCESS PLATFORM PROVIDED BY GENERAL CONTRACTOR.
18. REMOVE A 48" WIDE x 40" TALL BLANK OFF PANEL SECTION
OFF BACK OF EXTERIOR WALL LOUVER TO ALLOW OUTSIDE
VENTILATION AIR TO ENTER VENTILATION SHAFT. REMOVE
SECTION DIRECTLY ABOVE SOLID EXTERIOR PANEL.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RESOLVE HVAC ISSUES
IN BUILDING 15
CINCINNATI, OH
539-20-212
Chief Engineer
03/12/2020Revisions: Date:
SCHEMATIC DESIGN SUBMITTAL 04/18/2019 JASON REEVES
CONSTRUCTION DOCUMENTS 08/30/2019
DESIGN DEVELOPMENT SUBMITTAL 06/10/2019
95% OWNER REVIEW 07/26/2019
BID DOCUMENTS 03/12/2020
SCALE: 1/8" = 1'-0"
SECOND FLOOR DEMOLITION PLAN - BUILDING 15
15-M102
SECOND FLOOR PLAN - BLDG 15
REMOVALS & NEW WORK
SCALE: 1/8" = 1'-0"
SECOND FLOOR PLAN - BUILDING 15
A. ALL WORK SHALL BE CLOSELY COORDINATED WITH THE VA
COR PRIOR TO THE EXECUTION OF THE WORK. THIS WILL
REQUIRE A MINIMUM ONE MONTH PRIOR TO SHUTDOWN OF
THE EQUIPMENT.
B. ALL WORK ASSOCIATED WITH THE REMOVAL AND
REPLACEMENT OF 15AHU-31 TO BE COMPLETED IN THE
FIRST FLOOR MECHANICAL ROOM AND BASEMENT CAN BE
EXECUTED DURING NORMAL BUSINESS HOURS. ALL WORK
REQUIRED TO BE COMPLETED IN THE ANIMAL ROOMS AND
OTHER OCCUPIED SPACES SHALL BE PERFORMED AFTER
HOURS AND ON WEEKENDS.
C. ALL WORK ASSOCIATED WITH THE MAIN BUILDING EXHAUST
AND BALANCING OF EXISTING SYSTEM SHALL BE
PERFORMED AFTER HOURS AND ON WEEKENDS.
GENERAL NOTES
MJG
DNUPUP DN
E-VAV
E-AHU 30
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAVE-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV E-VAV
E-VAV
E-VAV
E-VAV E-VAV
E-VAV
E-VAV
E-30"Ø HOT AIR DUCT
E-40"Ø COLD AIR DUCT
DNUPUP DN
E-VAV
E-VAVE-VAV
Lab
Office
209A
Corridor
C204 Stair #1
S*2*1
Elec.
Lobby
Corridor
C215
H.A.C.
Toilet
Office
Control Room
Office
Lab
Scrub
210C
Stair #2
S*2*2
Office
Office
Corridor
C203
Office
Office
Storage
207A
Electric
Storage
Sterile Surgery
210B
15-F/SD1
30"Ø 40"Ø
E-AHU 30
E-VAV E-VAV E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAV E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAVE-VAV
15-AFCV1
FUME
HOOD
15-F/SD2
CR1
TR1
8"x8"
8/8 T
T T
T
T
T
T
T T T
T
T
T
CR1
12"x12"
24"x24"
1. REMOVE FUME HOOD AIR CONTROL VALVE AND
ASSOCIATED FUME HOOD CONTROLS AND DISPOSE OFF
SITE. PREPARE DUCTWORK FOR NEW CONNECTION.
EXISTING DAMPER AND CONTROLS TO REMAIN UNDER
DEDUCT ALTERNATE #2.
2. PROVIDE NEW VENTURI AIR CONTROL VALVE FOR FUME
HOOD EXHAUST. EXISTING DAMPER AND CONTROLS TO
REMAIN UNDER DEDUCT ALTERNATE #2.
3. FIX CONTROL DAMPER ON FUME HOOD. BALANCE MANUAL
DAMPER IN DUCT SERVING EXHAUST HOOD TO 290 CFM.
AUTOMATIC DAMPER SHALL CLOSE WHEN WASHER UNIT
BELOW IS NOT IN OPERATION.
4. FIX EXHAUST AIR DAMPER CONTROL AND ASSOCIATED
PRESSURE CONTROL DISPLAY LOCATED ABOVE DOOR.
5. REMOVE EXHAUST GRILLE AND EXHAUST DAMPER.
DAMPER CONTROLLER TO REMAIN. CAP DUCT AND
PROVIDE STAINLESS STEEL BLANK OFF PANEL ON WALL.
TURN DAMPER OVER TO OWNER.
6. REMOVE EXHAUST GRILLE AND CAP EXHAUST DUCT.
PROVIDE STAINLESS STEEL BLANK OFF PANEL ON WALL.
7. PRESSURE SENSOR IS READING POSITIVE PRESSURE WHEN
SPACE IS NEGATIVE TO CORRIDOR. SENSOR IS
CONNECTED BACKWARDS. CORRECT WIRING TO SENSOR.
ROOM 301 SHALL BE NEGATIVE TO CORRIDOR. CORRECT
SENSOR.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RESOLVE HVAC ISSUES
IN BUILDING 15
CINCINNATI, OH
539-20-212
Chief Engineer
03/12/2020Revisions: Date:
SCHEMATIC DESIGN SUBMITTAL 04/18/2019 JASON REEVES
CONSTRUCTION DOCUMENTS 08/30/2019
DESIGN DEVELOPMENT SUBMITTAL 06/10/2019
95% OWNER REVIEW 07/26/2019
BID DOCUMENTS 03/12/2020
SCALE: 1/8" = 1'-0"
THIRD FLOOR DEMOLITION PLAN - BUILDING 15
15-M103
THIRD FLOOR PLAN - BLDG 15
REMOVALS & NEW WORK
SCALE: 1/8" = 1'-0"
THIRD FLOOR PLAN - BUILDING 15
A. ALL WORK SHALL BE CLOSELY COORDINATED WITH THE VA
COR PRIOR TO THE EXECUTION OF THE WORK. THIS WILL
REQUIRE A MINIMUM ONE MONTH PRIOR TO SHUTDOWN OF
THE EQUIPMENT.
B. ALL WORK ASSOCIATED WITH THE REMOVAL AND
REPLACEMENT OF 15-AHU-31 TO BE COMPLETED IN THE
FIRST FLOOR MECHANICAL ROOM AND BASEMENT CAN BE
EXECUTED DURING NORMAL BUSINESS HOURS. ALL WORK
REQUIRED TO BE COMPLETED IN THE ANIMAL ROOMS AND
OTHER OCCUPIED SPACES SHALL BE PERFORMED AFTER
HOURS AND ON WEEKENDS.
C. ALL WORK ASSOCIATED WITH THE MAIN BUILDING EXHAUST
AND BALANCING OF EXISTING SYSTEM SHALL BE
PERFORMED AFTER HOURS AND ON WEEKENDS.
GENERAL NOTES
MJG
DNUPUP DN
E-VAV
E-VAV E-VAV E-VAV E-VAV
E-VAV
E-VAV
E-VAVE-VAV
E-VAV
E-VAV
E-VAV
FUME
HOOD
FUME
HOOD
FUME
HOOD
E-SSCU
E-HOOD
DNUPUP DN
Biochemistry
Control Temp.
Room
Control Temp Room
305A
Glassware
307Biochemistry
Corridor
C315
Biochemistry
Biochemistry
Electric Closet
Lobby
Corridor
C-3-317
H.A.C.
Toilet
Stair #1
S*3*1
Stair #2
S*3*2
Electric
Staff
E-VAV
E-VAV E-VAV E-VAV
E-VAV
E-VAV
E-VAV
E-VAVE-VAV
E-VAV
E-VAV
E-VAV
2 2
FUME
HOOD
FUME
HOOD
FUME
HOOD
15-AFCV2 15-AFCV3
15-AFCV4
T T
T
T
T
T
T
T
T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RESOLVE HVAC ISSUES
IN BUILDING 15
CINCINNATI, OH
539-20-212
Chief Engineer
03/12/2020Revisions: Date:
SCHEMATIC DESIGN SUBMITTAL 04/18/2019 JASON REEVES
CONSTRUCTION DOCUMENTS 08/30/2019
DESIGN DEVELOPMENT SUBMITTAL 06/10/2019
95% OWNER REVIEW 07/26/2019
BID DOCUMENTS 03/12/2020
SCALE: 1/8" = 1'-0"
FOURTH FLOOR DEMOLITION PLAN - BUILDING 15
15-M104
FOURTH FLOOR PLAN - BLDG 15
REMOVALS & NEW WORK
SCALE: 1/8" = 1'-0"
FOURTH FLOOR PLAN - BUILDING 15
1. REMOVE FUME HOOD AIR CONTROL VALVE AND
ASSOCIATED CONTROLS AND DISPOSE OFF SITE. PREPARE
DUCTWORK FOR NEW CONNECTION. EXISTING DAMPER
AND CONTROLS TO REMAIN UNDER DEDUCT ALTERNATE #2.
2. PROVIDE NEW VENTURI AIR CONTROL VALVE FOR FUME
HOOD EXHAUST. EXISTING DAMPER AND CONTROLS TO
REMAIN UNDER DEDUCT ALTERNATE #2.
3. REMOVE EXHAUST GRILLE, CAP DUCT, AND INSTALL
STAINLESS STEEL BLANK OFF PANEL ON WALL.
4. REMOVE EXHAUST GRILLE AND EXHAUST DAMPER.
DAMPER CONTROLLER TO REMAIN. CAP DUCT AND
PROVIDE STAINLESS STEEL BLANK OFF PANEL ON WALL.
TURN DAMPER OVER TO OWNER.
PLAN NOTES
A. ALL WORK SHALL BE CLOSELY COORDINATED WITH THE VA
COR PRIOR TO THE EXECUTION OF THE WORK. THIS WILL
REQUIRE A MINIMUM ONE MONTH PRIOR TO SHUTDOWN OF
THE EQUIPMENT.
B. ALL WORK ASSOCIATED WITH THE REMOVAL AND
REPLACEMENT OF 15-AHU-31 TO BE COMPLETED IN THE
FIRST FLOOR MECHANICAL ROOM AND BASEMENT CAN BE
EXECUTED DURING NORMAL BUSINESS HOURS. ALL WORK
REQUIRED TO BE COMPLETED IN THE ANIMAL ROOMS AND
OTHER OCCUPIED SPACES SHALL BE PERFORMED AFTER
HOURS AND ON WEEKENDS.
C. ALL WORK ASSOCIATED WITH THE MAIN BUILDING EXHAUST
AND BALANCING OF EXISTING SYSTEM SHALL BE
PERFORMED AFTER HOURS AND ON WEEKENDS.
GENERAL NOTES
MJG
DNDN
E-VAV
FUME
HOOD
E-VAV
E-VAV
E-VAV
E-VAV E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAVE-VAV
FUME
HOOD
FUME
HOOD
DNDN
Electric
Lab #1
Stair #2
S*4*2
Lab #2
Controlled Temp. Room
Staff
Bio-safety Level 2 Lab
Elec.
Lobby
Corridor
C-4-417
Corridor
C415
H.A.C.
Unisex Toilet
Equipment
E-VAV
FUME
HOOD
E-VAV
E-VAV
E-VAV
E-VAV E-VAV
E-VAV
E-VAV
E-VAV
E-VAV
E-VAVE-VAV
FUME
HOOD
FUME
HOOD
15-AFCV5
15-AFCV715-AFCV6
TTT
T T
1. REMOVE EXISTING EXHAUST FAN AND DISPOSE OFF SITE.
REMOVE ASSOCIATED EXHAUST DUCT TO ROOF CURB,
DISPOSE OFF SITE, AND PREPARE DUCT FOR NEW
CONNECTION.
2. REMOVE EXHAUST BRANCH DUCT ABOVE ROOF TO MAIN
DUCT AND DISPOSE OFFSITE. CAP BRANCH DUCT AT MAIN.
3. INSTALL NEW EXHAUST DUCT. CONNECT TO EXISTING
BRANCH. PROVIDE MANUAL VOLUME DAMPER IN DUCT.
INSULATE DUCT WITH 2" INSULATION AND ALUMINUM
JACKET.
4. CONNECT TO EXISTING EXHAUST DUCT. INSULATE
EXHAUST DUCT EXTERNAL INSULATION FROM CURB TO FAN
INLET. PROVIDE ALUMINUM JACKET ON INSULATION.
5. ROOF CURB FLASHING CONTAINS ASBESTOS. DO NOT
DISTURB CURB FLASHING WITH MODIFICATION OF
DUCTWORK AND EXHAUST FAN REPLACEMENT.
PLAN NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F il e P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RESOLVE HVAC ISSUES
IN BUILDING 15
CINCINNATI, OH
539-20-212
Chief Engineer
03/12/2020Revisions: Date:
SCHEMATIC DESIGN SUBMITTAL 04/18/2019 JASON REEVES
CONSTRUCTION DOCUMENTS 08/30/2019
DESIGN DEVELOPMENT SUBMITTAL 06/10/2019
95% OWNER REVIEW 07/26/2019
BID DOCUMENTS 03/12/2020
SCALE: 1/8" = 1'-0"
ROOF DEMOLITION PLAN - BUILDING 15
15-M105
ROOF PLAN - BLDG 15
REMOVALS & NEW WORK
SCALE: 1/8" = 1'-0"
ROOF PLAN - BUILDING 15
A. ALL WORK SHALL BE CLOSELY COORDINATED WITH THE VA
COR PRIOR TO THE EXECUTION OF THE WORK. THIS WILL
REQUIRE A MINIMUM ONE MONTH PRIOR TO SHUTDOWN OF
THE EQUIPMENT.
B. ALL WORK ASSOCIATED WITH THE REMOVAL AND
REPLACEMENT OF 15-AHU-31 TO BE COMPLETED IN THE
FIRST FLOOR MECHANICAL ROOM AND BASEMENT CAN BE
EXECUTED DURING NORMAL BUSINESS HOURS. ALL WORK
REQUIRED TO BE COMPLETED IN THE ANIMAL ROOMS AND
OTHER OCCUPIED SPACES SHALL BE PERFORMED AFTER
HOURS AND ON WEEKENDS.
C. ALL WORK ASSOCIATED WITH THE MAIN BUILDING EXHAUST
AND BALANCING OF EXISTING SYSTEM SHALL BE
PERFORMED AFTER HOURS AND ON WEEKENDS.
GENERAL NOTES
SCALE: 1/4" = 1'-0"
SECTION B-B - EXHAUST FAN 15-EF1
MJG
E-12/6
E-18/16 E-18/16
E-18/24
E-18/16
E-18/16
E-18/16
E-18/16E-20/20E-18/16E-18/16
E-18/16
12/4
E-26/20 E-50/28 E-50/32 E-50/40
E-80/46
E-18/16
E-16/18
E-EF5
E-12/6
E-18/16 E-18/16 E-18/16
E-18/16
E-18/16
E-18/16E-20/20E-18/16E-18/16
E-18/16
12/4
E-26/20 E-50/28 E-50/32 E-50/40
E-80/46
E-16/18
E-EF5
15-EF1
E-18/16
E-16/18 18/16
MANUAL BALANCE DAMPER
MANUAL BALANCE DAMPER
E14/12
E-18/24
BB
4 5 5
15-EF1
15-EF1
E-ROOF CURB
E-ROOF
BIRDSCREEN
EXHAUST OUTLET
18/24
1x RADIUS ELBOW
E-24/18
CONNECT TO EXISTING
ROOF
CURB
DO NOT
DISTURB
FLEXIBLE DUCT CONNECTION
DUCT TRANSITION
ROOF MOUNTED EXHAUST FAN SECTION
ANCHOR INTO
EXISTING CURB
UNISTRUT
VIBRATION
ISOLATOR
ROOF MOUNTED EXHAUST FAN SECTION
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RESOLVE HVAC ISSUES
IN BUILDING 15
CINCINNATI, OH
539-20-212
Chief Engineer
03/12/2020Revisions: Date:
SCHEMATIC DESIGN SUBMITTAL 04/18/2019 JASON REEVES
CONSTRUCTION DOCUMENTS 08/30/2019
DESIGN DEVELOPMENT SUBMITTAL 06/10/2019
95% OWNER REVIEW 07/26/2019
BID DOCUMENTS 03/12/2020
15-M501
DETAILS
SCALE: NTS
BUILDING 15 EXHAUST RISER DIAGRAM
1. REMOVE CEILING DIFFUSER AND CAP DUCT ABOVE CEILING.
2. DAMPER AND ASSOCIATED CONTROLS BROKEN. REPAIR
DAMPER.
3. REPLACE FUME HOOD VENTURI VALVE.
4. INSTALL DUCT MOUNTED MANUAL BALANCE DAMPER.
5. INSTALL NEW EXHAUST GRILLE WITH MANUAL BALANCE
DAMPER.
6. RESIZE EXHAUST DUCT ON ROOF TO 14/12.
7. REMOVE CONNECTION TO EXISTING DUCT MAIN, PROVIDE
NEW DUCT ON ROOF, AND CONNECT UPSTREAM OF MAIN
DUCT ELBOW.
8. PROVIDE NEW FUME HOOD VENTURI VALVE.
9. REMOVE EXHAUST GRILLE, EXHAUST DAMPER WITH
ASSOCIATED CONTROLS. CAP DUCT.
PLAN NOTES
SCALE: NTS
BUILDING 15 EXHAUST RISER DIAGRAM
SCALE: NTS
BUILDING 15 ANIMAL ROOM EXHAUST RISER DIAGRAM SCALE: 1/2" = 1'-0"
15-AHU-31 DETAIL
MJG
300 CFM
HOOD
C115
16x12 DAMPER
16/12
1550 CFM
20x10 GRILLE
12x10 DAMPER
18/16
1550 CFM
20/20
2433 CFM
20/20
10/6
2433 CFM
104A
800 CFM
HOOD
C116
450 CFM
18x10 GRILLE
10x10 DAMPER
16/12
1100 CFM
20x10 GRILLE
12x10 DAMPER
15/12
325 CFM
16/16
18/16
50/40
20312/8
10/10
12/10
325 CFM
325 CFM
12x24 GRILLE
14x8 DAMPER10/10
12/10
0 CFM
400 CFM
(NEW) 24x24 GRILLE
C215
18/16
400 CFM
16/16
1100 CFM
18/16
8x8
1100 CFM
700 CFM
FUME HOOD
12/10
700 CFM
775 CFM
20x10 GRILLE
12x10 DAMPER
15/12
16/16
1150 CFM
18/16
1925 CFM
12/10
450 CFM
12 x 12 GRILLE
103A
10x12 DAMPER10/10
700 CFM
FUME HOOD
12/10
700 CFM
50/40
580 CFM
18x10 GRILLE
12x10 DAMPER
15/12
100 CFM
16/16
680 CFM
18/16
1260 CFM
12/10
0 CFM
580 CFM
18x10 GRILLE
12x10 DAMPER 12/10
15/12
530 CFM
16/16
1680 CFM
18/16
12/10
530 CFM
20x10 GRILLE
12x10 DAMPER
700 CFM
FUME HOOD
700 CFM
12/10
1150 CFM
20210/10
530 CFM
20x12 GRILLE 12x12 DAMPER
2380 CFM
80x46 80x46
EXHAUST FAN
10006
883 CFM
775 CFM
1100 CFM
16x3 OPENING
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
ROOF
3 3
325 CFM
AA
450 CFM
450 CFM
100 CFM
24x24 GRILLE
14/12
14/12
18/167
EF-5
50/40
20023 CFM
1 1 1
CAPPED
15-AFCV3 15-AFCV4
15-AFCV7
100 CFM
8x4 GRILLE
12/6
310 CFM
125 CFM
85 CFM
85 CFM
12/6
395 CFM
12/6
225 CFM
12/6
100 CFM
100 CFM
12/4
240 CFM
100 CFM
40 CFM
40 CFM
12/4
280 CFM
12/4
200 CFM
12/4
100 CFM
26/20
16/16
700 CFM
18/16
1400 CFM
15/12
700 CFM
FUME HOOD
12/10
700 CFM
700 CFM
FUME HOOD
12/10
700 CFM
200 CFM
18x10 GRILLE
16/16
885 CFM
15/12
885 CFM
12/10
325 CFM
125 CFM
8x8
111A 8x8
10x8 DAMPER8x4 GRILLE
8x4 GRILLE 8x4 GRILLE
8x4 GRILLE 8x4 GRILLE
220 CFM
14x8 GRILLE
210B
340 CFM
12x10 GRILLE
210C
12x10 DAMPER14x8 DAMPER
700 CFM
FUME HOOD
12/10
700 CFM
18/16
1585 CFM
26/20
750 CFM
18x10 GRILLE
12x16 DAMPER
12/10
750 CFM
FOURTH
ROOF
1025 CFM
20x10 GRILLE
12x10 DAMPER
883 CFM
20x10 GRILLE
12x10 DAMPER
1075 CFM
20x10 GRILLE
12x10 DAMPER
15/12
1775 CFM
16/16
2658 CFM
18/16
3733 CFM
500 CFM
18x10 GRILLE
10x10 DAMPER
12/10
500 CFM
975 CFM
20x10 GRILLE
12x10 DAMPER
325 CFM
10x10 GRILLE
12x10 DAMPER
775 CFM
20x10 GRILLE
12x10 DAMPER
15/12
1475 CFM
16/16
1800 CFM
18/16
2575 CFM
12x10
50/28
300 CFM
18x10 GRILLE
10 x 10 DAMPER
12/10
300 CFM
209A
20x10 GRILLE
12x10 DAMPER
15/12
500 CFM
16/16
18/16
10x6
290 CFM
HOOD
12x10 DAMPER
20x10 GRILLE
12x10 DAMPER
15/12
700 CFM
16/16
900 CFM
18/16
1675 CFM
12x10
700 CFM
FUME HOOD
12/10
700 CFM
50/32
1383 CFM
883 CFM
775 CFM
1383 CFM
FLOOR
THIRD
FLOOR
SECOND
FLOOR
FIRST
FLOOR
MANUAL BALANCE DAMPER (TYP)
AUTOMATIC EXHAUST AIR DAMPER (TYP)
3 3
AA
CAPPED
15-AFCV5 15-AFCV6
15-AFCV2
15-AFCV1
200 CFM
(NEW) 24x24 GRILLE
500 CFM
20x24
500 CFM
20x24
18/10
1000 CFM
18/10
500 CFM
20x24
500 CFM
20x24
006 005
22/14
500 CFM
20x24
500 CFM
20x24
004 003
32/14
500 CFM
12x24
24/18
12x24 DAMPER 12x24 DAMPER 12x24 DAMPER
14/8
500 CFM
18/10
1000 CFM
18/10
1000 CFM
EXHAUST FAN
450 CFM
FUME HOOD
15-EF1
2 15-AHU-31
15-HTX1
24/1815-AFCV8
18/16
1955 CFM (D)
1000DUCT SEGMENT:
DUCT SIZE:
PROPOSED DESIGN CFM:
LEGEND
VENTURI VALVE
MANUAL BALANCE DAMPER
AUTOMATIC EXHAUST DAMPER
15-PF2
PREFILTER
74"x8" EA OPENING
24"x74" OA INLET
24"x74" EA OUTLET
15-PF1
PREFILTER
OA BYPASS
DAMPER
15-HTX1
FIXED PLATE
HEAT EXCHANGER
8'-8"
20"x74" AIR
TRANSFER OPENING
ACCESS DOOR (TYP)
SS DRAIN PAN
PLAN VIEW HEAT EXCHANGER
ELEVATION VIEW
PLAN VIEW AIR HANDLER
15-SF1 / 15-SF2
SUPPLY FAN
15-CC1
COOLING
COIL
C
C
15-SH1
HUMIDIFIER
15-PH1
PREHEAT
COIL
15-PF3
PRE FILTER
15-AF1
FINAL FILTER
5" BASERAIL
15'-10"
15-SF1
SUPPLY FAN
15-SF2
SUPPLY FAN
22"x38" SA OUTLET
22"x38" SA OUTLET
15-CC1
COOLING
COIL
15-SH1
HUMIDIFIER
15-PH1
PREHEAT
COIL
15-PF3
AFTER FILTER
15-AF1
FINAL FILTER
ACCESS DOOR (TYP)
MOTOR CONTROL CENTER
20"x74"
AIR TRANSFER
OPENING
SS DRAIN PAN
SS DRAIN PAN
74"x24" OA INLET
74"x24" EA OUTLET
8"x74"
EA OPENING
15-PF1
PREFILTER
15-HTX1
FIXED PLATE
HEAT EXCHANGER
OA BYPASS DAMPER
ACCESS DOOR (TYP)
8'-8"
15-PF2
PREFILTER
15'-6"
LIGHT (TYP)
WINDOW (TYP)
NOTES:
1. UNIT SHALL BE SHIPPED IN SECTIONS.
MAXIMUM SECTION WIDTH SHALL BE 60
INCHES FOR INSTALLATION THRU EXISTING
BUILDING DOORS.
2. THE OVERALL UNIT HEIGHT, LENGTH, AND
WIDTH AS SHOWN ON THIS DETAIL ARE THE
MAXIMUM UNIT DIMENSIONS PERMITTED.
UNITS LARGER THAN SHOWN WILL NOT FIT
IN MECHANICAL ROOM SPACE.
MOTOR CONTROL CENTER
15-M502
DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RESOLVE HVAC ISSUES
IN BUILDING 15
CINCINNATI, OH
539-20-212
Chief Engineer
03/12/2020Revisions: Date:
SCHEMATIC DESIGN SUBMITTAL 04/18/2019 JASON REEVES
CONSTRUCTION DOCUMENTS 08/30/2019
DESIGN DEVELOPMENT SUBMITTAL 06/10/2019
95% OWNER REVIEW 07/26/2019
BID DOCUMENTS 03/12/2020
COIL
TEST PLUG (TYP.)
REDUCER, IF REQUIRED
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS (TYP.)
WATER SUPPLY
SHUT OFF VALVE
DRAIN WITH HOSE
CONNECTION
MODULATING 2-WAY CONTROL VALVE
15-AHU-31 CHILLED WATER COIL
PIPING CONNECTION
AUTOMATIC FLOW
CONTROL VALVE
STRAINER WITH BLOW DOWN
TYPICAL MANUAL AIR VENT
AIR VENT
1/2" BALL VALVE
1/4" COPPER TUBING
1/2" x 4" NIPPLE
CIRCULATING WATER PIPING
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS AS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO NEAREST DRAIN.
MV
OR
AV
DRAIN VALVE AND AIR VENT
CONNECTIONS (HYDRONIC SYSTEMS)
TYPICAL CHILLED AND HOT WATER PIPING DRAIN VALVE CONNECTIONS
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" BALL VALVE
ADAPTER TO 3/4" HOSE
THREAD-PROVIDE HOSE CAP NUT
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
PIPE HANGERS
5 FT
6 8 10
9 1110 12
-1312 14 -16 -
1614 17 2219 23
2725 28 3230
20 241814 16128 1064 532 2 1/21 1/21 1 1/4THRU 3/4
7 7
7 98
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000
LB. UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE
43 - SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" MIN.)
BAND
1-5/8" 12 GAUGE CHANNEL
OR 2"x2"x1/4" ANGLE
1/2" DIA. HANGER
RODS WITH 36" MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
FT.
FT.
M A
X
NOTE: SEE SPECIFICATIONS FOR
DETAILED HANGER REQUIREMENTS
NOTES:
1.
2.
3.
4.
ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED
AS DETAILED BY SMACNA.
WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE
THICKNESS VANE TYPE REGARDLESS OF "W" DIMENSION.
ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1 1/2"
MAXIMUM SPACE BETWEEN VANES AND 3/4" TRAILING EDGE.
WHEN W EQUALS W2 AND W1 IS GREATER THAN 20", VANES
SHALL BE DOUBLE VANE TYPE.
W
W1
DUCTWORK SQUARE
VANE ELBOWS
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
M A X
30° M
A X
E Q
U
IP
M E
N T
AIR
FLOW
AIR
FLOW
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEWTYPICAL DUCTWORK TRANSITION WITH
EQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
M
A X
15° M
A X
M A
X
M A
X
DUCTWORK TRANSITIONS
1/8" CLEARANCE
ALL AROUND SECTIONSIDE ELEVATION
STIFFEN BLADE
AS REQUIRED
DUCT
1/2" ROUND ROD PIN
INSULATION
STAND-OFF
HANDLE WITH
LOCKING
QUADRANT
INSIDE END BEARING
OUTSIDE END BEARING
DAMPER BLADE
INSULATION SEE
SPECIFICATION
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR
FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.
NOTES:
1.
2.
VOLUME DAMPER DETAIL
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR FLOW
AIR FLOW
W
PROVIDE VOLUME
DAMPER
AT EACH BRANCH
DUCT
1/4W OR 4" MIN.
BRANCH DUCT
45 DEG.
EXHAUST OR RETURN
BRANCH DUCTWORK
NOTE:
1. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE
OF ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS,
VALVES, OR EQUIPMENT.
TI
TI SHUT OFF VALVE
COIL
TEST PLUG (TYP.)
REDUCER, IF REQUIRED
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS (TYP.)
WATER SUPPLY
SHUT OFF VALVE
DRAIN WITH HOSE
CONNECTION
MODULATING 2-WAY CONTROL VALVE
15-AHU-31 HEATING WATER COIL
PIPING CONNECTION
AUTOMATIC FLOW
CONTROL VALVE
STRAINER WITH BLOW DOWN
NOTE:
1. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE
OF ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS,
VALVES, OR EQUIPMENT.
TI
TI SHUT OFF VALVE
DDC TEMPERATURE
SENSOR (TYP)
THERMOSTAT (TYP)
DDC TEMPERATURE
SENSOR (TYP)
THERMOSTAT (TYP)
COIL
TEST PLUG (TYP.)
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS (TYP.)
WATER SUPPLY
SHUT OFF VALVE
DRAIN WITH HOSE
CONNECTION
UNIT HEATER HOT WATER COIL
PIPING CONNECTION
AUTOMATIC FLOW
CONTROL VALVE
STRAINER WITH BLOW DOWN
SHUT OFF VALVE
SECTION "A-A"
"B" "B"
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-15
ACCESS PANEL
ACCESS DOOR
CASING
GASKET
HANDLE INSIDE
FLEXIBLE
WASHER
FACTORY
FABRICATED
LATCH
SECTION "B-B"
INSULATION
DUCT
GASKET
INSULATION
INSULATION
"A"
"A"
ACCESS PANEL AND DOOR DETAIL
NTS
ACCESS
PANEL
NOTE 5
COMBINATION FIRE SMOKE DAMPER INSTALLATION
NTS
FIRE BARRIER
PARTITION OR CHASE
8"
16"
NOTES:
1. A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, 1S
SIMILAR. FOLLOW DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING
FASTENER OPTIONS AND GAGES FOR SLEEVE AND PERIMETER ANGLES. FIRE
DAMPERS MUST BE INSTALLED IN THE PARTITION OR FLOOR AND NOT OUTSIDE
THE PENETRATION.
2. DAMPER, ACTUATOR, SLEEVE TO BE FACTORY ASSEMBLED. DAMPER SHALL BE
16 GAUGE GALVANIZED STEEL. FASTEN SLEEVE TO PERIMETER ANGLES
3. PERIMETER ANGLES: GALVANIZED STEEL, NOT LESS THAN 1 1/2" x 1 1/2", 14
GAGE, TO PROVIDE 1" MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.
4. FACTORY SUPPLIED RECTANGULAR TO ROUND DUCT TRANSITION WITH
BREAKAWAY DUCT CONNECTION. DUCT CONNECTION SHALL BE EITHER QUICK
CONNECT UNIVERSAL BREAKAWAY CONNECTION OR S-SLIP JOINTS WITH DRIVE
SLIP CONNECTIONS.
5. EXISTING ACCESS PANELS TO REMAIN.
6. PROVIDE 1/4" TO 1/2" CLEARANCE ON HEIGHT AND WIDTH. FILL OPEN SPACE
WITH ROCK WOOL FIRESTOP FIBER.
7. ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC
FLOORS AND MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [75mm]
HIGH CONCRETE CURB AROUND OPENING FOR DUCT.
8. HEAT DETECTOR PROVIDED WITH COMBINATION FIRE / SMOKE DETECTOR
ASSEMBLY. DETECTOR SHALL BE REUSABLE RESETTABLE LINK.
9. SMOKE DETECTOR BY FIRE ALARM CONTRACTOR.
10. SMOKE DAMPER ACTUATOR. 115V/1PH. NORMALLY CLOSED. ACTUATOR
PROVIDED BY DAMPER MFG AND FACTORY ASSEMBLED AS PART OF DAMPER
PACKAGE.
PERIMETER ANGLE
(NOT FASTENED TO PARTITION)
ACCESS
PANEL
TWO-POSITION 2-WAY CONTROL VALVE
10 9 15
NOTES:
1. AIR HANDLING UNIT CASING.
2. STAINLESS STEEL DRAIN PAN. DRAIN PAN PROVIDED WITH AIR HANDLING UNIT.
3. STEAM DISPERSION TUBE. FURNISHED BY HUMIDIFIER MANUFACTURER. TYPE,
QUANTITY, SIZE, AND SPACING PER MANUFACTURER.
4. STEAM HEADER. FACTORY FABRICATED AS PART OF HUMIDIFIER DISPERSION
UNIT.
5. SEPARATOR. FURNISHED BY HUMIDIFIER MANUFACTURER.
6. LINE SIZE AUTOMATIC TWO-POSITION ISOLATION VALVE BY CONTROL
CONTRACTOR. REFER TO SHEET M701 FOR CONTROL SEQUENCE.
7. MODULATING HUMIDIFIER CONTROL VALVE. FURNISHED BY HUMIDIFIER
MANUFACTURER.
8. UNION.
9. MANUAL SHUTOFF GATE VALVE.
10. STRAINER.
11. CHECK VALVE
12. 0.375" TEST CONNECTION
13. F&T TRAP. INSULATE TRAP.
14. HEADER TRAP. TYPE AS RECOMMENDED BY MANUFACTURER.
15. 30# STEAM SUPPLY PIPE
16. ENTEND CONDENSATE TO MEDIUM PRESSURE RETURN PIPE AS SHOWN ON
FLOOR PLANS.
17. PROVIDE CONDENSATE DRAIN COOLER FOR HEADER CONDENSATE AND
EXTEND TO NEAREST FLOOR DRAIN AS REQUIRED BY MANUFACTURER.
15-AHU-31
AIR HANDLING UNIT MOUNTED
STEAM HUMIDIFIER
MJG
DRAIN POINTED DOWN
WALL
15-EF2
EXHAUST FAN
EXTERIOR WALL
14" x 14" WALL OPENING
ANCHOR PLATE
15-EF2
EXHAUST FAN
ANCHOR PLATE
EXHAUST DUCT
1/2" ANCHOR BOLT,
MIN 2" LONG
14" x 14"
WALL OPENING
CAULK SEALANT AROUND
ANCHOR PLATE.
SIDEWALL EXHAUST FAN DETAIL
ACCESS SECTION FOR ROUND/OVAL DUCT
NTS
15-CCP1
COIL CIRCULATING PUMP
CHECK VALVE
DOUBLE WALL
ROUND DUCT
SANDWITCH STYLE ACCESS
DOOR
KNOB HANDLES / STEEL
COMPRESSION SPRINGS.
INNER PLATE
CLOSED CELL NEOPRENE GASKET
15-CCP2
COIL CIRCULATING PUMP
CHECK VALVE
15-M601
SCHEDULES
AIR DISTRIBUTION DEVICES
SURFACE
TYPE MOUNTING
DESCRIPTION
EGGCRATE CEILING REGISTER
SYMBOL
CR-1
LAY-IN
FINISH
E.C.L.STEEL ALUM.
MATERIAL
W.B.E.
SEE NOTE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RESOLVE HVAC ISSUES
IN BUILDING 15
CINCINNATI, OH
539-20-212
Chief Engineer
03/12/2020Revisi…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .